RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy- mm-dd 1 RBSP Instrument/Suite Name Critical Design Review PI

Upload: phebe-watkins

Post on 13-Dec-2015

223 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

RBSP

Rad

iati

on B

elt S

torm

Pro

bes

RBSP

Rad

iati

on B

elt S

torm

Pro

bes

ADD LOGO HERERBSP-instrument name CDR yyyy-mm-dd 1

RBSP Instrument/Suite Name

Critical Design Review

PI

Page 2: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

2

Instrument/Suite Name CDR Agenda

Topic Presenter Start Time Duration

Introductions & Meeting Logistics

Chairman’s Remarks

Program Manager Remarks

Science Overview

Systems Engineering

Subsystem n Design (ex. Detectors)

Subsystem n+1 Design (ex. FPGA)

Controller Electronics

Software

Mechanical Packaging/Structural Design

Thermal Design

Mechanisms

Power System (LVPS/HVPS)

GSE

Page 3: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

3

Instrument/Suite Name CDR Agenda

Topic Presenter Start Time Duration

Reliability Engineering

Radiation Engineering/Modeling

EMI/EMC analysis

Assembly, I&T

Calibration

Verification

Instrument Operations

Systems Assurance

Development Status

Risk Status

Documentation Status Summary

Review Board Caucus

Review Board Debrief/RFA Review

Page 4: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

4

Instrument/Suite Name Team

• 1-2 pages• Organization chart of the instrument/suite team members

– Include team member roles

– Include any key partners, subcontractors or major suppliers

– Highlight major changes since PDR

Page 5: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Entrance Criteria/Objectives

• 1-2 pages• List entrance criteria/objectives for the I-CDR

RBSP-instrument name CDR yyyy-mm-dd

5

Page 6: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name CDR Success Criteria

• 1-2 pages• List Success Criteria for the I-CDR as provided by the Project

RBSP-instrument name CDR yyyy-mm-dd

6

Page 7: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

7

Instrument/Suite NameScience Overview

• 3-4 pages• List of the major science objectives allocated to the instrument

and the resulting instrument performance requirements and specifications– List the major requirements that drive the instrument design and give

their parent (usually STARD).

– This may be best presented in a table as a compliance matrix

– Describe any changes to science requirements since PDR

– Describe any non-conformances in instrument performance

Page 8: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Space Weather Support

• <Instrument/Suite name> will broadcast data in real-time as part of the RBSP mission support of space weather modeling, forecast and prediction efforts

Particle Count Rates (electrons/ions/protons)<electron/ion/

proton> Energy# particle species

per # spins #polar (spin plane) angles

#az angles

#values #bits/value

Data Product Report Rate

(bps):

e.g. > 2 MeV (TBR)

1 1 1 8 8 12 9.6

Notes:All values reported once per spin, except ………Total bit rate: XX bps.

Magnetic/Electric Field/Wave Power/Plasma Density#values #bits/

valueData Product

Report Rate (bps):

e.g. 1 3D vector sample (3 components) 3 16 4.00

or

Tables can be provided by Nicky if necessary

RBSP-instrument name CDR yyyy-mm-dd

8

Page 9: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

9

Instrument/Suite Name Instrument Overview

• 1-2 pages • General description of the instrument to the level of the major

subsystems.– Block diagram of the total instrument– Serves as an introduction to the detailed presentations to follow

Page 10: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

10

Instrument/Suite Name Systems Engineering

• 5-7 pages • List major instrument/suite performance requirements trace to the major subsystems

– Include their parent requirement– May be best presented in a table as a compliance matrix– Describe any requirements changes since PDR– Include relevant document numbers and their release status

• Design description and top level specifications– Electrical and thermal instrument and components performance REQUIREMENTS – Software architecture and design– Mechanical design and analyses– Grounding diagram

• Mechanical and electrical interface requirements with other subsystems– Status of Instrument ICD (address any outstanding TBDs)– Instrument specification documentation status– Subsystem specification status– Status of any pending ECRs (engineering change requests)

• Resource requirements– Table of mass and power for the components– Commanding and housekeeping telemetry requirements– Power services required– Margins– Other

Page 11: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

11

Instrument/Suite Name Systems Engineering - continue

• Describe your approach to “worst case” or “defensive” design principles. Items to consider:

