rabe si_audit simeredit

Upload: sondraraharja

Post on 08-Jul-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 Rabe Si_audit Simeredit

    1/781

    REKAPITULRENCANA ANG

    Kegiatan :

    Pekerjaan :

    Lokasi :

    NO.

    I PEK

    II PEK

    III PEK

    I! PEK

    Terbilang :

  • 8/19/2019 Rabe Si_audit Simeredit

    2/781

    SIARAN BIAYA (RAB)

    "aster#$an LP"P Ria%

    Pe&'ang%nan Ge%ng A%itori%&

    Pekan'ar%

    URAIAN PEKERAAN

    ERJAAN PERSIAPAN

    ERJAAN STRUKTUR

    ERJAAN ARSITEKTUR

    ERJAAN MEKANIKAL/ELEKTRIKAL

    JUMLAH

    PPN 10 %

    JUMLAH + PPN 10%

    PE"BULATAN

      Dua Milyar Lima Ratus Lima Puluh Delapan Juta Tiga Ratus Sembil

  • 8/19/2019 Rabe Si_audit Simeredit

    3/781

    U"LA ARGA

      252!1"#$"5

    122!1""2"#

    '&!!#5$1#10

    205!0!'2000

    *+,*-+/0+-0.0 212020#1"$#$

    2"25#1$#5$#

    255#"&!"$0"2

    *+--+,12+333.33

    n Puluh Enam Ribu Rupiah

  • 8/19/2019 Rabe Si_audit Simeredit

    4/781

      205!0!'2000

    '!&215$2$0&'1 "02"!1&!"

    '$2!2 "1"1&211"

  • 8/19/2019 Rabe Si_audit Simeredit

    5/781

    RENCANA ANGGARAN BIAYA (R

    Kegiatan : Masterplan LPMP Riau

    Pekerjaan : Pemangunan Ge!ung Au!it"rium

    L"kasi : Pekanaru

    N"# $raian Pekerjaan

    I PEKER%AAN PER&IAPAN

    1. Pek.Pembersihan lapangan

    2. Pek.Papan nama proyek

    3. Pek.Pengukuran dan Pemasangan Bouwplank

    %$MLA' I

    II PEKER%AAN &R$K$RA Pekerjaan P"n!asi

    1. Pengadaan dan Pemancangan Tiang Pancang 20 x 20 cm

    2. Pemotongan Tiang Pancang 20 x 20 cm

    # P"n!asi *pe PC+, (,-. / ,-.)

    a. Galian Tanah Pondasi

    b. rugan Pasir Bawah Pondasi

    c. !or "antai #er$a

    d .Pek. bekisting pondasi

    e. Pek. Pembesian%. Pek. !or beton mutu #&2'0

    g. Pek. Penimbunan kembali bekas galian

    0# P"n!asi *pe PC+-

    a. Galian Tanah Pondasi

    b. rugan Pasir Bawah Pondasi

    c. !or "antai #er$a

    d .Pek. bekisting pondasi

    e. Pek. Pembesian

    %. Pek. !or beton mutu #&2'0g. Pek. Penimbunan kembali bekas galian

    1# P"n!asi *pe PC+

    a. Galian Tanah Pondasi

    b. rugan Pasir Bawah Pondasi

    c. !or "antai #er$a

    d .Pek. bekisting pondasi

    e. Pek. Pembesian

    %. Pek. !or beton mutu #&2'0

    g. Pek. Penimbunan kembali bekas galian2# P"n!asi riun ,3- Bata

    k i

  • 8/19/2019 Rabe Si_audit Simeredit

    6/781

    N"# $raian Pekerjaan

    b. Pek. "antai ker$a

    c. Pek. Pasang 1(2 bata

    B Pekerjaan &l""41. Bal"k sl""4 t*pe B&,

    a. Galian sloo%

    b. Pek. Pasir urug

    c. Pek. "antai ker$a

    d. Pek. Bekisting sloo%

    e. Pek. Pembesian

    %. Pek. !or beton mutu #&2'0

    2. Bal"k sl""4 t*pe B&-

    a. Galian sloo%b. Pek. Pasir urug

    c. Pek. "antai ker$a

    d. Pek. Bekisting sloo%

    e. Pek. Pembesian

    %. Pek. !or beton mutu #&2'0

    3. Bal"k sl""4 t*pe B&

    a. Galian sloo%

    b. Pek. Pasir urug

    c. Pek. "antai ker$ad. Pek. Bekisting sloo%

    e. Pek. Pembesian

    %. Pek. !or beton mutu #&2'0

    C Pekerjaan K"l"m

    1. K"l"m *pe K,

    a. Pek. Pembesian

    b. Pek. Bekisting #olom

    c. Pek. !or beton mutu #&2'0

    2. K"l"m *pe K-a. Pek. Pembesian

    b. Pek. Bekisting #olom

    c. Pek. !or beton mutu #&2'0

    3. K"l"m *pe K

    a. Pek. Pembesian

    b. Pek. Bekisting #olom

    c. Pek. !or beton mutu #&2'0

    ). K"l"m *pe K0

    a. Pek. Pembesianb. Pek. Bekisting #olom

    k b

  • 8/19/2019 Rabe Si_audit Simeredit

    7/781

    N"# $raian Pekerjaan

    '. K"l"m *pe K1

    a. Pek. Pembesian

    b. Pek. Bekisting #olomc. Pek. !or beton mutu #&2'0

    *. K"l"m *pe KP

    a. Pek. Pembesian

    b. Pek. Bekisting #olom

    c. Pek. !or beton mutu #&2'0

    5 Pekerjaan Bal"k !an Plat Lantai

    i Ele6asi +,#..

    1. Bal"k *pe BL -

    a. Pek. Bekisting balokb. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0

    2. Bal"k *pe BL

    a. Pek. Bekisting balok

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0

    3. Plat !ag et"n t 7 ,. 8m

    a. Pek. Bekisting plat

    b. Pek. Pembesianc. Pek. !or beton mutu #&2'0

    ii Ele6asi 90#..

    1. Bal"k *pe BL ,

    a. Pek. Bekisting balok

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0

    2. Bal"k *pe BL -

    a. Pek. Bekisting balok

    b. Pek. Pembesianc. Pek. !or beton mutu #&2'0

    3. Bal"k *pe BL

    a. Pek. Bekisting balok

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0

    ). Plat !ag et"n t 7 ,. 8m

    a. Pek. Bekisting plat

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0iii Ele6asi 90#1.

    l k

  • 8/19/2019 Rabe Si_audit Simeredit

    8/781

    N"# $raian Pekerjaan

    a. Pek. Bekisting balok

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0i+ Ele6asi 91#..

    1. Bal"k *pe BL -

    a. Pek. Bekisting balok

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0

    + Ele6asi 92#1.

    1. Bal"k *pe BL -

    a. Pek. Bekisting balok

    b. Pek. Pembesianc. Pek. !or beton mutu #&2'0

    2. Bal"k *pe BL

    a. Pek. Bekisting balok

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0

    3. Plat !ag et"n t 7 ,. 8m

    a. Pek. Bekisting plat

    b. Pek. Pembesian

    c. Pek. !or beton mutu #&2'0 Pekerjaan Atap

    1. Pek. ,angka atap ba$a ringan -by specialist

    2. Pek. Penutup atap genteng metal t / 0.3 mm

    3. Pek. Penutup atap incalume t / 0.3 mm

    ). Pek. Penutup atap dg llumunium !omposite Panel -!P ,angka

    '. Pek. Perabung

    *. Pek. "istplank G,!

    . Pek. 4lashing

    G Pekerjaan urap Batu Kali1. Pek. !or lantai ker$a -Beton 5utu #&1'

    2. Pek. Pasang batu kali

    3. Pek. Pasang pipa drain P6! 1(27 pan$ang 30 cm

    %$MLA' II

    III PEKER%AAN AR&IEK$R

    1. Pekerjaan lantai !asar

    a. Pek. Tanah urug kembali

    b. Pek. Pasir urug

    c. Pek. !or lantai t / 10 cm -Beton mutu #&2'0d. Pek.4inishing lantai -exclude Toilet 8

    i k

  • 8/19/2019 Rabe Si_audit Simeredit

    9/781

    N"# $raian Pekerjaan

     & #eramik k. )0 x )0

     & #eramik k. 30 x 30

    2. Pekerjaan 5in!inga. Pek. Pasangan 1(2 bata -ad.18)

    b. Pek. Plester dinding -ad. 18)

    c. Pek. Pasangan 1(2 bata -ad.182

    d. Pek. Plester dinding -ad. 182

    e. Pek. !at dinding

    3. Pekerjaan Kusen Pintu !an %en!ela (in8lu!e t"ilet) :

    a. Pek. #usen Type P91

    b. Pek. #usen Type P1

    c. Pek. #usen Type P2d. Pek. #usen Type P3

    e. Pek. #usen Type 91

    %. Pek. #usen Type 61

    g. Pek. #usen Type 62

    ). Pekerjaan Pla4"n! Ruangan (e/8lu!e t"ilet)

    a. Pek. ,angka pla%ond

    b. Pek. Penutup pla%ond gypsum

    c. Pek. "ist Pla%ond

    d. Pek. !at pla%ond'. Pekerjaan Pla4"n! Luar Ruangan (piri+piri)

    a. Pek. ,angka Pla%ond G,!

    b. Pek. Penutup Pla%ond G,! * mm

    c. Pek. "ist Pla%ond G,!

    d. Pek. ,angka Pla%ond "umberering

    e. Pek. Penutup Pla%ond "umberering

    %. Pek. "ist Pla%ond "umberering

    *. Pekerjaan "ilet *pe C+,

    a. Pek. Pasang closet dudukb. Pek. Pasang %loor drain

    c. Pek. Pasang shower

    d. Pek. Pasang :ashta%el

    e. Pek. Pasang rinoir

    %. Pek. Pasang #eramik "antai -k. 20 x 20

    g. Pek. Pasang #eramik ;inding -k. 20 x 2' tinggi 1.' m

    h. Pek. Pla%ond Toilet

     & Pek. ,angka pla%ond

     & Pek. Penutup pla%ond dengan G,! & Pek. "ist pla%ond

    k l % d

  • 8/19/2019 Rabe Si_audit Simeredit

    10/781

    N"# $raian Pekerjaan

    . Pekerjaan "ilet *pe C+-

    a. Pek. Pasang closet duduk

    b. Pek. Pasang %loor drainc. Pek. Pasang bak %iber

    d. Pek. Pasang keran air

    e. Pek. Pasang :ashta%el

    %. Pek. Pasang #eramik "antai -k. 20 x 20

    g. Pek. Pasang #eramik ;inding -k. 20 x 2' tinggi 1.' m

    h. Pek. Pla%ond Toilet

     & Pek. ,angka pla%ond

     & Pek. Penutup pla%ond dengan G,!

