RCRA Issues in the Demolition of a Copper Mine & Smelter
•James Glasston, Environmental Coordinator•Juanita Hyde, HSEC and Risk Specialist
![Page 2: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/2.jpg)
History• 1944 Magma Copper Company purchases San Manuel claims and begins
exploration.• 1948 Underground exploration and development of San Manuel orebody
begins.• 1985 Development begins of Open Pit and Heap Leach facility at San
Manuel.• 1987 In-situ leaching production starts. Development of Kalamazoo orebody
begins.• 1996 Merger forms BHP Copper.• 1999 Facility goes into Care and Maintenance• 2003 BHP announces closure. • 2006 Reclamation of Mine was completed.
![Page 3: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/3.jpg)
Mine & Plant SiteCopper production operations included• An underground mine,• An Open Pit,• A Heap Leach facility,• In-situ leach mine in the Open Pit,• Solvent Extraction-Electrowinning (SW-EW) Plant and• Two limestone/quartz quarriesThe facilities at the plant site included• A 7 mile long rail line,• A smelter• Concentrator with associated thickeners,• Crushers• Maintenance FacilitiesThe Tailings Facilities included seven tailings dams covering 3,300 acres, a result of
over 50 years of mining.
![Page 4: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/4.jpg)
San Manuel Mine Site
Tailings
Open Pit
Shafts
Heap
SXEW
Community Of Mammoth
Community Of San Manuel
![Page 5: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/5.jpg)
Reclamation of Mine Site
![Page 6: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/6.jpg)
San Manuel Plant Site
Mill
Smelter
TailingsMine
Rod Plant
Refinery
![Page 7: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/7.jpg)
Plant Site During Demolition
![Page 8: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/8.jpg)
Plant Site Reclamation
![Page 9: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/9.jpg)
Schedule & Budget• Unknown Waste Types and
Volumes• Conflicting Schedule
Expectations• Unknown regulatory
requirements• Project Example – PCB Soils
![Page 10: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/10.jpg)
Resourcing• Internal
– Example – HSEC Department prior to project start-up
• External– Example - Contracting Waste
Broker
![Page 11: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/11.jpg)
Contractor Management• Contract Preparation• Competency• HSE Culture• Ownership• Example – RCRA Training
NOV
![Page 12: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/12.jpg)
Stakeholder Interface• Corporate• Regulatory
– Example – Coordination meeting with agency on characterization of buildings as waste
• Contractors• Community
– Example – Stack Abatement and Demolition
– APP Public Hearing
![Page 13: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/13.jpg)
Pre-Demolition HSE Surveys• Multi-disciplinary Team
approach• Initial Survey• Follow-up Survey• Sampling
![Page 14: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/14.jpg)
Sampling• Access• QA / QC• Turnaround times
![Page 15: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/15.jpg)
Material Characterization• Reclaimable• On-site disposal• Off-site disposal• Example – Flue Dust, Scrap
Steel, Explosives
![Page 16: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/16.jpg)
Remediation• Man-power• Equipment• Containers• Profiling• Transportation• Disposal
• Example – Vanadium Pentoxide Catalyst
![Page 17: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/17.jpg)
Regulated Waste Summary
41,073 tons1369Asbestos6,713 gallons2Asbestos Wastewater14,205,960 lbs = 521 tons329PCB Soil61,864 lbs = 31 tons119PCB Ballasts, Switches & Caps606,500 lbs = 303.3 tons31Transformers (PCB, non PCB)1,884,000 lbs = 942 tons53Vanadium Pentoxide4,452,000 lbs = 2226 tons125Refractory Brick1,470,000 lbs = 735 tons63RCRA Debris 85 drums2Cyanide Salts / Pipe 860 drums24Lab Pack Projects118, 750 gallons142Dielectric fluid (PCB, non PCB)52,700 lbs = 26.4 tons4Explosives18, 645 bulbs13Fluorescent Bulbs613, 281 lbs = 307 tons26Mixed BatteriesTotal Weight# LoadsWaste Name
![Page 18: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/18.jpg)
Documentation• Photo• Written• Reporting
![Page 19: RCRA Issues in the Demolition of a Copper Mine & · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing](https://reader031.vdocuments.site/reader031/viewer/2022030502/5aaf32fd7f8b9aa8438d03db/html5/thumbnails/19.jpg)
Reclamation Project Achievements• Working transparently with Regulatory Agencies throughout
Reclamation to obtain permitting• Tours• The transportation and disposal of approximately 20 million pounds
of regulated waste from the property with no associated incidents• Successful reclamation of flue dust / concentrate blend
– BHP HSEC Merit Award– Generated $545,193– Recycled 6,058 tons
• Project will be completed on-time and under budget• The Reclamation project preserved the property for future use.