r2e relocation & shielding ls1 preparation
DESCRIPTION
R2E relocation & shielding LS1 preparation. Anne Laure Perrot EN/MEF- LE. Discussion with OP colleagues, 5 th July 2012. Contents. R2E shielding & relocation: status of activities LS1 provisional schedule Implementation & worksite organisation Manpower request. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/1.jpg)
R2E relocation & shielding
LS1 preparation
Anne Laure Perrot EN/MEF- LE
Discussion with OP colleagues, 5th July 2012
![Page 2: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/2.jpg)
2
Contents
1. R2E shielding & relocation: status of activities
2. LS1 provisional schedule
3. Implementation & worksite organisation
4. Manpower request
![Page 3: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/3.jpg)
3
Areas of the LS1 mitigation activitiesMain critical areas today considered
UJ76
UJ14/16RR13/17
UJ56RR53/57
US85
![Page 4: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/4.jpg)
4
RelocationPoint 1
Point 5
Point 8
Point 7
ShieldingPoints 1, 5, 7 & 8
FinishedUnder approval
Integration studies
All integration & planning sequences are finished
R2E activities in
Point 1
Point 5
Point 7
Point 8
Planning – LS1
Status of the mitigation activities
![Page 5: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/5.jpg)
5
Equipment / activity BE/APB survey eqpt.
BE/BI BTV, BLM
BE/CO timing & remote-resetWorldFip
DGS/RP RAMSES
EN/CV cooling/ventilation eqpt
EN/EL electrical eqpt& cabling activity
EN/HE eqpt. transportshielding inst.
EN/STI collimator control eqpt
GS/ASE fire/ODHaccess
GS/SE-CEP duct activities
IT/CS ethernet
TE/CRG cryogenics eqpt
TE/EPC power converters
TE/MPE QPS*PIC*current leads heatersBISWIC
TE/VSC vacuum eqpt
Groups involved during LS1
15 groups involved in the R2E mitigation activities
![Page 6: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/6.jpg)
6
R2E LS1 Provisional Schedule
Work by M. Barberan (EN/MEF)
![Page 7: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/7.jpg)
R2E review November 2011 7
UL16US15
UL14
UJ14 UJ16UJ13RR1 UJ17 RR1
POINT 1
RR13 RR17
10 groups involved56 weeks activities
![Page 8: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/8.jpg)
R2E review November 2011 8
POINT 5
USC55
UXC55 UJ56
UL557
UL56
UJ57
UPS56
TU56 / UP56
UL55
UL558
UJ56RR57RR53
12 groups involved57 weeks activities
![Page 9: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/9.jpg)
A. L. Perrot, EN-MEF/LE 9
POINT 7
UJ76
12 groups involved54 weeks activities
R771UJ76
RR73 RR77
TZ76
US76
PM76
R74, R76
![Page 10: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/10.jpg)
A. L. Perrot, EN-MEF/LE 10
UL86
US85
UJ84 UJ86
UL84
UJ83
UJ1
UJ87RB84 RB86
UX85
RA87RA83
UA87UA83
UW85
POINT 8
7 groups involved24 weeks activities
![Page 11: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/11.jpg)
A. L. Perrot, EN-MEF/LE 11
S12 S23P2 S34P3 S45P4 S56P5 S67P6 S78P7 S81P8
Dec.
Jan.
Feb.Mar.Apr.
MayJun.
Jul.
Aug.Sep.Oct.
Nov.Dec.
Jan.
Feb.Mar.Apr.
MayJun.
Jul.
Aug.Sep.
Oct.Nov.Dec.Jan.
Dec.
Jan.
Feb.Mar.Apr.
MayJun.
Jul.
Aug.Sep.Oct.
Nov.Dec.
Jan.
Feb.Mar.Apr.
MayJun.
Jul.
Aug.Sep.
Oct.Nov.Dec.Jan.
2013
2014
P1
2013
2014
Feb.Mar.Apr.
Feb.Mar.Apr.
