Page 1: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

Capital Projects

Quarterly Status Report 2nd Quarter FY2020: October 01 – December 31, 2019

Prepared for the March 04, 2020 SamTrans Board Meeting

San Mateo County Transit District

Page 2: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of
Page 3: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

San Mateo County Transit District

QUARTERLY CAPITAL PROGRAM STATUS REPORT Status Date: December 31, 2019

TABLE OF CONTENTS

Capital Program – Budget Status Summary 1 Traffic Light Report 3 Vehicle Replacement Projects: 021501 - Replacement of 55 - 2002 NABI Buses Project 5 021502 - Major Bus Components Project 6 100113 - Procurement of 10 Electric Buses Project 6 100354 - MB-2000 Bus Simulator System 7 Information Technology Projects: 021505 - Replace & Upgrade Servers & Out of Warranty Equipment Project 8 100016 - Wi-Fi at Bases for Video Review Project 8 100251 - FY2018 Transit Asset Management Plan 9 Facilities / Construction Projects: 021507 - Facility Smaller Projects 10 100247 - FY2018 Tech Refresh 10 100248 - EPM Replacement 11 100252 - Central Roof Replacement 11 100255 - Traffic Signal Priority Project 12 100348 - Upgrade Current District Website 12 100349 - FY2019 Facilities Eng. Smaller Projects 13 100350 - Central Office Sanitary Sewer Pump Replacement Project 13 100460 - FY2020 Purchase 14 Revenue Para Transit Vehicles (Vans) 14 100461 - FY2020 13 Paratransit (Cutaway) Revenue Vehicles 14 FY2018 Capital Budget 15 FY2019 Capital Budget 16 FY2020 Capital Budget 17 DBE Status Report 19 Definition of Terms 21 Performance Status (Traffic Light) Criteria 23

Page 4: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

This page is intentionally left blank.

Page 5: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

FY2016 FY2017 FY2018 FY2019 FY2020

1. Revenue Vehicles Replacement $35,312 $7,725 $0 $0 $0

2. Revenue & Non Revenue Vehicle Support $1,421 $1,451 $5,321 $1,895 $3,546

3. Information Technology $5,775 $2,627 $2,878 $3,100 $500

4. Development $2,350 $1,942 $1,552 $750 $250

5. Facilities/Construction $1,190 $2,835 $7,282 $1,730 $10,612

6. Safety and Security $1,830 $1,451 $0 $0 $150

7. Contingency $250 $250 $250 $200 $250

$48,128 $18,281 $17,283 $7,675 $15,308

Some of the major projects completed or in progress include, but are not limited to the following:

Active ProjectsBus Stop Improvement Program Central Office Sanitary Sewer Pump Replacement ProjectLinda Mar Park-n-Ride Lot Repaving ProjectMaint. & Op. Facility Pavement Rehabilitation ProjectNon-Revenue Service Support Vehicles ProjectNorth and South Base Industrial Waste Line Replacement ProjectProcurement of 10 Electric Buses ProjectReplace & Upgrade Servers & Out of Warranty Equipment ProjectReplacement of 55 - 2002 NABI Buses ProjectTraffic Signal Priority ProjectWi-Fi at Bases for Video Review Project

Projects Completed Within the Last Three YearsFacilities Smaller Projects - FY2012Installation of CCTV to Enhance Safety at Central Office ProjectLighting Upgrade at North Base and South Bases ProjectMajor Bus Components - FY2012Non-Revenue Service Support Vehicles ProjectNorth and South Base Industrial Waste Line Replacement ProjectRedi-Wheels (3) Expansion Vehicles ProjectReplace 50 2003 Gillig low-floor buses ProjectSan Carlos Transit Center ProjectWi-Fi Installation at North and South Bases Project

Total Board Approved Budget by FY (1)

Programs

SamTrans - Capital Program - Budget Status Summary 2nd Quarter FY2020 - October 01, 2019 to December 31, 2019

All Costs in $1,000's

Note:(1) The "Total Board Approved Budget by FY" reflects the annual budget approved by the SamTrans Board of Directors for each fiscal year. This authorizes the amount that can be spent on projects. Unspent budget in a fiscal year may be carried forward to subsequent budget years.

Page 1

Page 6: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

This page is intentionally left blank.

Page 2

Page 7: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

Oct 01, 2019 - Dec 31, 2019 SamTrans Quarterly ReportTRAFFIC LIGHT REPORT

Active Capital Projects

PageQ1 FY19 Q2 FY20 Q1 FY19 Q2 FY20 Q1 FY19 Q2 FY20 Q1 FY19 Q2 FY20

Vehicle Replacement Projects:

021501 - Replacement of 55 - 2002 NABI Buses Project 5

021502 - Major Bus Components Project 6

100113 - Procurement of 10 Electric Buses Project 6

7

Information Technology Projects:

021505 - Replace & Upgrade Servers & Out of Warranty Equipment Project 8

100016 - Wi-Fi at Bases for Video Review Project 8

100251 - FY2018 Transit Asset Management Plan 9

Facilities / Construction Projects:

021507 - Facility Smaller Projects 10

100247 - FY2018 Tech Refresh 10

100248 - EPM Replacement 11

100252 - Central Roof Replacement 11

100255 - Traffic Signal Priority Project 12

100348 - Upgrade Current District Website 12

100349 - FY2019 Facilities Eng. Smaller Projects 13

100350 - Central Office Sanitary Sewer Pump Replacement Project 13

100460 - FY2020 Purchase 14 Revenue Para Transit Vehicles (Vans) 14

100461 - FY2020 13 Paratransit (Cutaway) Revenue Vehicles 14

FUNDING

The following projects represent a sub-set of the total Capital Program and have been selected for inclusion into the Quarterly Report due to project value, operational significance, and/or impact on customers.

SCOPE BUDGET SCHEDULE

100354 - MB-2000 Bus Simulator System

G G GG

GG GG GG GG

G G GG

G G G

G G G

G G GG

G G GG

G G GGGG G GG

G G G

G G G

G G GG

G G GG

G G GG

G G GG

G G GG

G

G G GG

G G GG

G G GG

G

R

G G GG

G G G G

G G GG

G G GG

G G GG

G G GG

G G GG

G G GG

G

G G G G

G G GG

G G GG

G G GG

G G GG

G G GG

Page 3

Page 8: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

This page is intentionally left blank.

Page 4

Page 9: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Scop

e: P

rocu

re (5

5) re

plac

emen

t bus

es fo

r the

200

2 N

AB

I ar

ticul

ated

bus

es th

at h

ave

reac

hed

the

end

of th

eir u

sefu

l life

. Th

e ne

w b

uses

will

mee

t the

reco

mm

enda

tions

for v

ehic

le ty

pe to

co

mpl

emen

t the

Sam

trans

Stra

tegi

c P

lan

(SS

P).

The

pro

ject

al

so, p

urch

ases

maj

or b

us c

ompo

nent

s, in

acc

orda

nce

with

FTA

al

low

able

allo

wan

ce fo

r spa

re c

ompo

nent

s. T

he b

uses

will

be

purc

hase

d pe

r the

Fix

ing

Am

eric

a’s

Sur

face

Tra

nspo

rtatio

n (F

AS

T) A

ct w

hich

allo

ws

gran

tees

to p

urch

ase

rolli

ng s

tock

and

re

late

d eq

uipm

ent f

rom

a S

tate

’s c

oope

rativ

e pr

ocur

emen

t co

ntra

ct. T

his

allo

ws

the

Dis

trict

to p

urch

ase

vehi

cles

that

mee

t pr

oven

des

ign

and

cons

truct

ion

stan

dard

s, a

s w

ell a

s co

nfig

ure

them

to th

e D

istri

ct’s

spe

cific

atio

ns, a

t hig

hly

com

petit

ive

pric

es.

