rainfall-runoff modeling (2)

106
Applied Hydrology RSLAB-NTU Lab for Remote Sensing Hydrology and Spatial Modeling 1 Rainfall-Runoff Modeling (2) Professor Ke-Sheng Cheng Dept. of Bioenvironmental Systems Engineering National Taiwan University

Upload: armen

Post on 24-Feb-2016

95 views

Category:

Documents


1 download

DESCRIPTION

Rainfall-Runoff Modeling (2). Professor Ke-Sheng Cheng Dept. of Bioenvironmental Systems Engineering National Taiwan University. Peak flow estimation. Rational method Empirical method Unit hydrograph technique. The concept of Isochrones. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Rainfall-Runoff Modeling (2)

1

Applied Hydrology

RSLAB-NTU

Lab for Remote Sensing Hydrology and Spatial Modeling

Rainfall-Runoff Modeling (2)

Professor Ke-Sheng ChengDept. of Bioenvironmental Systems EngineeringNational Taiwan University

Page 2: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

2

Peak flow estimation

Rational methodEmpirical methodUnit hydrograph technique

Page 3: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

3

The concept of Isochrones

Let’s assume that raindrops fall on a spatial point x within the watershed require an amount of travel time t(x) to move from point x to the basin outlet.

Page 4: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

4

Contour lines of the travel time are termed as isochrones (or runoff isochrones) of the watershed.

The highest value of isochrones represents the time of concentration of the watershed.

Assume the effective rainfall has a constant intensity (in time) and is uniformly distributed over the whole watershed, i.e.,

constant),( ee itxi

Page 5: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

5

If the effective rainfall duration tr = 2 hours, what is the peak direct runoff at the basin outlet? When will the peak flow occur? When will the direct runoff end?

Page 6: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

6

The time of peak flow occurrence is dependent on the relative magnitude of Ai’s.

Page 7: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

7

If the effective rainfall duration tr = 10 hours, what is the peak direct runoff at the basin outlet? When will the peak flow occur? When will the direct runoff end?

Page 8: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

8

The watershed storage effect is neglected.

Page 9: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

9

Under the assumptions of constant intensity and uniform spatial distribution for effective rainfall, the peak direct runoff occurs at the time t = tc, if the duration of the effective rainfall is longer than or equal to tc.

Page 10: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

10

cttr

Page 11: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

11

However, for storms with duration shorter than tc, the peak flow and its time of occurrence depend on relative magnitude of contributing areas (Ai’s).

cttr

Page 12: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

12

Rational method for peak flow estimation

Consider a rainfall of constant intensity and very long duration occurring uniformly over a basin. The runoff gradually increases from zero to a constant value as shown in the following figure.

tcoefficien runoff

c

ciAAiQ ep

Page 13: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

13

Practical application of the rational method for peak flow estimation

Calculating the time of concentration, tc.Determining the average rainfall intensity i

from the IDF curve using tc as the storm duration and a predetermined return period T.

Calculating the runoff coefficient, c.Calculating the peak direct runoff

tcoefficien runoff

c

ciAAiQ epIn engineering practice, it is normally restricted to catchments with basin area not exceeding 15 km2.

Page 14: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

14

Unit hydrograph of the modified rational method

Original rational method only estimates the peak flow. It does not yield the complete runoff hydrograph.

cttr cttr cttr

Neglecting the watershed storage effect.2tc tc+tr

Page 15: Rainfall-Runoff Modeling (2)

15

Synthetic unit hydrographs For areas where rainfall and runoff data are not

available, unit hydrograph can be developed based on physical characteristics of the watershed. Clark’s IUH (time-area method) SCS unit hydrograph Linear reservoir model (Nash model)

Page 16: Rainfall-Runoff Modeling (2)

16

Clark’s IUH (time-area method) The concept of isochrones

Isochrones are lines of equal travel time. Any point on a given isochrone takes the same time to reach the basin outlet. Therefore, for the following basin isochrone map and assuming constant and uniform effective rainfall, discharge at the basin outlet can be decomposed into individual contributing areas and rainfalls.

Page 17: Rainfall-Runoff Modeling (2)

17

Contributing area and contributing rainfall

Page 18: Rainfall-Runoff Modeling (2)

18

Page 19: Rainfall-Runoff Modeling (2)

19

Using the basin isochrone map, the cumulative contributing area curve can be developed. The derivatives or differences of this curve constitute the instantaneous unit hydrograph IUH(t).

Time base of the IUH is the time of concentration of the watershed.

Page 20: Rainfall-Runoff Modeling (2)

20

If the effect of watershed storage is to be considered, the unit hydrograph described above is routed through a hypothetical linear reservoir with a storage coefficient k located at the watershed outlet.

