Course Overview
This course introduces you to the RABiTAH – Supplier Relationship Management Processes
Target Audience
This Course is intended for
Vendors
Prerequisites:
Supplier Registration process in JSRS
Basic knowledge and experience in PDO Qualification Process
Building a Bridge for Tomorrow …
Course Outline
Supplier Registration
Supplier Qualification- Sell Side
ABC Due Diligence
Technical Qualification
Supplier Master data management - Sell side
3
Building a Bridge for Tomorrow … 4
Supplier Registration
Steps : • Unregistered/Interested supplier will click on the “Supplier Self-Registration” link
provided on PDO website • Supplier should be already registered with JSRS before registering in PDO • Below Supplier Self registration Form will open up . • Supplier will fill in the required data in “Supplier Self-Registration” form • Make sure to enter your actual email address in the Company and contact email fields • System will throw an error if any of the mandatory fields are not field • In JSRS Number field , enter the JSRS registration number
Vendor
Building a Bridge for Tomorrow … 26/10/2016
Supplier Registration
Steps : 1. Fill in the contact details of the person from your company who would be point of
contact for all documents 2. In Step 3 , you would mention the products and service that you would provide PDO . 3. Click on ADD button to add the product/service categories . Once you click on ADD a
new pop up window with all the PDO specific product categories will be displayed.
5
Click on ADD button to mention which all product/services you would be interested in providing . Once you click on Add button , a new pop up window will open with all PDO
approved vendor material and service codes
If you already know the category description or code
you can use this option to find it
Use the checkbox to select the categories that you want to add or
supply . If you select the Parent categories , all the child categories will be added automatically . You can also
select individual categories
Click OK to add the selected categories
Vendor
Building a Bridge for Tomorrow … 26/10/2016
Steps : 1. Once you select the products categories and click OK as mentioned in previous slide ,
categories will be added as shown below . You can delete the categories at any point 2. Once you fill in all the details , you need to select the two checkboxes mentioned in
step 2 . Send button will be only activated after you select the checkboxes 3. Click Send once done
6
You can delete categories which you don't want to supply using the delete button
Once all the data is field , you need to accept the Terms and Conditions . Send Button will be only activated if you select both the checkboxes
If you miss out any of the mandatory fields system will throw an error as shown . Fill in the details and click send again
Supplier Registration
Vendor
Building a Bridge for Tomorrow … 26/10/2016
Steps : 1. System would show you below message , that means your form is submitted successfully. 2. System will also send you 2 emails one with your User ID and another with your initial
password . 3. Using the User ID , you would be able to login to PDO supplier portal and collaborate on
all the documents . So kindly remember the User ID and keep it safe . 4. Click on the URL to navigate to PDO supplier portal .
7
Supplier Registration
Vendor
Your User ID
Click on the link to navigate to PDO supplier portal . You would be asked to change the password for the first time . Password would be sent in a different email
Building a Bridge for Tomorrow … 26/10/2016
Steps : 1. On the logon page copy paste the User ID and password that you got from PDO
registration system . 2. System will ask you to change the initial password. 3. Once you click change button , system will take you to your portal screen . Check your
name as shown in the PIC 3 . 4. Verify you see the screen as shown in PIC 3 . 5. Supplier can now maintain there own data or add change data (Covered later).
Collaborate on various documents . (Covered in later chapters)
8
Copy User ID and password from the email and paste it
Supplier Registration
Vendor
Building a Bridge for Tomorrow … 26/10/2016
Steps : • PDO vendor management team will regularly send out Qualification forms to
you/suppliers. • You would receive an email about the forms . You can access all your forms from below
mentioned area in your portal . 1. Click on Qualification Expert 2. Click on Qualification on left hand side pane 3. Click on NEW to see all newly sent forms . 4. Click on the Form name to open the form .
9
Vendor
Supplier Qualification-ABC Due Diligence
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Fill in the form
10
Vendor
Supplier Qualification-ABC Due Diligence
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Fill in the form as shown below
11
Vendor
Supplier Qualification-ABC Due Diligence
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Fill in the form as shown below
12
Vendor
Supplier Qualification-ABC Due Diligence
Building a Bridge for Tomorrow … 26/10/2016
Steps : • In case PDO requires more clarification on some question that you responded earlier ,
you would receive the same form . You need to edit it and put in more clarification wherever required .