     & Pek. "ist pla%ond & Pek. !at Pla%ond

  • 8/19/2019 Rabe Si_audit Simeredit

    11/781

    B)

    &at# ="lume'arga &atuan %umla 'arga  

    (Rp) (Rp)

    52 [email protected] 13@'0.00 1)@0'*@23.)0

    "s 1.00 '[email protected] '[email protected]

    51 13).2' @

  • 8/19/2019 Rabe Si_audit Simeredit

    12/781

  • 8/19/2019 Rabe Si_audit Simeredit

    13/781

    &at# ="lume'arga &atuan %umla 'arga  

    (Rp) (Rp)

    #G 21'.*0 1'@3=.= 3@3=3@'3*.=

    52 3=.*2 3''@3**.00 1)@0

  • 8/19/2019 Rabe Si_audit Simeredit

    14/781

    &at# ="lume'arga &atuan %umla 'arga  

    (Rp) (Rp)

    52 '.*' 210@30=.00 12@12'@02

  • 8/19/2019 Rabe Si_audit Simeredit

    15/781

    &at# ="lume'arga &atuan %umla 'arga  

    (Rp) (Rp)

    52 2'.' 1''@0*2.*0 3@==3@3)=.*

    52 1).0< 13*@*20.00 20@0=)@31'.

    52 '=3.3) 10=@2'2.00 *)@

  • 8/19/2019 Rabe Si_audit Simeredit

    16/781

    &at# ="lume'arga &atuan %umla 'arga  

    (Rp) (Rp)

    Bh 1.00 2@)[email protected] 2@)[email protected]

    Bh 1.00 1*@2'.00 1*@2'.00Bh 1.00 1@1-.?>,0#?0

  • 8/19/2019 Rabe Si_audit Simeredit

    17/781

    NO. SKETSA GAM

    Pondasi Type PC-1 (120 x 120)

  • 8/19/2019 Rabe Si_audit Simeredit

    18/781

    NO. SKETS

    1. TULANGAN PILE CAP Pondasi Type PC-1 (120 x 120)

    Tiang

    M,-a Lan.ai + 0%00

  • 8/19/2019 Rabe Si_audit Simeredit

    19/781

    NO. SKETSA GAM

    Pondasi Type PC-2

    /ei 1! 15

  • 8/19/2019 Rabe Si_audit Simeredit

    20/781

    NO. SKETS

    1. TULANGAN PILE CAP Pondasi Type PC-2

    M,-a Lan.ai + 0%00

       2   1   5

  • 8/19/2019 Rabe Si_audit Simeredit

    21/781

    NO. SKETSA GAM

    Pondasi Type PC-

       /

       e   0   i    

        1   ! 

      2   1   5

    /ei 1! 15

  • 8/19/2019 Rabe Si_audit Simeredit

    22/781

    NO. SKETS

    1. TULANGAN PILE CAP Pondasi Type PC-

    M,-a Lan.ai + 0%00 M,

  • 8/19/2019 Rabe Si_audit Simeredit

    23/781

    NO. SKETSA GAM

    Pondasi T!i"#n 1$2 %a&a

  • 8/19/2019 Rabe Si_audit Simeredit

    24/781

    NO. SKETSA GAM

    %a'o s'oo &ype %S1

  • 8/19/2019 Rabe Si_audit Simeredit

    25/781

    NO. SKETS

    %a'o s'oo &ype %S1

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    TA.

    T7

    TKi7

    TLa6

    TKa7

  • 8/19/2019 Rabe Si_audit Simeredit

    26/781

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    %a'o s'oo &ype %S2

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    27/781

    NO. SKETS

    %a'o s'oo &ype %S2

  • 8/19/2019 Rabe Si_audit Simeredit

    28/781

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    TA.

    T7

    TKi7

    TLa6

    TKa7

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    29/781

    NO. SKETSA GAM

    %a'o s'oo &ype %S

  • 8/19/2019 Rabe Si_audit Simeredit

    30/781

    NO. SKETS

    %a'o s'oo &ype %S

    A TULANGAN UTA*A Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    TA.

    T7

    TKi7

    TLa6

  • 8/19/2019 Rabe Si_audit Simeredit

    31/781

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    Ko'o+ Type K1

    TKa7

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    32/781

    NO. SKETS

    Ko'o+ Type K1

    A TULANGAN UTA*A

     Tulangan ,%&%&

    % TULANGAN SENGKANG

    Seng&ang A

  • 8/19/2019 Rabe Si_audit Simeredit

    33/781

    Seng&ang B

    NO. SKETSA GAM

    Ko'o+ Type K2

  • 8/19/2019 Rabe Si_audit Simeredit

    34/781

    NO. SKETS

    Ko'o+ Type K2

    A TULANGAN UTA*A Tulangan ,%&%&

    % TULANGAN SENGKANG

    Seng&ang A

  • 8/19/2019 Rabe Si_audit Simeredit

    35/781

    NO. SKETSA GAM

    Ko'o+ Type K

  • 8/19/2019 Rabe Si_audit Simeredit

    36/781

    NO. SKETS

    Ko'o+ Type K

    A TULANGAN UTA*A

     Tulangan ,%&%&

    % TULANGAN SENGKANG

    Seng&ang A

    NO SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    37/781

    Ko'o+ Type K,

    NO. SKETS

    Ko'o+ Type K,

    A TULANGAN UTA*A

     Tulangan ,%&%&

  • 8/19/2019 Rabe Si_audit Simeredit

    38/781

    % TULANGAN SENGKANG

    Seng&ang A

    NO. SKETSA GAM

    Ko'o+ Type K

  • 8/19/2019 Rabe Si_audit Simeredit

    39/781

    NO. SKETS

    Ko'o+ Type K

    A TULANGAN UTA*A

     Tulangan ,%&%&

    % TULANGAN SENGKANG

    Seng&ang A

  • 8/19/2019 Rabe Si_audit Simeredit

    40/781

    NO. SKETSA GAM

    Ko'o+ Type KP

  • 8/19/2019 Rabe Si_audit Simeredit

    41/781

    NO. SKETS

    Ko'o+ Type KP

    A TULANGAN UTA*A

     Tulangan ,%&%&

    % TULANGAN SENGKANG

    Seng&ang A

    NO. SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    42/781

    %a'o Type %L 2 Ele-a* 1.00

    NO. SKETS

    %a'o Type %L 2 E'easi -1.00

  • 8/19/2019 Rabe Si_audit Simeredit

    43/781

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    TA.

    T7

    TKi7

    TLa6

    TKa7

  • 8/19/2019 Rabe Si_audit Simeredit

    44/781

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    %a'o Type %L

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    45/781

    NO. SKETS

    %a'o Type %L

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

    TA.

    T7

    TKi7

    TLa6

  • 8/19/2019 Rabe Si_audit Simeredit

    46/781

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    P'a& da/ "e&on & 10 +

    TKa7

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    47/781

    NO. SKETS

    P'a& da/ "e&on & 10 +

     Tulangan a!a

    ara) /

    ara)

     Tulangan 'a(a)

    ara) /

    ara)

    NO. SKETSA GAM

    %a'o Type %L 1 Ele-a* 4.00

  • 8/19/2019 Rabe Si_audit Simeredit

    48/781

    NO. SKETS

    %a'o Type %L 1 E'easi ,.00

    A TULANGAN UTA*A

    Tulangan meneru a!a "T A!#

  • 8/19/2019 Rabe Si_audit Simeredit

    49/781

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* a!a "T.K*.A!#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan a!a "T.Ka.A!#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    TA.

    T7

    TKiA.

    TLa6

    TKaA.

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    50/781

    NO. SKETSA GAM

    %a'o Type %L 2 Ele-a* 4.00

    NO. SKETS

  • 8/19/2019 Rabe Si_audit Simeredit

    51/781

    %a'o Type %L 2 E'easi ,.00

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    TA.

    T7

    TKi7

    TLa6

    TKa7

  • 8/19/2019 Rabe Si_audit Simeredit

    52/781

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    %a'o Type %L E'easi ,.00

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    53/781

    NO. SKETS

    %a'o Type %L E'easi ,.00

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

    TA.

    T7

    TKi7

  • 8/19/2019 Rabe Si_audit Simeredit

    54/781

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    P'a& da/ "e&on & 10 + E'easi ,.00

    TLa6

    TKa7

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    55/781

    NO. SKETS

    P'a& da/ "e&on & 10 + E'easi ,.00

     Tulangan a!a

    ara) /

    ara)

     Tulangan 'a(a)ara) /

    ara)

    NO. SKETSA GAM

    %a'o Type %L 1 Ele-a* 4.50

  • 8/19/2019 Rabe Si_audit Simeredit

    56/781

    NO. SKETS

    %a'o Type %L 1 E'easi ,.0

  • 8/19/2019 Rabe Si_audit Simeredit

    57/781

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* a!a "T.K*.A!#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan a!a "T.Ka.A!#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    TA.

    T7

    TKiA.

    TLa6

    TKaA.

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    58/781

    NO. SKETSA GAM

    %a'o Type %L 2 Ele-a* 5.00

  • 8/19/2019 Rabe Si_audit Simeredit

    59/781

    NO. SKETS

    %a'o Type %L 2 E'easi .00

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

    TA.

    T7

    TKi7

    TLa6

    TKa7

  • 8/19/2019 Rabe Si_audit Simeredit

    60/781

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    %a'o Type %L 2 Ele-a* 6.50

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    61/781

    NO. SKETS

    %a'o Type %L 2 E'easi 3.0

    A TULANGAN UTA*A

     Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

    TA.

    T

  • 8/19/2019 Rabe Si_audit Simeredit

    62/781

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    NO. SKETSA GAM

    %a'o Type %L E'easi 3.0

    TKi7

    TLa6

    TKa7

    TPg

  • 8/19/2019 Rabe Si_audit Simeredit

    63/781

    NO. SKETS

    %a'o Type %L E'easi 3.0

  • 8/19/2019 Rabe Si_audit Simeredit

    64/781

    A TULANGAN UTA*A Tulangan meneru a!a "T.A!#

     Tulangan $%&%& 'a(a) "T.B(#

     Tulangan e&!ra !um$uan &*r* 'a(a) "T.K*.B(#

     Tulangan e&!ra la$angan "T.+a$#

     Tulangan e&!ra !um$uan &anan 'a(a) "T.Ka.B(#

    % TULANGAN SENGKANG

     Tul. S&g Tum$uan Kanan

     Tul. S&g Tum$uan K*r*

     Tul. S&g +a$angan

    C TULANGAN PINGGANG

     Tulangan $*nggang "T.,g#

    TA.

    T7

    TKi7

    TLa6

    TKa7

    T Pg

  • 8/19/2019 Rabe Si_audit Simeredit

    65/781

    NO. SKETSA GAM

    P'a& da/ "e&on & 10 + E'easi 3.0

    NO. SKETS

    P'a& da/ "e&on & 10 + E'easi 3.0

     Tulangan a!a

    ara) /

    ara)

  • 8/19/2019 Rabe Si_audit Simeredit

    66/781

     Tulangan 'a(a)

    ara) /

    ara)

    NO. SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    67/781

    NO. SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    68/781

    NO. SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    69/781

    NO. SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    70/781

  • 8/19/2019 Rabe Si_audit Simeredit

    71/781

    NO. SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    72/781

  • 8/19/2019 Rabe Si_audit Simeredit

    73/781

  • 8/19/2019 Rabe Si_audit Simeredit

    74/781

    NO. SKETSA GAM

  • 8/19/2019 Rabe Si_audit Simeredit

    75/781

  • 8/19/2019 Rabe Si_audit Simeredit

    76/781

    AR

    Pee!4aan Pondasi

    Tian/ panan/ +ini

     umla) !*!*& $anang

    Kealaman $anang

    ,anang $emanangan

    ,engaaan an ,eman

    ,em%!%ngan T*ang ,an

    Pondasi Type PC-1 (

    *men* !a$a& $%na*

    &uran $ee!al $%na

     umla) $%na* T$e ,

    n

    alam gal*an T$e ,;

     Te'al $a*r urug :

    !

