RENCANA ANGGARAN BIAYA( R A B )
Pekerjaan : Pembagunan Gedung AULA Universitas SamawaLokasi : Jln. Raya Sering Bay Pass Kec. Unter Iwes Sumbawa
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA (Rp)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN1 Pembersian Lokasi - Ls 1.000 5,000,000.00 5,000,000.00 2 Pengukuran dan Pemasangan Bowplank - Ls 1.000 8,000,000.00 8,000,000.00
Sub Total I 13,000,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi B.1 83.300 44,610.00 3,716,013.00
2 Urugan Pasir Bawah Pondasi B.11 4.165 122,844.00 511,645.26
3 Urugan Tanah bawah Lantai Dipadatkan B.10.a 132.159 75,444.00 9,970,638.62 Sub Total II 14,198,296.88
III PEKERJAAN PASANGAN
1 Pasangan Batu Kosong C.9 12.495 240,182.70 3,001,082.84
2 Pasangan Batu 1 PC : 5 Ps C.3 34.733 510,365.50 17,726,269.73
3 Pasangan Tembok Bata 1 Pc : 5 Ps E.10 460.749 88,876.60 40,949,822.35
4 Plesteran Tembok 1 Pc : 5 Ps D.5 921.498 39,333.58 36,245,831.04 Sub Total III 97,923,005.95
IV PEKERJAAN BETON
1 Kolom Struktur Beton Mutu f'c = 14,5 Mpa (K 175) F.5 5.58 821,820.27 4,582,384.38 2 Konstruksi Rangka Baja M.25 Kg 2,945.25 25,536.60 75,211,671.15 3 Sloff 15/20 (4 Ø 12 mm, Begel Ø 6 - 15 cm) F.29 M3 2.35 4,878,739.03 11,474,794.19
4 Kolom Praktis 12/12 (4 Ø 10 mm, Begel Ø 6 - 15 cm) F.30.d 0.39 5,392,130.78 2,096,460.45
5 Balok Latei 12/15 (4 Ø 10 mm, Begel Ø 6 - 15 cm) F.31.a 2.63 4,798,723.78 12,611,046.08
6 Ring Balok 12/15+Balok Gantung (4 Ø 12 mm, Begel Ø 6 - 15 cm) F.31.d 1.96 5,486,223.78 10,763,971.05
7 Plat Penutup (dak) F.33 0.27 5,323,287.43 1,437,287.60 Sub Total IV 118,177,614.90
V PEKERJAAN PINTU DAN JENDELA
1 Mengerjakan Kusen ls 19.590 25,536.60 500,272.21 3 Mengerjakan Daun Pintu ls M2 - 460,940.00 -
4 Mengerjakan Daun Jendela Kaca ls 19.590 25,536.60 500,272.21
5 Memasang Kaca Mati t = 5 mm - 9.354 176,000.00 1,646,346.24 6 Acordion Door Ls unit 1.000 12,000,000.00 12,000,000.00
Sub Total V 2,646,890.66 VI PEKERJAAN ATAP
1 Pek. Rangka Atap Baja Ls Kg ### 25,536.60 77,781,349.23
2 Pasang Kalsiplank Ls 23.652 36,000.00 851,472.00
3 Rangka Plafond Metalfuring I.3 327.000 57,795.50 18,899,128.50
4 Penutup Plafond Calsiboard I.5 327.000 37,640.00 12,308,280.00
5 List Plafon Kayu Profil I.10 126.380 15,013.70 1,897,431.41
Sub Total VI 111,737,661.14 VII PEKERJAAN LANTAI
1 Pasir Urug Dibawah Lantai B.11 16.350 122,844.00 2,008,499.40
2 Rabat Beton Bawah Lantai F.4 16.350 699,060.27 11,429,635.50
3 Keramik 40 x 40 Motif L.35.a 327.000 173,048.83 56,586,968.50
4 Acian Lantai D.27 327.000 24,345.50 7,960,978.50 Sub Total VII 77,986,081.90
VIII PEKERJAAN PENGUNCI1 Kunci Tanam - Bh 5.000 127,500.00 637,500.00 2 Grendel Pintu - Bh 5.000 8,300.00 41,500.00 3 Grendel Jendela - Bh 8.000 5,700.00 45,600.00 4 Hak Angin Besar - Stel 4.000 7,300.00 29,200.00 5 Engsel Pintu - Psng 5.000 8,500.00 42,500.00 6 Engsel Jendela - Psng 8.000 8,500.00 68,000.00
Sub Total VIII 864,300.00 IX PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu - Bh 28.000 155,000.00 4,340,000.00 2 Stop kontak Tanam - Bh 16.000 145,000.00 2,320,000.00 3 Saklar Tanam Ganda - Bh 6.000 25,000.00 150,000.00 4 Saklar Tanam Tunggal - Bh 1.000 25,000.00 25,000.00 6 Hemat Energi SL 18 Watt (Philips) - Bh 28.000 40,000.00 1,120,000.00 7 MCB - Bh 1.000 125,000.00 125,000.00
Sub Total IX 8,080,000.00
NOMOR
ANALISA
HARGA SATUAN (Rp)
M3
M3
M3
M3
M3
M2
M2
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M1
M1
M3
M3
M2
M2
X PEKERJAAN PENGECATAN
1 Pengecatan Tembok M.14.a 921.498 16,334.27 15,052,003.67
2 Pengecatan Plafond M.14.a 327.000 16,334.27 5,341,306.29
3 Pengecatan Atap M.24 ### 18,897.58 57,559,709.19 Sub Total X 77,953,019.15
XI PEKERJAAN SANITASI
1 Pekerjaan Lubang Biopori Ls Bh 30.00 135,000.00 4,050,000.00
1 Galian Tanah Lubang - 18.65 30,174.00 562,684.75
2 Pas trasram 1/2 Bata 1 Pc : 3 Ps - 46.10 176,994.20 8,159,432.62
3 Balok 12/12 ( 4 dia 10 - dia 6 Jarak 20 cm) G.41.e 0.33 11,890,793.53 3,895,423.96
4 Beton Penutup Septictank T= 10 cm G.41.a 1.19 3,255,312.67 3,875,682.25
5 Lantai Kerja Beton - 0.47 627,270.65 293,562.66
6 Saluran Air Kotor Pipa PVC 4" Ls M 20.00 62,200.00 1,244,000.00
7 Saluran Air Bersih 3/4 " Ls M 35.00 3,800.00 133,000.00
8 PiPa Hawa PVC 2" Ls M 2.00 20,200.00 40,400.00
9 Bak Fyberglass Kap. 0.5 M3 Ls Bh 2.00 275,000.00 550,000.00
10 Closet Duduk + Asesoris Ls Bh 1.00 1,960,700.00 1,960,700.00
11 Ijuk - 10.00 96,034.80 960,348.00
12 Pasir Urug - 2.00 116,469.60 232,939.20
13 Batu Kali - 2.00 207,928.56 415,857.12
Sub Total XI 26,374,030.57
M2
M2
M2
M2
M2
M3
M3
M3
M2
M3
M3
REKAPITULASIRENCANA ANGGARAN BIAYA
Pekerjaan : Pembagunan Gedung AULA Universitas SamawaLokasi : Jln. Raya Sering Bay Pass Kec. Unter Iwes Sumbawa
NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)
1 2 3
I PEKERJAAN PERSIAPAN 13,000,000.00
II PEKERJAAN TANAH 14,198,296.88
III PEKERJAAN PASANGAN 97,923,005.95
IV PEKERJAAN BETON 118,177,614.90
V PEKERJAAN PINTU DAN JENDELA 2,646,890.66
VI PEKERJAAN ATAP 111,737,661.14
VII PEKERJAAN LANTAI 77,986,081.90
VIII PEKERJAAN PENGUNCI 864,300.00
IX PEKERJAAN INSTALASI LISTRIK 8,080,000.00
X PEKERJAAN PENGECATAN 77,953,019.15
XI PEKERJAAN SANITASI 26,374,030.57
Jumlah 548,940,901.14
PPn+PPH 57,389,276.03
(A+B) 606,330,177.17 Pembulatan 606,330,100.00
Terbilang : Tujuh Ratus Empat Puluh Tiga Juta Seratus Sembilan Puluh Enam Ribu Rupiah
Sumbawa Besar, July 2015Dibuat oleh:
PerencanaD' E - Team
Erwin Ariyadi12.05.12.0519
BUILT OF QUANTITY(B O Q)
Kegiatan : Pembangunan Ruang Kelas/ Perpustakaan Pekerjaan : SDN Pungkit
Lokasi : Kecamatan LopokTahun Anggaran : 2014
Sumber Dana : DAK Bidang Pendidikan
NO URAIAN PEKERJAAN PANJANG (M)Panjang LEBAR (M) Lebar
JUMLAH VOLUME SATRata-rata a b Rata-rata
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek -
2 Pengukuran dan Pemasangan Bowplank - - -
3 Air Kerja -
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 83.30
Induk 87.00 0.85 1.00 73.95 m3
Teras 11.00 0.85 1.00 9.35 m3
83.30 m3
2 Urugan Pasir Bawah Pondasi 4.17
Induk 87.00 0.85 0.05 3.70 m3
Teras 11.00 0.85 0.05 0.47 m3
4.17 m3
3 Urugan Tanah bawah Lantai Dipadatkan 130.80
Induk 315.00 - 0.40 126.00 m3
Teras 12.00 - 0.40 4.80 m3
130.80 m3
III PEKERJAAN PASANGAN
1 Pasangan Batu Kosong 12.50
Induk 87.00 0.85 0.15 11.09 m3
TINGGI/TBL (M)
Teras 11.00 0.85 0.15 1.40 m3
12.50 m3
2 Pasangan Batu 1 PC : 5 Ps 34.73
Induk 87.00 0.85 0.25 0.55 0.65 31.10 m3
Teras 11.00 0.85 0.25 0.55 0.60 3.63 m3
34.73 m3
3 Pasangan Tembok Bata 1 Pc : 5 Ps 460.75
Induk Luar 53.00 4.50 238.50
Induk Luar 7.00 2.35 16.45
Induk Luar 26.00 6.85 178.10
Induk Luar 8.00 8.36 66.88
480.34 m2
Faktor Pengurangan
P1 2.48 2.03 1.00 5.03 m2
P2 1.30 2.03 4.00 10.56 m2
P3 1.00 2.00 2.00 4.00 m2
19.59 m2
4 Plesteran Tembok 1 Pc : 5 Ps 921.50
IV PEKERJAAN BETON
1 Sloof 12/20 (4 Ø 12 mm, Begel Ø 6 - 15 cm) 2.35
Induk 87.00 0.12 0.20 2.09 m3
Teras 11.00 0.12 0.20 0.26 m3
2.35 m3
2 Kolom Struktur Baja I 5.58
Tinggi 4 M 4.50 0.26 0.18 10.00 2.11 m3
5.25 0.26 0.18 4.00 0.98
6.86 0.26 0.18 4.00 1.28
Tinggi 4,3 M 8.36 0.20 0.18 4.00 1.20 m3
5.58 m3
3 Kolom Praktis 12/12 (4 Ø 10 mm, Begel Ø 6 - 15 cm) 0.39
Tinggi 4 M 4.50 0.12 0.12 6.00 0.39 m3
Tinggi 4,3 M 8.36 0.12 0.12 - - m3
0.39 m3
4 Kolom Struktur 20/20 (4 Ø 12 mm, Begel Ø 6 - 15 cm) 0.71
Tinggi 4 M 2.60 0.12 0.12 14.00 0.52 m3
3.35 0.12 0.12 2.00 0.10 m3
Tinggi 4,3 M 3.00 0.12 0.12 2.00 0.09 m3
0.71 m3
4 Kolom Teras 20/20 (4 Ø 12 mm, Begel Ø 6 - 15 cm) -
3.10 0.15 0.20 - - m3
5 Balok Latei 12/15 (4 Ø 10 mm, Begel Ø 6 - 15 cm) 2.63
73.00 0.12 0.15 2.00 2.63 m3
6 Ring Balok 12/15+Balok Gantung (4 Ø 12 mm, Begel Ø 6 - 15 cm) 1.96
Induk 87.00 0.12 0.15 1.00 1.57 m3
Teras 11.00 0.12 0.15 2.00 0.40 m3
1.96 m3
7 Gevel 12/15 (4 Ø 10 mm, Begel Ø 6 - 15 cm) -
Belakang 6.53 0.12 0.15 - - m3
Tiang 3.25 0.12 0.15 - - m3
Depan 4.05 0.12 0.15 - - m3
Tiang 2.10 0.12 0.15 - - m3
- m3
8 Plat Beton Bertulang (DAK Beton) 0.27
Induk 0.15 0.15 - m3
Teras 12.00 0.15 0.15 0.27 m3
0.27
8 Plat Beton Bertulang (Tangga) 0.64
Anak Tangga 0.85 0.15 0.30 15.00 0.57 m3
Bordes 1.79 0.12 0.30 1.00 0.06 m3
0.64
0.27 m3
V PEKERJAAN PINTU DAN JENDELA
1 Mengerjakan Kusen 19.59
P1 2.48 - 2.03 - - - 1.00 5.03 m3
P2 1.30 - 2.03 - - - 4.00 10.56
P3 1.00 - 2.00 - - - 2.00 4.00
- - - - - - - - -
- - - - - - - - -
- - 19.59 m3
3 Mengerjakan Daun Pintu panel -
P1 - 2.00 - - m2
4 Mengerjakan Daun Jendela Kaca Kayu Klas II -
- - - - -
- - 1.00 - - m2
-
5 Memasang Kaca Mati t = 5 mm 9.35
P1 15.59 0.60 1.00 9.35 m2
- - 1.00 - - m2
9.35 m2
VI PEKERJAAN ATAP
1 Pek. Rangka Atap baja Ringan 19.25
Atap 1 5.50 3.50 1.00 1.00 19.25 m2
Atap 2 6.50 4.50 1.00 1.00 29.25
Atap 3 8.50 7.50 1.00 1.00 63.75
112.25 m
3 Pasang Listplank (Calsiplank) , 23.65
Atap 1 78.84 0.30 23.652 m2
Atap 2 - 0.30 0 m2
Atap 3 - 0.30 - m2
23.65 m2
9 Rangka Plafond Kayu Kelas II 327.00
Dalam Ruanga 315.00 1.00 315.00
Teras Depan 12.00 1.00 12.00
Belakang
Tritisan
327.00 m
10 Penutup Plafond Triplek 4 mm 327.00
11 List Plafon Kayu Profil 126.38
87.00 1.00 88.00 m
37.38 1.00 38.38 m
126.38 m
VII PEKERJAAN LANTAI
1 Pasir Urug Dibawah Lantai 16.35
Induk 315.00 1.00 0.05 15.75 m3
Ters 12.00 1.00 0.05 0.60 m3
16.35 m3
2 Rabat Beton Bawah Lantai 16.35
Induk 315.00 1.00 0.05 15.75 m3
Ters 12.00 1.00 0.05 0.60 m3
16.35 m3
3 Keramik 40 x 40 Motif 327.00
315.00 1.00 315.00 m2
12.00 1.00 12.00 m2
327.00 m2
4 Acian Lantai
VIII PEKERJAAN PENGUNCI
1 Kunci Tanam 5.00
2 Grendel Pintu 5.00
3 Grendel Jendela 8.00
4 Hak Angin Besar 4.00
5 Engsel Pintu 5.00
6 Engsel Jendela 8.00
IX PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu 28.000 2 Stop kontak Tanam 16.000 3 Saklar Tanam Ganda 6.000 4 Saklar Tanam Tunggal 4.000 5 Hemat Energi SL 8 Watt (Philips) 22.000 6 Hemat Energi SL 18 Watt (Philips) 28.000 7 MCB 1.000
X PEKERJAAN PENGECATAN
1 Pengecatan Tembok 921.50
2 Pengecatan Kayu Tampak #REF!
3 Pengecatan Plafond 327.00
4 Pekerjaan Mengeter Kap #REF!
5 Pengecatan Atap Seng
PEKERJAAN SANITASI
1 Pekerjaan Lubang Biopori 0.42
0.70 0.70 0.85 0.42
2 Pas trasram 1/2 Bata 1 Pc : 3 Ps -
0.55 0.55 0.05 - -
0.70 0.50 0.05 - -
-
5 Lantai Kerja Beton 3.58 0.55 0.90 4.00 1.98
2.00 0.80 1.00 1.60
3.58
6 Saluran Air Kotor Pipa PVC 4" 5.56 1.98 1.98
3.58 3.58
5.56
7 Saluran Air Bersih 3/4 " 4.00 4.00
8 PiPa Hawa PVC 2" 20.00 20.00
9 Bak Fyberglass Kap. 0.5 M3 1.00 1.00
10 Closet Duduk + Asesoris 1.00 1.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN BANGUNANBerdasarkan Keputusan Bupati Sumbawa Nomor : 1217 Tahun 2014Tentang Perubahan Atas Keputusan Bupati Sumbawa Nomor : 852 Tahun 2015Tentang Penetapan Standar Harga Satuan Pemerintah Kabupaten Sumbawa
NO URAIAN SAT. HARGA KET.1 Upah Pekerja
1.1 Pekerja OH Rp 56,800 1.2 Pekerja terlatih OH Rp 64,970 1.3 Tukang Batu OH Rp 69,825 1.4 Kepala Tukang Batu OH Rp 74,650 1.5 Tukang Kayu OH Rp 69,825 1.6 Kepala Tukang Kayu OH Rp 74,650 1.7 Tukang Besi OH Rp 69,825 1.8 Kepala Tukang Besi OH Rp 74,650 1.9 Tukang Las OH Rp 69,825 1.10 Kepala Tukang Las OH Rp 74,650 1.11 Tukang Pelitur OH Rp 69,825 1.12 Tukang Cat OH Rp 69,825 1.13 Kepala Tukang Cat OH Rp 74,650 1.14 Pemecah Batu OH Rp 59,570 1.15 Penggergaji OH Rp 60,750 1.16 Mandor Pengisi Bronjong OH Rp 80,400 1.17 Pengisi Bronjong OH Rp 69,825 1.18 Penganyam Bronjong OH Rp 60,750 1.19 Kepala Penganyam Bronjong OH Rp 74,650 1.20 Mandor OH Rp 80,400 1.21 Sopir OH Rp 69,825 1.22 Pembantu sopir OH Rp 59,570 1.23 Mekanik OH Rp 74,650 1.24 Pembantu Mekanik OH Rp 59,570 1.25 Operator alat ringan OH Rp 69,825 1.26 Operator alat berat OH Rp 74,650 1.27 Pembantu operator OH Rp 59,570 1.28 Pemasak aspal OH Rp 60,750 1.29 Penunjuk Jalan OH Rp 60,750 1.30 Tukang Pipa PVC OH Rp 69,825 1.31 Tukang Pipa Besi OH Rp 69,825 1.32 Kepala Tukang Pipa OH Rp 74,650 1.33 Tukang Listrik OH Rp 69,825 1.34 Kepala Tukang Listrik OH Rp 74,650 1.35 Kepala Tukang OH Rp 74,650
2 Bahan Pasangan dan Tanah2.1 Batu belah 15 cm - 20 cm M3 Rp 100,000 2.2 Batu Paras M3 Rp 198,000 2.3 Batu kali alam M3 Rp 98,500 2.4 Batu pecah 5-7 cm M3 Rp 200,000
2.5 Batu pecah 3-5 cm M3 Rp 220,000 2.6 Batu pecah 2-3 cm M3 Rp 265,000 2.7 Kerikil alam 2/3 cm M3 Rp 264,200 2.8 Kerikil Sungai - Royalti M3 Rp 75,000 2.9 Kerikil pecah 1/2 cm M3 Rp 241,000 2.10 Kerikil Alam 1 cm M3 Rp 306,200 2.11 Koral Beton M3 Rp 264,200 2.12 Agregate 2-3 (stone crusher) M3 Rp 287,000 2.13 Agregate 1-2 (stone crusher) M3 Rp 220,000 2.14 Aggregat Klas B (20% Agg.Hls : 80% Agg.Ksr) M3 Rp 200,000 2.15 Bata merah kelas 1 BH Rp 650 2.16 Bata merah kelas 2 BH Rp 600 2.17 Pasir Beton (PB) M3 Rp 95,000 2.18 Pasir pasang M3 Rp 92,000 2.19 Pasir urug M3 Rp 90,000 2.20 Sirtu M3 Rp 90,000 2.21 Tanah urug Biasa M3 Rp 46,000 2.22 Filler (abu batu ) M3 Rp 46,000 2.23 Tanah Liat (TL) M3 Rp 181,500 2.24 Semen Merah (SM) M3 Rp 198,000 2.25 Semen Warna KG Rp 13,000 2.26 Semen KG Rp 1,390 2.27 Semen PC. Merk Tiga Roda ZAK Rp 69,500 2.28 Semen PC. Merk Gresik ZAK Rp 69,000 2.29 Semen PC. Merk Tonasa ZAK Rp 65,000 2.30 Semen PC. Merk Bosowa ZAK Rp 64,000 2.31 Semen PC. Merk Holcim ZAK Rp 60,000 2.32 PC Mortar Tiga Roda KG Rp 75,000 2.33 Rumput Gebalan M2 Rp 22,000 2.34 List plafon (propil) 4/4 cm M Rp 22,000 2.35 Aspal (Aspal Concrete/ AC ) KG Rp 16,800 2.36 Aspal (Medium Curring/ MC) KG Rp 18,000 2.37 Aspal emulsi KG Rp 15,600 2.38 Filler (abu batu ) KG Rp 2,500 2.39 Buton Granular Asphalt (BGA) KG Rp 2,300 2.40 Air LTR Rp 150
3 Bahan Atap3.1 Sirap Kalimantan BH Rp 1,000 3.2 Genteng Lokal BH Rp 600 3.3 Genteng Beton/Pres BH Rp 1,600 3.4 Genteng karang pilang/Kodok BH Rp 1,100 3.5 Genteng Pres Lokal/Nijang Super BH Rp 1,000 3.6 Genteng Kaca BH Rp 14,100 3.7 Genteng Keramik BH Rp 20,500 3.8 Genteng Karang Pilang type keramik BH Rp 6,300 3.9 Bubungan Genteng Lokal BH Rp 4,500 3.10 Bumbungan Genteng Beton BH Rp 7,700
3.11 Bubungan Genteng Silang BH Rp 7,000 3.12 Bubungan Genteng Pres Lokal/Nijang Super BH Rp 5,800 3.13 Bubungan Genteng Keramik BH Rp 24,300 3.14 Bubungan Karang Pilang BH Rp 9,240 3.15 Atap Metalroof 3,5 mm (Lapis Butiran) LBR Rp 85,000 3.16 Bubungan Metalroof (lapis buriran) BH Rp 57,700 3.17 Atap Metal 3,5 mm (tanpa Lapis Butiran) LBR Rp 35,000 3.18 Bubungan Metal (tanpa lapis butiran) BH Rp 35,000 3.19 Asbes type genteng (tyluq) LBR Rp 57,750 3.20 Ijuk KG Rp 12,700 3.21 Asbes Gelombang 92 x 180 LBR Rp 42,500 3.22 Asbes Gelombang 105 x 240 LBR Rp 73,250 3.23 Bubungan Asbes Gelombang 92 cm LBR Rp 45,000 3.24 Bubungan Asbes Gelombang 105 cm LBR Rp 48,000 3.25 Seng Glmb. Besar BJLS 20 LBR Rp 61,600 3.26 Seng Glmb. Besar BJLS 25 LBR Rp 79,800 3.27 Seng Glmb. Besar BJLS 30 LBR Rp 104,500 3.28 Seng Glmb. Kecil BJLS 20 LBR Rp 71,100 3.29 Seng Plat BJLS 18 lebar 90 cm M Rp - 3.30 Seng Plat BJLS 20 lebar 90 cm M Rp - 3.31 Seng Plat BJLS 25 lebar 90 cm M Rp 55,000 3.32 Seng Plat BJLS 28 lebar 90 cm M Rp 75,000 3.33 Seng Plat BJLS 30 lebar 90 cm M Rp 44,900 3.34 Galvalume 2.5 lebar 70 cm M Rp 35,000 3.35 Galvalume 3 lebar 70 cm M Rp 40,000 3.36 Galvalume 4 lebar 70 cm M Rp - 3.37 Kalsipleng M Rp 36,000 Lokal3.38 Bubungan Galvalume 3 mm M Rp 30,000 3.39 Rangka Atap Baja Ringan (Profil C 75.075) M2 Rp 175,000
4 Bahan Kayu4.1 Papan Kayu Klas I M3 Rp 5,500,000 4.2 Papan Kayu Klas II M3 Rp 3,800,000 4.3 Papan Kayu Klas III M3 Rp 3,150,000 4.4 Balok Kayu Klas I M3 Rp 5,350,000 4.5 Balok Kayu Klas II M3 Rp 3,675,000 4.6 Balok Kayu Klas III M3 Rp 2,870,000 4.7 Dolken / Perancah Dia. 7 Cm - 4 M BTG Rp 24,300 4.8 Papan kayu bekisting M3 Rp 3,000,000 4.9 Balok kayu bekisting M3 Rp 2,750,000 4.10 Lumbersering Kls I M2 Rp 440,000 4.11 Lumbersering Kls II M2 Rp 385,000 4.12 Papan Kayu Jati M3 Rp 7,000,000
5 Bahan Bambu5.1 Bambu (dia.12,5 cm, P - 6 m) BTG Rp 18,000 5.2 Bambu (dia.10 cm, P- 6 m) BTG Rp 15,600 5.3 Bambu (dia.7 cm, P- 6 m) BTG Rp 12,800
5.4 Bedek kulitan M2 Rp 21,800 5.5 Bedek biasa M2 Rp 25,600 5.6 Bedek pagar M2 Rp 16,700 5.7 Bilik bambu M2 Rp 33,000
6 Bahan Cetak6.1 Lubang Angin 10x20 Cm BH Rp 45,000 6.2 Lubang Angin 20x20 Cm BH Rp 52,500 6.3 Lubang Angin 30x30 Cm BH Rp 57,000 6.4 Buis Beton Dia. 10 Cm BH/0.5 M Rp 32,000 6.5 Buis Beton Dia. 20 Cm BH/0.5 M Rp 57,700 6.6 Buis Beton Dia. 30 Cm BH/0.5 M Rp 70,500 6.7 Buis Beton Dia. 40 Cm BH/0.5 M Rp 102,500 6.8 Buis Beton Dia. 60 Cm BH/0.5 M Rp 141,000 6.9 Buis Beton Dia. 80 Cm BH/0.5 M Rp 179,400 6.10 Bataco 10 x 20 x 40 Cm BH Rp 3,200 6.11 Paving blok press type bata t=8 cm BH Rp 2,400 6.12 Paving blok biasa type bata t=6 cm BH Rp 1,900 6.13 Paving blok press type berlian t= 8 m BH Rp 2,500 6.14 Roster Pejaten BH Rp 60,500
7 Bahan Lantai7.1 Tegel Abu-abu 20 x 20 M2 Rp 39,900 7.2 Tegel Bergaris Abu 20 x 20 Cm M2 Rp 55,000 7.3 Tegel Warna 20 x 20 Cm. M2 Rp 55,000 7.4 Tegel Bergaris Warna 20 x 20 Cm M2 Rp 56,100 7.5 Tegel Traso Klas I 30 x 30 M2 Rp 46,600 7.6 Tegel Traso Klas II 30 x 30 M2 Rp 42,500 7.7 Keramik dinding M2 Rp 82,000 7.8 Keramik KW I (Motif) M2 Rp 75,000 7.9 Keramik KW II (Motif) M2 Rp 70,000 7.10 Keramik KW I (Polos) M2 Rp 61,000 7.11 Keramik KW II (Polos) M2 Rp 53,100 7.12 Keramik Cutting 30 X 50 M2 Rp 142,400 7.13 Marmer 100/100 M2 Rp 308,700 7.14 Marmer M2 Rp 233,000 7.15 Beton grid pracetak M2 Rp 72,600 7.16 Porselin 11/11 M2 Rp 69,900 7.17 Porselin 10/20 M2 Rp 69,900 7.18 Porselin 20/20 M2 Rp - 7.19 Ubin Keramik 30/30 Motif M2 Rp 68,200 7.20 Ubin Keramik 30/30 Polos M2 Rp 67,600 7.21 Ubin Keramik 40/40 Motif M2 Rp 70,000 7.22 Ubin Keramik 40/40 Polos M2 Rp 68,000 7.23 Ubin Keramik 20/20 M2 Rp 79,000 7.24 Mozaik 30/30 M2 Rp 33,500 7.25 Ubin Keramik artistik 10/20 M2 Rp 39,900 7.26 Ubin Keramik artistik 10/10 M2 Rp 79,800
7.27 Keramik artistik 5/20 M2 Rp 290,400 7.28 Keramik artistik 10/20 M2 Rp 152,400 7.29 Plint Keramik artistik 10/10 M2 Rp 254,100 7.30 Plint Keramik artistik 10/20 M2 Rp 152,400 7.31 Plint Keramik artistik 5/20 M2 Rp 108,900 7.32 Plint Internal Cove artistik 5 x 5/20 M2 Rp 22,600 7.33 Ubin Abu-abu 20/20 M2 Rp 42,900 7.34 Ubin Abu-abu 30/30 M2 Rp 42,700 7.35 Ubin Abu-abu 40/40 M2 Rp 42,700 7.36 Plint Ubin Abu-abu 15/20 M2 Rp 28,600 7.37 Plint Ubin Abu-abu 15/30 M2 Rp 28,700 7.38 Plint Ubin Abu-abu 10/40 M2 Rp 42,900 7.39 Ubin Warna 20/20 M2 Rp 49,700 7.40 Ubin Warna 30/30 M2 Rp 49,700 7.41 Ubin Warna 40/40 M2 Rp 49,500 7.42 Plint Ubin Warna 10/20 M2 Rp 50,100 7.43 Plint Ubin Warna 10/30 M2 Rp 49,800 7.44 Plint Ubin Warna 10/40 M2 Rp 24,800 7.45 Ubin Teraso 30/30 M2 Rp 61,000 7.46 Ubin Teraso 40/40 M2 Rp 61,000 7.47 Plint Ubin Teraso 10/30 M2 Rp 61,000 7.48 Plint Ubin Teraso 10/40 M2 Rp 61,000 7.49 Ubin Granit 30/30 M2 Rp 190,700 7.50 Ubin Granit 40/40 M2 Rp 190,600 7.51 Plint Ubin Granit 10/30 M2 Rp 190,700 7.52 Plint Ubin Granit 10/40 M2 Rp 190,600 7.53 Ubin Teralux Kerang 30/30 M2 Rp 205,700 7.54 Ubin Teralux Kerang 40/40 M2 Rp 205,700 7.55 Plint Ubin Teralux Kerang 10/30 M2 Rp 206,200 7.56 Plint Ubin Teralux Kerang 10/40 M2 Rp 205,700 7.57 Ubin Teralux Marmer 30/30 M2 Rp 221,100 7.58 Ubin Teralux Marmer 40/40 M2 Rp 221,100 7.59 Ubin Teralux Marmer 60/60 M2 Rp 221,100 7.60 Plint Ubin Teralux Marmer 10/30 M2 Rp 269,500 7.61 Plint Ubin Teralux Marmer 10/40 M2 Rp 293,700 7.62 Plint Ubin Teralux Marmer 10/60 M2 Rp 245,300 7.63 Teraso Cor M3 Rp 686,000 7.64 Batu Teraso (Krikil sikat) KG Rp 5,300 7.65 Batu Granit (Krikil sikat) KG Rp 11,400 7.66 Karpet M2 Rp 94,300 7.67 Underlayer / rubber corrugated M2 Rp 101,600 7.68 Parquet M2 Rp 130,600 7.69 Gymfloor (Lantai Kayu) M2 Rp 130,600 7.70 Vinyl 30/30 M2 Rp 108,900 7.71 Vinyl karet 30/30 M2 Rp 202,400 7.72 Batu Hias BH Rp 2,200
8 Bahan Besi
8.1 Besi Beton Ulir KG 12,500 8.2 Besi Beton Polos KG 12,500 @8.2a Besi 6 SNI (satuan Panjang) Ljr 26,000 8.2a.1 Besi 6 SNI (satuan Berat) Kg 9,848 8.2b Besi 8 SNI (satuan Panjang) Ljr 39,000 8.2b.1 Besi 8 SNI (satuan Berat) 8,270 8.2c Besi 10 SNI (satuan Panjang) Ljr 59,000 8.2c.1 Besi 10 SNI (satuan Berat) 7,969 8.2d Besi 12 SNI (satuan Panjang) Ljr 88,000 8.2d.1 Besi 12 SNI (satuan Berat) 8,268 8.2e Besi 19 SNI (satuan Panjang) Ljr 257,500 8.2e.1 Besi 19 SNI (satuan Berat) 9,537 8.3 Besi Profil Siku ST 33 KG Rp 16,500 8.4 Besi Plat KG Rp 20,000 8.5 Besi profil siku ST 37 KG Rp 20,000 8.6 Besi Baja WF dan Sejenisnya ST 37 KG Rp 20,600 8.7 Besi Black steel (S40) KG Rp 21,400 8.8 Alluminium Kuzen tebal 1,2 mm (natural) M Rp 154,000 8.9 Alluminium Kuzen tebal 1,2 mm (Warna) M Rp 165,000 8.10 Besi kotak hollow 20/20, 1.6 mm M Rp 8,800 Lokal8.11 Besi kotak hollow 20/40, 1.6 mm M Rp 12,800 Lokal8.12 Besi kotak hollow 30/30, 1.6 mm M Rp 14,000 Lokal8.13 Besi kotak hollow 40/40, 1.6 mm M Rp 17,000 Lokal8.14 Besi canal C KG Rp 20,000 8.15 Kawat Ikat Beton KG Rp 18,000 8.16 Kawat Nyamuk Besi M2 Rp 25,400 8.17 Kawat Nyamuk Plastik M2 Rp 19,800 8.18 Kawat Saringan Pasir M2 Rp 24,800 8.19 Kawat Duri ROL Rp 123,400 8.20 Kawat Bronjong 3 mm KG Rp 32,600 8.21 Kawat Bronjong 4 mm KG Rp 32,600 8.22 Kawat 3 mm (gulungan) KG Rp 17,600 8.23 Kawat Las KG Rp 36,300 8.24 Jaring kawat baja dilas KG Rp 19,800 8.25 Besi Angkur Ø 8 mm KG Rp 19,600 8.26 Besi strip tebal 5 mm KG Rp 19,800 8.27 Besi strip 2 x 3 mm KG Rp 19,800 8.28 Baja strip (0,2 x 2) cm KG Rp 19,800 8.29 Baja strip KG Rp 19,800 8.30 Besi list kaca (1 x 1) cm M Rp 264,000 8.31 Pintu gulung besi M2 Rp 605,000 8.32 Pintu lipat baja Folding door M2 Rp 254,100 8.33 Sunscreen alluminium M2 Rp 363,000 8.34 Rolling door alluminium M2 Rp 550,000 8.35 Alumunium strip M Rp 50,800 8.36 Alumunium voil LBR Rp 108,900 8.37 Pintu Alumunium M2 Rp 124,100
8.38 Profil kaca alluminium M Rp 51,700 8.39 Jendela nako (rangka + kaca 5 mm) M2 Rp 231,000 8.40 Kawat 4 mm (gulungan) KG Rp 17,600
8.41 UNIT Rp 467,500
8.42 UNIT Rp 528,000
8.43 UNIT Rp 638,000
8.44 UNIT Rp 693,000
8.45 UNIT Rp 775,500
8.46 UNIT Rp 935,000
8.47 UNIT Rp 968,000
8.48 UNIT Rp 1,078,000
8.49 UNIT Rp 1,320,000
8.50 UNIT Rp 907,500
8.51 UNIT Rp 1,017,500
8.52 UNIT Rp 1,347,500
8.53 UNIT Rp 517,000
8.54 UNIT Rp 574,700
8.55 UNIT Rp 698,500
8.56 UNIT Rp 720,500
8.57 UNIT Rp 803,000
8.58 UNIT Rp 962,500
8.59 UNIT Rp 107,500
8.60 UNIT Rp 1,133,000
8.61 UNIT Rp 1,380,500
8.62 UNIT Rp 1,347,500
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 2.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 2.0 x 1.0 x 0.5 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 2.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 3.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 3.0 x 1.0 x 0.5 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 3.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 3.0 x 1.5 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 3.0 x 1.5 x 0.5 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 3.0 x 1.5 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 4.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 4.0 x 1.0 x 0.5 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 4.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 1.5 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 1.5 x 1.0 x 1.0 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 1.5 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 2.0 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 2.0 x 1.0 x 1.0 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 2.0 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 3.0 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 3.0 x 1.0 x 1.0 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 3.0 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 4.0 x 1.0 x 1.0 dia 2.7 mm
8.63 UNIT Rp 1,490,500
8.64 UNIT Rp 1,793,000
8.65 Pagar BRC 120x240 cm BH Rp 387,200 8.66 Tiang BRC 1.5"x120 cm BH Rp 90,800 8.67 Knop Tiang BRC 1.5" BH Rp 8,400 8.68 Pintu BRC 120x100 cm Swing Tunggal BH Rp 559,000 8.69 Mur Baut BRC M8x80 BH Rp 2,200 8.70 Pintu Intake Irigasi 400 x 400 x 1700 UNIT Rp 6,380,000 8.71 Pintu Penstock 500 x 1.700 x 2.990 UNIT Rp 85,800 8.72 Trash rack 1.800 x 2.000 UNIT Rp 91,800 8.73 Pagar Besi Hollow M2 Rp 500,000 8.74 Pintu Pagar Besi Hollow M2 Rp 650,000
9 Bahan Langit - Langit9.1 Eternit 100 x 100 Cm LBR Rp 19,800 9.2 Triplek 120x240x 2 mm LBR Rp 38,500 9.3 Triplek 120x240x 3 mm LBR Rp 57,500 9.4 Triplek 120x240x 6 mm LBR Rp 90,000 9.5 Triplek 120x240x 9 mm LBR Rp 147,500 9.6 Triplek 120x240x 12 mm LBR Rp 165,000 9.7 Triplek 120x240x 18 mm LBR Rp 231,000 9.8 Triplek lapis aluminium LBR Rp 137,500 9.9 Multipleks 120 x 240 x 12 mm LBR Rp 211,200 9.10 Multipleks 120 x 240 x 18 mm LBR Rp 297,000 9.11 Multipleks 120 x 240 x 4 mm LBR Rp 89,700 9.12 Multipleks 120 x 240 x 6 mm LBR Rp 92,400 9.13 Multipleks 120 x 240 x 9 mm LBR Rp 158,400 9.14 Calsiboard 120x240x3,5 mm LBR Rp 70,000 9.15 Calsiboard 120x240x6 mm LBR Rp 72,000 9.16 Gypsum board 1200 x 2400 x 6 mm LBR Rp - 9.17 Gypsum board 1200 x 2400 x 9 mm LBR Rp 68,000 9.18 Formika Putih 120 x 240 Cm LBR Rp 147,700 9.19 Formika Warna 120 x 240 Cm LBR Rp 153,800 9.20 Gypsum M Rp 68,000 9.21 List Gypsum Profil M Rp 33,000 9.22 List Kayu Profil M Rp 7,500 9.23 Lem Kayu KG Rp 32,500 9.24 Lem KG Rp 29,700 9.25 Lem Vinyl KG Rp 29,700 9.26 Baja C-75 t 0.8 mm M Rp 14,200 9.27 Baja C-75 t 0.6 mm M Rp 12,500 9.28 Reng Baja Ringan M Rp 7,000 9.29 Plafond Calcyboard Rangka Metaforing M2 Rp 135,000
10 Bahan Pipa
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. Uk. 4.0 x 1.0 x 1.0 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy Galv. & PVC Uk. 4.0 x 1.0 x 1.0 dia 2.7 mm
10.1 Pipa GI Ø ½" M Rp 35,300 10.2 Pipa GI Ø ¾" M Rp 40,000 10.3 Pipa GI Ø 1" M Rp 47,000 10.4 Pipa GI Ø 1 ½" M Rp 70,600 10.5 Pipa GI Ø 2" M Rp 118,500 10.6 Pipa GI Ø 3" M Rp 119,800 10.7 Pipa GI Ø 4" M Rp 321,600 10.8 Pipa PVC Ø ½" M Rp 5,800 10.9 Pipa PVC Ø ¾" M Rp 7,700 10.10 Pipa PVC Ø 1" M Rp 11,800 10.11 Pipa PVC Ø 1 ½" M Rp 35,900 10.12 Pipa PVC Ø 2" M Rp 88,300 10.13 Pipa PVC Ø 3" M Rp 25,000 10.14 Pipa PVC Ø 4" M Rp 137,300 10.15 Pipa HDPE Ø ½" M Rp 12,300 10.16 Pipa HDPE Ø ¾" M Rp 18,200 10.17 Pipa HDPE Ø 1" M Rp 45,300 10.18 Pipa HDPE Ø 1 ½" M Rp 71,500 10.19 Pipa HDPE Ø 2" M Rp 100,200 10.20 Pipa HDPE Ø 3" M Rp 114,500 10.21 Pipa HDPE Ø 4" M Rp 218,500 10.22 Stop Kran Dia ½" BH Rp 59,800 10.23 Stop Kran Dia ¾" BH Rp 91,900 10.24 Stop Kran Dia 1" BH Rp 226,600 10.25 Stop Kran Dia 1½" BH Rp 407,800 10.26 Stop Kran Dia 2" BH Rp 604,100 10.27 Stop Kran Dia 2½'' BH Rp 1,166,900 10.28 Stop Kran Dia 3" BH Rp 1,647,400 10.29 Kran Dia ½" BH Rp 31,700 10.30 Kran Dia ¾" BH Rp 45,900 10.31 Bend Knee GI Dia ½" BH Rp 4,900 10.32 Bend Knee GI Dia ¾" BH Rp 6,600 10.33 Bend Knee GI Dia 1" BH Rp 9,700 10.34 Bend Knee GI Dia 1½" BH Rp 19,400 10.35 Bend Knee GI Dia 2" BH Rp 29,700 10.36 Bend Knee GI Dia 2½'' BH Rp 50,900 10.37 Bend Knee GI Dia 3" BH Rp 91,800 10.38 Bend Knee GI Dia 4" BH Rp 155,400 10.39 Bend Knee PVC Dia ½" BH Rp 2,800 10.40 Bend Knee PVC Dia ¾" BH Rp 4,900 10.41 Bend Knee PVC Dia 1" BH Rp 8,400 10.42 Bend Knee PVC Dia 1½" BH Rp 21,200 10.43 Bend Knee PVC Dia 2" BH Rp 49,500 10.44 Bend Knee PVC Dia 2½'' BH Rp 60,000 10.45 Bend Knee PVC Dia 3" BH Rp 70,600 10.46 Bend Knee PVC Dia 4" BH Rp 113,300
11 Bahan Kaca
11.1 Kaca Polos 3 mm M2 Rp 150,000 11.2 Kaca Polos 5 mm M2 Rp 176,000 11.3 Kaca Polos 10 mm M2 Rp 237,600 11.4 Kaca Riben Tebal 3 mm M2 Rp 160,000 11.5 Kaca Riben Tebal 5 mm M2 Rp 187,000 11.6 Kaca Raiben 10 mm M2 Rp 264,000 11.7 Kaca Raiben 12 mm M2 Rp 297,000 11.8 Kaca Buram 3 mm M2 Rp 125,400 11.9 Kaca Buram 5 mm M2 Rp 178,200 11.10 Kaca Buram bermotif 3 mm M2 Rp 165,000 11.11 Kaca Buram bermotif 5 mm M2 Rp 204,600 11.12 Kaca Cermin 5 mm M2 Rp 99,000 11.13 Kaca Wire Glass 5 mm M2 Rp 198,000 11.14 Kaca Wire Glass 8 mm M2 Rp 198,000 11.15 Glass Blok BH Rp 33,000 11.16 Kerangka Nako 5 mm M2 Rp 141,000 11.17 Kerangka Es 3 mm M2 Rp 99,000
12 Bahan Finishing12.1 Ampelas LBR Rp 3,500 12.2 Plamir Kayu KG Rp 20,900 12.3 Spiritus LTR Rp 16,700 12.4 Minyak Cat LTR Rp 33,000 12.5 Residu LTR Rp 12,200 12.6 Teak Oil LTR Rp 17,900 12.7 Meni Besi KG Rp 44,900 12.8 Meni Kayu KG Rp 44,000 12.9 Cat Kayu Mutu Menengah KG Rp 39,000 12.10 Cat Kayu Mutu Tinggi KG Rp 52,500 12.11 Cat Tembok Mutu Menengah KG Rp 20,400 12.12 Cat Tembok Mutu Tinggi KG Rp 21,400 12.13 Cat Dasar Kayu KG Rp 33,000 12.14 Cat Besi KG Rp 44,000 12.15 Cat genteng/seng KG Rp 38,500 12.16 Plamir Tembok KG Rp 20,000 12.17 Tepung Gypsum KG Rp 19,800 12.18 T e e r LTR Rp 15,000 12.19 Politur LTR Rp 42,000 12.20 Cat Marka Jalan Scalato KG Rp 57,700 12.21 Aqua Proff KG Rp 42,500 12.22 Cat Marka Jalan Biasa KG Rp 44,900 12.23 Cairan Pengupas Cat KG Rp 30,000 12.24 Cairan Pengeras Cat (Hardner) KG Rp 196,900 12.25 Roll Cat BH Rp 13,800 12.26 Kape BH Rp 6,600 12.27 Kuas BH Rp 7,000
13 Bahan Kunci
13.1 Kunci pintu mutu menengah BH Rp 114,800 13.2 Kunci pintu mutu Tinggi BH Rp 323,700 13.3 Yale Kecil BH Rp 62,700 13.4 Yale Besar BH Rp 113,000 13.5 Kuda Terbang Kecil BH Rp 64,300 13.6 Kuda Terbang Besar BH Rp 80,000 13.7 Royal STEL Rp 53,500 13.8 Haag Angin Besar STEL Rp 7,200 13.9 Haag Angin Kecil STEL Rp 5,800 13.10 Grendel Besar BH Rp 13,300 13.11 Grendel Kecil BH Rp 10,200 13.12 Engsel Nylon PS Rp 14,900 13.13 Engsel Biasa PS Rp 10,000 13.14 Expagnolet BH Rp 60,800
14 Bahan Sanitair14.1 Kloset Duduk Keramik BH Rp 1,960,700 14.2 Kloset Jongkok Teraso BH Rp 71,500 14.3 Kloset Jongkok Porselin BH Rp 150,000 14.4 Wastafel BH Rp 1,486,500 14.5 Urinoir Porselin (kualitas no. 1) BH Rp 3,911,800 14.6 Avoir Plastik BH Rp 35,000 14.7 Avoir Besi BH Rp 37,500 14.8 Saringan Air Besi Stainless BH Rp 5,478,400 14.9 Saringan Air Plastik BH Rp 891,900 14.10 Bak Cuci Piring Teraso BH Rp 256,300 14.11 Bak Cuci Stainless Steel BH Rp 365,000 14.12 Reservoir Fybg Kapasitas 1 M3 BH Rp 416,500 14.13 Septictank Kapasitas 1 M3 BH Rp 3,203,800 14.14 Septictank Kapasitas 2 M3 BH Rp 4,164,900 14.15 Bak Fiberglass 1,00 M3 BH Rp 356,400 14.16 Bak Mandi Plastik Kap 0,5 M3 BH Rp 275,000 14.17 Bak Mandi Porselin BH Rp 396,000 14.18 Floor Drain BH Rp 19,800 14.19 Seal tape BH Rp 3,300 14.20 Tangki Air Fiberglass 1 000 Lt. vertikal BH Rp 5,567,200 14.21 Tangki Air Fiberglass 2 000 Lt. vertikal BH Rp 8,415,500 14.22 Tangki Air Fiberglass 3 000 Lt. vertikal BH Rp 11,134,400 14.23 Tangki Air Fiberglass 4 000 Lt. vertikal BH Rp 16,054,200 14.24 Tangki Air Fiberglass 3 000 Lt. Horisontal BH Rp 31,720,100 14.25 Tangki Air Fiberglass 4 000 Lt. Horisontal BH Rp 44,667,100
