Diana Alcala Regulatory Case Manager Regulatory Affairs 555 West Fifth Street, GT14D6 Los Angeles, CA 90013-1011 Tel: 213.244.3754 Fax: 213.244.4957 [email protected] January 31, 2019 Mr. Ed Randolph Director, Energy Division California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102 Ms. Elizaveta Malashenko Director, Safety and Enforcement Division California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102 RE: Southern California Gas Company and San Diego Gas & Electric Monthly Pipeline Safety Enhancement Plan Status Report-December 2018 Dear Mr. Randolph and Ms. Malashenko: Enclosed please find the Monthly Pipeline Safety Enhancement Plan Status Report of Southern California Gas Company (SoCalGas) and San Diego Gas & Electric Company (SDG&E) for December 2018 as required per D.12-04-021. Decision 12-04-021 requires SoCalGas and SDG&E to provide a Monthly Pipeline Safety Enhancement Plan update to the Commission’s Energy Division and Safety and Enforcement Division (SED) as our plan is implemented. Please feel free to contact me should you have any additional questions regarding this report. Sincerely, /s/ Diana Alcala Diana Alcala Regulatory Case Manager Attachment CC: Belinda Gatti, CPUC Energy Division Jean Spencer, CPUC Energy Division Sunil Shori, CPUC Safety and Enforcement Division Kenneth Bruno, CPUC Safety and Enforcement Division Matthewson Epuna, CPUC Safety and Enforcement Division 1

Upload: others

Post on 24-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

Diana Alcala

Regulatory Case Manager

Regulatory Affairs

555 West Fifth Street, GT14D6

Los Angeles, CA 90013-1011

Tel: 213.244.3754

Fax: 213.244.4957

[email protected]

January 31, 2019

Mr. Ed Randolph

Director, Energy Division

California Public Utilities Commission

505 Van Ness Avenue

San Francisco, CA 94102

Ms. Elizaveta Malashenko

Director, Safety and Enforcement Division

California Public Utilities Commission

505 Van Ness Avenue

San Francisco, CA 94102

RE: Southern California Gas Company and San Diego Gas & Electric Monthly Pipeline

Safety Enhancement Plan Status Report-December 2018

Dear Mr. Randolph and Ms. Malashenko:

Enclosed please find the Monthly Pipeline Safety Enhancement Plan Status Report of Southern

California Gas Company (SoCalGas) and San Diego Gas & Electric Company (SDG&E) for

December 2018 as required per D.12-04-021. Decision 12-04-021 requires SoCalGas and SDG&E

to provide a Monthly Pipeline Safety Enhancement Plan update to the Commission’s Energy

Division and Safety and Enforcement Division (SED) as our plan is implemented.

Please feel free to contact me should you have any additional questions regarding this report.

Sincerely,

/s/ Diana Alcala

Diana Alcala

Regulatory Case Manager

Attachment

CC: Belinda Gatti, CPUC Energy Division

Jean Spencer, CPUC Energy Division

Sunil Shori, CPUC Safety and Enforcement Division

Kenneth Bruno, CPUC Safety and Enforcement Division

Matthewson Epuna, CPUC Safety and Enforcement Division

1

Page 2: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

December 2018 PSEP Update

I. Introduction

Decision (D.) 12-04-021 directs Southern California Gas (SoCalGas) and San Diego Gas & Electric

(SDG&E) to provide monthly Pipeline Safety Enhancement Plan (PSEP) updates to the

Commission’s Energy Division and Consumer Protection and Safety Division (now Safety and

Enforcement Division) as the plan is implemented.1 Attached is the update for December 2018.

II. Current Project Status

SoCalGas and SDG&E have undertaken the following PSEP-related activities for the month of

December:

Pipelines (Appendix A):

• No pipeline projects commenced new construction activity (Stage 4)

• 5 pipeline projects are in construction (Stage 4)

• 19 pipeline projects are in close-out (Stage 5)

Valves (Appendix B):

• New construction activity began on two valve projects (Stage 4)

o V-L1018-P1B-El Toro

o V-L4000-P1B-Camp Rock Rd

• 23 valve projects are in construction (Stage 4)

• 39 valve projects are in close-out (Stage 5)

III. Costs

Actual project costs are tracked in SoCalGas’ and SDG&E’s respective Regulatory Accounts, are

provided in Appendices A, B, and C, and are summarized in Appendix D.

IV. Attachments

• Appendix A – SoCalGas/SDG&E PSEP - Pipeline Projects List with Costs

• Appendix B – SoCalGas/SDG&E PSEP - Valve Projects List with Costs

• Appendix C – SoCalGas/SDG&E PSEP - Records Review and Interim Safety Measure Costs

• Appendix D – SoCalGas/SDG&E PSEP - Total Project Costs Summary

1 D.12-04-021 at 7 and 12 (Ordering Paragraph No. 4).

2

Page 3: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

V. Notes

• Appendix A, SoCalGas Active Pipeline Projects Table 1, Footnote 15:

The Line 38-514-P1B-01 project has been renamed, "38-514-P1B-03."

• Appendix A, SoCalGas Active Pipeline Projects Table 1, Footnote 16:

The scope and costs for the Line 45-1001-P1B-01 and 36-1001-P1B-01 projects have been

merged to be reported and executed as one project.

• Appendix A, SoCalGas Active Pipeline Projects Table 1, Footnote 17:

The following projects have been split into individual projects and are currently in the scoping

phase. Individual project information will be updated in the future.

o 2000-C

o 2000-D

o 2001 West-C

o 2001 West-D

• Appendix A, SoCalGas Active Pipeline Projects Table 1, Footnote 18:

The Line 235E-P2-01 project has been split into the following individual projects:

o L235E-P2-KELSO REPL

o L235E-P2-NORTH NEEDLES REPL

o L235E-P2-NEWBERRY SPRINGS REPL

• Appendix A, SoCalGas Active Pipeline Projects Table 1, Footnote 19:

The increase of approximately $950K in project-to-date costs from November 2018 to December

2018 is due to the inclusion of costs for the following Phase 2 projects in November 2018 that

were previously excluded:

o 2000-C-P2

o 2000-C-CHLA-P2

o 2000-D-BADL-P2

o 2000-Moreno Replacement

o 2001 WC-P2

o 2001 WC-CHLA-PA2

• Appendix A, SDG&E Active Pipeline Projects Table 2, Footnote 5:

On January 15, 2019, the SED transmitted a Response Letter to SDG&E and SoCalGas

approving the proposed plan for the Line 1600 project as submitted.

• Appendix A, SDG&E Active Pipeline Projects Table 2, Footnote 20:

The decrease of approximately $11K in project-to-date costs from November 2018 to December

2018 is due to a system migration mapping discrepancy for the Line 1600 project.

• Appendix A, SoCalGas Pipeline Projects Remediated or Removed Table 3, Footnote 2:

The Line 33-6263 project and corresponding costs have been added to Appendix A, Table 3.

• Appendix B, SoCalGas Active Valve Projects Table 1, Footnote 7:

The increase of approximately $51K in project-to-date costs from November 2018 to December

2018 is due to:

o Inclusion of the V-Burbank-GRC-Lindley-P1B project costs in November 2018 that

were previously excluded.

o Moving the V-L8109-GRC-Apache Cyn project from Appendix B, Table 1 to Table 3.

3

Page 4: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

Pipeline Project

PSEP Current

Mileage(1) Project Lifecycle Stage(2)

Predominant

Vintage

Construction Start Date(3)

(Month-Year)

December 2018

Actuals(14) (in $1,000)

Project-to-Date

Actuals(14) (in $1,000)