     Te'al lan!a* &era :

    !

      *!ung -%lume 'e!%n :

  • 8/19/2019 Rabe Si_audit Simeredit

    77/781

      *!ung -%lume $a*r ur

    . ,e&. ;%r 'e!%n mu!u

    g. ,e&. ,en*m'unan &e

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    16 1.12 0.21

    16 1.12 0.21

    = 40 mm

    &a*! = 50 mm

    Tiang Pan(ang )ini Pile 25 * 25

    Panang & )

    M,-a Lan.ai + 0%00

  • 8/19/2019 Rabe Si_audit Simeredit

    78/781

    = 125 mm

     uM+A = 16 ')

    %E6AT

    AR

    Pondasi Type PC-2

    *men* !a$a& $%na*

    &uran $ee!al $%na

     umla) $%na* T$e ,

    n

    alam gal*an T$e ,;

     Te'al $a*r urug :

    !

     Te'al lan!a* &era :

    !

      *!ung -%lume 'e!%n :

  • 8/19/2019 Rabe Si_audit Simeredit

    79/781

  • 8/19/2019 Rabe Si_audit Simeredit

    80/781

    &a*! = 50 mm

    = 150 mm

     uM+A = 19 ')

    %E6AT

    AR

    Pondasi Type PC-

    *men* !a$a& $%na*

    &uran $ee!al $%na

     umla) $%na* T$e ,

    n

    alam gal*an T$e ,;

     Te'al $a*r urug :

    !

     Te'al lan!a* &era :

    !

      *!ung -%lume 'e!%n :

  • 8/19/2019 Rabe Si_audit Simeredit

    81/781

  • 8/19/2019 Rabe Si_audit Simeredit

    82/781

    = 40 mm

    &a*! = 50 mm

    = 125 mm

     uM+A = 11 ')

    %E6AT

    AR

    Pondasi T!i"#n 1$2 %

    ,a*r urug

     Te'al

    +e'ar,anang

  • 8/19/2019 Rabe Si_audit Simeredit

    83/781

    AR

    %a'o s'oo &ype %S1

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    . ,e&. ;%r 'e!%n mu!u

    PE67ITUNGAN TULA

     Tulangan M

     Tulangan M

     Tulangan Tum$uan K*r*

    Poo 

    A!a : 2

    Ba(a) :

    Sen/an/

    *a. 10

     Tulangan +a$angan

  • 8/19/2019 Rabe Si_audit Simeredit

    84/781

    A!a :

    Ba(a) : 2

    Sen/an/

    *a. 10

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    13

    13

    13

    13

    13

  • 8/19/2019 Rabe Si_audit Simeredit

    85/781

    10 0.19 0.34

    10 0.19 0.34

    10 0.19 0.34

    13

    %E6AT

    AR

    %a'o s'oo &ype %S2

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

  • 8/19/2019 Rabe Si_audit Simeredit

    86/781

    < =

     

    '. ,e&. ,a*r urug

    . ,e&. +an!a* &era

    . ,e&. Be&*!*ng l%%> 

    e. ,e&. ,em'e*an

    >. ,e&. ;%r 'e!%n mu!u

    PE67ITUNGAN TULA

     Tulangan M

     Tulangan M

     Tulangan Tum$uan K*r*

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/

    *a. 10

     Tulangan +a$angan

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/

    *a. 10

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

  • 8/19/2019 Rabe Si_audit Simeredit

    87/781

    13

    13

    13

    13

    13

    10 0.14 0.14

    10 0.14 0.14

    10 0.14 0.14

    13

  • 8/19/2019 Rabe Si_audit Simeredit

    88/781

    %E6AT

    AR

    %a'o s'oo &ype %S

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    . ,e&. ;%r 'e!%n mu!u

    PE67ITUNGAN TULA

     Tulangan M

     Tulangan M

     Tulangan Tum$uan K*r*

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/

    *a. 10

  • 8/19/2019 Rabe Si_audit Simeredit

    89/781

     Tulangan +a$angan

    Poo 

    A!a :

    Ba(a) : 2

    Sen/an/

    *a. 10

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    10

    10

    10

    10

    10

  • 8/19/2019 Rabe Si_audit Simeredit

    90/781

    10 0.09 0.14

    10 0.09 0.14

    10 0.09 0.14

    10

    %E6AT

    AR

    Ko'o+ Type K1

    a!a ,er)*!ungan

    5i+ensi o'o+ 8

    = 0.6

    = 0.03+ = 9.1

    @! = 2

    + = 10.6

    @! = 2

    9o'#+e "e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    91/781

    +ua 'e&*!*ng =

    a. ,e&. ,em'e*an

    '. ,e&. Be&*!*ng K%l%

    . ,e&. ;%r 'e!%n mu!u

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    19

    10 1.70 0.1

  • 8/19/2019 Rabe Si_audit Simeredit

    92/781

    10 0.54 0.1

    AR

    Ko'o+ Type K2

    a!a ,er)*!ungan

    5i+ensi o'o+ 8

    B = 0.15

    = 0.4 = 0.03

    AS ,g "m#

    18K 5.6

    15E, 10.2

    14@ 11.37

    13;R 10.933

    12BS 9.996

    11AT 8.5598 9.1

    7 9 1

  • 8/19/2019 Rabe Si_audit Simeredit

    93/781

    4 9.1

     umla) &%l%m =

    9o'#+e "e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    94/781

    AR

    Ko'o+ Type K

    a!a ,er)*!ungan

    5i+ensi o'o+ 8

    B = 0.4

    = 0.4

    = 0.03

    AS ,g "m#

    1K 8.1

     umla) &%l%m =

    9o'#+e "e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    95/781

    . ,e&. ;%r 'e!%n mu!u

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    14

      8 0.34 0.34

    AR

  • 8/19/2019 Rabe Si_audit Simeredit

    96/781

    Ko'o+ Type K,

    a!a ,er)*!ungan

    5i+ensi o'o+ 8

    = 0.3

    = 0.03

    + = 9.1

    @! = 2

    + = 10.6

    @! = 2

    AS ,g "m#

    8.463

    9.1

    8.1

     umla) &%l%m =

    9o'#+e "e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    97/781

    8 0.75 0.1

    AR

    Ko'o+ Type K

    a!a ,er)*!ungan

    5i+ensi o'o+ 8

    B = 0.15

    = 0.15

    = 0.02

    AS ,g "m#7 9.1

    3 8.1

    15 10.215

    18 5.6

     umla) &%l%m =

  • 8/19/2019 Rabe Si_audit Simeredit

    98/781

    9o'#+e "e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    99/781

    AR

    Ko'o+ Type KP

    a!a ,er)*!ungan

    5i+ensi o'o+ 8

    B = 0.15

    = 0.15

    = 0.02

    AS ,g "m#

    1 8.1

    3 8.1

    5 9.1

    6 9.1

    7 9.1

    9 8.4

    10 8.1

    15 10.2

    16 5.6

    17 5.6

    18 5.6

     umla) &%l%m =

    9o'#+e "e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    100/781

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    10

      6 0.11 0.11

    AR

  • 8/19/2019 Rabe Si_audit Simeredit

    101/781

    %a'o Type %L 2

    a!a ,er)*!ungan

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    102/781

    13

    13

    13

    13

    13

    10 0.14 0.24

    10 0.14 0.24

    10 0.14 0.24

  • 8/19/2019 Rabe Si_audit Simeredit

    103/781

    13

    %E6AT

    AR

    %a'o Type %L

    a!a ,er)*!ungan

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    104/781

    *a. 3

     Tulangan +a$angan

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/*a. 3

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    10

    10

    10

    10

  • 8/19/2019 Rabe Si_audit Simeredit

    105/781

    10

    6 0.09 0.14

    6 0.09 0.14

    6 0.09 0.14

    13

    %E6AT

    AR

    P'a& da/ "e&on & 1

    a!a ,er)*!ungan

    5i+ensi S'a"

    !e'al =

    +ua =

    +ua ne!!% =

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    106/781

    '. ,e&. ,em'e*an

    . ,e&. ;%r 'e!%n mu!u

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    10

    10

    10

    10

    %E6AT $ *2

    AR

    %a'o Type %L 1a!a ,er)*!ungan

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    107/781

  • 8/19/2019 Rabe Si_audit Simeredit

    108/781

    13

    13

    13

    13

    10 0.19 0.34

    10 0.19 0.34

    10 0.19 0.34

    13

    %E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    109/781

    AR

    %a'o Type %L 2

    a!a ,er)*!ungan*men* 'al%&

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    110/781

    (**) (*) (*)

    13

    13

    13

    13

    13

    10 0.14 0.24

    10 0.14 0.24

    10 0.14 0.24

  • 8/19/2019 Rabe Si_audit Simeredit

    111/781

    13

    %E6AT

    AR

    %a'o Type %L

    a!a ,er)*!ungan

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    112/781

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/

    *a. 3

     Tulangan +a$angan

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/

    *a. 3

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    10

    10

    10

  • 8/19/2019 Rabe Si_audit Simeredit

    113/781

    10

    10

    6 0.09 0.14

    6 0.09 0.14

    6 0.09 0.14

    13

    %E6AT

    AR

    P'a& da/ "e&on & 1

    a!a ,er)*!ungan

    5i+ensi S'a"

    !e'al =

    +ua =

    +ua ne!!% =

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    114/781

  • 8/19/2019 Rabe Si_audit Simeredit

    115/781

  • 8/19/2019 Rabe Si_audit Simeredit

    116/781

    13

    13

    13

    13

    13

    10 0.19 0.34

    10 0.19 0.34

    10 0.19 0.34

    13

  • 8/19/2019 Rabe Si_audit Simeredit

    117/781

    %E6AT

    AR

    %a'o Type %L 2

    a!a ,er)*!ungan

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    118/781

    *a. 10

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    13

    13

    13

    13

    13

  • 8/19/2019 Rabe Si_audit Simeredit

    119/781

    10 0.14 0.24

    10 0.14 0.24

    10 0.14 0.24

    13

    %E6AT

    AR

    %a'o Type %L 2

    a!a ,er)*!ungan

    *men* 'al%&

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    120/781

    PE67ITUNGAN TULA

     Tulangan M

     Tulangan M

     Tulangan Tum$uan K*r*

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/

    *a. 10

     Tulangan +a$angan

    Poo 

    A!a : 2

    Ba(a) : 2

    Sen/an/

    *a. 10

    5IA. Pan4an/ a Pan4an/ "

    (**) (*) (*)