– the design’s response to spurious and out-of- specification inputs

– the extremes of operation

– performance and failure mode behavior

• Environmental design and test requirements• Summary of drawings

– Number of drawings required to build the FM instrument– Status of drawings

• Instrument Performance– Describe any known shortcomings in instrument performance relative to known science

requirements

• Identify any Long-Lead Time procurements not discussed in subsystem presentations

Page 12: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

12

Instrument/Suite NamePeer Reviews Held Since I-PDR

• 1-2 pages • List of Peer Reviews held since I-PDR (include requirements & design); more detailed

info presented in each appropriate section

Peer Review Name

Date Held

Reviewers # of A/I # of A/I closed

# of A/I open

Page 13: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

13

Instrument/Suite NameTechnical Changes since I-PDR

• 1-2 pages• Give each change (recommend table below).

– Give reason for change and provide impact, as appropriate, on resources of mass, power, size, telemetry, cost and schedule.

Change since I-PDR Reason for Change Impact on Resources

Page 14: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

14

Instrument/Suite Name Lessons Learned from Previous Missions

• 1 page• Summarize any applicable lessons learned from previous

missions….

• If you have no lessons learned, be prepared to say you’ve reviewed them as applicable to your instrument/suite

Page 15: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

15

Subsystem Name (ex. Detector System) Design Description

• 6-8 pages ; Subsystem design description, including• List major subsystem performance requirements

– Include their parent requirement– May be best presented in a table as a compliance matrix– Describe any changes in requirements or implementation since I-PDR

• Block diagram(s)• Subsystem design description and top level specifications

– Electrical and thermal subsystem design– Software architecture and design (if applicable)– Mechanical design and analyses– Design and performance margins– Discuss any changes since I-PDR

• Major mechanical and electrical interface requirements with other subsystems/components and how these are captured (mechanical ICD, electrical ICD, other?)

• Resource requirements– Table of mass and power for the components– Commanding and housekeeping telemetry requirements– Power services required– Other

• Breadboard/Engineering Model Testing– Status of testing– Approach to subsystem testing– Summarize tests– Results

• Describe ground handling• Results of special parts testing, as applicable• Results of packaging studies, show shielding plans

Page 16: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Subsystem Name (ex. Detector System - continued) Design Description

• Subsystem Verification– Plans for subsystem performance verification– Changes to plans for system verification since I-PDR– Status of any interface verification

• Subsystem Peer Reviews– Summary description of any subsystem peer reviews – Status of the action items (tabular format ok with list of actions items in backup)

• Discuss schedule for development/procurement• Describe any changes planned from the EM to the FM• Subsystem risks with mitigation plan and trigger dates per risk• Describe any open work relative to design work yet incomplete

– Include discussion of major component procurements– Include any major subcontracted fabrication activities

• Describe any special fabrication or test facility needs• Drawing release status• Parts/Materials PMPCB approval status

– Include derating results• Waivers sought against requirements

• Supporting the presentation (available hard copy in the room and electronically)– As-designed parts list with any parts requiring special screening identified– As-designed materials & processes list– Drawings (schematics, board artwork, assembly drawings)

RBSP-instrument name CDR yyyy-mm-dd

16

Page 17: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

17

Subsystem Name (ex. FPGA) Design Description

• 6-8 pages ; Subsystem design description, including• List major FPGA performance requirements

– Include their parent requirement– May be best presented in a table as a compliance matrix– Describe any changes in requirements or implementation since I-PDR

• Block diagram(s)• FPGA design description and top level specifications

– Electrical and thermal subsystem design– Software architecture and design (if applicable)– Design and performance margins– Discuss any changes since I-PDR

• Major interface requirements with other subsystems/components and how these are captured (mechanical ICD, electrical ICD, other?)