Issu

es: N

one.

Key

Act

iviti

esTh

is Q

uart

er:

(1) C

ontin

ued

rece

ivin

g bu

ses

(54

out o

f 55

buse

s ha

ve b

een

rece

ived

). (2

) Con

tinue

d co

ordi

natin

g R

esid

ent I

nspe

ctio

n fo

r In-

Pla

nt

Insp

ectio

n S

ervi

ces.

(3) A

ccep

ted

mor

e bu

ses

(45

buse

s ha

ve b

een

acce

pted

to d

ate)

.(4

) Con

tinue

d pu

tting

bus

es in

ser

vice

(33

buse

s ar

e in

ser

vice

).

Nex

t Qua

rter

: (1

) Con

tinue

coo

rdin

atin

g R

esid

ent I

nspe

ctio

n fo

r In-

Pla

nt

Insp

ectio

n S

ervi

ces.

(2

) Con

tinue

rece

ivin

g bu

ses.

(3

) Con

tinue

acc

epta

nce

test

ing

of b

uses

. (4

) Con

tinue

pla

cing

bus

es in

ser

vice

.

05/3

1/20

/06

/30/

20$4

5,75

1,64

7$4

8,97

2,00

0$0

93.4

2%71

.0%

02/0

4/17

/02

/04/

17A

$3,2

20,3

53

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

0215

01

Rep

lace

men

t of 5

5 -

2002

NA

BI B

uses

P

roje

ct

PM

- D

avid

Har

bour

$48,

972,

000

$48,

972,

000

$0$4

8,97

2,00

0

VEH

ICLE

REP

LAC

EMEN

T/M

AIN

TEN

AN

CE

PRO

JEC

TS:

Page 5

Page 10: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

Scop

e: T

he o

bjec

tive

of th

is p

roje

ct is

to m

aint

ain

a st

ate

of g

ood

repa

ir fo

r bus

tran

sit.

Wel

l mai

ntai

ned

capi

tal b

us c

ompo

nent

s ar

e es

sent

ial t

o ke

ep o

ur re

venu

e eq

uipm

ent i

n se

rvic

e, re

liabl

e, a

nd

safe

for b

us p

atro

ns.

This

pro

ject

pro

vide

s fu

ndin

g fo

r new

par

ts, r

ebui

lt pa

rts, a

nd

maj

or b

us c

ompo

nent

s, n

ot a

ccou

nted

for i

n th

e op

erat

ing

budg

et,

that

exc

eed

$1,0

00 in

acc

orda

nce

and

com

plia

nce

with

FTA

gu

idel

ines

. P

arts

and

maj

or b

us c

ompo

nent

s in

clud

e; e

ngin

es,

trans

mis

sion

s, d

iffer

entia

ls, E

CU

(ele

ctro

nic

cont

rol u

nit),

HV

AC

un

its (h

eatin

g, v

entil

atio

n an

d ai

r con

ditio

ning

) rad

iato

r, m

uffle

r, ai

r co

mpr

esso

r, D

igita

l Vid

eo R

ecor

ders

(DV

Rs)

, Aut

omat

ic M

obile

D

ata

Term

inal

s (A

MD

Ts),

etc.

Issu

es: N

one.

Key

Act

iviti

es:

Th

is Q

uart

er:

(1) P

urch

ased

maj

or b

us c

ompo

nent

s an

d re

plac

emen

t par

ts.

Nex

t Qua

rter

: (1

) Con

tinue

to p

urch

ase

maj

or b

us c

ompo

nent

s an

d re

plac

emen

t pa

rts, a

s ne

eded

.

$5,2

32,1

69$1

,374

,467

$6,6

06,6

36$6

,606

,636

$0$6

,606

,636

07/0

1/15

/07

/01/

15A

06/3

0/20

/06

/30/

20$0

79.2

%79

.2%

$10,

926,

668

0215

02

Maj

or B

us

Com

pone

nts

PM

- D

avid

Har

bour

$6,6

06,6

36

1001

13

Pro

cure

men

t of 1

0 E

lect

ric B

uses

PM

- D

avid

Har

bour

$10,

926,

668

$10,

926,

668

$0

Scop

e: P

rocu

re 1

0 ba

ttery

-ele

ctric

Zer

o E

mis

sion

s B

uses

(ZE

Bs)

to

repl

ace

10 o

f the

200

3 G

illig

die

sel b

uses

and

inst

all s

ix

char

ging

sta

tions

in s

uppo

rt of

the

elec

tric

buse

s. T

his

proj

ect w

ill

supp

ort C

alifo

rnia

Air

Res

ourc

es B

oard

(CA

RB

)'s g

oal o

f 100

%

ZEB

tran

sit f

leet

by

2040

. The

se e

lect

ric b

uses

will

be

plac

ed in

a

pilo

t ser

vice

pro

gram

at N

orth

Bas

e.

Issu

es: N

one.

Key

Act

iviti

es

This

Qua

rter

:(1

) Wai

ting

for P

rote

rra

to fi

naliz

e pr

oduc

tion

sche

dule

.(2

) Con

tinue

d w

eekl

y m

eetin

g w

ith P

rote

rra’

s en

gine

erin

g te

am

rega

rdin

g bu

s de

fect

s an

d re

mai

ning

eig

ht b

uses

.(3

) Con

tinue

d tra

inin

g an

d te

stin

g of

bus

es.

(4) C

ompl

eted

con

figur

atio

n re

view

for r

emai

ning

eig

ht b

uses

.

Nex

t Qua

rter

: (1

) Con

tinue

wee

kly

mee

ting

with

Pro

terr

a’s

engi

neer

ing

team

re

gard

ing

bus

defe

cts

and

Lot 2

(rem

aini

ng e

ight

bus

es).

(2) C

orre

spon

d w

ith R

esid

ent I

nspe

ctor

abo

ut p

rodu

ctio

n in

202

0.(3

) Est

ablis

h fin

al p

rodu

ctio

n sc

hedu

le w

ith P

rote

rra.

Not

e: P

rodu

ctio

n fo

r the

rem

aini

ng e

ight

bus

es w

ill b

egin

in e

arly

20

20.

$2,2

69,2

67$8

,657

,401

$10,

926,

668

$020

.8%

42.0

%11

/30/

20/

11/3

0/20

02/0

1/18

/02

/01/

18A

Page 6

Page 11: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

$310

,000

$310

,000

$0$3

10,0

00$5

3312

/31/

20/

12/3

1/20

1003

54$3

09,4

67$3

10,0

00$0

0.2%

0.2%

12/0

1/19

/12

/01/

19A

MB

-200

0 B

us

Sim

ulat

or S

yste

m

PM

- D

avid

Har

bour

Scop

e: T

he re

plac

emen

t of t

he o

utda

ted

MB

-200

0 B

us S

imul

ator

aq

uire

d in

200

5. S

amTr

ans

has

bene

fited

in tr

aini

ng a

war

enes

s fro

m th

e M

B-2

000

Bus

Sim

ulat

or te

chno

logy

but

is a

t the

end

of

its li

fe s

pan

and

can

no lo

nger

be

upgr

aded

. The

old

er S

imul

ator

la

cks

the

abili

ty to

ada

pt to

the

chan

ging

adv

ance

s as

a m

ulti

func

tioni

ng tr

aini

ng to

ol. A

new

sim

ulat

or g

ives

us

the

flexi

bilit

y to

m

anag

e la

rger

cla

sses

in th

e tra

inin

g ro

om e

nviro

nmen

t and

free

s up

bus

es in

ser

vice

. Als

o a

prim

ary

reas

on fo

r the

sim

ulat

or is

to

redu

ce p

reve

ntab

le c

ollis

ions

and

inci

dent

s. R

educ

ing

Ris

k in

a

haza

rds

envi

ronm

ents

. The

Sim

ulat

or h

as s

how

n po

sitiv

e re

sults

in

the

prev

entin

g pr

even

tabl

e an

d at

faul

t col

lisio

ns.

