Execut
Within thOffice Buand how into DesiInteriors Building evaluatiodescriptiabout thdefined fThe ownconfiden
tive Summ
his technicaluilding in Wait is broken gn Phase, Dand FinisheSystems andon of the coson of Washie owner, Gefollowed by er has requetiality of the
RENOV
mary
report, oneashington, Dinto the maemolition, Ss. Followingd what is beist of the prongton, D.C.’eneral Servicthe staffing ested that the project.
VATION OF ANWASH
e can find an.C. You will ajor phases oStructure, Fag the scheduing installedject, followes local buildces Administplans of thehe various na
N OFFICE BUIINGTON, D.C
L
y informatiofirst find infof constructiçade, Roof, ule summary in the new ed by a site ping conditioration (GSA)e General Coames of the
ILDING IN D.CC.
Lynn Appel |
on pertainingformation abion. The proPavilion/Atry, there is a bOffice Buildplan of existons is explain). Finally, thontractor andcontractors
C.
Technical Re
g to the renobout the proovided schedrium Construbreakdown oing. Next, thting conditioned, along whe project ded Constructis be withheld
October 4, 20
eport #1 2
ovation of aoject schedudule is brokeuction, MEPof the majorhere is an ons. A with informatelivery systeion Managerd due to the
010
n ule en , r
tion m is r. e
Executiv
Project
Building
Project
Site Pla
Local Co
Client In
Project
Staffing
Works C
Append
Append
Append
ve Summa
Schedule S
g Systems S
Cost Evalu
n of Existin
onditions…
nformation
Delivery S
g Plans………
Cited…………
dix A: D4 Co
dix B: RS M
dix C: Site P
RENOV
ry……………
Summary…
Summary…
uation………
ng Conditio
…………………
n………………
ystem………
…………………
………………
ost Estima
eans Squa
Plan...………
VATION OF ANWASH
Table
…………………
…………………
…………………
…………………
ons…………
…………………
…………………
…………………
…………………
………………
te……………
are Foot Es
…………………
N OFFICE BUIINGTON, D.C
L
of Conte
…………………
…………………
…………………
…………………
………………
…………………
…………………
…………………
…………………
………………
…………………
timate....…
…………………
ILDING IN D.CC.
Lynn Appel |
ents
…………………
…………………
…………………
…………………
………………
…………………
…………………
………………
………………
…………………
…………………
…………………
…………………
C.
Technical Re
…………………
………………
………………
…………………
…………………
……………….
………………
………………
………………
…………………
…………………
…………………
…………………
October 4, 20
eport #1 3
…………………
………………
………………
…………………
…………………
..…………….
………………
………………
………………
…………………
…………………
…………………
…………………
010
……2
…..4
…..6
……8
…..10
…11
…12
…..13
…..14
….16
…17
…19
…22
Project
The folloby the owdurationDesign PDocumenthe Consthey hav
Demolitiohazardoubegin in existing band façadgreen rooschedulecompleteOffice Bu
t Schedu
wing projecwner and thes for every phase into Plants and estimtruction Doce to go thro
on of the buus materials parts of the building, thede are a largof. The conse. The buildied after the uilding will re
RENOV
le Summ
t summary se Constructiphase or actianning/Progmated their cuments wough at GSA.
uilding takes needed to bbuilding whe structure wge part of thstruction of ng should rebuilding haseceive its Ba
VATION OF ANWASH
ary
schedule is bion Managerivity, so somgramming, Scdurations baould take the
a substantiabe removed.ere demolit
was not a huge schedule fthe Pavilioneach 100% cs been close ase Building C
N OFFICE BUIINGTON, D.C
L
based off of r. The sched
me durationschematic Deased on cone longest tim
al amount of. However, cion was comge part of thfollowed by t and Atriumlose in on Ain and MEPCertificate o
ILDING IN D.CC.
Lynn Appel |
a number ofdules provid had to be eesign Develoversations w
me based on
f time due toconstructionmpleted. Beche overall scthe construc
m also take upril 6, 2012.P and Interioof Occupancy
C.