13
Vendor
Click here
Supplier Qualification-ABC Due Diligence
post onsite audit
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Similar to Vendor Due Diligence; technical qualification requests can be received by
vendor from PDO • Once the final approval post onsite audit is done by PDO, vendors will receive a
notification • Vendors can check which all PDO categories they are approved for . • Login as vendor: 1. Click on Master data manager 2. Click on Company Data 3. On right hand side you will find Approved PDO categories (need to scroll Down)
14
Vendor
Technical Qualification-Approval
Due Diligence
Tech Qualification Promotion
Performance Management
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Vendors can maintain their own data using their vendor portal . • Vendors can
• Add additional attachments • Add company logo • Change/add bank accounts • Change own data ,like email id , phone no . • Create additional employee User IDs
• Changes to company and bank data will go for PDO’s approval
15
For adding additional attachments like vendor catalog , new equipment designs.
Currently there is no approval for Vendor added attachments . So the status will automatically update once you refresh the screen
Vendor
Vendor Self-Service - Data Maintenance
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Vendors can change the company data by following below steps
16
Company Logo can be only uploaded/updated in display mode . So if you want to add company logo , do not click Edit
Click Save once your done with changes
Changes like Bank account change/addition will trigger a workflow to vendor management team , who will approve the changes . If rejected , changes will be reverted back to original.
Vendor
Vendor Self-Service - Data Maintenance
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Vendors manage their certificates here
17
Mandatory certificate that is not yet uploaded by vendor .
Click here to add certificates
Vendor
Vendor Self-Service - Data Maintenance
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Vendors can create additional employees and there user IDs from below menu option.
18
There is no approval for employee creation . Additional employees will be automatically accepted . Maximum of 5 employees can be created .
Vendor
Vendor Self-Service - Data Maintenance
Building a Bridge for Tomorrow … 26/10/2016
Steps : • Once additional employee/contact person is created , User IDs can be created for them. • Newly created Employee will be visible in Find User menu . • Role assignment can be done during this User ID creation step .
19
Click here to open the contact person .
User ID will be automatically generated and cannot be edited
Password
Roles the user will perform . Check the relevant roles.
Vendor
Vendor Self-Service - Data Maintenance
Building a Bridge for Tomorrow … 26/10/2016
Steps : • For already registered vendors who want to register new product categories , you need
to fill the new product registration excel sheet and attach it in attachment area .
20
Vendor
Add/Renew Product Registration
Click here to Download the excel template
Fill the template and upload it in attachment
Building a Bridge for Tomorrow …
OPERATIONAL SOURCING
Replacing: IX2 (OTN)
SCOPE: RFQ Process
Publish/Evaluation/Award PO Creation
STRATEGIC SOURCING AND CLM
Replacing: Omnicom, PPT
SCOPE: Tendering Contracts
SUPPLIER LIFE CYCLE (SLC)
Replacing: Omnicom
SCOPE: On-boarding # Qualification Classification Evaluation Phase Out
SUPPLIER SELF SERVICE (SUS)
Replacing: IX2 (OTN)
SCOPE: PO Management Invoice Management
# Registration will continue in JSRS
RABiTAH will lead to integration of all procurement
activities into one SAP SRM platform
Scope of RABiTAH
Building a Bridge for Tomorrow …
Sourcing Terminology
RFX – Request for Quotation(RFQ), Request for Proposal(RFP), Request for Information(RFI)
Bid Invitations – Enquiry, Tender (Same as RFx)
RFX Response – Bid submission, Quote
Submission Deadline – Deadline date for bidders to submit their bids, after submission deadline no more electronic submission of RFx Responses.
Opening Date and Time – Date and time that Bids can be opened by Buyers
Bidders – Vendors invited to an RFX
Two Envelope Bidding – Vendors submit RFX responses in two parts i.e. Technical and Commercial
Binding Period – Bid validity End Date (Set by PDO, not the Vendor) The date until the quote from the vendors is expected to be valid
Building a Bridge for Tomorrow …
RFX Process
BUYER SELLER
Create RFX and Send Bid invitation
View how many vendors responded
Receive Bid Responses
Open Bids when due
Evaluate Bids
Accept Bid and Award
Create Follow-On Doc.
Receive e-mail notification
Accept /Reject the invitation to Bid
Create Bid Response
Send Response before Submission deadline
Receive PO in SUS Collab.
Approve the Award
Building a Bridge for Tomorrow …
RFX – Notification
Vendor
When PDO publishes RFX it generates an individual email to each invited Vendor (Bidder). The email address used is taken from the details of the contact person of that Vendor.
Publishing an RFX generates an email to each invited Vendor. This email will contain the Tendering Texts (Header and Item).
The text of the email body is currently under review and will change before Go-Live
The hyperlink will bring the Vendor to the SUS (Vendor Portal) Login page.
The hyperlink from the email will open the logon screen for the Vendor.
Building a Bridge for Tomorrow …
Bids (Quotes)
The bidders get an e-mail notification of the bid
invitation
The invitation can be accessed by bidders through the
e-mail using hyperlink provided or can log on to the SRM
portal and respond.