15 Bahan Paku15.1 Paku Biasa KG Rp 25,000 15.2 Paku Triplek KG Rp 30,000 15.3 Paku Sekrup KG Rp 19,800 15.4 Paku Kait BH Rp 1,900 15.5 Paku Eternit KG Rp 25,000
15.6 Paku Seng KG Rp 30,000 15.7 Paku Asbes KTK Rp 30,000 15.8 Sekrup Piles DOZ Rp 11,600 15.9 Besi Begel/Baut BH Rp 30,800 15.10 Paku Sumbat BH Rp 2,200 15.11 Baut/Skrup Ulir (Screw) BH Rp 1,250 15.12 Paku Panjang 1 - 3 cm Kg Rp 18,000 15.13 Paku Panjang 4 - 6 cm Kg Rp 15,000 15.14 Paku Panjang 7 - 12 cm Kg Rp 14,000
16 Bahan Listrik16.1 Titik Lampu BH 175,000 16.2 Stop Kontak Tanam BH 175,000 16.3 Kap Stop Kontak BH 25,000 16.4 Kap Saklar ganda BH 25,000 16.5 Kap Saklar tunggal BH 25,000 16.6 Zekering Boxes 1 Group BH 125,000 16.7 Zekering Boxs 2 Group BH 175,000 16.8 Zekering Boxs 3 Group BH 403,603 16.9 Lampu Hemat Energy 18 w BH Rp 47,500 16.10 Lampu SL Philips 23 w BH Rp 68,000 16.11 Pemasukan Daya (900 w) UNIT Rp 2,500,000 Lokal16.12 SLO PAKET Rp 700,000 Lokal
17 Bahan Tambahan17.1 Spon/Busa T 3 cm M2 250,000 Lokal
Hal 24 dari 149
ANALISA HARGA SATUAN
A ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
A.1 1 M' Pengukuran dan Pemasangan Bowplank Rp. 70,801.00
A.1.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas III 0.012 M3 2,870,000.00 34,440.00 - Paku Biasa 0.020 KG 25,000.00 500.00 - Papan Kayu Klas III 0.007 M3 3,150,000.00 22,050.00
A.1.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang Kayu 0.010 OH 74,650.00 746.50 - Mandor 0.005 OH 80,400.00 402.00
Rp. 70,801.00
B. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
B.1 Rp. 44,610.00
B.1.2 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.750 OH 56,800.00 42,600.00 - Tukang Batu - OH 69,825.00 - - Kepala Tukang Batu - OH 74,650.00 - - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 44,610.00
B.2 Rp. 14,843.20
B.2.2 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu - OH 69,825.00 - - Kepala Tukang Batu - OH 74,650.00 - - Mandor 0.008 OH 80,400.00 643.20
Rp. 14,843.20
B.3 Rp. 32,420.00
B.3.2 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.500 OH 56,800.00 28,400.00 - Tukang Batu - OH 69,825.00 - - Kepala Tukang Batu - OH 74,650.00 - - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 32,420.00
B.4 Rp. 125,844.00
B.4.1 Bahan Koefesien Satuan Harga Jumlah- Pasir urug 1.200 M3 90,000.00 108,000.00
B.4.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu - OH 69,825.00 - - Kepala Tukang Batu - OH 74,650.00 - - Mandor 0.010 OH 80,400.00 804.00
Rp. 125,844.00
B.5 Rp. 73,044.00
B.5.1 Bahan Koefesien Satuan Harga Jumlah- Filler (abu batu ) 1.200 M3 46,000.00 55,200.00
B.5.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu OH 69,825.00 - - Kepala Tukang Batu OH 74,650.00 - - Mandor 0.010 OH 80,400.00 804.00
Rp. 73,044.00
1 M3 Galian Tanah Biasa Sedalam 1 Meter
1 M3 Urugan Kembali
1 M3 Pemadatan Tanah
1 M3 Urugan Pasir
1 M3 Urugan Tanah
Hal 25 dari 149
C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI
C.1 Rp. 508,285.50
C.1.1 Bahan Koefesien Satuan Harga Jumlah- Batu belah 15 cm - 20 cm 1.200 M3 100,000.00 120,000.00 - Semen 136.000 KG 1,390.00 189,040.00 - Pasir pasang 0.544 M3 92,000.00 50,048.00
C.1.2 Tenaga- Pekerja 1.500 OH 56,800.00 85,200.00 - Tukang Batu 0.750 OH 69,825.00 52,368.75 - Kepala Tukang Batu 0.075 OH 74,650.00 5,598.75 - Mandor 0.075 OH 80,400.00 6,030.00
Rp. 508,285.50
C.2 Rp. 236,462.70
C.2.1 Bahan Koefesien Satuan Harga Jumlah- Batu belah 15 cm - 20 cm 1.200 M3 100,000.00 120,000.00 - Pasir urug 0.432 M3 90,000.00 38,880.00
C.2.2 Tenaga- Pekerja 0.780 OH 56,800.00 44,304.00 - Tukang Batu 0.390 OH 69,825.00 27,231.75 - Kepala Tukang Batu 0.039 OH 74,650.00 2,911.35 - Mandor 0.039 OH 80,400.00 3,135.60
Rp. 236,462.70
D. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
D.1 Rp. 197,122.50
D.1.1 Bahan Koefesien Satuan Harga Jumlah- Bata merah kelas 1 140.000 BH 650.00 91,000.00 - Semen 32.950 KG 1,390.00 45,800.50 - Pasir pasang 0.091 M3 92,000.00 8,372.00
D.1.2 Tenaga- Pekerja 0.600 OH 56,800.00 34,080.00 - Tukang Batu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang Batu 0.020 OH 74,650.00 1,493.00 - Mandor 0.030 OH 80,400.00 2,412.00
Rp. 197,122.50
D.2 Rp. 183,192.00
D.2.1 Bahan Koefesien Satuan Harga Jumlah- Bata merah kelas 1 140.000 BH 650.00 91,000.00 - Semen 22.200 KG 1,390.00 30,858.00 - Pasir pasang 0.102 M3 92,000.00 9,384.00
D.2.2 Tenaga- Pekerja 0.600 OH 56,800.00 34,080.00 - Tukang Batu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang Batu 0.020 OH 74,650.00 1,493.00 - Mandor 0.030 OH 80,400.00 2,412.00
Rp. 183,192.00
1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps
1 M3 Pasang Pondasi Batu Kosong
1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps
1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps
Hal 26 dari 149
D.3 Rp. 95,129.30
D.3.1 Bahan Koefesien Satuan Harga Jumlah- Bata merah kelas 1 70.000 BH 650.00 45,500.00 - Semen 14.370 KG 1,390.00 19,974.30 - Pasir pasang 0.040 M3 92,000.00 3,680.00
D.3.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang Batu 0.010 OH 74,650.00 746.50 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 95,129.30
D.4 Rp. 89,070.20
D.4.1 Bahan Koefesien Satuan Harga Jumlah- Bata merah kelas 1 70.000 BH 650.00 45,500.00 - Semen 9.680 KG 1,390.00 13,455.20 - Pasir pasang 0.045 M3 92,000.00 4,140.00
D.4.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang Batu 0.010 OH 74,650.00 746.50 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 89,070.20
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
E.1 Rp. 42,764.14
E.1.1 Bahan Koefesien Satuan Harga Jumlah- Semen 7.776 KG 1,390.00 10,808.64 - Pasir pasang 0.023 M3 92,000.00 2,116.00
E.1.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang Batu 0.015 OH 74,650.00 1,119.75 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 42,764.14
E.2 Rp. 39,437.26
E.2.1 Bahan Koefesien Satuan Harga Jumlah- Semen 5.184 KG 1,390.00 7,205.76 - Pasir pasang 0.026 M3 92,000.00 2,392.00
E.2.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang Batu 0.015 OH 74,650.00 1,119.75 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 39,437.26
E.3 Rp. 24,410.50
E.3.1 Bahan Koefesien Satuan Harga Jumlah- Semen 3.250 KG 1,390.00 4,517.50
E.3.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Batu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang Batu 0.010 OH 74,650.00 746.50 - Mandor 0.010 OH 80,400.00 804.00
Rp. 24,410.50
E.4 Rp. 39,756.10
1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps
1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps
1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm
1 M2 Acian Semen
1 M2 Siaran 1 PC : 2 PS
Hal 27 dari 149
E.4.1 Bahan Koefesien Satuan Harga Jumlah- Semen 6.340 KG 1,390.00 8,812.60 - Pasir pasang 0.012 M3 92,000.00 1,104.00
E.4.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang Batu 0.015 OH 74,650.00 1,119.75 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 39,756.10
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
F.1 Rp. 6,183,640.00
F.1.1. Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 1.200 M3 3,675,000.00 4,410,000.00 - Paku Panjang 7 - 12 cm 1.250 Kg 14,000.00 17,500.00
F.1.2 Tenaga- Pekerja 6.000 OH 56,800.00 340,800.00 - Tukang Kayu 18.000 OH 69,825.00 1,256,850.00 - Kepala Tukang Kayu 1.800 OH 74,650.00 134,370.00 - Mandor 0.300 OH 80,400.00 24,120.00
Rp. 6,183,640.00
1 M3 Pasang Kusen Pintu dan Jendela, Kayu Kelas II
Hal 28 dari 149
F.1.1 Rp. 1,771,070.00
F.1.1.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II M3 3,675,000.00 -
F.1.1.2 Tenaga- Pekerja 6.000 OH 56,800.00 340,800.00 - Tukang Kayu 18.000 OH 69,825.00 1,256,850.00 - Kepala Tukang Kayu 2.000 OH 74,650.00 149,300.00 - Mandor 0.300 OH 80,400.00 24,120.00
Rp. 1,771,070.00
F.2 Rp. 460,940.00
F.2.1. Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.040 M3 3,800,000.00 152,000.00 - Lem Kayu 0.500 KG 32,500.00 16,250.00
F.2.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Kayu 3.000 OH 69,825.00 209,475.00 - Kepala Tukang Kayu 0.300 OH 74,650.00 22,395.00 - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 460,940.00
F.2a Rp. 588,940.00
F.2a.1. Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Jati 0.040 M3 7,000,000.00 280,000.00 - Lem Kayu 0.500 KG 32,500.00 16,250.00
F.2a.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Kayu 3.000 OH 69,825.00 209,475.00 - Kepala Tukang Kayu 0.300 OH 74,650.00 22,395.00 - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 588,940.00
F.2.1 Rp. 254,045.00
F.2.1.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II M3 3,800,000.00 -
F.2.1.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Kayu 2.500 OH 69,825.00 174,562.50 - Kepala Tukang Kayu 0.250 OH 74,650.00 18,662.50 - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 254,045.00
F.3 Rp. 335,102.00
F.3.1. Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.024 M3 3,800,000.00 91,200.00 - Lem Kayu 0.300 KG 32,500.00 9,750.00
F.3.2 Tenaga- Pekerja 0.800 OH 56,800.00 45,440.00 - Tukang Kayu 2.400 OH 69,825.00 167,580.00 - Kepala Tukang Kayu 0.240 OH 74,650.00 17,916.00 - Mandor 0.040 OH 80,400.00 3,216.00
Rp. 335,102.00
F.3a Rp. 411,902.00
F.3.1. Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Jati 0.024 M3 7,000,000.00 168,000.00 - Lem Kayu 0.300 KG 32,500.00 9,750.00
F.3.2 Tenaga
1 M3 Psg Kusen Pintu dan Jendela, Kayu Kls II (lama)
1 M2 Pasang Pintu Panel Kayu Kelas II
1 M2 Pasang Pintu Panel Kayu Jati
1 M2 Pasang Pintu Panel Kayu Kelas II (lama)
1 M2 Pasang Pintu dan Jendela Kaca Kayu Kelas II
1 M2 Pasang Pintu dan Jendela Kaca Kayu Jati
Hal 29 dari 149
- Pekerja 0.800 OH 56,800.00 45,440.00 - Tukang Kayu 2.400 OH 69,825.00 167,580.00 - Kepala Tukang Kayu 0.240 OH 74,650.00 17,916.00 - Mandor 0.040 OH 80,400.00 3,216.00
Rp. 411,902.00
F.3.1 Rp. 203,236.00
F.3.1.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II M3 3,800,000.00 -
F.3.2.2 Tenaga- Pekerja 0.800 OH 56,800.00 45,440.00 - Tukang Kayu 2.000 OH 69,825.00 139,650.00 - Kepala Tukang Kayu 0.200 OH 74,650.00 14,930.00 - Mandor 0.040 OH 80,400.00 3,216.00
Rp. 203,236.00
1 M2 Psg Pintu dan Jendela Kaca Kayu Kls II (lama)
Hal 30 dari 149
F.4 Rp. 555,990.00
F.4.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.064 M3 3,800,000.00 243,200.00
F.4.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Kayu 3.000 OH 69,825.00 209,475.00 - Kepala Tukang Kayu 0.300 OH 74,650.00 22,395.00 - Mandor 0.300 OH 80,400.00 24,120.00
Rp. 555,990.00
F.5 Rp. 416,740.00
F.5.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.0600 M3 3,800,000.00 228,000.00 - Paku Biasa 0.150 KG 25,000.00 3,750.00
F.5.2 Tenaga- Pekerja 0.500 OH 56,800.00 28,400.00 - Tukang Kayu 2.000 OH 69,825.00 139,650.00 - Kepala Tukang Kayu 0.200 OH 74,650.00 14,930.00 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 416,740.00
F.6 Rp. 481,211.00
F.6.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.0196 M3 3,800,000.00 74,480.00 - Paku Biasa 0.300 KG 25,000.00 7,500.00 - Lem Kayu 0.800 KG 32,500.00 26,000.00 - Triplek 120x240x 3 mm 1.000 LBR 57,500.00 57,500.00 - Formika Putih 120 x 240 Cm 0.500 LBR 147,700.00 73,850.00
- F.6.2 Tenaga -
- Pekerja 0.800 OH 56,800.00 45,440.00 - Tukang Kayu 2.500 OH 69,825.00 174,562.50 - Kepala Tukang Kayu 0.250 OH 74,650.00 18,662.50 - Mandor 0.040 OH 80,400.00 3,216.00
Rp. 481,211.00
F.7 Rp. 5,353,260.00
F.7.1. Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 1.1000 M3 3,675,000.00 4,042,500.00 - Paku Biasa 5.600 KG 25,000.00 140,000.00
F.7.1.2 Tenaga- Pekerja 4.000 OH 56,800.00 227,200.00 - Tukang Kayu 12.000 OH 69,825.00 837,900.00 - Kepala Tukang Kayu 1.200 OH 74,650.00 89,580.00 - Mandor 0.200 OH 80,400.00 16,080.00
Rp. 5,353,260.00
F.7.1 Rp. 1,607,760.00
F.7.1.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II M3 3,675,000.00 - - Besi strip tebal 5 mm 15.000 KG 19,800.00 297,000.00 - Paku Biasa 5.600 KG 25,000.00 140,000.00
F.7.1.2 Tenaga- Pekerja 4.000 OH 56,800.00 227,200.00 - Tukang Kayu 12.000 OH 69,825.00 837,900.00 - Kepala Tukang Kayu 1.200 OH 74,650.00 89,580.00 - Mandor 0.200 OH 80,400.00 16,080.00
Rp. 1,607,760.00
1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kelas II
1 M2 Pasang Jalusi Mati Kusen Kayu Kelas II
1 M2 Psg Pintu Tripleks dan Formika Rangka Kayu Kls II
1 M3 Pasang Konstruksi Kuda-kuda Kayu Kelas II
1 M3 Pasang Konstruksi Kuda-kuda (Bahan Lama Digunakan)
Hal 31 dari 149
F.7.2 Rp. 4,786,956.00
F.7.2.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 1.1000 M3 3,675,000.00 4,042,500.00 - Paku Panjang 7 - 12 cm 3.000 Kg 14,000.00 42,000.00
F.7.2.2 Tenaga- Pekerja 2.400 OH 56,800.00 136,320.00 - Tukang Kayu 7.200 OH 69,825.00 502,740.00 - Kepala Tukang Kayu 0.720 OH 74,650.00 53,748.00 - Mandor 0.120 OH 80,400.00 9,648.00
Rp. 4,786,956.00
F.8 1 M2 Pasang Usuk + Reng Rp. 72,686.00
F.8.1. Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 0.015 M3 3,675,000.00 55,125.00 - Paku Biasa 0.150 KG 25,000.00 3,750.00
F.8.2 Tenaga- Pekerja 0.10 OH 56,800.00 5,680.00 - Tukang Kayu 0.10 OH 69,825.00 6,982.50 - Kepala Tukang Kayu 0.01 OH 74,650.00 746.50 - Mandor 0.01 OH 80,400.00 402.00
Rp. 72,686.00
F.8.1 1 M2 Pasang Usuk + Reng (kayu lama) Rp. 17,561.00
F.8.1.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II M3 3,675,000.00 - - Paku Biasa 0.150 KG 25,000.00 3,750.00
F.8.2 Tenaga- Pekerja 0.10 OH 56,800.00 5,680.00 - Tukang Kayu 0.10 OH 69,825.00 6,982.50 - Kepala Tukang Kayu 0.01 OH 74,650.00 746.50 - Mandor 0.01 OH 80,400.00 402.00
Rp. 17,561.00
F.9 1 M' Psg Listplank Ukuran (3 x 20) Cm, Kayu Kelas II Rp. 50,523.25
F.9.1. Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.0072 M3 3,800,000.00 27,360.00 - Paku Biasa 0.050 KG 25,000.00 1,250.00
F.9.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang Kayu 0.025 OH 74,650.00 1,866.25 - Mandor 0.0050 OH 80,400.00 402.00
Rp. 50,523.25
F.9a 1 M' Psg Listplank Uk. (3 x 20) Cm, (Kayu Lama) Rp. 23,163.25
F.9a.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II M3 3,800,000.00 - - Paku Biasa 0.050 KG 25,000.00 1,250.00
F.9a.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang Kayu 0.025 OH 74,650.00 1,866.25 - Mandor 0.0050 OH 80,400.00 402.00
Rp. 23,163.25
F.9b 1 M' Psg Listplank dengan Kalsipleng Rp. 51,620.00
F.9b.1 Bahan Koefesien Satuan Harga Jumlah- Kalsipleng 1.1000 M 36,000.00 39,600.00 - Paku Biasa 0.050 KG 25,000.00 1,250.00
1 M3 Pasang Konstruksi Gordeng Kayu Kelas II
Hal 32 dari 149
F.9b.2 Tenaga- Pekerja 0.050 OH 56,800.00 2,840.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang Kayu 0.010 OH 74,650.00 746.50 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 51,620.00
F.9c 1 M' Psg Listplank Ukuran (2 x 20) Cm, Kayu Kelas II Rp. 42,040.00
F.9c.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.0050 M3 3,800,000.00 19,000.00 - Paku Panjang 4 - 6 cm 0.100 Kg 15,000.00 1,500.00
F.9c.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang Kayu 0.020 OH 74,650.00 1,493.00 - Mandor 0.0050 OH 80,400.00 402.00
Rp. 42,040.00
F.9d 1 M' Psg Listplank Ukuran (2 x 10) Cm, Kayu Kelas II Rp. 34,440.00
F.9c.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.0030 M3 3,800,000.00 11,400.00 - Paku Panjang 4 - 6 cm 0.100 Kg 15,000.00 1,500.00
F.9c.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang Kayu 0.020 OH 74,650.00 1,493.00 - Mandor 0.0050 OH 80,400.00 402.00
Rp. 34,440.00
F.10 Rp. 199,925.50
F.10.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 0.0195 M3 3,675,000.00 71,662.50 - Papan Kayu Klas II 0.007 M3 3,800,000.00 26,600.00 - Paku Biasa 0.100 KG 25,000.00 2,500.00 - Lem Kayu 0.560 KG 32,500.00 18,200.00 - Triplek 120x240x 3 mm 0.390 LBR 57,500.00 22,425.00
- F.10.2 Tenaga -
- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Kayu 0.600 OH 69,825.00 41,895.00 - Kepala Tukang Kayu 0.060 OH 74,650.00 4,479.00 - Mandor 0.010 OH 80,400.00 804.00
Rp. 199,925.50
1 M2 Psg Sekat Tripleks Rangkap, Rangka Kayu KLs II
Hal 33 dari 149
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.1 Rp. 719,518.27
G.1.1 Bahan Koefesien Satuan Harga Jumlah- Semen 247.000 KG 1,390.00 343,330.00 - Pasir Beton (PB) 0.621 M3 95,000.00 58,995.00 - Koral Beton 0.740 M3 264,200.00 195,508.00
G.1.2 Tenaga- Pekerja 1.650 OH 56,800.00 93,720.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Kepala Tukang Batu 0.028 OH 74,650.00 2,090.20 - Mandor 0.083 OH 80,400.00 6,673.20
Rp. 719,518.27
G.2 Rp. 827,730.67
G.2.1 Bahan Koefesien Satuan Harga Jumlah- Semen 326.000 KG 1,390.00 453,140.00 - Pasir Beton (PB) 0.543 M3 95,000.00 51,585.00 - Koral Beton 0.762 M3 264,200.00 201,320.40
G.2.2 Tenaga- Pekerja 1.650 OH 56,800.00 93,720.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Kepala Tukang Batu 0.028 OH 74,650.00 2,090.20 - Mandor 0.083 OH 80,400.00 6,673.20
Rp. 827,730.67
G.3 1 Kg Pembesian dengan Besi Polos atau Besi Ulir Rp. 14,365.79
G.3.1 Bahan Koefesien Satuan Harga Jumlah- Besi Beton Polos 1.050 KG 12,500.00 13,125.00 - Kawat Ikat Beton 0.015 KG 18,000.00 270.00
G.3.2 Tenaga- Pekerja 0.007 OH 56,800.00 397.60 - Tukang Besi 0.007 OH 69,825.00 488.78 - Kepala Tukang Besi 0.0007 OH 74,650.00 52.26 - Mandor 0.0004 OH 80,400.00 32.16
Rp. 14,365.79
G.4 Rp. 197,671.80
G.4.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas III 0.045 M3 3,150,000.00 141,750.00 - Paku Panjang 7 - 12 cm 0.300 Kg 14,000.00 4,200.00
G.4.2 Tenaga- Pekerja 0.520 OH 56,800.00 29,536.00 - Tukang Kayu 0.260 OH 69,825.00 18,154.50 - Kepala Tukang Kayu 0.0260 OH 74,650.00 1,940.90 - Mandor 0.0260 OH 80,400.00 2,090.40
Rp. 197,671.80
G.5 Rp. 277,971.90
G.5.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas III 0.040 M3 3,150,000.00 126,000.00 - Paku Panjang 7 - 12 cm 0.400 Kg 14,000.00 5,600.00 - Balok Kayu Klas II 0.015 M3 3,675,000.00 55,125.00 - Bambu (dia.7 cm, P- 6 m) 2.000 BTG 12,800.00 25,600.00
G.5.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang Kayu 0.0330 OH 74,650.00 2,463.45 - Mandor 0.0330 OH 80,400.00 2,653.20
Rp. 277,971.90
1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Mutu K 100)
1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr (Mutu K 175)
1 M2 Pasang Bekisting Untuk Sloof 15/20
1 M2 Pasang Bekisting Untuk Kolom
Hal 34 dari 149
G.6 Rp. 277,971.90
G.6.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas III 0.040 M3 3,150,000.00 126,000.00 - Paku Panjang 7 - 12 cm 0.400 Kg 14,000.00 5,600.00 - Balok Kayu Klas II 0.015 M3 3,675,000.00 55,125.00 - Bambu (dia.7 cm, P- 6 m) 2.000 BTG 12,800.00 25,600.00
G.6.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang Kayu 0.0330 OH 74,650.00 2,463.45 - Mandor 0.0330 OH 80,400.00 2,653.20
Rp. 277,971.90
G.7 Rp. 288,996.90
G.7.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas III 0.040 M3 3,150,000.00 126,000.00 - Paku Panjang 7 - 12 cm 0.400 Kg 14,000.00 5,600.00 - Balok Kayu Klas II 0.018 M3 3,675,000.00 66,150.00 - Bambu (dia.7 cm, P- 6 m) 2.000 BTG 12,800.00 25,600.00
G.7.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang Kayu 0.0330 OH 74,650.00 2,463.45 - Mandor 0.0330 OH 80,400.00 2,653.20
Rp. 288,996.90
G.8 Rp. 288,996.90
G.8.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas III 0.040 M3 3,150,000.00 126,000.00 - Paku Panjang 7 - 12 cm 0.400 Kg 14,000.00 5,600.00 - Balok Kayu Klas II 0.018 M3 3,675,000.00 66,150.00 - Bambu (dia.7 cm, P- 6 m) 2.000 BTG 12,800.00 25,600.00
G.8.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang Kayu 0.0330 OH 74,650.00 2,463.45 - Mandor 0.0330 OH 80,400.00 2,653.20
Rp. 288,996.90
G.9 Rp. 254,796.90
G.9.1 Bahan Koefesien Satuan Harga Jumlah- Paku Panjang 7 - 12 cm 0.400 Kg 14,000.00 5,600.00 - Balok Kayu Klas II 0.015 M3 3,675,000.00 55,125.00 - Triplek 120x240x 9 mm 0.350 LBR 147,500.00 51,625.00 - Bambu (dia.7 cm, P- 6 m) 6.000 BTG 12,800.00 76,800.00
G.9.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang Kayu 0.0330 OH 74,650.00 2,463.45 - Mandor 0.0330 OH 80,400.00 2,653.20
Rp. 254,796.90
G.10 4,510,751.90 (Tulangan pokok 4 Dia 12, Sengkang dia 6 - 15 cm)
G.10.1 Bahan + tenaga Koefesien Satuan Harga Jumlah- Beton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 - Besi tulangan (G3) 152.9000 KG 14,365.79 2,196,529.29 - Bekisting (G4) 7.5200 M2 197,671.80 1,486,491.94
Rp. 4,510,751.90
G.11 3,867,164.51 (Tulangan pokok 4 Dia 10, Sengkang dia 6 - 20 cm)
G.11.1 Bahan + tenaga Koefesien Satuan Harga Jumlah
1 M2 Pasang Bekisting Untuk Kolom Teras/Selasar
1 M2 Pasang Bekisting Untuk Balok
1 M2 Pasang Bekisting Untuk Balok Tarik 13/20
1 M2 Pasang Bekisting Untuk Plat
1 M3 Sloof 15/20
1 M3 Sloof 15/20 Untuk Pagar
Hal 35 dari 149
Beton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 Besi tulangan (G3) 108.1000 KG 14,365.79 1,552,941.90 Bekisting (G4) 7.5200 M2 197,671.80 1,486,491.94
Rp. 3,867,164.51
G.12 6,868,180.60 (Tulangan pokok 4 Dia 10, Sengkang dia 6 - 20 cm)
G.12.1 Bahan + tenaga Koefesien Satuan Harga JumlahBeton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 Besi tulangan (G3) 244.2000 KG 14,365.79 3,508,125.92 Bekisting (G5) 9.1100 M2 277,971.90 2,532,324.01
Rp. 6,868,180.60
G.13 6,867,469.44 (Tulangan pokok 4 Dia 10, Sengkang dia 6 - 20 cm)
G.13.1 Bahan + tenaga Koefesien Satuan Harga JumlahBeton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 Besi tulangan (G3) 244.2000 KG 14,365.79 3,508,125.92 Bekisting (G7) 8.7600 M2 288,996.90 2,531,612.84
Rp. 6,867,469.44
G.14 6,006,958.62 (Tulangan pokok 4 Dia 10, Sengkang dia 6 - 20 cm)
G.14.1 Bahan + tenaga Koefesien Satuan Harga JumlahBeton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 Besi tulangan (G3) 184.3000 KG 14,365.79 2,647,615.10 Bekisting (G7) 8.7600 M2 288,996.90 2,531,612.84
Rp. 6,006,958.62
G.15 7,747,838.65 (Tulangan pokok 5 Dia 12, Sengkang dia 6 - 15 cm)
G.15.1 Bahan + tenaga Koefesien Satuan Harga JumlahBeton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 Besi tulangan (G3) 153.8000 KG 14,365.79 2,209,458.50 Bekisting (G8) 16.3000 M2 288,996.90 4,710,649.47
Rp. 7,747,838.65
G.16 5,250,814.89 (Tulangan pokok 4 Dia 12, Sengkang dia 6 - 15 cm)
G.16.1 Bahan + tenaga Koefesien Satuan Harga JumlahBeton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 Besi tulangan (G3) 152.9000 KG 14,365.79 2,196,529.29 Bekisting (G5) 8.0100 M2 277,971.90 2,226,554.92
Rp. 5,250,814.89
G.17 7,807,759.16 (Tulangan pokok 4 Dia 12, Sengkang dia 6 - 15 cm)
G.17.1 Bahan + tenaga Koefesien Satuan Harga JumlahBeton cor 1PC:2Ps:3Kr (G2) 1.0000 M3 827,730.67 827,730.67 Besi tulangan (G3) 146.1000 KG 14,365.79 2,098,841.92 Bekisting (G6) 17.5600 M2 277,971.90 4,881,186.56
Rp. 7,807,759.16
G.18 4,607,227.49 (Tulangan pokok 4 Dia 10, Sengkang dia 6 - 20 cm)
G.18.1 Bahan + tenaga Koefesien Satuan Harga Jumlah Beton cor 1PC:2Ps:3Kr (G2) 1.000 M3 827,730.675 827,730.675 Besi tulangan (G3) 108.100 KG 14,365.790 1,552,941.899 Bekisting (G5) 8.010 M2 277,971.900 2,226,554.919
Rp. 4,607,227.493
G.19 4,428,901.45 (Tulangan Dia 10 - 13 cm)
G.18.1 Bahan + tenaga Koefesien Satuan Harga Jumlah Beton cor 1PC:2Ps:3Kr (G2) 1.000 M3 827,730.675 827,730.675 Besi tulangan (G3) 74.200 KG 14,365.790 1,065,941.618 Bekisting (G9) 9.950 M2 254,796.900 2,535,229.155
Rp. 4,428,901.448
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
1 M3 Kolom Praktis 11/11, Kolom Gewel 11/11
1 M3 Balok Latai 11/11
1 M3 Ring Balok 11/15, Ring Gewel 11/15
1 M3 Balok Tarik 13/20
1 M3 Kolom Struktur 15/20
1 M3 Kolom Teras 18/18
1 M3 Kolom Pagar 15/20
1 M3 Plat Dak
Hal 36 dari 149
H.1 Rp. 80,869.40
H.1.1. Bahan Koefesien Satuan Harga Jumlah- Atap Metal 3,5 mm (tanpa Lapis Butiran) 1.620 LBR 35,000.00 56,700.00 - Paku Biasa 0.200 KG 25,000.00 5,000.00
H.1.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang Kayu 0.010 OH 74,650.00 746.50 - Mandor 0.001 OH 80,400.00 80.40
Rp. 80,869.40
H.2 1 M' Pasang Bubung Metal Zincalum Rp. 66,588.70
H.2.1 Bahan Koefesien Satuan Harga Jumlah- Bubungan Metal (tanpa lapis butiran) 1.100 BH 35,000.00 38,500.00 - Paku Biasa 0.050 KG 25,000.00 1,250.00
H.2.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Kayu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang Kayu 0.015 OH 74,650.00 1,119.75 - Mandor 0.013 OH 80,400.00 1,045.20
Rp. 66,588.70
H.3 Rp. 67,913.40
H.3.1. Bahan Koefesien Satuan Harga Jumlah- Seng Glmb. Besar BJLS 25 0.700 LBR 79,800.00 55,860.00 - Paku Seng 0.020 KG 30,000.00 600.00
- H.3.1.2 Tenaga -
- Pekerja 0.120 OH 56,800.00 6,816.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang Kayu 0.006 OH 74,650.00 447.90 - Mandor 0.006 OH 80,400.00
Rp. 67,913.40
H.3.1 Rp. 64,194.80
H.3.1.1 Bahan Koefesien Satuan Harga Jumlah- Seng Glmb. Besar BJLS 25 LBR 79,800.00 - - Paku Seng 0.020 KG 30,000.00 600.00
- H.3.2 Tenaga -
- Pekerja 0.120 OH 56,800.00 6,816.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang Kayu 0.006 OH 74,650.00 447.90 - Mandor 0.006 OH 80,400.00
Rp. 64,194.80
1 M2 Pasang Atap Metal Zincalum
1 M2 Pasang Atap Seng Gelombang
1 M2 Pasang Atap Seng Gelombang (bahan lama)
Hal 37 dari 149
H.3.3 Rp. 55,173.40
H.3.3.1 Bahan Koefesien Satuan Harga Jumlah- Seng Glmb. Besar BJLS 20 0.700 LBR 61,600.00 43,120.00 - Paku Seng 0.020 KG 30,000.00 600.00
- H.3.3.2 Tenaga -
- Pekerja 0.120 OH 56,800.00 6,816.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang Kayu 0.006 OH 74,650.00 447.90 - Mandor 0.006 OH 80,400.00
Rp. 55,173.40
H.4 1 M Pasang Atap Nok Seng Rp. 62,167.90
H.4.1 Bahan Koefesien Satuan Harga Jumlah- Seng Plat BJLS 25 lebar 90 cm 1.000 M 55,000.00 55,000.00 - Paku Seng 0.040 KG 30,000.00 1,200.00
- H.4.2 Tenaga -
- Pekerja 0.060 OH 56,800.00 3,408.00 - Tukang Kayu 0.030 OH 69,825.00 2,094.75 - Kepala Tukang Kayu 0.003 OH 74,650.00 223.95 - Mandor 0.003 OH 80,400.00 241.20
Rp. 62,167.90
H.5 Rp. 74,435.80
H.5.1. Bahan Koefesien Satuan Harga Jumlah- Galvalume 3 lebar 70 cm 1.375 M 40,000.00 55,000.00 - Baut/Skrup Ulir (Screw) 6.000 BH 1,250.00 7,500.00
H.5.2 Tenaga- Pekerja 0.120 OH 56,800.00 6,816.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang Kayu 0.006 OH 74,650.00 447.90 - Mandor 0.006 OH 80,400.00 482.40
Rp. 74,435.80
H.6 1 M' Pasang Bubung Galvalume Rp. 39,467.90
H.6.1 Bahan Koefesien Satuan Harga Jumlah- Bubungan Galvalume 3 mm 1.100 M 30,000.00 33,000.00 - Paku Biasa 0.020 KG 25,000.00 500.00
H.6.2 Tenaga- Pekerja 0.060 OH 56,800.00 3,408.00 - Tukang Kayu 0.030 OH 69,825.00 2,094.75 - Kepala Tukang Kayu 0.003 OH 74,650.00 223.95 - Mandor 0.003 OH 80,400.00 241.20
Rp. 39,467.90
I. ANALISA BIAYA KONSTRUKSI LANGIT - LANGIT
I.1 Rp. 15,445.70
I.1.1 Bahan Koefesien Satuan Harga Jumlah- List Kayu Profil 1.100 M 7,500.00 8,250.00 - Paku Biasa 0.010 KG 25,000.00 250.00
I.1.2 Tenaga- Pekerja 0.050 OH 56,800.00 2,840.00 - Tukang Kayu 0.050 OH 69,825.00 3,491.25 - Kepala Tukang Kayu 0.005 OH 74,650.00 373.25 - Mandor 0.003 OH 80,400.00 241.20
Rp. 15,445.70
I.1a Rp. 9,085.70
I.1a.1 Bahan Koefesien Satuan Harga Jumlah
1 M2 Pasang Atap Seng Gelombang
1 M2 Pasang Atap Galvalume
1 M1 List kayu Profil
1 M1 List Tripleks 6 mm
Hal 38 dari 149
- Triplek 120x240x 6 mm 0.021 LBR 90,000.00 1,890.00 - Paku Biasa 0.010 KG 25,000.00 250.00
I.1a.2 Tenaga- Pekerja 0.050 OH 56,800.00 2,840.00 - Tukang Kayu 0.050 OH 69,825.00 3,491.25 - Kepala Tukang Kayu 0.005 OH 74,650.00 373.25 - Mandor 0.003 OH 80,400.00 241.20
Rp. 9,085.70
I.2 Rp. 96,495.50
I.2.1. Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 0.0120 M3 3,675,000.00 44,100.00 - Triplek 120x240x 3 mm 0.380 LBR 57,500.00 21,850.00 - Paku Biasa 0.060 KG 25,000.00 1,500.00 - Paku Triplek 0.020 KG 30,000.00 600.00
I.2.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.250 OH 69,825.00 17,456.25 - Kepala Tukang Kayu 0.025 OH 74,650.00 1,866.25 - Mandor 0.008 OH 80,400.00 603.00
Rp. 96,495.50
I.2.1 Rp. 52,395.50
I.2.1.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II M3 3,675,000.00 - - Triplek 120x240x 3 mm 0.380 LBR 57,500.00 21,850.00 - Paku Biasa 0.060 KG 25,000.00 1,500.00 - Paku Triplek 0.020 KG 30,000.00 600.00
I.2.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.250 OH 69,825.00 17,456.25 - Kepala Tukang Kayu 0.025 OH 74,650.00 1,866.25 - Mandor 0.008 OH 80,400.00 603.00
Rp. 52,395.50
I.3 Rp. 57,795.50
I.3.1 Bahan Koefesien Satuan Harga Jumlah- Triplek 120x240x 3 mm 0.380 LBR 57,500.00 21,850.00 - Baut/Skrup Ulir (Screw) 6.000 BH 1,250.00 7,500.00
I.3.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.250 OH 69,825.00 17,456.25 - Kepala Tukang Kayu 0.025 OH 74,650.00 1,866.25 - Mandor 0.008 OH 80,400.00 603.00
Rp. 57,795.50
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI
J.1 Memasang 1 buah Kloset Jongkok Porselen Rp. 445,636.50
J.1.1 Bahan Koefesien Satuan Harga Jumlah- Kloset Jongkok Porselin 1.000 BH 150,000.00 150,000.00 - Semen 6.000 KG 1,390.00 8,340.00 - Pasir pasang 0.010 M3 92,000.00 920.00
J.1.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Batu 1.500 OH 69,825.00 104,737.50 - Kepala Tukang Batu 1.500 OH 74,650.00 111,975.00 - Mandor 0.160 OH 80,400.00 12,864.00
Rp. 445,636.50
J.2 Rp. 760,474.50
1 M2 Plafond Tripleks 3 mm, Rangka Kayu Kelas II
1 M2 Plafond Tripleks 3 mm, Rangka Kayu Lama
1 M2 Plafond Tripleks 3 mm, pada Kerangka Hollow
Memasang 1 buah Bak Mandi Fibreglass volume 1 m3
Hal 39 dari 149
J.2.1 Bahan Koefesien Satuan Harga Jumlah- Bak Fiberglass 1,00 M3 1.000 BH 356,400.00 356,400.00 - Perlengkapan (18% X Bahan) 1.000 LS 64,152.00 64,152.00
J.7.2 Tenaga- Pekerja 1.800 OH 56,800.00 102,240.00 - Tukang Batu 2.700 OH 69,825.00 188,527.50 - Kepala Tukang Batu 0.540 OH 74,650.00 40,311.00 - Mandor 0.110 OH 80,400.00 8,844.00
Rp. 760,474.50
J.3 Rp. 26,033,450.00
J.3.1 Bahan Koefesien Satuan Harga Jumlah- Bata merah kelas 1 0.400 BH 650.00 260.00 - Semen 120.000 KG 1,390.00 166,800.00 - Pasir pasang 0.300 M3 92,000.00 27,600.00 - Porselin 11/11 360.000 M2 69,900.00 25,164,000.00 - Semen Warna 6.000 KG 13,000.00 78,000.00