Issu

es: N

one.

Key

Act

iviti

es:

This

Qua

rter

: (1

) Beg

an w

orki

ng w

ith B

udge

ts to

sec

ure

the

addi

tiona

l fu

ndin

g ne

eded

to b

egin

the

proj

ect.

Nex

t Qua

rter

: (1

) Sec

ure

addi

tona

l fun

ding

.(2

) Pre

pare

sta

ff re

port

for S

amtra

ns B

oard

.

Page 7

Page 12: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

Scop

e: T

his

proj

ect w

ill re

plac

e D

istri

ct’s

ser

vers

and

dat

a st

orag

e, c

opie

rs/p

rinte

rs, r

oute

rs a

nd s

witc

hes,

AC

, UP

S a

nd o

the r

appl

ianc

es th

at a

re a

t the

end

of t

heir

expe

cted

ser

vice

life

and

so

on to

be

out o

f war

rant

y. T

he p

roje

ct w

ill p

rocu

re n

ew

equi

pmen

t to

repl

ace

old

and

out o

f war

rant

y eq

uipm

ent i

n C

entra

l’s D

ata

Cen

ter,

Nor

th B

ase,

and

Sou

th B

ase

as w

ell a

s pr

ofes

sion

al s

ervi

ces

for s

etup

and

con

figur

atio

n.

Issu

es: N

one.

Key

Act

iviti

esTh

is Q

uart

er:

(1) P

rocu

red

addi

tiona

l ser

vers

, net

wor

k ro

uter

s an

d sw

itche

s to

re

plac

e th

e ou

t of w

arra

nty

equi

pmen

t.

Nex

t Qua

rter

: (1

) Pro

cure

add

ition

al s

erve

rs, n

etw

ork

rout

ers

and

switc

hes

to

repl

ace

the

out o

f war

rant

y eq

uipm

ent.

Scop

e: T

he p

roje

ct s

cope

will

prim

arily

be

as fo

llow

s:1.

Inst

all a

nd te

st W

iFi e

quip

men

t at N

orth

Bas

e an

d S

outh

Bas

e.2.

Spe

cify

sof

twar

e co

nfig

urat

ion

base

d on

sta

keho

lder

co

nsen

sus.

3.

Inst

all,

conf

igur

e, a

nd te

st s

erve

rs, i

nclu

ding

:a.

App

licat

ion

serv

er, w

hich

ser

ves

as th

e ba

ck e

nd fo

r clie

nt

com

pute

rs a

llow

ing

user

s to

requ

est v

ideo

, ini

tiate

s co

mm

unic

atio

n w

ith b

uses

whe

n th

ey e

nter

the

yard

, and

upl

oads

D

igita

l Vid

eo R

ecor

ders

(DV

Rs)

hea

lth d

ata

as w

ell a

s an

y re

ques

ted

vide

o.b.

Dat

abas

e se

rver

, whi

ch ru

ns M

icro

soft

SQ

L se

rver

and

ho

uses

dat

a fo

r the

ser

ver a

pplic

atio

n.

4. In

stal

l and

con

figur

e cl

ient

app

licat

ion

on s

peci

fied

com

pute

rs.

5. C

onfig

ure

all n

ew W

iFi e

quip

ped

DV

Rs

to c

omm

unic

ate

with

th

e ap

plic

atio

n se

rver

.

Issu

es:

(1) P

M is

requ

estin

g a

sing

le s

ourc

e op

tion

for t

he s

oftw

are

porti

on

of th

e co

ntra

ct.

(2) S

ched

ule

will

be

upda

ted

afte

r a v

endo

r is

sele

cted

.

Key

Act

iviti

es:

This

Qua

rter

:(1

) C

ontin

ued

the

proc

ess

of g

athe

ring

requ

irem

ents

for t

he W

iFi

infra

stru

ctur

e, b

acke

nd s

erve

rs a

nd s

tora

ge.

(2) C

ontin

ued

to m

eet w

ith p

roje

ct s

take

hold

ers.

(3) C

ontin

ued

revi

ew o

f the

ava

ilabl

e W

iFi s

yste

ms

to d

ecid

e on

th

e sy

stem

to b

e im

plem

ente

d.

Nex

t Six

Wee

ks:

(1) C

ontin

ue th

e pr

oces

s of

gat

herin

g re

quire

men

ts fo

r the

WiF

i in

frast

ruct

ure,

bac

kend

ser

vers

and

sto

rage

. (2

) Con

tinue

to m

eet w

ith p

roje

ct s

take

hold

ers.

(3) C

ontin

ue re

view

of t

he a

vaila

ble

WiF

i sys

tem

s.

07/0

1/14

/

07

/01/

14A

12/3

1/20

/12

/31/

20$4

,090

,947

$2,9

88,0

53$7

,079

,000

$057

.8%

62.0

%02

1505

Rep

lace

& U

pgra

de

Ser

vers

& O

ut o

f W

arra

nty

Equ

ipm

ent

Pro

ject

PM

- E

d K

elly

$7,0

79,0

00$9

95,0

00$6

,084

,000

$7,0

79,0

00

INFO

RM

ATI

ON

TEC

HN

OLO

GY

PRO

JEC

TS:

06/3

0/20

20/

06/3

0/20

0.4%

1000

16W

iFi a

t Bas

es fo

r V

ideo

Rev

iew

PM

- K

aram

bir

Che

ema

$690

,499

$690

,499

$0$6

90,4

9903

/26/

18/

03/2

6/18

A$2

,609

$687

,890

TBD

$690

,499

$0

Page 8

Page 13: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

Scop

e: T

o im

plem

ent a

Tra

nsit

Ass

et M

anag

emen

t (TA

M) P

lan

whi

ch w

ill in

clud

e a

reco

gniz

ed d

atab

ase

plat

form

est

ablis

hed

with

in th

e IT

pro

fess

ion.

The

pro

ject

will

gui

de th

e D

istri

ct’s

effo

rts

to s

olic

it an

d m

anag

e im

plem

enta

tion

of a

new

fede

ral

man

date

/requ

irem

ent f

or “c

ondi

tion

base

d” a

sses

smen

t and

an

nual

repo

rting

of t

rans

it re

sour

ces

acro

ss a

bro

ad ra

nge

of

asse

ts.

Org

aniz

atio

ns re

ceiv

ing

fede

ral f

undi

ng m

ust g

athe

r and

re

port

cate

goriz

ed d

ata

(fina

nces

, ope

ratio

ns, s

ervi

ce le

vels

, sa

fety

, fac

ilitie

s, e

tc.)

in a

man

ner f

ully

con

sist

ent w

ith s

tate

d N

atio

nal T

rans

it D

atab

ase

(NTD

) par

amet

ers.