The Vendor can maintain the following details in his
RFX Response (Bid, Quote):
-Incoterm (mandatory)
-Terms of Payment
-Price (mandatory)
-Price per – Price Quantity (defaulted to 1)
-Vendor Product number
-Country of origin (mandatory)
-Manufacturer’s Name (mandatory)
-Delivery Days (defaulted to 0) (mandatory)
-Text (Bidder’s Remark) on Item and Header level
-Attachments on Item and Header Level
Vendor
Building a Bridge for Tomorrow …
Vendor
When a supplier logs in he will see the functionalities from SUS, SLC, SRM and CLM combined in one ribbon at the top of his screen. Each functional area is accessible via one of the main pages. RFX’s are available via the ‘RFX and Auction’ page.
On the ‘RFX and Auction’ page a POWL with multiple queries allows the Vendor to search for RFX’s with different status.
The RFX can be opened by clicking on the RFX number.
The Vendor can also click on the RFX Response number to access his RFX Response directly.
Highlighting the RFX will enable the buttons like ‘Create Response’ and ‘Display Event’
RFX Response Creation
Building a Bridge for Tomorrow …
RFX Response Creation
Vendor
After opening the RFX the Vendor can communicate his Intent to Participate in this RFX to PDO. The Vendor can also create the RFX Response (Quote/Bid) from here by clicking the ‘Create Response’ button. Steps: 1. Review RFX details 2. Indicate Intent to Participate 3. Create RFX Response
The Vendor can review item details as well as Notes and Attachments on the RFX.
The RFX parameters show the Vendor until when he has time to submit his RFX Response.
1
2
3
Building a Bridge for Tomorrow …
RFX Response Creation
Vendor
Steps: 1. Enter Incoterm 2. Go to ‘Items’ tab 3. Maintain Price, Delivery Days, Country of Origin and Manufacturer 4. Click the ‘Submit’ button
The fields Country of Origin and Manufacturer are critical for ICV tracking and are mandatory on the RFX
The Country of Origin field requires valid the SAP key for the country, e.g. OM for Oman. A search help is available to select the correct key.
The RFX parameters show the Vendor until when he has time to submit his RFX Response.
1
2
3
4
The Bidder can select a different currency for his quote if PDO accepts quotes in multiple currencies on this RFX
Building a Bridge for Tomorrow …
RFX Change Notification
Vendor
When the PDO Buyer publishes a change to an RFX the SRM system sends out a notification email to the Bidders, informing them about the change.
Building a Bridge for Tomorrow …
RFX Version Comparison
Vendor
Whenever a change to an RFX is published by PDO a new version of the RFX is saved in the system. The Bidder can identify the differences between two versions by using the compare functionality for RFX’s from the RFX Response. In the example below the Submission Deadline was changed from 19.01.2016 17:00 to 20.01.2016 07:00
Building a Bridge for Tomorrow …
Questions and Answers
Can I change my Quote after I submitted it? – The Bidder can change the quote until the Submission Deadline is reached.
I would like to quote in a currency that is not avaiable in the dropdown. What can I do? – Contact the PDO Buyer and find out if they are will ed to add the missing currency to the RFX.
How do I quote for only some of the items on the RFX? – Just leave the price for the items that you do not want to offer as zero.
What is the size limitation for an attachment? – 10 MB per file.
Will I get a confirmation when my quote was accepted by PDO? – The confirmation that your quote was accepted will be the PO sent to you.
Can I offer an alternative item in my quote? –You could use Notes and Attachment functionality for this purpose.
Can we have more than one user working on RFX’s – Yes you can, please refer to SLC functionality for details of managing users.
I cannot deliver any of the items requested . Do I still need to submit a quote with zero prices?– No, but you should use the Do Not Participate button to submit your intent.
Building a Bridge for Tomorrow …
Prequalification
•Clarifications for prequalification to be submitted by bidders in the form of questionnaires
Combined Single
•Technical and commercial response submitted together; Technical and Commercial evaluation done in parallel.
Single Split Commercial
•Technical and commercial response submitted together; Commercial evaluation followed by Technical evaluation.
Single Split Technical
•Technical and commercial response submitted together; Technical Evaluation followed by the Commercial evaluation.
Traditional Sequential
•Stage 1 – Technical response and evaluation
•Stage 2 – Commercial response and evaluation
Initial Screening of bidders
35
SRM RFx Types
Building a Bridge for Tomorrow …
RFx setup both technical and commercial
Vendor responses
Opening and award
RFx
Creation Publishing
Vendor
Response Opening
Award Contract
Creation
Publishing the RFx
FT
B
activ
ities
Phases
Tender Process
Project Management
Tender Process
Contract Management
Building a Bridge for Tomorrow …
Prequalification
•Clarifications for prequalification to be submitted by bidders in the form of questionnaires
Combined Single
•Technical and commercial response submitted together; Technical and Commercial evaluation done in parallel.
