quarterly project tracking report
TRANSCRIPT
Southwest Power Pool, Inc.
REVISION HISTORY
DATE OR VERSION
NUMBER
AUTHOR CHANGE
DESCRIPTION
COMMENTS
4/12/2021 SPP Staff Submitted to MOPC
4/27/2021 SPP Staff Submitted to Board
Southwest Power Pool, Inc.
CONTENTS
REVISION HISTORY.......................................................................................................................................................... I
EXECUTIVE SUMMARY ..................................................................................................................................................1
NTC PROJECT SUMMARY ............................................................................................................................................2
COMPLETED UPGRADES...............................................................................................................................................2
NTCS ISSUED.....................................................................................................................................................................4
NTCS WITHDRAWN........................................................................................................................................................9
PORTFOLIO SUMMARY.............................................................................................................................................. 10
PROJECT STATUS SUMMARY .................................................................................................................................. 13
OUT-OF-BANDWIDTH PROJECTS .......................................................................................................................... 14
RESPONSIVENESS REPORT....................................................................................................................................... 15
ITP20 UPGRADES.......................................................................................................................................................... 17
APPENDIX 1 .................................................................................................................................................................... 18
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 1
EXECUTIVE SUMMARY
SPP actively monitors and supports the progress of transmission expansion projects, emphasizing the
importance of maintaining accountability for areas such as regional grid reliability standards, firm
transmission commitments, and SPP Open Access Transmission Tariff (OATT) cost recovery.
SPP staff solicits quarterly feedback from the project owners to determine the progress of each approved
transmission project. This quarterly report charts the progress of all SPP transmission projects approved
by the SPP Board of Directors (Board) or through a FERC-filed service agreement under the OATT.
Projects in the current portfolio include all Network Upgrades for which construction activities are
ongoing or those for which construction has completed but not all close-out requirements have been
fulfilled in accordance with Section 13 in Business Practice 70601.
1 SPP OATT Business Practices
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 2
NTC PROJECT SUMMARY
In adherence with the OATT and Business Practice 7060, SPP issues NTCs to Designated Transmission
Owners (DTOs) to begin work on Network Upgrades that have been approved or endorsed by the Board
to meet the construction needs of the OATT or Regional Transmission Organization (RTO).
COMPLETED UPGRADES
Figure 1: Completed Upgrades
NTC
ID
IN
SERVICE
DATE
UID OWNER UPGRADE NAME SOURCE
STUDY
COST
ESTIMATE
200407 12/15/2020 51478 SPS Mustang - Seminole 115
kV Ckt 1 New Line 2016 ITPNT $11,037,124
200407 12/15/2020 51479 SPS Mustang 115 kV Terminal
Upgrades 2016 ITPNT $2,629,398
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 3
NTC
ID
IN
SERVICE
DATE
UID OWNER UPGRADE NAME SOURCE
STUDY
COST
ESTIMATE
200407 12/15/2020 51480 SPS Seminole 115 kV Terminal
Upgrades 2016 ITPNT $2,398,399
210496 12/15/2020 51450 SPS Sundown 230/115 kV
Transformer 2018 ITPNT $8,086,787