For a linear reservoir with storage coefficient k, we have

Page 21: Rainfall-Runoff Modeling (2)

21

Consider the continuity of the hypothetical reservoir during a time interval t.

Page 22: Rainfall-Runoff Modeling (2)

22

Example. A watershed of 1000-acre drainage area has the following 15-minute time-area curve. The storage coefficient k of the watershed is 30 minutes. Determine the 15-minute unit hydrograph UH(15,t).

Page 23: Rainfall-Runoff Modeling (2)

23

Page 24: Rainfall-Runoff Modeling (2)

24

Area between isochrones t = 0 and t = 0.25 hr is 100 acres. Since we are interested in the unit hydrograph UH(15-min, t), the rainfall intensity in the time period (0.25 hr) should be 4 inch/hr. Therefore, the ordinate of UH(15-min, t) at time t = 0.25 hr is:4 inch/hr (1/12 ft/inch) (1/3600 hr/sec) 100 acres

(43560 ft2/acre) = 403.33 cfs

Page 25: Rainfall-Runoff Modeling (2)

25

Synthetic unit hydrographs

Clark’s IUH (time-area method) SCS unit hydrograph Linear reservoir model (Nash model)

Page 26: Rainfall-Runoff Modeling (2)

26

SCS unit hydrograph

Note: tb > tr+tc. The SCS UH takes into account the storage effect.

Page 27: Rainfall-Runoff Modeling (2)

27

Misuse of SCS UH – an example

tc=0.5

Page 28: Rainfall-Runoff Modeling (2)

28

Synthetic unit hydrographs

Clark’s IUH (time-area method) SCS unit hydrograph Linear reservoir model (Nash model)

Page 29: Rainfall-Runoff Modeling (2)

29

Nash’s linear reservoir model Consider a linear reservoir which has the

following characteristics:

)()( tKQtS

Page 30: Rainfall-Runoff Modeling (2)

30

Page 31: Rainfall-Runoff Modeling (2)

31

Page 32: Rainfall-Runoff Modeling (2)

32

)1()( / kteItQ

Page 33: Rainfall-Runoff Modeling (2)

33

Page 34: Rainfall-Runoff Modeling (2)

34

Page 35: Rainfall-Runoff Modeling (2)

35

Page 36: Rainfall-Runoff Modeling (2)

36

Summary of the Conceptual IUH modelAssumption: Linear Reservoir S(t)=kQ(t)

Page 37: Rainfall-Runoff Modeling (2)

Lab for Remote Sensing Hydrology and Spatial ModelingRSLAB-NTU

37

Relationship between IUH and the S curve

Page 38: Rainfall-Runoff Modeling (2)

38

Page 39: Rainfall-Runoff Modeling (2)

39

Page 40: Rainfall-Runoff Modeling (2)

40

Page 41: Rainfall-Runoff Modeling (2)

41

Page 42: Rainfall-Runoff Modeling (2)

42

Page 43: Rainfall-Runoff Modeling (2)

43)1(1)1(

1][1][

)(1)]1()1([

)(

)(

Kt

Kt

Kt

Kt

Kt

Kt

Kt

Ktt

Kt

Ktt

Kt

eetA

teAe

teeeA

teeA

ttt

eAeA

Page 44: Rainfall-Runoff Modeling (2)

44

Page 45: Rainfall-Runoff Modeling (2)

45

The Nash Linear Reservoir Model

Page 46: Rainfall-Runoff Modeling (2)

46

Page 47: Rainfall-Runoff Modeling (2)

47

The above equation represents a gamma density function, and thus the integration over 0 to infinity yields 1 (one unit of rainfall excess).

Page 48: Rainfall-Runoff Modeling (2)

48

Parameter estimation for n and k The IUH of the n-LR system is characterized by

a function which is identical to the gamma density.

=M1

=M2

Page 49: Rainfall-Runoff Modeling (2)

49

The direct runoff can be expressed as a convolution integral of the rainfall excess and IUH, i.e.

If the direct runoff hydrograph (DRH) is divided by the total volume of direct runoff, it can be viewed as a density function. Thus, denotes a density function of a random variable t.

