RAILWAY TRANSPORT IN TURKEY RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

Upload: godfrey-owens

Post on 15-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

RAILWAY TRANSPORT IN TURKEYRAILWAY TRANSPORT IN TURKEY

Hacer UYARLAR

Board Member of UTIKAD

Page 2: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

RAILWAY TRANSPORTATION

Total length of the railways 12.008 km

27 % is electrified

34 % is signallized

Private companies can operate own wagons

Monthly block train departures has reached to 5700

1000 block trains for international operations

13 block train routes to Europe

Automotive transportation by rail

Page 3: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

RAILWAY NETWORK

Total Lines: 12.008 km (Convantional+High Speed)

Page 4: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

FREIGHT TRANSPORTATION

Freight Transportation Nettonne (Thousand)

Freight Transportain On the Basis of Goods Nettonne

Page 5: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

ELECTRIFICATION

27 %

73 %8.792 km

3.216 km Conventional lines : 2.328 kmHigh Speed Train lines : 888 km

Page 6: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

SIGNALIZATION

4.016 km

7.992 km34 %66 %

Conventional lines : 3.128 kmHigh Speed Train lines : 872 km

Page 7: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

LIBERALIZATION OF TURKISH RAILWAYS

“Rail transport will increase in Turkey”

Liberalization Law has entered into force as of 1 May 2013 Turkish State Railways Transportation Company is established TCDD will be the operator of the national rail infrastructure network Private companies can operate own locomotives & wagons

Page 8: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

With the railways being the prioritized transport policy since 2003, significant

steps were taken towards the development of advanced railways industry with

the cooperation of domestic and foreign private sector

entities and in this scope;

• Adapazarı High Speed Train Factory (EUROTEM)

• Çankırı High Speed Turnout Factory (VADEMSAŞ)

• Sivas Modern Concrete Sleeper Factory (SİTAŞ)

were established

PUBLIC - PRIVATE SECTOR COOPERATION

Page 9: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

LOGISTICS CENTERS

Samsun, Denizli and İzmit Logistics Centers are opened 1. step of Eskişehir and Kayseri Logistics Centers are completed 2. step of Eskişehir and 1. step of Erzurum Logistics Center are beginning to work Balıkesir Logistics Center is under construction, 2. step of Kayseri Logistics Center will be begin Other logistics centers’ projects are continuing

Page 10: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

LOGISTICS CENTERS IN TURKEY

KOSEKOY / IZMIT HALKALI / ISTANBUL KEMALPASA / IZMIR

BOGAZKOPRU / KAYSERI HASANBEY / ESKİŞEHİR

Page 11: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

LOGISTICS CENTERS IN TURKEY

Page 12: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

RAILWAY PROJECTS

TRACECA

BALO PROJECTMARMARAY PROJECT

KARS-TBILISI-BAKU PROJECT

VIKING TRAIN PROJECT

SILK WIND BLOCK TRAIN

Page 13: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

MARMARAY PROJECT

“Marmaray Project will be opened on 29 October 2013”

Rail tunnel under Bosphorus

Marmaray project will provide a continuous communication between the Asian with European continents.

Linking Europe rail network to Middle East and CIS

75.000 pax per hour in one direction / Total travel time: ~ 105 min.A new capacity for the freight traffic (42 train per day)

Page 14: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

BALO PROJECT

“Great Anatolian Logistics Organizations Project”

UTIKAD:Shareholder of BALO

Page 15: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

KARS - TBILISI – BAKU RAILWAY PROJECT

The foundation of the part in Turkey was laid on 24 July 200892% realization of the project in Turkish side was achievedIt is planned to complete the project within 2014

Page 16: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

TRACECA

“The New Silk Road”

Aim:Strengthening of economic relations, trade and transport communication in the regions of the Black Sea basin, South Caucasus and Central Asia owing to active work based on political will and common aspirations of all member-states

Member Countries:

• Armenia• Azerbaijan• Bulgaria• Georgia• Iran• Kazakhstan• Kyrgyzstan

Page 17: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

SILK WIND BLOCK TRAIN

Route: China - Kazakhstan - Caspian Sea - Black Sea

Countries:

China Kazakhstan Azerbaijan Georgia Turkey

Page 18: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

VIKING TRAIN PROJECT

The Black Sea is connecting with the Baltic Sea by the “Viking Train”

The connection of the Viking Train will be able to be established to Mediterranean, Europe, Middle East and Central Asia via Turkey.

It is targeted to connect Europe to Middle East and Cental Asia through TRACECA Corridor in the shortest way.

Page 19: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

HIGH SPEED LINE PASSENGER TRANSPORTATION

Opened Lines Ankara-Eskisehir High Speed Train Ankara – Konya High Speed Train

8.741.921 passengers were transported and 31.320 services were rendered by HST between March 2009 - December 2012 on Ankara-Eskişehir and Ankara Konya lines. 3.349.524 passengers were transported in 2012, corresponding to 31% increase as compared to 2011.

Under Construction Lines Ankara – Sivas High Speed Train Ankara – Izmir High Speed Train Bursa High Speed Train

Ankara-Istanbul High Speed Train Line will be opened on 29 October 2013

Page 20: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

HIGH SPEED RAILWAY LINES

Total Invest Amount : 16 Billion 617 Million $ Construction Amount : 14 Billion 487 Million $High Train Multiple Unit (74 pcs) : 2 Billion 130 Million $Residuary Invest Amount : 14 Billion 5 Million $

While High Speed Train Project Completed;As year ;

48 million passenger 2 billion 105 million $ revenue 916 million $ net revenue

Page 21: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

ANKARA - ISTANBUL HIGH - SPEED TRAIN PROJECT

Page 22: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

FIATA WORLD CONGRESS 2014 - ISTANBUL

www.fiata2014.org

13 - 18 OCTOBER 2014 BOMONTI HILTON HOTEL & CONFERENCE CENTER

Page 23: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

ASSOCIATION OF INTERNATIONAL FORWARDING AND LOGISTICS SERVICE PROVIDERS

General Manager : Mr. Cavit UGUR

E-mail Address : [email protected]

Web Site : www.utikad.org.tr

Phone : + 90 212 663 62 61

Fax : + 90 212 663 62 72

Address : Senlikkoy Mahallesi, Saci Sokak,

No:4/F, Florya 34153

Bakirkoy – Istanbul / TURKEY

CONTACT DETAILS OF UTIKAD

Page 24: RAILWAY TRANSPORT IN TURKEY Hacer UYARLAR Board Member of UTIKAD

Thank YouThank YouHacer Uyarlar

Board Member of UTIKAD