    13

    13

  • 8/19/2019 Rabe Si_audit Simeredit

    121/781

    13

    13

    13

    10 0.14 0.24

    10 0.14 0.24

    10 0.14 0.24

    13

    %E6AT

    AR

    %a'o Type %L

    a!a ,er)*!ungan

    *men* 'al%&

  • 8/19/2019 Rabe Si_audit Simeredit

    122/781

    B

    "%-er 'e!%n#

    +

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    123/781

    10

    10

    10

    10

    10

    6 0.09 0.14

    6 0.09 0.14

    6 0.09 0.14

    13

  • 8/19/2019 Rabe Si_audit Simeredit

    124/781

    %E6AT

    AR

    P'a& da/ "e&on & 1

    a!a ,er)*!ungan

    5i+ensi S'a"

    !e'al =

    +ua =

    +ua ne!!% =

    %e&on

  • 8/19/2019 Rabe Si_audit Simeredit

    125/781

    10

    10

    %E6AT $ *2

    AR

    Pee!4aan A&ap

    ,e&. Rang&a a!a$ 'aa

    L#as a&ap /en&en/

    K#da K 8

    uu! a!a$

    lua a!a$ )

    +ua a!a$ a

    K#da K2 8

    uu! a!a$

    lua a!a$ )

    +ua a!a$ a

    K#da Se'e+"ay#n/ 8

    uu! a!a$

    lua a!a$ )

    +ua a!a$ a

    uu! a!a$

    lua a!a$ )

    +ua a!a$ a

    +ua !%!al a!a$ gen

    L#as a&ap :ina'#+

    K#da K, 8

    uu! a!a$

    lua a!a$ )

    +ua a!a$ a

    K#da K 8

    uu! a!a$

    lua a!a$ )

    +ua a!a$ a

    +ua !%!al a!a

  • 8/19/2019 Rabe Si_audit Simeredit

    126/781

    ,enu!u$ A;,

    !*ngg*

    $anang

    +ua

    ,e&. ,era'ung

    ,anang $e

    ,e&. +*!$lan& GR;

    ,anang l*!

    ,e&. la)*ng

    ,anang Ca

    ,e&. Rang&a a!a$ 'aa

    ,e&. ,enu!u$ a!a$ gen

    ,e&. ,enu!u$ a!a$ *n

    ,e&. ,enu!u$ a!a$ g A

    ,e&. ,era'ung

    ,e&. +*!$lan& GR;

    ,e&. la)*ng

    AR

    ,e&eraan Tura$ Ba!u K 

    +ua $ena

    +an!a* &era

    ,anang e,anang e

    ,anang e

    ,anang e

    ,anang e

    ,anang e

    ,anang e

    ,anang e

    ,anang e

    ,anang e

    ,anang e

  • 8/19/2019 Rabe Si_audit Simeredit

    127/781

    ,*$a ,

  • 8/19/2019 Rabe Si_audit Simeredit

    128/781

  • 8/19/2019 Rabe Si_audit Simeredit

    129/781

    $aa &uen 1 &anan

    $aa &uen 1 &*r*

    a 8

    a 8

    a 8

    a 8

    eg*!*ga

    eg*!*ga

  • 8/19/2019 Rabe Si_audit Simeredit

    130/781

     

    a. ,e&. ,aangan 1?2 '

    '. ,e&. ,le!er *n*ng

    . ,e&. ,aangan 1?2 '

    . ,e&. ,le!er *n*ng

    e. ,e&. ;a! *n*ng

    AR

    ,e&eraan Kuen ,*n!u

    a ,e& Kuen T$e ,1

  • 8/19/2019 Rabe Si_audit Simeredit

    131/781

    '. ,e&. Kuen T$e ,1

    . ,e&. Kuen T$e ,2

    . ,e&. Kuen T$e ,3

    e. ,e&. Kuen T$e 1

    >. ,e&. Kuen T$e

  • 8/19/2019 Rabe Si_audit Simeredit

    132/781

    1. Kuen T$e

    2. Kuen T$e

    3. Kuen T$e

    4. Kuen T$e

    5. Kuen T$e

    6. Kuen T$e

    7. Kuen T$e

    a. ,e&. Kuen T$e ,1

    Kuen Alu

    rame ,*n!

    Kaa

    Engel ,*n!

    Kun* Tana

    Kun* Sl%!

    anle ,*n!

    '. ,e&. Kuen T$e ,1

    ,e&eraan

    Kuen Kau

    aun ene

    Kaa

    aun $*n!u

    ,e&eraan ,

    Engel ,*n!

    Engel en

    Kun* Tana

    Kun* Sl%!

    anle ,*n!

    ,e&eraan ,

    em$ul Ka

    ;a! ,ela$*

    . ,e&. Kuen T$e ,2

    ,e&eraan

    Kuen Kau

    aun ene

    Kaa

    aun $*n!u

    ,e&eraan ,

    Engel ,*n!

    Engel en

  • 8/19/2019 Rabe Si_audit Simeredit

    133/781

    Kun* Tana

    Kun* Sl%!

    anle ,*n!

    ,e&eraan ,

    em$ul Ka

    ;a! ,ela$*

    e. ,e&. Kuen T$e 1

    Pee!4aan

    Kuen en

    Kaa

    >. ,e&. Kuen T$e %n

    '. ,e&. ,enu!u$ $la>%n

    . ,e&. +*! ,la>%n

    . ,e&. ;a! $la>%n

    ,e&eraan ,la>%n +uar

    a. ,e&. Rang&a ,la>%n

    '. ,e&. ,enu!u$ ,la>%n

    . ,e&. +*! ,la>%n GR

    . ,e&. Rang&a ,la>%n

    e. ,e&. ,enu!u$ ,la>%n

    >. ,e&. +*! ,la>%n +um

    Pee!4aan Toi'e& Typ

    , & , l !

  • 8/19/2019 Rabe Si_audit Simeredit

    134/781

    '. ,e&. ,aang C%%r r

    . ,e&. ,aang )%(er

    . ,e&. ,aang a)!a

    e. ,e&. ,aang r*n%*r

    >. ,e&. ,aang Keram*&

    g. ,e&. ,aang Keram*&

    ). ,e&. ,la>%n T%*le!

      ,e&. Rang&a $la>%n

      ,e&. ,enu!u$ $la>%n

    ,e&. +*! $la>%n

      ,e&. ;a! ,la>%n

    Pee!4aan Toi'e& Typ

    a. ,e&. ,aang l%e!

    '. ,e&. ,aang C%%r r

    . ,e&. ,aang 'a& F'e

    . ,e&. ,aang &eran a*

    e. ,e&. ,aang a)!a> 

    >. ,e&. ,aang Keram*&

    g. ,e&. ,aang Keram*&

    ). ,e&. ,la>%n T%*le!

      ,e&. Rang&a $la>%n

      ,e&. ,enu!u$ $la>%n

    ,e&. +*! $la>%n

      ,e&. ;a! ,la>%n

    ,e&eraan *n*)*ng *n

    a. ,e&. *n*ng Ba!a *

    '. ,e&. *n*ng Ba!a *

    ,e&eraan *n*ng 1?2

    a. ,e&. *n*ng 1?2 'a!

    ,e&eraan Ornamen S*

    ,e&eraan Ornamen Bu

  • 8/19/2019 Rabe Si_audit Simeredit

    135/781

    ,ERTNGAN

    i'e di+. 2x2

    = 73 !*!*&

    = 9 m

    = 657 m

    angan T*ang ,anang 20 / 20 m = 657 m

      ang 20 / 20 m = 73 !*!*&

    20 x 120)

    B = 1.2 M

    = 1.2 M

     T = 0.25 M

    * :

    ' = 0 M

    ) = 0 M

    ! = 0 M

    1 :

    = 16 B)

      :

    = 1.1 M

    = 0.05 M

    = 0.1 M

    < = "B / # / T "' / )# / !

    < = "1.2 / 1.2#/0.25 "0 / 0#/0< = 0.36 M3

    5 76M3

    TS#

  • 8/19/2019 Rabe Si_audit Simeredit

    136/781

    ug :

    < = +ua gal*an / !e'al $a*r urug

    < = 0.098 M3

      l = 1.568 M3

    ra :

    < = +ua gal*an / !e'al lan!a* &era

    < = 0.196 M3

    3.136M3

    < = +ua gal*an / alam gal*an

    < = 2.156 M3

    34.496M3

    = 1.2 M2

    = 19.2 M2

    * = 34.496 M3

    ,%na* = 1.568 M3

    = 3.136 M3

    * = 19.2 M2

    =   1477.63 &g

    K250 = 5.76 M3

      'al* 'e&a gal*an = 6.8992 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    1.12 0.21 0.1 2.76 10.60 29.26 1.58

    1.12 0.21 0.1 2.76 10.60 29.26 1.58

    PAN=ANGPOTONGAN

     =U*LA7POTONGAN

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    137/781

    ,ERTNGAN

    B = 0.8 M

    = 0.8 M

     T = 0.25 M

    * :

    ' = 0 M

    ) = 0 M

    ! = 0 M

    2 :

    = 19 B)

      :

    = 1.1 M

    = 0.05 M

    = 0.1 M

    < = "B / # / T "' / )# / !

    < = "1.2 / 1.2#/0.25 "0 / 0#/0

  • 8/19/2019 Rabe Si_audit Simeredit

    138/781

    2.56M3

    ug :

    < = +ua gal*an / !e'al $a*r urug

    < = 0.05 M3

      l = 0.8 M3

    ra :

    < = +ua gal*an / !e'al lan!a* &era

    < = 0.1 M3

    1.6 M3

    < = +ua gal*an / alam gal*an

    < = 1.1 M3

    17.6M3

    = 0.8 M2

    = 15.2 M2

    * = 17.6 M3

    ,%na* = 0.8 M3

    = 1.6 M3

    * = 15.2 M2

    = 744.51 &g

    K250 = 2.56 M3

      'al* 'e&a gal*an = 3.52 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    0.72 0.21 0.1 1.96 6.33 12.41 1.58

    0.72 0.21 0.1 1.96 6.33 12.41 1.58

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    139/781

    ,ERTNGAN

    B = 1.00 M

    = 1.00 M

     T = 0.25 M

    * :

    ' = 0 M

    ) = 0 M

    ! = 0 M

    3 :

    = 11 B)

      :

    = 1.1 M

    = 0.05 M

    = 0.1 M

    < = "B / # / T "' / )# / !