J.3.2 Tenaga- Pekerja 6.000 OH 56,800.00 340,800.00 - Tukang Batu 3.000 OH 69,825.00 209,475.00 - Kepala Tukang Batu 0.300 OH 74,650.00 22,395.00 - Mandor 0.300 OH 80,400.00 24,120.00
Rp. 26,033,450.00
J.4 Memasang 1 m' Pipa PVC Diameter 1/2" Rp. 15,672.20
J.4.1 Bahan Koefesien Satuan Harga Jumlah- Pipa PVC Ø ½" 1.200 M 5,800.00 6,960.00 - Perlengkapan (35%xbahan) 1.000 LS 2,030.00 2,030.00
J.4.2 Tenaga- Pekerja 0.036 OH 56,800.00 2,044.80 - Tukang Pipa PVC 0.060 OH 69,825.00 4,189.50 - Kepala Tukang Pipa 0.006 OH 74,650.00 447.90 - Mandor 0.0018 OH 80,400.00
Rp. 15,672.20
J.5 Memasang 1 m' Pipa PVC Tipe Diameter 3" Rp. 45,432.20
J.4.1 Bahan Koefesien Satuan Harga Jumlah- Pipa PVC Ø 3" 1.200 M 25,000.00 30,000.00 - Perlengkapan (35%xbahan) 1.000 LS 8,750.00 8,750.00
J.4.2 Tenaga- Pekerja 0.036 OH 56,800.00 2,044.80 - Tukang Pipa PVC 0.060 OH 69,825.00 4,189.50 - Kepala Tukang Pipa 0.006 OH 74,650.00 447.90 - Mandor 0.0018 OH 80,400.00
Rp. 45,432.20
K. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM
K.1 Rp. 206,125.90
K.1.1 Bahan Koefesien Satuan Harga Jumlah- Kaca Polos 5 mm 1.100 M2 176,000.00 193,600.00
K.1.2 Tenaga- Pekerja 0.015 OH 56,800.00 852.00 - Tukang Kayu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang Kayu 0.015 OH 74,650.00 1,119.75 - Mandor 0.001 OH 80,400.00 80.40
Rp. 206,125.90
K.2 Rp. 175,420.50
K.2.1 Bahan Koefesien Satuan Harga Jumlah
Memasang 1 buah Bak Mandi Batu Bata volume 0,3 m3
1 m2 Pasang Kaca, Tebal 5 mm
1 m2 Pasang Rangka Plafond Besi Hollow
Hal 40 dari 149
- Besi kotak hollow 40/40, 1.6 mm 3.500 M 17,000.00 59,500.00 - Besi kotak hollow 20/40, 1.6 mm 2.500 M 12,800.00 32,000.00
K.2.2 Tenaga- Pekerja 0.400 OH 56,800.00 22,720.00 - Tukang Las 0.800 OH 69,825.00 55,860.00 - Kepala Tukang Las 0.050 OH 74,650.00 3,732.50 - Mandor 0.020 OH 80,400.00 1,608.00
Rp. 175,420.50
K.3 Rp. 237,520.50
K.3.1 Bahan Koefesien Satuan Harga Jumlah- Besi kotak hollow 20/40, 1.6 mm 12.000 M 12,800.00 153,600.00
K.3.2 Tenaga- Pekerja 0.400 OH 56,800.00 22,720.00 - Tukang Las 0.800 OH 69,825.00 55,860.00 - Kepala Tukang Las 0.050 OH 74,650.00 3,732.50 - Mandor 0.020 OH 80,400.00 1,608.00
Rp. 237,520.50
K.4 Rp. 156,777.35
K.4.1 Bahan Koefesien Satuan Harga Jumlah- Baja C-75 t 0.8 mm 1.488 M 14,200.00 21,129.60 - Baja C-75 t 0.6 mm 2.232 M 12,500.00 27,900.00 - Reng Baja Ringan 3.600 M 7,000.00 25,200.00 - Baut/Skrup Ulir (Screw) 28.000 BH 1,250.00 35,000.00
K.4.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Besi 0.450 OH 69,825.00 31,421.25 - Kepala Tukang Besi 0.010 OH 74,650.00 746.50 - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 156,777.35
L. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN DINDING
L.1 162,724.50
L.1.1 Bahan Koefesien Satuan Harga Jumlah- Ubin Keramik 30/30 Motif 1.0700 M2 68,200.00 72,974.00 - Semen 11.5000 KG 1,390.00 15,985.00 - Pasir pasang 0.0450 M3 92,000.00 4,140.00 - Semen Warna KG 13,000.00 -
L.1.2 Tenaga- Pekerja 0.7000 OH 56,800.00 39,760.00 - Tukang Batu 0.3500 OH 69,825.00 24,438.75 - Kepala Tukang Batu 0.0350 OH 74,650.00 2,612.75 - Mandor 0.0350 OH 80,400.00 2,814.00
Rp. 162,724.50
L.1.a 161,601.40
L.1.a.1 Bahan Koefesien Satuan Harga Jumlah- Ubin Keramik 40/40 Motif 1.0600 M2 70,000.00 74,200.00 - Semen 9.8100 KG 1,390.00 13,635.90 - Pasir pasang 0.0450 M3 92,000.00 4,140.00
L.1.a.2 Tenaga- Pekerja 0.7000 OH 56,800.00 39,760.00 - Tukang Batu 0.3500 OH 69,825.00 24,438.75 - Kepala Tukang Batu 0.0350 OH 74,650.00 2,612.75 - Mandor 0.0350 OH 80,400.00 2,814.00
Rp. 161,601.40
L.1.b 171,141.40
L.1.a.1 Bahan Koefesien Satuan Harga Jumlah
1 m2 Pasang Angin-angin Besi Hollow
1 m2 Pasang Rangka Atap Baja Ringan
1 M2 pasang lantai keramik 30/30 cm (motif)
1 M2 pasang lantai keramik 40/40 cm (motif)
1 M2 pasang lantai keramik 20/20 cm (motif)
Hal 41 dari 149
- Ubin Keramik 20/20 1.0600 M2 79,000.00 83,740.00 - Semen 9.8100 KG 1,390.00 13,635.90 - Pasir pasang 0.0450 M3 92,000.00 4,140.00
L.1.a.2 Tenaga- Pekerja 0.7000 OH 56,800.00 39,760.00 - Tukang Batu 0.3500 OH 69,825.00 24,438.75 - Kepala Tukang Batu 0.0350 OH 74,650.00 2,612.75 - Mandor 0.0350 OH 80,400.00 2,814.00
Rp. 171,141.40
L.2 192,454.70 1 M2 pasang dinding keramik
Hal 42 dari 149
L.2.1 Bahan Koefesien Satuan Harga Jumlah- Keramik dinding 1.0000 M2 82,000.00 82,000.00 - Semen 11.3800 KG 1,390.00 15,818.20 - Pasir pasang 0.0420 M3 92,000.00 3,864.00 - Semen Warna 1.5000 KG 13,000.00 19,500.00
L.2.2 Tenaga- Pekerja 0.600 OH 56,800.00 34,080.00 - Tukang Batu 0.450 OH 69,825.00 31,421.25 - Kepala Tukang Batu 0.045 OH 74,650.00 3,359.25 - Mandor 0.0300 OH 80,400.00 2,412.00
Rp. 192,454.70
L.3 132,232.50
L.3.1 Bahan Koefesien Satuan Harga Jumlah- Paving blok press type berlian t= 8 m 33.0000 BH 2,500.00 82,500.00
L.3.2 Tenaga- Pekerja 0.500 OH 56,800.00 28,400.00 - Tukang Batu 0.250 OH 69,825.00 17,456.25 - Kepala Tukang Batu 0.025 OH 74,650.00 1,866.25 - Mandor 0.0250 OH 80,400.00 2,010.00
Rp. 132,232.50
L.4 128,932.50
L.4.1 Bahan Koefesien Satuan Harga Jumlah- Paving blok press type bata t=8 cm 33.0000 BH 2,400.00 79,200.00
L.4.2 Tenaga- Pekerja 0.500 OH 56,800.00 28,400.00 - Tukang Batu 0.250 OH 69,825.00 17,456.25 - Kepala Tukang Batu 0.025 OH 74,650.00 1,866.25 - Mandor 0.0250 OH 80,400.00 2,010.00
Rp. 128,932.50
L.4a 112,432.50
L.4a.1 Bahan Koefesien Satuan Harga Jumlah- Paving blok biasa type bata t=6 cm 33.0000 BH 1,900.00 62,700.00
L.4a.2 Tenaga- Pekerja 0.500 OH 56,800.00 28,400.00 - Tukang Batu 0.250 OH 69,825.00 17,456.25 - Kepala Tukang Batu 0.025 OH 74,650.00 1,866.25 - Mandor 0.0250 OH 80,400.00 2,010.00
Rp. 112,432.50
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN
M.1 Rp. 17,586.93
M.1.1 Bahan Koefesien Satuan Harga Jumlah- Plamir Kayu 0.150 KG 20,900.00 3,135.00 - Cat Dasar Kayu 0.170 KG 33,000.00 5,610.00 - Cat Tembok Mutu Menengah 0.170 KG 20,400.00 3,468.00
- M.1.2 Tenaga -
- Pekerja 0.070 OH 56,800.00 3,976.00 - Tukang Cat 0.009 OH 69,825.00 628.43 - Kepala Tukang Cat 0.006 OH 74,650.00 447.90 - Mandor 0.004 OH 80,400.00 321.60
Rp. 17,586.93
1 M2 Paving Block Type Berlian t=8 cm
1 M2 Paving Block Type Bata t=8 cm
1 M2 Paving Block Type Bata t=6 cm
1 M2 Pengecatan Bidang Kayu Lama
Hal 43 dari 149
M.2 Rp. 30,668.53
M.2.1 Bahan Koefesien Satuan Harga Jumlah- Meni Kayu 0.200 KG 44,000.00 8,800.00 - Plamir Kayu 0.150 KG 20,900.00 3,135.00 - Cat Kayu Mutu Menengah 0.260 KG 39,000.00 10,140.00 - Minyak Cat 0.100 LTR 33,000.00 3,300.00
M.2.2 Tenaga- Pekerja 0.070 OH 56,800.00 3,976.00 - Tukang Cat 0.009 OH 69,825.00 628.43 - Kepala Tukang Cat 0.006 OH 74,650.00 447.90 - Mandor 0.003 OH 80,400.00 241.20
Rp. 30,668.53
M.3 Rp. 34,424.90
M.3.1 Bahan Koefesien Satuan Harga Jumlah- Politur 0.520 LTR 42,000.00 21,840.00 - Ampelas 2.000 LBR 3,500.00 7,000.00
M.3.2 Tenaga- Pekerja - OH 56,800.00 - - Tukang Cat 0.060 OH 69,825.00 4,189.50 - Kepala Tukang Cat 0.016 OH 74,650.00 1,194.40 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 34,424.90
M.4 Rp. 15,550.27
M.4.1 Bahan Koefesien Satuan Harga Jumlah- Plamir Tembok 0.100 KG 20,000.00 2,000.00 - Cat Tembok Mutu Menengah 0.360 KG 20,400.00 7,344.00
M.4.2 Tenaga- Pekerja 0.020 OH 56,800.00 1,136.00 - Tukang Cat 0.063 OH 69,825.00 4,398.98 - Kepala Tukang Cat 0.0063 OH 74,650.00 470.30 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 15,550.27
M.5 Rp. 11,157.58
M.5.1 Bahan Koefesien Satuan Harga Jumlah- Cat Tembok Mutu Menengah 0.120 KG 20,400.00 2,448.00 - Cat Tembok Mutu Menengah 0.180 KG 20,400.00 3,672.00
M.5.2 Tenaga- Pekerja 0.028 OH 56,800.00 1,590.40 - Tukang Cat 0.042 OH 69,825.00 2,932.65 - Kepala Tukang Cat 0.0042 OH 74,650.00 313.53 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 11,157.58
1 M2 Pengecatan Bidang Kayu Baru (1 plamir,1 dasar, 2 penutup)
1 M2 Pelaburan bidang kayu dengan Politur
1 M2 Pengecatan tembok baru (1 plamir, 1 cat dasar, 2 cat penutup)
1 M2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Hal 44 dari 149
M.6 Rp. 16,292.04
M.6.1 Bahan Koefesien Satuan Harga Jumlah- Cat genteng/seng 0.300 KG 38,500.00 11,550.00
M.6.2 Tenaga- Pekerja 0.060 OH 56,800.00 3,408.00 - Tukang Cat 0.012 OH 69,825.00 837.90 - Kepala Tukang Cat 0.0060 OH 74,650.00 447.90 - Mandor 0.0006 OH 80,400.00 48.24
Rp. 16,292.04
M.7 Rp. 11,412.40
M.7.1 Bahan Koefesien Satuan Harga Jumlah- T e e r 0.350 LTR 15,000.00 5,250.00
M.7.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Cat OH 69,825.00 - - Kepala Tukang Cat OH 74,650.00 - - Mandor 0.0060 OH 80,400.00 482.40
Rp. 11,412.40
1 M2 Pengecatan permukaan seng
1 M2 Pengeteeran Kap
Rekap. Analis Hal. 45 dari 149
REKAPITULASI ANALISA HARGA SATUANUPAH DAN BARANG TAHUN 2015
KODE URAIAN BIAYA (Rp.) SATUAN KETA ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
A.1 1 M' Pengukuran dan Pemasangan Bowplank 70,801.00 M' B. ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH
B.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter 44,610.00 M3 B.2 1 M3 Urugan Kembali 14,843.20 M3 B.3 1 M3 Pemadatan Tanah 32,420.00 M3 B.4 1 M3 Urugan Pasir 125,844.00 M3 B.5 1 M3 Urugan Tanah 73,044.00 M3
C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASIC.1 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps 508,285.50 M3 C.2 1 M3 Pasang Pondasi Batu Kosong 236,462.70 M3
D. ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDINGD.1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps 197,122.50 M2 D.2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps 183,192.00 M2 D.3 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps 95,129.30 M2 D.4 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps 89,070.20 M2
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERANE.1 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm 42,764.14 M2 E.2 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm 39,437.26 M2 E.3 1 M2 Acian Semen 24,410.50 M2 E.4 1 M2 Siaran 1 PC : 2 PS 39,756.10 M2
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYUF.1 1 M3 Pasang Kusen Pintu dan Jendela, Kayu Kelas II 6,183,640.00 M3 F.1.1 1 M3 Psg Kusen Pintu dan Jendela, Kayu Kls II (lama) 1,771,070.00 M3 F.2 1 M2 Pasang Pintu Panel Kayu Kelas II 460,940.00 M2 F.2a 1 M2 Pasang Pintu Panel Kayu Jati 588,940.00 M2 F.2.1 1 M2 Pasang Pintu Panel Kayu Kelas II (lama) 254,045.00 M2 F.3 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kelas II 335,102.00 M2 F.3a 1 M2 Pasang Pintu dan Jendela Kaca Kayu Jati 411,902.00 M2 F.3.1 1 M2 Psg Pintu dan Jendela Kaca Kayu Kls II (lama) 203,236.00 M2 F.4 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kelas II 555,990.00 M2 F.5 1 M2 Pasang Jalusi Mati Kusen Kayu Kelas II 416,740.00 M2 F.6 1 M2 Psg Pintu Tripleks dan Formika Rangka Kayu Kls II 481,211.00 M2 F.7 1 M3 Pasang Konstruksi Kuda-kuda Kayu Kelas II 5,353,260.00 M3
F.7.1 1 M3 Pasang Konstruksi Kuda-kuda (Bahan Lama Digunakan) 1,607,760.00 M3
F.7.2 1 M3 Pasang Konstruksi Gordeng Kayu Kelas II 4,786,956.00 M3 F.8 1 M2 Pasang Usuk + Reng 72,686.00 M2 F.8.1 1 M2 Pasang Usuk + Reng (kayu lama) 17,561.00 M2 F.9 1 M' Psg Listplank Ukuran (3 x 20) Cm, Kayu Kelas II 50,523.25 M' F.9a 1 M' Psg Listplank Uk. (3 x 20) Cm, (Kayu Lama) 23,163.25 M' F.9b 1 M' Psg Listplank dengan Kalsipleng 51,620.00 M' F.9c 1 M' Psg Listplank Ukuran (2 x 20) Cm, Kayu Kelas II 42,040.00 M' F.9d 1 M' Psg Listplank Ukuran (2 x 10) Cm, Kayu Kelas II 34,440.00 M' F.10 1 M2 Psg Sekat Tripleks Rangkap, Rangka Kayu KLs II 199,925.50 M2
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
Rekap. Analis Hal. 46 dari 149
G.1 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr (Mutu K 100) 719,518.27 M3
G.2 1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr (Mutu K 175) 827,730.67 M3
G.3 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 14,365.79 Kg G.4 1 M2 Pasang Bekisting Untuk Sloof 15/20 197,671.80 M2 G.5 1 M2 Pasang Bekisting Untuk Kolom 277,971.90 M2 G.6 1 M2 Pasang Bekisting Untuk Kolom Teras/Selasar 277,971.90 M2 G.6.1 Bahan Jumlah ha G.7 1 M2 Pasang Bekisting Untuk Balok 288,996.90 M2 G.8 1 M2 Pasang Bekisting Untuk Balok Tarik 13/20 288,996.90 M2 G.9 1 M2 Pasang Bekisting Untuk Plat 254,796.90 M2 G.10 1 M3 Sloof 15/20 4,510,751.90 M3 G.11 1 M3 Sloof 15/20 Untuk Pagar 3,867,164.51 M3 G.12 1 M3 Kolom Praktis 11/11, Kolom Gewel 11/11 6,868,180.60 M3 G.13 1 M3 Balok Latai 11/11 6,867,469.44 M3 G.14 1 M3 Ring Balok 11/15, Ring Gewel 11/15 6,006,958.62 M3 G.15 1 M3 Balok Tarik 13/20 7,747,838.65 M3 G.15a #N/A #N/A #N/AG.16 1 M3 Kolom Struktur 15/20 5,250,814.89 M3 G.17 1 M3 Kolom Teras 18/18 7,807,759.16 M3 G.18 1 M3 Kolom Pagar 15/20 4,607,227.49 M3 G.19 1 M3 Plat Dak 4,428,901.45 M3
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAPH.1 1 M2 Pasang Atap Metal Zincalum 80,869.40 M2 H.2 1 M' Pasang Bubung Metal Zincalum 66,588.70 M' H.3 1 M2 Pasang Atap Seng Gelombang 67,913.40 M2 H.3.1 1 M2 Pasang Atap Seng Gelombang (bahan lama) 64,194.80 M2 H.3.3 1 M2 Pasang Atap Seng Gelombang 55,173.40 M2 H.4 1 M Pasang Atap Nok Seng 62,167.90 M H.5 1 M2 Pasang Atap Galvalume 74,435.80 M2 H.6 1 M' Pasang Bubung Galvalume 39,467.90 M'
I. ANALISA BIAYA KONSTRUKSI LANGIT - LANGITI.1 1 M1 List kayu Profil 15,445.70 M1 I.1a 1 M1 List Tripleks 6 mm 9,085.70 M1 I.2 1 M2 Plafond Tripleks 3 mm, Rangka Kayu Kelas II 96,495.50 M2 I.2.1 1 M2 Plafond Tripleks 3 mm, Rangka Kayu Lama 52,395.50 M2 I.3 1 M2 Plafond Tripleks 3 mm, pada Kerangka Hollow 57,795.50 M2
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASIJ.1 Memasang 1 buah Kloset Jongkok Porselen 445,636.50 buah J.2 Memasang 1 buah Bak Mandi Fibreglass volume 1 m3 760,474.50 buah J.3 Memasang 1 buah Bak Mandi Batu Bata volume 0,3 m3 26,033,450.00 buah J.4 Memasang 1 m' Pipa PVC Diameter 1/2" 15,672.20 m' J.5 Memasang 1 m' Pipa PVC Tipe Diameter 3" 45,432.20 m'
K. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM
K.1 1 m2 Pasang Kaca, Tebal 5 mm 206,125.90 m2 K.2 1 m2 Pasang Rangka Plafond Besi Hollow 175,420.50 m2 K.3 1 m2 Pasang Angin-angin Besi Hollow 237,520.50 m2 K.4 1 m2 Pasang Rangka Atap Baja Ringan 156,777.35 m2
L. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN DINDING
Rekap. Analis Hal. 47 dari 149
L.1 1 M2 pasang lantai keramik 30/30 cm (motif) 162,724.50 M2 L.1.a 1 M2 pasang lantai keramik 40/40 cm (motif) 161,601.40 M2 L.2 1 M2 pasang dinding keramik 192,454.70 M2 L.3 1 M2 Paving Block Type Berlian t=8 cm 132,232.50 M2 L.4 1 M2 Paving Block Type Bata t=8 cm 128,932.50 M2 L.4a 1 M2 Paving Block Type Bata t=6 cm 112,432.50 M2
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATANM.1 1 M2 Pengecatan Bidang Kayu Lama 17,586.93 M2
M.2 1 M2 Pengecatan Bidang Kayu Baru (1 plamir,1 dasar, 2 penutup) 30,668.53 M2
M.3 1 M2 Pelaburan bidang kayu dengan Politur 34,424.90 M2
M.4 15,550.27 M2
M.5 11,157.58 M2
M.6 1 M2 Pengecatan permukaan seng 16,292.04 M2 M.7 1 M2 Pengeteeran Kap 11,412.40 M2
N. ANALISA BIAYA KONSTRUKSI PEKERJAAN MEUBELAIRN.1 1 Unit Meja Siswa Tunggal 274,433.75 Un N.2 1 Unit Meja Siswa Ganda 340,400.00 Un N.3 1 Unit Meja Guru/Kantor 487,490.63 Un N.4 1 Unit Kursi Siswa 244,786.90 Un N.5 1 Unit Kursi Guru/Kantor 253,072.50 Un N.6 1 Unit Lemari/Rak Buku 1,004,215.00 Un N.7 1 Unit Lemari Kelas 1,373,365.00 Un N.8 1 Unit Papan Tulis Gantung 449,763.00 Un
1 M2 Pengecatan tembok baru (1 plamir, 1 cat dasar, 2 cat penutup)
1 M2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
TABEL PERHITUNGAN KEBUTUHANPEMBESIAN, BEGISTING DAN PLESTERAN PEKERJAAN BETON BERTULANG
UNTUK ANALISA HARGA SATUAN PEKERJAAN
DIMENSI TULANGAN ARAH X TULANGAN ARAH Y BERAT PER-METER BERAT TOTAL KEBUTUHAN PER - M3 BETONURAIAN PEKRJAAN b x h x t VOL Diameter Jarak Panjang Jumlah Diameter Jarak Panjang Jumlah Arah X Arah Y Arah X Arah Y Tulangan Beton Begisting Plesteran
Bawah Atas Bawah Atas Bawah Atas Bawah Atas Bawah Atas Bawah Atas Bawah Atas Bawah Atas Bawah Atas Bawah Atas
(CM) (M3) (MM) (MM) (CM) (CM) (CM) (CM) (BH) (BH) (MM) (MM) (CM) (CM) (CM) (CM) (BH) (BH) (KG/M) (KG/M) (KG/M) (KG/M) (KG) (KG) (KG) (M3) (M2) (M2)
PLAT LANTAI
Plat lantai tebal 12 cm 765 x 933 x 12 8.85 8 8 12.5 12.5 768 768 62 62 8 8 15.0 15.0 936 936 63 63 0.395 0.395 0.395 0.395 377.134 467.022 95.380 0.9878 8.333 -
Plat Sunscreen tebal 10 cm 765 x 933 x 10 7.14 8 8 15.0 15.0 768 768 52 52 8 8 15.0 15.0 936 936 63 63 0.395 0.395 0.395 0.395 315.289 467.022 109.606 0.9860 10.000 -
Plat Sunscreen tebal 9 cm 765 x 933 x 9 6.42 6 15.0 15.0 766 760 52 52 6 15.0 15.0 934 928 63 63 0.222 0.000 0.222 0.000 88.444 131.069 34.172 0.9956 11.111 -
Plat tebal 8 cm 765 x 933 x 8 5.71 10 15.0 15.0 770 760 52 52 12 15.0 15.0 940 928 63 63 0.617 0.000 0.888 0.000 246.961 527.645 135.659 0.9827 12.500 -
Plat 6 cm 765 x 933 x 6 4.28 10 15.0 15.0 770 760 52 52 12 15.0 15.0 940 928 63 63 0.617 0.000 0.888 0.000 246.961 527.645 180.878 0.9770 16.667 -
DAFTAR ANALISA
B.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter Rp 44,610.00
B.1.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.750 OH 56,800.00 42,600.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 44,610.00
B.2 1 M3 Galian Tanah Biasa Sedalam 2 Meter Rp 54,738.00
B.2.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.900 OH 56,800.00 51,120.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.045 OH 80,400.00 3,618.00
Rp. 54,738.00
B.4 1 M3 Galian Tanah Keras Sedalam 1 Meter Rp 59,372.80
B.3.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.032 OH 80,400.00 2,572.80
Rp. 59,372.80
B.5 1 M3 Galian Tanah Cadas Sedalam 1 Meter Rp 90,024.00
B.5.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 1.500 OH 56,800.00 85,200.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.060 OH 80,400.00 4,824.00
Rp. 90,024.00
B.6 1 M3 Galian Tanah Lumpur Sedalam 1 Meter Rp 71,778.00
B.1.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 1.200 OH 56,800.00 68,160.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.045 OH 80,400.00 3,618.00
Rp. 71,778.00
B.7 1 M3 Striping Tebing Setinggi 1 Meter Rp 3,242.00
B.1.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.050 OH 56,800.00 2,840.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.005 OH 80,400.00 402.00
Rp. 3,242.00
B.9 1 M3 Urugan Kembali Rp 15,004.00
B.9.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.010 OH 80,400.00 804.00
Rp. 15,004.00
B.10 1 M3 Pemadatan Tanah ( Per 20 cm ) Rp 32,420.00
B.10.1 Tenaga Koefesien Satuan Harga Jumlah- Pekerja 0.500 OH 56,800.00 28,400.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 32,420.00
B.10.a Rp 75,444.00
B.10.a.1 Bahan Koefesien Satuan Harga Jumlah- Tanah Urug 1.200 48,000.00 57,600.00
B.10.a.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.010 OH 80,400.00 804.00
Rp. 75,444.00
B.11 Rp 122,844.00
B.11.1 Bahan Koefesien Satuan Harga Jumlah- Pasir Urug 1.200 87,500.00 105,000.00
B.11.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Gali - OH - - - Kepala Tukang - OH - - - Mandor 0.010 OH 80,400.00 804.00
Rp. 122,844.00
C.3 Rp 505,565.50
C.3.1 Bahan Koefesien Satuan Harga Jumlah- Batu Belah 15/20 cm 1.200 100,000.00 120,000.00 - Semen Portland (PC) 136.000 Kg 1,370.00 186,320.00 - Pasir Pasang (PP) 0.544 92,000.00 50,048.00
C.3.2 Tenaga- Pekerja 1.500 OH 56,800.00 85,200.00 - Tukang Batu 0.750 OH 69,825.00 52,368.75 - Kepala Tukang 0.075 OH 74,650.00 5,598.75 - Mandor 0.075 OH 80,400.00 6,030.00
Rp. 505,565.50
C.9 Rp 235,382.70
C.9.1 Bahan Koefesien Satuan Harga Jumlah- Batu Belah 15/20 cm 1.200 100,000.00 120,000.00 - Pasir Urug 0.432 87,500.00 37,800.00
C.9.2 Tenaga- Pekerja 0.780 OH 56,800.00 44,304.00 - Tukang Batu 0.390 OH 69,825.00 27,231.75 - Kepala Tukang 0.039 OH 74,650.00 2,911.35 - Mandor 0.039 OH 80,400.00 3,135.60
Rp. 235,382.70
Mengurug dan Memadatkan 1 M3 Tanah
M3
Mengurug 1 M3 Pasir Urug
M3
Memasang 1 M3 Pondasi Batu Belah, campuran 1 Pc : 5 PP
M3
M3
Memasang 1 M3 Batu Kosong (anstamping)
M3
M3
D.3 Rp 42,608.62
D.3.1 Bahan Koefesien Satuan Harga Jumlah- Semen Portland (PC) 7.776 Kg 1,370.00 10,653.12 - Pasir Pasang (PP) 0.023 92,000.00 2,116.00
D.3.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang 0.015 OH 74,650.00 1,119.75 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 42,608.62
D.5 Rp 39,333.58
D.5.1 Bahan Koefesien Satuan Harga Jumlah- Semen Portland (PC) 5.184 Kg 1,370.00 7,102.08 - Pasir Pasang (PP) 0.026 92,000.00 2,392.00
D.5.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang 0.015 OH 74,650.00 1,119.75 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 39,333.58
D.26 Rp 39,629.30
D.26.1 Bahan Koefesien Satuan Harga Jumlah- Semen Portland (PC) 6.340 Kg 1,370.00 8,685.80 - Pasir Pasang (PP) 0.012 92,000.00 1,104.00
D.26.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang 0.015 OH 74,650.00 1,119.75 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 39,629.30
D.27 Rp 24,345.50
D.27.1 Bahan Koefesien Satuan Harga Jumlah- Semen Portland (PC) 3.250 Kg 1,370.00 4,452.50
D.27.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Batu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.010 OH 80,400.00 804.00
Rp. 24,345.50
E.8 Rp 94,841.90 tebal 1/2 bata, campuran 1 Pc : 3 PP
E.8.1 Bahan Koefesien Satuan Harga Jumlah- Bata Merah 5 x 11 x 22 Cm 70.000 Bh 650.00 45,500.00 - Semen Portland (PC) 14.370 Kg 1,370.00 19,686.90 - Pasir Pasang (PP) 0.040 92,000.00 3,680.00
E.8.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 94,841.90
Memasang 1 M2 Plesteran 1 Pc : 3 PP, Tebal 15 mm
M3
Memasang 1 M2 Plesteran 1 Pc : 5 PP, Tebal 15 mm
M3
Memasang 1 M2 Finising Siar Pasangan Batu Kali Adukan 1 PC : 2 PP
M3
Memasang 1 M2 Acian
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
E.8.a 1 M2 Pasangan Rollag Bata, 1 Pc : 3 PP Rp 196,463.50
E.8.a.1 Bahan Koefesien Satuan Harga Jumlah- Bata Merah 5 x 11 x 22 Cm 140.000 Bh 650.00 91,000.00 - Semen Portland (PC) 32.950 Kg 1,370.00 45,141.50 - Pasir Pasang (PP) 0.091 92,000.00 8,372.00
E.8.a.2 Tenaga- Pekerja 0.600 OH 56,800.00 34,080.00 - Tukang Batu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang 0.020 OH 74,650.00 1,493.00 - Mandor 0.030 OH 80,400.00 2,412.00
Rp. 196,463.50
E.10 Rp 88,876.60 tebal 1/2 bata, campuran 1 Pc : 5 PP
E.10.1 Bahan Koefesien Satuan Harga Jumlah- Bata Merah 5 x 11 x 22 Cm 70.000 Bh 650.00 45,500.00 - Semen Portland (PC) 9.680 Kg 1,370.00 13,261.60 - Pasir Pasang (PP) 0.045 92,000.00 4,140.00
E.10.2 Tenaga- Pekerja 0.300 OH 56,800.00 17,040.00 - Tukang Batu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 88,876.60
F.3 Rp 879,375.27 slump (12 ± 2) cm, w/c = 0,72
F.3.1 Bahan Koefesien Satuan Harga Jumlah- Semen Portland (PC) 299.000 Kg 1,370.00 409,630.00 - Pasir Beton (PB) 0.799 95,000.00 75,905.00 - Koral (maksimum 30 mm) 1.027 265,000.00 272,155.00 - Air
F.3.2 Tenaga- Pekerja 1.650 OH 56,800.00 93,720.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Kepala Tukang 0.028 OH 74,650.00 2,090.20 - Mandor 0.083 OH 80,400.00 6,673.20
Rp. 879,375.27
F.4 Rp 760,532.00 slump (3 - 6) cm, w/c = 0,87
F.4.1 Bahan Koefesien Satuan Harga Jumlah- Semen Portland (PC) 230.000 Kg 1,370.00 315,100.00 - Pasir Beton (PB) 0.893 95,000.00 84,835.00 - Koral (maksimum 30 mm) 1.027 265,000.00 272,155.00 - Air
F.4.2 Tenaga- Pekerja 1.200 OH 56,800.00 68,160.00 - Tukang Batu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang 0.020 OH 74,650.00 1,493.00 - Mandor 0.060 OH 80,400.00 4,824.00
Rp. 760,532.00
M3
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150)
M3
M3
Catatan : bobot pasir 1 m3 = 1.400 Kg , bobot kerikil 1 m3 = 1.350 Kg , buckling factor pasir = 20 %
Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100)
M3
M3
F.5 Rp 913,190.27
F.5.1 Bahan Koefesien Satuan Harga Jumlah- Semen Portland (PC) 326.000 Kg 1,370.00 446,620.00 - Pasir Beton (PB) 0.760 95,000.00 72,200.00 - Koral (maksimum 30 mm) 1.029 265,000.00 272,685.00 - Air
F.5.2 Tenaga- Pekerja 1.650 OH 56,800.00 93,720.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Kepala Tukang 0.028 OH 74,650.00 2,090.20 - Mandor 0.083 OH 80,400.00 6,673.20
Rp. 913,190.27
F.17 Pembesian 10 Kg dengan Besi Polos atau Besi Ulir Rp 143,657.90
F.17.1 Bahan Koefesien Satuan Harga Jumlah- Besi beton (polos/ulir) 10.500 Kg 12,500.00 131,250.00 - Kawat beton 0.150 Kg 18,000.00 2,700.00
F.17.2 Tenaga- Pekerja 0.070 OH 56,800.00 3,976.00 - Tukang Besi 0.070 OH 69,825.00 4,887.75 - Kepala Tukang 0.007 OH 74,650.00 522.55 - Mandor 0.004 OH 80,400.00 321.60
Rp. 143,657.90
F.17.a Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Rp 14,365.79
F.17a.1 Bahan Koefesien Satuan Harga Jumlah- Besi beton (polos/ulir) 1.0500 Kg 12,500.00 13,125.00 - Kawat beton 0.0150 Kg 18,000.00 270.00
F.17a.2 Tenaga- Pekerja 0.0070 OH 56,800.00 397.60 - Tukang Besi 0.0070 OH 69,825.00 488.78 - Kepala Tukang 0.0007 OH 74,650.00 52.26 - Mandor 0.0004 OH 80,400.00 32.16
Rp. 14,365.79
F.21 Memasang 1 m2 begisting Sloof Rp 197,971.80
F.21.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Kelas III 0.045 3,150,000.00 141,750.00 - Paku 5 cm - 10 cm 0.300 Kg 15,000.00 4,500.00 - Minyak Begisting 0.100 Liter - -
F.21.2 Tenaga- Pekerja 0.520 OH 56,800.00 29,536.00 - Tukang Kayu 0.260 OH 69,825.00 18,154.50 - Kepala Tukang 0.026 OH 74,650.00 1,940.90 - Mandor 0.026 OH 80,400.00 2,090.40
Rp. 197,971.80
Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175)slump (12 ± 2) cm, w/c = 0,66
M3
M3
m3
F.22 Memasang 1 m2 begisting Untuk Kolom Rp 341,621.90
F.22.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Kelas III 0.040 3,150,000.00 126,000.00 - Paku 5 cm - 10 cm 0.400 Kg 15,000.00 6,000.00 - Minyak Begisting 0.200 Liter - -
Balok Kayu Kelas II 0.015 3,675,000.00 55,125.00 Polywood tebal 9 mm 0.350 Lbr 115,000.00 40,250.00 Dolken, Panjang 4 m 2.000 Btng 24,300.00 48,600.00
F.22.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang 0.033 OH 74,650.00 2,463.45 - Mandor 0.033 OH 80,400.00 2,653.20
Rp. 341,621.90
F.23 Memasang 1 m2 begisting Untuk Balok Rp 352,646.90
F.23.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Kelas III 0.040 3,150,000.00 126,000.00 - Paku 5 cm - 12 cm 0.400 Kg 15,000.00 6,000.00 - Minyak Begisting 0.200 Liter - - - Balok Kayu Kelas II 0.018 3,675,000.00 66,150.00 - Polywood tebal 9 mm 0.350 Lbr 115,000.00 40,250.00 - Dolken, Panjang 4 m 2.000 Btng 24,300.00 48,600.00
F.23.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang 0.033 OH 74,650.00 2,463.45 - Mandor 0.033 OH 80,400.00 2,653.20
Rp. 352,646.90
F.24 Memasang 1 m2 begisting Untuk Plat Lantai Rp 438,821.90
F.23.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Kelas III 0.040 3,150,000.00 126,000.00 - Paku 5 cm - 12 cm 0.400 Kg 15,000.00 6,000.00 - Minyak Begisting 0.200 Liter - - - Balok Kayu Kelas II 0.015 3,675,000.00 55,125.00 - Polywood tebal 9 mm 0.350 Lbr 115,000.00 40,250.00 - Dolken, Panjang 4 m 6.000 Btng 24,300.00 145,800.00
F.23.2 Tenaga- Pekerja 0.660 OH 56,800.00 37,488.00 - Tukang Kayu 0.330 OH 69,825.00 23,042.25 - Kepala Tukang 0.033 OH 74,650.00 2,463.45 - Mandor 0.033 OH 80,400.00 2,653.20
Rp. 438,821.90
m3
m3
m3
m3
m3
m3
F.28 Rp 3,913,214.93
F.28 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.200 3,150,000.00 630,000.00 - Paku 5 cm - 12 cm 1.500 Kg 15,000.00 22,500.00 - Minyak Bekisting 0.400 Liter - - - Besi beton polos 157.500 Kg 12,500.00 1,968,750.00 - Kawat Beton 2.250 Kg 18,000.00 40,500.00 - Portland Cement 336.000 Kg 1,370.00 460,320.00 - Pasir Beton (PB) 0.540 95,000.00 51,300.00 - Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
F.28 Tenaga- Pekerja 5.300 OH 56,800.00 301,040.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Tukang Kayu 1.300 OH 69,825.00 90,772.50 - Tukang Besi 1.050 OH 69,825.00 73,316.25 - Kepala Tukang 0.262 OH 74,650.00 19,558.30 - Mandor 0.265 OH 80,400.00 21,306.00
Rp. 3,913,214.93
F.29 Rp 4,879,439.03
F.29.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.270 3,150,000.00 850,500.00 - Paku 5 cm - 12 cm 2.000 Kg 15,000.00 30,000.00 - Minyak Bekisting 0.600 Liter - - - Besi beton polos 210.000 Kg 12,500.00 2,625,000.00 - Kawat Beton 3.000 Kg 18,000.00 54,000.00 - Portland Cement 336.000 Kg 1,370.00 460,320.00 - Pasir Beton (PB) 0.540 95,000.00 51,300.00 - Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
F.29.2 Tenaga- Pekerja 5.650 OH 56,800.00 320,920.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Tukang Kayu 1.560 OH 69,825.00 108,927.00 - Tukang Besi 1.400 OH 69,825.00 97,755.00 - Kepala Tukang 0.323 OH 74,650.00 24,111.95 - Mandor 0.283 OH 80,400.00 22,753.20
Rp. 4,879,439.03
F.29.a Rp 6,482,837.82 (besi 6 dia 12 mm + begisting)
F.29.a Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 203.958 Kg 14,365.79 2,930,023.54 - Begisting (F.21) 13.333 197,971.80 2,639,624.00
Rp. 6,482,837.82
F.29.b Rp 6,773,113.96 (besi 4 dia 12 mm+ begisting)
F.29.b.1 Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 178.229 Kg 14,365.79 2,560,393.68 - Begisting (F.21) 16.667 Liter 197,971.80 3,299,530.00
Rp. 6,773,113.96
Membuat 1 M3 pondasi beton bertulang (150 Kg besi + begisting)
M3
M3
M3
Membuat 1 M3 sloof beton bertulang (200 Kg besi + begisting)
M3
M3
M3
Membuat 1 M3 sloof beton bertulang 15/20
M3
M2
Membuat 1 M3 sloof beton bertulang 12/20
M3
F.29.c Rp 6,675,828.83 (besi 4 dia 10 mm+ begisting)
F.29.b.1 Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 171.457 Kg 14,365.79 2,463,108.55 - Begisting (F.21) 16.667 Liter 197,971.80 3,299,530.00
Rp. 6,675,828.83
F.29.d Rp 7,180,326.57 (besi 4 dia 10 mm+ begisting)
F.29.b.1 Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 185.695 Kg 14,365.79 2,667,649.02 - Begisting (F.21) 18.182 Liter 197,971.80 3,599,487.27
Rp. 7,180,326.57
F.30 Rp 8,244,470.78
F.30.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.400 3,150,000.00 1,260,000.00 - Paku 5 cm - 12 cm 4.000 Kg 15,000.00 60,000.00 - Minyak Bekisting 2.000 Liter - - - Besi beton polos 315.000 Kg 12,500.00 3,937,500.00 - Kawat Beton 4.500 Kg 18,000.00 81,000.00 - Portland Cement 336.000 Kg 1,370.00 460,320.00 - Pasir Beton (PB) 0.540 95,000.00 51,300.00 - Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00 - Kayu Klas II balok 0.150 3,675,000.00 551,250.00 - Plywood 9 mm 3.500 Lembar 115,000.00 402,500.00 - Dolken Kayu (8/10) panjang 4 m' 20.000 Batang 24,300.00 486,000.00