• Resource requirements– Table of mass and power for the components– Commanding and housekeeping telemetry requirements– Power services required– Other

• Breadboard/Engineering Model Testing– Status of testing– Approach to subsystem testing– Summarize tests– Results

• Describe ground handling

Page 18: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Subsystem Name (ex. FPGA - continued) Design Description

• FPGA Verification– Plans for FPGA performance verification– Changes to plans for FPGA verification since I-PDR– Status of any interface verification

• FPGA Peer Reviews– Summary description of any FPGA peer reviews – Status of the action items (tabular format ok with list of actions items in backup)

• Discuss schedule for development• Describe any changes planned from the EM to the FM• FPGA risks with mitigation plan and trigger dates per risk• Describe any open work relative to design work yet incomplete• Describe any special assembly or test facility needs• Drawing release status• Waivers sought against requirements

• Supporting the presentation (available hard copy in the room and electronically)– Drawings (schematics, board artwork, assembly drawings)

RBSP-instrument name CDR yyyy-mm-dd

18

Page 19: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

19

Controller ElectronicsDesign Description

• 6-8 pages • List major controller electronics performance requirements

– Include their parent requirement– May be best presented in a table as a compliance matrix– Describe any changes in requirements or implementation since I-PDR

• Block diagram(s)• Controller electronics design description and top level specifications

– Electrical and thermal subsystem design– Software architecture and design (if applicable)– Mechanical design and analyses– Design and performance margins– Discuss any changes since I-PDR

• Major mechanical and electrical interface requirements with other subsystems/components and how these are captured (mechanical ICD, electrical ICD, other?)

• Resource requirements– Table of mass and power for the components– Commanding and housekeeping telemetry requirements– Power services required– Other

• Breadboard/Engineering Model Testing– Status of testing– Approach to subsystem testing– Summarize tests – Results including any problems identified

• Describe ground handling• Results of special parts testing, as applicable• Results of packaging studies, show shielding plans

Page 20: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Controller Electronics - continued Design Description

• Controller Electronics Verification– Plans for controller electronics performance verification– Changes to plans for system verification since I-PDR– Status of any interface verification

• Controller Electronics Peer Reviews– Summary description of any controller electronics peer reviews – Status of the action items (tabular format ok with list of actions items in backup)

• Discuss schedule for development/procurement• Describe any changes planned from the EM to the FM• Controller Electronics risks with mitigation plan and trigger dates per risk• Describe any open work relative to design work yet incomplete

– Include discussion of major component procurements– Include any major subcontracted fabrication activities

• Describe any special fabrication or test facility needs• Drawing release status• Parts/Materials PMPCB approval status

– Include environmental worthiness of EEE components– Derating results

• Waivers sought against requirements• Radiation worthiness (both total dose and SEE)

• Supporting the presentation (available hard copy in the room and electronically)– As-designed parts list with any parts requiring special screening identified– As-designed materials & processes list– Drawings (schematics, board artwork, assembly drawings)

RBSP-instrument name CDR yyyy-mm-dd

20

Page 21: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

21

Controller Software Design Description

• See template previously distributed by G. Heiligman

Page 22: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

22

Mechanical Packaging & StructuralDesign Description

• 6-8 pages: Structural/Mechanical design description, including• Design description, with a complete and comprehensive definition of the

entire design. • Requirements and design changes since PDR and rationale• Analyses are completed for mechanical/structural loads, stress, dynamics,

fracture control, and torque margins & venting, thermal environment, including predicted performance and margins

– If applicable, finite element model demonstrating structural integrity of the housing under launch loads

– Analyses down to board level for electronics

• Presentation on all analysis margins• Presentation of all required mechanical GSE design • Combined optical, thermal and mechanical budgets (specifically internal

alignment plans)• Surface coating• Interface control documents (ICDs) formally released for subsystems• Final implementation plans, including engineering models, prototypes,

flight units, and spares. Include any changes planned from EM to FM

Page 23: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Mechanical Packaging & StructuralDesign Description - continued

• Engineering model/breadboard test results and design margins

• Mechanisms qualification

• Completed detailed design with bulk (~75%) of drawings signed off and ready for fabrication. (Drawings available.)

