  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    1/28

    GOVERNMENT OF ANDHRA PRADESH

    PANCHAYATRAJ ENGINEERING DEPARTMENT

    RECASTED ESTIMATE

    Estimate Amount Rs. 6.50 Laks

    G!ant "NA#ARD RID$ %I%

    Name of the Work : Construction of AnganwadiPathamupparru

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    2/28

     building at

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    3/28

    SPECI$ICATI'N REP'RT

    Name o+ te &o!k " Const!u,tion o+ An-ana/i ui1/in- at Patamu22a!!u

    Estimate Amount Rs. 6.50 Lak

    The work"Construction of Anganwadi building at Pathamupparru",Est.Cost.Rs.

    was sanctioned under A#AR$ R%$& '%' grant (ide )*+s.o. $ept for C$-Cs $t./0.!1./!10

    T2pe plan is communicated 3Plan enclosed4.

    The building is designed for )51 floors3$esigns-drawings enclosed for appro(

    The estimate for the abo(e building is prepared with the following pro(isions7

    $oun/ation"*

      /8!mm dia 9R $umm2 piles for /.m depth77776 os

    Su2e! St!u,tu!e"*

      The basement height of !.8m is proposed with #+ in C+3164

    %n this connection,% submit that the following items proposed in the Anne:ure7%% of )*+s.

    for C$-Cs $t./0.!1./!10 could not be accomodated in the estimate due to paucit2 of funds

    $inisin-s"*

    / os of &lush doors of si;e 1 !:/ 1!m

      8@mm $9R piles7776 os

      8!!mm $9R piles7770 os

      Columns of si;e !./8:!.8m777= os

      Columns of si;e !./8:!./8m777/ os

      Plinth beam of si;e !./8:!.8m

      RCC beams and slab is proposed

      alls are proposed with #rick masonr2 in C+31=4

      1/mm thick plastering is proposed in C+314

      1/mm thick ornamental plastering is proposed in C+3184

      PC conduit for electrical wiring

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    4/28

    1 Pro(ision for AT .!!

    /4DC charges B !.

    The estimate is prepared as per the current R,i.e./!107/!1 rates and as p

    the A.P Re(ised tandard data work will be carried out as per AP$ after entrustment.

    D3.E4e,utie En-inee! Asst.E4e,utie En-inee!  

    PRIE1u!u PRIE1u!u

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    5/28

      s

    .! lakhs

      l4.

      o. $ept

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    6/28

      r

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    7/28

    DETAILED C)M A#STRACT ESTIMATE

    Name o+ te &o!k " Const!u,tion o+ An-ana/i ui1/in- at Patamu22a!!u

    Estimate

    Des,!i2tion o+ Item No 7uantit3 )nit

    8 9 : ; 5 6 < =

    8

    &or Columns 1 : 0 1.=8 1.=8 1.=! /0.11

     777do777 1 : 6 1.6! 1.6! 1.=! /@.6

    &or steps to rooms 1 : 8 0.1< !.

    55.85 cum

    9

    &or dumm2 piles 1 : 6 7777 7777 7777 6.!!6.00 cum

    :

    S1.No.

    Len-t>m?

    &i/t>m?

    Ti,kness >m?

    Ea!t o!k e:ca(ation and depositing on bank with initial lead of 1!m andinitial lift of /m in *rdinar2 oils for &oundation.3AP o. 8!=4 3RR4

     Augoring and boring of holes in site for #ored cast7in7situ R.C.C. Piles forbuilding foundations in loam2, cla2e2 soils like #lack cotton soils and ordinar2soils as per % /

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    8/28

    &or Columns 1 : 0 1.=8 1.=8 !.1 /.!1

     777do777 1 : 6 1.6! 1.6! !.1 /.8!

    #asement +i11in-"*Fall 1 : 1 0./@ 6.1 !.8

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    9/28

    89

    #uilding A>R 1 : 1 8!.@6 !./8 !.8! /.1/

    $educt columns 1 : 1! !./8 !./8 !.8! 7!.16

    ong cross wall 1 : 1 6.1 !./8 !.8! !.0

    Cross walls 1 : / 0.!= !./8 !.8! !.6

     7777do777 1 : 1 0./@ !./8 !.8! !./<

    :.96 cum

    8:

    Roof slab 1 : 1

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    10/28

    8=.6: rmt

    86

    /.08!

    9.;:0 +T

    8<

    #uilding A>R 1 : 1 8!.@6 !./8 !.8! /.1/

    $educt columns 1 : 1! !./8 !./8 !.8! 7!.16

    ong cross wall 1 : 1 6.1 !./8 !.8! !.0

    Cross walls 1 : / 0.!= !./8 !.8! !.6

    Gitchen wall 1 : 1 /.!1 !./8 !.8! !.10

    $!ont ste2s"*

    for step % 1 : 8 0.1< !.

    for step %% 1 : 8 0.1< !.6! !.1 1.18

    for step %%% 1 : 8 0.1< !.8! !.1 !.@

    6.58 cum

    8=

    #uilding A>R 1 : 1 88 /! ! /8 /

    Pro(iding high 2ield strength deformed 3FI$4 steel T+T bars 3&e 01 gradeas per % 1@=671