A D

istri

ct-w

ide

asse

t dat

abas

e m

eetin

g th

e N

TD p

aram

eter

s do

es n

ot c

urre

ntly

ex

ist w

ithin

the

agen

cy, t

he D

istri

ct w

ill s

eek

a tu

rnke

y da

taba

se/tr

aini

ng s

olut

ion

from

an

expe

rienc

ed fi

rm.

Exi

stin

g D

istri

ct re

sour

ces

(prio

r dat

a, IT

equ

ipm

ent,

etc.

) will

be

utili

tized

to

the

max

imum

ext

ent p

ossi

ble.

Issu

es: N

one.

This

Qua

rter

: (1

) TA

M a

naly

st w

as h

ired

and

bega

n th

e on

-boa

rdin

g pr

oces

s.(2

) Eng

aged

sta

ff an

d di

scus

sed

appl

icab

le to

pics

.

Nex

t Qua

rter

: (1

) TA

M d

ata

is u

pdat

ed c

ontin

uous

ly (f

ull c

ycle

onc

e ev

ery

4 ye

ars)

with

on-

goin

g co

nditi

on a

sses

smen

ts.

(2) T

AM

sup

port

for E

AM

sof

twar

e co

ntin

ues.

1002

51

FY18

Tra

nsit

Ass

et

Man

agem

ent P

lan

PM

- Je

ff Th

omas

$975

,000

$170

,811

$804

,189

02/0

1/18

/02

/01/

18A

05/3

1/20

/05

/31/

20$9

75,0

00$0

$975

,000

$975

,000

$017

.5%

17.5

%

Page 9

Page 14: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

Scop

e: T

his

proj

ect w

ill m

aint

ain

a st

ate

of g

ood

repa

ir (S

OG

R)

for t

he D

istri

ct’s

infra

stru

ctur

e, s

hops

and

faci

litie

s. T

his

proj

ect w

ill

mai

ntai

n co

ntin

uity

of s

ervi

ces

and

sust

aina

bilit

y of

a p

leas

ant

wor

k en

viro

nmen

t, in

clus

ive

of ro

utin

e m

aint

enan

ce o

r re

plac

emen

t, e.

g. c

arpe

ts.

Issu

es: N

one.

Key

Act

iviti

es:

This

Qua

rter

: (1

) Per

form

ed m

aint

enan

ce a

nd re

pairs

wor

k.

Nex

t Qua

rter

: (1

) Con

tinue

with

mai

nten

ance

and

repa

irs w

ork,

as

need

ed.

Faci

lity

Sm

alle

r P

roje

cts

PM

- G

reg

Moy

er

$0$1

,265

,264

$38,

052

$1,2

65,2

6497

.0%

0215

07$1

,265

,264

$1,2

65,2

64$1

,227

,212

$097

.0%

07/0

1/15

/07

/01/

15A

06/3

0/20

/06

/30/

20

FAC

ILIT

IES

/ CO

NST

RU

CTI

ON

PR

OJE

CTS

:

2.3%

2.3%

1002

47

FY20

18 T

ech

Ref

resh

PM

- E

d K

elly

$1,3

03,4

76$1

,303

,476

$0$1

,303

,476

07/0

1/18

/07

/01/

18A

12/3

1/20

/12

/31/

20

Scop

e: T

o fa

cilia

te th

e ad

optio

n of

new

tech

nolo

gy to

mee

t ch

angi

ng n

eeds

and

miti

gate

the

risk

of o

bsol

esce

nce

of e

xist

ing

tech

nolo

gy.

Incl

uded

is th

e pe

riodi

c re

plac

emen

t of D

istri

ct

syst

em’s

ser

vers

and

sto

rage

, cop

iers

/prin

ters

, net

wor

k eq

uipm

ent

such

as

rout

ers

and

switc

hes,

AC

, UP

S a

nd o

ther

app

lianc

es th

at

are

at th

e en

d of

its

expe

cted

ser

vice

life

and

will

be

out o

f w

arra

nty.

Thi

s pr

opos

al w

ill c

over

pro

cure

men

t as

wel

l as

prof

essi

onal

ser

vice

s fo

r ins

talla

tion,

set

up a

nd c

onfig

urat

ion.

Issu

es: N

one.

Key

Act

iviti

es:

This

Qua

rter

: (1

) Con

tinue

d re

plac

emen

t of D

istri

ct’s

IT e

quip

men

t on

an a

s ne

eded

bas

is.

Nex

t Qua

rter

: (1

) Con

tinue

d re

plac

emen

t of D

istri

ct’s

IT e

quip

men

t on

an a

s ne

eded

bas

is.

$29,

766

$1,2

73,7

10$1

,303

,476

$0

Page 10

Page 15: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

0.0%

07/0

1/20

/01

/01/

20

09/3

0/21

/09

/30/

21$5

00,0

00$0

$500

,000

$500

,000

$00.

0%10

0248

EP

M R

epla

cem

ent

PM

- L.

Mill

ard-

Olm

eda

Scop

e: T

his

proj

ect w

ill re

plac

e an

d up

grad

e th

e E

PM

(Ent

erpr

ise

Per

form

ance

Man

agem

ent)

softw

are

that

is c

urre

ntly

bei

ng u

sed

by th

e B

udge

ts g

roup

.

Issu

es: N

one.

Key

Act

iviti

es:

This

Qua

rter

: (1

) Thi

s pr

ojec

t has

not

sta

rted

yet.

Nex

t Qua

rter

: (1

) Bud

gets

gro

up w

ill b

e w

orki

ng w

ith IT

to d

evel

op s

cope

of w

ork

and

optio

ns fo

r the

sof

twar

e re

plac

emen

t.

$500

,000

$500

,000

$0

$2,9

98$1

,272

,002

$1,2

75,0

00$0

0.2%

1002

52C

entra

l Roo

f R

epla

cem

ent

PM

- G

reg

Moy

er

Scop

e: In

volv

es th

e re

habi

litat

ion

of th

e C

entra

l offi

ce ro

of, f

rom

th

e ea

st e

nd o

f the

tenn

is c

ourts

to th

e ea

st s

ide

of th

e bu

ildin

g.

The

roof

is a

20+

yea

rs o

ld “f

oam

roof

”, w

hich

nee

ds e

xten

sive

re

habi

litat

ion.

The

cur

rent

roof

allo

ws

leak

s in

to th

e 4t

h flo

or o

f th

e bu

ildin

g, w

hich

are

con

tain

ed b

y ga

rbag

e ca

ns in

hea

vy ra

ins.

Th

e m

ost c

ost e

ffect

ive

appr

oach

to re

hab

the

roof

will

be

dete

rmin

ed d

urin

g th

e de

sign

pha

se.

The

cost

est

imat

e fo

r thi

s pr

ojec

t is

base

d on

the

assu

mpt

ion

that

this

par

t of t

he ro

of w

ill b

e re

plac

ed w

ith a

new

foam

roof

. It

is a

lso

assu

med

that

wal

kway

s fo

r foo

t tra

ffic

will

als

o be

add

ed to

ext

end

the

life

of th

e ne

w ro

of.

This

pro

posa

l doe

s no

t inc

lude

reha

b of

the

tenn

is c

ourts

nor

the

faci

litie

s w

est o

f the

tenn

is c

ourts

. Thi

s pr

ojec

t wou

ld p

rom

ote

the

Dis

trict

’s g

oal o

f a re

liabl

e sy

stem

in a

sta

te o

f goo

d re

pair.

Issu

es: N

one.

This

Qua

rter

: (1

) Pre

pare

d W

ork

Dire

ctor

Pro

posa

l (W

DP

R) c

ost e

stim

ate.