• Completed (or near completion) Materials Identification List (MIL) including procured components

• Brief report on fabrication plans and any items of concern for fabrication (possibly a report from an FFR, or a plan for one)

• Fabrication, Assembly, Integration and Test plan/procedure at instrument level, including a detailed handling plan. Include purge requirements

• Ground and in-flight calibration plans and their impact on mechanical alignments and I&T

• Environmental test plans and test flow with test verification matrix

• Integration and Environmental Test plans at observatory level– Include LV operation requirements (pre fairing install, shipping, erection, and at pad)– Purge requirements while on LV

RBSP-instrument name CDR yyyy-mm-dd

23

Page 24: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Mechanical Packaging & StructuralDesign Description - continued

• Mass report on margins, bottoms up mass stack-up reported• Presentation on mechanical risks (if any) to instrument delivery• Plans for shipping containers, environmental control, and

transportation & logistics• Waivers sought against requirements

RBSP-instrument name CDR yyyy-mm-dd

24

Page 25: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

25

Thermal Design Description

• 4-6 pages • Thermal design description, including

– List of instrument thermal requirements

– Description of implementation of thermal requirements

– Final design for the instrument thermal control

– Implementation plan

– Expected performance and margins

– Plans for thermal verification

– Plans for acquisition of any MLI, heaters or special surface finishes (paints, germanium black kapton, etc.)

Page 26: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

MechanismsDesign Description

• 6-9 pages• Design description, with a complete and comprehensive definition of the

entire release or deployment mechanisms used for the instrument. • Requirements and design changes since PDR and rationale• Implementation plans• Presentation on all design and analysis margins• Plans for verification• Discuss any peer reviews conducted since the PDR• EM testing and analysis shall be presented, including life tests if

applicable. • Safing philosophy shall be presented to verify that the mechanism will not

deploy unexpectedly. • Any heritage based information on similar mechanisms should also be

presented. • Test and validation plans specific to mechanisms should be presented. • Plans for verification of release and/or deployment shall be presented.

RBSP-instrument name CDR yyyy-mm-dd

26

Page 27: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

27

Power System - LVPS Design Description

• 6-9 pages • Low voltage power supply system final design description, including

– List major performance requirements for the low voltage power systems• include their parent requirement• may be best presented in a table as a compliance matrix• Include performance margins• Include environmental• Include magnetic cleanliness requirements• Include EMI/EMC requirements

– Block diagram(s)– Power system design description and top level specifications– Describe of the power supplies topology, circuit margins, packaging and thermal management– Interface requirements with other subsystems/components and how these are captured (ICD,

other?)– Resource requirements

• Table of mass and power for the components• Other

– Resource margins– Breadboard/Engineering Model Testing

• Summarize tests• Results• Current status

– Implementation plans– Work remaining to be done– Verification plans

Page 28: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Power System - LVPS Design Description - continued

– Results of special parts testing, as applicable– Results of packaging studies, show shielding plans– Plans for testing– LVPS Peer Reviews

• Summary description of any LVPS peer reviews since PDR• Status of the action items (tabular format ok with list of actions items in backup)

– Packaging of the LVPS • Include any thermal analyses related to the packaging

– Plans for EMI and ESD protection– Current status of EEE component procurements– Status of any custom magnetics development or any special screening imposed on a

DC/DC converter supplier– Discuss any special protection circuits (input over voltage, short circuit protection and any

internal failure detection/recovery circuits)

• Supporting the presentation– As-designed parts list with any parts requiring special screening identified– Schematics, assembly drawings, printed wiring board layout drawings

RBSP-instrument name CDR yyyy-mm-dd

28

Page 29: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Power System - HVPS Design Description

• 6-9 pages • High voltage power supply system final design description, including

– List major performance requirements for the high voltage power systems• include their parent requirement• may be best presented in a table as a compliance matrix• Include performance margins• Include environmental• Include magnetic cleanliness requirements• Include EMI/EMC requirements• Discuss any requirements changes since PDR

– Block diagram(s)– Power system design description and top level specifications– Describe of the power supplies topology, circuit margins, packaging and thermal

management– Interface requirements with other subsystems/components and how these are captured

(ICD, other?)– Resource requirements

• Table of mass and power for the components• Other

– Resource margins– Breadboard/Engineering Model Testing

• Summarize tests• Results• Current status

RBSP-instrument name CDR yyyy-mm-dd

29

Page 30: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Power System - HVPS Design Description - continued

– Implementation plans• Include any implementation plans since PDR

– Work remaining to be done– Verification plans– Results of special parts testing, as applicable– Results of packaging studies, show shielding plans