  • 8/19/2019 Rabe Si_audit Simeredit

    140/781

    < = 0.25 M3

    4 M3

    ug :

    < = +ua gal*an / !e'al $a*r urug

    < = 0.072 M3

      l = 1.152 M3

    ra :

    < = +ua gal*an / !e'al lan!a* &era

    < = 0.144 M3

    2.304M3

    < = +ua gal*an / alam gal*an

    < = 1.584 M3

    25.344M3

    = 1 M2

    = 11 M2

    * = 25.344 M3

    ,%na* = 1.152 M3

    = 2.304 M3

    * = 11 M2

    = 737.52 &g

    K250 = 4 M3

      'al* 'e&a gal*an = 5.0688 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    0.92 0.21 0.1 2.36 9.00 21.24 1.58

    0.92 0.21 0.1 2.36 9.00 21.24 1.58

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    141/781

    ,ERTNGAN

    a&a

    +an!a* &era

    = 0.05 m Te'al = 0.05

    = 0.25 m +e'ar = 0.25= 224.97 m ,anang = 224.97

    = 2.81 m3

  • 8/19/2019 Rabe Si_audit Simeredit

    142/781

    ,ERTNGAN

     

    = 0.25 m !e'al lan!a* &era = 0.05

    = 0.40 m !e'al $a*r urug = 0.05

    = 0.03 m alam gal*an l%%> = 0.50

    = 124.81 m +e'ar gal*an l%%> = 0.45

    %n = B / / +

    0.25 / 0.4 / 124.8100 = 12.48 m3

      *!*ng = 2 / / +

    2 / 0.4 / 124.810063 = 99.85 m2

      a* &era = +e'ar gal*an / !e'al l!. Kera / +

    0.45 / 0.05 / 124.810 = 2.81 m3

      *r urug = +e'ar gal*an / !e'al $a*r urug / +

    0.45 / 0.05 / 124.810 = 2.81 m3

      an = +e'ar gal*an / alam gal*an / +

    0.45 / 0.5 / 124.8100 = 28.08 m3

    = 28.08 m3

    = 2.81 m3

    = 2.81 m3

    = 99.85 m2

    = 1535.15 &g

    K250 = 12.48 m3

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 2 5 1

    5 1 Ba(a) : 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

  • 8/19/2019 Rabe Si_audit Simeredit

    143/781

    5 1 2 5 1

    5 1

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      124.81 2.00 249.62 1.04

    124.81 2.00 249.62 1.04

    31.20 1.00 31.20 1.04

    62.41 1.00 62.41 1.04

    31.20 1.00 31.20 1.04

    PAN=ANG

    POTONGAN

     =U*LA7

    POTONGAN

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    144/781

      0.19 0.34 0.10 1.16 312.03 361.95 0.62

    0.19 0.34 0.10 1.16 312.03 361.95 0.62

    0.19 0.34 0.10 1.16 249.62 289.56 0.62

    124.81 2.00 249.62 1.04

    ,ERTNGAN

     

    = 0.20 m !e'al lan!a* &era = 0.05

    = 0.20 m !e'al $a*r urug = 0.05

    = 0.03 m alam gal*an l%%> = 0.30

    = 43.80 m +e'ar gal*an l%%> = 0.40

    %n = B / / +

    0.2 / 0.2 / 43.796 = 1.75 m3

      *!*ng = 2 / / +

    2 / 0.2 / 43.796 = 17.52 m2

      a* &era = +e'ar gal*an / !e'al l!. Kera / +

    0.4 / 0.05 / 43.796 = 0.88 m3

      *r urug = +e'ar gal*an / !e'al $a*r urug / +

  • 8/19/2019 Rabe Si_audit Simeredit

    145/781

    0.4 / 0.05 / 43.796 = 0.88 m3

      an = +e'ar gal*an / alam gal*an / +

    0.4 / 0.3 / 43.796 = 5.26 m3

    = 5.26 m3

    = 0.88 m3

    = 0.88 m3

    = 17.52 m2

    = 398.55 &g

    K250 = 1.75 m3

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 2 5 1

    5 1 Ba(a) : 2 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

    Poo 

    5 1 2 5 1

    5 1

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    146/781

      43.80 2.00 87.59 1.04

    43.80 2.00 87.59 1.04

    10.95 1.04

    21.90 1.04

    10.95 1.04

    0.14 0.14 0.10 0.66 109.49 72.26 0.62

    0.14 0.14 0.10 0.66 109.49 72.26 0.62

    0.14 0.14 0.10 0.66 87.59 57.81 0.62

    43.80 2.00 87.59 1.04

  • 8/19/2019 Rabe Si_audit Simeredit

    147/781

    ,ERTNGAN

     

    = 0.15 m !e'al lan!a* &era = 0.05

    = 0.20 m !e'al $a*r urug = 0.05

    = 0.03 m alam gal*an l%%> = 0.30

    = 43.80 m +e'ar gal*an l%%> = 0.35

    %n = B / / +

    0.15 / 0.2 / 43.796 = 1.31 m3

      *!*ng = 2 / / +

    2 / 0.2 / 43.796 = 17.52 m2

      a* &era = +e'ar gal*an / !e'al l!. Kera / +

    0.35 / 0.05 / 43.796 = 0.77 m3

      *r urug = +e'ar gal*an / !e'al $a*r urug / +

    0.35 / 0.05 / 43.796 = 0.77 m3

      an = +e'ar gal*an / alam gal*an / +

    0.35 / 0.3 / 43.796 = 4.60 m3

    = 4.60 m3

    = 0.77 m3

    = 0.77 m3

    = 17.52 m2

    = 247.52 &g

    K250 = 1.31 m3

    GAN

      eneru A!a 2 5 10

      eneru Ba(a) 2 5 10

     Tulangan Tum$uan Kanan

    Poo 

    5 10 A!a : 2 5 10

    5 10 Ba(a) : 2 5 10

    Sen/an/

    > 100 *a. 10 > 100

  • 8/19/2019 Rabe Si_audit Simeredit

    148/781

     Tulangan ,*nggang

    Poo 

    5 10 0 5 10

    5 10

    > 10

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      43.80 2.00 87.59 0.62

    43.80 2.00 87.59 0.62

    10.95 0.62

    21.90 1.00 21.90 0.62

    10.95 0.62

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    149/781

      0.09 0.14 0.10 0.56 109.49 61.31 0.62

    0.09 0.14 0.10 0.56 109.49 61.31 0.62

    0.09 0.14 0.10 0.56 145.99 81.75 0.62

    43.80 0.62

    ,ERTNGAN

    T#'an/an

    M  Tul. ,%&%& 14 19

    MM Seng&ang A 10 150

    B) Seng&ang B 10 150

    B)

    B)

    1?4 / 3.14 / H2 / + / @!

      11.14 M3

    / + / @!

  • 8/19/2019 Rabe Si_audit Simeredit

    150/781

    74.26725 M2

    = 1622.27 KG

    = 74.27 M2

    K250 = 11.14 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      39.40 14.00 551.60 2.23

    1.80 262.67 471.87 0.62

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTAL

    PAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    151/781

      0.64 262.67 168.11 0.62

    ,ERTNGAN

    T#'an/an

    M  Tul. ,%&%& 8 12

    MM Seng&ang A 8 150

    Seng&ang B 150

     l) "B)#

    2

    2 11.2

    2

    2

    2

    23

    2

  • 8/19/2019 Rabe Si_audit Simeredit

    152/781

    4

    21 ')

    B / / + / @!

      11.71 M3

    2 / ,# / + / @!

      214.74 M2

    = 1879.51 KG

    = 214.74 M2

    K250 = 11.71 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      195.22 8.00 1561.73 0.89

    0.09 0.34 0.1 0.96 1301.44 1249.38 0.39

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    153/781

    ,ERTNGAN

    T#'an/an

    M  Tul. ,%&%& 8 14

    M

    M Seng&ang A 8 150

    Seng&ang B 150

     l) "B)#

    2

    2 ')

    B / / + / @!

      2.59 M3

    2 / ,# / + / @!

      25.92 M2

    = 218.83 KG

    = 25 92 M2

  • 8/19/2019 Rabe Si_audit Simeredit

    154/781

    K250 = 2.59 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      16.20 8.00 129.60 1.21

    0.34 0.34 0.1 1.46 108.00 157.68 0.39

    ,ERTNGAN

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    155/781

    T#'an/an

    M  Tul. ,%&%& 4 12

    M

    M Seng&ang A 8 150

    B) Seng&ang B 150

    B)

    B)

     l) "B)#

    2

    6

    4

    12

    1?4 / 3.14 / H2 / + / @!

      7.35 M3

    / + / @!

    37.133625M2

    = 602.53 KG

    = 37.13 M2

    K250 = 7.35 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      103.93 4.00 415.70 0.89

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    156/781

      0.85 692.84 591.67 0.39

    ,ERTNGAN

    T#'an/an

    M  Tul. ,%&%& 4 10

    M

    M Seng&ang A 6 150

    Seng&ang B 150

     l) "B)#2

    2

    2

    2

    8 ')

  • 8/19/2019 Rabe Si_audit Simeredit

    157/781

    B / / + / @!

      1.49 M3

    2 / ,# / + / @!

      39.62 M2

    = 215.60 KG

    = 39.62 M2

    K250 = 1.49 M3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      66.03 4.00 264.12 0.62

    0.11 0.11 0.1 0.54 440.20 237.71 0.22

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    158/781

    ,ERTNGAN

    T#'an/an

    M  Tul. ,%&%& 4 10

    M

    M Seng&ang A 6 150

    Seng&ang B 150

     l) "B)#

    8

    3

    5

    2

    1

    2

    2

    2

    5

    2

    1

    33 ')

    B / / + / @!

      4.76 M3

    2 / ,# / + / @!

      127.02 M2

    = 849.27 KG

    = 127.02 M2K250 = 4.76 M3

  • 8/19/2019 Rabe Si_audit Simeredit

    159/781

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      260.10 4.00 1040.40 0.62

    0.11 0.11 0.1 0.54 1734.00 936.36 0.22

    ,ERTNGAN

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    160/781

    Ele-a* 1.00

    = 0.20 m Te'al $la! = 0.10 m

    = 0.30 m

    = 0.03 m

    = 23.55 m

      %n = B / / +

    0.2 / 0.3 / 43.796 = 1.41 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.3 0.2#0.1# / 23.55

    = 14.13 m2

    = 14.13 m2

    = 394.16 &g

    K250 = 1.41 m3

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 2 5 1

    5 1 Ba(a) : 2 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

    Poo 

    5 1 2 5 1

    5 1

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    161/781

      23.55 2.00 47.10 1.04

    43.80 2.00 87.59 1.04

    10.95 1.04

    21.90 1.04

    10.95 1.04

    0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 87.59 75.33 0.62

  • 8/19/2019 Rabe Si_audit Simeredit

    162/781

      43.80 2.00 87.59 1.04

    ,ERTNGAN

    = 0.15 m !e'al $la! = 0.1 m

    = 0.20 m

    = 0.03 m

    = 32.74 m

      %n = B / / +

    0.15 / 0.2 / 43.796 = 0.98 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.2 0.15#0.1# / 32.736