(2

) Beg

an c

oord

inat

ion

with

Con

tract

s an

d P

rocu

rem

ent (

C&

P) t

o de

term

ine

polic

ies

of c

ontra

ct p

rocu

rem

ent.

(3) C

ontin

ued

to id

entif

y pr

ojec

t res

ourc

es to

dev

elop

sp

ecifi

catio

ns a

nd d

raw

ings

Nex

t Qua

rter

: (1

) Pro

ject

Tea

m to

wor

k w

ith C

&P

for d

esig

n-bu

ild p

rocu

rem

ent

type

.(2

) Con

tinue

to id

entif

y pr

ojec

t res

ourc

es to

dev

elop

spe

cific

atio

ns

and

draw

ings

for p

rocu

rem

ent.

$1,2

75,0

00$1

,275

,000

$0$1

,275

,000

0.2%

09/0

1/19

/09

/01/

19A

12/3

1/20

/12

/31/

20

Page 11

Page 16: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

0.7%

0.7%

06/0

1/19

/06

/01/

19

03/3

1/21

/03

/31/

21$0

$600

,000

$4,1

74$5

95,8

26$6

00,0

00$0

1003

48

Upg

rade

Cur

rent

D

istri

ct W

ebsi

te

PM

- J.

Lipp

s

Scop

e: T

o co

mpl

ete

a w

ebsi

te re

-des

ign

and

deve

lopm

ent t

hat

incl

ude,

des

ign

and

deve

lopm

ent;

host

ing

mai

nten

ance

and

su

ppor

t. Th

e D

istri

ct in

tend

s to

ent

er in

to a

Pro

fess

iona

l Ser

vice

s A

gree

men

t with

the

mos

t qua

lifie

d C

onsu

ltant

, to

be th

e se

rvic

e pr

ovid

er.

Issu

es: N

one.

Key

Act

iviti

es:

This

Qua

rter

: (1

) Con

tinue

d w

orki

ng o

n th

e R

FP.

(2) H

eld

mee

tings

with

C&

P a

bout

RFP

.(3

) Con

tinue

d to

ans

wer

RFP

que

stio

ns fr

om p

oten

tial v

endo

rs.

Nex

t Qua

rter

: (1

) Hol

d m

eetin

g to

orie

nt R

FP s

elec

tion

com

mitt

ee.

(2) H

old

subm

issi

on re

view

mee

tings

.

$600

,000

$600

,000

09/3

0/21

/09

/30/

21$8

29,2

94$3

,077

,706

$3,9

07,0

00$0

21.2

%34

.0%

01/0

1/18

/01

/01/

18A

1002

55Tr

affic

Sig

nal P

riorit

y P

roje

ctP

M -

Rob

ert T

am

Scop

e: T

his

proj

ect w

ill im

plem

ent T

raffi

c S

igna

l Prio

rity

(TS

P)

tech

nolo

gy fo

r Sam

Tran

s bu

ses

trave

ling

on E

l Cam

ino

Rea

l in

San

Mat

eo C

ount

y (S

tate

Hig

hway

82)

. Thi

s w

ill im

prov

e tra

nsit

spee

d al

ong

the

corr

idor

by

eith

er g

ivin

g bu

ses

early

gre

en li

ghts

or

ext

endi

ng g

reen

ligh

ts a

t tra

ffic

inte

rsec

tions

. Sam

Tran

s w

ill

build

on

the

exis

ting

El C

amin

o R

eal S

mar

t Cor

ridor

Pro

ject

, im

plem

ente

d by

Cal

trans

and

the

City

/Cou

nty

Ass

ocia

tion

of

Gov

ernm

ents

of S

an M

ateo

Cou

nty

(C/C

AG

), an

d de

ploy

way

side

an

tenn

as a

t int

erse

ctio

ns a

nd tr

ansp

onde

rs a

boar

d bu

ses

as th

e pr

imar

y TS

P d

etec

tion

tech

nolo

gy to

pro

vide

max

imum

co

mm

unic

atio

n pr

ecis

ion.

Issu

es: N

one.

Key

Act

iviti

es:

This

Qua

rter

: (1

) Rec

eive

d th

e pe

rmit

from

Cal

trans

.(2

) Rec

eive

d th

e re

vise

d tra

inin

g an

d in

stal

latio

n pl

ans.

(3) C

ompl

eted

5 p

ilot b

us in

stal

latio

ns.

(4) I

nsta

lled

trans

pond

ers

on a

n ad

ditio

nal 3

5 bu

ses,

for a

tota

l of

65 b

uses

with

tran

spon

ders

.(5

) Com

plet

ed s

ite v

isits

to th

e bu

s ba

ses

and

inte

rsec

tions

.

Nex

t Qua

rter

: '(1

) Con

tinue

inst

allin

g tra

nspo

nder

s on

bus

es.

(2) B

egin

inst

alla

tion

of w

aysi

de a

nten

nas

at in

ters

ectio

ns.

$3,9

07,0

00$3

,907

,000

$0$3

,907

,000

Page 12

Page 17: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

$035

.6%

35.6

%07

/01/

18A

/09

/30/

20

07/0

1/18

A/

09/3

0/20

1003

49

FY20

19 F

acili

ties

Eng

S

mal

ler P

roje

cts

PM

- V

ario

us

Scop

e: T

o m

aint

ain

a st

ate

of g

ood

repa

ir fo

r the

Dis

trict

’s

build

ings

, sho

ps, i

nfra

stru

ctur

e an

d fa

cilit

ies,

with

the

obje

ctiv

e of

m

aint

aini

ng c

ontin

uity

of s

ervi

ces,

incl

usiv

e of

rout

ine

mai

nten

ance

or

repl

acem

ent.

Thi

s pr

ojec

t add

s E

ngin

eerin

g an

d P

roje

ct

Man

agem

ent s

ervi

ces

to t

hese

"sm

alle

r pro

ject

s" in

ord

er to

ex

pedi

te th

eir d

eliv

ery.

Thi

s ye

ar's

fund

ing

requ

est c

onta

ins

spec

ific

proj

ects

as

follo

ws:

- Nor

th B

ase

Fire

Hyd

rant

Rep

air

- Cen

tral O

ffice

Par

king

Stru

ctur

e W

all R

ehab

- C

ompl

ete.

- N

orth

Bas

e M

aint

enan

ce B

uild

ing

Hyd

raul

ic L

ine

Reh

ab -

Com

plet

e.

- Oth

er P

roje

cts

Issu

es: N

one.

Key

Act

iviti

es:

Th

is Q

uart

er:

Cen

tral

Par

king

Wal

l Reh

ab(1

) NO

C w

as fi

led.

(2) W

aitin

g re

quire

d da

ys fo

r rel

easi

ng re

tent

ion.

Nor

th B

ase

Mai

nten

ance

Bui

ldin

g H

ydra

ulic

Lin

e R

ehab

(1

) Con

tract

ors

have

repa

ired

the

hydr

aulic

line

and

dem

obili

zed.

(2) I

ssue

d fin

al p

aym

ent a

nd b

egan

pro

ject

clo

seou

t.

Nex

t Qua

rter

: C

entr

al P

arki

ng W

all R

ehab

(1) R

elea

se re

tent

ion.

(2) B

egin

clo

seou

t of p

roje

ct.

Nor

th B

ase

Mai

nten

ance

Bui

ldin

g H

ydra

ulic

Lin

e R

ehab

(1

) Iss

ue fi

nal p

aym

ent.

(2) C

lose

out p

roje

ct.

