rain trail project – fry road in greenwood, indiana

15
Greenwood’s Fry Road Rain Trail

Upload: wessler-engineering

Post on 21-Mar-2017

204 views

Category:

Engineering


3 download

TRANSCRIPT

Page 1: Rain Trail Project – Fry Road in Greenwood, Indiana

Greenwood’s Fry Road Rain Trail

Page 2: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

The Problem

Page 3: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

The Problem

Page 4: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

The Problem• Standing Water• Erosion/Water Quality• Maintenance• Aesthetics

Page 5: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

The Solution

A Pipe!

Page 6: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

“Can we get a sidewalk too? How about a bike path? Something ‘green’ would be nice.”

Page 7: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

A New Approach• What if the path was part of the drainage

conveyance?• If we utilize porous pavement, an aggregate

recharge bed, and perforated pipe; we can reduce the size of the pipe while providing a water quality benefit.

Page 8: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

Introducing: The Rain Trail

Page 9: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

Introducing: The Rain Trail

Porous Asphalt

Aggregate Recharge Bed

Filter Fabric

Page 10: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

How Does it Work?

Page 11: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

How Does it Work?

• Runoff percolates through pavement• Stored in Aggregate Recharge Bed• Runoff in excess of soil infiltration capacity enters

perforated pipe

Page 12: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

Construction

Page 13: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

The Finished Product

Page 14: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

Challenges & Obstacles• Constructability & Durability– Asphalt mix is difficult to work with– Sections adjacent to approaches required

replacement– Some degradation occurred after 1st winter– Require 3-year maintenance bond

Page 15: Rain Trail Project – Fry Road in Greenwood, Indiana

Fry Road Rain TrailGreenwood, Indiana

Challenges & Obstacles• Maintenance– Porous Asphalt must be vacuum cleaned– Fry Road trail was too narrow (8’) for street

sweeper. Recommend 10’ wide trail.– Vac Truck attachment will be used for routine

maintenance