F.30.2 Tenaga- Pekerja 7.050 OH 56,800.00 400,440.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Tukang Kayu 1.650 OH 69,825.00 115,211.25 - Tukang Besi 2.100 OH 69,825.00 146,632.50 - Kepala Tukang 0.403 OH 74,650.00 30,083.95 - Mandor 0.353 OH 80,400.00 28,381.20
Rp. 8,244,470.78
F.30.a Rp 12,715,573.98 ( besi 4 dia 12 mm + begisting)
F.30.a Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 187.422 14,365.79 2,692,466.37 - Begisting (F.22) 26.667 341,621.90 9,109,917.33
Rp. 12,715,573.98
F.30.b Rp 9,338,449.61 ( besi 4 dia 12 mm + begisting)
F.30.b Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 110.876 14,365.79 1,592,821.33 - Begisting (F.22) 20.000 341,621.90 6,832,438.00
Rp. 9,338,449.61
Membuat 1 M3 sloof beton bertulang 12/15
M3
Membuat 1 M3 sloof beton bertulang 11/15
M3
Membuat 1 M3 kolom beton bertulang (300 Kg besi + begisting)
M3
M3
M3
M3
Membuat 1 M3 kolom beton bertulang 15/15
M3
M3
M2
Membuat 1 M3 kolom beton bertulang 20/20
M3
M3
M2
F.30.c Rp 12,022,167.94 ( besi 4 dia 10 mm + begisting)
F.30.c Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 139.154 14,365.79 1,999,060.33 - Begisting (F.22) 26.667 341,621.90 9,109,917.33
Rp. 12,022,167.94
F.30.d Rp 17,079,424.36 ( besi 4 dia 10 mm + begisting)
F.30.d Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 260.593 14,365.79 3,743,619.54 - Begisting (F.22) 36.364 341,621.90 12,422,614.55
Rp. 17,079,424.36
F.31 Rp 6,329,843.78
F.31.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.320 3,150,000.00 1,008,000.00 - Paku 5 cm - 12 cm 3.200 Kg 15,000.00 48,000.00 - Minyak Bekisting 1.600 Liter - - - Besi beton polos 210.000 Kg 12,500.00 2,625,000.00 - Kawat Beton 3.000 Kg 18,000.00 54,000.00 - Portland Cement 336.000 Kg 1,370.00 460,320.00 - Pasir Beton (PB) 0.540 95,000.00 51,300.00 - Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok 0.140 3,675,000.00 514,500.00 Plywood 9 mm 2.800 Lembar 115,000.00 322,000.00 Dolken Kayu (8/10) panjang 4 m' 16.000 Batang 24,300.00 388,800.00
F.31.2 Tenaga- Pekerja 6.350 OH 56,800.00 360,680.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Tukang Kayu 1.650 OH 69,825.00 115,211.25 - Tukang Besi 1.400 OH 69,825.00 97,755.00 - Kepala Tukang 0.333 OH 74,650.00 24,858.45 - Mandor 0.318 OH 80,400.00 25,567.20
Rp. 6,329,843.78
F.31.a Rp 9,253,747.16 (besi 4 dia 12 mm + begisting)
F.31.a Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 171.457 Kg 14,365.79 2,463,108.55 - Begisting (F.23) 16.667 M2 352,646.90 5,877,448.33
Rp. 9,253,747.16
F.31.b Rp 10,402,746.09 (besi 4 dia 10 mm + begisting)
F.31.b Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 214.245 Kg 14,365.79 3,077,794.00 - Begisting (F.23) 18.182 M2 352,646.90 6,411,761.82
Rp. 10,402,746.09
Membuat 1 M3 kolom beton bertulang 15/15
M3
M3
M2
Membuat 1 M3 kolom beton bertulang 11/11
M3
M3
M2
Membuat 1 M3 balok beton bertulang (200 Kg besi + begisting)
M3
M3
M3
M3
Membuat 1 M3 balok latei beton bertulang 12/15
M3
Membuat 1 M3 balok latei beton bertulang 11/13
M3
F.31.c Rp 9,377,495.99 (besi 4 dia 12 mm + begisting)
F.31.c.1 Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 180.071 Kg 14,365.79 2,586,857.38 - Begisting (F.23) 16.667 M2 352,646.90 5,877,448.33
Rp. 9,377,495.99
F.31.d Rp 10,067,851.01 (besi 4 dia 12 mm + begisting)
F.31.d Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 1.000 913,190.27 913,190.27 - Besi beton polos (F.17.a) 146.301 Kg 14,365.79 2,101,722.74 - Begisting (F.23) 20.000 M2 352,646.90 7,052,938.00
Rp. 10,067,851.01
F.32 Rp 5,851,288.88
F.32.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.320 3,150,000.00 1,008,000.00 - Paku 5 cm - 12 cm 3.200 Kg 15,000.00 48,000.00 - Minyak Bekisting 1.600 Liter - - - Besi beton polos 157.000 Kg 12,500.00 1,962,500.00 - Kawat Beton 2.250 Kg 18,000.00 40,500.00 - Portland Cement 336.000 Kg 1,370.00 460,320.00 - Pasir Beton (PB) 0.540 95,000.00 51,300.00 - Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok 0.120 3,675,000.00 441,000.00 Plywood 9 mm 2.800 Lembar 115,000.00 322,000.00 Dolken Kayu (8/10) panjang 4 m' 32.000 Batang 24,300.00 777,600.00
F.32.2 Tenaga- Pekerja 5.300 OH 56,800.00 301,040.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Tukang Kayu 1.300 OH 69,825.00 90,772.50 - Tukang Besi 1.050 OH 69,825.00 73,316.25 - Kepala Tukang 0.265 OH 74,650.00 19,782.25 - Mandor 0.265 OH 80,400.00 21,306.00
Rp. 5,851,288.88
F.32.a Rp 8,331,527.58
F.31.a Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 0.983 913,190.27 897,409.10 - Besi beton polos (F.17.a) 135.659 Kg 14,365.79 1,948,844.73 - Begisting (F.24) 12.500 M2 438,821.90 5,485,273.75
Rp. 8,331,527.58
F.32.b Rp 10,804,306.68
F.31.a Bahan Koefesien Satuan Harga Jumlah- Beton (F.5) 0.977 913,190.27 892,148.71 - Besi beton polos (F.17.a) 180.878 Kg 14,365.79 2,598,459.64 - Begisting (F.24) 16.667 M2 438,821.90 7,313,698.33
Rp. 10,804,306.68
Membuat 1 M3 balok beton bertulang 12/20
M3
Membuat 1 M3 balok gantung beton bertulang 15/20
M3
Membuat 1 M3 plat beton bertulang (150 Kg besi + begisting)
M3
M3
M3
M3
Membuat 1 M3 Plat beton bertulang Tebal 8 cm
M3
Membuat 1 M3 Plat beton bertulang Tebal 6 cm
M3
F.33 Rp 5,460,892.43
F.33.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.240 3,150,000.00 756,000.00 - Paku 5 cm - 12 cm 3.200 Kg 15,000.00 48,000.00 - Minyak Bekisting 1.600 Liter - - - Besi beton polos 157.000 Kg 12,500.00 1,962,500.00 - Kawat Beton 2.250 Kg 18,000.00 40,500.00 - Portland Cement 336.000 Kg 1,370.00 460,320.00 - Pasir Beton (PB) 0.540 95,000.00 51,300.00 - Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok 0.160 3,675,000.00 588,000.00 Plywood 9 mm 2.800 Lembar 115,000.00 322,000.00 Dolken Kayu (8/10) panjang 4 m' 24.000 Batang 24,300.00 583,200.00
F.33.2 Tenaga- Pekerja 5.300 OH 56,800.00 301,040.00 - Tukang Batu 0.275 OH 69,825.00 19,201.88 - Tukang Kayu 1.300 OH 69,825.00 - Tukang Besi 1.050 OH 69,825.00 73,316.25 - Kepala Tukang 0.262 OH 74,650.00 19,558.30 - Mandor 0.265 OH 80,400.00 21,306.00
Rp. 5,460,892.43
F.35 Rp 68,780.00
F.33.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.002 3,150,000.00 6,300.00 - Paku 5 cm - 12 cm 0.010 Kg 15,000.00 150.00 - Besi beton polos 3.000 Kg 12,500.00 37,500.00 - Kawat Beton 0.045 Kg 18,000.00 810.00 - Portland Cement 4.000 Kg 1,370.00 5,480.00 - Pasir Beton (PB) 0.006 95,000.00 570.00 - Koral (maksimum 30 mm) 0.009 265,000.00 2,385.00
F.33.2 Tenaga- Pekerja 0.180 OH 56,800.00 10,224.00 - Tukang Batu 0.020 OH 69,825.00 1,396.50 - Tukang Kayu 0.020 OH 69,825.00 1,396.50 - Tukang Besi 0.020 OH 69,825.00 1,396.50 - Kepala Tukang 0.006 OH 74,650.00 447.90 - Mandor 0.009 OH 80,400.00 723.60
Rp. 68,780.00
F.36 Rp 93,749.78
F.36.1 Bahan Koefesien Satuan Harga Jumlah- Kayu Klas III 0.003 3,150,000.00 9,450.00 - Paku 5 cm - 12 cm 0.020 Kg 15,000.00 300.00 - Besi beton polos 3.600 Kg 12,500.00 45,000.00 - Kawat Beton 0.050 Kg 18,000.00 900.00 - Portland Cement 5.500 Kg 1,370.00 7,535.00 - Pasir Beton (PB) 0.009 95,000.00 855.00 - Koral (maksimum 30 mm) 0.015 265,000.00 3,975.00
F.36.2 Tenaga- Pekerja 0.297 OH 56,800.00 16,869.60 - Tukang Batu 0.033 OH 69,825.00 2,304.23 - Tukang Kayu 0.033 OH 69,825.00 2,304.23 - Tukang Besi 0.033 OH 69,825.00 2,304.23 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.015 OH 80,400.00 1,206.00
Rp. 93,749.78
Membuat 1 M3 dinding beton bertulang (150 Kg besi + begisting)
M3
M3
M3
M3
Membuat 1 M' kolom praktis beton bertulang (11 x 11) cm
M3
M3
M3
Membuat 1 M' kolom praktis beton bertulang (10 x 15) cm
M3
M3
M3
G.2 Rp 6,216,140.00 kayu kelas II
G.2.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu 1.200 3,675,000.00 4,410,000.00 - Paku 10 cm 1.250 Kg 14,000.00 17,500.00 - Lem Kayu 1.000 Kg 32,500.00 32,500.00
G.2.2 Tenaga- Pekerja 6.000 OH 56,800.00 340,800.00 - Tukang Kayu 18.000 OH 69,825.00 1,256,850.00 - Kepala Tukang 1.800 OH 74,650.00 134,370.00 - Mandor 0.300 OH 80,400.00 24,120.00
Rp. 6,216,140.00
G.5 Rp 476,140.00 kayu kelas II
G.5.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.044 3,800,000.00 167,200.00 - Lem Kayu 0.500 Kg 32,500.00 16,250.00
G.5.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Kayu 3.000 OH 69,825.00 209,475.00 - Kepala Tukang 0.300 OH 74,650.00 22,395.00 - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 476,140.00
G.6 Rp 511,102.00 kayu kelas II
G.6.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.024 3,800,000.00 91,200.00 - Lem Kayu 0.300 Kg 32,500.00 9,750.00 - Kaca Polos 5 mm 1.000 M2 176,000.00 176,000.00
G.6.2 Tenaga- Pekerja 0.800 OH 56,800.00 45,440.00 - Tukang Kayu 2.400 OH 69,825.00 167,580.00 - Kepala Tukang 0.240 OH 74,650.00 17,916.00 - Mandor 0.040 OH 80,400.00 3,216.00
Rp. 511,102.00
G.6.a 1 M2 Pasang Kaca Polos 5 mm Rp 188,501.78
G.6.a.1 Bahan Koefesien Satuan Harga Jumlah- Kaca Polos 5 mm 1.000 M2 176,000.00 176,000.00
G.6.a.2 Tenaga- Pekerja 0.015 OH 56,800.00 852.00 - Tukang Kayu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang 0.015 OH 74,650.00 1,119.75 - Mandor 0.001 OH 80,400.00 56.28
Rp. 188,501.78
Membuat dan Memasang 1 M3 Kusen Pintu dan Kusen Jendela
M3
Membuat dan Memasang 1 M2 Daun Pintu Panel
M3
Membuat dan Memasang 1 M2 Pintu dan Jendela Kaca
M3
G.7 Rp 552,140.00 kayu kelas II
G.7.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.064 3,800,000.00 243,200.00 - Lem Kayu 0.500 Kg 32,500.00 16,250.00
G.7.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Kayu 3.000 OH 69,825.00 209,475.00 - Kepala Tukang 0.300 OH 74,650.00 22,395.00 - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 552,140.00
G.8 Rp 406,673.00
G.8.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.025 3,800,000.00 95,000.00 - Paku 1 cm - 2,5 cm 0.030 Kg 18,000.00 540.00 - Lem Kayu 0.500 Kg 32,500.00 16,250.00 - teakwood tebal 4 mm (90x220) cm 1.000 Lembar 90,000.00 90,000.00
G.8.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Kayu 2.100 OH 69,825.00 146,632.50 - Kepala Tukang 0.210 OH 74,650.00 15,676.50 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 406,673.00
G.8.a Rp 618,730.00 rangkap + Kaca
G.8.a.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.025 3,800,000.00 95,000.00 - Paku 1 cm - 2,5 cm 0.030 Kg 18,000.00 540.00 - Lem Kayu 0.500 Kg 90,000.00 45,000.00 - teakwood tebal 4 mm (90x220) cm 1.000 Lembar 90,000.00 90,000.00 - Kaca Polos 5 mm 0.500 M2 176,000.00 88,000.00 - List Profil kayu 1.000 M' 7,500.00 7,500.00
G.8.a.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Kayu 3.000 OH 69,825.00 209,475.00 - Kepala Tukang 0.300 OH 74,650.00 22,395.00 - Mandor 0.050 OH 80,400.00 4,020.00
Rp. 618,730.00
G.12 Rp 534,066.70 rangka exposes kayu kelas II
G.12.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.025 3,800,000.00 95,000.00 - Paku 1 cm - 2,5 cm 0.030 Kg 18,000.00 540.00 - Lem Kayu 0.800 Kg 32,500.00 26,000.00 - Teakwood Tebal 4 mm (90x220) cm 1.000 Lembar 90,000.00 90,000.00 - Formika 0.500 Lembar 147,400.00 73,700.00
G.12.2 Tenaga- Pekerja 0.850 OH 56,800.00 48,280.00 - Tukang Kayu 2.550 OH 69,825.00 178,053.75 - Kepala Tukang 0.255 OH 74,650.00 19,035.75 - Mandor 0.043 OH 80,400.00 3,457.20
Rp. 534,066.70
Membuat dan Memasang 1 M2 Pintu dan Jendela Jalusi Kayu
M3
Membuat dan Memasang 1 M2 Pintu Kayu Lapis (Teakwood) rangkap
M3
Membuat dan Memasang 1 M2 Pintu Kayu Lapis (Teakwood)
M3
Membuat dan Memasang 1 M2 teakwood rangkap lapis formika
M3
G.13 Rp 5,310,410.00 kayu kelas II bentang 6 meter
G.13.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 1.100 3,675,000.00 4,042,500.00 - Besi Strip Tebal 5 mm 15.000 Kg 1,250.00 18,750.00 - Paku 12 cm 5.600 Kg 14,000.00 78,400.00
G.13.2 Tenaga- Pekerja 4.000 OH 56,800.00 227,200.00 - Tukang Kayu 12.000 OH 69,825.00 837,900.00 - Kepala Tukang 1.200 OH 74,650.00 89,580.00 - Mandor 0.200 OH 80,400.00 16,080.00
Rp. 5,310,410.00
G.13a Rp 1,267,910.00 kayu kelas II bentang 6 meter (Kayu Lama Dipakai Lagi)
G.13a.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II - 3,675,000.00 - - Besi Strip Tebal 5 mm 15.00 Kg 1,250.00 18,750.00 - Paku 12 cm 5.60 Kg 14,000.00 78,400.00
G.13a.2 Tenaga- Pekerja 4.00 OH 56,800.00 227,200.00 - Tukang Kayu 12.00 OH 69,825.00 837,900.00 - Kepala Tukang 1.20 OH 74,650.00 89,580.00 - Mandor 0.20 OH 80,400.00 16,080.00
Rp. 1,267,910.00
G.14 Rp 6,468,173.00 kayu kelas II
G.14.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 1.200 3,675,000.00 4,410,000.00 - Besi Strip Tebal 5 mm 15.000 Kg 1,250.00 18,750.00 - Paku 12 cm 5.600 Kg 14,000.00 78,400.00
G.14.2 Tenaga- Pekerja 6.700 OH 56,800.00 380,560.00 - Tukang Kayu 20.100 OH 69,825.00 1,403,482.50 - Kepala Tukang 2.010 OH 74,650.00 150,046.50 - Mandor 0.335 OH 80,400.00 26,934.00
Rp. 6,468,173.00
G.15 Rp 4,805,706.00 kayu kelas II
G.15.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II 1.100 3,675,000.00 4,042,500.00 - Besi Strip Tebal 5 mm 15.000 Kg 1,250.00 18,750.00 - Paku 12 cm 3.000 Kg 14,000.00 42,000.00
G.15.2 Tenaga- Pekerja 2.400 OH 56,800.00 136,320.00 - Tukang Kayu 7.200 OH 69,825.00 502,740.00 - Kepala Tukang 0.720 OH 74,650.00 53,748.00 - Mandor 0.120 OH 80,400.00 9,648.00
Rp. 4,805,706.00
Membuat dan Memasang 1 M3 konstruksi kuda-kuda konvensional
M3
Membuat dan Memasang 1 M3 konstruksi kuda-kuda konvensional
M3
Membuat dan Memasang 1 M3 konstruksi kuda-kuda expose
M3
Membuat dan Memasang 1 M3 konstruksi gordeng
M3
G.15.a Rp 763,206.00 (kayu Lama Digunakan Kembali)
G.15a.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Klas II - 3,675,000.00 - - Besi Strip Tebal 5 mm 15.000 Kg 1,250.00 18,750.00 - Paku 12 cm 3.000 Kg 14,000.00 42,000.00
G.15a.2 Tenaga- Pekerja 2.400 OH 56,800.00 136,320.00 - Tukang Kayu 7.200 OH 69,825.00 502,740.00 - Kepala Tukang 0.720 OH 74,650.00 53,748.00 - Mandor 0.120 OH 80,400.00 9,648.00
Rp. 763,206.00
G.16 Rp 81,991.00 kayu kelas II
G.16.1 Bahan Koefesien Satuan Harga Jumlah- Kaso-kaso (5 x 7) cm 0.014 3,675,000.00 51,450.00 - Reng (3 x 4) cm 0.0036 3,675,000.00 13,230.00 - Paku 5 cm dan 10 cm 0.250 Kg 14,000.00 3,500.00
G.16.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.005 OH 80,400.00 402.00
Rp. 81,991.00
G.19 Rp 97,132.00 kayu kelas II
G.19.1 Bahan Koefesien Satuan Harga Jumlah- Kaso-kaso (5 x7) cm Klas II 0.0154 3,675,000.00 56,595.00 - Paku 7 cm - 10 cm 0.200 Kg 14,000.00 2,800.00
G.19.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.300 OH 69,825.00 20,947.50 - Kepala Tukang 0.030 OH 74,650.00 2,239.50 - Mandor 0.075 OH 80,400.00 6,030.00
Rp. 97,132.00
G.19a Rp 40,537.00 kayu lama digunakan kembali
G.19a.1 Bahan Koefesien Satuan Harga Jumlah- Kaso-kaso (5 x7) cm Klas II 0.015 - - - Paku 7 cm - 10 cm 0.200 Kg 14,000.00 2,800.00
G.19a.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.300 OH 69,825.00 20,947.50 - Kepala Tukang 0.030 OH 74,650.00 2,239.50 - Mandor 0.075 OH 80,400.00 6,030.00
Rp. 40,537.00
Membuat dan Memasang 1 M3 konstruksi gordeng
M3
Membuat dan Memasang 1 M2 rangka atap genteng Pres Lokal
M3
M3
Membuat dan Memasang 1 M2 rangka langit-langit
M3
Membuat dan Memasang 1 M2 rangka langit-langit
M3
G.20 Rp 98,753.50 kayu kelas II
G.2.1 Bahan Koefesien Satuan Harga Jumlah- Kaso-kaso (5 x7) cm Klas II 0.0163 3,675,000.00 59,902.50 - Paku 7 cm - 10 cm 0.250 Kg 14,000.00 3,500.00
G.2.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Kayu 0.300 OH 69,825.00 20,947.50 - Kepala Tukang 0.030 OH 74,650.00 2,239.50 - Mandor 0.010 OH 80,400.00 804.00
Rp. 98,753.50
G.21 Rp 63,980.00 kayu kelas II
G.21.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.0108 3,800,000.00 41,040.00 - Paku 5 cm - 7 cm 0.100 Kg 14,000.00 1,400.00
G.21.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang 0.020 OH 74,650.00 1,493.00 - Mandor 0.005 OH 80,400.00 402.00
Rp. 63,980.00
G.21.a Rp 62,540.00 Kalsiplank
G.21.a.1 Bahan Koefesien Satuan Harga Jumlah- Kalsiplank 1.1000 36,000.00 39,600.00 - Paku 5 cm - 7 cm 0.100 Kg 14,000.00 1,400.00
G.21.a.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang 0.020 OH 74,650.00 1,493.00 - Mandor 0.005 OH 80,400.00 402.00
Rp. 62,540.00
G.22 Rp 63,280.00 kayu kelas II
G.22.1 Bahan Koefesien Satuan Harga Jumlah- Papan Kayu Klas II 0.011 3,800,000.00 41,040.00 - Paku 5 cm - 7 cm 0.050 Kg 14,000.00 700.00
G.22.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang 0.020 OH 74,650.00 1,493.00 - Mandor 0.005 OH 80,400.00 402.00
Rp. 63,280.00
Membuat dan Memasang 1 M2 rangka langit-langit (60 x 60) cm
M3
Membuat dan Memasang 1 M' lisplank ukuran (3 x 20) cm
M3
Membuat dan Memasang 1 M' lisplank ukuran (1 x 20) cm
M1
Membuat dan Memasang 1 M1 lisplank ukuran (3 x 30) cm
M3
G.23 Rp 148,943.70 kayu kelas II
G.23.1 Bahan Koefesien Satuan Harga Jumlah- Balok Kayu Kelas II 0.028 3,675,000.00 102,900.00 - Paku 5 cm - 7 cm 0.150 Kg 14,000.00 2,100.00
G.23.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.450 OH 69,825.00 31,421.25 - Kepala Tukang 0.045 OH 74,650.00 3,359.25 - Mandor 0.008 OH 80,400.00 643.20
Rp. 148,943.70
G.24 Rp 286,743.70 kayu kelas II
G.23.1 Bahan Koefesien Satuan Harga Jumlah- Balok kayu ukuran (6 x 12) cm 0.028 3,800,000.00 106,400.00 - Paku 5 cm - 7 cm 0.150 Kg 14,000.00 2,100.00 - Teakwood tebal 4 mm 0.860 Lembar 135,000.00 116,100.00
120 cm x 240 cm- Lem Kayu 0.560 Kg 32,500.00 18,200.00
G.23.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.450 OH 69,825.00 31,421.25 - Kepala Tukang 0.045 OH 74,650.00 3,359.25 - Mandor 0.008 OH 80,400.00 643.20
Rp. 286,743.70
H.3 Rp 37,800.60
H.3.1 Bahan Koefesien Satuan Harga Jumlah- Genteng Press Lokal 24.000 Bh 1,000.00 24,000.00
H.3.2 Tenaga- Pekerja 0.150 OH 56,800.00 8,520.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang 0.006 OH 74,650.00 447.90 - Mandor 0.008 OH 80,400.00 643.20
Rp. 37,800.60
H.6 1 M' Pasang Bubung Genteng Press Lokal Rp 81,242.80
H.6.1 Bahan Koefesien Satuan Harga Jumlah- Genteng Bubung Press Lokal 5.000 Bh 5,800.00 29,000.00 - Semen Portland (PC) 8.000 Kg 1,370.00 10,960.00 - Pasir Pasang (PP) 0.032 92,000.00 2,944.00
H.6.2 Tenaga- Pekerja 0.400 OH 56,800.00 22,720.00 - Tukang Kayu 0.200 OH 69,825.00 13,965.00 - Kepala Tukang 0.020 OH 74,650.00 1,493.00 - Mandor 0.002 OH 80,400.00 160.80
Rp. 81,242.80
Memasang 1 M2 Rangka Dinding Pemisah (60x120) cm Kayu
M3
Memasang 1 M2 dinding pemisah teakwood rangkap
M3
1 M2 Pasang Atap Genteng Press Lokal
M3
H.32 Rp 68,069.40
H.32.a.1 Bahan Koefesien Satuan Harga Jumlah- Genteng Metal 1.020 Lbr 45,000.00 45,900.00 - Paku Biasa 2" - 5"" 0.200 Kg 15,000.00 3,000.00
H.32.a.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.001 OH 80,400.00 80.40
Rp. 68,069.40
H.32.a Rp 98,969.40
H.32.a.1 Bahan Koefesien Satuan Harga Jumlah- Genteng Zincalum 1.680 Lbr 45,000.00 75,600.00 - Paku Biasa 2" - 5"" 0.300 Kg 14,000.00 4,200.00
H.32.a.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.001 OH 80,400.00 80.40
Rp. 98,969.40
H.32.b Rp 166,169.40
H.32.b.1 Bahan Koefesien Satuan Harga Jumlah- Genteng Zincalum Berpasir 1.680 Lbr 85,000.00 142,800.00 - Paku Biasa 2" - 5"" 0.300 Lbr 14,000.00 4,200.00
H.32.b.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.001 OH 80,400.00 80.40
Rp. 166,169.40
H.36.a 1 M' Pasang Bubungan Genteng Zincalum Rp 66,238.70
H.36.a.1 Bahan Koefesien Satuan Harga Jumlah- Bubung Genteng Zincalum 1.100 Bh 35,000.00 38,500.00 - Paku Biasa 1/2" - 1" 0.050 Kg 18,000.00 900.00
H.36.a.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Kayu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang 0.015 OH 74,650.00 1,119.75 - Mandor 0.013 OH 80,400.00 1,045.20
Rp. 66,238.70
H.36.b 1 M' Pasang Bubungan Genteng Zincalum Berpasir Rp 91,208.70
H.36.b.1 Bahan Koefesien Satuan Harga Jumlah- Bubung Genteng Zincalum Berpasir 1.100 Bh 57,700.00 63,470.00 - Paku Biasa 1/2" - 1" 0.050 Kg 18,000.00 900.00
H.36.b.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Kayu 0.150 OH 69,825.00 10,473.75 - Kepala Tukang 0.015 OH 74,650.00 1,119.75 - Mandor 0.013 OH 80,400.00 1,045.20
Rp. 91,208.70
1 M2 Pasang Atap Genteng Metal
1 M2 Pasang Atap Genteng Zincalum
1 M2 Pasang Atap Genteng Zincalum Berpasir
H.38 1 M2 Pasang Atap Seng Gelombang Rp. 64,564.80
H.38.1 Bahan Koefesien Satuan Harga Jumlah - Seng Gelombang 3" x 6" BJLS 28/30 0.655 Lbr 79,800.00 52,269.00 - Paku Biasa 1/2" - 1" 0.020 Kg 18,000.00 360.00
H.38.2 Tenaga- Pekerja 0.120 OH 56,800.00 6,816.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang 0.006 OH 74,650.00 447.90 - Mandor 0.006 OH 80,400.00 482.40
Rp. 64,564.80
H.38.a 1 M2 Pasang Atap Seng Gelombang Rp. 12,295.80 (seng lama digunakan kembali)
H.38.a.1 Bahan Koefesien Satuan Harga Jumlah - Seng Gelombang 3" x 6" BJLS 28/30 - Lbr 79,800.00 - - Paku Biasa 1/2" - 1" 0.020 Kg 18,000.00 360.00
H.38.a.2 Tenaga- Pekerja 0.120 OH 56,800.00 6,816.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang 0.006 OH 74,650.00 447.90 - Mandor 0.006 OH 80,400.00 482.40
Rp. 12,295.80
H.38.b 1 M2 Pasang Atap Seng Galvalum Rp. 56,395.80
H.38.b.1 Bahan Koefesien Satuan Harga Jumlah - Seng Galvalum BJLS 30 1.260 m2 35,000.00 44,100.00 - Paku Biasa 1/2" - 1" 0.020 Kg 18,000.00 360.00
H.38.b.2 Tenaga- Pekerja 0.120 OH 56,800.00 6,816.00 - Tukang Kayu 0.060 OH 69,825.00 4,189.50 - Kepala Tukang 0.006 OH 74,650.00 447.90 - Mandor 0.006 OH 80,400.00 482.40
Rp. 56,395.80
H.38.c 1 M2 Pasang Bubungan Seng Galvalum Rp. 46,306.50
H.38.c.1 Bahan Koefesien Satuan Harga Jumlah - Bubungan Seng Galvalum BJLS 30 1.200 M' 30,000.00 36,000.00 - Paku Biasa 1/2" - 1" 0.020 Kg 18,000.00 360.00
H.38.c.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.050 OH 69,825.00 3,491.25 - Kepala Tukang 0.005 OH 74,650.00 373.25 - Mandor 0.005 OH 80,400.00 402.00
Rp. 46,306.50
I.1 Rp 24,005.90
I.1.1 Bahan Koefesien Satuan Harga Jumlah- asbes semen 1.100 14,900.00 16,390.00 - paku tripleks 0.010 Kg 18,000.00 180.00
I.1.2 Tenaga- Pekerja 0.030 OH 56,800.00 1,704.00 - Tukang Kayu 0.070 OH 69,825.00 4,887.75 - Kepala Tukang 0.007 OH 74,650.00 522.55 - Mandor 0.0040 OH 80,400.00 321.60
Rp. 24,005.90
Pasang 1 M2 Langit - langit asbes semen, tebal 4mm,5mm,6mm
m2
I.5 Rp 33,101.00
I.5.1 Bahan Koefesien Satuan Harga Jumlah- Triplek 0.375 Lbr 50,000.00 18,750.00 - paku tripleks 0.030 Kg 18,000.00 540.00
I.5.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.005 OH 80,400.00 402.00
Rp. 33,101.00
I.5.a Rp 14,351.00
I.5a.1 Bahan Koefesien Satuan Harga Jumlah- Triplek 0.375 Lbr - - - paku tripleks 0.030 Kg 18,000.00 540.00
I.5a.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.005 OH 80,400.00 402.00
Rp. 14,351.00
I.5.b Rp 41,711.00
I.5.b.1 Bahan Koefesien Satuan Harga Jumlah- Triplek 0.375 Lbr 62,000.00 23,250.00 - paku tripleks 0.030 Kg 155,000.00 4,650.00
I.5.b.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Kayu 0.100 OH 69,825.00 6,982.50 - Kepala Tukang 0.010 OH 74,650.00 746.50 - Mandor 0.005 OH 80,400.00 402.00
Rp. 41,711.00
I.10 Rp 22,875.70
I.10.1 Bahan Koefesien Satuan Harga Jumlah- list kayu profil 1.050 M' 7,500.00 7,875.00 - Paku 0.010 Kg 18,000.00 180.00
I.10.2 Tenaga- Pekerja 0.050 OH 56,800.00 2,840.00 - Tukang Kayu 0.050 OH 69,825.00 3,491.25 - Kepala Tukang 0.005 OH 74,650.00 373.25 - Mandor 0.003 OH 80,400.00 241.20
Rp. 22,875.70
I.10.a Pasang 1 M2 Langit-Langit Calsiboard uk (120x240) mm, tebal 6mm Rp 295,322.60
I.10a.1 Bahan Koefesien Satuan Harga Jumlah- Besi Hollow + Accessories 1.200 Batang 125,000.00 150,000.00 - Calsiboard 120x240x6 mm 0.364 Lbr 175,000.00 63,700.00
I.10a.2 Tenaga- Pekerja 0.280 OH 56,800.00 15,904.00 - Tukang 0.800 OH 69,825.00 55,860.00 - Kepala Tukang 0.080 OH 74,650.00 5,972.00 - Mandor 0.0140 OH 80,400.00 1,125.60
Rp. 295,322.60
Pasang 1 M2 Langit - langit tripleks ukuran (120 x 240) cm,tebal 3mm
Pasang 1 M2 Langit - langit (langit-langit lama digunakan kembali)
Pasang 1 M2 Langit - langit tripleks ukuran (120 x 240) cm,tebal 4mm
Memasang 1 M' list langit-langit kayu profil
I.10b Pasang 1 M2 Dinding Partisi Calsiboard uk (120x240) mm, tebal 6mm Rp 459,022.60
I.10b.1 Bahan Koefesien Satuan Harga Jumlah- Besi Canal C (Baja Ringan) 1.000 250,000.00 250,000.00 - Paku Skrup 0.110 Kg 25,100.00 2,761.00 - Calsiboard 120x240x6 mm 0.728 Lbr 175,000.00 127,400.00
I.10b.2 Tenaga- Pekerja 0.280 OH 56,800.00 15,904.00 - Tukang 0.800 OH 69,825.00 55,860.00 - Kepala Tukang 0.080 OH 74,650.00 5,972.00 - Mandor 0.0140 OH 80,400.00 1,125.60
Rp. 459,022.60
J.1 Memasang 1 buah Kloset Duduk/Monoblok Rp 2,355,528.15
J.1.1 Bahan Koefesien Satuan Harga Jumlah- Kloset duduk/monoblok 1.000 Bh 1,960,700.00 1,960,700.00 - Perlengkapan 6 % Harga Kloset 117,642.00 117,642.00
J.1.2 Tenaga- Pekerja 3.300 OH 56,800.00 187,440.00 - Tukang Batu 1.100 OH 69,825.00 76,807.50 - Kepala Tukang 0.001 OH 74,650.00 74.65 - Mandor 0.160 OH 80,400.00 12,864.00
Rp. 2,355,528.15
J.2 Memasang 1 buah Kloset Jongkok Porselen Rp 445,516.50
J.2.1 Bahan Koefesien Satuan Harga Jumlah- Kloset Jongkok Porselen 1.000 Bh 150,000.00 150,000.00 - Semen Portland (PC) 6.000 Kg 1,370.00 8,220.00 - Pasir Pasang (PP) 0.010 92,000.00 920.00
J.2.2 Tenaga- Pekerja 1.000 OH 56,800.00 56,800.00 - Tukang Batu 1.500 OH 69,825.00 104,737.50 - Kepala Tukang 1.500 OH 74,650.00 111,975.00 - Mandor 0.160 OH 80,400.00 12,864.00
Rp. 445,516.50
J.5 Memasang 1 buah Wastafel Rp 561,783.75
J.5.1 Bahan Koefesien Satuan Harga Jumlah- Wastafel 1.000 Bh 325,000.00 325,000.00 - Perlengkapan 12% Harga Wastafel 39,000.00 39,000.00 - Semen Abu - abu 6.000 Kg 1,370.00 8,220.00 - Pasir Pasang (PP) 0.010 92,000.00 920.00
J.5.2 Tenaga- Pekerja 1.200 OH 56,800.00 68,160.00 - Tukang Batu 1.450 OH 69,825.00 101,246.25 - Kepala Tukang 0.150 OH 74,650.00 11,197.50 - Mandor 0.100 OH 80,400.00 8,040.00
Rp. 561,783.75
J.7 Rp 664,422.50
J.7.1 Bahan Koefesien Satuan Harga Jumlah- Bak Fibreglass 1.000 Bh 275,000.00 275,000.00 - Perlengkapan 18 % Harga Bak 49,500.00 49,500.00
J.7.2 Tenaga- Pekerja 1.800 OH 56,800.00 102,240.00 - Tukang Batu 2.700 OH 69,825.00 188,527.50 - Kepala Tukang 0.540 OH 74,650.00 40,311.00
m2
M3
M3
Memasang 1 buah Bak Mandi Fibreglass volume 0,5 m3
- Mandor 0.110 OH 80,400.00 8,844.00 Rp. 664,422.50
J.19 Memasang 1 M2 Pagar Kawat Duri Jarak 25 cm Rp 43,222.49
J.19.1 Bahan Koefesien Satuan Harga Jumlah- Kawat Duri (30 m / roll) 0.192 Bh 65,000.00 12,458.33
J.19.2 Tenaga- Pekerja 0.3333 OH 56,800.00 18,933.33 - Tukang Las 0.1667 OH 69,825.00 11,637.50 - Kepala Tukang Las 0.0025 OH 74,650.00 186.63 - Mandor 0.0001 OH 80,400.00 6.70
Rp. 43,222.49
J.19.a Memasang 1 M2 Pagar Kawat Duri Jarak 10 cm Rp 50,264.16
J.19.a.1 Bahan Koefesien Satuan Harga Jumlah- Kawat Duri (30 m / roll) 0.300 Bh 65,000.00 19,500.00
J.19.a.2 Tenaga- Pekerja 0.3333 OH 56,800.00 18,933.33 - Tukang Las 0.1667 OH 69,825.00 11,637.50 - Kepala Tukang Las 0.0025 OH 74,650.00 186.63 - Mandor 0.0001 OH 80,400.00 6.70
Rp. 50,264.16
K.11 Rp 257,064.71
K.11.1 Bahan Koefesien Satuan Harga Jumlah- Profil Alluminium 1.100 m' 224,300.00 246,730.00 - Skrup fixer 2.000 Buah 2,200.00 4,400.00 - Sealant 0.060 Tube -
K.11.2 Tenaga- Pekerja 0.043 OH 56,800.00 2,442.40 - tukang khusus alluminium 0.043 OH 69,825.00 3,002.48 - Kepala Tukang 0.0043 OH 74,650.00 321.00 - Mandor 0.0021 OH 80,400.00 168.84
Rp. 257,064.71
K.13 Rp 5,032,676.98
K.13.1 Bahan Koefesien Satuan Harga Jumlah- Jendela / Pintu Alumunium 4.400 M' 961,100.00 4,228,840.00 - Profil Kaca 4.500 M' 176,000.00 792,000.00 - Sealant 0.270 Tube
K.13.2 Tenaga- Pekerja 0.085 OH 56,800.00 4,828.00 - tukang alluminium 0.085 OH 69,825.00 5,935.13 - Kepala Tukang 0.009 OH 74,650.00 671.85 - Mandor 0.005 OH 80,400.00 402.00
Rp. 5,032,676.98
K.18 Rp 120,455.25
K.18.1 Bahan Koefesien Satuan Harga Jumlah- seng plat 1.050 17,500.00 18,375.00 - paku 1 cm - 2.5 cm 0.015 kg 18,000.00 270.00 - papan kayu kelas III 0.019 3,150,000.00 59,850.00
K.18.2 Tenaga- Pekerja 0.200 OH 56,800.00 11,360.00 - Tukang 0.400 OH 69,825.00 27,930.00 - Kepala Tukang 0.025 OH 74,650.00 1,866.25 - Mandor 0.010 OH 80,400.00 804.00
Rp. 120,455.25
1 m1 Pasang kusen pintu alluminium 4/7
1 m2 Pasang pintu/Jendela rangka alluminium
1 m' Pasang talang datar/jurai seng bjls28 lebar 90 cm
M'
m3
L.35 Rp 179,265.67
L.35.1 Bahan Koefesien Satuan Harga Jumlah- Keramik 30 x 30 cm (Polos) 11.870 Bh 6,091.00 72,300.17 - Semen Portland (PC) 10.000 Kg 1,370.00 13,700.00 - Pasir Pasang (PP) 0.045 92,000.00 4,140.00 - Semen warna 1.500 Kg 13,000.00 19,500.00
L.35.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Batu 0.350 OH 69,825.00 24,438.75 - Kepala Tukang 0.035 OH 74,650.00 2,612.75 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 179,265.67
L.35.a Rp 180,630.00
L.35.a.1 Bahan Koefesien Satuan Harga Jumlah- Keramik 40 x 40 cm (Polos) 6.500 Bh 11,333 73,664.50 - Semen Portland (PC) 10.000 Kg 1,370.00 13,700.00 - Pasir Pasang (PP) 0.045 92,000.00 4,140.00 - Semen warna 1.500 Kg 13,000.00 19,500.00
L.35.a.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Batu 0.350 OH 69,825.00 24,438.75 - Kepala Tukang 0.035 OH 74,650.00 2,612.75 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 180,630.00
L.35.b Rp 180,559.50
L.35.b.1 Bahan Koefesien Satuan Harga Jumlah- Keramik 30 x 30 cm (Motif) 11.870 Bh 6,200 73,594.00 - Semen Portland (PC) 10.000 Kg 1,370.00 13,700.00 - Pasir Pasang (PP) 0.045 92,000.00 4,140.00 - Semen warna 1.500 Kg 13,000.00 19,500.00
L.35.b.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Batu 0.350 OH 69,825.00 24,438.75 - Kepala Tukang 0.035 OH 74,650.00 2,612.75 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 180,559.50
L.35.c Rp 182,798.83
L.35.c.1 Bahan Koefesien Satuan Harga Jumlah- Keramik 40 x 40 cm (Motif) 6.500 Bh 11,667 75,833.33 - Semen Portland (PC) 10.000 Kg 1,370.00 13,700.00 - Pasir Pasang (PP) 0.045 92,000.00 4,140.00 - Semen warna 1.500 Kg 13,000.00 19,500.00
L.35.c.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Batu 0.350 OH 69,825.00 24,438.75 - Kepala Tukang 0.035 OH 74,650.00 2,612.75 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 182,798.83
1 M2 pasang lantai Keramik 30 x 30 cm (Polos)
M3
1 M2 pasang lantai Keramik 40 x 40 cm (Polos)
M3