Technical Re
f schedules ed to me didestimated. I opment, andwith owner. how many d
o the fact thn of the strucause it is a hedule. Thection of the p a large po. The finishers are finishy on Septem
October 4, 20
eport #1 4
provided to d not includebroke the
d Constructio I assumed tdesign review
hat so many cture could renovation e curtain waskylight andrtion of the es will be ing up. The
mber 3, 2012
010
me e
on that ws
of an ll d
2.
RENOVVATION OF ANWASH
N OFFICE BUIINGTON, D.C
L
ILDING IN D.CC.
Lynn Appel |
C.
Technical Re
October 4, 20
eport #1 5
010
Buildin
Yes/N
Yes
Yes
Yes
No
Yes
ng System
No
s
De Dempainbiolin comucmonepowhesteetrap
s
Str Newsupbeincon
s
Cas Theconwhecondec
o Pre N/A
s Me TheThe
RENOV
ms Summ
Work Scmolition
molition of thnt and dust, ogical and raoncrete slabch as possibnitor the PCBoxy paint areere a hazardel that is holp and contai
ructural S
w steel columport the curng installed acrete edge b
st in Plac
cast in placcrete in fill serever the flcrete in fill sk on top of n
ecast Con
A
echanical
mechanical Office Build
VATION OF ANWASH
mary
cope (if yeRequirem
he Office BuPolychlorinaadiological ebs and ballasle, but in somB rather thae applied to tous materiading the coon it than it is
Steel Fram
mns are beinrtain wall. Nas well as nebeams.
e Concre
e concrete islabs on exisoor needed slab on metanew steel be
ncrete
l System
l rooms are ding is under
N OFFICE BUIINGTON, D.C
L
es, addrements
uilding involvated biphenyelements. Psts in the lighme cases it in removing the concreteal needs to boling tower us to remove
me
ng installed aew steel moew steel bea
te
ncluded newsting slabs into be eveneal deck on eleams to help
located in thrgoing a com
ILDING IN D.CC.
Lynn Appel |
ess these
ved the remoyls (PCB), mCB was founhting. The sis more costit. When the and the PCbe trapped isup has lead oit.
around the eoment frameams (W14x82
w concrete bn the sub‐based out. CIP Clevated floorp support th
he sub‐basemmplete remo
C.
Technical Re
question
oval of asbeercury in thend throughoubcontractot effective tohat is the casCB is trappeds in the coolion it and it i
exterior of the columns (W2) to suppor
blast reinforcsement and Concrete alsrs and a cone curtain wa
ment and peoval and repl
October 4, 20
eport #1 6
ns/issues)
stos, lead bae pipes and ut the buildor is removino trap and se, three coad. Another cing tower. Ts cheaper to
he building tW14x82) arert existing
cement andbasement so included nncrete single all.
enthouse levacement of
010
)
ased
ing ng as
ats of case The o
to e
new
new span
vels. all
Yes
Yes
No
Yes
MEPsubexchreplthe loca
s
Ele Theelecpowtranpenbac
s
Ma Thehan
o
Sup N/A
s
LEE GSAGoldrooflandconElec
RENOV
P equipment‐basement. hanged for nlaced. The cstreet from ated in the p
ectrical Sy
Electrical roctrical equipwer is then dnsformers lothouse. Thek‐up power
asonry
only locatiodicap lift in
pport of
A
ED Requi
A is adding a d rating. Innf, maximumdscape irrigatrols technoctric Vehicles
VATION OF ANWASH
t with the ex Two out of new ones sochiller plant the Office B
penthouse of
ystem
oom is locatement is beinistributed tocated in theere is an emto the critica
on of masonthe loading
Excavatio
rements
number of fnovative env use of natuation, energyology, and chs.
N OFFICE BUIINGTON, D.C
L
xception of tthe four chi they will realso serves tBuilding. Airf the Office B
ed in the subng completeo the brand e sub‐basemergency genal building s
ry in the Offdock.
on
features to tvironmental ral light in thy saving Lighharging stati
ILDING IN D.CC.