• Discuss E-field analysis performed on the design of the HVPS packaging• Plans for packaging• Include any thermal analyses related to the packaging

– Plans for testing– HVPS Peer Reviews

• Summary description of any HVPS peer reviews since PDR• Status of the action items (tabular format ok with list of actions items in backup)

– Plans for EMI and ESD protection– Current status of EEE component procurements– Status of any custom magnetics development or any special screening imposed on a

DC/DC converter supplier– Discuss any special protection circuits (input over voltage, short circuit protection and any

internal failure detection/recovery circuits)– Discuss safety, air-safe operation and enable/disable interfaces and control

• Supporting the presentation– As-designed parts list with any parts requiring special screening identified– Schematics, assembly drawings, printed wiring board layout drawings

RBSP-instrument name CDR yyyy-mm-dd

30

Page 31: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

31

Instrument/Suite Name GSE

• 2-4 pages• GSE design description, including

– EGSE and MGSE requirements and implementation associated with the GSE

– EGSE software including requirements, design and verification of EGSE software

– Instrument purge equipment

– Instrument shipping container

– Slings or other special fixtures needed to mount and align the instrument

Page 32: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Reliability Engineering

• 1-2 pages• Discuss any feedback/results of required instrument to

spacecraft FMEA analysis (analysis performed by the Project)• Identify any limited life items • Discuss any ongoing reliability engineering work • Any special reliability concerns shall be presented along with

mitigation plans.• Discuss GSE FMEA analysis results

RBSP-instrument name CDR yyyy-mm-dd

32

Page 33: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Radiation Modeling

• 1-2 pages• Present the final modeling results for radiation effects• Discuss requirements, implementation, margins and plans for

verification to meet the radiation requirements in the RBSP EDTRD.

• Present any special radiation concerns along with mitigation plans.

RBSP-instrument name CDR yyyy-mm-dd

33

Page 34: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

34

EMI/EMC Requirement Design Description

• 2-3 pages • Electromagnetic interference/compatibility requirements

description as defined in the EMECP, including– Requirements

– Specifications

– Implementation

– Margins

– Description of design mitigations to meet the requirements

– Description of testing to be performed to verify compliance

– Description of when the testing will take place

– Present any special EMI/EMC concerns along with mitigation plans

Page 35: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

35

Assembly, I&T Description

• 5-7 pages • Assembly, I&T description, including

– Flow chart(s) showing plans for the assembly, integration, functional and environmental testing (EMI, vibration, thermal balance, thermal vacuum, etc.), and calibration

– Major milestones in the I&T flow

– Description of any cleanliness requirements imposed on the mission by the instrument as well as any special facilities needed

– Instrument alignment requirements and plans for verification of alignment

– Purge requirements and plans for maintaining purge

– Expected number of operating hours on the instrument at launch

– Identify any special facilities

– Discuss any risks including mitigation plans

Page 36: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Calibration

• 2-4 pages• Detailed discussion of plans for instrument calibration

– facilities planned for calibration

– range of parameters over which the instrument will be calibrated

– any shortcomings to the calibration that bring into question the ability of the instrument to meet its mission science requirements

RBSP-instrument name CDR yyyy-mm-dd

36

Page 37: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

37

Instrument/Suite Name Verification Plans

• 2-4 page

• Describe the process for verifying all instrument interfaces (hardware & software), resources, form factor, performance and operations, environmental worthiness, and science performance requirements

• Discuss verification of internal redundancy (if applicable)

• Complete I&T plans and the I&T schedule shows credible task durations.

• Describe test plans, Provide test flow

• Present a verification cross reference matrix (It is expected that every verifiable element identified in the instrument specification document will be linked to a verification requirement. )

• Discuss any time-phased verification closure plans

• Discuss any verification activities which must be closed prior to flight hardware fabrication (design verification)

Page 38: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Verification Plans - continued

• Final design of all electrical GSE and special test requirements and facilities

• Plan for mechanical GSE, shipping containers and environmental control for the selected mode of transportation

• Supporting information available:– A verification plan exists (including science performance/calibration) that

shows traceability from subsystem to system level.