Single Split Commercial
•Technical and commercial response submitted together; Commercial evaluation followed by Technical evaluation.
Single Split Technical
•Technical and commercial response submitted together; Technical Evaluation followed by the Commercial evaluation.
Traditional Sequential
•Stage 1 – Technical response and evaluation
•Stage 2 – Commercial response and evaluation
Initial Screening of bidders
37
SRM RFx Types
Building a Bridge for Tomorrow …
Initial Screening of Bidders
# Foreign company
`
PDO Bidders- Existing on SRM New Bidders – Not Existing on
SRM
Existing
SRM users
Access the bid
invitation
Answer the
questionnaire
Submit respons
e
Exit from
process
Access tender
documents
Yes
Evaluate Reponse
s
Answer to questionna
ire
Provide access
to tender
document
Yes
No
Temporary registration thru SLC#
Register to SRM system
Recieve user id
and password
A
No
Publish tender on
public portal
Building a Bridge for Tomorrow …
Pre-Qualification
PDO Bidders- Existing on SRM
Publish bid invitation
Recieve responses
Access to bid
invitation
Access tender
documents
Answer the pre-question
naire
Upload attachme
nts
Submit response
Building a Bridge for Tomorrow …
Bid Submission
Contract Engineer Bidders- Existing on SRM
Access the bid invitation
Access tender documents
Provide technical response
Provide Commercial
Response
Submit response
Yes
Publish bid invitation
Recieve responses
Building a Bridge for Tomorrow …
Key Changes
41
Decommissioning of Omnicom, IX2, PPT
Fully automated contract management process (creation, approval, negotiation and analysis)
RFQ process to be done in SAP SRM and not ECC/IX2 Systems
Discontinuity of Fax of Award
Internal and external collaboration using system
Integrated systems (SAP SRM and SAP Mustaqbal)
Workflows in SAP
New SAP SRM System Security Roles
Building a Bridge for Tomorrow …
Single cohesive system to manage
the key C&P operations
Time reduction between
awarding and contract creation
Compliance enforcement
Process visibility
Standardized and formalized
purchasing organization
Collaboration with suppliers
Better visibility, monitoring and
workflow for all contract owners
Business Benefits
42
Building a Bridge for Tomorrow …
Bidder view in SRM
43
Click on any of the RFx to view details of the RFx
If you have not created any response for the RFx , this column will be blank.
Building a Bridge for Tomorrow …
cFolder for Collaboration
44
To access Tender related documents click on Technical Rfx to access Cfolders.
Steps: • If you are opening the Cfolder for the first time , you will get disclaimer that you need
to accept . Scroll down to find Accept button • Also make sure you accept any java applet warning that comes up .
Building a Bridge for Tomorrow …
Creating RFx Response/Quotation
45
If it’s a public tender , you need to first Register . Only after you register you can create a Response/Quote
First click on participate button and then Click on Create Response
New screen with Create RFx response heading will open . This is your Quotation
If there are any screening questions which are mandatory to answer , you can find them here.
Building a Bridge for Tomorrow …
Steps: • To submit any technical documents relating to the tender , vendor has to click on
Technical RFx response button to open Cfolder . • Any point of time if you need any clarification on the tender you can use Questions
and Answers functionality or Cfolder Collaboration
Vendor
Open cFolder and provide Technical Response Enter
Price
For any Bid Clarification you can use Collaboration Folder
For any Bid clarification you can use Chat functionality with Buyer
47
Creating RFx Response/Quotation
Building a Bridge for Tomorrow …
Technical Response by Bidder
48
Your technical submission should be inside Tech_Bid folder and not in Collaboration or External folder .
Click here to open Cfolder where you will submit your technical documents .
Building a Bridge for Tomorrow …
Financial Response by Bidder
49
Steps: • To submit your financial response , you need to attach your commercial sheet in
attachment area of the main RFx and not in CFOLDER . • Once Commercial is attached you need to click on Submit button to submit your
response.
1
2
3
4
Building a Bridge for Tomorrow …
Contract Document Review
50
All Active Agreements
Click to Open the agreement
Building a Bridge for Tomorrow …
Contract Document Review
51
Click here to open the contractual
document
1
2
3
4
Click here to Download document
to local desktop
Building a Bridge for Tomorrow …
Contract Document Review
52
Use Check out to make modification to
contractual document (which you downloaded
to local machine)
Use Check in to upload the modified
contractual document