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    11/28

    /1 Pro(ision for sienorage charges

    // Pro(ision for unforeseen items

    De2ut3 E4e,utie En-inee! Assistant E4e,uti

    PRI Su*Diision E1u!u PRI E1u!u

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    12/28

      mount Rs. 6.50 Laks

    Rate Amount

    @ 80

    18.!/ =08<

    @==./1 0@/<

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    13/28

    10

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    14/28

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    15/28

    [email protected] =@=8

    6/=86.=! 1/6

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    16/28

    88=0

    Tota1

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    17/28

    DATA SHEET

    Name o+ te &o!k " Const!u,tion o+ An-ana/i ui1/in- at Patamu22a!!u

    Estimate Amount Rs. 6.50 Laks

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.

    8 9 : ; 5 6 <

    #?CI(IL &'R"*

    8 R#R* E4,aation +o! St!u,tu!es$NDN*8

    '!/ina!3 soi1

    Manua1 Means

    )2to : m /e2t

    9nit J cum

    Taking output J 1! cum

    +ate da2 !.!! 80.!! !.!!

    +a;door 39nskilled4 da2 8.60 / 8!0+*RTF

    ote Classifications of Earth ork pecification are as per 8!/./.13a4 of+*R$ and 8!1./.1 of +*RT-F

    a?  Laou! 

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    18/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

    #. A#*9R

    +a;door da2 8.

    0

     A. +ATER%A

    il

    #. A#*9R

    +a;door da2 /.

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    19/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

    6

    9nitJCum

    A. MATERIALS"

    /!mm F#) graded metal cum !.=!! /1#. LA#')R"1st Class +ason da2 !.188 8=.!! 1./1

    /nd Class +ason da2 !./6@ 80.!! #ot Men an/ &omen? da2 0.6!! /

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    20/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

    +an ma;door for mi:ing mortar da2 !./! /

     Add +AB/ 10.@

    G!an/ Tota1 :950.8 " 6?

    CSTN*8*< )nit " 8,um

    A. MATERIALS"

    Cement kg. /0!.!! .

    and 3including wastage4 cum 1.! [email protected]! 10@@.@@

    #. MACHINERY

    7 il 7

    C. LA#')R"

    +an ma;door for mi:ing mortar da2 !./! /

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    21/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

    CSTN*9*8:

    A. MATERIALS"/!mm F#) graded metal cum !.=!! /1#. LA#')R"

    1st Class +ason da2 !.188 8=.!! 1./1

    /nd Class +ason da2 !./6@ 80.!! #ot Men an/ &omen? da2 0.6!! / @ cft 3!./ > !.= cum4capacit2

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    22/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

     Add o(erhead charges B10 1/=.1=

    Tota1 809;5.8<

    90 LINTELS IN #)ILDINGS#ASIC C'ST 2e! 8 ,um cum 1.!! @1@/.

    1st Class +ason da2 !.!6@ 8=.!! /.=!

    /nd Class +ason da2 !.188 80.!! 0.=<

    Ma/oo! >#ot Men an/ &omen? da2 8.!@@ / Add +AB/ /00.=

    #. MACHINERY

    hour !./6@ 08.!! 1/!.

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    23/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

    Rate 2e! t B a 69=:6.=0

    96 #LD*CSTN*:*8

    )nit B 8,um

    A. MATERIALS"

    Cement kg 86.!! .

    os 1/.!! !8=./ /@

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    24/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

     Add +AB/ 0/6./0

    Top Tower bolts 1!!mm long3Aluminium4 os /

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    25/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

    da2 !.6! 8=.!! /81.!!

    +a;door 3unskilled4 da2 !.

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    26/28

    In/e4*,o/e Des,!i2tion )nit 7uantit3 Rate Rs. Amount Rs.S1.No.

    C. SCA$'LDING

     Access cafolding charges s?m 1!.!! !.!! !.!!

     Add o(erhead charges B10 1=/.!0

    Tota1 2e! 80 sFm 8;=9.:9Tota1 2e! 8 sFm 8;=.9:

    :; #LD*CSTN*6*:

    )nit B 80 sFm

    A. MATERIALS"

    Cement +ortor 314 cum !.1! 8/!.@/ [email protected]

    #. LA#')R"

    da2 !.6! 8=.!! /81.!!

    +a;door 3unskilled4 da2 !.

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    27/28

    LEAD STATEMENT

    Name of the Work : Construction of Anganwadi building at Pathamupparru

    Estimate Amount Rs. 6.! "akhs

    Des,!i2tion o+ Mate!ia1 )nit

    1 / 8 0 6 @ = < 1/

    1 Coarse and for Concrete 1.!! Cum )oda(ari @Lea/ inM

    Cone3an,e ,a!-es

    Initia1 Cost#1astin-,a!-es

    Ma,ine,!usin-,a!-es

    Loa/in-)n1oa/in-,a!-es

    Tota1Amount

     Aggregates 0!mm nominalsi;e3Fand broken4

  • 8/9/2019 RCC Design of Anganwadi Footings.xls

    28/28