Lynn Appel |
the chiller pillers in the pmain while tthe Ford Buir handling unBuilding.
b‐basement ly replaced. new transfoent and founerator in thystems duri
fice Building
the Office Buaspects of the interior, sht Emitting Dons in the lo
C.
Technical Re
lant, which iplant were rthe two oldeilding which nits and coo
of the build From the sw
ormers. Ther transformee penthouseng a power
is a CMU en
uilding to acthe project instorm waterDiodes (LEDsower parking
October 4, 20
eport #1 7
is located in ecently er chillers wis located aling towers a
ding. All witchgear, tre are eight ers located ie to provideoutage.
nclosure for
chieve a LEEDnclude a grer retention fs), smart buig level for
010
the
ill be cross are
the
n the
a
D een or lding
Project
The actuConstrucAll costs
A
The projeBased on$106.82/$72,812,major buevaluatiocoming t
t Cost Eva
al constructction Managshown do n
Actual Costs:
Cast‐MetaGlassMechElect
ect cost of thn numbers p/SF. Next th000 or $132uilding systemon, it is deteo a total of $
RENOV
aluation
ion costs areer. The amoot represent
:
System‐in‐Place Conal Fabrications and Glazing hanical and Ptrical
he Office Burovided by te total cost 2.39/SF. Beloms costs andrmined that$14,150,000
ConstrucTotal Co
VATION OF ANWASH
e based on aounts are sligt actual bid c
Building crete ns
Plumbing
ilding was fithe owner, twas taken inow the consd cost per sq the mechan0.
Ge
ction Cost st
N OFFICE BUIINGTON, D.C
L
a Schedule oghtly alteredcosts for the
Systems CosCost
$ 2,000,00 $ 4,300,00 $ 7,900,00 $ 14,150,00 $ 9,950,00
rst evaluatehe construcnto considertruction cosquare foot fonical and plu
eneral Costs
Cost $ 58,750,0$ 72,812,00
ILDING IN D.CC.
Lynn Appel |
of Values repd and rounde project.
sts Per SF
00 $3.64 00 $7.82 00 $14.3600 $25.7300 $18.09
ed by using ttion cost waration and it st and total cor each of thumbing syste
Per S000 $ 10600 $ 132
C.
Technical Re
port provideed for comp
% of CC 3% 6% 11% 20% 14%
he actual coas around $5 came out tocost is a tablhe systems. em is the mo
SF 6.82 2.39
October 4, 20
eport #1 8
d by the parison purp
onstruction c58,750,000 oo be aroundle that showAfter ost expensiv
010
poses.
cost. or
ws the
ve,
D4 Cost EAfter calcMeans Crespectivcase stud$40,134,SeptembD4 estimcalculatinexisting bwhen in fthe D4 Co RS Mean
I develop(http://wConcreteRS Meanended updiscrepanOffice Buthe RS M
Estimate: culating the ost Works tovely. For thedy. This offic138. After seber 2010 andate was abong the cost obuilding. Thfact most ofost Estimate
ns Square Fo
ped a squarewww.meansce Block Back‐s so I chose p being arouncy could beuilding were Means Square
RENOV
building coso come up we D4 Cost estce building welecting thisd Washingtoout $7,000,0of a new buie D4 estimaf the concrete, see Appen
oot Cost Estim
e foot estimacostworks.co‐up with a rethe option t
und $7,000,0e that there outside of te Foot Cost E
VATION OF ANWASH
st based on awith a paramtimate, I selewas a 7‐storys case study,n, D.C. and t00 over. Onlding while tte also accote in the Offndix A.
mate:
ate by using om). I choseeinforced cothat was clos000 over theis no renovahe ranges reEstimate, se
N OFFICE BUIINGTON, D.C
L
actual valuemetric estimaected the Hay, 267,000 S I adjusted tthen adjustene reason fothe Office Buunts for a laice Building
RS Means Oe a 5‐10 storoncrete framsest to the O actual estimation option ecommendee Appendix
ILDING IN D.CC.
Lynn Appel |
es, I used botate and squaa‐Lo HeadquSF building wthe target daed the buildir this sourceuilding in D.Carge amountis already in
Online ry office builme. There waOffice Buildinmate. A couin RS Mean
ed by RS MeaB.