Nor

th B

ase

Fire

Hyd

rant

Rep

air

(1) B

egin

pre

parin

g w

ork

plan

.

$530

,000

$530

,000

$0$5

30,0

00

37.2

%

$188

,440

$341

,560

$530

,000

$0$3

50,0

0007

/01/

17/

07/0

1/17

A

12/3

1/19

/03

/31/

20$1

30,3

04$2

19,6

96$3

50,0

00$0

37.2

%10

0350

Cen

tral O

ffice

S

anita

ry S

ewer

Pum

p R

epla

cem

ent

PM

- H

uber

t Cha

n

Scop

e: T

o re

plac

e tw

o se

wer

pum

ps lo

cate

d in

the

base

men

t of

Cen

tral.

Orig

inal

pum

ps w

ere

inst

alle

d in

197

9.

Issu

es: N

one.

Key

Act

iviti

es:

This

Qua

rter

: (1

) Con

duct

ed k

icko

ff m

eetin

g fo

r con

stru

ctio

n co

ntra

ct.

(2) A

ppro

ved

“app

rove

d eq

ual”

desi

gn s

ubm

ittal

.(3

) Com

plet

ed re

plac

ing

sew

er p

umps

.(4

) Beg

an p

unch

list w

ork.

(5) A

ppro

ved

war

ning

stro

be li

ght d

esig

n.

Nex

t Qua

rter

: (1

) Com

plet

e pu

nchl

ist i

tem

s.(2

) Com

plet

e w

arni

ng s

trobe

ligh

t Ins

talla

tion.

(3) C

ompl

ete

proj

ect c

lose

out

.

$350

,000

$350

,000

Page 13

Page 18: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

(a)

(b)

(c)

(d)

(e)

(f)(g

) = (e

) + (f

)(h

)(i)

= (j

) - (h

)(j)

(k) =

(g) -

(j)

(l) =

(h) /

(j)

(m)

(n)

(o)

Proj

ect

No.

Proj

ect N

ame

Scop

e /

Issu

es /

Key

Act

iviti

esA

ppro

ved

Fund

ing

Orig

inal

Bud

get

App

rove

d C

hang

esC

urre

nt B

udge

tEx

pend

ed +

A

ccru

al T

o D

ate

Estim

ate

to

Com

plet

eEs

timat

e at

C

ompl

etio

nVa

rianc

e at

C

ompl

etio

n%

Exp

ende

d of

EA

CEs

t. Ph

ysic

al

% C

ompl

ete

Cur

rent

B

asel

ine

/ C

urre

nt

Star

t

Cur

rent

B

asel

ine

/ C

urre

nt

Fini

sh

Sam

Tran

s - M

ajor

Cap

ital P

roje

ct -

Qua

rter

ly R

epor

t - Q

2 FY

2020

Oct

ober

01,

201

9 to

Dec

embe

r 31,

201

9

12/0

1/19

/12

/01/

19

06/3

0/20

/06

/30/

20$1

,747

,086

$2,0

00$1

,745

,086

$1,7

47,0

86$0

0.1%

0.0%

TBD /

TBD

TBD /

TBD

1004

61

FY20

20 -

13 P

ara

Tran

sit

(Cut

away

) Rev

enue

V

ehic

les

PM

- D

avid

Har

bour

Scop

e: T

he p

roje

ct s

cope

is to

pro

cure

and

repl

ace

13 P

ara

Tran

sit (

cuta

way

) rev

enue

veh

icle

s th

at h

ave

exce

eded

use

ful

serv

ice

life.

Thi

s w

ill c

ontin

ue to

insu

re th

e re

liabi

lity,

dep

enda

bilit

y an

d co

st-e

ffect

iven

ess

of th

e D

istri

ct's

reve

nue

vehi

cle

fleet

s w

hich

in tu

rn w

ill im

prov

e cu

stom

er s

ervi

ce, a

nd w

ill h

elp

to

min

imiz

e re

pair

and

mai

nten

ace

cost

s. A

thre

e ye

ar 3

6,00

0 m

ile

war

rant

y on

the

chas

sis,

and

one

yea

r bum

per t

o bu

mpe

r w

arra

nty

from

El d

orad

o w

ill a

lso

miti

gate

ove

rall

repa

ir co

sts

for

that

per

iod.

In 2

016

the

EP

A a

nd N

HTS

A in

itiat

ed p

hase

2 o

f the

em

issi

on re

gula

tion

stan

dard

s to

impr

ove

over

all c

arbo

n fo

otpr

int

and

bette

r fue

l eco

nom

y st

anda

rds.

The

se n

ew re

plac

emen

t ve

hicl

es w

ill b

e pa

rt of

the

phas

e 2

stan

dard

s an

d he

lp to

de

crea

se th

e ov

eral

l car

bon

foot

prin

t and

day

to d

ay fu

el c

osts

as

soci

ated

with

this

sub

-flee

t.

Issu

es:T

he p

rocu

rem

ent w

ill p

iggy

bac

k of

f the

Cal

Act

- no

RFP

w

ill b

e re

quire

d.

Key

Act

iviti

es:

Th

is Q

uart

er:

(1) B

egan

pre

parin

g fo

r aw

ard

of c

ontra

ct.

Nex

t Qua

rter

: (1

) Aw

ard

cont

ract

.

$1,7

47,0

86$1

,747

,086

$00.

1%

$956

,480

$0$9

56,4

80$9

56,4

80$0

0.0%

1004

60

FY20

20 -

Pur

chas

e 14

R

even

ue P

ara

Tran

sit

Veh

icle

s (V

ans)

PM

- D

avid

Har

bour

Scop

e: T

he p

roje

ct s

cope

is to

pro

cure

and

repl

ace

four

teen

re

venu

e P

ara

Tran

sit v

ans

whi

ch h

ave

exce

eded

ther

e us

eful

se

rvic

e lif

e. T

his

proc

urem

ent w

ill a

lso

cont

inue

to in

sure

the

relia

bilit

y, d

epen

dabi

lity

and

cost

-effe

ctiv

enes

s of

the

Dis

trict

's

reve

nue

vehi

cle

fleet

s an

d w

ill im

prov

e cu

stom

er s

ervi

ce a

nd w

ill

help

to m

inim

ize

repa

ir an

d m

aint

enac

e co

sts.

A th

ree

year

36

,000

mile

war

rant

y on

the

chas

sis,

and

one

yea

r bum

per t

o bu

mpe

r war

rant

y fro

m E

l Dor

ado

will

miti

gate

ove

rall

repa

ir co

sts.

In

201

6 th

e E

PA

and

NH

TSA

initi

ated

pha

se 2

of t

he e

mis

sion

re

gula

tion

stan

dard

s to

impr

ove

over

all c

arbo

n fo

otpr

int a

nd b

ette

r fu

el e

cono

my

stan

dard

s. T

he n

ew re

plac

emen

t veh

icle

s w

ill b

e pa

rt of

the

phas

e 2

stan

dard

s an

d w

ill le

ssen

the

over

all c

arbo

n fo

otpr

int a

nd d

ay to

day

fuel

cos

t in

the

repl

acem

ent s

ub-fl

eet.

Issu

es: T

he p

rocu

rem

ent w

ill p

iggy

bac

k of

f the

Cal

Act

- no

RFP

w

ill b

e re

quire

d.

Key

Act

iviti

es:

Th

is Q

uart

er:

(1) T

he p

roje

ct h

as n

ot y

et s

tarte

d.

Nex

t Qua

rter

: (1

) Beg

in p

roje

ct.

Not

e: S

ched

ule

info

rmat

ion

will

be

adde

d ne

xt q

uart

er.