2000-A 15.29 Closed 1947 Jul-2013 A - 22,427

42-66-1&2 0.06 Closed 1947 Oct-2013 A - 681

Playa Del Rey Phase 1&2 0.13 Closed 1955 Mar-2013 A - 648

1005 0.03 Closed 1951 Sep-2014 A - 5,820

1011 0.08 Closed 1947 Jul-2014 A - 2,418

1013 0.03 Closed 1956 Jul-2014 A - 2,423

1014 0.00 Closed 1959 Oct-2014 A - 825

1015 0.41 Closed 1954 Aug-2014 A - 5,541

235 West 0.03 Closed 1957 Jun-2014 A - 3,406

235W Sawtooth Canyon 0.32 Closed 1957 Oct-2014 A - 1,884

2000-West Section 1,2,3 14.57 Closed 1945 Jul-2014 A - 23,280

2001 West - A 0.01 Closed 1950 Apr-2014 A - 745

2001 West-B Section 10,11,14 2.94 Closed 1950 Aug-2014 A - 11,884

2003 0.25 Closed 1953 Aug-2014 A - 8,805

33-120 Section 2 0.28 Closed 1940 Jun-2014 A - 7,052

35-20-N 0.01 Closed 1963 Aug-2014 A - 231

36-1032 0.65 Closed 1928 May-2014 A - 9,895

36-37 0.01 Closed 1970 Apr-2014 A - 1,042

36-9-09 North Section 2B 2.15 Closed 1953 Jun-2014 A - 2,416

36-9-09 North Section 6A 0.92 Closed 1954 Mar-2015 A - 2,699

38-539 2.61 Closed 1949 Oct-2014 A - 15,469

41-30-A 0.02 Closed 1951 Jul-2014 A - 432

44-654 0.05 Closed 1957 Jun-2014 A - 1,825

45-120 Section 1 0.55 Closed 1930 Mar-2014 A - 5,828

45-120X01 0.01 Closed 1930 Sep-2013 A - 750

406 Section 1,2,2A,4,5 1.17 Closed 1951 Aug-2014 A - 9,685

407 3.00 Closed 1951 Mar-2014 A - 6,391

Playa Del Rey Phase 5 0.27 Closed 1955 Mar-2015 A - 5,007

127-P1B-01 0.00 2-Preliminary Design 1944 Mar-2020 - 234

2000-C, D & E (4)(42) 1,613

2000-C (17) 23.00

2000-C-P2 (13) TBD 2-Preliminary Design 1947 Jul-2019 3 690

2000-C-CHLA-P2 (13) TBD 2-Preliminary Design 1947 Jan-2020 20 66

2000-D (17) 14.00

2000-D-BADL-P2 (13) TBD 2-Preliminary Design 1947 TBD 29 95

2000-Moreno Replacement (13) TBD 2-Preliminary Design 1947 Nov-2019 3 5

36-1002-P1B-01 (11) 16.68 2-Preliminary Design 1928 Jun-2020 - 1,503

36-37-P1B-11A 1.75 3-Detailed Design & Procurement 1927 Jun-2019 65 956

36-37-P1B-11B 4.40 4-Construction 1927 Jul-2018 A 2,608 19,378

36-37-P1B-11C 1.47 3-Detailed Design & Procurement 1927 Oct-2019 31 650

36-37-P1B-12 (12) 31.00 3-Detailed Design & Procurement 1927 Feb-2019 55 2,288

38-514-P1B-03 (15) 1.40 3-Detailed Design & Procurement 1945 Jun-2019 66 550

38-556 5.60 3-Detailed Design & Procurement 1956 Apr-2019 68 951

38-960-P1B-01 6.12 5-Close-Out 1928 Jul-2018 A 185 11,611

43-121-P1B-01 0.30 3-Detailed Design & Procurement 1930 Jun-2019 47 590

45-1001-P1B-01 & 36-1001-P1B-01 (16) 1.23 3-Detailed Design & Procurement 1925 Sep-2019 49 717

7043-P1B-01 0.00 2-Preliminary Design 1928 Mar-2020 - 124

1004 9.03 Closed 1945 May-2015 A 3 13,050

2000-C 7.59 Closed 1947 Jan-2017 A - 12,890

2000-West Santa Fe Springs Sta. 0.20 Closed 1947 Oct-2016 A 1 8,392

2001 West-B Section 17,18,19 1.80 Closed 1952 Aug-2015 A - 4,742

2003 Section 2 0.09 Closed 1957 Jul-2015 A - 2,749

30-18 Section 1 2.00 Closed 1943 Jul-2014 A 3 592

30-18 Section 3 0.01 Closed 1943 Oct-2016 A - 1,806

31-09 0.21 Closed 1969 Jul-2015 A - 3,647

32-21 Section 1 1.56 Closed 1948 May-2015 A - 9,438

32-21 Section 2 1.60 Closed 1948 Jun-2016 A - 5,140

32-21 Section 3 2.39 Closed 1948 Sep-2016 A - 3,565

33-120 Section 3 0.52 Closed 1940 Jun-2017 A - 6,571

36-1002 0.03 Closed 1928 Jun-2015 A - 1,847

36-9-09 North Section 1 5.98 Closed 1920 May-2015 A - 46,900

36-9-09 North Section 3 2.96 Closed 1927 Dec-2014 A - 25,480

36-9-09 North Section 4 (6)- 3,036

36-9-09 North Section 4A 0.58 Closed 1940 May-2017 A - 4,248

36-9-09 North Section 4B 0.46 Closed 1940 Sep-2014 A - 5,657

36-9-09 North Section 5A 1.49 Closed 1960 Feb-2016 A - 12,647

36-9-09 North Section 7A 1.07 Closed 1932 Sep-2016 A 2 10,772

36-9-09 North Section 7B 3.19 Closed 1932 May-2015 A - 24,261

36-9-09 South (10) 1.24 Closed 1951 Apr-2016 A - 2,146

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix A - SoCalGas/SDG&E PSEP Pipeline Project List with Costs as of December 2018

2018 Reasonableness Review Application (A.18-11-010)

Table 1 - SoCalGas Active Pipeline Projects

PSRMA Application (A.14-12-016)

2016 Reasonableness Review Application (A.16-09-005)

2017 Forecast Application (A.17-03-021)

4

Page 5: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix A - SoCalGas/SDG&E PSEP Pipeline Project List with Costs as of December 2018

Pipeline Project

PSEP Current

Mileage(1) Project Lifecycle Stage(2)

Predominant

Vintage

Construction Start Date(3)

(Month-Year)

December 2018

Actuals(14) (in $1,000)

Project-to-Date

Actuals(14) (in $1,000)

