@rajendra yadav resume_1

9
RAJENDRA YADAV Engineer (Pipeline/Piping Construction) Mobile +91-9967546232/+968-94412415 (Oman) E-mail – [email protected]

Upload: rajendra-yadav

Post on 15-Apr-2017

112 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: @RAJENDRA YADAV Resume_1

RAJENDRA YADAV Engineer (Pipeline/Piping Construction) Mobile +91-9967546232/+968-94412415 (Oman) E-mail – [email protected]

Permanent Address:Vill. DhirauliNanKarVishunpur JaunpurU.P. India

Present Address:Arabian camp, Sohar, Oman

Personal Data:Father : Late Phunnan Yadav

Sex : MaleNationality : IndianM. Status. : MarriedLanguage : English.Hindi

Passport No:LKOA04620312

Computer Skills: 1. Windows-2000/XP 2. Microsoft Office 2007 3. MS Office 4. AUTO CAD 2006

Strengths : 1 . C o n fi d e n t 2 . H a r d w o r k i n g 3 . G o o d L i s t e n e r 4 . Q u i c k L e a r n i n g

Career Objective

To become a part of your prestigious organization that would utilize my knowledge to fulfill its good and in the process provide an environment conducive to further personal and professional growth.

Professional ProfileA Graduate Mechanical Engineer having More than 10 Year 6 Months of experience in construction of Mechanical projects especially in Pipe Line, Piping, Structure, Tanks, Heaters, and Equipment Erection. With exposure in various Petrochemicals, oil Gas Refinery. Experience in Execution, Quality, Fabrication, Erection, Inspection and Material Handling.

Familiar with Piping Codes like ASME, ASTM, API, IS. Knowledge of Erection procedure & erection Scheme. Knowledge of Job Procedure, QAP/ITP/FQP/IMIR/IRN. Knowledge of Drawings and drawing & details. Knowledge of Welding & Welding Procedures. Certified in ASNT- Level II in ( RT, DPT, MPT )

Professional Skills Pipe Line (Stringing, Welding, Pre-padding, Post padding, Lowering,

Tie-in , Backfilling, Foc laying , CP clit etc.) Billing of contractor and client. Material reconciliation Final billing and close-up of contract. Pipe fabrication, erection & testing Making arrangements for erection like checking orientation, if required

& Preparation of documents as per approved procedures & ITP. Marking of Joint no. & spool no. on piping ISO drawings. Identification of piping material as per approved PMS. Supervision of piping Fabrication & Erections as per Isometric

drawings, GA drawings & piping & instrument diagram (P&ID). Aware piping standards, Codes, procedures for fabrication, erection &

Welding of plant piping work. Mechanical clearance of pipe as per work order. Pneumatic / Hydro test arrangement done as per approved line list. Box up of fluid loops completely up to handover of respective loop to

the client.

Total Experience : 10 Year 6 Months

Page 2: @RAJENDRA YADAV Resume_1

General

Ensure that the work is carried out as per standards, drawings, maintaining quality & safety Make necessary QC documents. Supervise the work and give necessary clarifications to contractors as required. Make day-to-day planning and monitor the progress at site. Arrange stage wise inspection as required and get clearance from competent authority. Scrutinize contractor’s bills and submit to contract-cell. Leading a team of engineers & other supporting staff for time bond completion Assignment.

Work ExperienceSN. COMPANY Duration CLIENT PROJECT NAME

1 The Oman Construction Company(TOCO)

March 2015 to

Till Date

Oxy,Oripic, BP Installation of compressor piping,Tie-in, shut down etc , 18” Muscat Sohar Pipe Line, 36”KHAZZAN GAS EXPORT PIPE LINE

2 Reliance Industries LTD 9 Months Reliance Industries LTD J3

3 Triune Energy Services Pvt. Ltd 1.6 Years IOC Limited., Mathura OHCU REVAMP & Shutdown

ProjectsONGC

Uran, MaharastraAPU

ONGC Refinery4 Larsen & Toubro Ltd.

ECC Division 3 Years Cairn EnergyBarmer Rajasthan

Mangala Processing Terminal & Pipeline

5 L & T Ecc(AEPL Pay Roll) 1.9 Years Reliance Industries

LimitedJERP

Reliance Refinery6 UFlex Industries Limited 2 Years UFlex Industries Limited FWNP

Noida

The Oman Construction Company(TOCO)EMPLOYER : The Oman Construction Company(TOCO)CLIENT : Oripic, Oman/ British Petroleum (BP), occidental of oman (OXY)PROJECT : 18” Muscat Sohar Pipe Line Project, 36” Gas Export Pipe Line KhazzanDESIGNATION : Project Engineer (Construction)DURATION : 28 March 2015 to till dateBRIEF DESCRIPTION OF PROJECT

1) Multi product Pipe Line construction of 227 Kilometers from Muscat to Sohar.2) Installation of compressor piping , Tie-in,Revamp ,shutdown , Roto and PE Lining , Flow line

project in OXY.3) 36“dia Gas export pipeline project BP khazzan .