    = 11.46 m2

    = 11.46 m2

    = 139.73 &g

    K250 = 0.98 m3

    GAN

      eneru A!a 2 5 10

      eneru Ba(a) 2 5 10

     Tulangan Tum$uan Kanan

    Poo 

    5 10 A!a : 2 5 10

    5 10 Ba(a) : 2 5 10

    Sen/an/

  • 8/19/2019 Rabe Si_audit Simeredit

    163/781

    > 100 *a. 3 > 100

     Tulangan ,*nggang

    Poo 

    5 10 0 5 1

    5 10

    > 10

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      32.74 2.00 65.47 0.62

    43.80 2.00 87.59 0.62

    10.95 0.62

    21.90 0.62

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    164/781

      10.95 0.62

    0.09 0.14 0.10 0.56 109.49 61.31 0.22

    0.09 0.14 0.10 0.56 109.49 61.31 0.22

    0.09 0.14 0.10 0.56 145.99 81.75 0.22

    43.80 1.04

    ,ERTNGAN

    +

    T#'an/an

      0.10 m Tulangan a!a 10 250

    60.106854 m2 "' ;A# Tulangan 'a(a) 10 250

    51.043261 m2 "' ;A#

    %eis&in/

    !e'al / lua Kel*l*ng 'e&*!*ng = 41.411068 m1

      5.10 m3 +ua 'e&*!*ng = 55.18 m2

    = 55.18 m2

  • 8/19/2019 Rabe Si_audit Simeredit

    165/781

    = 592.93 &g

    K250 = 5.10 m3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    ,ERTNGAN

    Ele-a* 4.00

    = 0.25 m Te'al $la! = m

    = 0.40 m

    = 0.03 m

    = 15.74 m

      %n = B / / +

    0.25 / 0.4 / 43.796 = 1.57 m3

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    166/781

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.4 0.25#0# / 15.7432443

    = 16.53 m2

    = 16.53 m2

    = 480.23 &g

    K250 = 1.57 m3

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 5 1

    5 1 Ba(a) : 2 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

    Poo 

    5 1 2 5 1

    5 1

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    15 74 2 00 31 49 1 04

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    167/781

      43.80 2.00 87.59 1.04

    10.95 1.00 10.95 1.04

    21.90 1.00 21.90 1.04

    10.95 1.00 10.95 1.04

    0.19 0.34 0.10 1.16 109.49 127.01 0.62

    0.19 0.34 0.10 1.16 109.49 127.01 0.62

    0.19 0.34 0.10 1.16 87.59 101.61 0.62

    43.80 2.00 87.59 1.04

  • 8/19/2019 Rabe Si_audit Simeredit

    168/781

    ,ERTNGAN

    Ele-a* 4.00

    = 0.20 m Te'al $la! = 0.10 m

    = 0.30 m

    = 0.03 m

    = 113.76 m

      %n = B / / +

    0.2 / 0.3 / 43.796 = 6.83 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.3 0.2#0.1# / 113.7581148

    = 68.25 m2

    = 68.25 m2

    = 582.14 &g

    K250 = 6.83 m3

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 2 5 1

    5 1 Ba(a) : 2 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

    Poo 

    5 1 2 5 1

    5 1

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*PAN=ANGPOTONGA

     =U*LA7POTONGA

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    169/781

    (*) (*) (*) (*) (%&/) (*) KG$*1

      113.76 2.00 227.52 1.04

    43.80 2.00 87.59 1.04

    10.95 1.04

    21.90 1.04

    10.95 1.04

    0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 87.59 75.33 0.62

  • 8/19/2019 Rabe Si_audit Simeredit

    170/781

      43.80 2.00 87.59 1.04

    ,ERTNGAN

    Ele-a* 4.00

    = 0.15 m !e'al $la! = 0.1 m

    = 0.20 m

    = 0.03 m

    = 21.39 m

      %n = B / / +

    0.15 / 0.2 / 43.796 = 0.64 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.2 0.15#0.1# / 21.3944338

    = 7.49 m2

    = 7.49 m2

    = 125.75 &g

    K250 = 0.64 m3

    GAN

      eneru A!a 2 5 10

      eneru Ba(a) 2 5 10

     Tulangan Tum$uan Kanan

  • 8/19/2019 Rabe Si_audit Simeredit

    171/781

    Poo 

    5 10 A!a : 2 5 10

    5 10 Ba(a) : 2 5 10

    Sen/an/

    > 100 *a. 3 > 100

     Tulangan ,*nggang

    Poo 

    5 10 0 5 1

    5 10

    > 10

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      21.39 2.00 42.79 0.62

    43.80 2.00 87.59 0.62

    10.95 0.62

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    172/781

      21.90 0.62

    10.95 0.62

    0.09 0.14 0.10 0.56 109.49 61.31 0.22

    0.09 0.14 0.10 0.56 109.49 61.31 0.22

    0.09 0.14 0.10 0.56 145.99 81.75 0.22

    43.80 1.04

    ,ERTNGAN

    + Ele-a* 4.00

    T#'an/an

      0.10 m Tulangan a!a 10 250

    81.655381 m2 "' ;A# Tulangan 'a(a) 10 250

    61.784602 m2 "' ;A#

    %eis&in/

    !e'al / lua Kel*l*ng 'e&*!*ng = 41.411068 m1

  • 8/19/2019 Rabe Si_audit Simeredit

    173/781

      6.18 m3 +ua 'e&*!*ng = 65.93 m2

    = 65.93 m2

    = 805.50 &g

    K250 = 6.18 m3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    ,ERTNGAN

    Ele-a* 4.50

    = 0.25 m Te'al $la! = m

    = 0.40 m

    = 0.03 m

    = 54.91 m

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    174/781

      %n = B / / +

    0.25 / 0.4 / 43.796 = 5.49 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.4 0.25#0# / 54.908

    = 57.65 m2

    = 57.65 m2

    = 561.84 &g

    K250 = 5.49 m3

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 5 1

    5 1 Ba(a) : 2 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

    Poo 

    5 1 2 5 1

    5 1

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    175/781

      54.91 2.00 109.82 1.04

    43.80 2.00 87.59 1.04

    10.95 1.00 10.95 1.04

    21.90 1.00 21.90 1.04

    10.95 1.00 10.95 1.04

    0.19 0.34 0.10 1.16 109.49 127.01 0.62

    0.19 0.34 0.10 1.16 109.49 127.01 0.62

    0.19 0.34 0.10 1.16 87.59 101.61 0.62

    43.80 2.00 87.59 1.04

  • 8/19/2019 Rabe Si_audit Simeredit

    176/781

    ,ERTNGAN

    Ele-a* 5.00

    = 0.20 m Te'al $la! = m

    = 0.30 m

    = 0.03 m

    = 59.15 m

      %n = B / / +

    0.2 / 0.3 / 43.796 = 3.55 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.3 0.2#0# / 59.15

    = 47.32 m2

    = 47.32 m2

    = 468.35 &g

    K250 = 3.55 m3

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 2 5 1

    5 1 Ba(a) : 2 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

    Poo 

    5 1 2 5 1

    5 1

  • 8/19/2019 Rabe Si_audit Simeredit

    177/781

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      59.15 2.00 118.30 1.04

    43.80 2.00 87.59 1.04

    10.95 1.04

    21.90 1.04

    10.95 1.04

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    178/781

      0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 87.59 75.33 0.62

    43.80 2.00 87.59 1.04

    ,ERTNGAN

    Ele-a* 6.50

    = 0.20 m Te'al $la! = 0.10 m

    = 0.30 m

    = 0.03 m

    = 20.70 m

      %n = B / / +

    0.2 / 0.3 / 43.796 = 1.24 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.3 0.2#0.1# / 20.7

    = 12.42 m2

    = 12.42 m2

    = 388.22 &g

    K250 = 1.24 m3

  • 8/19/2019 Rabe Si_audit Simeredit

    179/781

    GAN

      eneru A!a 2 5 1

      eneru Ba(a) 2 5 1

     Tulangan Tum$uan Kanan

    Poo 

    5 1 A!a : 2 5 1

    5 1 Ba(a) : 2 5 1

    Sen/an/

    > 100 *a. 10 > 100

     Tulangan ,*nggang

    Poo 

    5 1 2 5 1

    5 1

    > 20

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      20.70 2.00 41.40 1.04

    43.80 2.00 87.59 1.04

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    180/781

      10.95 1.04

    21.90 1.04

    10.95 1.04

    0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 109.49 94.16 0.62

    0.14 0.24 0.10 0.86 87.59 75.33 0.62

    43.80 2.00 87.59 1.04

    ,ERTNGAN

    Ele-a* 6.50

  • 8/19/2019 Rabe Si_audit Simeredit

    181/781

    = 0.15 m !e'al $la! = 0.1 m

    = 0.20 m

    = 0.03 m

    = 7.85 m

      %n = B / / +

    0.15 / 0.2 / 43.796 = 0.24 m3

      *!*ng = ""2 / B# !e'al $la!# / +

    " " 2 / 0.2 0.15#0.1# / 7.85

    = 2.75 m2

    = 2.75 m2

    = 109.05 &g

    K250 = 0.24 m3

    GAN

      eneru A!a 2 5 10

      eneru Ba(a) 2 5 10

     Tulangan Tum$uan Kanan

    Poo 

    5 10 A!a : 2 5 10

    5 10 Ba(a) : 2 5 10

    Sen/an/

    > 100 *a. 3 > 100

     Tulangan ,*nggang

    Poo 

    5 10 0 5 1

    5 10

    > 10

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    182/781

      7.85 2.00 15.70 0.62

    43.80 2.00 87.59 0.62

    10.95 0.62

    21.90 0.62

    10.95 0.62

    0.09 0.14 0.10 0.56 109.49 61.31 0.22

    0.09 0.14 0.10 0.56 109.49 61.31 0.22

    0.09 0.14 0.10 0.56 145.99 81.75 0.22

    43.80 1.04

  • 8/19/2019 Rabe Si_audit Simeredit

    183/781

    ,ERTNGAN

    + Ele-a* 6.50

    T#'an/an

      0.10 m Tulangan a!a 10 250

    19.1575 m2 "' ;A# Tulangan 'a(a) 10 250

    14.62 m2 "' ;A#

    %eis&in/

    !e'al / lua Kel*l*ng 'e&*!*ng = 41.411068 m1

      1.46 m3 +ua 'e&*!*ng = 18.76 m2

    = 18.76 m2

    = 188.98 &g

    K250 = 1.46 m3

    Pan4an/ Pan4an/ d Pan4an/ e %E6AT$*

    (*) (*) (*) (*) (%&/) (*) KG$*1

      1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    PAN=ANGPOTONGA

    N

     =U*LA7POTONGA

    N

    TOTALPAN=ANG

  • 8/19/2019 Rabe Si_audit Simeredit

    184/781

      1.00 4.00 4.00 0.62

    1.00 4.00 4.00 0.62

    ,ERTNGAN

    r*ngan "' $e*al*!#

      e&a'

    = 30 0.8660254

    r*%n!al = 16 M2

    &!ual = 18.475209 M2

    = 20 0.9396926

    r*%n!al = 80.43875 M2

    &!ual = 85.60113 M2

     

    = 30 0.8660254

    r*%n!al = 56 M2

    &!ual = 64.66323 M2

    = 60 0.5

    r*%n!al = 24 M2

    &!ual = 48 M2

      !eng me!al = 216.73957 M2

    = 10 0.9848078

    r*%n!al = 298.302 M2

    &!ual = 302.90379 M2

    = 9 0.9876883

    r*%n!al = 162.10287 M2

    &!ual = 164.1235 M2

    $ *nalum = 467.02729 M2

  • 8/19/2019 Rabe Si_audit Simeredit

    185/781

    = 0.9 m

    = 40.8 m

    = 36.72 m2

      a'ung = 42.042218 m1

      $lan& = 203.38822 m1

      )*ng = 33.806

    r*ngan "' $e*al*!# = 683.76686

      eng me!al ! = 0.3 mm = 216.73957

      lume ! = 0.3 mm = 467.02729

      llumun*um ;%m$%*!e ,anel "A;,# Rang&a = 36.72

    = 42.042218

    = 203.38822

    = 33.806

    ,ERTNGAN

    al*

    $ang !ura$ = 2.375 m2

    = 0.17 m2

  • 8/19/2019 Rabe Si_audit Simeredit

    186/781

     umla) = 90 ')