36-9-09-JJ (10) 0.46 Closed 1920 Jun-2016 A - 1,724

37-07 3.22 Closed 1945 Sep-2014 A - 27,425

37-18 4.06 Closed 1945 Oct-2014 A (86) 42,036

37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899

37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578

38-KWB-P1B-01 (10) 15.23 Closed 1939 Oct-2015 A - 1,741

38-200 0.37 Closed 1945 Apr-2016 A 2 7,518

38-501 Section 1 0.32 Closed 1952 Jun-2015 A - 4,728

38-501 Section 2 2.12 Closed 1952 Aug-2016 A - 15,482

38-504 0.38 Closed 1952 Sep-2016 A (3) 5,178

38-512 4.92 Closed 1929 Mar-2015 A - 28,972

38-512 Section 3 0.04 Closed 1929 Sep-2017 A - 76

38-514 Section 1 0.09 Closed 1945 May-2016 A - 1,936

38-514 Section 2 2.84 Closed 1945 Feb-2016 A - 11,680

38-931 2.41 Closed 1942 Jan-2017 A - 6,639

41-17 (12) 2.62 Closed 1955 Sep-2016 A - 2,554

41-116 0.01 Closed 1957 Oct-2016 A - 200

43-121 North 1.01 Closed 1930 Aug-2016 A 1 14,223

43-121 South 1.48 Closed 1930 Aug-2014 A - 30,281

44-137 1.04 Closed 1950 Nov-2014 A 7 24,641

44-687 0.30 Closed 1946 Sep-2014 A - 5,176

44-720 1.49 Closed 1947 Jun-2015 A - 9,951

404 Section 1 0.03 Closed 1944 Sep-2015 A - 2,622

404 Section 2 2.98 Closed 1944 Sep-2015 A - 3,785

404 Section 2A 0.82 Closed 1944 Mar-2017 A - 2,292

404 Section 3A 0.56 Closed 1944 Aug-2016 A - 5,047

404 Section 3 & 8A 0.55 Closed 1944 Feb-2014 A - 2,470

404 Section 4&5 7.32 Closed 1944 Sep-2015 A - 6,191

404 Section 9 0.41 Closed 1944 Jun-2016 A - 1,870

406 Section 3 0.43 Closed 1949 Jun-2016 A - 2,374

6914 Installation 11.74 Closed N/A Sep-2015 A - 76,599

85 South Newhall 0.17 Closed 1930 Dec-2014 A - 8,919

1011-P2-01 1.77 2-Preliminary Design 1947 May-2020 - 144

1030-P2-01 (7) 25.79 2-Preliminary Design 1955 Apr-2022 - 196

225 North (7)(8) 8.12 2-Preliminary Design 1959 Jan-2022 - -

235W-P2-01 (6)- 777

235 West Sec 1 24.64 2-Preliminary Design 1957 Jan-2021

235 West Sec 2 20.35 2-Preliminary Design 1957 Mar-2020

235 West Sec 3 26.88 2-Preliminary Design 1957 Nov-2019

2000-E (4) 8.88 2-Preliminary Design 1947 Sep-2020 - -

2000-P2-02 (6)- 391

2000 Chino Hills 10.00 2-Preliminary Design 1947 Oct-2019 92 231

2000 Blythe to Cactus City Hydrotest 64.65 2-Preliminary Design 1947 Aug-2020

2000-E Cactus City Compressor Sta 0.17 2-Preliminary Design 1947 Aug-2020

2001E-P2-01 (7) 0.07 2-Preliminary Design 1953 Mar-2022 - 88

2001E-P2-02 (7) 27.43 2-Preliminary Design 1954 Mar-2022 - 193

2001W-P2-01 (7) 5.66 2-Preliminary Design 1953 Jan-2022 - 113

2001 West - C, D & E (6)(616) 1,447

2001 West - C (17) 13.85 1953

2001WC-P2 (13) TBD 2-Preliminary Design TBD TBD 626 627

2001WC-CHLA-P2 (13) TBD 2-Preliminary Design TBD TBD - 6

2001 West - D (17) 17.84 1950 - -

2001W-D-P2 (13) TBD 2-Preliminary Design TBD TBD - -

2001W-D-BADL-P2 (13) TBD 2-Preliminary Design TBD TBD - -

2001 West - E 8.88 2-Preliminary Design 1953 Oct-2021 - -

2005-P2-01 (7) 0.28 2-Preliminary Design 1950 Nov-2019 - 101

36-1032-P1B-01 (6)- 292

36-1032-P1B-11 0.49 2-Preliminary Design 1939 Jun-2020 1 508

36-1032-P1B-12 5.16 2-Preliminary Design 1943 Jul-2020 1 575

36-1032-P1B-13 3.21 2-Preliminary Design 1928 Aug-2020 4 626

36-1032-P1B-14 1.73 2-Preliminary Design 1928 May-2020 6 571

36-9-09N-P1B-01 (6)- 43

36-9-09N-P1B-12 0.88 3-Detailed Design & Procurement 1920 Jul-2019 87 1,005

36-9-09N-P1B-14 1.92 3-Detailed Design & Procurement 1920 Sep-2019 24 893

36-9-09N-P1B-15 1.53 2-Preliminary Design 1920 Mar-2020 14 805

36-9-09N-P1B-16 2.02 3-Detailed Design & Procurement 1920 Aug-2019 103 1,860

44-1008-P1B-01 (6)1 328

44-1008 (50%) 27.43 1-Initiation & Feasibility 1937 Jan-2020

44-1008 (50%) (7) 27.43 1-Initiation & Feasibility 1937 Jan-2021

407-P2-01 3.97 2-Preliminary Design 1951 Jul-2020 18 260

5000-P2-01 (7) 0.02 2-Preliminary Design 1953 Sep-2022 - 84

85 Elk Hills to Lake Station (9) 13.03 2-Preliminary Design 1931 Oct-2020 71 4,569

103-P1B-01 (11) 9.28 3-Detailed Design & Procurement 1941 Jun-2019 10 203

128-P1B-01 0.44 2-Preliminary Design 1945 Sep-2019 - 55

133-P2-01 (13) 3.22 1-Initiation & Feasibility 1946 TBD - 161

173-P2-01 (13) 0.00 1-Initiation & Feasibility 1952 TBD - 5

2019 GRC Application (A.17-10-008)

Future Filing

Table 1 - SoCalGas Active Pipeline Projects (continued)

5

Page 6: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix A - SoCalGas/SDG&E PSEP Pipeline Project List with Costs as of December 2018

Pipeline Project

PSEP Current

Mileage(1) Project Lifecycle Stage(2)

Predominant

Vintage

Construction Start Date(3)

(Month-Year)

December 2018

Actuals(14) (in $1,000)

Project-to-Date

Actuals(14) (in $1,000)

1004-P1B-01 (13) 2.43 2-Preliminary Design 1944 TBD - 580

1004-P2-01 (13) 1.28 1-Initiation & Feasibility 1944 TBD - 144

1005-P2 (13) 12.53 1-Initiation & Feasibility 1951 TBD - 291

225 3.10 3-Detailed Design & Procurement 1959 Aug-2019 - 1,374

225-P2-01 (8)(13) 10.70 1-Initiation & Feasibility 1959 TBD - 514

225-P2-02 (13) 0.04 1-Initiation & Feasibility 1965 TBD - 199

225-P2-03 (13) 0.06 1-Initiation & Feasibility 1959 TBD - 168

235E-P2-01 114.01 1-Initiation & Feasibility 1960 Jun-20 174 278

L235E-P2-KELSO REPL (13) TBD TBD TBD TBD 2 2

L235E-P2-NORTH NEEDLES REPL (13) TBD TBD TBD TBD 0 0

L235E-P2-NEWBERRY SPRINGS REPL (13) TBD TBD TBD TBD 6 6

257-P2-01 (13) 0.02 TBD 1961 TBD - 134

2000-D 3.18 5-Close-Out 1947 Sep-2017 A 3 9,136

2000-D Section 7&9 (13) 3.28 TBD 1947 TBD - -

2000-P2-01 0.57 1-Initiation & Feasibility TBD Sep-2020 - 27

2001 West Santa Ana River Crossing 0.15 2-Preliminary Design 1950 Jul-2020 70 839

2001 West - C 11.41 3-Detailed Design & Procurement 1953 Feb-2019 64 1,910

2001 West - D 1.60 3-Detailed Design & Procurement 1950 Feb-2019 17 1,548

2001W-P2-02 (13) TBD TBD TBD TBD - 60

2006 0.06 2-Preliminary Design 1953 Sep-2019 46 192

30-18 Section 2 0.65 5-Close-Out 1943 Jan-2018 A 47 30,692

31-09-C (13) TBD 1-Initiation & Feasibility TBD TBD 3 7

33-120 Section 1 0.23 5-Close-Out 1930 Sep-2017 A 48 10,578

33-121 0.46 Closed 1955 Jan-2018 A 13 4,122

33-750 0.57 1-Initiation & Feasibility 1946 Jul-2020 4 27

36-1032 Section 4 0.32 5-Close-Out 1953 Jul-2017 A 14 5,415

36-9-09 North Section 5C 0.62 Closed 1932 Dec-2016 A 0 6,657

36-9-09 North Section 5B-01 0.10 3-Detailed Design & Procurement 1932 Jun-2022 0 1

36-9-09 North Section 5B-02 0.20 4-Construction 1932 Nov-2018 A 1,043 2,976

36-9-09 North Section 6B 1.55 5-Close-Out 1955 Oct-2017 A 42 13,824

36-9-21 0.46 Closed 1950 Aug-2017 A 1 5,940

37-18-K 1.91 5-Close-Out 1949 Mar-2018 A (1,097) 14,320

38-1102-P1B-01 (13) 0.01 2-Preliminary Design 1963 TBD 5 497

38-100-P2-01 (13) 0.00 1-Initiation & Feasibility 1960 TBD - 211

38-101-P1B-01 (13) 8.55 2-Preliminary Design 1921 May-2019 83 2,017

38-143-P1B-01 (13) 4.42 2-Preliminary Design 1935 TBD - 626

38-362-P2-01 (13) 7.31 1-Initiation & Feasibility 1956 TBD - 222

38-539-P2-01 (13) 12.57 1-Initiation & Feasibility 1947 TBD - 265

38-952-P2-01 (13) 9.22 1-Initiation & Feasibility 1950 TBD - 229

41-6000-2 Abandonment (12) 27.44 4-Construction 1948 Aug-2018 A 1,229 5,683

41-6000-2 Tie Over 0.15 5-Close-Out 1949 Oct-2017 A 970 16,557

41-6001-2 0.00 Closed 1967 Oct-2017 A 2 547

43-121N-P1A-02 0.13 Closed 1930 Apr-2017 A 2 4,456

43-121N-P1A-03 0.15 Closed 1930 Apr-2017 A 8 4,278

43-121N-P1A-04 0.78 Closed 1930 Aug-2017 A 8 11,335

44-707-P2-01 (13) 0.00 1-Initiation & Feasibility 1969 TBD - 150

44-729-P2-01 (13) 0.01 1-Initiation & Feasibility 1958 TBD - 306

45-120 Section 2 3.53 5-Close-Out 1930 Sep-2014 A 267 76,573

404 Section 4A 0.79 4-Construction 1944 Aug-2018 A 1,178 6,482

404-P2-01 (13) 6.07 1-Initiation & Feasibility 1944 TBD - 174

404-406 Somis Station 0.14 5-Close-Out 1951 Aug-2018 A 1,171 6,200

406-P2-01 (13) 13.72 1-Initiation & Feasibility 1951 TBD - 622

6921 Dowden & Kershaw 0.01 5-Close-Out N/A Apr-2018 A 85 902

85 (9)(13) 61.07 2-Preliminary Design 1931 TBD - -

Goleta 0.29 3-Detailed Design & Procurement 1944 Apr-2019 1 1,639

9,068 1,048,998

Table 1 - SoCalGas Active Pipeline Projects (continued)

Total SoCalGas Active Pipeline Projects (19)

6

Page 7: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix A - SoCalGas/SDG&E PSEP Pipeline Project List with Costs as of December 2018

Pipeline Project

PSEP Current

Mileage(1) Project Lifecycle Stage(2)