$956

,480

$956

,480

$0

Page 14

Page 19: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

San Mateo

 Cou

nty Tran

sit D

istrict

Fiscal Year  2018

 Cap

ital B

udget

Budget 

Item

Project N

o.Descriptio

nCu

rren

t Years 

Budget

Previous Years 

Budget

Total Project 

Budget

Revenu

e Ve

hicle Supp

ort

1.1

1001

13/100

389

Purchase 10 electric buses

3,67

6,66

8        

7,25

0,00

0       

10,926

,668

     

1.2

1002

4650

 flip se

ats &

 mod

esty panels

144,61

3            

‐                   

144,61

3           

1.3

0215

02Major bus com

pone

nts (FY18

)1,50

0,00

0        

3,34

1,43

6       

4,84

1,43

6       

S/T 

5,32

1,28

1        

10,591

,436

     

15,912

,717

     

Inform

ation Techno

logy

‐                     

2.1

1002

47Tech Refresh (FY 18

)2,37

7,80

0        

(1,074

,324

)      

1,30

3,47

6       

2.2

1002

48EPM re

placem

ent

500,00

0            

‐                   

500,00

0           

S/T 

2,87

7,80

0        

(1,074

,324

)      

1,80

3,47

6       

Plan

ning/D

evelop

men

t3.1

1002

49Ride

rship repo

rting software

222,00

0            

‐                   

222,00

0           

3.2

0214

07Samtrans b

usiness p

lan

780,00

0            

358,00

0           

1,13

8,00

0       

3.3

0900

37Ca

pital program

 & project develop

men

t25

0,00

0            

118,12

3           

368,12

3           

3.4

0990

24Ca

pital program

 managem

ent

250,00

0            

‐                   

250,00

0           

3.5

1000

85Express b

us fe

asibility stud

y ‐ C

OMPLETE

50,000

              

634,00

0           

684,00

0           

S/T 

1,55

2,00

0        

1,11

0,12

3       

2,66

2,12

3       

Facilities/Co

nstructio

n4.1

1002

55Traffic signal prio

rity

3,90

7,00

0        

‐                   

3,90

7,00

0       

4.2

0215

07Facilities smaller p

rojects (FY17

 & FY18)

265,00

0            

282,00

0           

547,00

0           

4.3

1002

50Timeclock re

placem

ent

100,00

0            

100,00

0           

4.4

1002

51Transit asset m

anagem

ent p

lan

975,00

0            

975,00

0           

4.5

1002

52Ro

of re

placem

ent

475,00

0            

475,00

0           

4.6

1002

53Lind

a Mar park‐n‐rid

e repa

ving

 ‐ CO

MPLETE

700,00

0            

700,00

0           

4.7

0212

37San Ca

rlos tran

sit cen

ter ‐ COMPLETE

860,00

0            

6,23

0,21

4       

7,09

0,21

4       

S/T 

7,28

2,00

0        

6,51

2,21

4       

13,794

,214

     

Other 6.1

Contingency

250,00

0            

‐                   

250,00

0           

S/T 

250,00

0           

‐                   

250,00

0          

Total FY2

018 Bu

dget

17,283

,081

       

17,139

,449

       

34,422

,530

       

3 year Cap

 Bud

get Q

PR 2Q FY20.xlsx

2/14

/202

0

Page 15

Page 20: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

Fiscal Year  2019

 Cap

ital B

udget ‐ Amen

dmen

t 2

Budget 

Item

Project N

o.Descriptio

nCu

rren

t Years 

Budget

Previous 

Budget

Total Project 

Budget

Revenu

e Ve

hicle Supp

ort

1.1

0215

02Major bus com

pone

nts (FY18

 & FY19)

1,17

3,20

0        

4,84

1,43

6       

6,01

4,63

6       

1.2

1003

54MB‐20

00 bus simulator sy

stem

310,00

0            

‐                   

310,00

0           

1.3

1003

52AD

A self evaluatio

n plan

200,00

0            

200,00

0           

1.4

1003

53Mainten

ance su

pport e

quipmen

t94

,185

              

94,185

             

S/T 

1,77

7,38

5        

4,84

1,43

6       

6,61

8,82

1       

Non

‐Reven

ue Veh

icle Sup

port

2.1

1003

60Pu

rchase 4 non

‐reven

ue su

pport v

ehicles

847,31

1            

847,31

1           

S/T 

847,31

1           

‐                   

847,31

1          

Inform

ation Techno

logy

3.1

0215

05Tech Refresh (FY 15

, 16, 17, 19)

2,50

0,00

0        

4,57

9,00

0       

7,07

9,00

0       

3.2

1003

48Upgrade

 current District w

ebsite

600,00

0            

‐                   

600,00

0           

S/T 

3,10

0,00

0        

4,57

9,00

0       

7,67

9,00

0       

Plan

ning/D

evelop

men

t4.1

Capital program

 & project develop

men

t25

0,00

0            

234,43

0           

484,43

0           

4.2

Capital program

 managem

ent

250,00

0            

75,000

             

325,00

0           

4.3

US 10

1 mob

ility action plan

250,00

0            

250,00

0           

S/T 

750,00

0           

309,43

0          

1,05

9,43

0       

Facilities/Co

nstructio

n5.1

0215

07Facilities smaller p

rojects (FY17

, FY18 & FY19)

570,00

0            

695,26

4           

1,26

5,26

4       

5.2

1003

49Facilities e

ngineerin

g sm

aller p

rojects

530,00

0            

‐                   

530,00

0           

5.3

1003

50Ce

ntral O

ffice Sanita

ry Sew

er Pum

ps Rep

lacemen

t 35

0,00

0            

350,00

0           

5.4

1003

51Ce

ntral Boiler R

eplacemen

t80

,000

              

80,000

             

5.5

1002

53Lind

a pa

rk‐n‐ride repa

ving

 ‐ CO

MPLETE

200,00

0            

700,00

0           

900,00

0           

S/T 

1,73

0,00

0        

1,39

5,26

4       

3,12

5,26

4       

Other 6.1

Contingency

200,00

0            

‐                   

200,00

0           

S/T 

200,00

0           

‐                   

200,00

0          

Total FY2

019 Bu

dget

8,40

4,69

6         

11,125

,130

       

19,529

,826

       

3 year Cap

 Bud

get Q

PR 2Q FY20.xlsx

2/14

/202

0

Page 16

Page 21: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

Fiscal Year  2020

 Cap

ital B

udget

Budget 

Item

Project N

o.Descriptio

nCu

rren

t Years 

Budget

Previous 

Budget

Total Project 

Budget

Revenu

e Ve

hicle Supp

ort

1.1

0215

02Major Bus Com

pone

nts (FY18

, FY19 & FY20 )

592,00

0            

6,01

4,63

6       

6,60

6,63

6       

1.2

1004

60Re

placem

ent o

f (14

) Reven

ue Paratransit Va

ns 

956,48

0            

956,48

0           

1.3

1004

61Re

placem

ent o

f (13

) Reven

ue Paratransit Cu

taway 

1,73

2,64

0        

1,73

2,64

0       

1.4

1003

53Mainten

ance su

pport e

quipmen

t10

0,83

5            

94,185

             