W-UpW-Up W-Up W-Up
CSCMW-Up
W-Up
W-Up W-Up W-Up
Splices
SplicesSplices
Splices
SplicesSplices
SplicesSplices
Cool-down
Cool-down
Cool-down Cool-downCool-down
Cool-downCool-down
Cool-down
13 TeV
Beam Commissioning
MM
M
R2E LS1 Provisional Schedule
56 weeks 57 weeks 54 weeks24 weeks
R2E R
2E R2E
R2E
13 TeVCourtesy of K. Foraz
![Page 12: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/12.jpg)
12
https://espace.cern.ch/MEFactivitiesforR2E/R2E_home/Home.aspx
R2E relocation & shielding Web Site
![Page 13: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/13.jpg)
13
Implementation & worksite organisation
![Page 14: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/14.jpg)
1414
1. Day-to-day in-situ management & supervision (rapidly react/solve problems of all nature as they occurred, direct contact with the groups
supervisors, cleaning/ waste management)
5. Planning: follow – up and adaptation (detailed installation planning & critical path weekly updated, impact on/of the non R2E works)
4. Material delivery & contracts: weekly follow – up
6. Communicating (periodical reviews of the activities, non conformities & planning)
2. Safety supervision (sites managers to enforce safety and environment protection rules, ‘VIC’, follow the implementation of safety measures/procedures)
3. Integration: non conformities follow-up (weekly reports, intermediate survey scans )
Organisation during the LS1 installation
Implementation & worksite organisation
Point coordinator
in charge
Point coordinator
involved
![Page 15: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/15.jpg)
15
Point coordinator activities
Implementation & worksite organisation
- In charge of one/two LHC Points (points 1 & 8, point 5, point 7) -> 3 persons needed
- Fluent in French (daily discussions in situ with firms personal)
- Before LS1:- Participation in R2E relocation meetings from September 2012 (Fridays 10h30-12h30, 2 meetings/month)
- Visits in situ during TS3 (September) and Christmas break to get knowledge of the environment/ equipment to be relocated
- be aware of the material delivery, storage, safety issues, installation procedures etc… In other words….get knowledge of the work/activities
- During LS1: - see previous slide AND…- Daily organisation of in-situ status meeting with the group supervisors- Daily short report to Anne Laure (by phone)- Weekly report status to ‘Friday meetings’
![Page 16: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/16.jpg)
16
Ressources for the coordination & follow-up of the R2E mitigation activities
Manpower request
2011Manpower
[FTE]
2012 Manpower
[FTE]
LS1 Manpower
[FTE]
Overall coordination – work package holder 0.8 0.8 0.8
Layout modifications and database management
0.1 0.1 0.1
Shielding (design, purchase, logistics) 0.5 0.25 (to 0.5)
0.25
Integration activities 2 1 0.5 to 1
Planning activities 0.2 0.2 0.2
Work supervisors in-situ 3 t.b.d.Work supervisors in - situ
![Page 17: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/17.jpg)
A. L. Perrot, EN-MEF/LE 17
Addendum
![Page 18: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/18.jpg)
R2E review November 2011 A. L. Perrot, EN-MEF/LE 18R2E review November 2011 A. L. Perrot, EN-MEF/LE 18
Equipment / activity
Activity in Point 1
Activity in Point 4
Activity in Point 6
Activity in Point 5
Activity in Point 7
Activity in Point 8
BE/APB survey eqpt. - - - - -
BE/BI BTV, BLM - - - - -
BE/CO timing & remote-resetWorldFip
-
--
--
DGS/RP RAMSES - - - - -
EN/CV cooling/ventilation eqpt - -
EN/EL electrical eqpt& cabling activity
EN/HE eqpt. transportshielding inst.
- -
done
EN/STI collimator control eqpt - - - -
GS/ASE fire/ODHaccess
- -
done -
GS/SE-CE duct activities - - - -
IT/CS ethernet
TE/CRG cryogenics eqpt
TE/EPC power converters - - -
TE/MPE QPS*PIC*
current leads heatersBISWIC
- -
- -
-
-
- - - -
TE/VSC vacuum eqpt - - - - -
![Page 19: R2E relocation & shielding LS1 preparation](https://reader035.vdocuments.site/reader035/viewer/2022062218/56816207550346895dd22d93/html5/thumbnails/19.jpg)
R2E review November 2011 A. L. Perrot, EN-MEF/LE 191919
Process towards LS1 installation March 2012
integration and planning studies finished(i.e. new locations= defined; activities= identified; works sequences= defined)
Implementation & worksite organisation
Merge the R2E LS1 planning with the overall LHC LS1
planning
Estimate the real intervention slots for each group
Finalise the manpower requests
Planning/manpowerPlanning/manpower
All material requests identified
Contracts / material orders launched vs delivery deadlines
Material
Follow-up of the material delivery
Material Documentation for installation
ECRs
Safety documentation&
Installation procedures&
Installation drawings
Documentation for installation
Finished by Automn 2012
Finished by summer 2012