Predominant

Vintage

Construction Start Date(3)

(Month-Year)

December 2018

Actuals(14) (in $1,000)

Project-to-Date

Actuals(14) (in $1,000)

49-14 0.03 Closed 1959 Sep-2014 A - 4,061

49-22 (10) 4.05 Closed 1951 Apr-2014 A - 4,057

49-32 0.09 Closed 1950 Jun-2014 A 2 4,222

49-11 0.96 Closed 1969 Jun-2015 A - 6,667

49-13 3.17 Closed 1959 Jul-2015 A 2 20,907

49-15 1.78 5-Close-Out 1950 Nov-2015 A 410 32,203

49-15 Transmission 1.01 Closed 1950 Nov-2015 A - 7,854

49-28 2.60 5-Close-Out 1932 Sep-2014 A 9 39,412

49-16 Pipeline 0.99 5-Close-Out 1948 Mar-2015 A 74 25,599

49-16 4th & Palm 0.01 5-Close-Out 1958 Jan-2018 A 61 7,090

49-16 Gate Station 1.04 4-Construction 1955 Nov-2018 A 409 2,074

49-17 East 5.16 5-Close-Out 1948 Jun-2015 A 31 60,372

49-17 West 1.64 5-Close-Out 1948 Oct-2014 A (27) 28,465

49-25 1.74 Closed 1960 Aug-2014 A - 21,882

49-26 3.46 5-Close-Out 1958 Oct-2014 A 38 31,080

49-32-L 0.20 5-Close-Out 1965 Aug-2016 A (351) 4,583

1600 South - 444

1600(5)(13) 49.89 2-Preliminary Design 1949 TBD 346 26,196

1,004 327,170

(3) The "A" at the end of the date indicates that construction has begun.

(1) The mileage column was renamed "PSEP Current Mileage," formerly labeled "PSEP Mileage as filed," and updated to reflect the current reporting month's mileage. The mileage reported is the sum of

test, replacement, and abandonment miles (except for extensive incidental abandonment). The mileage is subject to change based on various factors including, but not limited to, engineering drawings,

construction, and closeout. Numbers may not add exactly due to rounding.

(4) Project 2000-C, D & E currently includes cost for Sections C, D & E. Sections C & D are part of Forecast Application and Section E is part of 2019 GRC. In the future, the cost will be split.

(5) D.18-06-028 denies the Pipeline Safety and Reliability Project (PSRP) Application A.15-09-013, but requires a test or replace plan for Line 1600 and inclusion of the status of Line 1600 in this report. See

D.18-06-028 at 129 (Ordering Paragraph No. 8). In compliance with D.18-06-028, SDG&E and SoCalGas submitted its Line 1600 Test or Replacement Plan to SED on September 26, 2018. On January 15,

2019, the SED transmitted a Response Letter to SDG&E and SoCalGas approving the proposed plan as submitted.

(14) Costs are in nominal direct dollars. Costs recovery will include indirects and applicable loaders.

(10) The scope for this project is abandonment only.

(12) The scope for this project is combination of abandonment and de-rate.

(16) The scope and costs for the Line 45-1001-P1B-01 and 36-1001-P1B-01 projects have been merged to be reported and executed as one project.

(8) All the costs for project 225 North are captured under project 225-P2-01. In the future, the cost will be split.

(9) All the costs for project 85 are captured under project 85 Elk Hills to Lake Station. In the future, the cost will be split. Note: 85 South Newhall is a different project.

(7) This project was filed in the 2019 General Rate Case (GRC) Application A.17-10-007/008 as a 4th year project (2022).

(2) Project Lifecycle Stage represents the five stages of a pipeline project’s lifecycle: Stage 1 Project Initiation & Feasibility, Stage 2 Preliminary Design, Stage 3 Detailed Design & Procurement, Stage 4

Construction, and Stage 5 Close-out.

(15) The Line 38-514-P1B-01 project has been renamed, "38-514-P1B-03."

(17) The following projects have been split into individual projects and are currently in the scoping phase: 2000-C, 2000-D, 2001 West – C and 2001 West – D. Individual project information will be updated

in future.

(20) The decrease of approximately $11K in project-to-date costs from November 2018 to December 2018 is due to a system migration mapping discrepancy for the Line 1600 project.

Table 2 - SDG&E Active Pipeline Projects

Tables 1 and 2 - Project Footnotes:

Total SDG&E Active Pipeline Projects (20)

2016 Reasonableness Review Application (A.16-09-005)

2018 Reasonableness Review Application (A.18-11-010)

Future Filing

Line 1600

(19) The increase of approximately $950K in project-to-date costs from November 2018 to December 2018 is due to the inclusion of costs for the following Phase 2 projects in November 2018 that were

previously excluded: 2000-C-P2, 2000-C-CHLA-P2, 2000-D-BADL-P2, 2000-Moreno Replacement, 2001 WC-P2, and 2001 WC-CHLA-PA2.

(18) The Line 235E-P2-01 project has been split into the following individual projects: L235E-P2-KELSO REPL, L235E-P2-NORTH NEEDLES REPL and L235E-P2-NEWBERRY SPRINGS REPL.

(6) This line has been split into individual projects. The line still holds some actual costs which will be transferred to the individual projects in the future.

(13) TBD - Information will be updated in the future.

(11) The scope for this project is de-rate only.

7

Page 8: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix A - SoCalGas/SDG&E PSEP Pipeline Project List with Costs as of December 2018

December 2018

Actuals(14) (in $1,000)

Project-to-Date

Actuals(1) (in $1,000)

119 North-P2-01 - 20

169 - -

1003 - -

1003LT2 - -

1017BP1 - -

1017BP2 - -

1017BP3 - -

1017BR4 - -

1017BR5 - -

1017BR6 - -

1017BR7 - -

1018 - -

1020 - -

1024 - -

1025 - -

1171LT2 - -

1171LT1BP2 - -

1172 BP2ST1 - -

1172 BP2ST2 - 2

1172 BP2ST3 - -

1172 BP2ST4 - -

1172 BP3 - -

1172 ID 2313 - 29

235 East - -

247 - 18

2000-Bridge - -

2000-0.18-BO Crossover Piping - -

2001 East - 106

30-02 - -

30-02-U - -

30-09-A - -

30-32 - -

30-6200 - -

30-6209 - -

30-6292 - -

30-6543 - -

30-6799 - -

30-6799BR1 - -

32-90 - -

33-6263 - 3

35-10 - -

35-20 - -

35-20-A - 17

35-20-A1 - -

35-22 - -

35-39 - -

35-40 - -

35-6405 - -

35-6416 - -

35-6520 - -

36-7-04 - -

36-1006 - 1

36-6588 - -

36-8-01 - -

36-8-01-C - -

36-8-06 - -

36-9-06 - 4

36-9-06-A - -

36-9-09 North Section 2A - -

36-9-21BR1 - -

37-04 - -

37-18 J - -

37-49 - -

37-6180 - -

38-116-1-P2-01 - 27

38-351 - -

38-508 - -

38-516 - 5

38-523 - 55

38-528 - 22

38-552 - -

38-931-P1B-01 - 91

38-959 - -

317 - -

3000-261.73-BO - -

3000-261.73-BR - -

41-04-I - 8

41-05 - 4

Pipeline Project

Table 3 - SoCalGas Pipeline Projects Remediated or Removed

8

Page 9: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix A - SoCalGas/SDG&E PSEP Pipeline Project List with Costs as of December 2018

December 2018

Actuals(14) (in $1,000)

Project-to-Date

Actuals(1) (in $1,000)

41-05-A - -

41-17-A2 - 4

41-17-F - (1)

41-17-FST1 - -

41-19 - -

41-25 - 1

41-25-A - -

41-30 - 37

41-35-1-KST2 - -

41-55 - -

41-80 - 41

41-83 - -

41-84 - -

41-84-A - -

41-90 - -

41-101 - -

41-116BP1 - -

41-117 - -

41-128 - -

41-141 - -

41-181 - 28

41-201 - -

41-207BR1 - -

41-198 - -

41-199 - -

41-6045 - 52

41-6501 - -

42-12 - -

42-46 - -

42-46-F - -

42-57 - -

43-1106 - -

43-34 - -

44-719 - 1

44-1008 Section 2B - 1,336

45-163 - 1

408XO1 - -

4000 - -

53 - -

6100 - -

765-8.24-BO - -

765BR4 - -

775 - -

775BO1 - -

8107 - -

- 1,913

December 2018

Actuals(14) (in $1,000)

Project-to-Date

Actuals(1) (in $1,000)

- -

- -

- -

- -

- -

(1) Costs are in nominal direct dollars. Costs recovery will include indirects and applicable loaders.