The first moment of this rescaled DRH is

t

dtuitQ0

)()()(

)(/)( tqVtQ DRH

0 001 )()(1)( dtdtuit

VdtttqM

DRHQ

Page 50: Rainfall-Runoff Modeling (2)

50

The second moment of the rescaled DRH is

Similarly, the first and second moments of the rescaled effective rainfall can be respectively expressed as

0 0

2

0

22 )()(1)( dtdtuit

VdttqtM

DRHQ

01 )(1 dttti

VM

ERHI

0

22 )(1 dttitV

MERH

I

Page 51: Rainfall-Runoff Modeling (2)

51

It can be shown that

Thus, given the ERH and DRH, the parameters n and k can obtained from the above equations.

nkMM IQ 11

12

22 2)1( IIQ nkMknnMM

Page 52: Rainfall-Runoff Modeling (2)

52

Calculation of

1IM21 and II MM

Page 53: Rainfall-Runoff Modeling (2)

53

Calculation of 21 and QQ MM

Page 54: Rainfall-Runoff Modeling (2)

54

坡地開發滯留池之水文設計Hydrological Analysis for Detention Pond Design in Hillslope Development

Page 55: Rainfall-Runoff Modeling (2)

55

坡地開發水文設計相關規範

Page 56: Rainfall-Runoff Modeling (2)

56

Page 57: Rainfall-Runoff Modeling (2)

57

Page 58: Rainfall-Runoff Modeling (2)

58

Page 59: Rainfall-Runoff Modeling (2)

59

Page 60: Rainfall-Runoff Modeling (2)

60

Page 61: Rainfall-Runoff Modeling (2)

61

Page 62: Rainfall-Runoff Modeling (2)

62

Page 63: Rainfall-Runoff Modeling (2)

63

Page 64: Rainfall-Runoff Modeling (2)

64

Page 65: Rainfall-Runoff Modeling (2)

65

Page 66: Rainfall-Runoff Modeling (2)

66

Page 67: Rainfall-Runoff Modeling (2)

67

現行設計規範之檢討

Page 68: Rainfall-Runoff Modeling (2)

68

Page 69: Rainfall-Runoff Modeling (2)

69

Page 70: Rainfall-Runoff Modeling (2)

70

Page 71: Rainfall-Runoff Modeling (2)

71

Page 72: Rainfall-Runoff Modeling (2)

72

Page 73: Rainfall-Runoff Modeling (2)

73

Page 74: Rainfall-Runoff Modeling (2)

74

Page 75: Rainfall-Runoff Modeling (2)

75

Page 76: Rainfall-Runoff Modeling (2)

76

Page 77: Rainfall-Runoff Modeling (2)

77

Page 78: Rainfall-Runoff Modeling (2)

78

Page 79: Rainfall-Runoff Modeling (2)

79

Page 80: Rainfall-Runoff Modeling (2)

80

Page 81: Rainfall-Runoff Modeling (2)

81

Page 82: Rainfall-Runoff Modeling (2)

82

Page 83: Rainfall-Runoff Modeling (2)

83

Page 84: Rainfall-Runoff Modeling (2)

84

Page 85: Rainfall-Runoff Modeling (2)

85

Page 86: Rainfall-Runoff Modeling (2)

86

Page 87: Rainfall-Runoff Modeling (2)

87

Page 88: Rainfall-Runoff Modeling (2)

88

Page 89: Rainfall-Runoff Modeling (2)

89

Page 90: Rainfall-Runoff Modeling (2)

90

Page 91: Rainfall-Runoff Modeling (2)

91

7957)1020(10)60/15(14.159 43

103502/)60/60(75.5

Page 92: Rainfall-Runoff Modeling (2)

92

Page 93: Rainfall-Runoff Modeling (2)

93

Page 94: Rainfall-Runoff Modeling (2)

94

Page 95: Rainfall-Runoff Modeling (2)

95

Page 96: Rainfall-Runoff Modeling (2)

96

Page 97: Rainfall-Runoff Modeling (2)

97

Page 98: Rainfall-Runoff Modeling (2)

98

Page 99: Rainfall-Runoff Modeling (2)

99

Page 100: Rainfall-Runoff Modeling (2)

100

Page 101: Rainfall-Runoff Modeling (2)

101

Page 102: Rainfall-Runoff Modeling (2)

102

Page 103: Rainfall-Runoff Modeling (2)

103

Page 104: Rainfall-Runoff Modeling (2)

104

逕流量分析 ( 水土保持技術規範第 十七條 ) 洪峰流量之估算,有實測資料時,得採用單位歷線分析;面積在一千公頃以內者,無實測資料時,得採用合理化公式 (Rational Formula) 計算。合理化公式如下:

。公頃:集水區面積小時公釐:降雨強度

無單位:逕流係數

秒立方公尺:洪峰流量式中,

)(),/(

),(

),/(

3601

AIC

Q

CIAQ

p

p

Page 105: Rainfall-Runoff Modeling (2)

105

滯洪設施規劃設計原則 ( 水土保持技術規範第 九十五 條 )

Page 106: Rainfall-Runoff Modeling (2)

106

滯洪量之估算( 水土保持技術規範第 九十六 條 )