Roles & responsibilities

Planning and Execution of Pre-construction survey. Planning of all activities for the mobilization of construction facilities. Participation in meetings with top management and client regarding execution of site activities. Site coordination. Planning and Execution of Pre-construction survey Execution of permits in consultation with clients.

Page 3: @RAJENDRA YADAV Resume_1

Execution of pipeline activities in accordance with the engineering and design. Strict planning and Implementation to get the desired output in line of production in accordance with

client quality and HSE standards.

Page 4: @RAJENDRA YADAV Resume_1

Reliance Industries LTDEMPLOYER : Reliance Industries LTDCLIENT : Reliance Industries LTD, JamnagarPROJECT : J3 ProjectDESIGNATION : Manager PipingDURATION : 02 July 2014 to 20 March 2015

BRIEF DESCRIPTION OF PROJECT

Overall supervision fabrication shop. Execution, fabrication, erection & hydro testing of Piping & Tanks as per approved QAP/ITP. System wise Loop marking, Loop Test Pack & Mechanical Clearance Inspection & Formatting. Witness of Hydro Test, Air Blasting and final box-up. Witness of Blasting-Painting, Wrapping & Coating and DP Test. Inspection of Incoming Material & Reviewed of MTC & IRN. Witness of Equipment erection, Final alignments and grouting.

Triune Energy Services Pvt. Ltd. (PMC of Project)

EMPLOYER : Triune Energy Services Pvt. Ltd (PMC of Project)CLIENT : IOC Limited., MathuraPROJECT : OHCU REVAMP & Shutdown ProjectsDESIGNATION : Sr.Mechanical Engineer (Site Incharge)DURATION : 22 july-2013 to 30 june 2014,

CLIENT : ONGC Limited., UranPROJECT : ADDITIONAL PROCESS UNIT(APU) ProjectsDESIGNATION : Sr.Mechanical Engineer (Piping)DURATION : 04 Feb-2013 to 22 july- 2013

BRIEF DESCRIPTION OF PROJECT

Overall supervision & Control of APU project as PMC. Execution of fabrication, erection & hydro testing of Piping & Tanks as per approved QAP/ITP. System wise Loop marking, Loop Test Pack & Mechanical Clearance Inspection & Formatting. Witness of Hydro Test,and final box-up. Witness of Blasting-Painting, Wrapping & Coating and DP Test. Inspection of Incoming Material & Reviewed of MTC & IRN. Witness of Equipment erection, Final alignments and grouting.

Page 5: @RAJENDRA YADAV Resume_1

Larsen & Toubro Ltd. BarmerEMPLOYER : Larsen & Toubro Ltd. ECC Division.CLIENT : Crain Energy, BarmerDESIGNATION : Sr Mechanical EngineerDURATION : 10 March 2010 to 02 Feb 2013Cairn Energy project; 24” dia BSPL Pipe line Project , Viramgam Ahmadabad & MPT Project Barmer Rajasthan

L & T Ecc ( AEPL Pay roll)EMPLOYER : L & T Ecc ( AEPL.Pay roll)CLIENT : RIL JamnagarPROJECT : JERP Reliance RefineryDESIGNATION : MechanicalEngineerDURATION : 5 July 2008 to 10 March 2010

Project worked over is piping execution in Reliance JERP (Jamnagar export refinery project ) Jamnagar ,Successfully Completed crude distillation unit/ vacuum distillation unit and coker unit in JERP.

UFlex Industries Limited NoidaEMPLOYER : UFlex Industries LimitedCLIENT : UFlex Industries LimitedPROJECT : FWNPDURATION : 07 June 2006 to 24 June 2008

UFlex Industries Limited (Formerly known as Flex Industries Limited), Noida from 06 June 2006 to 5 June 2008)

Educational Details

B. Tech (Mechanical) 2002-2006

Certification

Certified in ASNT- Level II from American Society of Non Destructive Test in1. RT 2. DPT 3. MPT

Declaration

I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

Place : Date : Rajendra Yadav

Page 6: @RAJENDRA YADAV Resume_1