Pipeline Project

Tables 3 and 4 - Project Footnotes:

Total SoCalGas Pipeline Projects Remediated or Removed (2)

Total SDG&E Pipeline Projects Remediated or Removed

Table 4 - SDG&E Pipeline Projects Remediated or Removed

49-18

49-19

49-27

49-32

Pipeline Project

Table 3 - SoCalGas Pipeline Projects Remediated or Removed (continued)

(2) The Line 33-6263 project and corresponding costs have been added to Appendix A, Table 3.

(Test)

9

Page 10: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

Valve Project No. of Valves(1) Project Lifecycle Stage(2)Construction Start Date(3)

(Month-Year)

December 2018

Actuals(6) (in $1,000)

Project-to-Date

Actuals(6) (in $1,000)

V-235-335 Palmdale 6 Closed Jun-2014 A - 6,771

V-Arrow & Haven 1 Closed May-2014 A - 965

V-Bain Street Station 2 Closed Dec-2013 A - 883

V-Brea Station-1013 1 Closed Oct-2014 A - 240

V-Chino Station 5 Closed Dec-2013 A - 997

V-Haskell Station 2 Closed Jan-2014 A - 698

V-Moreno Large 1 Closed Jan-2014 A - 505

V-Moreno Small 2 Closed Jan-2014 A - 710

V-Pixley Station 3 Closed Nov-2014 A - 1,339

V-Prado Station 5 Closed Jan-2014 A - 1,207

V-Puente Station 2 Closed Jun-2014 A - 16

V-Santa Fe Springs 3 Closed Mar-2014 A - 723

V-SGV 3 Closed Feb-2015 A - 5,051

V-Victoria Station 4 Closed Dec-2014 A - 1,533

V-Whitewater Station 3 Closed Mar-2014 A - 702

V-L1014 Brea 6 Closed Nov-2015 A - 6,421

V-L1018-P1B-Dana Point Station 1 Closed Oct-2016 A - 561

V-L1020 1 Closed Mar-2015 A - 1,397

V-L225 Bundle-P1B 3 Closed Aug-2016 A - 2,283

V-235-335 East 7 Closed Oct-2016 A (0) 3,380

V-L2000 Beaumont 2015 3 Closed Aug-2015 A - 2,373

V-2001W Seg 10-11 1 Closed Jan-2017 A - 1,387

V-L2003 East 7 Closed Sep-2015 A 1 3,913

V-L2003 West 6 Closed Oct-2015 A - 3,441

V-404 Ventura 4 Closed Feb-2016 A - 3,864

V-404-406 Ventura 2016 Bundle 3 Closed Oct-2016 A - 856

V-406 Ventura 5 Closed Nov-2015 A - 3,249

V-L4000 MP 45.36 1 Closed Sep-2016 A - 1,224

V-L4000 MP 53.00 3 Closed May-2015 A - 1,184

V-L4000 MP 80.08 MLV 3 Closed May-2015 A - 1,137

V-L6916-P1B 3 Closed Nov-2016 A - 2,434

V-L7000 Bundle-P1B 2 Closed Sep-2016 A 23 1,533

V-Alhambra Station 3 Closed Apr-2015 A (5) 3,133

V-Aviation-P1A-Aviation and Boardwalk 2 Closed Jun-2016 A - 6,592

V-Banning 5000 2 Closed Oct-2015 A - 2,145

V-El Segundo 2 Closed Apr-2015 A (2) 6,671

V-Fontana Bundle - L4002 1 Closed Jul-2015 A (0) 1,111

V-Fontana MLVs 4000-4002 1 Closed Oct-2016 A - 1,340

V-Haynes Station 3 Closed Nov-2016 A - 1,422

V-Honor Ranch - L225 4 Closed May-2016 A - 1,189

V-Indio 2014 4 Closed May-2015 A - 2,461

V-Lampson 4 Closed Apr-2015 A - 8,268

V-New Desert 7 Closed Oct-2014 A - 9,261

V-Newhall Station 7 Closed Jan-2015 A 0 13,627

V-Orange 3 Closed Apr-2015 A - 4,679

V-Questar Taps 6 Closed Sep-2015 A - 1,608

V-Rainbow 10 Closed May-2016 A - 4,426

V-Riverside 2001 5 Closed Oct-2015 A - 2,111

V-Santa Barbara - 1005 1 Closed Mar-2015 A - 416

V-Sepulveda Station-P1B 2 Closed Sep-2016 A - 886

V-L115-GRC-Herron 3 2-Preliminary Design Sep-2019 11 290

V-L115-GRC-Pierce 3 2-Preliminary Design Jun-2019 276 647

V-L115-GRC-Randall 3 2-Preliminary Design Apr-2019 (262) 1

V-L1004-GRC-Ortega Hill 1 2-Preliminary Design Mar-2020 3 152

V-L1017-GRC-Bristol 2 2-Preliminary Design Dec-2019 0 57

V-L1017-P1B-Dyer 1 3-Detailed Design & Procurement May-2019 5 910

V-L225 Honor Ranch-GRC-Castaic 1 2-Preliminary Design Aug-2019 18 196

V-L225 Forest Service-GRC-Forest Inn Road 1 2-Preliminary Design Apr-2020 22 34

V-L225 Forest Service-GRC-Old Ridge Route 1 2-Preliminary Design May-2020 18 23

V-L235-GRC-Black Canyon 1 2-Preliminary Design Apr-2020 1 79

V-235-335 West Bundle-P1B (5)- 86

V-235-335 West-GRC-Agua Dulce Canyon 3 2-Preliminary Design Jun-2019 4 115

V-235-335 West-GRC-Shannon Valley 1 2-Preliminary Design Jun-2020 4 14

V-235-335 West-GRC-Tick Canyon 2 2-Preliminary Design Apr-2020 4 10

V-L235-GRC-Bristol Mtn 1 2-Preliminary Design Jun-2020 1 77

V-L235-GRC-Crucero Rd 1 2-Preliminary Design Jul-2020 15 60

V-L235-GRC-Fernner 1 2-Preliminary Design Mar-2020 2 97

V-L235-GRC-Hwy 247 1 2-Preliminary Design Mar-2020 0 26

V-L235-GRC-Kelso Dunes 1 2-Preliminary Design May-2020 0 79

V-L235-GRC-Mtn Springs 1 2-Preliminary Design Feb-2020 1 93

V-L235-GRC-Oro Mtn 1 2-Preliminary Design Sep-2020 2 38

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix B - SoCalGas/SDG&E PSEP Valve Project List with Costs as of December 2018

Table 1 - SoCalGas Active Valve Projects

2016 Reasonableness Review Application (A.16-09-005)

2018 Reasonableness Review Application (A.18-11-010)

2019 GRC Application (A.17-10-008)

10

Page 11: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix B - SoCalGas/SDG&E PSEP Valve Project List with Costs as of December 2018

Valve Project No. of Valves(1) Project Lifecycle Stage(2)Construction Start Date(3)

(Month-Year)

December 2018

Actuals(6) (in $1,000)

Project-to-Date

Actuals(6) (in $1,000)

V-L235-GRC-Pisgah Rd 1 2-Preliminary Design Aug-2020 1 30

V-L235-GRC-Sacramento Mtn 1 2-Preliminary Design Jan-2020 2 93

V-L235-GRC-Stoddard Wells Rd 1 2-Preliminary Design Oct-2020 1 25

V-SL32-21-GRC-Alhambra Stn 2 2-Preliminary Design Sep-2019 21 62

V-SL32-21-GRC-State St 1 2-Preliminary Design Apr-2020 26 113

V-SL32-21-GRC-Crosby St 1 2-Preliminary Design May-2020 29 98

V-SL33-120-P1B (4) 1 TBD May-2020 1 30

V-SL38-504-GRC-Hanford Armona And Front(4) TBD TBD TBD 2 2

V-L324 Bundle-P1B (5)

- 79

V-L324-GRC-Center Rd Stn 3 2-Preliminary Design Oct-2019 4 22

V-L324-GRC-Happy Camp 1 2-Preliminary Design Mar-2020 6 34

V-L324-GRC-Rice Rd 1 2-Preliminary Design Jul-2020 4 83

V-L324-GRC-Sence Ranch 1 2-Preliminary Design Jul-2020 5 39

V-L324-GRC-Torrey Mtn 1 2-Preliminary Design Aug-2019 16 96

V-L324-GRC-Windy Gap and Salt Creek 1 2-Preliminary Design May-2020 14 89

V-L2000 And L2001 Fault Isolation-GRC-Dillon Rd 0 1-Initiation & Feasibility Oct-2020 0 0

V-L2000 Fault Isolation-GRC-Brea Telegraph Canyon Rd 0 1-Initiation & Feasibility Jan-2021 - -

V-L2000 And L2051 Fault Isolation-GRC-Monroe St 0 1-Initiation & Feasibility Mar-2021 - -