C.
Technical Re
th D4 COST Vare foot estimuarters Officwith a total pate and locating size to 55e of error is C. is a renovt of Cast‐in‐Pn place. For
lding with Lias no curtainng. The RS Mple reasons s and the paans. For a sp
October 4, 20
eport #1 9
V9.5 and RS mate, e Building aproject cost otion to 50,000 SF. Tbecause DDvation of an Place concrea spreadshe
mestone Pan wall optionMeans estimfor this arameters ofpreadsheet
010
s the of
The 4 is
ete eet of
nel n in mate
f the of
Site Pla
*See APP
The Officuninterrubuilding highway governmOffice Bupedestriaon the Eafrom out
an of Exis
PENDIX C for
ce Building inupted views is surroundeon its East s
ment buildinguilding is thean heavy areast side of thtside of the c
Office B
RENOV
sting Con
r the Existin
n D.C. is locaof the Capited by other oside. Similargs due to its Metro‐Fedeea at the intehe building, city. See AP
Building S
VATION OF ANWASH
nditions
ng Site Plan
ated at 200 Ctol, FOB 8 is office buildinr to the Officclose proximeral Center Sersection of I‐395, makePENDIX C fo
Site
N OFFICE BUIINGTON, D.C
L
C Street SW in a prime longs on its Soce Building, amity to the CSW Station. D Street ands the Office r the existin
ILDING IN D.CC.
Lynn Appel |
in the heartocation for aouth, West aall of the surCapitol. Acro This stationd 3rd Street.Building verng conditions
C.
Technical Re
t of Washingan office buiand North sidrrounding buoss the streen makes for a The major ry accessibles site plan.
October 4, 20
eport #1 10
gton, D.C. Wilding. The odes and a muildings are et from the a very highway loce when trave
010
With office ajor
cated eling
Local C
The prefethis methpassed thstreet plu1961, costaying w
At the Ofonly avaivery limitacross thworkers
Since therecyclingaround $play a hehas a proCurrently
*(Grunwal
Condition
erred methohod is becauhe Heights ous 20 feet.*”ncrete beamwithin the he
ffice Buildingilable for theted parking he street froman easy and
e Office Buildg dumpsters $500 and theeavy role witoject engineey, the site ha
d)
RENOV
ns
od of construuse there is aof Building A” As a resultms and concreight restrict
g, there is vee Constructiofor workers m the Metro inexpensive
ding is strivinto help achiere is a tippinth the buildiner who is resas is recyclin
VATION OF ANWASH
uction in Waa height restct…but was t, when Federete columntion.
ery limited ron Manageron site, the o‐Federal SWe way to com
ng for LEED eve points fng fee of abng earning Lsponsible fog 99% of all
N OFFICE BUIINGTON, D.C
L
ashington, Dtriction in Wamended ineral Office Bs were used
oom for conr and the GeOffice Build
W Station. Tmmute to th
Gold Certificfor certificatout $130 forLEED certificar tracking thwaste.
ILDING IN D.CC.
Lynn Appel |
DC is the use Washington, Dn 1910 to theBuilding No. 8d to maximiz
nstruction paneral Contrading project shis method e job site.
cation, the sion. The initr each dumpation. As a rhe percentag
C.
Technical Re
of concreteD.C. “In 188e width of th8 was origine the floor‐t
arking. On‐sactor. Even site is conveof transport
site has a nutial cost of tpster. Recycresult, Turnege of waste
October 4, 20
eport #1 11
. The reaso89, Congress he adjacent ally built in to‐floor heig
site parking though thereniently locatation gives
mber of he dumpstecling dumpster Constructbeing recycl
010
n for
ght,
is re is ted the
ers is ters tion ed.