1 M2 pasang lantai Keramik 30 x 30 cm (Motif)
M3
1 M2 pasang lantai Keramik 40 x 40 cm (Motif)
M3
L.36 Rp 167,373.50
L.36.1 Bahan Koefesien Satuan Harga Jumlah- Ubin keramik 20 x 20 cm 26.500 Bh 2,200.00 58,300.00 - Semen Portland (PC) 10.400 Kg 1,370.00 14,248.00 - Pasir Pasang (PP) 0.045 92,000.00 4,140.00 - Semen warna 1.620 Kg 13,000.00 21,060.00
L.36.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Batu 0.350 OH 69,825.00 24,438.75 - Kepala Tukang 0.035 OH 74,650.00 2,612.75 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 167,373.50
L.36.a Rp 175,323.50
L.36.1 Bahan Koefesien Satuan Harga Jumlah- Keramik Anti Selip / Sponeng (20x20) 26.500 Bh 2,500.00 66,250.00 - Semen Portland (PC) 10.400 Kg 1,370.00 14,248.00 - Pasir Pasang (PP) 0.045 92,000.00 4,140.00 - Semen warna 1.620 Kg 13,000.00 21,060.00
L.36.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Batu 0.350 OH 69,825.00 24,438.75 - Kepala Tukang 0.035 OH 74,650.00 2,612.75 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 175,323.50
L.58 Rp 330,943.00
L.58.1 Bahan Koefesien Satuan Harga Jumlah- batu tempel hitam 1.100 220,000.00 242,000.00 - Semen Portland (PC) 11.750 Kg 1,370.00 16,097.50 - Pasir Pasang (PP) 0.0350 92,000.00 3,220.00
L.58.2 Tenaga- Pekerja 0.700 OH 56,800.00 39,760.00 - Tukang Batu 0.350 OH 69,825.00 24,438.75 - Kepala Tukang 0.035 OH 74,650.00 2,612.75 - Mandor 0.035 OH 80,400.00 2,814.00
Rp. 330,943.00
L.80 Memasang 1 M2 Paving Block Natural Segi 4 T = 6 cm Rp 134,305.00
L.80.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Natural Segi 4 T = 6 cm ( 1.010 M2 70,000.00 70,700.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.80.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 134,305.00
1 M2 pasang Lantai keramik ukuran (20 x 20) cm
M3
1 M2 pasang Lantai keramik Anti Slip ukuran (20 x 20) cm
M3
1 M2 pasang dinding batu tempel hitam
m2
M3
M3
L.81 Memasang 1 M2 Paving Block Warna Segi 4 T = 6 cm Rp 134,305.00
L.81.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Warna Segi 4 T = 6 cm ( 1.010 M2 70,000.00 70,700.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.81.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 134,305.00
L.82 Memasang 1 M2 Paving Block Natural Segi 4 T = 8 cm Rp 154,505.00
L.82.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Natural Segi 4 T = 8 cm ( 1.010 M2 90,000.00 90,900.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.82.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 154,505.00
L.83 Memasang 1 M2 Paving Block Warna Segi 4 T = 8 cm Rp 154,505.00
L.83.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Warna Segi 4 T = 8 cm ( 1.010 M2 90,000.00 90,900.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.83.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 154,505.00
L.84 Memasang 1 M2 Paving Block Natural Segi 6 T = 6 cm Rp 134,305.00
L.84.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Natural Segi 6 T = 6 cm ( 1.010 M2 70,000.00 70,700.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.84.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 134,305.00
L.85 Memasang 1 M2 Paving Block Warna Segi 6T = 6 cm Rp 134,305.00
L.85.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Warna Segi 6T = 6 cm (2 1.010 M2 70,000.00 70,700.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.85.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 134,305.00
M3
M3
M3
M3
M3
L.86 Memasang 1 M2 Paving Block Natural Segi 6 T = 8 cm Rp 154,505.00
L.86.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Natural Segi 6 T = 8 cm 1.010 M2 90,000.00 90,900.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.86.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 154,505.00
L.87 Memasang 1 M2 Paving Block Warna Segi 6 T = 8cm Rp 154,505.00
L.87.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Warna Segi 6 T = 8cm ( 1.010 M2 90,000.00 90,900.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.87.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 154,505.00
L.88 Memasang 1 M2 Paving Block Natural 3 Berlian T = 6 cm Rp 134,305.00
L.88.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Natural 3 Berlian T = 6 c 1.010 M2 70,000.00 70,700.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.88.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 134,305.00
L.89 Memasang 1 M2 Paving Block Warna 3 Berlian T = 6 cm Rp 134,305.00
L.89.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Warna 3 Berlian T = 6 c 1.010 M2 70,000.00 70,700.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.89.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 134,305.00
L.90 Memasang 1 M2 Paving Block Natural 3 Berlian T = 8 cm Rp 154,505.00
L.90.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block Natural 3 Berlian T = 8 c 1.010 M2 90,000.00 90,900.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.90.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 154,505.00
M3
M3
M3
M3
M3
L.91 Memasang 1 M2 Paving Block warna 3 Berlian T = 8 cm Rp 154,505.00
L.91.1 Bahan Koefesien Satuan Harga Jumlah- Paving Block warna 3 Berlian T = 8 cm 1.010 M2 90,000.00 90,900.00 - Pasir Urug 0.100 87,500.00 8,750.00
L.91.2 Tenaga- Pekerja 0.250 OH 56,800.00 14,200.00 - Tukang Batu 0.500 OH 69,825.00 34,912.50 - Kepala Tukang 0.050 OH 74,650.00 3,732.50 - Mandor 0.025 OH 80,400.00 2,010.00
Rp. 154,505.00
M.7 Rp 26,028.75
M.7.1 Bahan Koefesien Satuan Harga Jumlah- Plamir 0.150 Kg 20,900.00 3,135.00 - Cat Dasar 0.170 Kg 38,000.00 6,460.00 - Cat Penutup 0.170 Kg 38,000.00 6,460.00
M.7.2 Tenaga- Pekerja 0.070 OH 56,800.00 3,976.00 - Tukang Cat 0.075 OH 69,825.00 5,236.88 - Kepala Tukang 0.0075 OH 74,650.00 559.88 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 26,028.75
M.8 Rp 33,528.33 1 lapis cat dasar, 2 lapis cat penutup
M.8.1 Bahan Koefesien Satuan Harga Jumlah- Cat Meni 0.200 Kg 44,000.00 8,800.00 - Plamir 0.150 Kg 20,900.00 3,135.00 - Cat Dasar 0.170 Kg 38,000.00 6,460.00 - Cat Penutup 2 kali 0.260 Kg 38,000.00 9,880.00
M.8.2 Tenaga- Pekerja 0.070 OH 56,800.00 3,976.00 - Tukang Cat 0.009 OH 69,825.00 628.43 - Kepala Tukang 0.006 OH 74,650.00 447.90 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 33,528.33
M.11 Rp 34,424.90
M.11.1 Bahan Koefesien Satuan Harga Jumlah- Politur 0.520 Ltr 42,000.00 21,840.00 - Ampelas 2.000 Lbr 3,500.00 7,000.00
M.11.2 Tenaga- Pekerja - OH 56,800.00 - - Tukang Cat 0.060 OH 69,825.00 4,189.50 - Kepala Tukang 0.016 OH 74,650.00 1,194.40 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 34,424.90
M3
1 M2 Pengecatan Bidang Kayu Lama
1 M2 Pengecatan Bidang Kayu Baru (1 lapis plamir),
1 M2 Pelaburan bidang kayu dengan Politur
M.12 Rp 11,412.40
M.12.1 Bahan Koefesien Satuan Harga Jumlah- Residu atau ter 0.350 Ltr 15,000.00 5,250.00
M.12.2 Tenaga- Pekerja 0.100 OH 56,800.00 5,680.00 - Tukang Cat - OH 69,825.00 - - Kepala Tukang - OH 74,650.00 - - Mandor 0.006 OH 80,400.00 482.40
Rp. 11,412.40
M.14 Rp 18,150.27 1 lapis cat dasar, 2 lapis cat penutup)
M.14.1 Bahan Koefesien Satuan Harga Jumlah- Plamir 0.100 Kg 42,400.00 4,240.00 - Cat Dasar 0.100 Kg 21,400.00 2,140.00 - Cat Penutup 2 x 0.260 Kg 21,400.00 5,564.00
M.14.2 Tenaga- Pekerja 0.020 OH 56,800.00 1,136.00 - Tukang Cat 0.063 OH 69,825.00 4,398.98 - Kepala Tukang 0.0063 OH 74,650.00 470.30 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 18,150.27
M.15 Rp 11,457.58 2 lapis cat penutup)
M.15.1 Bahan Koefesien Satuan Harga Jumlah- Cat Dasar 0.120 Kg 21,400.00 2,568.00 - Cat Penutup 2 x 0.180 Kg 21,400.00 3,852.00
M.15.2 Tenaga- Pekerja 0.028 OH 56,800.00 1,590.40 - Tukang Cat 0.042 OH 69,825.00 2,932.65 - Kepala Tukang 0.0042 OH 74,650.00 313.53 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 11,457.58
M.15.a 1 M2 Pengecatan Atap Seng Gelombang Dgn Cat Genteng Rp 25,367.58 2 (Dua) Kali Pengecatan
M.15.a.1 Bahan Koefesien Satuan Harga Jumlah- Cat Dasar 0.250 Kg 44,000.00 11,000.00 - Meni Besi 0.200 Kg 44,900.00 8,980.00 - Kuas Cat 0.050 Kg 7,000.00 350.00
M.15.a.2 Tenaga- Pekerja 0.028 OH 56,800.00 1,590.40 - Tukang Cat 0.042 OH 69,825.00 2,932.65 - Kepala Tukang 0.0042 OH 74,650.00 313.53 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 25,367.58
1 M2 Pelaburan bidang kayu dengan cat residu dan ter
1 M2 Pengecatan tembok baru (1 lapis plamir,
1 M2 Pengecatan tembok lama (1 lapis cat dasar,
M.24 Rp 20,976.58 sistem 3 lapis cat konvensional dengan tebal 200 um
M.24.1 Bahan Koefesien Satuan Harga Jumlah- Cat Dasar 0.110 Kg 44,900.00 4,939.00 - Cat Antara 0.170 Kg 44,000.00 7,480.00 - Cat Penutup 0.080 Kg 44,000.00 3,520.00
M.24.2 Tenaga- Pekerja 0.028 OH 56,800.00 1,590.40 - Tukang Cat 0.042 OH 69,825.00 2,932.65 - Kepala Tukang 0.0042 OH 74,650.00 313.53 - Mandor 0.0025 OH 80,400.00 201.00
Rp. 20,976.58
1 M2 Pengecatan permukaan baja lapis seng secara manual
DAFTAR REKAPITULASI ANALISA HARGA SATUAN
NO SAT URAIAN ANALISA HARGA SATUAN
1 B.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter Rp 44,610.00
2 B.9 1 M3 Urugan Kembali Rp 15,004.00
3 B.10 1 M3 Pemadatan Tanah ( Per 20 cm ) Rp 32,420.00
4 B.10.a Mengurug dan Memadatkan 1 M3 Tanah Rp 75,444.00
5 B.11 Mengurug 1 M3 Pasir Urug Rp 122,844.00
6 C.3 Memasang 1 M3 Pondasi Batu Belah, campuran 1 Pc : 5 PP Rp 505,565.50
7 C.9 Memasang 1 M3 Batu Kosong (anstamping) Rp 235,382.70
8 D.3 Memasang 1 M2 Plesteran 1 Pc : 3 PP, Tebal 15 mm Rp 42,608.62
9 D.5 Memasang 1 M2 Plesteran 1 Pc : 5 PP, Tebal 15 mm Rp 39,333.58
10 D.26 Memasang 1 M2 Finising Siar Pasangan Batu Kali Adukan 1 PC : 2 PP Rp 39,629.30
11 D.27 Memasang 1 M2 Acian Rp 24,345.50
12 E.8 Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm Rp 94,841.90
13 E.8.a 1 M2 Pasangan Rollag Bata, 1 Pc : 3 PP Rp 196,463.50
14 E.10 Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm Rp 88,876.60
15 F.3 Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150) Rp 879,375.27
16 F.4 Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100) Rp 760,532.00
17 F.5 Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175) Rp 913,190.27
18 F.17 Kg Pembesian 10 Kg dengan Besi Polos atau Besi Ulir Rp 143,657.90
19 F.17.a Kg Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Rp 14,365.79
20 F.21 Memasang 1 m2 begisting Sloof Rp 197,971.80
21 F.22 Memasang 1 m2 begisting Untuk Kolom Rp 341,621.90
22 F.23 Memasang 1 m2 begisting Untuk Balok Rp 352,646.90
23 F.24 Memasang 1 m2 begisting Untuk Plat Lantai Rp 438,821.90
24 F.28 Membuat 1 M3 pondasi beton bertulang (150 Kg besi + begisting) Rp 3,913,214.93
25 F.29 Membuat 1 M3 sloof beton bertulang (200 Kg besi + begisting) Rp 4,879,439.03
26 F.29.a Membuat 1 M3 sloof beton bertulang 15/20 Rp 6,482,837.82
27 F.29.b Membuat 1 M3 sloof beton bertulang 12/20 Rp 6,773,113.96
28 F.29.c Membuat 1 M3 sloof beton bertulang 12/15 Rp 6,675,828.83
29 F.29.d Membuat 1 M3 sloof beton bertulang 11/15 Rp 7,180,326.57
30 F.30 Membuat 1 M3 kolom beton bertulang (300 Kg besi + begisting) Rp 8,244,470.78
31 F.30.a Membuat 1 M3 kolom beton bertulang 15/15 Rp 12,715,573.98
32 F.30.b Membuat 1 M3 kolom beton bertulang 20/20 Rp 9,338,449.61
33 F.30.c Membuat 1 M3 kolom beton bertulang 15/15 Rp 12,022,167.94
34 F.30.d Membuat 1 M3 kolom beton bertulang 11/11 Rp 17,079,424.36
35 F.31 Membuat 1 M3 balok beton bertulang (200 Kg besi + begisting) Rp 6,329,843.78
36 F.31.a Membuat 1 M3 balok latei beton bertulang 12/15 Rp 9,253,747.16
37 F.31.b Membuat 1 M3 balok latei beton bertulang 11/13 Rp 10,402,746.09
38 F.31.c Membuat 1 M3 balok beton bertulang 12/20 Rp 9,377,495.99
39 F.31.d Membuat 1 M3 balok gantung beton bertulang 15/20 Rp 10,067,851.01
40 F.32 Membuat 1 M3 plat beton bertulang (150 Kg besi + begisting) Rp 5,851,288.88
41 F.32.a Membuat 1 M3 Plat beton bertulang Tebal 8 cm Rp 8,331,527.58
42 F.32.b Membuat 1 M3 Plat beton bertulang Tebal 6 cm Rp 10,804,306.68
43 F.33 Membuat 1 M3 dinding beton bertulang (150 Kg besi + begisting) Rp 5,460,892.43
44 F.36 M' Membuat 1 M' kolom praktis beton bertulang (10 x 15) cm Rp 93,749.78
45 G.2 Membuat dan Memasang 1 M3 Kusen Pintu dan Kusen Jendela Rp 6,216,140.00
46 G.5 Membuat dan Memasang 1 M2 Daun Pintu Panel Rp 476,140.00
47 G.6 Membuat dan Memasang 1 M2 Pintu dan Jendela Kaca Rp 511,102.00
KODE ANALISA
HARGA SATUAN ( Rp )
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M3
M3
M3
M2
M2
M2
M2
M3
M3
M3
M3
M3
M4
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
48 G.6.a 1 M2 Pasang Kaca Polos 5 mm Rp 188,501.78
49 G.7 Membuat dan Memasang 1 M2 Pintu dan Jendela Jalusi Kayu Rp 552,140.00
50 G.8 Membuat dan Memasang 1 M2 Pintu Kayu Lapis (Teakwood) rangkap Rp 406,673.00
51 G.8.a Membuat dan Memasang 1 M2 Pintu Kayu Lapis (Teakwood) Rp 618,730.00
52 G.12 Membuat dan Memasang 1 M2 teakwood rangkap lapis formika Rp 534,066.70
53 G.13 Membuat dan Memasang 1 M3 konstruksi kuda-kuda konvensional Rp 5,310,410.00
54 G.13a Membuat dan Memasang 1 M3 konstruksi kuda-kuda konvensional Rp 1,267,910.00
55 G.14 Membuat dan Memasang 1 M3 konstruksi kuda-kuda expose Rp 6,468,173.00
56 G.15 Membuat dan Memasang 1 M3 konstruksi gordeng Rp 4,805,706.00
57 G.15.a Membuat dan Memasang 1 M3 konstruksi gordeng Rp 763,206.00
58 G.16 Membuat dan Memasang 1 M2 rangka atap genteng Pres Lokal Rp 81,991.00
59 G.19 Membuat dan Memasang 1 M2 rangka langit-langit Rp 97,132.00
60 G.19a Membuat dan Memasang 1 M2 rangka langit-langit Rp 40,537.00
61 G.20 Membuat dan Memasang 1 M2 rangka langit-langit (60 x 60) cm Rp 98,753.50
62 G.21 M' Membuat dan Memasang 1 M' lisplank ukuran (3 x 20) cm Rp 63,980.00
63 G.21.a M' Membuat dan Memasang 1 M' lisplank ukuran (1 x 20) cm Rp 62,540.00
64 G.22 M' Membuat dan Memasang 1 M1 lisplank ukuran (3 x 30) cm Rp 63,280.00
65 G.24 Memasang 1 M2 dinding pemisah teakwood rangkap Rp 286,743.70
66 H.3 1 M2 Pasang Atap Genteng Press Lokal Rp 37,800.60
67 H.6 M' 1 M' Pasang Bubung Genteng Press Lokal Rp 81,242.80
68 H.32 1 M2 Pasang Atap Genteng Metal Rp 68,069.40
69 H.32.a 1 M2 Pasang Atap Genteng Zincalum Rp 98,969.40
70 H.32.b 1 M2 Pasang Atap Genteng Zincalum Berpasir Rp 166,169.40
71 H.36.a M' 1 M' Pasang Bubungan Genteng Zincalum Rp 66,238.70
72 H.36.b M' 1 M' Pasang Bubungan Genteng Zincalum Berpasir Rp 91,208.70
73 H.38 1 M2 Pasang Atap Seng Gelombang Rp 64,564.80
74 H.38.a 1 M2 Pasang Atap Seng Gelombang Rp 12,295.80
75 H.38.b 1 M2 Pasang Atap Seng Galvalum Rp 56,395.80
76 H.38.c 1 M2 Pasang Bubungan Seng Galvalum Rp 46,306.50
77 I.1 Pasang 1 M2 Langit - langit asbes semen, tebal 4mm,5mm,6mm Rp 24,005.90
78 I.5 Pasang 1 M2 Langit - langit tripleks ukuran (120 x 240) cm,tebal 3mm Rp 33,101.00
79 I.5.a Pasang 1 M2 Langit - langit (langit-langit lama digunakan kembali) Rp 14,351.00
80 I.5.b Pasang 1 M2 Langit - langit tripleks ukuran (120 x 240) cm,tebal 4mm Rp 41,711.00
81 I.10 M' Memasang 1 M' list langit-langit kayu profil Rp 22,875.70
82 I.10.a Pasang 1 M2 Langit-Langit Calsiboard uk (120x240) mm, tebal 6mm Rp 295,322.60
83 I.10b Pasang 1 M2 Dinding Partisi Calsiboard uk (120x240) mm, tebal 6mm Rp 459,022.60
84 J.1 Bh Memasang 1 buah Kloset Duduk/Monoblok Rp 2,355,528.15
85 J.2 Bh Memasang 1 buah Kloset Jongkok Porselen Rp 445,516.50
86 J.5 Bh Memasang 1 buah Wastafel Rp 561,783.75
87 J.7 Bh Memasang 1 buah Bak Mandi Fibreglass volume 0,5 m3 Rp 664,422.50
88 J.19 Bh Memasang 1 M2 Pagar Kawat Duri Jarak 25 cm Rp 43,222.49
89 J.19.a Bh Memasang 1 M2 Pagar Kawat Duri Jarak 10 cm Rp 50,264.16
90 K.11 M' 1 m1 Pasang kusen pintu alluminium 4/7 Rp 257,064.71
91 K.13 1 m2 Pasang pintu/Jendela rangka alluminium Rp 5,032,676.98
92 K.18 M' 1 m' Pasang talang datar/jurai seng bjls28 lebar 90 cm Rp 120,455.25
93 L.35 1 M2 pasang lantai Keramik 30 x 30 cm (Polos) Rp 179,265.67
94 L.35.a 1 M2 pasang lantai Keramik 40 x 40 cm (Polos) Rp 180,630.00
95 L.35.b 1 M2 pasang lantai Keramik 30 x 30 cm (Motif) Rp 180,559.50
96 L.35.c 1 M2 pasang lantai Keramik 40 x 40 cm (Motif) Rp 182,798.83
97 L.36 1 M2 pasang Lantai keramik ukuran (20 x 20) cm Rp 167,373.50
98 L.36.a 1 M2 pasang Lantai keramik Anti Slip ukuran (20 x 20) cm Rp 175,323.50
99 L.58 1 M2 pasang dinding batu tempel hitam Rp 330,943.00
100 L.80 Memasang 1 M2 Paving Block Natural Segi 4 T = 6 cm Rp 134,305.00
101 L.81 Memasang 1 M2 Paving Block Warna Segi 4 T = 6 cm Rp 134,305.00
102 L.82 Memasang 1 M2 Paving Block Natural Segi 4 T = 8 cm Rp 154,505.00
M2
M2
M2
M2
M2
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
103 L.83 Memasang 1 M2 Paving Block Warna Segi 4 T = 8 cm Rp 154,505.00
104 L.84 Memasang 1 M2 Paving Block Natural Segi 6 T = 6 cm Rp 134,305.00
105 L.85 Memasang 1 M2 Paving Block Warna Segi 6T = 6 cm Rp 134,305.00
106 L.86 Memasang 1 M2 Paving Block Natural Segi 6 T = 8 cm Rp 154,505.00
107 L.87 Memasang 1 M2 Paving Block Warna Segi 6 T = 8cm Rp 154,505.00
108 L.88 Memasang 1 M2 Paving Block Natural 3 Berlian T = 6 cm Rp 134,305.00
109 L.89 Memasang 1 M2 Paving Block Warna 3 Berlian T = 6 cm Rp 134,305.00
110 L.90 Memasang 1 M2 Paving Block Natural 3 Berlian T = 8 cm Rp 154,505.00
111 L.91 Memasang 1 M2 Paving Block warna 3 Berlian T = 8 cm Rp 154,505.00
112 M.7 1 M2 Pengecatan Bidang Kayu Lama Rp 26,028.75
113 M.8 1 M2 Pengecatan Bidang Kayu Baru (1 lapis plamir), Rp 33,528.33
1 lapis cat dasar, 2 lapis cat penutup
114 M.11 1 M2 Pelaburan bidang kayu dengan Politur Rp 34,424.90
115 M.12 1 M2 Pelaburan bidang kayu dengan cat residu dan ter Rp 11,412.40
116 M.14 1 M2 Pengecatan tembok baru (1 lapis plamir, Rp 18,150.27
1 lapis cat dasar, 2 lapis cat penutup)
117 M.15 1 M2 Pengecatan tembok lama (1 lapis cat dasar, Rp 11,457.58
2 lapis cat penutup)
118 M.15.a 1 M2 Pengecatan Atap Seng Gelombang Dgn Cat Genteng Rp 25,367.58
2 (Dua) Kali Pengecatan
119 M.24 1 M2 Pengecatan permukaan baja lapis seng secara manual Rp 20,976.58
sistem 3 lapis cat konvensional dengan tebal 200 um
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Daftar Analisa Pek Dikdas 2014 83
DAFTAR ANALISA
B.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter Rp 44,610.00
B.1.1 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 0.750 OH 56,800.00 42,600.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 44,610.00
B.1.a Membersihkan 1 m² lapangan dan perataan Rp 9,700.00
B.1.a.1 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 0.100 OH 56,800.00 5,680.00
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 9,700.00
B.2 1 M3 Galian Tanah Biasa Sedalam 2 Meter Rp 54,738.00
B.2.1 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 0.900 OH 56,800.00 51,120.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.045 OH 80,400.00 3,618.00
Rp. 54,738.00
B.3 1 M3 Galian Tanah Biasa Sedalam 3 Meter Rp 65,026.80
B.2.1 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 1.050 OH 56,800.00 59,640.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.067 OH 80,400.00 5,386.80
Rp. 65,026.80
B.7 Mengerjakan 1 m² stripping tebing setinggi 1 meter Rp 3,242.00
B.7.1 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 0.050 OH 56,800.00 2,840.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.005 OH 80,400.00 402.00
Rp. 3,242.00
B.9 1 M3 Urugan Kembali Rp 14,870.00
B.9.1 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.008 OH 80,400.00 670.00
Rp. 14,870.00
B.10 1 M3 Pemadatan Tanah ( 20 cm ) Rp 32,420.00
B.10.1 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 0.500 OH 56,800.00 28,400.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 32,420.00
Daftar Analisa Pek Dikdas 2014 84
B.10.a Rp 75,444.00
B.10.a.1 Bahan Koefesien Satuan Harga Jumlah
- Tanah Urug 1.200 48,000.00 57,600.00
B.10.a.2 Tenaga Koefesien Satuan Harga Jumlah
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.010 OH 80,400.00 804.00
Rp. 75,444.00
B.11 Rp 122,844.00
B.11.1 Bahan Koefesien Satuan Harga Jumlah
- Pasir Urug 1.200 87,500.00 105,000.00
B.11.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.010 OH 80,400.00 804.00
Rp. 122,844.00
B.11.a Rp 334,884.00
B.11.a.1 Bahan Koefesien Satuan Harga Jumlah
- Kerikil Alam 2/3 Cm 1.200 264,200.00 317,040.00
B.11.a.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Gali - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.010 OH 80,400.00 804.00
Rp. 334,884.00
B.12 Memasang 1 m² lapisan ijuk tebal 10 cm Rp 85,926.00
B.12.1 Bahan Koefesien Satuan Harga Jumlah
- Ijuk 6.000 Kg 12,700.00 76,200.00
B.12.2 Tenaga
- Pekerja 0.150 OH 56,800.00 8,520.00
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 85,926.00
C.3 Rp 510,365.50
C.3.1 Bahan Koefesien Satuan Harga Jumlah
- Batu Belah 15/20 cm 1.200 104,000.00 124,800.00
- Semen Portland 136.000 Kg 1,370.00 186,320.00
- Pasir Pasang 0.544 92,000.00 50,048.00
C.3.2 Tenaga
- Pekerja 1.500 OH 56,800.00 85,200.00
- Tukang Batu 0.750 OH 69,825.00 52,368.75
- Kepala Tukang 0.075 OH 74,650.00 5,598.75
- Mandor 0.075 OH 80,400.00 6,030.00
Rp. 510,365.50
Mengurug 1 M3 Tanah
M3
Mengurug 1 M3 Pasir Urug
M3
Mengurug 1 M3 Koral
M3
Memasang 1 M3 Pondasi Batu Belah, campuran 1 Pc : 5 Ps
M3
M3
Daftar Analisa Pek Dikdas 2014 85
C.9 Rp 240,182.70
C.9.1 Bahan Koefesien Satuan Harga Jumlah
- Batu Belah 15/20 cm 1.200 104,000.00 124,800.00
- Pasir Urug 0.432 87,500.00 37,800.00
C.9.2 Tenaga
- Pekerja 0.780 OH 56,800.00 44,304.00
- Tukang Batu 0.390 OH 69,825.00 27,231.75
- Kepala Tukang 0.039 OH 74,650.00 2,911.35
- Mandor 0.039 OH 80,400.00 3,135.60
Rp. 240,182.70
D.3 Rp 42,608.62
D.3.1 Bahan Koefesien Satuan Harga Jumlah
- Semen Portland 7.776 Kg 1,370.00 10,653.12
- Pasir Pasang 0.023 92,000.00 2,116.00
D.3.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Batu 0.150 OH 69,825.00 10,473.75
- Kepala Tukang 0.015 OH 74,650.00 1,119.75
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 42,608.62
D.5 Rp 39,333.58
D.5.1 Bahan Koefesien Satuan Harga Jumlah
- Semen Portland 5.184 Kg 1,370.00 7,102.08
- Pasir Pasang 0.026 92,000.00 2,392.00
D.5.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Batu 0.150 OH 69,825.00 10,473.75
- Kepala Tukang 0.015 OH 74,650.00 1,119.75
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 39,333.58
D.26 Rp 38,525.30
D.27.1 Bahan Koefesien Satuan Harga Jumlah
- Semen Portland 6.340 Kg 1,370.00 8,685.80
D.27.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Batu 0.150 OH 69,825.00 10,473.75
- Kepala Tukang 0.015 OH 74,650.00 1,119.75
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 38,525.30
D.27 Rp 24,345.50
D.27.1 Bahan Koefesien Satuan Harga Jumlah
- Semen Portland 3.250 Kg 1,370.00 4,452.50
D.27.2 Tenaga
- Pekerja 0.200 OH 56,800.00 11,360.00
- Tukang Batu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.010 OH 80,400.00 804.00
Rp. 24,345.50
Memasang 1 M3 Batu Kosong (anstamping)
M3
M3
Memasang 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
M3
Memasang 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm
M3
Memasang 1 M2 Finising Siar
Memasang 1 M2 Acian
Daftar Analisa Pek Dikdas 2014 86
E.4 Rp 182,748.00
tebal 1 bata, campuran 1 Pc : 5 Ps
E.4.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 140.000 Bh 650.00 91,000.00
- Semen Portland 22.200 Kg 1,370.00 30,414.00
- Pasir Pasang 0.102 92,000.00 9,384.00
E.4.2 Tenaga
- Pekerja 0.600 OH 56,800.00 34,080.00
- Tukang Batu 0.200 OH 69,825.00 13,965.00
- Kepala Tukang 0.020 OH 74,650.00 1,493.00
- Mandor 0.030 OH 80,400.00 2,412.00
Rp. 182,748.00
E.4.a Rp 271,624.60
tebal 1 ½ bata, campuran 1 Pc : 5 Ps
E.4.a.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 210.000 Bh 650.00 136,500.00
- Semen Portland 31.880 Kg 1,370.00 43,675.60
- Pasir Pasang 0.147 92,000.00 13,524.00
E.4.a.2 Tenaga
- Pekerja 0.900 OH 56,800.00 51,120.00
- Tukang Batu 0.300 OH 69,825.00 20,947.50
- Kepala Tukang 0.030 OH 74,650.00 2,239.50
- Mandor 0.045 OH 80,400.00 3,618.00
Rp. 271,624.60
E.4.b Rp 135,124.60
tebal 1 ½ bata, campuran 1 Pc : 5 Ps (Bata Lama Digunakan Kembali)
E.4.b.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 210.000 Bh - -
- Semen Portland 31.880 Kg 1,370.00 43,675.60
- Pasir Pasang 0.147 92,000.00 13,524.00
E.4.b.2 Tenaga
- Pekerja 0.900 OH 56,800.00 51,120.00
- Tukang Batu 0.300 OH 69,825.00 20,947.50
- Kepala Tukang 0.030 OH 74,650.00 2,239.50
- Mandor 0.045 OH 80,400.00 3,618.00
Rp. 135,124.60
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Daftar Analisa Pek Dikdas 2014 87
E.4.c Rp 365,496.00
tebal 2 bata, campuran 1 Pc : 5 Ps
E.4.c.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 280.000 Bh 650.00 182,000.00
- Semen Portland 44.400 Kg 1,370.00 60,828.00
- Pasir Pasang 0.204 92,000.00 18,768.00
E.4.c.2 Tenaga
- Pekerja 1.200 OH 56,800.00 68,160.00
- Tukang Batu 0.400 OH 69,825.00 27,930.00
- Kepala Tukang 0.040 OH 74,650.00 2,986.00
- Mandor 0.060 OH 80,400.00 4,824.00
Rp. 365,496.00
E.8 Rp 94,841.90
tebal 1/2 bata, campuran 1 Pc : 3 Ps
E.8.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 70.000 Bh 650.00 45,500.00
- Semen Portland 14.370 Kg 1,370.00 19,686.90
- Pasir Pasang 0.040 92,000.00 3,680.00
E.8.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Batu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 94,841.90
E.10 Rp 88,876.60
tebal 1/2 bata, campuran 1 Pc : 5 Ps
E.10.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 70.000 Bh 650.00 45,500.00
- Semen Portland 9.680 Kg 1,370.00 13,261.60
- Pasir Pasang 0.045 92,000.00 4,140.00
E.10.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Batu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 88,876.60
E.10.a Rp 43,376.60
tebal 1/2 bata, campuran 1 Pc : 5 Ps (Bata Lama Digunakan Kembali)
E.10.a.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 70.000 Bh - -
- Semen Portland 9.680 Kg 1,370.00 13,261.60
- Pasir Pasang 0.045 92,000.00 4,140.00
E.10.a.2 Tenaga
- Pekerja 0.300 OH 56,800.00 17,040.00
- Tukang Batu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 43,376.60
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Memasang 1 M2 Dinding Bata Merah ukuran (5x11x22)cm
M3
Daftar Analisa Pek Dikdas 2014 88
E.11 Rp 196,463.50
E.11.1 Bahan Koefesien Satuan Harga Jumlah
- Bata Merah 5 x 11 x 22 Cm 140.000 Bh 650.00 91,000.00
- Semen Portland 32.950 Kg 1,370.00 45,141.50
- Pasir Pasang 0.091 92,000.00 8,372.00
-
E.11.2 Tenaga -
- Pekerja 0.600 OH 56,800.00 34,080.00
- Tukang Batu 0.200 OH 69,825.00 13,965.00
- Kepala Tukang 0.020 OH 74,650.00 1,493.00
- Mandor 0.030 OH 80,400.00 2,412.00
Rp. 196,463.50
F.3 Rp 773,415.27
slump (12 ± 2) cm, w/c = 0,72
F.3.1 Bahan Koefesien Satuan Harga Jumlah
- Semen Portland 299.000 Kg 1,370.00 409,630.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.720 265,000.00 190,800.00
F.3.2 Tenaga
- Pekerja 1.650 OH 56,800.00 93,720.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Kepala Tukang 0.028 OH 74,650.00 2,090.20
- Mandor 0.083 OH 80,400.00 6,673.20
Rp. 773,415.27
F.4 Rp 699,060.27
slump (3 - 6) cm, w/c = 0,87
F.4.1 Bahan Koefesien Satuan Harga Jumlah
- Semen Portland 230.000 Kg 1,370.00 315,100.00
- Pasir Beton 0.638 95,000.00 60,610.00
- Koral (maksimum 30 mm) 0.761 265,000.00 201,665.00
- Air
F.4.2 Tenaga
- Pekerja 1.650 OH 56,800.00 93,720.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Kepala Tukang 0.028 OH 74,650.00 2,090.20
- Mandor 0.083 OH 80,400.00 6,673.20
Rp. 699,060.27
F.5 Rp 821,820.27
slump (12 ± 2) cm, w/c = 0,66
F.5.1 Bahan Koefesien Satuan Harga Jumlah
- Semen Portland 326.000 Kg 1,370.00 446,620.00
- Pasir Beton 0.543 95,000.00 51,585.00
- Koral (maksimum 30 mm) 0.762 265,000.00 201,930.00
- Air
F.5.2 Tenaga
- Pekerja 1.650 OH 56,800.00 93,720.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Kepala Tukang 0.028 OH 74,650.00 2,090.20
- Mandor 0.083 OH 80,400.00 6,673.20
Rp. 821,820.27
1 M2 Pasangan Rollag Bata, 1 Pc : 3 Ps
M3
Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150)
M3
M3
Catatan : bobot pasir 1 m3 = 1.400 Kg , bobot kerikil 1 m3 = 1.350 Kg , buckling factor pasir = 20 %
Membuat 1 M3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100)
M3
M3
Membuat 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175)
M3
M3
Daftar Analisa Pek Dikdas 2014 89
F.17 Pembesian 10 Kg dengan Besi Polos atau Besi Ulir Rp 143,582.90
F.17.1 Bahan Koefesien Satuan Harga Jumlah
- Besi beton (polos/ulir) 10.500 Kg 12,500.00 131,250.00
- Kawat beton 0.150 Kg 17,500.00 2,625.00
F.17.2 Tenaga
- Pekerja 0.070 OH 56,800.00 3,976.00
- Tukang Besi 0.070 OH 69,825.00 4,887.75
- Kepala Tukang 0.007 OH 74,650.00 522.55
- Mandor 0.004 OH 80,400.00 321.60
Rp. 143,582.90
F.17.a Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Rp 14,358.29
F.17a.1 Bahan Koefesien Satuan Harga Jumlah
- Besi beton (polos/ulir) 1.0500 Kg 12,500.00 13,125.00
- Kawat beton 0.0150 Kg 17,500.00 262.50
F.17a.2 Tenaga
- Pekerja 0.0070 OH 56,800.00 397.60
- Tukang Besi 0.0070 OH 69,825.00 488.78
- Kepala Tukang 0.0007 OH 74,650.00 52.26
- Mandor 0.0004 OH 80,400.00 32.16
Rp. 14,358.29
F.21 Memasang 1 m3 begisting Sloof Rp 198,091.80
F.21.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Kelas III 0.0450 3,150,000.00 141,750.00
- Paku 5 cm - 10 cm 0.3000 Kg 15,400.00 4,620.00
- Minyak Begisting 0.1000 Liter - -
F.21.2 Tenaga
- Pekerja 0.5200 OH 56,800.00 29,536.00
- Tukang Kayu 0.2600 OH 69,825.00 18,154.50
- Kepala Tukang 0.0260 OH 74,650.00 1,940.90
- Mandor 0.0260 OH 80,400.00 2,090.40
Rp. 198,091.80
F.22 Memasang 1 m2 begisting Untuk Kolom Rp 287,606.80
F.22.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Kelas III 0.0400 3,150,000.00 126,000.00
- Paku 5 cm - 10 cm 0.4000 Kg 15,400.00 6,160.00
- Minyak Begisting 0.2000 Liter - -
Balok Kayu Kelas II 0.0150 3,675,000.00 55,125.00
Polywood tebal 9 mm 0.3500 Lbr 118,300.00 -
Dolken, Panjang 4 m 2.0000 Btng 24,300.00 48,600.00
F.22.2 Tenaga
- Pekerja 0.5200 OH 56,800.00 29,536.00
- Tukang Kayu 0.2600 OH 69,825.00 18,154.50
- Kepala Tukang 0.0260 OH 74,650.00 1,940.90
- Mandor 0.0260 OH 80,400.00 2,090.40
Rp. 287,606.80
m3
m3
m3
Daftar Analisa Pek Dikdas 2014 90
F.23 Memasang 1 m3 begisting Untuk Balok Rp 312,556.90
F.23.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Kelas III 0.0400 3,150,000.00 126,000.00
- Paku 5 cm - 10 cm 0.4000 Kg 15,400.00 6,160.00
- Minyak Begisting 0.2000 Liter - -