195,02

0           

S/T 

3,38

1,95

5        

6,10

8,82

1       

9,49

0,77

6       

Non

‐Reven

ue Veh

icle Sup

port

2.1

1004

62Re

placem

ent N

on‐Rev Service Sup

port Veh

icles 

164,00

0            

‐                   

164,00

0           

S/T 

164,00

0           

‐                   

164,00

0          

Inform

ation Techno

logy

3.1

1004

63Spear S

ystem Im

provem

ents 

150,00

0            

‐                   

150,00

0           

3.2

1004

77Intranet Solution Re

placem

ent 

350,00

0            

‐                   

350,00

0           

S/T 

500,00

0           

‐                   

500,00

0          

Plan

ning/D

evelop

men

t4.1

1004

64Ca

pital Program

 and

 Project Develop

men

t 25

0,00

0            

‐                   

250,00

0           

S/T 

250,00

0           

‐                   

250,00

0          

Safety and

 Security

5.1

1004

65CC

TV Network Im

provem

ent

150,00

0            

‐                   

150,00

0           

S/T 

150,00

0           

‐                   

150,00

0          

3 year Cap

 Bud

get Q

PR 2Q FY20.xlsx

2/14

/202

0

Page 17

Page 22: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

Fiscal Year  2020

 Cap

ital B

udget (Co

nt)

Budget 

Item

Project N

o.Descriptio

nCu

rren

t Years 

Budget

Previous 

Budget

Total Project 

Budget

Facilities/Co

nstructio

n6.1

1000

58Facilities S

maller P

rojects 

1,11

0,00

0        

1,11

0,00

0       

6.2

1002

52 

Central Building Ro

of Rep

lacemen

t (FY18

 & FY20)

800,00

0            

475,00

0           

1,27

5,00

0       

6.3

1004

66North and

 Sou

th Base Em

ployee

 Areas 

520,00

0            

520,00

0           

6.4

1004

67North and

 Sou

th Base Bu

s Parking

 Area Re

strip

ing 

258,00

0            

258,00

0           

6.5

1004

68North and

 Sou

th Base Va

cuum

 Rep

lacemen

t Design 

150,00

0            

150,00

0           

6.6

1004

69North Base Bu

s Washe

r Rep

lacemen

t 54

0,00

0            

540,00

0           

6.7

1004

70North & So u

th Base IW

 Line to Brake Pit Re

placem

ent 

780,00

0            

780,00

0           

6.8

1004

74South Ba

se Bus W

ashe

r Walls Re

hab 

350,00

0            

350,00

0           

6.9

1004

7160

' Aerial Lift App

aratus

70,000

              

70,000

             

6.10

1004

75AD

A Stud

y & Phase 1 Retrofits

1,22

5,00

0        

1,22

5,00

0       

6.11

1004

76North and

 Sou

th Base Exterio

r Painting

1,14

0,00

0        

1,14

0,00

0       

6.12

1004

72Ce

ntral Building 

750,00

0            

750,00

0           

6.13

1004

73Ce

ntral Building Re

fresh

1,84

9,20

0        

1,84

9,20

0       

6.14

1005

11South Ba

se Natural Gas Line Re

placem

ent 

1,07

0,00

0        

1,07

0,00

0       

S/T 

10,612

,200

      

475,00

0          

11,087

,200

     

Other 7.1

0212

14Co

ntingency

250,00

0            

‐                   

250,00

0           

S/T 

250,00

0           

‐                   

250,00

0          

Total FY2

020 Bu

dget

15,308

,155

       

6,58

3,82

1         

21,891

,976

       

3 year Cap

 Bud

get Q

PR 2Q FY20.xlsx

2/14

/202

0

Page 18

Page 23: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

Page 19

Page 24: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

This page is intentionally left blank.

Page 20

Page 25: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

SamTrans

CAPITAL PROJECTS – Quarterly Status Report

Definition of Terms Approved Changes – Changes to the original budget and/or transfers of budget from

one segment code to another that have been approved by management and/or by the SamTrans Board of Directors.

Approved Funding – The amount of funding that has been approved by the SMCTD

Board for the execution of the project. Current Budget – The current budget reflects the original budget plus approved

changes or internal budget transfers which has been approved by the program manager and/or the project manager.

Expended % of EAC – This is the % of Money Spent (Not Physical Progress) as compare to the EAC. Estimate at Completion (EAC) – The forecasted final cost of the project. Estimate to Complete – Forecast of the cost to complete the remaining work, including anticipated and pending changes. Estimated Physical % Complete – An estimation of the physical work completed as

compared to the budgeted work expressed in %. Expended + Accrual to Date – The cumulative project costs that have been

recorded through the current reporting period in PeopleSoft + accrual cost of the work performed that has not been recorded in PeopleSoft.

Issues – Exceptions / concerns as identified for information or further actions. Key Activities - Identifies key activities being undertaken for the project for the current month and identifies the work anticipated for the next month. Original Budget – Budget as originally approved by senior management for execution

of the approved scope of work. Original Start / Current Start – The original planned start date and the current or actual start date of the project. Original Finish / Current Finish – The original planned completion date and the current forecasted completion date of the project.

Page 21

Page 26: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

SamTrans

CAPITAL PROJECTS – Quarterly Status Report

Scope - A concise description of the work elements to be performed and delivered by the project. Variance at Completion (VAC) – Difference between the Current Budget and the

Estimate at Completion. A positive value reflects potential underrun, whereas a negative amount indicates possible overun.

Page 22

Page 27: Quarterly Status Report - SamTransCapital... · 100354 $309,467 $310,000 $0 0.2% 0.2% 12/01/19 / 12/01/19A MB-2000 Bus Simulator System PM - David Harbour Scope: The replacement of

San Mateo County Transit District

SamTrans - Capital Programs Quarterly Status Report

Performance Status (Traffic Light) Criteria SECTIONS On Target

(GREEN) Moderate Risk

(YELLOW) High Risk

(RED)

1. SCOPE

(a) Scope is consistent with Budget or Funding.

(a) Scope is NOT consistent with Budget or Funding.

(a) Significant scope changes / significant deviations from the original plan.

(b) Scope is consistent with other projects.

(b) Scope appears to be in conflict with another project.

(b) Current Budget forecast exceeds current approved budget by more than 10%.

(c) Scope change has been mitigated.

(c) Scope changes have been proposed.

(d) Current Budget forecast exceeds the current approved budget by 5% to 10%.

2. BUDGET (a) Estimate at Completion forecast is within plus /minus 5% of the Current Approved Budget.

(a) Estimate at Completion forecast exceeds Current Approved Budget between 5% to 10%.

(a) Estimate at Completion forecast exceeds Current Approved Budget by more than 10%.

3. SCHEDULE

(a) Project milestones / critical path are within plus/minus four months of the current baseline schedule.

(a) Project milestones / critical path show slippage. Project is more than four to six months behind the current baseline schedule.

(a) Forecast project completion date is later than the current baseline scheduled completion date by more than six months.

(b) Physical progress during the report period is consistent with incurred expenditures.

(b) No physical progress during the report period, but expenditures have been incurred.

(c) Schedule has been defined.

(c) Detailed baseline schedule NOT finalized.

4. FUNDING

(a) Expenditure is consistent with Available Funding.

(a) Expenditure reaches 80% of Available Funding, where remaining funding is NOT yet available.

(a) Expenditure reaches 90% of Available Funding, where remaining funding is NOT yet available.

(b) All funding has been secured or available for scheduled work.

(b) NOT all funding is secured or available for scheduled work.

(b) No funding is secured or available for scheduled work.

Note: Schedule variance for (a) Purchase of maintenance equipment; (b) Purchase of major bus components; (c) Maintenance of facilities; and (d) Upgrading of computer systems will not be monitored, as schedules for these types of projects are only a reflection of the year that funding has been allocated.

Page 23