V-L3000-GRC-Bagdad 1 2-Preliminary Design Jul-2020 14 89

V-L3000-GRC-Black Ridge 1 2-Preliminary Design Aug-2020 15 80

V-L3000-GRC-Eagle Peak 1 2-Preliminary Design Jan-2020 21 164

V-L3000-GRC-Kelbaker 1 3-Detailed Design & Procurement Jan-2019 49 119

V-L3000-GRC-Marble Mtn 1 2-Preliminary Design May-2020 16 81

V-L3000-GRC-Mercury Mtn 1 2-Preliminary Design Mar-2020 0 50

V-L3000-GRC-Piute 1 2-Preliminary Design Feb-2020 4 79

V-L3000-GRC-Route 66 1 2-Preliminary Design Apr-2020 8 70

V-L3001-GRC-Burbank & Lindley 1 2-Preliminary Design Jul-2020 3 79

V-L4000 MP 69.00 MLV-P1B 1 3-Detailed Design & Procurement Apr-2019 4 929

V-43-121-P1B 2 2-Preliminary Design Feb-2020 - 689

V-L406-GRC-Burbank Etiwanda 1 2-Preliminary Design Apr-2020 - -

V-L407-L1205-GRC-San Vicente 2 3-Detailed Design & Procurement Nov-2019 49 1,098

V-L6906-GRC-Arrow Route Stn (4)

2 1-Initiation & Feasibility Jan-2021 4 16

V-L6906-GRC-Merrill Ave (4) 1 1-Initiation & Feasibility Feb-2021 5 14

V-L6906-GRC-Mill Rd (4) 1 1-Initiation & Feasibility Mar-2021 16 28

V-L765-GRC-Abbot & Atlantic 1 2-Preliminary Design Nov-2019 3 76

V-L765-GRC-Cypress & Arroyo Seco 3 1-Initiation & Feasibility Oct-2020 0 49

V-L765-GRC-Farragut & Anaheim 1 1-Initiation & Feasibility Nov-2019 65 150

V-L765-GRC-Linsley & Atlantic 1 2-Preliminary Design Jul-2019 20 133

V-L85-GRC-Ed Pump 1 3-Detailed Design & Procurement Jan-2019 10 70

V-L85-GRC-Rising Canyon Rd 1 2-Preliminary Design Aug-2019 22 55

V-L85-GRC-Twisselman Rd 1 2-Preliminary Design Jul-2019 16 43

V-L800-GRC-Nevada Ave 1 2-Preliminary Design Nov-2019 7 54

V-L800-GRC-Murphy Ranch Rd 1 2-Preliminary Design Dec-2019 13 37

V-L800-GRC-Lemoore Junction 2 2-Preliminary Design Dec-2019 16 63

V-L8109 Bundle-P1B (5)

- 2

V-L8109-GRC-Arundell 1 TBD Jan-2021 1 18

V-L8109-GRC-Casita Springs 1 TBD Nov-2020 2 18

V-L8109-GRC-Cuyama Meter Stn 1 TBD Aug-2020 6 80

V-L8109-GRC-Hall Canyon 1 TBD Oct-2020 (1) 36

V-L8109-GRC-Live Oaks 1 TBD Sep-2020 1 40

V-L8109-GRC-Sheep Camp 1 TBD Jan-2021 0 20

V-Adelanto-P1B-MLV17 1 3-Detailed Design & Procurement May-2019 2 220

V-Adelanto-GRC-Stoddard Wells & Dale Evans 1 3-Detailed Design & Procurement Jan-2019 2 229

V-Aviation-GRC-190th & Green 3 1-Initiation & Feasibility Jun-2020 4 242

V-Brea-P1B-Beach 1 2-Preliminary Design Mar-2019 13 365

V-Blythe Bndle-GRC-Blythe Statn 2 3 3-Detailed Design & Procurement May-2019 68 522

V-Blythe-P1B-Chuckawalla (4) 2 TBD Dec-2020 4 16

V-Blythe-P1B-Desert Center Station (4)

1 TBD Nov-2020 3 19

V-Blythe-GRC-Ford Dry Lake 3 TBD Jul-2020 (0) 14

V-Blythe-GRC-Hayfield Stn 3 TBD Aug-2020 0 9

V-Blythe-GRC-Shaver Summit 3 TBD Oct-2020 0 13

V-Brea-P1B-Lincoln 1 3-Detailed Design & Procurement Jun-2019 11 455

V-Brea-GRC-Placentia 4 2-Preliminary Design Oct-2020 4 219

V-Burbank & Lindley-P1B 1 2-Preliminary Design May-2020 10 155

V-Burbank-GRC-Valleyheart & Noble 3 2-Preliminary Design Mar-2020 29 146

V-Burbank-GRC-Verdugo & Reese 3 2-Preliminary Design Jul-2019 18 283

V-Cabazon-P1B 3 1-Initiation & Feasibility Jan-2021 - 12

V-Carpinteria-GRC-Conoco 1 2-Preliminary Design Aug-2019 20 393

V-Chestnut And Grand-GRC 4 TBD Sep-2019 7 129

V-Del Amo And Wilmington-GRC 1 2-Preliminary Design Sep-2019 4 386

V-El Segundo-P1B-Scattergood 4 3-Detailed Design & Procurement Feb-2020 4 1,555

V-Glendale Bundle-P1B (5)- 127

V-Glendale-GRC-Adams 3 2-Preliminary Design Sep-2019 6 155

Table 1 - SoCalGas Active Valve Projects (continued)

11

Page 12: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix B - SoCalGas/SDG&E PSEP Valve Project List with Costs as of December 2018

Valve Project No. of Valves(1) Project Lifecycle Stage(2)Construction Start Date(3)

(Month-Year)

December 2018

Actuals(6) (in $1,000)

Project-to-Date

Actuals(6) (in $1,000)

V-Glendale-GRC-Glenoaks 2 2-Preliminary Design Jul-2019 3 121

V-Glendale-GRC-Ave 59 3 1-Initiation & Feasibility Sep-2019 21 180

V-Goleta-GRC-Santa Rosa Rd Buellton 1 2-Preliminary Design Apr-2019 18 244

V-Goleta-GRC-Farren Rd 1 2-Preliminary Design Dec-2019 16 252

V-Goleta-GRC-Gaviota St Park 1 2-Preliminary Design May-2019 16 496

V-Goleta-GRC-Popco 1 2-Preliminary Design Oct-2019 28 209

V-Haskell Station FM-P1B 1 1-Initiation & Feasibility Nov-2019 3 20

V-Pico-GRC-Eastern And Commerce 3 2-Preliminary Design Feb-2020 3 268

V-Santa Barbara-GRC-Cabrillo Bl 1 2-Preliminary Design Aug-2020 (46) 1

V-Santa Barbara-GRC-Grove Ln 1 2-Preliminary Design Aug-2019 63 248

V-SB County-GRC-Park Ln 1 3-Detailed Design & Procurement Jun-2019 16 740

V-SB County-GRC-Parsons 1 3-Detailed Design & Procurement Jul-2019 7 533

V-SFV Olympic-GRC-Yarmouth Ave (4) 3 TBD Apr-2020 2 114

V-SFV Olympic-GRC-Chatsworth St (4) 2 TBD May-2020 - 1

V-SFV Olympic-GRC-Killion St (4) 3 TBD Jun-2020 1 2

V-SFV Olympic-GRC-White Oak Ave (4) 1 TBD Jul-2020 1 3

V-SFV Bundle Valencia (5)11 57

V-SFV Valencia-GRC-Encino and San Jose 1 TBD Oct-2020 - -

V-SFV Valencia-GRC-Balboa and Westbury 2 1-Initiation & Feasibility Nov-2020 7 111

V-SFV Valencia-GRC-San Fernando Mission 1 1-Initiation & Feasibility Apr-2020 15 142

V-SFV Valencia-GRC-Eternal Valley 2 TBD Sep-2021 2 68

V-SFV Valencia-GRC-Wilbur 1 1-Initiation & Feasibility Oct-2020 2 74

V-SFV Valencia-GRC-Woodley and Rinaldi 1 1-Initiation & Feasibility Oct-2020 6 77

V-Ventura Station-GRC 6 2-Preliminary Design Oct-2019 63 102

V-Wstrn Del Rey Bdle-P1B-Del Rey Junction 3 2-Preliminary Design Apr-2019 (1) 100

V-Wstrn Del Rey-GRC-McLaughlin & Palms 1 3-Detailed Design & Procurement Jun-2019 25 175