Balok Kayu Kelas II 0.0180 3,675,000.00 66,150.00
Polywood tebal 9 mm 0.3500 Lbr 118,300.00 -
Dolken, Panjang 4 m 2.0000 Btng 24,300.00 48,600.00
F.23.2 Tenaga
- Pekerja 0.6600 OH 56,800.00 37,488.00
- Tukang Kayu 0.3300 OH 69,825.00 23,042.25
- Kepala Tukang 0.0330 OH 74,650.00 2,463.45
- Mandor 0.0330 OH 80,400.00 2,653.20
Rp. 312,556.90
F.24 Memasang 1 m2 begisting Untuk Plat Lantai Rp 440,136.90
F.24.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Kelas III 0.0400 3,150,000.00 126,000.00
- Paku 5 cm - 10 cm 0.4000 Kg 15,400.00 6,160.00
- Minyak Begisting 0.2000 Liter - -
Balok Kayu Kelas II 0.0150 3,675,000.00 55,125.00
Polywood tebal 9 mm 0.3500 Lbr 118,300.00 41,405.00
Dolken, Panjang 4 m 6.0000 Btng 24,300.00 145,800.00
F.24.2 Tenaga
- Pekerja 0.6600 OH 56,800.00 37,488.00
- Tukang Kayu 0.3300 OH 69,825.00 23,042.25
- Kepala Tukang 0.0330 OH 74,650.00 2,463.45
- Mandor 0.0330 OH 80,400.00 2,653.20
Rp. 440,136.90
F.28 Rp 3,912,689.93
F.28 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.200 3,150,000.00 630,000.00
- Paku 5 cm - 12 cm 1.500 Kg 15,400.00 23,100.00
- Minyak Bekisting 0.400 Liter -
- Besi beton polos 157.500 Kg 12,500.00 1,968,750.00
- Kawat Beton 2.250 Kg 17,500.00 39,375.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
F.28 Tenaga
- Pekerja 5.300 OH 56,800.00 301,040.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.300 OH 69,825.00 90,772.50
- Tukang Besi 1.050 OH 69,825.00 73,316.25
- Kepala Tukang 0.262 OH 74,650.00 19,558.30
- Mandor 0.265 OH 80,400.00 21,306.00
Rp. 3,912,689.93
m3
m3
m3
m3
Membuat 1 M3 pondasi beton bertulang (150 Kg besi + begisting)
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 91
F.29 Rp 4,878,739.03
F.29.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.270 3,150,000.00 850,500.00
- Paku 5 cm - 12 cm 2.000 Kg 15,400.00 30,800.00
- Minyak Bekisting 0.600 Liter -
- Besi beton polos 210.000 Kg 12,500.00 2,625,000.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
F.29.2 Tenaga
- Pekerja 5.650 OH 56,800.00 320,920.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.560 OH 69,825.00 108,927.00
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.323 OH 74,650.00 24,111.95
- Mandor 0.283 OH 80,400.00 22,753.20
Rp. 4,878,739.03
F.29.a Rp 3,878,739.03
F.29.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.270 3,150,000.00 850,500.00
- Paku 5 cm - 12 cm 2.000 Kg 15,400.00 30,800.00
- Minyak Bekisting 0.600 Liter -
- Besi beton polos 130.000 Kg 12,500.00 1,625,000.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
F.29.2 Tenaga
- Pekerja 5.650 OH 56,800.00 320,920.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.560 OH 69,825.00 108,927.00
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.323 OH 74,650.00 24,111.95
- Mandor 0.283 OH 80,400.00 22,753.20
Rp. 3,878,739.03
F.29.b Rp 4,478,739.03
F.29.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.270 3,150,000.00 850,500.00
- Paku 5 cm - 12 cm 2.000 Kg 15,400.00 30,800.00
- Minyak Bekisting 0.600 Liter -
- Besi beton polos 178.000 Kg 12,500.00 2,225,000.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
F.29.2 Tenaga
- Pekerja 5.650 OH 56,800.00 320,920.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.560 OH 69,825.00 108,927.00
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.323 OH 74,650.00 24,111.95
- Mandor 0.283 OH 80,400.00 22,753.20
Rp. 4,478,739.03
F.29.c Rp 3,828,739.03
F.29.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.270 3,150,000.00 850,500.00
- Paku 5 cm - 12 cm 2.000 Kg 15,400.00 30,800.00
- Minyak Bekisting 0.600 Liter -
Membuat 1 M3 sloof beton bertulang (200 Kg besi + begisting)
M3
M3
M3
Membuat 1 M3 sloof beton bertulang 12/20 (4 Ø 10 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
Membuat 1 M3 sloof beton bertulang 12/20 (4 Ø 12 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
Membuat 1 M3 sloof beton bertulang 20/25 (6 Ø 12 mm, Begel Ø 6 - 15 cm)
M3
Daftar Analisa Pek Dikdas 2014 92
- Besi beton polos 126.000 Kg 12,500.00 1,575,000.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
F.29.2 Tenaga
- Pekerja 5.650 OH 56,800.00 320,920.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.560 OH 69,825.00 108,927.00
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.323 OH 74,650.00 24,111.95
- Mandor 0.283 OH 80,400.00 22,753.20
Rp. 3,828,739.03
F.30 Rp 8,280,930.78
F.30.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.400 3,150,000.00 1,260,000.00
- Paku 5 cm - 12 cm 4.000 Kg 15,400.00 61,600.00
- Minyak Bekisting 2.000 Liter - -
- Besi beton polos 315.000 Kg 12,500.00 3,937,500.00
- Kawat Beton 4.500 Kg 17,500.00 78,750.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok 0.150 3,675,000.00 551,250.00
Plywood 9 mm 3.500 Lembar 118,300.00 414,050.00
Dolken Kayu (8/10) panjang 4 m' 20.000 Batang 24,300.00 486,000.00
F.30.2 Tenaga
- Pekerja 7.500 OH 56,800.00 426,000.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 2.100 OH 69,825.00 146,632.50
- Kepala Tukang 0.403 OH 74,650.00 30,083.95
- Mandor 0.353 OH 80,400.00 28,381.20
Rp. 8,280,930.78
M3
M3
Membuat 1 M3 kolom beton bertulang (300 Kg besi + begisting)
M3
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 93
F.30.a Rp 3,929,630.78
F.30.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.400 3,150,000.00 1,260,000.00
- Paku 5 cm - 12 cm 4.000 Kg 15,400.00 61,600.00
- Minyak Bekisting 2.000 Liter - -
- Besi beton polos 83.000 Kg 12,500.00 1,037,500.00
- Kawat Beton 4.500 Kg 17,500.00 78,750.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' - Batang 24,300.00 -
F.30.2 Tenaga
- Pekerja 7.500 OH 56,800.00 426,000.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 2.100 OH 69,825.00 146,632.50
- Kepala Tukang 0.403 OH 74,650.00 30,083.95
- Mandor 0.353 OH 80,400.00 28,381.20
Rp. 3,929,630.78
F.30.b Rp 4,267,130.78
F.30.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.400 3,150,000.00 1,260,000.00
- Paku 5 cm - 12 cm 4.000 Kg 15,400.00 61,600.00
- Minyak Bekisting 2.000 Liter - -
- Besi beton polos 110.000 Kg 12,500.00 1,375,000.00
- Kawat Beton 4.500 Kg 17,500.00 78,750.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' - Batang 24,300.00 -
F.30.2 Tenaga
- Pekerja 7.500 OH 56,800.00 426,000.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 2.100 OH 69,825.00 146,632.50
- Kepala Tukang 0.403 OH 74,650.00 30,083.95
- Mandor 0.353 OH 80,400.00 28,381.20
Rp. 4,267,130.78
F.30.c Rp 4,642,130.78
F.30.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.400 3,150,000.00 1,260,000.00
- Paku 5 cm - 12 cm 4.000 Kg 15,400.00 61,600.00
- Minyak Bekisting 2.000 Liter - -
- Besi beton polos 140.000 Kg 12,500.00 1,750,000.00
- Kawat Beton 4.500 Kg 17,500.00 78,750.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' - Batang 24,300.00 -
F.30.2 Tenaga
- Pekerja 7.500 OH 56,800.00 426,000.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 2.100 OH 69,825.00 146,632.50
Membuat 1 M3 kolom beton bertulang 20/20 (4 Ø 10 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Membuat 1 M3 kolom beton bertulang 20/20 (4 Ø 12 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Membuat 1 M3 kolom Praktis beton bertulang 15/15 (4 Ø 12 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 94
- Kepala Tukang 0.403 OH 74,650.00 30,083.95
- Mandor 0.353 OH 80,400.00 28,381.20
Rp. 4,642,130.78
F.30.d Rp 5,392,130.78
F.30.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.400 3,150,000.00 1,260,000.00
- Paku 5 cm - 12 cm 4.000 Kg 15,400.00 61,600.00
- Minyak Bekisting 2.000 Liter - -
- Besi beton polos 200.000 Kg 12,500.00 2,500,000.00
- Kawat Beton 4.500 Kg 17,500.00 78,750.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' - Batang 24,300.00 -
F.30.2 Tenaga
- Pekerja 7.500 OH 56,800.00 426,000.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 2.100 OH 69,825.00 146,632.50
- Kepala Tukang 0.403 OH 74,650.00 30,083.95
- Mandor 0.353 OH 80,400.00 28,381.20
Rp. 5,392,130.78
Membuat 1 M3 kolom Praktis beton bertulang 12/12 (4 Ø 10 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 95
F.31 Rp 6,338,863.78
F.31.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.320 3,150,000.00 1,008,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting 1.600 Liter - -
- Besi beton polos 210.000 Kg 12,500.00 2,625,000.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok 0.140 3,675,000.00 514,500.00
Plywood 9 mm 2.800 Lembar 118,300.00 331,240.00
Dolken Kayu (8/10) panjang 4 m' 16.000 Batang 24,300.00 388,800.00
F.31.2 Tenaga
- Pekerja 6.350 OH 56,800.00 360,680.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.333 OH 74,650.00 24,858.45
- Mandor 0.318 OH 80,400.00 25,567.20
Rp. 6,338,863.78
F.31.a Rp 4,798,723.78
F.31.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.320 3,150,000.00 1,008,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting - Liter - -
- Besi beton polos 170.000 Kg 12,500.00 2,125,000.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' 8.000 Batang 24,300.00 194,400.00
F.31.2 Tenaga
- Pekerja 6.350 OH 56,800.00 360,680.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.333 OH 74,650.00 24,858.45
- Mandor 0.318 OH 80,400.00 25,567.20
Rp. 4,798,723.78
Membuat 1 M3 balok beton bertulang (200 Kg besi + begisting)
M3
M3
M3
M3
Membuat 1 M3 balok beton bertulang 12/15 balok latai (4 Ø 10 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 96
F.31.b Rp 4,336,223.78
F.31.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.320 3,150,000.00 1,008,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting 1.600 Liter - -
- Besi beton polos 133.000 Kg 12,500.00 1,662,500.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' 8.000 Batang 24,300.00 194,400.00
F.31.2 Tenaga
- Pekerja 6.350 OH 56,800.00 360,680.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.333 OH 74,650.00 24,858.45
- Mandor 0.318 OH 80,400.00 25,567.20
Rp. 4,336,223.78
F.31.c Rp 4,923,723.78
F.31.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.320 3,150,000.00 1,008,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting 1.600 Liter - -
- Besi beton polos 180.000 Kg 12,500.00 2,250,000.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' 8.000 Batang 24,300.00 194,400.00
F.31.2 Tenaga
- Pekerja 6.350 OH 56,800.00 360,680.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 1.400 OH 69,825.00 97,755.00
- Kepala Tukang 0.333 OH 74,650.00 24,858.45
- Mandor 0.318 OH 80,400.00 25,567.20
Rp. 4,923,723.78
F.31.d Rp 5,486,223.78
F.31.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.320 3,150,000.00 1,008,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting 1.600 Liter - -
- Besi beton polos 225.000 Kg 12,500.00 2,812,500.00
- Kawat Beton 3.000 Kg 17,500.00 52,500.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm - Lembar 118,300.00 -
Dolken Kayu (8/10) panjang 4 m' 8.000 Batang 24,300.00 194,400.00
F.31.2 Tenaga
- Pekerja 6.350 OH 56,800.00 360,680.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.650 OH 69,825.00 115,211.25
- Tukang Besi 1.400 OH 69,825.00 97,755.00
Membuat 1 M3 balok beton bertulang 12/20 (4 Ø 10 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Membuat 1 M3 balok beton bertulang 12/20 (4 Ø 12 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Membuat 1 M3 balok beton bertulang 12/15 (4 Ø 12 mm, Begel Ø 6 - 15 cm)
M3
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 97
- Kepala Tukang 0.333 OH 74,650.00 24,858.45
- Mandor 0.318 OH 80,400.00 25,567.20
Rp. 5,486,223.78
F.32 Rp 5,860,683.88
F.32.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.320 3,150,000.00 1,008,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting 1.600 Liter - -
- Besi beton polos 157.000 Kg 12,500.00 1,962,500.00
- Kawat Beton 2.250 Kg 17,500.00 39,375.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok 0.120 3,675,000.00 441,000.00
Plywood 9 mm 2.800 Lembar 118,300.00 331,240.00
Dolken Kayu (8/10) panjang 4 m' 32.000 Batang 24,300.00 777,600.00
F.32.2 Tenaga
- Pekerja 5.300 OH 56,800.00 301,040.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.300 OH 69,825.00 90,772.50
- Tukang Besi 1.050 OH 69,825.00 73,316.25
- Kepala Tukang 0.265 OH 74,650.00 19,782.25
- Mandor 0.265 OH 80,400.00 21,306.00
Rp. 5,860,683.88
F.32.a Rp 4,836,483.88
F.32.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.320 3,150,000.00 1,008,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting 1.600 Liter - -
- Besi beton polos 157.000 Kg 12,500.00 1,962,500.00
- Kawat Beton 2.250 Kg 17,500.00 39,375.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok - 3,675,000.00 -
Plywood 9 mm 2.800 Lembar 118,300.00 331,240.00
Dolken Kayu (8/10) panjang 4 m' 8.000 Batang 24,300.00 194,400.00
F.32.2 Tenaga
- Pekerja 5.300 OH 56,800.00 301,040.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.300 OH 69,825.00 90,772.50
- Tukang Besi 1.050 OH 69,825.00 73,316.25
- Kepala Tukang 0.265 OH 74,650.00 19,782.25
- Mandor 0.265 OH 80,400.00 21,306.00
Rp. 4,836,483.88
Membuat 1 M3 plat beton bertulang (150 Kg besi + begisting)
M3
M3
M3
M3
Membuat 1 M3 plat beton bertulang (150 Kg besi + begisting)
M3
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 98
F.33 Rp 5,323,287.43
F.33.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.240 3,150,000.00 756,000.00
- Paku 5 cm - 12 cm 3.200 Kg 15,400.00 49,280.00
- Minyak Bekisting 1.600 Liter - -
- Besi beton polos 157.000 Kg 12,500.00 1,962,500.00
- Kawat Beton 2.250 Kg 17,500.00 39,375.00
- Portland Cement 336.000 Kg 1,370.00 460,320.00
- Pasir Beton 0.540 95,000.00 51,300.00
- Koral (maksimum 30 mm) 0.810 265,000.00 214,650.00
Kayu Klas II balok 0.120 3,675,000.00 441,000.00
Plywood 9 mm 2.800 Lembar 118,300.00 331,240.00
Dolken Kayu (8/10) panjang 4 m' 24.000 Batang 24,300.00 583,200.00
F.33.2 Tenaga
- Pekerja 5.300 OH 56,800.00 301,040.00
- Tukang Batu 0.275 OH 69,825.00 19,201.88
- Tukang Kayu 1.300 OH 69,825.00
- Tukang Besi 1.050 OH 69,825.00 73,316.25
- Kepala Tukang 0.262 OH 74,650.00 19,558.30
- Mandor 0.265 OH 80,400.00 21,306.00
Rp. 5,323,287.43
F.35 Rp 68,761.50
F.33.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.002 3,150,000.00 6,300.00
- Paku 5 cm - 12 cm 0.010 Kg 15,400.00 154.00
- Besi beton polos 3.000 Kg 12,500.00 37,500.00
- Kawat Beton 0.045 Kg 17,500.00 787.50
- Portland Cement 4.000 Kg 1,370.00 5,480.00
- Pasir Beton 0.006 95,000.00 570.00
- Koral (maksimum 30 mm) 0.009 265,000.00 2,385.00
F.33.2 Tenaga
- Pekerja 0.180 OH 56,800.00 10,224.00
- Tukang Batu 0.020 OH 69,825.00 1,396.50
- Tukang Kayu 0.020 OH 69,825.00 1,396.50
- Tukang Besi 0.020 OH 69,825.00 1,396.50
- Kepala Tukang 0.006 OH 74,650.00 447.90
- Mandor 0.009 OH 80,400.00 723.60
Rp. 68,761.50
Membuat 1 M3 dinding beton bertulang (150 Kg besi + begisting)
M3
M3
M3
M3
Membuat 1 M' kolom praktis beton bertulang (11 x 11) cm
M3
M3
M3
Daftar Analisa Pek Dikdas 2014 99
F.36 Rp 93,732.78
F.36.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas III 0.003 3,150,000.00 9,450.00
- Paku 5 cm - 12 cm 0.020 Kg 15,400.00 308.00
- Besi beton polos 3.600 Kg 12,500.00 45,000.00
- Kawat Beton 0.050 Kg 17,500.00 875.00
- Portland Cement 5.500 Kg 1,370.00 7,535.00
- Pasir Beton 0.009 95,000.00 855.00
- Koral (maksimum 30 mm) 0.015 265,000.00 3,975.00
F.36.2 Tenaga
- Pekerja 0.297 OH 56,800.00 16,869.60
- Tukang Batu 0.033 OH 69,825.00 2,304.23
- Tukang Kayu 0.033 OH 69,825.00 2,304.23
- Tukang Besi 0.033 OH 69,825.00 2,304.23
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.015 OH 80,400.00 1,206.00
Rp. 93,732.78
G.2 Rp 6,217,890.00
kayu kelas II
G.2.1 Bahan Koefesien Satuan Harga Jumlah
- Balok Kayu 1.200 3,675,000.00 4,410,000.00
- Paku 10 cm 1.250 Kg 15,400.00 19,250.00
- Lem Kayu 1.000 Kg 32,500.00 32,500.00
G.2.2 Tenaga
- Pekerja 6.000 OH 56,800.00 340,800.00
- Tukang Kayu 18.000 OH 69,825.00 1,256,850.00
- Kepala Tukang 1.800 OH 74,650.00 134,370.00
- Mandor 0.300 OH 80,400.00 24,120.00
Rp. 6,217,890.00
G.2a Rp 8,227,890.00
kayu kelas I
G.2a.1 Bahan Koefesien Satuan Harga Jumlah
- Balok Kayu 1.200 5,350,000.00 6,420,000.00
- Paku 10 cm 1.250 Kg 15,400.00 19,250.00
- Lem Kayu 1.000 Kg 32,500.00 32,500.00
G.2a.2 Tenaga
- Pekerja 6.000 OH 56,800.00 340,800.00
- Tukang Kayu 18.000 OH 69,825.00 1,256,850.00
- Kepala Tukang 1.800 OH 74,650.00 134,370.00
- Mandor 0.300 OH 80,400.00 24,120.00
Rp. 8,227,890.00
Membuat 1 M' kolom praktis beton bertulang (10 x 15) cm
M3
M3
M3
Membuat dan Memasang 1 M3 Kusen Pintu dan Kusen Jendela
M3
Membuat dan Memasang 1 M3 Kusen Pintu dan Kusen Jendela
M3
Daftar Analisa Pek Dikdas 2014 100
G.5 Rp 460,940.00
kayu kelas II
G.5.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.040 3,800,000.00 152,000.00
- Lem Kayu 0.500 Kg 32,500.00 16,250.00
G.5.2 Tenaga
- Pekerja 1.000 OH 56,800.00 56,800.00
- Tukang Kayu 3.000 OH 69,825.00 209,475.00
- Kepala Tukang 0.300 OH 74,650.00 22,395.00
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 460,940.00
G.5a Rp 550,940.00
kayu kelas I
G.5a.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas I 0.044 5,500,000.00 242,000.00
- Lem Kayu 0.500 Kg 32,500.00 16,250.00
G.5a.2 Tenaga
- Pekerja 1.000 OH 56,800.00 56,800.00
- Tukang Kayu 3.000 OH 69,825.00 209,475.00
- Kepala Tukang 0.300 OH 74,650.00 22,395.00
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 550,940.00
G.6 Rp 511,102.00
kayu kelas II
G.6.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.024 3,800,000.00 91,200.00
- Lem Kayu 0.300 Kg 32,500.00 9,750.00
- Kaca Polos 5 mm 1.000 M2 176,000.00 176,000.00
G.6.2 Tenaga
- Pekerja 0.800 OH 56,800.00 45,440.00
- Tukang Kayu 2.400 OH 69,825.00 167,580.00
- Kepala Tukang 0.240 OH 74,650.00 17,916.00
- Mandor 0.040 OH 80,400.00 3,216.00
Rp. 511,102.00
Membuat dan Memasang 1 M2 Daun Pintu Panel
M3
Membuat dan Memasang 1 M2 Daun Pintu Panel
M3
Membuat dan Memasang 1 M2 Pintu dan Jendela Kaca
M3
Daftar Analisa Pek Dikdas 2014 101
G.6a Rp 551,902.00
kayu kelas I
G.6a.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas I 0.024 5,500,000.00 132,000.00
- Lem Kayu 0.300 Kg 32,500.00 9,750.00
- Kaca Polos 5 mm 1.000 M2 176,000.00 176,000.00
G.6a.2 Tenaga
- Pekerja 0.800 OH 56,800.00 45,440.00
- Tukang Kayu 2.400 OH 69,825.00 167,580.00
- Kepala Tukang 0.240 OH 74,650.00 17,916.00
- Mandor 0.040 OH 80,400.00 3,216.00
Rp. 551,902.00
G.6b Rp 188,501.78
G.6b.1 Bahan Koefesien Satuan Harga Jumlah
- Kaca Polos 5 mm 1.000 176,000.00 176,000.00
-
G.6b.2
Pekerja 0.015 OH 56,800.00 852.00
Tukang Kayu 0.150 OH 69,825.00 10,473.75
- Kepala Tukang 0.015 OH 74,650.00 1,119.75
- Mandor 0.001 OH 80,400.00 56.28
Rp. 188,501.78
G.7 Rp 535,890.00
kayu kelas II
G.7.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.064 3,800,000.00 243,200.00
- Lem Kayu - Kg 32,500.00 -
G.7.2 Tenaga
- Pekerja 1.000 OH 56,800.00 56,800.00
- Tukang Kayu 3.000 OH 69,825.00 209,475.00
- Kepala Tukang 0.300 OH 74,650.00 22,395.00
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 535,890.00
G.7a Rp 543,590.00
G.7a.1 Bahan Koefesien Satuan Harga Jumlah
- Kayu Klas.II, Papan 0.064 3,800,000.00 243,200.00
- Paku Panjang 1 - 3 Cm 0.500 Kg 15,400.00 7,700.00
G.7a.2 Tenaga
- Pekerja 1.000 OH 56,800.00 56,800.00
- Tukang Kayu 3.000 OH 69,825.00 209,475.00
- Kepala Tukang 0.300 OH 74,650.00 22,395.00
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 543,590.00
Membuat dan Memasang 1 M2 Pintu dan Jendela Kaca
M3
1 M2 Pasang Kaca Polos 5 mm
M2
Membuat dan Memasang 1 M2 Pintu dan Jendela Jalusi Kayu
M3
1 M2 Memasang Jalusi Kayu Pintu dan Jendela, Kayu Klas II
M3
Daftar Analisa Pek Dikdas 2014 102
G.8 Rp 434,081.00
G.8.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.025 3,800,000.00 93,100.00
- Paku 1 cm - 2,5 cm 0.030 Kg 19,300.00 579.00
- Lem Kayu 0.500 Kg 32,500.00 16,250.00
- teakwood tebal 4 mm (90x220) cm 1.000 Lembar 90,000.00 90,000.00
G.8.2 Tenaga
- Pekerja 0.800 OH 56,800.00 45,440.00
- Tukang Kayu 2.400 OH 69,825.00 167,580.00
- Kepala Tukang 0.240 OH 74,650.00 17,916.00
- Mandor 0.040 OH 80,400.00 3,216.00
Rp. 434,081.00
G.8.a Rp 616,869.00
G.8.a.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.025 3,800,000.00 93,100.00
- Paku 1 cm - 2,5 cm 0.030 Kg 19,300.00 579.00
- Lem Kayu 0.500 Kg 90,000.00 45,000.00
- teakwood tebal 4 mm (90x220) cm 1.000 Lembar 90,000.00 90,000.00
- Kaca Polos 5 mm 0.500 M2 176,000.00 88,000.00
- List Profil kayu 1.000 M' 7,500.00 7,500.00
G.8.a.2 Tenaga
- Pekerja 1.000 OH 56,800.00 56,800.00
- Tukang Kayu 3.000 OH 69,825.00 209,475.00
- Kepala Tukang 0.300 OH 74,650.00 22,395.00
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 616,869.00
G.12 Rp 534,105.70
rangka exposes kayu kelas II
G.12.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.025 3,800,000.00 95,000.00
- Paku 1 cm - 2,5 cm 0.030 Kg 19,300.00 579.00
- Lem Kayu 0.800 Kg 32,500.00 26,000.00
- teakwood tebal 4 mm (90x220) cm 1.000 Lembar 90,000.00 90,000.00
- Formika 0.500 Lembar 147,400.00 73,700.00
G.12.2 Tenaga
- Pekerja 0.850 OH 56,800.00 48,280.00
- Tukang Kayu 2.550 OH 69,825.00 178,053.75
- Kepala Tukang 0.255 OH 74,650.00 19,035.75
- Mandor 0.043 OH 80,400.00 3,457.20
Rp. 534,105.70
G.13 Rp 5,515,500.00
kayu kelas II bentang 6 meter
G.13.1 Bahan Koefesien Satuan Harga Jumlah
- Balok Kayu Klas II 1.100 3,675,000.00 4,042,500.00
- Besi Strip Tebal 5 mm 15.000 Kg 14,400.00 216,000.00
- Paku 12 cm 5.600 Kg 15,400.00 86,240.00
G.13.2 Tenaga
- Pekerja 4.000 OH 56,800.00 227,200.00
- Tukang Kayu 12.000 OH 69,825.00 837,900.00
- Kepala Tukang 1.200 OH 74,650.00 89,580.00
- Mandor 0.200 OH 80,400.00 16,080.00
Rp. 5,515,500.00
Membuat dan Memasang 1 M2 Pintu Kayu Lapis (Teakwood) rangkap
M3
Membuat dan Memasang 1 M2 Pintu Kayu Lapis (Teakwood) rangkap + Kaca
M3
Membuat dan Memasang 1 M2 teakwood rangkap lapis formika
M3
Membuat dan Memasang 1 M3 konstruksi kuda-kuda konvensional
M3
Daftar Analisa Pek Dikdas 2014 103
G.14 Rp 6,673,263.00
kayu kelas II
G.14.1 Bahan Koefesien Satuan Harga Jumlah
- Balok Kayu Klas II 1.200 3,675,000.00 4,410,000.00
- Besi Strip Tebal 5 mm 15.000 Kg 14,400.00 216,000.00
- Paku 12 cm 5.600 Kg 15,400.00 86,240.00
G.14.2 Tenaga
- Pekerja 6.700 OH 56,800.00 380,560.00
- Tukang Kayu 20.100 OH 69,825.00 1,403,482.50
- Kepala Tukang 2.010 OH 74,650.00 150,046.50
- Mandor 0.335 OH 80,400.00 26,934.00
Rp. 6,673,263.00
G.15 Rp 5,007,156.00
kayu kelas II
G.15.1 Bahan Koefesien Satuan Harga Jumlah
- Balok Kayu Klas II 1.100 3,675,000.00 4,042,500.00
- Besi Strip Tebal 5 mm 15.000 Kg 14,400.00 216,000.00
- Paku 12 cm 3.000 Kg 15,400.00 46,200.00
G.15.2 Tenaga
- Pekerja 2.400 OH 56,800.00 136,320.00
- Tukang Kayu 7.200 OH 69,825.00 502,740.00
- Kepala Tukang 0.720 OH 74,650.00 53,748.00
- Mandor 0.120 OH 80,400.00 9,648.00
Rp. 5,007,156.00
G.15.a Rp 964,656.00
(kayu Lama Digunakan Kembali)
G.15a.1 Bahan Koefesien Satuan Harga Jumlah
- Balok Kayu Klas II - 3,675,000.00 -
- Besi Strip Tebal 5 mm 15.000 Kg 14,400.00 216,000.00
- Paku 12 cm 3.000 Kg 15,400.00 46,200.00
G.15a.2 Tenaga
- Pekerja 2.400 OH 56,800.00 136,320.00
- Tukang Kayu 7.200 OH 69,825.00 502,740.00
- Kepala Tukang 0.720 OH 74,650.00 53,748.00
- Mandor 0.120 OH 80,400.00 9,648.00
Rp. 964,656.00
Membuat dan Memasang 1 M3 konstruksi kuda-kuda expose
M3
Membuat dan Memasang 1 M3 konstruksi gordeng
M3
Membuat dan Memasang 1 M3 konstruksi gordeng
M3
Daftar Analisa Pek Dikdas 2014 104
G.16 Rp 82,341.00
kayu kelas II
G.16.1 Bahan Koefesien Satuan Harga Jumlah
- Kaso-kaso (5 x 7) cm 0.014 3,675,000.00 51,450.00
- Reng (3 x 4) cm 0.004 3,675,000.00 13,230.00
- Paku 5 cm dan 10 cm 0.250 Kg 15,400.00 3,850.00
G.16.2 Tenaga
- Pekerja 0.100 OH 56,800.00 5,680.00
- Tukang Kayu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.005 OH 80,400.00 402.00
Rp. 82,341.00
G.16.a Rp 30,891.00
kayu kelas II (Kayu Lama Digunakan Kembali)
G.16.a.1 Bahan Koefesien Satuan Harga Jumlah
- Kaso-kaso (5 x 7) cm 0.014 - -
- Reng (3 x 4) cm 0.004 3,675,000.00 13,230.00
- Paku 5 cm dan 10 cm 0.250 Kg 15,400.00 3,850.00
G.16.a.2 Tenaga
- Pekerja 0.100 OH 56,800.00 5,680.00
- Tukang Kayu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.005 OH 80,400.00 402.00
Rp. 30,891.00
G.19 Rp 97,412.00
kayu kelas II
G.19.1 Bahan Koefesien Satuan Harga Jumlah
- Kaso-kaso (5 x7) cm Klas II 0.015 3,675,000.00 56,595.00
- Paku 7 cm - 10 cm 0.200 Kg 15,400.00 3,080.00
G.19.2 Tenaga
- Pekerja 0.150 OH 56,800.00 8,520.00
- Tukang Kayu 0.300 OH 69,825.00 20,947.50
- Kepala Tukang 0.030 OH 74,650.00 2,239.50
- Mandor 0.075 OH 80,400.00 6,030.00
Rp. 97,412.00
G.21 Rp 64,340.00
kayu kelas II
G.21.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.0108 3,800,000.00 41,040.00
- Paku 5 cm - 7 cm 0.100 Kg 17,600.00 1,760.00
G.21.2 Tenaga
- Pekerja 0.100 OH 56,800.00 5,680.00
- Tukang Kayu 0.200 OH 69,825.00 13,965.00
- Kepala Tukang 0.020 OH 74,650.00 1,493.00
- Mandor 0.005 OH 80,400.00 402.00
Rp. 64,340.00
Membuat dan Memasang 1 M2 rangka atap genteng Pres Lokal
M3
M3
Membuat dan Memasang 1 M2 rangka atap genteng Pres Lokal
M3
M3
Membuat dan Memasang 1 M2 rangka langit-langit
M3
Membuat dan Memasang 1 M2 lisplank ukuran (3 x 20) cm
M3
Daftar Analisa Pek Dikdas 2014 105
G.22 Rp 63,460.00
kayu kelas II
G.22.1 Bahan Koefesien Satuan Harga Jumlah
- Papan Kayu Klas II 0.011 3,800,000.00 41,040.00
- Paku 5 cm - 7 cm 0.050 Kg 17,600.00 880.00
G.22.2 Tenaga
- Pekerja 0.100 OH 56,800.00 5,680.00
- Tukang Kayu 0.200 OH 69,825.00 13,965.00
- Kepala Tukang 0.020 OH 74,650.00 1,493.00
- Mandor 0.005 OH 80,400.00 402.00
Rp. 63,460.00
G.23 Rp 52,130.00
Kalsiplank
G.23.1 Bahan Koefesien Satuan Harga Jumlah
- Kalsipleng 1.100 M1 36,000.00 39,600.00
- Paku biasa 5cm -7cm 0.100 Kg 17,600.00 1,760.00
G.23.2 Tenaga
- Pekerja 0.050 OH 56,800.00 2,840.00
- Tukang Kayu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.003 OH 80,400.00 201.00
Rp. 52,130.00
G.24 Rp 260,483.70
kayu kelas II
G.23.1 Bahan Koefesien Satuan Harga Jumlah
- Balok kayu ukuran (6 x 12) cm 0.028 3,800,000.00 106,400.00
- Paku 5 cm - 7 cm 0.150 Kg 17,600.00 2,640.00
- Teakwood tebal 3 mm 0.860 Lembar 125,000.00 107,500.00
120 cm x 240 cm
G.23.2 Tenaga
- Pekerja 0.150 OH 56,800.00 8,520.00
- Tukang Kayu 0.450 OH 69,825.00 31,421.25
- Kepala Tukang 0.045 OH 74,650.00 3,359.25
- Mandor 0.008 OH 80,400.00 643.20
Rp. 260,483.70
H.3 Rp 37,800.60
H.3.1 Bahan Koefesien Satuan Harga Jumlah
- Genteng Press Lokal 24.000 Bh 1,000.00 24,000.00
H.3.2 Tenaga
- Pekerja 0.150 OH 56,800.00 8,520.00
- Tukang Kayu 0.060 OH 69,825.00 4,189.50
- Kepala Tukang 0.006 OH 74,650.00 447.90
- Mandor 0.008 OH 80,400.00 643.20
Rp. 37,800.60
Membuat dan Memasang 1 M2 lisplank ukuran (3 x 30) cm
M3
Membuat dan Memasang 1 M1lisplank ukuran (2 x 20) cm
Memasang 1 M3 dinding pemisah teakwood rangkap
M3
1 M2 Pasang Atap Genteng Press Lokal
Daftar Analisa Pek Dikdas 2014 106
H.6 1 M' Pasang Bubung Genteng Press Lokal Rp 81,242.80
H.6.1 Bahan Koefesien Satuan Harga Jumlah
- Genteng Bubung Press Lokal 5.000 Bh 5,800.00 29,000.00
- Semen Portland 8.000 Kg 1,370.00 10,960.00
- Pasir Pasang 0.032 92,000.00 2,944.00
H.6.2 Tenaga
- Pekerja 0.400 OH 56,800.00 22,720.00
- Tukang Kayu 0.200 OH 69,825.00 13,965.00
- Kepala Tukang 0.020 OH 74,650.00 1,493.00
- Mandor 0.002 OH 80,400.00 160.80
Rp. 81,242.80
H.32 Rp 93,869.40
H.32.a.1 Bahan Koefesien Satuan Harga Jumlah
- Genteng Metal 1.680 Lbr 40,000.00 67,200.00
- Paku Skrup + Mur 6.000 Bh 1,250.00 7,500.00
H.32.a.2 Tenaga
- Pekerja 0.200 OH 56,800.00 11,360.00
- Tukang Kayu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.001 OH 80,400.00 80.40
Rp. 93,869.40
H.32.a Rp 91,649.40
H.32.a.1 Bahan Koefesien Satuan Harga Jumlah
- Genteng Zincalum 1.680 Lbr 40,000.00 67,200.00
- Paku Biasa 2" - 5"" 0.300 Kg 17,600.00 5,280.00
H.32.a.2 Tenaga
- Pekerja 0.200 OH 56,800.00 11,360.00
- Tukang Kayu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.001 OH 80,400.00 80.40
Rp. 91,649.40
H.32.b Rp 167,249.40
H.32.b.1 Bahan Koefesien Satuan Harga Jumlah
- Genteng Zincalum Berpasir 1.680 Lbr 85,000.00 142,800.00
- Paku Biasa 2" - 5"" 0.300 Kg 17,600.00 5,280.00
H.32.b.2 Tenaga
- Pekerja 0.200 OH 56,800.00 11,360.00
- Tukang Kayu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.001 OH 80,400.00 80.40
Rp. 167,249.40
M3
1 M2 Pasang Atap Genteng Metal ( Rangka Baja Ringan)
1 M2 Pasang Atap Genteng Zincalum ( Rangka Kayu)
1 M2 Pasang Atap Genteng Zincalum Berpasir
Daftar Analisa Pek Dikdas 2014 107
H.36. 1 M' Pasang Nok Genteng Zincalum ( Rangka Baja Ringan ) Rp 74,588.70
H.36.1 Bahan Koefesien Satuan Harga Jumlah
- Bubung Genteng Zincalum 1.100 Bh 40,000.00 44,000.00
- Paku Skrup + Mur 3.000 Bh 1,250.00 3,750.00
H.36.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Kayu 0.150 OH 69,825.00 10,473.75
- Kepala Tukang 0.015 OH 74,650.00 1,119.75
- Mandor 0.013 OH 80,400.00 1,045.20
Rp. 74,588.70
H.36.a 1 M' Pasang Nok Genteng Zincalum ( rangka Kayu) Rp 66,108.70
H.36.a.1 Bahan Koefesien Satuan Harga Jumlah
- Bubung Genteng Zincalum 1.100 Bh 35,000.00 38,500.00
- Paku Biasa 1/2" - 1" 0.050 Kg 15,400.00 770.00
H.36.a.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Kayu 0.150 OH 69,825.00 10,473.75
- Kepala Tukang 0.015 OH 74,650.00 1,119.75
- Mandor 0.013 OH 80,400.00 1,045.20
Rp. 66,108.70
H.36.b 1 M' Pasang Nok Genteng Zincalum Berpasir Rp 91,078.70
H.36.b.1 Bahan Koefesien Satuan Harga Jumlah
- Bubung Genteng Zincalum Berpasir 1.100 Bh 57,700.00 63,470.00
- Paku Biasa 1/2" - 1" 0.050 Kg 15,400.00 770.00
H.36.b.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Kayu 0.150 OH 69,825.00 10,473.75
- Kepala Tukang 0.015 OH 74,650.00 1,119.75
- Mandor 0.013 OH 80,400.00 1,045.20
Rp. 91,078.70
H.38 1 M2 Pasang Atap Seng Gelombang Rp. 48,670.53
H.38.1 Bahan Koefesien Satuan Harga Jumlah
- Seng Gelombang 3" x 6" BJLS 25 KI 0.455 Lbr 79,800.00 36,272.73
- Paku Biasa 1/2" - 1" 0.020 Kg 23,100.00 462.00
H.38.2 Tenaga
- Pekerja 0.120 OH 56,800.00 6,816.00
- Tukang Kayu 0.060 OH 69,825.00 4,189.50
- Kepala Tukang 0.006 OH 74,650.00 447.90
- Mandor 0.006 OH 80,400.00 482.40
Rp. 48,670.53