    ,anang = 0.3 m

    ,anang !%!al = 27 m1

    !a* &era "Be!%n Mu!u K175# = 10.72088 m3

    'a!u &al* = 149.777 m3

    $*$a ra*n ,

  • 8/19/2019 Rabe Si_audit Simeredit

    187/781

    = 73.943603 m3

    +ua lan!a* : 29.65 m2

    64.52881 m2

    16.7475 m2

    4.3475m2

    4.3475m2

    1.5725m2

    1.5725m2

    1.5725m2

    1.5725m2

    22.548946m2

    22.548946m2

    73.540901m2

    73.540901m2

    353.12235m2

    25.753146m2

    39.047031m2

    3.4225m2

     umla) = 739.43603 m2

    = 0.1 m

    = 739.43603 m2

    = 73.943603 m3

    = 551.37359 m2

    = 25.753146 m2

    = 147.0818 m2

      'al* = 615.37234 m3

    = 73.943603 m3

    m "Be!%n mu!u K250# = 73.943603 m3

    e/lue T%*le!# :

    = 551.37359 m2

    = 25.753146 m2

    = 147.0818 m2

    ,ERTNGAN

    g

    ,anang T*ngg* +ua

  • 8/19/2019 Rabe Si_audit Simeredit

    188/781

    3.4 6.5 = 22.10 m2

    1.45 6.5 = 9.43 m2

    5.55 6.5 = 36.08 m2

    1.6 6.5 = 10.40 m2

    3.4 6.5 = 22.10 m2

    0.85 6.5 = 5.53 m2

    2.1 6.5 = 13.65 m2

    2.35 6.5 = 15.28 m2

    1.35 6.5 = 8.78 m2

    1.85 6.5 = 12.03 m2

    1.85 6.5 = 12.03 m2

    2.225 6.5 = 14.46 m2

    0.725 6.5 = 4.71 m2

    3.4 6.5 = 22.10 m2

    2.601 6.5 = 16.91 m2

    1.349 6.5 = 8.77 m2

    2.975 6.5 = 19.34 m2

    3.85 6.5 = 25.03 m2

    9.593 1.05 = 10.07 m2

    9.593 1.05 = 10.07 m2

    3.035 7.5 = 22.76 m2

    4.11 7.5 = 30.83 m2

    4.11 7.5 = 30.83 m2

    3.035 7.5 = 22.76 m2

    0.747 7.5 = 5.60 m2

    0.747 7.5 = 5.60 m2

    7.058 4 = 28.232 m2

    7.058 4 = 28.232 m2

    7.058 1.5 = 5.2935 m2

    7.058 1.5 = 5.2935 m2

    7.616 7.7 = 29.3216 m2

    7.616 7.7 = 29.3216 m2

    7.504 7.7 = 28.8904 m2

    7.822 7.7 = 30.1147 m2

    0.697 8.4 = 2.9274 m2

    1.35 8.4 = 5.67 m2

    0.925 8.4 = 3.885 m2

    1.385 8.4 = 5.817 m2

    3.995 8.4 = 16.779 m2

    3.995 8.4 = 16.779 m2

    0.925 8.4 = 3.885 m2

    1.35 8.4 = 5.67 m2

    0.697 8.4 = 2.9274 m2

    1.85 4 = 3.7 m2

    1.85 4 = 3.7 m2

    1.85 4 = 3.7 m2

    1.85 4 = 3.7 m2

    1.85 4 = 3.7 m2

  • 8/19/2019 Rabe Si_audit Simeredit

    189/781

    7.85 4 = 15.7 m2

    3.85 4 = 7.7 m2

    +ua *n*ng 'ru!% = 759.18 m2

    +ua lu'ang &uen = 136.27 m2

    +ua *n*ng ne!!% = 622.91 m2

    #as dindin/ ad (182)

    ,anang T*ngg* +ua +u'ang &uen +ua 'er*)

    3.4 1.5 = 5.10 2.72 = 2.38

    1.6 1.5 = 2.40 2.40

    1.85 1.5 = 2.78 2.78

    1.85 1.5 = 2.78 2.78

    1.85 1.5 = 2.78 2.78

    0.725 1.5 = 1.09 1.09

    0.725 1.5 = 1.09 1.09

    0.85 1.5 = 1.28 1.76 1.28

    0.85 1.5 = 1.28 1.76 1.28

    0.85 1.5 = 1.28 1.76 1.28

    0.85 1.5 = 1.28 1.76 1.28

    1.85 1.5 = 2.78 1.76 1.02

    1.85 1.5 = 2.78 0.15 2.63

    1.85 1.5 = 2.78 2.78

    1.85 1.5 = 2.78 2.78

    +ua *n*ng a. 1 : 2 = 29.57

    !a "a.1:4# = 593.34 m2

    "a. 1:4# = 1186.67 m2

    !a "a.1:2# = 29.57 m2

    "a. 1:2# = 59.14 m2

    = 1186.67 m2

    ,ERTNGAN

    an enela "*nlue !%*le!# :

  • 8/19/2019 Rabe Si_audit Simeredit

    190/781

    ,anang +e'ar +ua

    3.7 1.225 4.5325

    3.7 4.6 17.02

    3.7 1.225 4.5325

     umla) = 26.085 m2

    ,anang +e'ar +ua

    2.55 1.7 4.335 m2

    ,anang +e'ar +ua

    2.55 0.9 2.295 m2

    ,anang +e'ar +ua

    2.2 0.8 1.76 m2

    ,anang +e'ar +ua

    0.5 0.3 0.15 m2

    ,anang +e'ar +ua

    0.85 0.8 0.68 m2

    +ua 4/ = 2.72 m2

    ,anang +e'ar +ua

    9.593 2.8 26.8604 m2

    an enela "$aa +T.1# :

    umla) +ua lu'ang

  • 8/19/2019 Rabe Si_audit Simeredit

    191/781

    ,1 = 1  n*! 26.085m2

    ,1 = 6  n*! 26.01 m2

    ,2 = 7  n*! 16.065m2

    ,3 = 5  n*! 8.8m2

    1 = 2  n*! 53.7208m2

  • 8/19/2019 Rabe Si_audit Simeredit

    192/781

    = 1 B)

    = 1 B)

      u = 1 B)

      engea!an

      u = 3.44 M2

    = 3.44 M2

     K#sen$ 4ende'a

    la Alumun*um = 60.772 M1

    = 23.177511 M2

    = 0.012 M3

    = 0.08 M2

    = 2.72 m2

    ,ERTNGAN

    gan "e/lue !%*le!#

    = 544.296733 m2

    g$um = 544.296733 m2

    = 218.207428 m1

    = 544.296733 m2

    Ruangan "$*r*$*r*#

    GR; = 53.04 m2

    GR; 6 mm = 53.04 m2

      = 109.4 m1

    +um'erer*ng = 12.8 m2

    +um'erer*ng = 12.8 m2

      'erer*ng = 16 m1

      C-1

    & 4 B)

  • 8/19/2019 Rabe Si_audit Simeredit

    193/781

    *n = 4 B)

    = 4 B)

    el = 1 B)

    = 2 B)

     +an!a* "&. 20 / 20# = 14.985 m2

    *n*ng "&. 20 / 25 !*ngg* 1.5 m# = 25.36 m2

    = 14.985 m2

    engan GR; = 14.985 m2

    = 38.4 m1

    = 14.985 m2

      C-2

    uu& = 1 B)

    *n = 1 B)

    r = 1 B)

    r = 1 B)

    el = 1 B)

     +an!a* "&. 20 / 20# = 3.4225 m2

    *n*ng "&. 20 / 25 !*ngg* 1.5 m# = 9.34 m2

    = 3.4225 m2

    engan GR; = 3.4225 m2

    = 7.4 m1

    = 3.4225 m2

      *ng Ba!a

    *) ;%ne(%% = 33.99 m2

    *) Ba!u Alam = 36.60 m2

      a!a %-er &%l%m !ru&!ur

    "a. 1 : 4# = 14.3 m2

      ga$ GR; *u&*r melau = 9.9065853 M2

      &u ,la! Be* ! = 1 mm = 1 n*!

  • 8/19/2019 Rabe Si_audit Simeredit

    194/781

  • 8/19/2019 Rabe Si_audit Simeredit

    195/781

    KG

      46.18

    46.18

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    196/781

      92.35

  • 8/19/2019 Rabe Si_audit Simeredit

    197/781

    KG

      19.59

    19.59

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    198/781

      39.18

  • 8/19/2019 Rabe Si_audit Simeredit

    199/781

    KG

      33.52

    33.52

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    200/781

      67.05

    m

    mm

    m3

  • 8/19/2019 Rabe Si_audit Simeredit

    201/781

    m

    m

    m

    m

  • 8/19/2019 Rabe Si_audit Simeredit

    202/781

    KG

      260.09

    260.09

    32.51

    65.02

    32.51

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    203/781

      223.16

    223.16

    178.52

    260.09

    1535.15

    m

    m

    m

    m

  • 8/19/2019 Rabe Si_audit Simeredit

    204/781

    KG

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    205/781

      91.27

    91.27

    44.55

    44.55

    35.64

    91.27

  • 8/19/2019 Rabe Si_audit Simeredit

    206/781

      398.55

    m

    m

    m

    m

  • 8/19/2019 Rabe Si_audit Simeredit

    207/781

    KG

      54.00

    54.00

    13.50

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    208/781

  • 8/19/2019 Rabe Si_audit Simeredit

    209/781

    KG

      1227.70

    290.93

    TOTAL

    %E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    210/781

      103.64

    1622.27

    11.2

    20.4

    22.74

    21.866

    19.992

    17.118

    27.318.2

    36 4

  • 8/19/2019 Rabe Si_audit Simeredit

    211/781

    195.216 214.7376

    e&

    e&

    KG

      1386.52

    492.99

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    212/781

      1879.51

    16.2

    0

    0

    0

    0

    0

    0 16.2

    0

    0

    16.2 25.92

    e& e&

    e&

  • 8/19/2019 Rabe Si_audit Simeredit

    213/781

    KG

      156.61

    62.22

    218.83

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    214/781

    16.926 16.926

    54.6 54.6

    32.4 32.4

    103.926 103.926

    7.3460961

    e& OK  

    e& OK  

    KG

      369.07

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    215/781

      233.46

    602.53

    18.216.2

    20.43

    11.2

    0

    0

    0 66.03

    0

    0

    66.03 39.618

    e&

    e&

  • 8/19/2019 Rabe Si_audit Simeredit

    216/781

    e&

    KG

      162.84

    52.76

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    217/781

  • 8/19/2019 Rabe Si_audit Simeredit

    218/781

  • 8/19/2019 Rabe Si_audit Simeredit

    219/781

      43.80

    KG

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    220/781

      49.08

    91.27

    58.05

    58.05

    46.44

  • 8/19/2019 Rabe Si_audit Simeredit

    221/781

      91.27

    394.16

    43.80

  • 8/19/2019 Rabe Si_audit Simeredit

    222/781

    KG

      40.37

    54.00

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    223/781

     

