R12 Upgrade at The Wendy’s Company
Barbara Wheeler – VP, Enterprise Solutions
Brian Cardin - Director, Enterprise Solutions August 23, 2013
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
The Wendy’s Company is the 3rd largest hamburger quick service restaurant chain in the US, with 6500 company and franchised locations.
The Wendy’s Company
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32 3
First Comes Love…
2008
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32 4
Second Comes Marriage…
2009
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32 5
Then Comes…SEPARATION!
2011
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32 6
Then Comes the Final Papers!
2012
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Project Guiding Principles
• Minimum Cost
• No additional Oracle licenses
• Technical upgrade – no BPR, utilize functionality/change process
where software dictates
• Utilize internal team with minimal contractors
• Minimize risk to the business
• Ability to convert back to 11i within hours should an issue be
encountered during cutover
• Fast refresh of test environments – hours as opposed to days
• Perform infrastructure refresh
• End of life o/s and hardware upgrade
7
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Wendy’s 11.5.10 Environment
• EBS – Financials (GL, AP, AR, FA, PA, PN), HCM (HR, PR, OIC, CWB), OM,
Adv Pric
• HPT, OBI, Sabrix, EiS Reporting, Demantra, Oracle Transportation
Management, various other custom and 3rd party applications
• Single instance
• 3 Database Nodes – RAC, 3 Concurrent Managers, 2 App Servers, EMC Storage
• O/S level 4.7OEL, 32 bit
• Non-Prd – Pre-Production similar to PRD, 4 additional Dev/Test
environments
8
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Non-EBS Application Impact
• Sabrix – reconfiguring to align with EB Tax
• Discoverer – upgrade from 10.1.2.2 to 10.1.2.55.26
• EiS Reporting for Payroll and HR – upgrade from 7.0.0 to 8.0.0
• SOA (utilized with OTM Integrations) – upgrade from 10g to 11g
9
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Infrastructure Improvements
• Production
• New database and CM servers
• Upgraded O/S to OEL5.6 and app level to 64-bit
• Consolidated footprint – 3 servers to 2 more powerful servers –
licensing remained intact
• App servers remained as is
• Performed rolling O/S upgrade
• Non-Production
• Utilized Snapclone capability on the disk array to perform clones
• Decreased cloning from days to hours
• R12 instances resided on same HW as 11i
10
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Project Team
Office Consolidation – project to take place in Ohio
• New Business Users – still learning process and system
• Staffing in Ohio to replace Oracle IT Team not relocating from ATL
• Staff Augmentation where necessary
• AP - due to large number of changes between versions
• Sabrix/EB Tax – contracted with vendor to help with integrations and additional
configurations
• OBI – contracted with consulting firm to assist with integrations
• SOA – contracted with consulting firm to assist with changes from 10g to 11g
• Payroll/HR – staff augmentation to assist with workload of testing - many internal and
3rd party integrations, EiS upgrade, visibility of payroll accuracy
• Development
11
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Challenges
• Business Team
• New to Wendy’s – new to process, new to Oracle EBS, new leadership, new to
project methodologies
• IT Team
• Co-location, new to Wendy’s, new to Wendy’s configuration, experience level
• Competing projects
• Transportation Management – go live Jan, 2013
• Performance Management – go live Feb, 2013
• Other challenges
• Higher level of PRD support for 11.5.10 during project
12
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Test & Deployment Plan
• DBA’s performed entire upgrade process (end-to-end) 8 times
• Formal business process testing performed in 4 different cycles
• CRP1
• CRP2
• CRP3
• UAT
13
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Test & Deployment Plan
Production deployment incorporated the Business with a detailed Cutover
strategy
Cutover / Deployment Summary
Activity Mon
TueW
ed ThrFri
Sat
Sun
Mon
P4 Close
System Shutdown
PreValidation - Prep/Build Instance
Validations - pre upgrade
Technical Upgrade
3rd Party Apps Sync/Patching/Migrations
IT Team PreValidation - Configs/Table Counts
Validations - post upgrade
Processing Critical Jobs
key transactional processes- live data test
System Available
14
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
R12 Upgrade Command Central
Around the clock for
72 hours…
15
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Implementation Gotcha’s
• AP Navigation and utilization/enabling of Hot Keys
• Unaccounted Payments –
• 11i Processed Payment subsequently Cancelled in R12
• Data fix required to enable Accounting
• AP Close Performance
• EBTax consultant – important if use 3rd party Sales/Use Tax Engine
• ADI Journal form errors
• Concurrent Requests – not visible by users with shared
responsibilities
• Scheduled Jobs should be rescheduled as best practice
16
R 0, G 0, B 0
Colors and Tints
Please use the Arial Narrow font for the
slides.
R 206, G 17, B 38
R 224, G 195, B 152
R 179, G 8, B 56
R 215, G 131, B 45
R 181, G 26, B 138
R 251, G 176, B 64
R 141, G 198, B 63
R 80, G 200, B 232
R 124, G 53, B 32
Fun Facts
Technical & Configuration Changes
• Upgrade from 11i to 12.1.1 - executed 145,000 jobs
• Upgrade from 12.1.1 to 12.1.3 - executed approx. 20,000 jobs
• Post patching - over 100 updates applied
• Overall, 4 days around the clock processing and monitoring with heavy manual configurations, etc.,
200+ hours, and over 100 activities in the DBA project plan
• 136 configurations applied to 22 modules elapsing over 70 man hours
Testing
• Almost 2000 test scenarios were executed in multiple test phases over a 6 month period
• Over 200 people involved (Business & IT)
• Over 400 issues were identified and resolved over the course of the project