H.38.a 1 M2 Pasang Atap Seng Gelombang Rp. 12,397.80
(seng lama digunakan kembali)
H.38a.1 Bahan Koefesien Satuan Harga Jumlah
- Seng Gelombang 3" x 6" BJLS 28/30 - Lbr 79,800.00 -
- Paku Biasa 1/2" - 1" 0.020 Kg 23,100.00 462.00
H.38b.2 Tenaga
- Pekerja 0.120 OH 56,800.00 6,816.00
- Tukang Kayu 0.060 OH 69,825.00 4,189.50
- Kepala Tukang 0.006 OH 74,650.00 447.90
- Mandor 0.006 OH 80,400.00 482.40
Rp. 12,397.80
Daftar Analisa Pek Dikdas 2014 108
H.39 1 M1 Pasang Atap Nok Seng Rp. 26,931.35
H.39.1 Bahan Koefesien Satuan Harga Jumlah
- Seng Plat BJLS 35 0.300 Lbr 38,400.00 11,520.00
- Paku seng 0.040 Kg 23,100.00 924.00
H.39.2 Tenaga
- Pekerja 0.150 OH 56,800.00 8,520.00
- Tukang Kayu 0.070 OH 69,825.00 4,887.75
- Kepala Tukang 0.008 OH 74,650.00 597.20
- Mandor 0.006 OH 80,400.00 482.40
Rp. 26,931.35
H.40 1 M2 Pasang Atap Galvalum Rp. 73,035.80
H.40.1 Bahan Koefesien Satuan Harga Jumlah
- Aluminium Gelombang/Spandek 0.30 1.340 m' 40,000.00 53,600.00
- Paku Skrup + mur 6.000 bh 1,250.00 7,500.00
H.40.2 Tenaga
- Pekerja 0.120 OH 56,800.00 6,816.00
- Tukang Kayu 0.060 OH 69,825.00 4,189.50
- Kepala Tukang 0.006 OH 74,650.00 447.90
- Mandor 0.006 OH 80,400.00 482.40
Rp. 73,035.80
H.41 Memasang 1 m' bubung Aluminium Rp. 113,080.50
H.41.1 Bahan Koefesien Satuan Harga Jumlah
- Bubungan Aluminium 1.200 Lbr 30,000.00 36,000.00
- Paku Biasa 0.020 Kg 1,250.00 25.00
H.41.2 Tenaga
- Pekerja 0.100 OH 56,800.00 5,680.00
- Tukang Kayu 1.000 OH 69,825.00 69,825.00
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.010 OH 80,400.00 804.00
Rp. 113,080.50
I.1 Rp 24,018.90
I.1.1 Bahan Koefesien Satuan Harga Jumlah
- asbes semen 1.100 14,900.00 16,390.00
- paku tripleks 0.010 Kg 19,300.00 193.00
I.1.2 Tenaga
- Pekerja 0.030 OH 56,800.00 1,704.00
- Tukang Kayu 0.070 OH 69,825.00 4,887.75
- Kepala Tukang 0.007 OH 74,650.00 522.55
- Mandor 0.0040 OH 80,400.00 321.60
Rp. 24,018.90
I.5 Rp 37,640.00
I.5.1 Bahan Koefesien Satuan Harga Jumlah
- Triplek 0.375 Lbr 62,000.00 23,250.00
- paku tripleks 0.030 Kg 19,300.00 579.00
I.5.2 Tenaga
- Pekerja 0.100 OH 56,800.00 5,680.00
- Tukang Kayu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.010 OH 74,650.00 746.50
- Mandor 0.005 OH 80,400.00 402.00
Rp. 37,640.00
Pasang 1 M2 Langit - langit asbes semen, tebal 4mm,5mm,6mm
m2
Pasang 1 M2 Langit - langit tripleks ukuran (120 x 240) cm,tebal 4mm
Daftar Analisa Pek Dikdas 2014 109
I.10 Rp 15,013.70
I.10.1 Bahan Koefesien Satuan Harga Jumlah
- list kayu profil 1.050 m' 7,500.00 7,875.00
- Paku 0.010 Kg 19,300.00 193.00
I.10.2 Tenaga
- Pekerja 0.050 OH 56,800.00 2,840.00
- Tukang Kayu 0.050 OH 69,825.00 3,491.25
- Kepala Tukang 0.005 OH 74,650.00 373.25
- Mandor 0.0030 OH 80,400.00 241.20
Rp. 15,013.70
J.1 Memasang 1 buah Kloset Duduk/Monoblok Rp 2,355,528.15
J.1.1 Bahan Koefesien Satuan Harga Jumlah
- Kloset duduk/monoblok 1.000 Bh 1,960,700.00 1,960,700.00
- Perlengkapan 6 % Harga Kloset 117,642.00 117,642.00
J.1.2 Tenaga
- Pekerja 3.300 OH 56,800.00 187,440.00
- Tukang Batu 1.100 OH 69,825.00 76,807.50
- Kepala Tukang 0.001 OH 74,650.00 74.65
- Mandor 0.160 OH 80,400.00 12,864.00
Rp. 2,355,528.15
J.2 Memasang 1 buah Kloset Jongkok Porselen Rp 405,516.50
J.2.1 Bahan Koefesien Satuan Harga Jumlah
- Kloset Jongkok Porselen 1.000 Bh 110,000.00 110,000.00
- Semen Portland 6.000 Kg 1,370.00 8,220.00
- Pasir Pasang 0.010 92,000.00 920.00
J.2.2 Tenaga
- Pekerja 1.000 OH 56,800.00 56,800.00
- Tukang Batu 1.500 OH 69,825.00 104,737.50
- Kepala Tukang 1.500 OH 74,650.00 111,975.00
- Mandor 0.160 OH 80,400.00 12,864.00
Rp. 405,516.50
J.5 Memasang 1 buah Wastafel Rp 1,862,663.75
J.5.1 Bahan Koefesien Satuan Harga Jumlah
- Wastafel 1.000 Bh 1,486,500.00 1,486,500.00
- Perlengkapan 12% Harga Wastafel 178,380.00 178,380.00
- Semen Abu - abu 6.000 Kg 1,370.00 8,220.00
- Pasir Pasang 0.010 92,000.00 920.00
J.5.2 Tenaga
- Pekerja 1.200 OH 56,800.00 68,160.00
- Tukang Batu 1.450 OH 69,825.00 101,246.25
- Kepala Tukang 0.150 OH 74,650.00 11,197.50
- Mandor 0.100 OH 80,400.00 8,040.00
Rp. 1,862,663.75
J.7 Rp 664,422.50
J.7.1 Bahan Koefesien Satuan Harga Jumlah
- Bak Fibreglass 1.000 Bh 275,000.00 275,000.00
- Perlengkapan 18 % Harga Bak 49,500.00 49,500.00
J.7.2 Tenaga
- Pembantu Tukang 1.800 OH 56,800.00 102,240.00
- Tukang Batu 2.700 OH 69,825.00 188,527.50
- Kepala Tukang 0.540 OH 74,650.00 40,311.00
- Mandor 0.110 OH 80,400.00 8,844.00
Rp. 664,422.50
pasang 1 M' list langit-langit kayu profil
M3
M3
Memasang 1 buah Bak Mandi Fibreglass volume 0,5 m3
Daftar Analisa Pek Dikdas 2014 110
J.26 Memasang 1 m pipa PVC tipe AW diameter 3/4" Rp 12,716.92
J.31.1 Bahan Koefesien Satuan Harga Jumlah
- Pipa PVC 1.200 m 3,800.00 4,560.00
- Perlengkapan 35 % Hrg Pipa 1,330.00 1,330.00
J.31.2 Tenaga
- Pekrja 0.0360 OH 56,800.00 2,044.80
- Tukang Batu 0.0600 OH 69,825.00 4,189.50
- Kepala Tukang 0.0060 OH 74,650.00 447.90
- Mandor 0.0018 OH 80,400.00 144.72
Rp. 12,716.92
J.31 Memasang 1 m pipa PVC tipe AW diameter 3" Rp 80,619.59
J.31.1 Bahan Koefesien Satuan Harga Jumlah
- Pipa PVC 1.200 m 42,100.00 50,520.00
- Perlengkapan 5 % Harga Pipa 14,735.00 14,735.00
J.31.2 Tenaga
- Pembantu Tukang 0.0810 OH 56,800.00 4,600.80
- Tukang Batu 0.1350 OH 69,825.00 9,426.38
- Kepala Tukang 0.0135 OH 74,650.00 1,007.78
- Mandor 0.0041 OH 80,400.00 329.64
Rp. 80,619.59
J.32 Memasang 1 m pipa PVC tipe AW diameter 4" Rp 111,774.59
J.32.1 Bahan Koefesien Satuan Harga Jumlah
- Pipa PVC 1.200 m 62,200.00 74,640.00
- Perlengkapan 5 % Harga Pipa 21,770.00 21,770.00
J.32.2 Tenaga
- Pembantu Tukang 0.0810 OH 56,800.00 4,600.80
- Tukang Batu 0.1350 OH 69,825.00 9,426.38
- Kepala Tukang 0.0135 OH 74,650.00 1,007.78
- Mandor 0.0041 OH 80,400.00 329.64
Rp. 111,774.59
J.35 Memasang 1 bh kran dia. 3/4" atau 1/2" Rp 29,699.00
J.35.1 Bahan Koefesien Satuan Harga Jumlah
- Kran air 1.000 Bh 20,000.00 20,000.00
- Seal tape 0.0225 Bh 1,000.00 1,000.00
J.35.2 Tenaga
- Pembantu Tukang 0.0100 OH 56,800.00 568.00
- Tukang Batu 0.1000 OH 69,825.00 6,982.50
- Kepala Tukang 0.0100 OH 74,650.00 746.50
- Mandor 0.0050 OH 80,400.00 402.00
Rp. 29,699.00
J.36 1 m' Memasang saluran buis beton 1/2 Ø 30cm Rp 235,855.60
J.36.1 Bahan Koefesien Satuan Harga Jumlah
- Buis beton 1/2 Ø 30cm 1.100 m1 70,500.00 77,550.00
- Bata merah 70.000 bh 650.00 45,500.00
PC 17.500 kg 1,370.00 23,975.00
Pasir pasang 0.150 m3 92,000.00 13,800.00
J.36.2 Tenaga
- Pembantu Tukang 0.9000 OH 56,800.00 51,120.00
- Tukang Batu 0.3000 OH 69,825.00 20,947.50
- Kepala Tukang 0.0300 OH 74,650.00 2,239.50
- Mandor 0.0090 OH 80,400.00 723.60
Rp. 235,855.60
Daftar Analisa Pek Dikdas 2014 111
K.4 1 m2 Pasang Rangka Atap Baja Ringan
K.4 Bahan Koefesien Satuan Harga Jumlah
- Baja C-75 t 0.8 mm 1.488 M 14,200.00 21,129.60
- Baja C-75 t 0.6 mm 2.232 M 12,500.00 27,900.00
- Reng Baja Ringan 3.600 M 7,000.00 25,200.00
- Baut/Skrup Ulir (Screw) 28.000 BH 1,250.00 35,000.00
K.11.2 Tenaga
- Pekerja 0.200 OH 56,800.00 11,360.00
- Tukang Besi 0.450 OH 69,825.00 31,421.25
- Kepala Tukang Besi 0.010 OH 74,650.00 746.50
- Mandor 0.050 OH 80,400.00 4,020.00
Rp. 156,777.35
K.11.1 Bahan Koefesien Satuan Harga Jumlah
- profil alluminium Coklat Complit 4.000 m' 224,300.00 897,200.00
K.11.2 Tenaga
- Pekerja 0.043 OH 56,800.00 2,442.40
- tukang khusus alluminium 0.043 OH 69,825.00 3,002.48
- Kepala Tukang 0.004 OH 74,650.00 321.00
- Mandor 0.0021 OH 80,400.00 168.84
Rp. 903,134.71
K.13 Rp 972,936.98
K.13.1 Bahan Koefesien Satuan Harga Jumlah
- Jendela / Pintu Alumunium Complit 1.000 M2 961,100.00 961,100.00
- Kaca 5 mm 4.500 M2 176,000.00
K.13.2 Tenaga
- Pekerja 0.085 OH 56,800.00 4,828.00
- tukang alluminium/kaca 0.085 OH 69,825.00 5,935.13
- Kepala Tukang 0.009 OH 74,650.00 671.85
- Mandor 0.00500 OH 80,400.00 402.00
Rp. 972,936.98
K.18 Rp 92,124.75
K.18.1 Bahan Koefesien Satuan Harga Jumlah
- seng plat 1.050 17,500.00 18,375.00
- paku 1 cm - 2.5 cm 0.015 kg 19,300.00 289.50
- papan kayu kelas III 0.010 3,150,000.00 31,500.00
K.18.2 Tenaga
- Pekerja 0.200 OH 56,800.00 11,360.00
- Tukang 0.400 OH 69,825.00 27,930.00
- Kepala Tukang 0.025 OH 74,650.00 1,866.25
- Mandor 0.01000 OH 80,400.00 804.00
Rp. 92,124.75
1 m2 Pasang pintu kaca rangka alluminium
1 m' Pasang talang datar/jurai seng bjls28 lebar 90 cm
M'
m3
Daftar Analisa Pek Dikdas 2014 112
L.35 Rp 180,559.50
L.35.1 Bahan Koefesien Satuan Harga Jumlah
- Keramik 30 x 30 cm 11.870 Bh 6,200 73,594.00
- Semen Portland 10.000 Kg 1,370.00 13,700.00
- Pasir pasang 0.0450 92,000.00 4,140.00
- Semen warna 1.500 Kg 13,000.00 19,500.00
L.35.2 Tenaga
- Pekerja 0.700 OH 56,800.00 39,760.00
- Tukang Batu 0.350 OH 69,825.00 24,438.75
- Kepala Tukang 0.035 OH 74,650.00 2,612.75
- Mandor 0.035 OH 80,400.00 2,814.00
Rp. 180,559.50
L.35.a Rp 173,048.83
L.35.a.1 Bahan Koefesien Satuan Harga Jumlah
- Keramik Kualitas II (Polos) 40 x 40 6.500 Bh 10,167 66,083.33
- Semen Portland 10.000 Kg 1,370.00 13,700.00
- Pasir pasang 0.0450 92,000.00 4,140.00
- Semen warna 1.500 Kg 13,000.00 19,500.00
L.35.a.2 Tenaga
- Pekerja 0.700 OH 56,800.00 39,760.00
- Tukang Batu 0.350 OH 69,825.00 24,438.75
- Kepala Tukang 0.035 OH 74,650.00 2,612.75
- Mandor 0.035 OH 80,400.00 2,814.00
Rp. 173,048.83
L.68 Rp 160,162.57
L.36.1 Bahan Koefesien Satuan Harga Jumlah
- Ubin keramik 20 x 20 cm 25.000 Bh 3,177.27 79,431.82
- Semen Portland 9.300 Kg 1,370.00 12,741.00
- Pasir pasang 0.0180 92,000.00 1,656.00
- Semen warna 1.500 Kg 13,000.00 19,500.00
L.36.2 Tenaga
- Pekerja 0.600 OH 56,800.00 34,080.00
- Tukang Batu 0.100 OH 69,825.00 6,982.50
- Kepala Tukang 0.045 OH 74,650.00 3,359.25
- Mandor 0.030 OH 80,400.00 2,412.00
Rp. 160,162.57
1 M2 pasang lantai Keramik 30 x 30 cm
M3
1 M2 pasang lantai Keramik 40 x 40 cm
M3
1 M2 pasang dinding keramik ukuran (20 x 20) cm
M3
Daftar Analisa Pek Dikdas 2014 113
L.48 Rp 168,036.10
L.36.1 Bahan Koefesien Satuan Harga Jumlah
- Ubin keramik 10.000 Bh 6,400.00 64,000.00
- Semen Portland 11.380 Kg 1,370.00 15,590.60
- Pasir pasang 0.0420 92,000.00 3,864.00
- Semen warna 1.500 Kg 13,000.00 19,500.00
-
L.36.2 Tenaga -
- Pekerja 0.620 OH 56,800.00 35,216.00
- Tukang Batu 0.350 OH 69,825.00 24,438.75
- Kepala Tukang 0.035 OH 74,650.00 2,612.75
- Mandor 0.035 OH 80,400.00 2,814.00
Rp. 168,036.10
L.58 Rp 328,178.00
L.58.1 Bahan Koefesien Satuan Harga Jumlah
- batu tempel hitam 1.100 220,000.00 242,000.00
- Semen Portland 11.750 Kg 1,370.00 16,097.50
- Pasir pasang 0.0350 13,000.00 455.00
L.58.2 Tenaga
- Pekerja 0.700 OH 56,800.00 39,760.00
- Tukang Batu 0.350 OH 69,825.00 24,438.75
- Kepala Tukang 0.035 OH 74,650.00 2,612.75
- Mandor 0.035 OH 80,400.00 2,814.00
Rp. 328,178.00
L.70 Rp 368,476.30
L.70.1 Bahan Koefesien Satuan Harga Jumlah
- marmer 1.020 233,000.00 237,660.00
- Semen Portland 12.440 Kg 1,370.00 17,042.80
- Pasir pasang 0.0250 13,000.00 325.00
- semen warna 1.5000 Kg 13,000.00 19,500.00
L.70.2 Tenaga
- Pekerja 0.720 OH 56,800.00 40,896.00
- Tukang Batu 0.650 OH 69,825.00 45,386.25
- Kepala Tukang 0.065 OH 74,650.00 4,852.25
- Mandor 0.035 OH 80,400.00 2,814.00
Rp. 368,476.30
ANALISA PAVING BLOCK
L.80 Memasang 1 m² paving block natural segi empat; tebal 6 cm Rp 159,555.00
L.80.1 Bahan Koefesien Satuan Harga Jumlah
- Paving Segi Empat Natural: tebal 6 cm 1.010 m² 95,000.00 95,950.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.80.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 159,555.00
1 M2 pasang Lantai keramik 30 x 30 cm anti slip
M3
1 M2 pasang dinding batu tempel hitam
m2
M3
1 M2 pasang dinding marmer
m2
M3
Daftar Analisa Pek Dikdas 2014 114
L.81 Memasang 1 m² paving block warna segi empat; tebal 6 cm Rp 131,780.00
L.81.1 Bahan Koefesien Satuan Harga Jumlah
- Paving Segi Empat Warna; tebal 6 cm 1.010 m² 67,500.00 68,175.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.81.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 131,780.00
L.82 Rp 139,355.00
L.82.1 Bahan Koefesien Satuan Harga Jumlah
- Paving Block Natural Segi 4 t 8 cm 1.010 m² 75,000.00 75,750.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.82.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 139,355.00
L.83 Rp 146,930.00
L.83.1 Bahan Koefesien Satuan Harga Jumlah
- Paving Block Warna Segi 4 t 8 cm 1.010 m² 82,500.00 83,325.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.83.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 146,930.00
L.84 Rp 124,205.00
L.84.1 Bahan Koefesien Satuan Harga Jumlah
- Paving segi 6 natural 6 cm 1.010 m² 60,000.00 60,600.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.84.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 124,205.00
L.85 Rp 131,780.00
L.85.1 Bahan Koefesien Satuan Harga Jumlah
- Paving segi 6 warna 6 cm 1.010 m² 67,500.00 68,175.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.85.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 131,780.00
Memasang 1 M2 Paving Block Natural Segi 4 Tebal 8 cm
Memasang 1 M2 Paving Block Natural Segi 4 Tebal 8 cm
Memasang 1 M2 Paving Block Natural Segi 6 Tebal 6 cm
Memasang 1 M2 Paving Block Warna Segi 6 Tebal6 cm
Daftar Analisa Pek Dikdas 2014 115
L.86 Rp 139,355.00
L.86.1 Bahan Koefesien Satuan Harga Jumlah
- Paving segi 6 natural t 8 cm 1.010 m² 75,000.00 75,750.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.86.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 139,355.00
L.87 Rp 146,930.00
L.87.1 Bahan Koefesien Satuan Harga Jumlah
- Paving segi 6 warna t 8 cm 1.010 m² 82,500.00 83,325.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.87.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 146,930.00
L.88 Rp 124,205.00
L.88.1 Bahan Koefesien Satuan Harga Jumlah
- Pav 3 berlian Natural t 6 cm 1.010 m² 60,000.00 60,600.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.88.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 124,205.00
L.89 Rp 131,780.00
L.89.1 Bahan Koefesien Satuan Harga Jumlah
- Pav 3 berlian warna t 6 cm 1.010 m² 67,500.00 68,175.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.89.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 131,780.00
L.90 Rp 139,355.00
L.90.1 Bahan Koefesien Satuan Harga Jumlah
- Pav 3 berlian Natural t 8 cm 1.010 m² 75,000.00 75,750.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.90.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 139,355.00
Memasang 1 M2 Paving Block Natural Segi 6 Tebal 8 cm
Memasang 1 M2 Paving Block Warna Segi 6 Tebal 8 cm
Memasang 1 M2 Paving Block Natural 3 Berlian Tebal 6 cm
Memasang 1 M2 Paving Block Warna 3 Berlian Tebal 6 cm
Memasang 1 M2 Paving Block Natural 3 Berlian Tebal 8 cm
Daftar Analisa Pek Dikdas 2014 116
L.91 Rp 146,930.00
L.91.1 Bahan Koefesien Satuan Harga Jumlah
- Pav 3 berlian warna t 8 cm 1.010 m² 82,500.00 83,325.00
- Pasir Urug 0.100 m³ 87,500.00 8,750.00
L.91.2 Tenaga
- Pekerja 0.250 OH 56,800.00 14,200.00
- Tukang Batu 0.500 OH 69,825.00 34,912.50
- Kepala Tukang 0.050 OH 74,650.00 3,732.50
- Mandor 0.025 OH 80,400.00 2,010.00
Rp. 146,930.00
M.7 Rp 30,329.75
M.7.1 Bahan Koefesien Satuan Harga Jumlah
- Plamir 0.150 Kg 20,900.00 3,135.00
- Cat Dasar 0.170 Kg 43,600.00 7,412.00
- Cat Penutup 0.170 Kg 57,700.00 9,809.00
M.7.2 Tenaga
- Pekerja 0.070 OH 56,800.00 3,976.00
- Tukang Cat 0.075 OH 69,825.00 5,236.88
- Kepala Tukang 0.0075 OH 74,650.00 559.88
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 30,329.75
M.8 Rp 39,522.33
1 lapis cat dasar, 2 lapis cat penutup
M.8.1 Bahan Koefesien Satuan Harga Jumlah
- Cat Meni 0.200 Kg 43,600.00 8,720.00
- Plamir 0.150 Kg 20,900.00 3,135.00
- Cat Dasar 0.170 Kg 43,600.00 7,412.00
- Cat Penutup 2 kali 0.260 Kg 57,700.00 15,002.00
M.8.2 Tenaga
- Pekerja 0.070 OH 56,800.00 3,976.00
- Tukang Cat 0.009 OH 69,825.00 628.43
- Kepala Tukang 0.006 OH 74,650.00 447.90
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 39,522.33
M.8.a Rp 32,110.33
1 lapis cat dasar, 2 lapis cat penutup
M.8.1 Bahan Koefesien Satuan Harga Jumlah
- Cat Meni 0.200 Kg 43,600.00 8,720.00
- Plamir 0.150 Kg 20,900.00 3,135.00
- Cat Dasar - Kg 43,600.00 -
- Cat Penutup 2 kali 0.260 Kg 57,700.00 15,002.00
M.8.2 Tenaga
- Pekerja 0.070 OH 56,800.00 3,976.00
- Tukang Cat 0.009 OH 69,825.00 628.43
- Kepala Tukang 0.006 OH 74,650.00 447.90
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 32,110.33
Memasang 1 M2 Paving Block Warna 3 Berlian Tebal 8 cm
1 M2 Pengecatan Bidang Kayu Lama
1 M2 Pengecatan Bidang Kayu Baru (1 lapis plamir),
1 M2 Pengecatan Bidang Kayu Baru (1 lapis plamir),
Daftar Analisa Pek Dikdas 2014 117
M.11 Rp 29,224.90
M.11.1 Bahan Koefesien Satuan Harga Jumlah
- Politur 0.520 Ltr 32,000.00 16,640.00
- Ampelas 2.000 Lbr 3,500.00 7,000.00
M.11.2 Tenaga
- Pekerja - OH 56,800.00 -
- Tukang Cat 0.060 OH 69,825.00 4,189.50
- Kepala Tukang 0.016 OH 74,650.00 1,194.40
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 29,224.90
M.12 Rp 10,642.40
M.12.1 Bahan Koefesien Satuan Harga Jumlah
- Residu atau ter 0.350 Ltr 12,800.00 4,480.00
M.12.2 Tenaga
- Pekerja 0.100 OH 56,800.00 5,680.00
- Tukang Cat - OH 69,825.00 -
- Kepala Tukang - OH 74,650.00 -
- Mandor 0.006 OH 80,400.00 482.40
Rp. 10,642.40
M.14 Rp 19,662.27
1 lapis cat dasar, 2 lapis cat penutup)
M.14.1 Bahan Koefesien Satuan Harga Jumlah
- Plamir 0.100 Kg 42,400.00 4,240.00
- Cat Dasar 0.100 Kg 25,600.00 2,560.00
- Cat Penutup 2 x 0.260 Kg 25,600.00 6,656.00
M.14.2 Tenaga
- Pekerja 0.020 OH 56,800.00 1,136.00
- Tukang Cat 0.063 OH 69,825.00 4,398.98
- Kepala Tukang 0.0063 OH 74,650.00 470.30
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 19,662.27
M.14.a Rp 16,334.27
1 lapis cat dasar, 1 lapis cat penutup)
M.14.1 Bahan Koefesien Satuan Harga Jumlah
- Plamir 0.100 Kg 42,400.00 4,240.00
- Cat Dasar 0.100 Kg 25,600.00 2,560.00
- Cat Penutup 2 x 0.130 Kg 25,600.00 3,328.00
M.14.2 Tenaga
- Pekerja 0.020 OH 56,800.00 1,136.00
- Tukang Cat 0.063 OH 69,825.00 4,398.98
- Kepala Tukang 0.0063 OH 74,650.00 470.30
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 16,334.27
1 M2 Pelaburan bidang kayu dengan Politur
1 M2 Pelaburan bidang kayu dengan cat residu dan ter
1 M2 Pengecatan tembok baru (1 lapis plamir,
1 M2 Pengecatan tembok baru (1 lapis plamir,
Daftar Analisa Pek Dikdas 2014 118
M.15 Rp 12,717.58
2 lapis cat penutup)
M.15.1 Bahan Koefesien Satuan Harga Jumlah
- Cat Dasar 0.120 Kg 25,600.00 3,072.00
- Cat Penutup 2 x 0.180 Kg 25,600.00 4,608.00
M.15.2 Tenaga
- Pekerja 0.028 OH 56,800.00 1,590.40
- Tukang Cat 0.042 OH 69,825.00 2,932.65
- Kepala Tukang 0.0042 OH 74,650.00 313.53
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 12,717.58
M.24 Rp 18,897.58
sistem 3 lapis cat konvensional dengan tebal 200 um
M.24.1 Bahan Koefesien Satuan Harga Jumlah
- Cat Dasar 0.110 Kg 38,500.00 4,235.00
- Cat Antara 0.170 Kg 38,500.00 6,545.00
- Cat Penutup 0.080 Kg 38,500.00 3,080.00
M.24.2 Tenaga
- Pekerja 0.028 OH 56,800.00 1,590.40
- Tukang Cat 0.042 OH 69,825.00 2,932.65
- Kepala Tukang 0.0042 OH 74,650.00 313.53
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 18,897.58
M.24.a Rp 17,709.58
M.24.a.1 Bahan Koefesien Satuan Harga Jumlah
- Cat Besi Dasar 0.110 Kg 35,200.00 3,872.00
- Cat Besi Antara 0.170 Kg 35,200.00 5,984.00
- Cat Besi Penutup 0.080 Kg 35,200.00 2,816.00
M.24.a.2 Tenaga
- Pekerja 0.028 OH 56,800.00 1,590.40
- Tukang Cat 0.042 OH 69,825.00 2,932.65
- Kepala Tukang 0.0042 OH 74,650.00 313.53
- Mandor 0.0025 OH 80,400.00 201.00
Rp. 17,709.58
M.25 Memasang 1 kg rangka baja Rp 25,536.60
M.24.a.1 Bahan Koefesien Satuan Harga Jumlah
- Besi Baja WF 1.150 Kg 15,000.00 17,250.00
M.24.a.2 Tenaga
- Pekerja 0.060 OH 56,800.00 3,408.00
- Tukang las konstruksi 0.060 OH 69,825.00 4,189.50
- Kepala tukang 0.006 OH 74,650.00 447.90
- Mandor 0.003 OH 80,400.00 241.20
Rp. 25,536.60
1 M2 Pengecatan tembok lama (1 lapis cat dasar,
1 M2 Pengecatan permukaan baja lapis seng secara manual
1 M2 Pengecatan permukaan baja / Besi
119
DAFTAR HARGA SATUAN UPAH DAN BAHAN BANGUNAN
1. Daftar Harga Satuan Upah
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Pekerja OH 56,800 2 Mandor OH 80,400 3 Tukang Batu OH 69,825 4 Kepala Tukang Batu OH 74,650 5 Kepala Tukang Kayu OH 74,650 6 Tukang Kayu OH 69,825 7 Kepala Tukang Besi Beton OH 74,650 8 Tukang Besi Beton OH 69,825 9 Tukang Las OH 69,825
10 Kepala Tukang Las OH 74,650 11 Tukang Pelitur OH 69,825 12 Kepala Tukang Cat OH 74,650 13 Tukang Cat OH 69,825 14 Pemecah Batu OH 56,800 15 Kepala Tukang Pelitur OH 74,650
2. Bahan Pasangan
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Batu gunung /kuari 100,000
2 Batu Kali Belah 104,000
3 Batu Kali Keping / Tempel 99,000
4 Kerikil Alam 5/7 Cm ( BT. Pecah ) 113,200
5 Kerikil Pecah 5/7 Cm ( BT. Pecah ) 107,000
6 Kerikil Alam 3/5 Cm ( BT. Pecah ) 114,500
7 Kerikil Pecah 3/5 Cm ( BT. Pecah ) 182,000
8 Kerikil Alam 2/3 Cm 264,200
9 Kerikil Pecah 2/3 Cm 265,000
10 Kerikil Pecah 2 Cm 250,000
11 Kerikil Pecah 1 Cm 250,000
12 Pasir Beton 95,000
13 Pasir Pasang 92,000
14 Pasir Urug 87,500
15 Tanah Urug Pilihan 48,000 16 Kapur Gamping / Labur Kg 2,450
17 Kapur Pasang 342,000 18 Batu Bata Klas I Buah 650 19 Batu Bata Klas II Buah 600 20 Semen Warna Kg 13,000 21 PC. Merk Tiga Roda Kg 1,370 8022 PC. Merk Gresik Kg 1,360 8023 Fuller Kg 2,000
24 Sirtu 90,000
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
120
3. Bahan Atap
NO URAIAN SATUANHARGA
KET.(Rp)
1 2 3 4 5
1 Sirap Kalimantan Buah 1,000.00 2 Genteng Lokal Buah 600 3 Genteng Bubungan Lokal Buah 4,500.00 4 Genteng Pres Lokal/Nijang Super Buah 1,000.00 5 Bubungan Genteng Pres Lokal / Nijang Super Buah 5,800.00 6 Atap Metal Zincalum Lb 40,000 7 Bubungan Metal Zincalum Buah 35,000 8 Atap Metal Zincalum Berpasir Lb 85,000 9 Bubungan Metal Zincalum Berpasir Buah 57,700
10 Genteng Kaca Buah 14,100 11 Genteng Keramik Buah 20,500 12 Genteng Bubungan Keramik Buah 24,300 13 Ijuk Atap Kg 12,700 14 Asbes Gelombang Kecil Lembar 34,100 15 Asbes Gelombang Besar Lembar 39,000 16 Asbes Bubungan Gelombang Kecil Lembar 35,200 17 Asbes Bubungan Gelombang Besar Lembar 44,900 18 Seng Gelombang Besar BJLS 20 Lembar 61,600 19 Seng Gelombang Besar BJLS 25 Lembar 79,800 20 Seng Gelombang Besar BJLS 30 Lembar 104,500 21 Seng Gelombang Kecil BJLS 20 Lembar 71,100 22 Seng Plat BJLS 20 Lembar 28,200 23 Seng Plat BJLS 25 Lembar 38,400 24 Seng Plat BJLS 30 Lembar 44,900
Seng Plat Talang M' 17,500 25 Seng Dikroll Lembar 6,000 26 Plastik Talang M' 32,000 27 Rangka Atap Baja Ringan M2 175,000 28 Baja Kg 15,000 28 Seng Galvalume BJLS 25 M' 35,000 29 Seng Galvalume BJLS 30 M' 40,000 29 Bubungan Galvalume BJLS 27 M' 30,000 30 Kalsi Plank M' 36,000
4. Bahan Kayu
NO URAIAN SATUAN HARGA KET.(RP)
1 2 3 4 5
1 Papan Kayu Klas I 5,500,000 2 Balok Kayu Klas I 5,350,000
3 Papan Kayu Klas II 3,800,000
4 Balok Kayu Klas II 3,675,000
5 Papan Kayu Klas III 3,150,000
6 Balok Kayu Klas III 2,870,000 7 Dolken / Perancah Dia 10 Cm - 4 M Buah 24,300
M3
M3
M3
M3
M3
M3
121
5. Bahan Cetak
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Lubang Angin 10 x 20 Cm Buah 45,000 2 Lubang Angin 20 x 20 Cm Buah 52,500 3 Lubang Angin 30 x 20 Cm Buah 57,000 4 Buis Beton Dia 10 Cm M' 32,000 5 Buis Beton Dia 20 Cm M' 57,700 6 Buis Beton Dia 30 Cm M' 70,500 7 Buis Beton Dia 40 Cm M' 102,500 8 Buis Beton Dia 50 Cm Buah 117,000
9 Paving Block Natural Segi 4 T = 6 cm (50 Buah / m 95,000 1,900
10 Paving Block Warna Segi 4 T = 6 cm (50 Buah / m 67,500 1,350
11 Paving Block Natural Segi 4 T = 8 cm (50 Buah / m 75000 1,500
12 Paving Block Warna Segi 4 T = 8 cm (50 Buah / m 82,500 1,650
13 Paving Block Natural Segi 6 T = 6 cm (27 Buah / 60,000 2,222.22
14 Paving Block Warna Segi 6T = 6 cm (27 Buah / m 67,500 2,500.00
15 Paving Block Natural Segi 6 T = 8 cm (27 Buah / 75000 2,777.78
16 Paving Block Warna Segi 6 T = 8cm (27 Buah / m 82,500 3,055.56
17 Paving Block Natural 3 Berlian T = 6 cm (36 Buah 60,000 1,666.67
18 Paving Block Warna 3 Berlian T = 6 cm (36 Buah / 67,500 1,875.00
19 Paving Block Natural 3 Berlian T = 8 cm (36 Buah 75000 2,083.33
20 Paving Block warna 3 Berlian T = 8 cm (36 Buah / 82,500 2,291.67 21 Buis Beton 1/2 Dia. 20 Cm M' 32,000 22 Buis Beton 1/2 Dia. 30 Cm M' 38,400
6. Bahan Lantai
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Batu Tempel Hitam M2 220,000
2 Tegel Bergaris Abu - Abu 20 x 20 x 20 Cm M2 37,300 3 Tegel Warna 20 x 20 Cm M2 40,800 4 Tegel Bergaris Warna 20 x 20 Cm M2 41,600 5 Tegel Traso Klas I 30 x 30 Cm M2 46,600 6 Tegel Traso Klas II 30 x 30 Cm M2 42,500 7 Keramik Dinding M2 75,700 8 Porselin Kualitas I (Polos) 20 x 20 Bh 3,177 9 Keramik Kualitas I (Motif) Bh 68,200 68,200
10 Keramik Kualitas II (Motif) Bh 64,100 64,100 11 Keramik Kualitas II (Polos) Bh 61,000 61,000 12 Keramik Kualitas I (Polos) 30 x 30 Bh 6,200 13 Keramik Kualitas I (Polos) 40 x 40 Bh 11,367 14 Keramik Kualitas II (Polos) 30 x 30 Bh 5,545 15 Keramik Kualitas II (Polos) 40 x 40 Bh 10,167 16 Keramik Kualitas II (motif) 30 x 30 Bh 5,827 17 Keramik Kualitas II (Motif) 40 x 40 Bh 10,683 18 Keramik Kualitas II (Motif) 33 x 33 Bh 6,400 19 Marmer Kualitas II M2 233,000
Lis Keramik ( kuku Macan) M1 20,000
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
122
7. Bahan Besi
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Besi Beton Ulir Kg 12,500
2 Besi Beton Polos Kg 12,500 3 Besi Siku 30 x 30 x 3 mm Kg 55,000 4 Besi Siku 70 x 70 x 7 mm Kg 290,000 5 Besi Siku 50 x 50 x 5 mm Kg 109,000 6 Kusen Aluminium M' 224,300
7 Daun Pintu/Jendela Aluminium 961,100 8 Kawat Ikat Beton Kg 17,500
9 Kawat Saringan Pasir 24,100 10 Kawat Duri Rol 85,000 11 Kawat Bronjong Digalvanisir Kg 13,600
12 Daun Gerbang Besi Kotak ( Besi Kotak 3/4 cm ) 750,000
13 Pagar Besi Kotak ( 2/4 - 4/4 cm ) 450,000
8. Bahan Langit - Langit
NO URAIAN SATUAN HARGA KET.(RP)
1 2 3 4 5
1 Eternit 100 x 100 Cm Lembar 14,900 2 Triplek 120 x 240 x 2 mm Lembar 38,500 3 Triplek 120 x 240 x 3 mm Lembar 42,400 4 Triplek 120 x 240 x4mm Lembar 62,000
Triplek 120 x 240 x6mm Lembar 71,500 5 Triplek 120 x 240 x 9 mm Lembar 118,300 6 Triplek 120 x 240 x 12 mm Lembar 151,300 7 Triplek 120 x 240 x 18 mm Lembar 225,500 8 Teakwood 120 x 240 x 3 mm Lembar 125,000 9 Teakwod Pintu Lembar 90,000
10 Formika Putih 120 x 240 Cm Lembar 147,400 11 Formika Warna 120 x 240 Cm Lembar 153,800 12 Lem Kayu Lt 19,200 13 Triplek Pintu 90 x 200 Lembar 35,800 14 List Plafond Profil M' 7,500 15 List Plapond Polos M' 5,000 16 Calsiboard Lembar 70,500 17 List plafond gypsum besar M' 32,500 18 Calsiboard + Rangka Metafuring M2 100,000
9. Bahan Pipa
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Pipa GI ND 13 mm M' 18,600 2 Pipa GI ND 20 mm M' 28,300 3 Pipa PVC ND 75 mm M' 42,100 4 Pipa PVC ND 100 mm M' 62,200 5 Pipa PVC ND 20 mm M' 3,800 6 Kran air 3/4 " Buah 20,000 7 Stop Kran Dia 1/2 mm Buah 30,000 8 Stop Kran Dia 3/4 mm Buah 45,000 9 Pipa PVC ND 50 mm M' 20,235
10 Pipa PVC ND 13 mm M' 2,675
M2
M2
M2
M2
123
124
10. Bahan Kaca
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Kaca Polos 3 mm 150,000 Tetap2 Kaca Polos 5 mm 176,000
3 Kaca Riben tebal 3 mm 160,000
4 Kaca Riben tebal 5 mm 187,000
5 Kaca S Tebal 5 mm 141,000
11. Bahan Finishing
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Ampelas Kayu Lembar 3,500
2 Plamir Kayu Kg 20,900 3 Spritus Liter 16,700 4 Minyak Cat Liter 33,000 5 Residu Liter 12,200 6 Lem Kayu Kg 32,500 7 Meni Besi Kg 44,900 8 Meni Kayu Kg 43,600 9 Cat Kayu Mutu Menengah Kg 32,000
10 Cat Kayu Mutu Tinggi Kg 57,700 11 Cat Tembok Mutu Menengah Kg 25,600 12 Cat Tembok Mutu Tinggi Kg 57,700 13 Cat Besi Kg 35,200 14 Plamir Tembok Kg 42,400 15 T e e r Kg 12,800 16 Politur Liter 32,000 17 Cat Marka Jalan Biasa Kg 44,900 18 Minyak Cat A Spesial Liter 16,000 19 Cat Marka Jalan Scalato Kg 57,700 20 Roll Cat Buah 13,800 21 Kuas Cat 2 - 4 Cm Buah 7,000 22 Kuas Cat 4 - 8 Cm Buah 4,500 23 Cat Genteng Kg 38,500
12. Bahan Pengunci
NO URAIAN SATUAN HARGA KET.(RP)
1 2 3 4 5
1 Union Kecil 1 Slag Buah 71,500 2 Union Kecil 2 Slag Buah 127,500 3 Yale 1 Slag Buah 74,000 4 Yale 2 Slag Buah 93,700 5 Kuda Terbang 1 Slag Buah 77,600 6 Kuda Terbang 2 Slag Buah 93,700 7 Royal Stel 84,700 8 Haag Angin Besar Stel 7,300 9 Haag Angin Kecil Stel 4,900
10 Grendel Besar Buah 8,300 11 Grendel Kecil Buah 5,700 12 Engsel Nylon PS 11,000 13 Engsel H PS 8,500 14 Expagnolet Buah 20,400
M2
M2
M2
M2
M2
125
13. Bahan Sanitaire
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Closet Duduk Buah 1,960,700 2 Closet Jangkok Traso Buah 71,500 3 Closet Jongkok Porselin Buah 110,000 4 Wastafel Buah 1,486,500 5 Urinoir Porselin Buah 39,117,800 6 Saringan Air Bersih Buah 5,478,400 7 Saringan Air Plastik Buah 891,900 8 Bak Cuci Piring Plastik Buah 165,000 9 Bak Cuci Piring Logam Buah 210,000
10 Buah 416,500
11 Buah 3,203,800
12 Buah 4,164,900
13 Buah 275,000
14 Buah 350,000
15 Bak Mandi Teraso 50 x 50 cm Buah 256,300
16 Bak Mandi LPS Keramik 50 x 50 Cm Buah 1,601,900
17 Avoir Buah 35,000
14. Bahan Paku
NO URAIAN SATUAN HARGA KET.(RP)
1 2 3 4 5
1 Paku Panjang 1 - 3 Cm Kg 19,300
2 Paku Panjang 4 - 6 Cm Kg 17,600 3 Paku Panjang 7 - 12 Cm Kg 15,400 4 Paku Seng Kg 23,100 5 Paku Asbes Buah 4,300 6 Skrup/Piles 1.5 Cm Doos Kecil 25,100 7 Paku Skrup + Mur ( atap Genteng Metal) Bh 1,250 8 Besi Strep Kg 11,200 9 Paku Sumbat Buah 2,200
10 Besi Beugel/Baut (Untuk Kuda-kuda) Kg 14,400 11 Plat Gapit Kuda-kuda Buah 14,400 12 Angkur Buah 7,200 13 Baut Mur Plat Strip Buah 21,500
Reservoir Fybg Kapasitas 1 M3
Septictank Kapasitas 1 M3
Septictank Kapasitas 2 M3
Bak Fyberglass Kap 0.5 M3
Bak Mandi Plastik Kap 0.5 M3
126
15. Bahan Instalasi Listrik
NO URAIAN SATUANHARGA
KET.(RP)
1 2 3 4 5
1 Titik Lampu Buah 155,000
2 Stop Kontak Tanam Buah 145,000 3 Stop Kontak Luar Buah 25,000 4 Saklar Tanam Double Buah 25,000 5 Saklar Tanam Tunggal Buah 25,000 6 Zekering Boxes 1 Group Buah 125,000 7 Zekering Boxes 2 Group Buah 175,000 8 MCB Buah 125,000 9 Zekering Boxes 3 Group Buah 225,000
10 Pemasukan Daya (900Watt) Unit 2,500,000 11 Lampu Pijar Philips 15 - 25 Watt Buah 5,940 12 Lampu Pijar Philips 40 - 60 Watt Buah 8,500