RBSP-instrument name CDR yyyy-mm-dd

38

Page 39: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

39

Flight Operations Description

• 2-4 pages • Describe the flight operations including

– key elements of the instrument ground system that allows the operation of the instrument

– command definitions and critical housekeeping telemetry definitions

– commanding path and telemetry data

– concept of operations for command and data handling of your instrument during the commissioning phase of the mission as well as normal operations shall be presented.

• Define all roles and responsibilities for the operations with signed ICDs available (if applicable)– Include plans for flight operations staffing

Page 40: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

40

Instrument/Suite Name Systems Assurance

• 6-9 page

• Identify performance assurance team and show organizational structure

• Describe flow down of performance assurance requirements• Describe Performance Assurance Matrix Status

– Identify any exceptions and status of exceptions

• Identify any waiver requests and status of approval

Waiver No.

Title DescriptionRequirement

Source

Waiver Approval Authority

Risk(High, Med, Low)

Status

Page 41: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• System Safety– Discuss status of inputs to the Missile System Prelaunch Safety Package

(MSPSP)– Discuss the instrument’s safety plan – Identify any safety hazards along with methods for controlling them– Discuss status of System Safety CDRLs

RBSP-instrument name CDR yyyy-mm-dd

41

Title CDRL # Due Date Status

Safety Data Inputs (MSPSP) - Interim MA-006-001B 30 DB I-CDR

Safety Data Inputs (MSPSP) - Baseline MA-006-001C 90 DB I-PSR

Page 42: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Reliability– Discuss results of the instrument to spacecraft FMEA performed by the Project– Discuss results of the instrument to GSE FMEAs performed– Discuss results of Worst Case Analysis– Discuss status of reliability CDRLs

RBSP-instrument name CDR yyyy-mm-dd

42

Title CDRL # Due Date Status

Performance Assurance Matrix - Update MA-001-001C 03/30/09

Inputs for FMEA - Baseline MA-002-002B 60 DB I-CDR

GSE Interface FMEA - Preliminary MA-002-007A 60 DB I-CDR

GSE Interface FMEA - Baseline MA-002-007A20 days after receipt of

comments from APL on prelim.

Limited Life Item List - Baseline MA-002-009B 30 DB I-CDR

As-Designed Parts List MA-005-002B 60 DB I-CDR

Page 43: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Critical Suppliers– Describe procurement process including flow down of requirements– Identify critical supplier (if applicable)

RBSP-instrument name CDR yyyy-mm-dd

43

Critical PartSelected Supplier

Supplier Approval Status

Supplier Site Visit

Heritage

Page 44: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Parts– EEE parts selection and screening plans– Plans for selection and qualification of special items such as detectors and

mechanisms– Discuss status of Parts Identification List (PIL)– Discuss status of Parts Stress Analysis (have analyses available if requested)

– Discuss PMPCB review/approval status

RBSP-instrument name CDR yyyy-mm-dd

44

Title CDRL # Due Date Status

As-Designed Parts List MA-005-002B 60 DB I-CDR

PartsCE

ApprovalRadiation Engineering

ApprovalScreening/ Qual

Approval

PMPCB Approval TOTAL

EEE Parts Enter qty Enter qty Enter qty Enter qty Enter qty

Detectors Enter qty Enter qty Enter qty Enter qty Enter qty

ASICs Enter qty Enter qty Enter qty Enter qty Enter qty

Hybrids Enter qty Enter qty Enter qty Enter qty Enter qty

Page 45: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Materials and Processes– Materials selection and screening plans– Discuss any special processes needed to build the instrument– Discuss status of Material Identification List (MIL)

– Discuss PMPCB review/approval status

RBSP-instrument name CDR yyyy-mm-dd

45

Title CDRL # Due Date Status

As-Designed Materials & Processes List SE-007-009B 30 DB I-CDR

M&P Category

AcceptableQualified

AcceptableConditional Acceptable

Not Acceptable

Not Yet Evaluated

TOTAL

Non-Metallic Materials

Enter qty Enter qty Enter qty Enter qty Enter qty Enter qty

Metallic Materials

Enter qty Enter qty Enter qty Enter qty Enter qty Enter qty

Processes Enter qty Enter qty Enter qty Enter qty Enter qty Enter qty

Page 46: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Limited Life Items– Indentify limited life items (if applicable) and status