V-L1014 Olympic 6 5-Close-Out Feb-2016 A (78) 6,666

V-L1018-P1B-Alipaz 1 5-Close-Out May-2018 A 19 1,214

V-L1018-P1B-Avery 1 5-Close-Out Feb-2018 A 4 1,061

V-L1018-P1B-Burt Bdl 2 5-Close-Out Jul-2017 A 7 2,223

V-L1018-P1B-Camino Capistrano 1 4-Construction Sep-2018 A 347 2,970

V-L1018-P1B-El Toro 1 4-Construction Dec-2018 A 33 657

V-L1018-P1B-Harvard 3 4-Construction Jul-2018 A 188 2,043

V-29 Palms-P1B-Indian Canyon 1 4-Construction Oct-2017 A 6 1,110

V-29 Palms-P1B-Mohawk Trail 1 5-Close-Out Feb-2018 A 11 785

V-29 Palms-P1B-Sunburst St 1 5-Close-Out May-2018 A 14 1,312

V-29 Palms-P1B-Utah Trail 1 5-Close-Out Jan-2018 A 16 1,132

V-L225-P1B-Beartrap 1 Closed May-2017 A (23) 1,115

V-L225-P1B-Quail Canal 1 Closed Jun-2017 A 3 1,111

V-L2000 Beaumont 2016 4 4-Construction Jun-2017 A 296 4,609

V-SL45-120 Section 2-P1B 1 5-Close-Out Apr-2018 A 3 822

V-404-406 Valley 8 5-Close-Out Sep-2015 A 26 9,149

V-404-406 Vent. 2016 P1B Somis Yard 1 5-Close-Out May-2018 A 21 1,059

V-L4000-P1B-Camp Rock Rd 1 4-Construction Dec-2018 A 46 318

V-L4000-P1B-Powerline Rd 1 4-Construction Nov-2018 A 107 409

V-L4000-P1B-Desert View Rd 1 4-Construction Oct-2018 A 86 1,185

V-L4000-P1B-Devore Stn 3 4-Construction Sep-2018 A 88 987

V-L7000-P1B-Melcher & Elmo 3 4-Construction Jun-2018 A 5 2,861

V-L7000-P1B-Beech & HWY 46 1 5-Close-Out Mar-2018 A 45 2,988

V-L7000-P1B-Rd 68 & Ave 232 1 5-Close-Out Jan-2018 A 32 1,797

V-L7000-P1B-Rd 96 & Ave 198 1 5-Close-Out Oct-2017 A 32 1,947

V-L7000-P1B-Visalia Stn 2 5-Close-Out Jul-2018 A 10 326

V-Adelanto-P1B-MLV4 1 5-Close-Out Dec-2017 A (26) 559

V-Apple Valley-P1B 1 5-Close-Out May-2018 A 16 1,298

V-Apple Valley-P1B-MLV13 1 5-Close-Out Nov-2017 A 8 314

V-Aviation-P1B-Aviation and 104th 5 5-Close-Out Apr-2017 A (43) 8,102

V-Banning 2001 3 Closed Apr-2016 A - 1,148

V-Banning-2001-P1B-MLV16A 1 5-Close-Out Oct-2017 A 20 1,080

V-Banning-2001-P1B-MLV14A 1 Closed May-2017 A 0 1,089

V-Banning-2001-P1B-MLV17A 1 5-Close-Out Apr-2018 A 26 1,442

V-Banning Airport 2 Closed Apr-2015 A 0 990

V-Blythe (Cactus City)-P1B 1 4-Construction Jul-2018 A 24 1,311

V-Brea Hacienda Bundle-P1B - (13)

V-Brea-P1B-Atwood Stn 3 5-Close-Out Jul-2017 A 2 853

V-Brea-P1B-Azusa Ave 1 4-Construction Mar-2018 A 4 321

V-Brea-P1B-Brea Canyon 3 5-Close-Out Oct-2017 A 3 1,137

V-Brea-P1B-Carbon Canyon 1 Closed Sep-2017 A 4 388

V-Burbank-P1B-Riverside & Agnes 1 4-Construction Oct-2018 A 67 316

V-Carpinteria-P1B-Oxy-Rincon 1 5-Close-Out Apr-2018 A 46 1,063

V-Del Amo Station-P1B 3 5-Close-Out Jan-2018 A 1 1,100

V-Fontana MLVs 4000-4002-P1B-Benson & Chino 1 5-Close-Out Sep-2017 A (23) 1,329

V-Fontana 4002-P1B-Etiwand & 4th 1 5-Close-Out Apr-2017 A (22) 1,298

Table 1 - SoCalGas Active Valve Projects (continued)

Future Filing

12

Page 13: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix B - SoCalGas/SDG&E PSEP Valve Project List with Costs as of December 2018

Valve Project No. of Valves(1) Project Lifecycle Stage(2)Construction Start Date(3)

(Month-Year)

December 2018

Actuals(6) (in $1,000)

Project-to-Date

Actuals(6) (in $1,000)

V-Glendale-P1B-Monterey 1 5-Close-Out Feb-2018 A 3 415

V-Indio 2016-P1B 2 5-Close-Out Aug-2017 A 3 1,171

V-Indio-2016-P1B-MLV10s 3 5-Close-Out Oct-2017 A 11 1,532

V-Indio-2016-P1B-MLV8s 3 5-Close-Out Jan-2018 A 12 1,604

V-Palowalla-P1B 3 4-Construction Feb-2018 A (2,689) 2,910

V-Rainbow 2017 2 4-Construction Jul-2018 A 209 1,368

V-Rainbow CV-P1B (5)- 157

V-Rainbow CV-P1B-Newport & Briggs 1 5-Close-Out Jul-2018 A 6 388

V-Rainbow CV-P1B-Rainbow Valley & Pechanga 2 5-Close-Out Aug-2018 A 8 155

V-Rainbow CV-P1B-Ramona & Lakeview 2 5-Close-Out Jul-2018 A 15 357

V-Rainbow CV-P1B-Scott & El Centro 2 5-Close-Out Sep-2018 A 11 435

V-Rainbow-P1B-MLV5 3 4-Construction Oct-2018 A 262 574

V-SB County-P1B-Lions 1 4-Construction Jul-2018 A 25 1,511

V-Spence Station-P1B 2 4-Construction Dec-2017 A 7 1,121

V-Taft-P1B (5)- 0

V-Taft-P1B-Buttonwillow 1 Closed Apr-2017 A 0 1,133

V-Taft-P1B-7th Standard 1 Closed Sep-2017 A - 1,204

V-Taft-P1B-Hageman & Runfro 2 4-Construction Nov-2018 A 2,175 3,422

V-Taft-P1B-Sycamore 1 Closed Aug-2017 A 4 1,145

V-Victorville COMMS-P1B-MLV11 1 4-Construction Oct-2018 A 368 657

V-Victorville COMMS-P1B-MLV12 1 Closed Nov-2017 A 2 418

V-Wilmington-P1B Lecouver Ave & F St 3 4-Construction Oct-2018 A 26 237

V-Wilmington-P1B Eubank Stn 2 5-Close-Out Mar-2018 A 13 515

V-Western/Del Rey Bundle-P1B (5)

- 5

V-Wstrn Del Rey Bdle-P1B-Mississippi & Armacost 1 Closed Nov-2017 A 3 418

V-Yorba Station-P1B (4) 0 TBD Jan-2022 2 16

Total SoCalGas Active Valve Projects (7) 3,078 252,682

Valve Project No. of Valves(1)

Project Lifecycle Stage(2)

Construction Start Date(3)

(Month-Year)

December 2018

Actuals(6)

(in $1,000)

Project-to-Date

Actuals(6)

(in $1,000)

V-1600 Bundle 16 Closed Dec-2014 A (186) 324

V-3010 Bundle 9 Closed Dec-2014 A - 219

V-3100 and 2010 FM 2 Closed Oct-2016 A - 238

V-3600 Bundle 12 Closed Mar-2015 A - 4,400

V-49-28 1 Closed Oct-2016 A (0) 1,522

V-1601 Ultrason 1 4-Construction Apr-2018 A 115 429

V-49-11 & 49-27 1 5-Close-Out Sep-2016 A 6 1,578

V-49-16 RCV 4 5-Close-Out Aug-2017 A 19 1,938

V-49-18 MVH 1 5-Close-Out Oct-2017 A 47 498

V-49-23 1 4-Construction Sep-2018 A 115 1,244

V-49-32-L RCV 1 5-Close-Out Aug-2016 A 18 1,886

Total SDG&E Active Valve Projects 133 14,277

Tables 1 and 2 - Project Footnotes:

(1) Number subject to change based on design and constructability. Backflow Prevention (BFP2) and Flow Meters (FM) are for check valves, regulatory station modifications and communication

sites. Counts do not include BFP1 (regulator station modification) projects.

(2) Project Lifecycle Stage represents the five stages of a valve project's lifecycle: Stage 1 Project Initiation & Feasibility, Stage 2 Preliminary Design, Stage 3 Detailed Design & Procurement, Stage 4

Construction, and Stage 5 Close-out.

(3) The "A" at the end of the date indicates that construction has begun.

(4) New valve project currently being initiated. TBD represent that the Project scope, stage, and/or construction start date information will be available at a later date.