13 Lampu Pijar Philips 80 - 100 Watt Buah 13,601 14 Lampu HE 8 Watt Ex Philips Buah 27,500 15 Lampu HE 15 Watt Ex Philips Buah 39,000.00 16 Lampu HE 18 Watt Ex Philips Buah 40,000.00 17 Lampu HE 23 Watt Ex Philips Buah 43,000.00 18 Lampu HE 25 Watt Ex Philips Buah 45,000.00 19 Arde Tanam Buah 150,000
Memasang 1 kg rangka kuda - kuda baja WF
Kebutuhan Satuan IndeksBahan Besi Baja WF KG 1.15
Pekerja OH 0.060Tenaga Kerja Tukang las konstruksi OH 0.060
Kepala tukang OH 0.006Mandor OH 0.003
Batang Profil Panjang Batang Berat ( KG ) Jml Batang VolumeAtas Koppel siku ( 75 x 75 x 8 ) 7.52 5.42 2 81.56Bawah Siku ( 45 x 45 x 7 ) 7.52 13.1 2 197.13Diagonal Koppel siku ( 70 x 70 x7 ) 1.90 6.74 12 153.67Vertikal Koppel siku ( 45 x 45 x5 ) 1.9 3.77 13 93.12
Total Volume 525.48Kolom 5 5.95 14 416.5
Total Volume 416.5
Batang Profil Panjang Batang Berat ( KG ) Jml Batang VolumeAtas Koppel siku ( 60 x 60 x 6 ) 7.37 5.42 2 79.87Bawah Koppel siku ( 90 x 90 x 16 ) 7.37 20.7 2 305.04Diagonal(3 & 19 ) siku ( 75 x 75 x 12 ) 1.78 13.1 2 46.64( 7 & 15 ) siku ( 75 x 75 x 12 ) 2.29 13.1 2 60.00( 10 & 13 ) siku ( 75 x 75 x 12 ) 2.14 13.1 2 56.07Vertikal( 5 & 17 ) Koppel siku ( 90 x 90 x 13 ) 0.90 17.1 2 30.78
11 Koppel siku ( 90 x 90 x 13 ) 1.80 17.1 1 30.78Total Volume 609.18
Kolom 4.5 5.95 22 589.05Total Volume 589.05
I ( 100 x 75 )
I ( 80 x 42 x 5.9 )
60 x 60 x 675 x 75 x 1250 x 50 x 950 x 50 x 5
80 x 42 x 5.9
60 x 60 x 690 x 90 x 1675 x 75 x 12
90 x 90 x 13
80 x 42 x 5.9
Batang Profil Panjang Batang Berat ( KG ) Jml Batang VolumeAtas Koppel siku ( 60 x 60 x 6 ) 8.25 5.42 2 89.39Bawah Siku ( 75 x 75 x 12 ) 8.25 13.1 2 216.05Diagonal Koppel siku ( 50 x 50 x 9 ) 1.77 6.74 12 143.29Vertikal Koppel siku ( 50 x 50 x 5 ) 1.5 3.77 13 73.52
Total Volume 522.25Kolom 5 5.95 14 416.5
Total Volume 416.5I ( 80 x 42 x 5.9 )
60 x 60 x 675 x 75 x 1250 x 50 x 950 x 50 x 5
80 x 42 x 5.9
DAFTAR HARGA SATUAN UPAH DAN BAHAN BANGUNAN
1. Daftar Harga Satuan Upah
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Pekerja OH 56,800 2 Pekerjaan Hutan OH 60,750 3 Mandor OH 80,400 4 Tukang Batu OH 69,825 5 Kepala Tukang Batu OH 74,650 6 Kepala Tukang Kayu OH 74,650 7 Tukang Kayu OH 69,825 8 Kepala Tukang Besi Beton OH 74,650 9 Tukang Besi Beton OH 69,825
10 Tukang Las OH 69,825 11 Kepala Tukang Las OH 74,650 12 Tukang Pelitur OH 69,825 13 Kepala Tukang Cat OH 74,650 14 Tukang Cat OH 69,825 15 Pemecah Batu OH 56,800 16 Jaga Malam OH 60,750 17 Pembantu Operator OH 60,750 18 Kepala Tukang Pelitur OH 74,650
2. Bahan Pasangan
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Batu Kali Alam 98,500
2 Batu Kali Belah 100,000
3 Batu Kali Keping / Tempel 99,000
4 Kerikil Alam 5/7 Cm ( BT. Pecah ) 113,200
5 Kerikil Pecah 5/7 Cm ( BT. Pecah ) 107,000
6 Kerikil Alam 3/5 Cm ( BT. Pecah ) 114,500
7 Kerikil Pecah 3/5 Cm ( BT. Pecah ) 182,000
8 Kerikil Alam 2/3 Cm 264,200
9 Kerikil Pecah 2/3 Cm 265,000
10 Kerikil Pecah 2 Cm 250,000
11 Kerikil Pecah 1 Cm 250,000
12 Pasir Beton 95,000
13 Pasir Pasang 92,000
14 Pasir Urug 87,500
15 Tanah Urug Pilihan 48,000 16 Kapur Gamping / Labur Kg 2,450
17 Kapur Pasang 342,000 18 Batu Bata Klas I Buah 650 19 Batu Bata Klas II Buah 600 20 Semen Warna Kg 13,000 21 PC. Merk Tiga Roda Kg 1,370 22 PC. Merk Gresik Kg 1,360 23 PC. Merk Tonasa Kg 1,280 24 PC. Merk Basowa Kg 1,260 25 Fuller Kg 2,000
26 Sirtu 25,000
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
3. Bahan Atap
NO URAIAN SATUAN HARGA KETERANGAN
1 2 3 4 5
1 Sirap Kalimantan Buah 1,000.00 2 Genteng Lokal Buah 600 3 Genteng Bubungan Lokal Buah 4,500.00 4 Genteng Pres Lokal/Nijang Super Buah 1,000.00 5 Bubungan Genteng Pres Lokal / Nijang Super Buah 5,800.00 6 Atap Metal Zincalume Lembar 45,000 7 Bubungan Metal Zincalume Buah 35,000 8 Sakura Roof Pasir Lembar 70,000 9 Sakura Roof Biasa Lembar 32,500
10 Atap Metal Zincalume Berpasir Lbr 85,000 11 Bubungan Metal Zincalume Berpasir Buah 57,700 12 Genteng Kaca Buah 14,100 13 Genteng Keramik Buah 20,500 14 Genteng Bubungan Keramik Buah 24,300 15 Ijuk Atap Kg 12,700 16 Asbes Gelombang Kecil Lembar 45,000 17 Asbes Gelombang Besar Lembar 48,000 18 Asbes Bubungan Gelombang Kecil Lembar 42,500 19 Asbes Bubungan Gelombang Besar Lembar 73,250 20 Seng Gelombang Besar BJLS 20 Lembar 61,600 21 Seng Gelombang Besar BJLS 25 Lembar 79,800 22 Seng Gelombang Besar BJLS 30 Lembar 104,500 23 Seng Gelombang Kecil BJLS 20 Lembar 71,100 24 Seng Plat BJLS 20 Lembar 28,200 25 Seng Plat BJLS 25 Lembar 38,400 26 Seng Plat BJLS 30 Lembar 44,900 27 Seng Plat Talang M' 17,500 28 Seng Dikroll Lembar 32,000 29 Plastik Talang M' 32,000 30 RangRangka Atap Baja Ringan ( Hitungan Mirin M2 250,000 31 Seng Galvalum BJLS 25 M' 35,000 32 Seng Galvalum BJLS 30 M' 38,000 33 Seng Galvalum BJLS 35 M' 45,000 34 Seng Galvalum BJLS 40 M' 50,000 35 Bubungan Seng Galvalum BJLS 30 M' 30,000 36 Kalsi Plank M' 36,000
4. Bahan Kayu
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Papan Kayu Klas I 5,500,000
2 Balok Kayu Klas I 5,350,000
3 Papan Kayu Klas II 3,800,000
4 Balok Kayu Klas II 3,675,000
5 Papan Kayu Klas III 3,150,000
6 Balok Kayu Klas III 2,870,000 7 Dolken / Perancah Dia 10 Cm - 4 M Buah 24,300
M3
M3
M3
M3
M3
M3
5. Bahan Cetak
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Lubang Angin 10 x 20 Cm Buah 45,000 2 Lubang Angin 20 x 20 Cm Buah 52,500 3 Lubang Angin 30 x 20 Cm Buah 57,000 4 Lubang Angin 30 x 15 Cm Buah 41,300 4 Buis Beton Dia 10 Cm M' 45,000 5 Buis Beton Dia 20 Cm M' 85,000 6 Buis Beton Dia 30 Cm M' 110,000 7 Buis Beton Dia 40 Cm M' 150,000 8 Buis Beton Dia 50 Cm Buah 190,000 9 Buis Beton Dia 60 Cm Buah 250,000
10 Buis Beton Dia 70 Cm Buah 310,000 11 Buis Beton Dia 80 Cm Buah 340,000
12 Paving Block Natural Segi 4 T = 6 cm (50 Buah / m2) 70,000 1,400
13 Paving Block Warna Segi 4 T = 6 cm (50 Buah / m2) 70,000 1,400
14 Paving Block Natural Segi 4 T = 8 cm (50 Buah / m2) 90,000 1,800
15 Paving Block Warna Segi 4 T = 8 cm (50 Buah / m2) 90,000 1,800
16 Paving Block Natural Segi 6 T = 6 cm (27 Buah / m2) 70,000 2,593
17 Paving Block Warna Segi 6T = 6 cm (27 Buah / m2) 70,000 2,593
18 Paving Block Natural Segi 6 T = 8 cm (27 Buah / m2) 90,000 3,333
19 Paving Block Warna Segi 6 T = 8cm (27 Buah / m2) 90,000 3,333
20 Paving Block Natural 3 Berlian T = 6 cm (36 Buah / m2) 70,000 1,944
21 Paving Block Warna 3 Berlian T = 6 cm (36 Buah / m2) 70,000 1,944
22 Paving Block Natural 3 Berlian T = 8 cm (36 Buah / m2) 90,000 2,500
23 Paving Block warna 3 Berlian T = 8 cm (36 Buah / m2) 90,000 2,500 24 Buis Beton 1/2 Dia. 20 Cm M' 50,000 25 Buis Beton 1/2 Dia. 30 Cm M' 60,000 26 Buis Beton 1/2 Dia. 40 Cm M' 65,000
6. Bahan Lantai
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Batu Tempel Hitam M2 220,000 2 Keramik Anti Selip / Sponeng (20x20) Buah 2,500 3 Keramik Dinding (20x25) Buah 4,100 4 Keramik Kualitas I (Motif) M2 75,000 5 Keramik Kualitas I (Motif) M2 65,000 6 Keramik Kualitas I (Motif) (30x30) Buah 6,200 7 Keramik Kualitas I (Polos) (30x30) Buah 6,091 8 Keramik Kualitas I (Polos) (40x40) Buah 11,333 9 Keramik Kualitas II (Motif) (40x40) Buah 11,667
10 Keramik Kualitas II (Polos) M2 61,000 11 Keramik Kualitas II (Motif) Buah 11,167 12 Keramik Lis buah 9,000 13 Marmer Kualitas I M2 308,700 14 Marmer Kualitas II M2 233,000 15 Porselin Kualitas I (Polos) M2 69,900 16 Porselin Kualitas I (Polos) 20 x 20 buah 3,177 17 Tegel Abu-abu 20 x 20 cm buah 2,200 18 Tegel bergaris Abu-abu 20 x 20 cm buah 1,492 19 Tegel bergaris warna 20 x 20 cm buah 2,200 20 Tegel traso Klas I 30 x 30 cm buah 4,236 21 Tegel traso Klas II 30 x 30 cm buah 3,864 22 Tegel warna 20 x 20 cm buah 2,200
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
7. Bahan Besi
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Besi Beton Ulir Kg 12,500 2 Besi Beton Polos Kg 12,500 3 Besi Siku 50 x 50 x 5 mm M' 46,800 4 Besi Siku 60 x 60 x 6 mm M' 76,375 5 Besi Siku 70 x 70 x 7 mm M' 96,200 6 Besi Siku 80 x 80 x 8 mm M' 149,500 7 Besi Siku 100 x 100 x 10 mm M' 300,625 8 Kusen Aluminium M' 224,300
9 Daun Pintu/Jendela Aluminium 961,100 10 Kawat Ikat Beton Kg 18,000
11 Kawat Saringan Pasir 30,000 12 Kawat Duri Rol 65,000 13 Kawat Bronjong Digalvanisir Kg 13,600 14 Reling GI kg 17,300 15 Rengka Besi Kotak 5x5 kg 16,000 16 Rengka Besi Kotak 4x4 1,6x6 ( 6 meter ) batang 125,000 17 Hollow Galvanis 2x4x0.3 - 4 m batang 22,000 18 Hollow Galvanis 4x4x0.3 - 4 m batang 26,000 19 Hollow Meni 2x4x0.35 - 4 m batang 22,000 20 Hollow Meni 2x4x0.40 - 4 m batang 26,000 21 Hollow Meni 4x4x0.35 - 4 m batang 27,000 22 Hollow Meni 4x4x0.40 - 4 m batang 32,000
8. Bahan Langit - Langit
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Eternit 100 x 100 Cm Lembar 14,900 2 Triplek 120 x 240 x 2 mm Lembar 38,500 3 Triplek 120 x 240 x 3 mm Lembar 50,000 4 Triplek 120 x 240 x4mm Lembar 62,000 5 Triplek 120 x 240 x6mm Lembar 85,000 6 Triplek 120 x 240 x 9 mm Lembar 115,000 7 Triplek 120 x 240 x 12 mm Lembar 172,000 8 Triplek 120 x 240 x 18 mm Lembar 240,000 9 Teakwood 120 x 240 x 3 mm Lembar 135,000
10 Teakwod Pintu Lembar 90,000 11 Formika Putih 120 x 240 Cm Lembar 147,400 12 Formika Warna 120 x 240 Cm Lembar 153,800 13 Lem Kayu Lt 19,200 14 Triplek Pintu 90 x 200 Lembar 45,000 15 List Plafond Profil M' 7,500 16 List Plapond Polos M' 5,000 17 Calksboard 120 x 240 x 6 mm Lembar 175,000 18 List plafond gypsum besar M' 32,500
9. Bahan Pipa
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Pipa GI ND 13 mm M' 19,900 2 Pipa GI ND 20 mm M' 30,300 3 Pipa PVC ND 75 mm M' 52,750 4 Pipa PVC ND 100 mm M' 66,550 5 Pipa PVC ND 20 mm M' 4,075 6 Pipa PVC ND 50 mm M' 42,800 7 Kran air 3/4 " Buah 17,500 8 Stop Kran Dia 1/2" Buah 61,950
M2
M2
9 Stop Kran Dia 3/4" Buah 89,450
10. Bahan Kaca
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Kaca Polos 3 mm 150,000
2 Kaca Polos 5 mm 176,000
3 Kaca Riben tebal 3 mm 160,000
4 Kaca Riben tebal 5 mm 187,000
5 Kaca S Tebal 5 mm 141,000
11. Bahan Finishing
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Ampelas Kayu Lembar 3,500 2 Plamir Kayu Kg 20,900 3 Spritus Liter 16,700 4 Minyak Cat Liter 33,000 5 Residu Liter 12,200 6 Lem Kayu Kg 32,500 7 Meni Besi Kg 44,900 8 Meni Kayu Kg 44,000 9 Cat Kayu Mutu Menengah Kg 38,000
10 Cat Kayu Mutu Tinggi Kg 58,000 11 Cat Tembok Mutu Menengah Kg 21,400 12 Cat Tembok Mutu Tinggi Kg 90,000 13 Cat Besi Kg 44,000 14 Plamir Tembok Kg 42,400 15 T e e r Kg 15,000 16 Politur Liter 42,000 17 Cat Marka Jalan Biasa Kg 44,900 18 Minyak Cat A Spesial Liter 16,000 19 Cat Marka Jalan Scalato Kg 57,700 20 Roll Cat Buah 13,800 21 Kuas Cat 2 - 4 Cm Buah 7,000 22 Kuas Cat 4 - 8 Cm Buah 4,500 23 Cat Genteng Kg 38,500 23 Teak Oli Liter 17,900
12. Bahan Pengunci
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Union Kecil 1 Slag Buah 71,500 2 Union Kecil 2 Slag Buah 127,500 3 Yale 1 Slag Buah 90,000 4 Yale 2 Slag Buah 150,000 5 Kuda Terbang 1 Slag Buah 77,600 6 Kuda Terbang 2 Slag Buah 93,700 7 Royal Stel 84,700 8 Haag Angin Besar Stel 7,500 9 Haag Angin Kecil Stel 4,900
10 Grendel Besar Buah 11,000 11 Grendel Kecil Buah 9,000 12 Engsel Nylon PS 30,000 13 Engsel H PS 10,000 14 Expagnolet Buah 20,400
M2
M2
M2
M2
M2
13. Bahan Sanitaire
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Closet Duduk Buah 1,960,700 2 Closet Jangkok Traso Buah 71,500 3 Closet Jongkok Porselin Buah 150,000 4 Daun Pintu Fiber Buah 500,000 5 Wastafel Buah 325,000 6 Urinoir Porselin Buah 3,911,800 7 Saringan Air Bersih Buah 5,478,400 8 Saringan Air Plastik Buah 891,900 9 Bak Cuci Piring Plastik Buah 165,000
10 Bak Cuci Piring Logam Buah 210,000 11 Reservoir Fybg Kapasitas 1 M3 Buah 416,500 12 Septictank Kapasitas 1 M3 Buah 3,203,800 13 Septictank Kapasitas 2 M3 Buah 4,164,900 14 Bak Fyberglass Kap 0.5 M3 Buah 275,000 15 Bak Mandi Plastik Kap 0.5 M3 Buah 350,000 16 Bak Mandi Teraso 50 x 50 cm Buah 256,300 17 Bak Mandi LPS Keramik 50 x 50 Cm Buah 1,601,900 18 Avoir Buah 35,000
14. Bahan Paku
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Paku Panjang 1 - 3 Cm Kg 18,000 2 Paku Panjang 4 - 6 Cm Kg 15,000 3 Paku Panjang 7 - 12 Cm Kg 14,000 4 Paku Panjang 5 - 15 Cm Kg 13,000 5 Paku Panjang 2 Cm Kg 17,000 6 Paku Seng Kg 18,000 7 Paku Asbes Kg 22,000 8 Paku Anti Karat Kg 18,000 9 Paku Gypsum Kg 20,000
10 Paku Eternit Kg 25,000 11 Skrup/Piles 1.5 Cm Doos Kecil 25,100 12 Skrup/Piles 2.0 Cm Doos Kecil 25,800 13 Paku Skrup + Mur ( atap Genteng Metal) Bh 1,250 14 Besi Strep Kg 11,200 15 Paku Sumbat Buah 2,200 16 Besi Beugel/Baut (Untuk Kuda-kuda) Kg 20,000 17 Plat Gapit Kuda-kuda Buah 14,400 18 Angkur Buah 7,200 19 Baut Mur Plat Strip Buah 21,500
15. Bahan Instalasi Listrik
NO URAIAN SATUANHARGA
KETERANGAN(RP)
1 2 3 4 5
1 Titik Lampu Buah 155,000 2 Stop Kontak Tanam Buah 138,230 3 Stop Kontak Luar Buah 130,099 4 Saklar Tanam Double Buah 25,000 5 Saklar Tanam Tunggal Buah 25,000 6 Zekering Boxes 1 Group Buah 125,000 7 Zekering Boxes 2 Group Buah 200,000 8 MCB Buah 150,000 9 Zekering Boxes 3 Group Buah 403,603
10 Pemasukan Daya (900Watt) Unit 2,500,000 11 Lampu Pijar Philips 15 - 25 Watt Buah 5,940 12 Lampu Pijar Philips 40 - 60 Watt Buah 8,500 13 Lampu Pijar Philips 80 - 100 Watt Buah 13,601 14 Lampu HE 8 Watt Ex Philips Buah 24,000.00 15 Lampu HE 15 Watt Ex Philips Buah 30,000.00 16 Lampu HE 18 Watt Ex Philips Buah 30,000.00 17 Lampu HE 23 Watt Ex Philips Buah 43,000.00 18 Lampu HE 25 Watt Ex Philips Buah 45,000.00 19 Arde Tanam Buah 150,000.00
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln.Raya Bypass Pungka Sumbawa Besar
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN KANTOR RESORT KANAR KPHP BATU LANTEH
LOKASI : KECAMATAN BADAS
TAHUN ANGGARAN : 2015
SUMBER DANA : APBD
NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)
1 2 3
I PEKERJAAN PERSIAPAN 650,000.00
II PEKERJAAN TANAH 1,833,851.79
III PEKERJAAN PASANGAN 25,212,733.99
IV PEKERJAAN BETON 30,767,987.42
V PEKERJAAN PINTU DAN JENDELA 7,747,198.29
VI PEKERJAAN ATAP 7,958,822.45 VII PEKERJAAN LANTAI 1,811,196.00 VIII PEKERJAAN PENGUNCI 579,000.00 IX PEKERJAAN INSTALASI LISTRIK 1,912,921.60 X PEKERJAAN SANITASI 4,002,900.00
( A ) Jumlah : 84,257,938.49 ( B ) Overhead 10 % : 8,425,793.85 ( C = A + B ) Jumlah : 92,683,732.34 ( D ) PPn 10% 9,268,373.23 ( E = C + D ) Total : 101,952,105.57
Pembulatan : 101,952,000.00
Terbilang : #NAME?
Sumbawa Besar, 2015
KONSULTAN PERENCANACV. MAGITA RAYA Konsultan
Konsultan
SYAHID AWALUDDIN, STTeam Leader
DISETUJUI OLEH :Pejabat Pembuat Komitmen
(PPK)
EKO WIBOWO, STNIP. 19690924 200801 011
MENGETAHUI :Kepala Dinas Pekerjaan Umum
Kab.Sumbawa
H. ASAAT ABDULLAH, ST.NIP. 19581214 198212 1 002
MENGETAHUI :Kepala Kantor KPHP Batu Lanteh
Kab.Sumbawa
JULMANSYAH, S.HutNIP. 19740701 200212 1 005
DIPERIKSA OLEH :Pejabat Pelaksana Teknis Kegiatan
(PPTK)
SUPARMAN MASJRUN, S.HutNIP. 19760805 200501 1 001
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln.Raya Bypass Pungka Sumbawa Besar
RENCANA ANGGARAN BIAYA( R A B )
KEGIATAN : PEMBANGUNAN GEDUNG KANTORPEKERJAAN : PEMBANGUNAN KANTOR RESORT KANAR KPHP BATU LANTEHLOKASI : KECAMATAN BADASTAHUN ANGGARAN : 2015SUMBER DANA : APBD
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA (Rp)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN1 Pembuatan Papan Nama Proyek - Ls 1.000 150,000.00 150,000.00 2 Pengukuran dan Pemasangan Bowplank - Ls 1.000 200,000.00 200,000.00 3 Pembersihan Lokasi - Ls 1.000 150,000.00 150,000.00 4 Air Kerja - Ls 1.000 150,000.00 150,000.00
Sub Total I 650,000.00
II PEKERJAAN TANAH1 Galian Tanah Pondasi B.1 M3 24.570 44,610.00 1,096,067.70 2 Urugan Pasir Bawah Pondasi B.11 M3 1.755 122,844.00 215,591.22 3 Urugan Kembali B.9 M3 6.143 15,004.00 92,162.07 4 Urugan Tanah bawah Lantai Dipadatkan B.10.a M3 5.700 75,444.00 430,030.80
Sub Total II 1,833,851.79 III PEKERJAAN PASANGAN
1 Pasangan Batu Kosong C.9 M3 5.265 235,382.70 1,239,289.92 2 Pasangan Batu 1 PC : 5 Ps C.3 M3 13.650 505,565.50 6,900,969.07 3 Pasangan Rolag Bata 1 Pc : 3 PP E.8.a M2 0.600 196,463.50 117,878.10 4 Pasangan Tembok Bata 1 Pc : 5 PP E.10 M2 98.143 88,876.60 8,722,640.67 5 Plesteran Pondasi 1 Pc : 3 PP D.3 M2 12.000 42,608.62 511,303.44 6 Plesteran Tembok 1 Pc : 5 PP D.5 M2 196.287 39,333.58 7,720,652.79
Sub Total III 25,212,733.99 IV PEKERJAAN BETON
1 Sloof 15/20 F.29.a M3 1.02 6,482,837.82 6,612,494.57 2 Kolom Teras 15/15 F.30.a M3 0.03 12,715,573.98 384,646.11 3 Kolom Praktis 11/11 F.30.d M3 0.29 17,079,424.36 4,959,864.83 4 Kolom Gevel 11/11 F.30.d M3 0.04 17,079,424.36 650,982.26 5 Balok Latei 11/13 F.31.b M3 0.10 10,402,746.09 1,041,314.88 6 Ring Balok 11/13 F.31.b M3 0.56 10,402,746.09 5,801,611.49 7 Balok Gantung 15/20 F.31.d M3 0.23 10,067,851.01 2,355,877.14 8 Balok Gevel 11/13 F.31.b M3 0.25 10,402,746.09 2,558,659.43 9 Plat Beton Teras tebal 0,8 cm F.32.a M3 0.70 8,331,527.58 5,832,069.30
10 Plat Beton Teras tebal 0,6 cm F.32.b M3 0.05 10,804,306.68 570,467.39 Sub Total IV 30,767,987.42
V PEKERJAAN PINTU DAN JENDELA1 Pek. Kusen Kayu Klas II G.2 M3 0.225 6,216,140.00 1,398,009.89 2 Pek. Daun Pintu panel Kayu Klas II G.5 M2 4.000 476,140.00 1,904,560.00 3 Pek. Daun Jendela Kaca 5mm G.6 M2 4.200 511,102.00 2,146,628.40 4 Memasang Kaca Mati Tebal 5mm G.6.a M2 0.500 176,000.00 88,000.00 5 Memasang Kusen Pintu KM/WC Fiber - Bh 1.000 500,000.00 500,000.00 6 Pasang Lubang Angin Beton 10 x 20 - Bh 24.000 45,000.00 1,080,000.00 7 Pasang Lubang Angin Beton 20 x 20 - Bh 12.000 52,500.00 630,000.00
Sub Total V 7,747,198.29 VI PEKERJAAN ATAP
1 Pek. Kuda-Kuda Kayu Kelas II G.13 M3 - 5,310,410.00 - 2 Pek. Gording dan Jurai Kap Kayu Kelas II G.15 M3 0.401 4,805,706.00 1,927,280.33 3 Pasang Listplank , Kalsiplank G.21.a M' 30.200 62,540.00 1,888,708.00 4 Pasang Atap Galvalume BJLS 30 H.38.b M2 49.050 56,395.80 2,766,213.99 5 Pek. Bubungan Galvalume H.38.c M3 12.300 46,306.50 569,569.95 6 Pek. Talang Seng Datar/Jurai K.18 M' 6.700 120,455.25 807,050.18
Sub Total VI 7,958,822.45
NOMOR ANALISA
HARGA SATUAN (Rp)
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA (Rp)
1 2 3 4 5 6 7
NOMOR ANALISA
HARGA SATUAN (Rp)
VII PEKERJAAN LANTAI1 Pasir Urug Dibawah Lantai B.11 M3 3.600 122,844.00 442,238.40 2 Lantai Rabat Beton F.4 M3 1.800 760,532.00 1,368,957.60 3 Pek. Acian Lantai D.27 M2 36.000 24,345.50 876,438.00
Sub Total VII 1,811,196.00 VIII PEKERJAAN PENGUNCI
1 Kunci Tanam - Bh 2.000 127,500.00 255,000.00 2 Grendel Pintu - Bh 2.000 11,000.00 22,000.00 3 Grendel Jendela - Bh 8.000 9,000.00 72,000.00 4 Hak Angin Kecil - Stel 8.000 7,500.00 60,000.00 5 Engsel Pintu - Psng 3.000 30,000.00 90,000.00 6 Engsel Jendela - Psng 8.000 10,000.00 80,000.00
Sub Total VIII 579,000.00 IX PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu - Bh 6.000 155,000.00 930,000.00 2 Stop kontak Tanam - Bh 4.000 138,230.40 552,921.60 3 Saklar Tanam Ganda - Bh 2.000 25,000.00 50,000.00 4 Saklar Tanam Tunggal - Bh 2.000 25,000.00 50,000.00 5 Lampu Hemat Energi SL 18 Watt (Philips) - Bh 6.000 30,000.00 180,000.00 6 MCB - Bh 1.000 150,000.00 150,000.00
Sub Total VIII 1,912,921.60 X PEKERJAAN SANITASI
1 Pemasangan Instalasi air kotor Pipa PVC 3" - 4.000 52,750.00 211,000.00 2 Pemasangan Instalasi Pipa Kotoran PVC 4 " - 4.000 66,550.00 266,200.00 3 Pemasangan Instalasi air Bersih Pipa PVC 1/2 " - 6.000 19,900.00 119,400.00 4 Pemasangan Klosed Jongkok Porselin - Bh 1.000 150,000.00 150,000.00 5 Kran Air - Bh 1.000 17,500.00 17,500.00 6 Avoir - Bh 1.000 35,000.00 35,000.00 7 Septictank 1 M3 - Bh 1.000 3,203,800.00 3,203,800.00
Sub Total VIII 4,002,900.00 XI PEKERJAAN PENGECATAN
1 Pengecatan Tembok (Bagian Dalam Bangunan) M.14 M2 98.143 18,150.27 1,781,326.96 Sub Total X 1,781,326.96
M1
M1
M1
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln. Manggis No. 2 Telp. (0371 - 21504) Sumbawa Besar
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : Pemanfaatan Potensi Sumber Daya Hasil Hutan Kayu dan Bukan Kayu
PEKERJAAN : Pembangunan Rumah Penyulingan Kayu Putih
LOKASI : Kecamatan Unter Iwes
TAHUN ANGGARAN : 2015
SUMBER DANA : APBD
NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)
1 2 3
I PEKERJAAN PERSIAPAN 600,000.00
II PEKERJAAN TANAH 938,057.76
III PEKERJAAN PASANGAN 11,032,538.84
IV PEKERJAAN BETON 13,147,833.82
V PEKERJAAN PINTU DAN JENDELA 4,745,767.57
VI PEKERJAAN ATAP 5,284,285.34 VII PEKERJAAN LANTAI 955,909.00 VIII PEKERJAAN PENGUNCI 168,500.00 IX PEKERJAAN INSTALASI LISTRIK 1,016,460.80 X PEKERJAAN PENGECATAN 37,015.27
( A ) Jumlah : 37,926,368.40 ( B ) Overhead 10 % : 3,792,636.84 ( C = A + B ) Jumlah : 41,719,005.24 ( D ) PPn 10% 4,171,900.52 ( E = C + D ) Total : 50,062,806.29
Pembulatan : 50,062,000.00
Terbilang : #NAME?
Sumbawa Besar, 2015
KONSULTAN PERENCANACV. MAGITA RAYA Konsultan
Konsultan
SYAHID AWALUDDIN, STTeam Leader
DISETUJUI OLEH :Pejabat Pembuat Komitmen
(PPK)
ARI WIBOWO, STNIP. 19690924 200801 1 011
MENGETAHUI :Kepala Dinas Pekerjaan Umum
Kab.Sumbawa
H. ASAAT ABDULLAH, ST.NIP. 19581214 198212 1 002
MENGETAHUI :Kepala Kantor KPHP Batu Lanteh
Kab.Sumbawa
JULMANSYAH, S.HutNIP. 19740701 200212 1 005
DIPERIKSA OLEH :Pejabat Pelaksana Teknis Kegiatan
(PPTK)
DINDIN SAEFUDIN, S.HutNIP. 19791009 199903 1 005
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln. Manggis No. 2 Telp. (0371 - 21504) Sumbawa Besar
RENCANA ANGGARAN BIAYA( R A B )
KEGIATAN : Pemanfaatan Potensi Sumber Daya Hasil Hutan Kayu dan Bukan KayuPEKERJAAN : Pembangunan Rumah Penyulingan Kayu PutihLOKASI : Kecamatan Unter IwesTAHUN ANGGARAN : 2015SUMBER DANA : APBD
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA (Rp)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN1 Pembuatan Papan Nama Proyek - Ls 1.000 150,000.00 150,000.00 2 Pengukuran dan Pemasangan Bowplank - Ls 1.000 200,000.00 200,000.00 3 Pembersihan Lokasi - Ls 1.000 150,000.00 150,000.00 4 Air Kerja - Ls 1.000 100,000.00 100,000.00
Sub Total I 600,000.00
II PEKERJAAN TANAH1 Galian Tanah Pondasi B.1 M3 10.080 44,610.00 449,668.80 2 Urugan Pasir Bawah Pondasi B.11 M3 0.720 122,844.00 88,447.68 3 Urugan Kembali B.9 M3 2.520 15,004.00 37,810.08 4 Urugan Tanah bawah Lantai Dipadatkan B.10.a M3 4.800 75,444.00 362,131.20
Sub Total II 938,057.76 III PEKERJAAN PASANGAN
1 Pasangan Batu Kosong C.9 M3 2.160 235,382.70 508,426.63 2 Pasangan Batu 1 PC : 5 Ps C.3 M3 5.600 505,565.50 2,831,166.80 3 Pasangan Tembok Bata 1 Pc : 5 Ps E.10 M2 45.102 88,876.60 4,008,533.19 4 Plesteran Pondasi 1 Pc : 3 Ps D.3 M2 3.200 42,608.62 136,347.58 5 Plesteran Tembok 1 Pc : 5 Ps D.5 M2 90.204 39,333.58 3,548,064.64
Sub Total III 11,032,538.84 IV PEKERJAAN BETON
1 Sloof 15/20 F.29.a M3 0.480 6,482,837.82 3,111,762.15 2 Kolom Praktis 11/11 F.30.d M3 0.169 17,079,424.36 2,893,254.49 3 Kolom Gevel 11/11 F.30.d M3 0.028 17,079,424.36 475,320.38 4 Balok Latei 11/13 F.31.b M3 0.114 10,402,746.09 1,190,074.15 5 Ring Balok 11/13 F.31.b M3 0.229 10,402,746.09 2,380,148.31 6 Balok Gevel 11/13 F.31.b M3 0.132 10,402,746.09 1,368,585.28 7 Plat Beton Tebal 6 cm F.32.b M3 0.160 10,804,306.68 1,728,689.07
Sub Total IV 13,147,833.82 V PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen Kayu Klas II G.2 M3 0.031 6,216,140.00 193,943.57 2 Pek. Daun Pintu panel Kayu Klas II G.5 M2 1.600 476,140.00 761,824.00 3 Pek. Daun Pintu Plat Besi Krangka Pipa Kotak + Gembok - 5.000 450,000.00 2,250,000.00 4 Pek. Ventilasi Pipa Kotak - 3.850 400,000.00 1,540,000.00
Sub Total V 4,745,767.57 VI PEKERJAAN ATAP
1 Pek. Kuda-Kuda Kayu Kelas II G.13 M3 0.113 5,310,410.00 599,014.25 2 Pek. Gording Kap Kayu Kelas II G.15 M3 0.216 4,805,706.00 1,038,032.50 3 Pasang Listplank , Calsiplank G.21.a M' 24.800 62,540.00 1,550,992.00 4 Pasang Atap Seng Galvalume H.38.b M2 32.490 56,395.80 1,832,299.54 5 Pasang Bubungan Galvalume H.38.c M3 5.700 46,306.50 263,947.05
Sub Total VI 5,284,285.34
NOMOR ANALISA
HARGA SATUAN (Rp)
M2
M2
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA (Rp)
1 2 3 4 5 6 7
NOMOR ANALISA
HARGA SATUAN (Rp)
VII PEKERJAAN LANTAI1 Pasir Urug Dibawah Lantai B.11 M3 1.900 122,844.00 233,403.60 2 Rabat Beton Bawah Lantai F.4 M3 0.950 760,532.00 722,505.40
Sub Total VII 955,909.00 VIII PEKERJAAN PENGUNCI
1 Kunci Tanam - Bh 1.000 127,500.00 127,500.00 2 Grendel Pintu - Bh 1.000 11,000.00 11,000.00 3 Engsel Pintu - Psng 1.000 30,000.00 30,000.00
Sub Total VIII 168,500.00 IX PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu - Bh 4.000 155,000.00 620,000.00 2 Stop kontak Tanam - Bh 2.000 138,230.40 276,460.80 3 Saklar Tanam Ganda - Bh 1.000 25,000.00 25,000.00 4 Lampu Hemat Energi SL 18 Watt (Philips) - Bh 2.000 30,000.00 60,000.00 5 MCB - Bh 1.000 150,000.00 35,000.00
Sub Total VIII 1,016,460.80 X PEKERJAAN PENGECATAN
1 Pengecatan Tembok M.14 M2 - 18,150.27 - 2 Pengecatan Kayu Tampak M.8 M2 1.104 33,528.33 37,015.27
Sub Total X 37,015.27
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln.Raya Bypass Pungka Sumbawa Besar
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN PAGAR SAMPING KANTOR KPHP BATU LANTEH
LOKASI : KECAMATAN UNTER IWES
TAHUN ANGGARAN : 2015
SUMBER DANA : APBD
NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)
1 2 3
I PEKERJAAN PERSIAPAN 550,000.00
II PEKERJAAN TANAH 1,230,558.00
III PEKERJAAN PASANGAN 18,293,399.42
IV PEKERJAAN BETON 18,941,580.81
( A ) Jumlah : 39,015,538.23 ( B ) Overhead 10 % : 3,901,553.82 ( C = A + B ) Jumlah : 42,917,092.06 ( D ) PPn 10% 4,291,709.21 ( E = C + D ) Total : 51,500,510.47
Pembulatan : 51,500,000.00
Terbilang : #NAME?
Sumbawa Besar, 2015
KONSULTAN PERENCANACV. MAGITA RAYA Konsultan
Konsultan
SYAHID AWALUDDIN, STTeam Leader
DISETUJUI OLEH :Pejabat Pembuat Komitmen
(PPK)
EKO WIBOWO, STNIP. 19690924 200801 011
MENGETAHUI :Kepala Dinas Pekerjaan Umum
Kab.Sumbawa
H. ASAAT ABDULLAH, ST.NIP. 19581214 198212 1 002
MENGETAHUI :Kepala Kantor KPHP Batu Lanteh
Kab.Sumbawa
JULMANSYAH, S.HutNIP. 19740701 200212 1 005
DIPERIKSA OLEH :Pejabat Pelaksana Teknis Kegiatan
(PPTK)
SUPARMAN MASJRUN, S.HutNIP. 19760805 200501 1 001
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln.Raya Bypass Pungka Sumbawa Besar
RENCANA ANGGARAN BIAYA( R A B )
KEGIATAN : PEMBANGUNAN GEDUNG KANTORPEKERJAAN : PEMBANGUNAN PAGAR SAMPING KANTOR KPHP BATU LANTEHLOKASI : KECAMATAN UNTER IWESTAHUN ANGGARAN : 2015SUMBER DANA : APBD
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA (Rp)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN1 Pembuatan Papan Nama Proyek - Ls 1.000 150,000.00 150,000.00 2 Pengukuran dan Pemasangan Bowplank - Ls 1.000 200,000.00 200,000.00 3 Pembersihan Lokasi - Ls 1.000 100,000.00 100,000.00 3 Air Kerja - Ls 1.000 100,000.00 100,000.00
Sub Total I 550,000.00 II PEKERJAAN TANAH
1 Galian Tanah Pondasi B.1 21.000 44,610.00 936,810.00 2 Urugan Pasir Bawah Pondasi B.11 1.750 122,844.00 214,977.00 3 Urugan Kembali B.9 5.250 15,004.00 78,771.00
Sub Total II 1,230,558.00 III PEKERJAAN PASANGAN
1 Pasangan Batu 1 PC : 5 Ps C.3 15.190 505,565.50 7,679,539.94 2 Pas. Batu Kosong C.9 5.250 235,382.70 1,235,759.18 3 Pasangan Tembok Bata 1 Pc : 5 Ps E.10 61.249 88,876.60 5,443,579.58 4 Plesteran Pondasi 1 Pc : 3 Ps D.3 35.800 42,608.62 1,525,388.60 5 Plesteran Tembok 1 Pc : 5 Ps (Bagian Dalam) D.5 61.249 39,333.58 2,409,132.13
Sub Total III 18,293,399.42 IV PEKERJAAN BETON
1 Sloof 11/15 F.29.d 0.83 7,180,326.57 5,923,769.42 2 Kolom Praktis 11/11 F.30.d 0.33 17,079,424.36 5,579,847.94 3 Ring Balok 11/13 F.31.b 0.72 10,402,746.09 7,437,963.45
Sub Total IV 18,941,580.81
NOMOR ANALISA
HARGA SATUAN (Rp)
M3
M3
M3
M3
M3
M2
M2
M2
M3
M3
M3
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln.Raya Bypass Pungka Sumbawa Besar
REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN TAMAN KANTOR KPHP BATU LANTEH
LOKASI : Kecamatan Unter Iwes
TAHUN ANGGARAN : 2015
SUMBER DANA : APBD
NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)
1 2 3
I PEKERJAAN PERSIAPAN 550,000.00
II PEKERJAAN BONGKARAN 100,000.00
III PEKERJAAN TANAH 5,767,278.72
IV PEKERJAAN KONSTRUKSI 43,169,635.81
( A ) Jumlah : 49,586,914.53 ( B ) Overhead 10 % : 4,958,691.45 ( C = A + B ) Jumlah : 54,545,605.98 ( D ) PPn 10% 5,454,560.60 ( E = C + D ) Total : 60,000,166.58
Pembulatan : 60,000,000.00
Terbilang : #NAME?
Sumbawa Besar, 2015
KONSULTAN PERENCANACV. MAGITA RAYA Konsultan
Konsultan
SYAHID AWALUDDIN, STTeam Leader
DISETUJUI OLEH :Pejabat Pembuat Komitmen
(PPK)
EKO WIBOWO, STNIP. 19690924 200801 011
MENGETAHUI :Kepala Dinas Pekerjaan Umum
Kab.Sumbawa
H. ASAAT ABDULLAH, ST.NIP. 19581214 198212 1 002
MENGETAHUI :Kepala Kantor KPHP Batu Lanteh
Kab.Sumbawa
JULMANSYAH, S.HutNIP. 19740701 200212 1 005
DIPERIKSA OLEH :Pejabat Pelaksana Teknis Kegiatan
(PPTK)
SUPARMAN MASJRUN, S.HutNIP. 19760805 200501 1 001
PEMERINTAH KABUPATEN SUMBAWAKESATUAN PENGELOLAHAN HUTAN PRODUKSI (KPHP) BATU LANTEH
Jln.Raya Bypass Pungka Sumbawa Besar
RENCANA ANGGARAN BIAYA( R A B )
KEGIATAN : PEMBANGUNAN GEDUNG KANTORPEKERJAAN : PEMBANGUNAN TAMAN KANTOR KPHP BATU LANTEHLOKASI : KECAMATAN UNTER IWESTAHUN ANGGARAN : 2015SUMBER DANA : APBD
NO. URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA (Rp)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN1 Pembuatan Papan Nama Proyek - Ls 1.000 150,000.00 150,000.00 2 Pengukuran dan Pemasangan Bowplank - Ls 1.000 200,000.00 200,000.00 3 Pembersihan Lokasi - Ls 1.000 100,000.00 100,000.00 4 Air Kerja - Ls 1.000 100,000.00 100,000.00
Sub Total I 550,000.00 II PEKERJAAN BONGKARAN
1 Pek. Bongkaran Pondasi - Unit 1.000 100,000.00 100,000.00 Sub Total I 100,000.00
III PEKERJAAN TANAH1 Galian Tanah Pondasi B.1 25.600 44,610.00 1,142,016.00 2 Urugan Tanah Pilihan B.10.a 60.200 75,444.00 4,541,728.80 3 Urugan Pasir B.11 0.680 122,844.00 83,533.92
Sub Total II 5,767,278.72 IV PEKERJAAN KONSTRUKSI
1 Pasangan Batu 1 PC : 5 Ps C.3 39.705 505,565.50 20,073,538.86 2 Pasangan Bata 1 Pc : 3 Ps (Kanstin) E.8 30.412 94,841.90 2,884,379.28 3 Plesteran 1 Pc : 5 Ps D.5 31.150 39,333.58 1,225,241.02 4 Siaran Talud D.26 40.500 39,629.30 1,604,986.65 5 Buis Beton 1/2 dia 30 - M1 30.000 60,000.00 1,800,000.00 6 Buis Beton dia 30 - M1 4.000 110,000.00 440,000.00 7 Pek. Paving Blok Warna Tebal 8 mm L.83 M2 98.000 154,505.00 15,141,490.00
Sub Total III 43,169,635.81
NOMOR ANALISA
HARGA SATUAN (Rp)
M3
M3
M3
M3
M2
M2
M2