RBSP-instrument name CDR yyyy-mm-dd

46

ItemSystem Affected

Limit/ Expected

Life

Reasonfor Limited

Life

Required Life

Duty Cycles

How Addressed/ Rationale for

Selection

Example:

EEPROM Program/ Erase

Program/erase cycles limited to 10,000 cycles

Manufacturer specification

Anticipate well under 100 cycles

Anticipate well under 100 cycles

Derate devices, track cycles through ground operations and in flight

Page 47: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Software Assurance– Describe software assurance requirements– Discuss software assurance activities and plans

• Configuration Management– Discuss configuration management requirements– Describe configuration management process being used– Discuss flight drawing status

– Estimated release date of all mechanical drawings: – Estimated release date of all electrical drawings:

RBSP-instrument name CDR yyyy-mm-dd

47

Drawings Total ReleasedComplete

but not released

Designed, not drawn

Not designed

Mechanical # (%) # (%) # (%) # (%) # (%)

Electrical # (%) # (%) # (%) # (%) # (%)

Page 48: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Contamination Control– Discuss contamination control and ESD requirements– Describe contamination control and ESD plan– Identify any special contamination control needs for your instrument/suite during

instrument I&T and during spacecraft I&T

• Work Order Travelers– Describe your process for developing, approving, use, and archiving work order

travelers– Discuss status of work order traveler development

• Inspection Flow– Describe the inspection process

• What is the process if an anomaly is observed?• What activities will SQA be required to witness/verify• Identify Project-APL mandatory inspection points• Where are inspection results recorded?

RBSP-instrument name CDR yyyy-mm-dd

48

Page 49: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Systems Assurance - continued

• Nonconformance Process– Describe the nonconformance process– Discuss any nonconformances already incurred

• Problem / Failure Reporting Process– Describe problem/failure reporting process– Discuss the method to be used for tracking PFRs– Discuss the method to be used for reporting PFRs per the Project requirements

• Material Review Board Process– Describe MRB process– Discuss minimum MRB membership– Describe APL’s (Project) role in the instrument MRBs

• GIDEP Status– List any pending GIDEP/NASA Alert open issues and status of resolution

RBSP-instrument name CDR yyyy-mm-dd

49

Page 50: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Programmatics/Development Status

• 6-8 slides • Should include (in the following pages):

– Performance to date • Use of schedule reserve• Use of reserve funds• Cost/performance summary (can use EVM statistics)

– Schedule moving forward (including critical path)• Include % of total remaining tasks on critical path• Include path closest to critical path and how far off the critical path it is

– Cost plan summary moving forward– Long lead items status (including detectors)

• Top level evidence that you have a realistic schedule with sufficient cost that can complete the instrument delivery and support post delivery

• APL can help with the charts in the following pages if information is provided beyond the EVM/533 reports

RBSP-instrument name CDR yyyy-mm-dd

50

Page 51: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

51

Instrument/Suite Name Risk Status

• 2-3 pages• Describe risk status, including

– 5x5 risk matrix

– Stop light chart showing instrument risks, consequences and likelihood

– Risk mitigation plans with associated implementation dates

– Threats and liens

Page 52: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

52

Instrument/Suite Name Development Status

• 1 page• Describe development status, including

– Project schedule showing critical path, schedule reserves and margins

Page 53: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Development Status - continued

– Present the following metrics with respect to the Phase C/D baseline schedule (can use charts):

• Schedule reserve burn plan vs actual

RBSP-instrument name CDR yyyy-mm-dd

53

Page 54: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Development Status - continued

• Progress Milestones (Monthly count of completed milestones: plan vs. actual; discrete and cumulative)

RBSP-instrument name CDR yyyy-mm-dd

54

Page 55: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Development Status - continued

• Contract Milestones (Monthly count of completed milestones: plan vs. actual; discrete and cumulative)

RBSP-instrument name CDR yyyy-mm-dd

55

Page 56: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Development Status - continued

• Drawing releases (Monthly count of completed drawing releases: plan vs. actual; discrete and cumulative)

RBSP-instrument name CDR yyyy-mm-dd

56

Page 57: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Development Status - continued

• Parts kit need date (Monthly count of parts kits needed: plan vs. actual; discrete and cumulative)

RBSP-instrument name CDR yyyy-mm-dd

57

Page 58: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Instrument/Suite Name Development Status - continued

– Long lead item status

– List of threats to the schedule and schedule risk mitigation plans

– Trends in the schedule performance of the team such as the gain or loss of float along the critical path

RBSP-instrument name CDR yyyy-mm-dd

58

Page 59: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Success CriteriaCDR Content Requirements Addressed

CDR Content Requirement AddressedEvidence of Compliance

The detailed design is expected to meet the requirements with adequate margins at an acceptable level of risk.