    13.61

    13.61

    18.15

    139.73

    43.80

  • 8/19/2019 Rabe Si_audit Simeredit

    224/781

    KG

      2.47

    2.47

    2.47

    2.47

    9.86

    43.80

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    225/781

    KG

    32 81

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    226/781

      91.27

    11.41

    22.82

    11.41

    78.31

    78.31

    62.64

    91.27

    480 23

  • 8/19/2019 Rabe Si_audit Simeredit

    227/781

      43.80

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    228/781

    KG

      237.06

    91.27

    58.05

    58.05

    46.44

  • 8/19/2019 Rabe Si_audit Simeredit

    229/781

      91.27

    582.14

    43.80

  • 8/19/2019 Rabe Si_audit Simeredit

    230/781

    KG

      26.38

    54.00

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    231/781

     

    13.61

    13.61

    18.15

    125.75

    43.80

  • 8/19/2019 Rabe Si_audit Simeredit

    232/781

    KG

      2.47

    2.47

    2.47

    2.47

    9.86

    43.80

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    233/781

    KG

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    234/781

      114.42

    91.27

    11.41

    22.82

    11.41

    78.31

    78.31

    62.64

    91.27

  • 8/19/2019 Rabe Si_audit Simeredit

    235/781

      561.84

    43.80

  • 8/19/2019 Rabe Si_audit Simeredit

    236/781

    KG

      123.26

    91.27

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    237/781

      58.05

    58.05

    46.44

    91.27

    468.35

    43.80

  • 8/19/2019 Rabe Si_audit Simeredit

    238/781

    KG

      43.14

    91.27

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    239/781

     

    58.05

    58.05

    46.44

    91.27

    388.22

  • 8/19/2019 Rabe Si_audit Simeredit

    240/781

      43.80

    KG

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    241/781

      9.68

    54.00

    13.61

    13.61

    18.15

  • 8/19/2019 Rabe Si_audit Simeredit

    242/781

      109.05

    43.80

    KG

      2.47

    2.47

    TOTAL%E6AT

  • 8/19/2019 Rabe Si_audit Simeredit

    243/781

      2.47

    2.47

    9.86

    0 30 45 60

    *n 0.5000 0.7071 0.8660

    % 1.0000 0.8660 0.7071 0.5000

    !g 0.5774 1.0000 1.7321

    !g 0.5774 1.0000 1.7321

    % A = am$*ng ? m*r*ng m*r*ng = am$*ng ? % A

  • 8/19/2019 Rabe Si_audit Simeredit

    244/781

    1

    m2

    m2

    m2

    m2

    m1

    m1

    m1

  • 8/19/2019 Rabe Si_audit Simeredit

    245/781

    g

  • 8/19/2019 Rabe Si_audit Simeredit

    246/781

  • 8/19/2019 Rabe Si_audit Simeredit

    247/781

  • 8/19/2019 Rabe Si_audit Simeredit

    248/781

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

  • 8/19/2019 Rabe Si_audit Simeredit

    249/781

  • 8/19/2019 Rabe Si_audit Simeredit

    250/781

  • 8/19/2019 Rabe Si_audit Simeredit

    251/781

  • 8/19/2019 Rabe Si_audit Simeredit

    252/781

  • 8/19/2019 Rabe Si_audit Simeredit

    253/781

  • 8/19/2019 Rabe Si_audit Simeredit

    254/781

  • 8/19/2019 Rabe Si_audit Simeredit

    255/781

  • 8/19/2019 Rabe Si_audit Simeredit

    256/781

  • 8/19/2019 Rabe Si_audit Simeredit

    257/781

  • 8/19/2019 Rabe Si_audit Simeredit

    258/781

  • 8/19/2019 Rabe Si_audit Simeredit

    259/781

  • 8/19/2019 Rabe Si_audit Simeredit

    260/781

  • 8/19/2019 Rabe Si_audit Simeredit

    261/781

  • 8/19/2019 Rabe Si_audit Simeredit

    262/781

  • 8/19/2019 Rabe Si_audit Simeredit

    263/781

  • 8/19/2019 Rabe Si_audit Simeredit

    264/781

  • 8/19/2019 Rabe Si_audit Simeredit

    265/781

  • 8/19/2019 Rabe Si_audit Simeredit

    266/781

  • 8/19/2019 Rabe Si_audit Simeredit

    267/781

  • 8/19/2019 Rabe Si_audit Simeredit

    268/781

  • 8/19/2019 Rabe Si_audit Simeredit

    269/781

  • 8/19/2019 Rabe Si_audit Simeredit

    270/781

    OK 

    OK 

  • 8/19/2019 Rabe Si_audit Simeredit

    271/781

    2.592

    OK OK 

    OK 

  • 8/19/2019 Rabe Si_audit Simeredit

    272/781

  • 8/19/2019 Rabe Si_audit Simeredit

    273/781

  • 8/19/2019 Rabe Si_audit Simeredit

    274/781

    1.485675

    OK 

    OK

  • 8/19/2019 Rabe Si_audit Simeredit

    275/781

    OK 

  • 8/19/2019 Rabe Si_audit Simeredit

    276/781

    4.76325

    OK 

    n%!%&

    OK 

  • 8/19/2019 Rabe Si_audit Simeredit

    277/781

  • 8/19/2019 Rabe Si_audit Simeredit

    278/781

  • 8/19/2019 Rabe Si_audit Simeredit

    279/781

  • 8/19/2019 Rabe Si_audit Simeredit

    280/781

  • 8/19/2019 Rabe Si_audit Simeredit

    281/781

  • 8/19/2019 Rabe Si_audit Simeredit

    282/781

  • 8/19/2019 Rabe Si_audit Simeredit

    283/781

  • 8/19/2019 Rabe Si_audit Simeredit

    284/781

  • 8/19/2019 Rabe Si_audit Simeredit

    285/781

  • 8/19/2019 Rabe Si_audit Simeredit

    286/781

  • 8/19/2019 Rabe Si_audit Simeredit

    287/781

  • 8/19/2019 Rabe Si_audit Simeredit

    288/781

  • 8/19/2019 Rabe Si_audit Simeredit

    289/781

  • 8/19/2019 Rabe Si_audit Simeredit

    290/781

  • 8/19/2019 Rabe Si_audit Simeredit

    291/781

  • 8/19/2019 Rabe Si_audit Simeredit

    292/781

  • 8/19/2019 Rabe Si_audit Simeredit

    293/781

  • 8/19/2019 Rabe Si_audit Simeredit

    294/781

  • 8/19/2019 Rabe Si_audit Simeredit

    295/781

  • 8/19/2019 Rabe Si_audit Simeredit

    296/781

  • 8/19/2019 Rabe Si_audit Simeredit

    297/781

  • 8/19/2019 Rabe Si_audit Simeredit

    298/781

  • 8/19/2019 Rabe Si_audit Simeredit

    299/781

  • 8/19/2019 Rabe Si_audit Simeredit

    300/781

  • 8/19/2019 Rabe Si_audit Simeredit

    301/781

  • 8/19/2019 Rabe Si_audit Simeredit

    302/781

    90

      1.0000

    0.0000

    III

    III

  • 8/19/2019 Rabe Si_audit Simeredit

    303/781

  • 8/19/2019 Rabe Si_audit Simeredit

    304/781

  • 8/19/2019 Rabe Si_audit Simeredit

    305/781

  • 8/19/2019 Rabe Si_audit Simeredit

    306/781

  • 8/19/2019 Rabe Si_audit Simeredit

    307/781

  • 8/19/2019 Rabe Si_audit Simeredit

    308/781

  • 8/19/2019 Rabe Si_audit Simeredit

    309/781

  • 8/19/2019 Rabe Si_audit Simeredit

    310/781

  • 8/19/2019 Rabe Si_audit Simeredit

    311/781

  • 8/19/2019 Rabe Si_audit Simeredit

    312/781

    ANA+SA ARGA SATAN ,EKE

    PE*ASANGAN %O?PLANK 1 *@

    N< $RAIAN &A

    A. BAAN

    1 Kau Meran!* 5?7 M3

    2 ,a$an Kau M3

    3 ,a&u B*aa 2D ? 3D Kg

    B. ,A

    1 ,e&era O

    2 Tu&ang Kau O3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    313/781

    B. ,A

    1 ,e&era O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    314/781

    <

    PE*OTONGAN 1 %7 KEPALA TIANG PANCANG

    N< $RAIAN &A

    A. BAAN

    B. ,A

    1 ,e&era O

    2 Me&an*& O

    3 O$era!%r O

    4 Ke$ala Tu&ang O

    5 Man%r O

    ;. A+AT

    1 Blener am2 Ala! 'an!u am

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    315/781

    2 ,l(%% !e'al 9 mm +'r

    3 Bal%& Kau Kela M3

    4 ,a&u 5 12 m Kg

    5 M*na& Be&*!*ng +*!er

    6 %l&en Kau Galam L "810# ;m ,anang 4 M B!g

    B. ,A1 ,e&era O

    2 Tu&ang Kau O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    316/781

    2 Bal%& Kau Kela M3

    3 ,a&u 5 7 m Kg

    4 M*na& Be&*!*ng +*!er

    5 %l&en Kau Galam L "810# ;m ,anang 4 M Ba!ang

    B. ,A

    1 ,e&era O2 Tu&ang Kau O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    317/781

    B. ,A

    1 ,e&era O

    2 Tu&ang Ba!u O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    1 ;%nre!e

  • 8/19/2019 Rabe Si_audit Simeredit

    318/781

    3 ,, M3

    B. ,A

    1 ,e&era O

    2 Tu&ang Ba!u O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    319/781

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    320/781

    N< $RAIAN &A

    A. BAAN

    1 Ba!u Gunung?Kal* M3

    2 ,a*r rug M3

    B. ,A

    1 ,e&era O

    2 Tu&ang Ba!u O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    321/781

    1 ,e&era O

    2 Tu&ang Ba!u O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    322/781

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    323/781

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    324/781

    . M+A ARGA SATAN ,EKERAAN " E #

    *E*ASANG 1 *2 LANGIT-LANGIT GPSU* %OA65 D ++

    N< $RAIAN &A

    A. BAAN

    1 G$um B%ar +em'ar

    2 ,a&u &ru$ Kg

    B. ,A

    1 ,e&era O

    2 Tu&ang Kau O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    325/781

    A. BAAN

    1 Kau $a$an M3

    2 ,a&u !r*$le& Kg

    B. ,A

    1 ,e&era O

    2 Tu&ang Kau O

    3 Ke$ala Tu&ang O

    4 Man%r O

    ;. A+AT

    . M+A ARGA " A B ; #

    E. O

  • 8/19/2019 Rabe Si_audit Simeredit

    326/781

    *E*ASANG 1 *2 PASANG 6ANGKA PLA

  • 8/19/2019 Rabe Si_audit Simeredit

    327/781

    *E*ASANG 1 *2