Client
felt that tOffice Buspace. T GSA is min on timoccupy thstriving fable to subudget a
Informat
the Office Building is locahe unobstru
ost concernme and on buheir space. or LEED golduccessfully mnd on time,
RENOV
tion:
The OfficAdminisStates gthe basiBuildingspace. The officheadqua
uilding woulated one bloucted views o
ed with the udget. The loGSA is also pd and want tmeet these oGSA will be
VATION OF ANWASH
ce Building is stration, or Government,c functioning due to a ch
ce building, arters and lald better serock from theof the Capito
needs of theonger the prplacing an emto do everytobjectives bysatisfied.
N OFFICE BUIINGTON, D.C
L
owned by tGSA. GSA is establishedg of federal ange in func
built in the 1ab space for rve as an offe Capitol andol make the
e tenants. Troject takes,mphasis grehing they cay providing a
ILDING IN D.CC.
Lynn Appel |
he United Stan independd in 1949 to hagencies. Gction from la
1960s, was othe Federalfice space rad is considerOffice Build
They expect the longer ten building an achieve tha high qualit
C.
Technical Re
tates Generadent agencyhelp manageGSA is renovab space to a
originally the Drug Adminther than a red premiumding everyon
the Office Bthe tenants and recyclinhis. If the prty end produ
October 4, 20
eport #1 12
al Services y of the Unitee and suppoating the Ofa Class A off
e central nistration. Glab space. T
m rental/officne’s ideal off
Building to cohave to waing. They areroject team uct within
010
ed ort ffice fice
GSA The ce fice.
ome t to e is
Project
The OfficManagercontract them fro
At the sacost, schmanagemGeneral Cfor each
Due to thfor all of
S
t Delivery
ce Building isr. GSA first hdocuments.m the Archi
me time GSedule and qment. Once Contractor itrade was aw
he confidentthe contrac
Structural Enginee
Civil Engineer
RENOV
y System
s being delivhired an Arc. Once the ptect.
A hired the Auality controthe design ws responsiblwarded the
tiality of thistors and tha
Architect
r
VATION OF ANWASH
:
vered as a dehitect to desproject plans
Architect, thol; improve cwas complete to hire thecontract.
s project, theat the types o
MEP Engineer
Landscape Archite
N OFFICE BUIINGTON, D.C
L
esign‐bid‐busign the renos and specifi
hey hired a Cconstructabte, GSA broue subcontrac
e owner has of contract t
GSAOwner
Ge
ect
S
ILDING IN D.CC.
Lynn Appel |
ild project wovation andications wer
Constructionility of the dught on a Gectors for eve
requested ttypes are wi
eneral Contracto
Sub‐Contractors
C.
Technical Re
with a Constr prepare a cre complete,
n Manager todesign; and ieneral Contrery trade. Th
that generic thheld.
Consor
s
October 4, 20
eport #1 13
ruction complete set, GSA purcha
o help impromprove fieldactor. The he lowest bi
names be u
struction Manag
010
t of ased
ove d
dder
used
ger
Staffin
The consorganizatyou haveUnderneday and oresponsibthe Projework direperform office.
Quality Control
Elec./Mech
Structura
ng Plan –
struction mational chart e the Projectath the Projoversees thebilities of theect Managerectly in the fand maintai
Superintendent
h. Inspector
Cost Engineer
Admin. Assistan
l Inspector
RENOV
Construc
nagement sabove, invot Executive tect Executive Superintene major tradr. The Superfield. There in all bookke
Senior Proj
Ar
t
r
nt
Project
VATION OF ANWASH
tion Man
taffing plan lves a numbhat overseeve is the Senndent and thdes of the prrintendent isis also a Coseeping and e
ject Manager
rchitectural Revi
t Executive
E
N OFFICE BUIINGTON, D.C
L
nager
of the Officeber of differes the entire ior Project Mhe part‐timeroject are divs also assignest Engineer aensure that e
iew S
lectrical Review
ILDING IN D.CC.
Lynn Appel |
e Building, aent players tproject andManager, wh project supvided amonged Inspectoand Adminiseverything is
Structural Review
Fire
C.
Technical Re
as outlined inhat all play a reports direho is on the pport staff. Tgst the five srs who help strative Assiss running sm
w M
e Protection Rev
October 4, 20
eport #1 14
n the a key role. Fectly to GSAjob site everThe sub‐positionoversee thestant on sitemoothly in th
Mechanical Revie
iew
010
First, . ry
ns of e e to he
w
Staffin
The Geneon site evmakes suManagerdone in tSuperinteunderneaAdministsite.