Interface control documents are sufficiently matured to proceed with fabrication, assembly, integration, and test, and plans are in place to manage any open items.

High confidence exists in the product baseline, and adequate documentation exists or will exist in a timely manner to allow proceeding with fabrication, assembly, integration, and test.

The product verification and product validation requirements and plans are complete.

The testing approach is comprehensive, and the planning for system assembly, integration, test, and launch site and mission operations is sufficient to progress into the next phase.

Adequate technical and programmatic margins and resources exist to complete the development within budget, schedule, and risk constraints.

RBSP-instrument name CDR yyyy-mm-dd

59

Page 60: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE

Success CriteriaCDR Content Requirements Addressed

CDR Content Requirement AddressedEvidence of Compliance

Risks to success are understood and credibly assessed, and plans and resources exist to effectively manage them.

Safety and mission assurance (e.g., safety, reliability, maintainability, quality, and EEE parts) have been adequately addressed in system and operational designs, and any applicable S&MA products (e.g., PRA, system safety analysis and failure modes and effects analysis) have been approved.

RBSP-instrument name CDR yyyy-mm-dd

60

Page 61: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

RBSP

Rad

iati

on B

elt S

torm

Pro

bes

RBSP

Rad

iati

on B

elt S

torm

Pro

bes

ADD LOGO HERERBSP-instrument name CDR yyyy-mm-dd 61

Instrument/Suite Backup

Page 62: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

62

Instrument/Suite Name Summary of Documentation Status

• 1 page• Give a list of your documents and their release status

– Include requirements docs

– Specs

– Limited life item list

– Other matrix required documents

– CDRL status

Page 63: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

63

Documents to be available at CDR

• Deliverable documents to be available at the review (delivery due date prior to the review – see CDRL)

– Instrument Requirements Document – baseline (SE-001-001C)– Deviations/Waivers (CM-002-004)– Performance Assurance Matrix – update (MA-001-001C)– GSE Interface FMEA – baseline (MA-002-007A)– Limited Life Items List – baseline (MA-002-009B)– As-Designed Parts List (MA-005-002B)– Spares List – baseline (MS-006-001)– Long Lead Items List – as applicable (MS-006-002)– CMD/TLM Definitions – preliminary (SE-005-001B)– Instrument User’s Manual Information – preliminary (SE-006-001A)– As-Designed Materials and Processes List – (SE-007-009B)– Software Requirements Document – baseline (SW-002-001B)– Software Integration, Verification and Test Plans – preliminary (SW-005)– Instrument Verification & Validation Plan – preliminary (TE-001-002A)– Test Plan Inputs for S/C I&T – baseline (TE-004-001B)– Instrument Test and Calibration Plan – preliminary (TE-001-002A)

• Available documents at the review– Indentured Drawing List – baseline (CM-002-001B)– Top Level Assembly Drawing – baseline (CM-002-002B)– Drawings & Schematics – baseline (CM-002-003B)– Instrument to spacecraft ICD - draft (SE-002-001D)– Contamination Control Plan (SE-008)– Subsystem Interface Control Documents

Page 64: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

64

Instrument/Suite Name Peer Review Action Item Summary

• Requirements Peer Review (fill in table)

AI Number Statement Response Closure date, if not closed

• Pre-CDR Peer Review (fill in table)

AI Number Statement Response Closure date, if not closed

Page 65: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

65

Instrument/Suite Name Design Trades

• 1-2 pages ….fill in table

Design Trades completed since I-PDR

Trade number

Trade Description Result

Page 66: RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd1 RBSP Instrument/Suite Name Critical

ADD LOGO HERE RBSP-instrument name CDR yyyy-mm-dd

66

Instrument/Suite Namemore backup

• More backup slides as required