Table 2 - SDG&E Active Valve Projects

Table 1 - SoCalGas Active Valve Projects (continued)

2018 Reasonableness Review Application (A.18-11-010)

Future Filing

(5) This valve has been broken up into separate projects for cost and schedule progress reporting purposes. Part of the project requires separate planning and execution due to location, permitting,

and/or constructability.

(6) Costs are in nominal direct dollars. Costs recovery will include indirects and applicable loaders.

(7) The increase of approximately $51K in project-to-date costs from November 2018 to December 2018 is due to:

o Inclusion of the V-Burbank-GRC-Lindley-P1B project costs in November 2018 that were previously excluded.

o Moving the V-L8109-GRC-Apache Cyn project from Appendix B, Table 1 to 3.

13

Page 14: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix B - SoCalGas/SDG&E PSEP Valve Project List with Costs as of December 2018

Valve Project

December 2018

Actuals(6) (in $1,000)

Project-to-Date

Actuals(1) (in $1,000)

V-L115-P1B-Walnut - 142

V-235-198.20 - 0

V-L247 Goleta-P1B - 38

V-L2002-P1B - 5

V-L37-18F - -

V-L4002 MP 67.00 MLV - 361

V-L4002 MP 72.70-P1B - 0

V-L4000-P1B-Cajon Junction 1 1

V-L4002 MP 86.44-FM-P1B - (0)

V-L765-P1B-Fairmont & Faircourt - -

V-L765-P1B-Mission & Workman - (0)

V-L85 Templin Highway MP 137.99-P1B - 90

V-L8109-GRC-Apache Canyon 25

V-Blythe COMMs-P1B - -

V-Goleta-P1B-More Ranch Rd - 122

V-Lampson Check Valves-P1B 0 15

V-Los Alamitos - 0

V-Needles COMMs-P1B - 19

V-Quigley Station - 82

V-Rainbow CV-P1B-Rancho California & Margarita - 0

Total SoCalGas Valve Projects Remediated or Removed 2 900

(1) Costs are in nominal direct dollars. Costs recovery will include indirects and applicable loaders.

Table 3 - SoCalGas Valve Projects Remediated or Removed

Tables 3 - Project Footnotes:

14

Page 15: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

December 2018 Actuals(1)

(in $1,000)

Project-to-Date

Actuals(1) (in $1,000)

- 684

- 14,707

- 196

- 447

- 16,035

December 2018 Actuals(1)

(in $1,000)

Project-to-Date

Actuals(1) (in $1,000)

- 70

- 1,098

- 3

- 1

- 1,172

Tables 1 and 2 - Footnotes:

(1) Costs are in nominal direct dollars. Costs recovery will include indirects and applicable loaders.

Total SoCalGas Records Review and Interim Safety Measure Costs

Records Review

Pressure Protection Equipment

Other Remediation

Total SDG&E Records Review and Interim Safety Measure Costs

Table 2 - SDG&E Records Review and Interim Safety Measure Costs

Cost Type

Leak Survey and Pipeline Patrol

Records Review

Pressure Protection Equipment

Other Remediation

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix C - SoCalGas/SDG&E Records Review and Interim Safety Measure Costs as of December 2018

Table 1 - SoCalGas Records Review and Interim Safety Measure Costs

Cost Type

Leak Survey and Pipeline Patrol

15

Page 16: RE: Southern California Gas Company and San Diego Gas ... · 37-18-F 2.08 Closed 1946 Aug-2016 A 3 6,899 37-18 Section 5 0.23 Closed 1945 Apr-2017 A - 7,578 38-KWB-P1B-01

December 2018

Actuals (in $1,000)

Project-to-Date

Actuals (in $1,000)

9,068 1,050,911

9,068 1,048,998

- 1,913

3,079 253,582

3,078 252,682

2 900

- 16,035

Total Pipeline and Valve Other Costs 187 21,511

(0) 322

- (27)

(5) 1,268

- 251

3 348

- 1

- 2

- 2,025

192 16,958

(2) 363

12,334 1,342,039

December 2018

Actuals (in $1,000)

Project-to-Date

Actuals (in $1,000)

1,004 327,170

1,004 327,170

- -

133 14,277

133 14,277

n/a n/a

- 1,172

17 3,190

- 104

0 7

- 0

1 65

- 0

- -

- 30

- 1,984

16 1,002

- (2)

1,153 345,808

(D) As of December 2018, the SoCalGas balance in the Pipeline Safety and Reliability Memorandum Account (PSRMA) reflects a balance of $5,980,128 which includes regulatory account interest and is

reduced for costs incurred prior to February 24, 2011 (i.e., the effective date of R.11-02-019), and reflects approximately $40.7 million of amortization revenues to-date. The overall regulatory account

balance in SoCalGas' PSRMA has decreased from the November 2018 to December 2018 report because amortization exceeds interest for the current month.

(1) General Management and Administration (GMA) pools. Dollars accumulated in GMA pools will be distributed to specific PSEP projects as work occurs on those specific projects. In addition, adjustment

will be made due to changes in project plans, scope, and schedule from the original projection of O&M and Capital project spend.

Table 1 and 2 - Overall Financial Notes:

(A) Costs reflect actuals for the month of December 2018 and project-to-date costs from May 2012 to December 2018.

(B) Project costs do not reflect year-to-date actuals. There is some lag time in getting costs posted.

(C) Costs are in nominal direct dollars. Costs recovery will include indirects and applicable loaders.

General Administration(1)

Program Management Office(1)

GRAND TOTAL SDG&E PSEP PROJECT COST

Tables 1 and 2 - Project Footnotes:

(K) As of December 2018, the SoCalGas balance in the Pipeline Safety Enhancement Plan (Phase 2) Memorandum Account (PSEP-P2MA) reflects a balance of $8,718,317 which includes balancing account

interest.

(E) As of December 2018, the SDG&E balance in the Pipeline Safety and Reliability Memorandum Account (PSRMA) reflects a balance of $518 which includes regulatory account interest and is reduced for

costs incurred prior to February 24, 2011 (i.e., the effective date of R.11-02-019).

(F) As of December 2018, the SoCalGas balance in the Safety Enhancement Expense Balancing Account (SEEBA) reflects a balance of $50,478,524 which includes balancing account interest and reflects

approximately $84.4 million of amortization revenues to-date. The overall SoCalGas SEEBA balance has decreased from the November 2018 to December 2018 report because amortization exceeds the

recorded costs and interest for the current month.

(G) Pursuant to D.16-08-003, SoCalGas and SDG&E are authorized interim rate recovery of 50% of the recorded balances, reduced by amounts currently under review by the Commission, in their SEEBA,

Safety Enhancement Capital Cost Balancing Account (SECCBA) and PSRMA.

(H) As of December 2018, the SDG&E balance in the Safety Enhancement Expense Balancing Account (SEEBA) reflects a balance of $4,284,688 which includes balancing account interest and approximately

$5.7 million of amortization revenues to-date. The overall SDG&E SEEBA balance has decreased from the November 2018 to December 2018 report because amortization exceeds the recorded costs and

interest for the current month.

(I) As of December 2018, the SoCalGas balance in the Safety Enhancement Capital Cost Balancing Account (SECCBA) reflects a balance of $234,608,306 which includes balancing account interest and reflects

approximately $87 million of amortization revenues to-date.

(J) As of December 2018, the SDG&E balance in the Safety Enhancement Capital Cost Balancing Account (SECCBA) reflects a balance of $63,881,565 which includes balancing account interest and

approximately $18.1 million of amortization revenues to-date.

Supply Management(1)

Training(1)

Gas Control(1)

Active Valve ProjectsA-C, F-K

Remediated or Removed Valve Projects

Total Records Review and Interim Safety Measure CostsA-E

Other Costs

Methane Detectors

Environmental(1)

Communications(1)

Construction(1)

Engineering(1)

Total Valve Projects

Environmental(1)

Supply Management(1)

General Administration(1)

Program Management Office(1)

GRAND TOTAL SOCALGAS PSEP PROJECT COST

Table 2 - SDG&E Cost Summary

Cost Type

Total Pipeline Projects

Active Pipeline ProjectsA-K

Remediated or Removed Pipeline Projects

Gas Control(1)

Active Pipeline ProjectsA-K

Remediated or Removed Pipeline Projects

Total Valve Project Costs

Active Valve ProjectsA-C, F-K

Remediated or Removed Valve Projects

Total Records Review and Interim Safety Measure CostsA-E

Methane Detectors

Communications(1)

Construction(1)

Engineering(1)

Training(1)

SoCalGas and SDG&E PSEP Monthly Pipeline Safety Plan Status Report to the Commission for December 2018

Appendix D - SoCalGas/SDG&E PSEP Total Project Cost Summary as of December 2018

Table 1 - SoCalGas Cost Summary

Cost Type

Total Pipeline Project Costs

*

*

16