En
ng Plan –
eral Contracvery day. Fiure that the r is the Genethe field. Thendent in thath the Projetration. They
ngineer
Supp
RENOV
General C
ctor staffing rst, you haveproject stayeral Superinte Superintehe field to enect Managey are there t
Proje
port Admin.
VATION OF ANWASH
Contracto
plan shown e the Projecys under budtendent. Thndent and Snsure that wr are the Engto assist the
Project M
ect Engineer
N OFFICE BUIINGTON, D.C
L
or
above lays oct Manager odget and on se General SuSafety Managwork is compgineer, ProjeProject Man
Manager
Superin
ILDING IN D.CC.
Lynn Appel |
out the relaton site that oschedule. Uuperintendeger are therleted in a timect Engineernager in day
Gen. Sup
ntendent
C.
Technical Re
tionships of oversees eveUnderneath tent overseese to help themely and safr and Suppoy‐to‐day acti
perintendent
Safety
October 4, 20
eport #1 15
people that eryone and the Project s work beinge General fe manner. rt vities on the
Manager
010
are
g
Also
e job
Works
Grunwaldhttp://wwdyn/cont
Cited
d, Michael. “ww.washingtent/article/
RENOV
“The Washingtonpost.com/2006/06/30
VATION OF ANWASH
ngton Post.”m/wp‐0/AR2006063
N OFFICE BUIINGTON, D.C
L
2 July 2006
3001316.htm
ILDING IN D.CC.
Lynn Appel |
6. Washingto
ml.
C.
Technical Re
onpost.com
October 4, 20
eport #1 16
1 October 20
010
010
RENOVVATION OF ANWASH
Ap
D4 Co
N OFFICE BUIINGTON, D.C
L
pendix A
ost Estima
ILDING IN D.CC.
Lynn Appel |
A
ate
C.
Technical Re
October 4, 20
eport #1 17
010
Division
00 01 02 03 04 05 06 07 08 09 10 12 14 15 16
Total Pr
Building SNo. of FloBuilding H1st Floor 1st Floor
n ProcuremGeneral RExisting CConcrete Masonry Metals Woods, PThermal &OpeningsFinishes SpecialtieFurnishinConveyinHVAC Electrical
oject Costs
RENOV
Size oors Height Height Size
ment & ContRequirementConditions
Plastics & Co& Moisture s
es gs g Systems
VATION OF ANWASH
Office
racting Req.ts
omposites Protection
N OFFICE BUIINGTON, D.C
L
Building in
550,0006
90'12.5'
37,000
ILDING IN D.CC.
Lynn Appel |
n D.C. Build
UFoundatiExt. WaInt. WaRoof Ty
Floor Ty
ProjTy
Percen 2.0 12.4 3.1 18.8 1.7 9.1 0.1 1.0 20.7 1.3 3.2 1.2 4.2 13.1 7.5
C.
Technical Re
ding Use: Officion: CONalls: CURalls: DRYype: MEMype: CONject ype: NEW
nt SF Co08% $341% $1812% $483% $2773% $216% $1319% $000% $177% $3038% $221% $422% $123% $615% $1954% $10
$145
October 4, 20
eport #1 18
ce N R Y M N
W
ost Amo.02 $1,65.03 $9,91.53 $2,49.36 $15,05.51 $1,37.31 $7,32.28 $15.45 $79.18 $16,60.00 $1,10.67 $2,56.78 $97.15 $3,38.11 $10,50.96 $6,02.34 $79,93
010
ount 59,09617,60390,75650,31079,01021,39854,90898,33500,31200,42869,24978,35380,59509,04227,03036,425
RENOV
RS Me
VATION OF ANWASH
Ap
ans Squa
N OFFICE BUIINGTON, D.C
L
pendix B
re Foot C
ILDING IN D.CC.
Lynn Appel |
B
Cost Estim
C.
Technical Re
mate
October 4, 20
eport #1 19
010
Estimate
Building T
Location:Story CouStory Hei
Floor AreLabor TypBasemenData ReleCost Per SFoot: Building C
A SubstruA1010 A1030 A2010 A2020 B Shell B1010 B1020 B2010 B2020 B2030 B3010 C InteriorC1010 C1020 C1030 C2010 C3010 C3020 C3030 D ServiceD1010 D2010
SName: O
Type: OP
Wunt: 6ght (L.F.): 1
ea (S.F.): 5pe: Ut Included: Nease: YSquare
$Cost: $
ucture
SSBB
FREEER
rs PIFSWFC
es EP
RENOV
Square Foot CoOffice BuildingOffice, 5‐10 StPanel / Steel F
WASHINGTON6 12.5
550000 Union No Year 2010 Qua
$138.47 $76,158,000
Standard FounSlab on Grade Basement ExcaBasement Wal
Floor ConstrucRoof ConstructExterior Walls Exterior WindoExterior DoorsRoof Covering
Partitions Interior Doors Fittings Stair ConstructWall Finishes Floor Finishes Ceiling Finishe
Elevators and Plumbing Fixtu
VATION OF ANWASH
ost Estimate Rg in DC ory with PrecaFrame
N, DC
arter 3
ndations
avation lls
ction tion
ows s s
tion
es
Lifts ures
N OFFICE BUIINGTON, D.C
L
Report
ast Concrete
ILDING IN D.CC.
Lynn Appel |
Costs are derived
Scope difference
Parameters are
C.
Technical Re
d from a building model
es and market condition
not within the ranges re
% of Total 2.10%
22.70%
21.50%
53.70%
October 4, 20
eport #1 20
l with basic components
s can cause costs to var
ecommended by RSMe
Cost Per S.F. $2.23$1.25$0.81$0.05$0.12
$23.71$17.65$0.91$3.49$0.70$0.23$0.72
$22.45$1.53$2.56$0.70$2.68$0.88$7.95$6.15
$56.12$15.91$2.22
010
s.
y significantly.
ans.
Cost 3 $1,228,05 $690,01 $445,05 $25,52 $67,51 $13,039,05 $9,707,51 $501,59 $1,920,00 $383,53 $129,02 $397,55 $12,345,03 $840,06 $1,407,00 $384,58 $1,475,58 $482,05 $4,375,05 $3,381,02 $30,865,51 $8,749,52 $1,222,5
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
D2020 D2040 D3050 D4010 D4020 D5010 D5020 D5030 D5090 E EquipmE1090 F Special G BuildinTotal Bui
DRTSSELCO
ment & FurnishO
Construction ng Sitework lding Cost
RENOV
Domestic WatRain Water DrTerminal & PaSprinklers Standpipes Electrical ServiLighting and BCommunicatioOther Electricahings Other Equipme
VATION OF ANWASH
er Distributionrainage ckage Units
ice/Distributioranch Wiringons and Securital Systems
ent
N OFFICE BUIINGTON, D.C
L
n
on
ty
ILDING IN D.CC.
Lynn Appel |
C.
Technical Re
0.00%
0.00% 0.00%
October 4, 20
eport #1 21
$0.49$0.25
$15.67$2.71$0.62$0.27
$11.54$5.36$1.07$0.00$0.00$0.00$0.00
$138.47
010
9 $270,05 $138,07 $8,620,01 $1,490,02 $343,07 $146,54 $6,346,56 $2,950,07 $589,50 0 0 0 7 $76,158,0
00 00 00 00 00 00 00 00 00 $0 $0 $0 $0 00
RENOV
Site
VATION OF ANWASH
Ap
e Plan of E
N OFFICE BUIINGTON, D.C
L
pendix C
Existing C
ILDING IN D.CC.
Lynn Appel |
C
Conditions
C.
Technical Re
s
October 4, 20
eport #1 22
010
RENOVVATION OF ANWASH
N OFFICE BUIINGTON, D.C
L
ILDING IN D.CC.
Lynn Appel |
C.
Technical Re
October 4, 20
eport #1 23
010