210497 11/1/2020 72052 WAPA Lewis - Richland 115kV Ckt
1 (WAPA) 2018 ITPNT $136,000
210507 11/3/2020 102156 SPS Eddy County - Kiowa 345
kV Ckt 1 New Line
DPA-2017-
November-808 $64,091,215
210507 11/15/2020 102158 SPS Bopco 115 kV Substation DPA-2017-
November-808 $15,345,796
210525 11/16/2020 112180 OPPD
GEN-2016-115
Interconnection Costs (NU)
(OPPD)
DISIS-2016-002 $7,553
11/16/2020 71943 WAPA Sulphur 115kV - GEN-
2014-001IS Addition (NU)
Generation
Interconnection $2,177,249
1/1/2021 82134 WAPA Gavins Point - Yankton
Junction 115 kV
Generation
Interconnection $1,401,596
10 Upgrade(s) Completed $107,311,117
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 4
NTCS ISSUED
Figure 2: NTCs Issued
NTC
ID
NTC ISSUE
DATE UID OWNER UPGRADE NAME
SOURCE
STUDY
COST
ESTIMATE
OF NEW
UPGRADES
COST
ESTIMATE OF
PREVIOUSLY
APPROVED
UPGRADES
210553 12/9/2020 122631 WAPA
Fort Randall - Spencer
115kV Ckt 1 Re-
conductor
DPA-2019-
May-1037 $2,650,000 $0
210553 12/9/2020 122632 WAPA Martin - Vetal Tap 115
kV Ckt 1 Rebuild
DPA-2019-
May-1037 $3,800,000 $0
210568 11/12/2020 112458 TSMO Sooner - Wekiwa 345
kV New Line 2019 ITP $77,606,498 $0
210569 11/12/2020 112457 WR/EKC Neosho - Riverton
161kV Rebuild (WR)
SPP-2019-
AG1-AFS-2 $3,972,869 $0
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 5
NTC
ID
NTC ISSUE
DATE UID OWNER UPGRADE NAME
SOURCE
STUDY
COST
ESTIMATE
OF NEW
UPGRADES
COST
ESTIMATE OF
PREVIOUSLY
APPROVED
UPGRADES
210570 11/12/2020 112456 EDE Neosho - Riverton
161kV Rebuild (EDE)
SPP-2019-
AG1-AFS-2 $43,153,324 $0
210574 11/17/2020 122725 SPS Allen - Quaker 115 kV
Ckt 1 Rebuild 2020 ITP $4,732,267 $0
210574 11/17/2020 122727 SPS Allen - Lubbock South
115 kV Ckt 1 Rebuild 2020 ITP $6,817,226 $0
210574 11/17/2020 122869 SPS
Bushland - Deaf Smith
230 kV Terminal
Upgrades
2020 ITP $923,938 $0
210574 11/17/2020 122870 SPS Newhart - Potter 230
kV Terminal Upgrades 2020 ITP $731,282 $0
210574 11/17/2020 122871 SPS Deaf Smith #6 - Friona
115 kV Rebuild 2020 ITP $12,626,190 $0
210574 11/17/2020 122872 SPS Carlisle - Murphy 115
kV Ckt 1 Rebuild 2020 ITP $4,746,175 $0
210574 11/17/2020 122876 SPS
Deaf Smith #6 -
Hereford 115 kV Ckt 1
Rebuild
2020 ITP $6,660,556 $0
210574 11/17/2020 122883 SPS
Lubbock South -
Wolfforth 230 kV Ckt
1 Terminal Upgrades
#2
2020 ITP $872,391 $0
210574 11/17/2020 143167 SPS Cargill - Friona 115 kV
Ckt 1 Rebuild 2020 ITP $817,466 $0
210574 11/17/2020 143168 SPS
Cargill - Deaf Smith
#24 115 kV Ckt 1
Rebuild
2020 ITP $5,501,901 $0
210574 11/17/2020 143169 SPS
Parmer - Deaf Smith
#24 115 kV Ckt 1
Rebuild
2020 ITP $824,574 $0
210574 11/17/2020 143170 SPS
Parmer - Deaf Smith
#20 115 kV Ckt 1
Rebuild
2020 ITP $5,402,384 $0
210575 11/17/2020 122730 AEP
South Shreveport -
Wallace Lake 138 kV
Ckt 1 Rebuild #2
2020 ITP $23,622,577 $0
210575 11/17/2020 122796 AEP
Chisholm Substation
345 kV Terminal
Equipment
2020 ITP $11,999,273 $0
210576 11/17/2020 143156 AEP Grady 138 kV
Capacitor Bank 2020 ITP $688,788 $0
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 6
NTC
ID
NTC ISSUE
DATE UID OWNER UPGRADE NAME
SOURCE
STUDY
COST
ESTIMATE
OF NEW
UPGRADES
COST
ESTIMATE OF
PREVIOUSLY
APPROVED
UPGRADES
210577 11/17/2020 112500 EREC
Aberdeen Jct -
Richmond 115 kV Ckt
1 (EREC)
2020 ITP $3,277,500 $0
210577 11/17/2020 122511 EREC Richmond 115/69 kV
Transformer 2020 ITP $2,022,000 $0
210577 11/17/2020 122512 EREC Richmond Capacitor
Bank 69 kV 2020 ITP $222,000 $0
210577 11/17/2020 132894 EREC Richmond 69 kV
Substation 2020 ITP $4,812,500 $0
210578 11/17/2020 122717 GRDA
GRDA1 345 kV
Terminal Upgrades
Transformer Ckt 1
2020 ITP $282,000 $0
210578 11/17/2020 122718 GRDA
GRDA1 161 kV
Terminal Upgrades
Transformer Ckt 1
2020 ITP $423,000 $0
210578 11/17/2020 122801 GRDA
GRDA1 345 kV
Terminal Upgrades
Transformer Ckt 2
2020 ITP $282,000 $0
210578 11/17/2020 122802 GRDA
GRDA1 161 kV
Terminal Upgrades
Transformer Ckt 2
2020 ITP $423,000 $0
210579 11/23/2020 143157 WAPA Bismarck 12.47 kV
Reactors 2020 ITP $2,380,700 $0
210580 11/17/2020 122726 WR/EKC
Meadowlark - Tower
33 115 kV Ckt 1
Rebuild
2020 ITP $1,342,588 $0
210580 11/17/2020 122812 WR/EKC Circleville - Goff 115
kV Ckt 1 Rebuild 2020 ITP $12,114,772 $0
210580 11/17/2020 122814 WR/EKC Goff - Kelly 115 kV Ckt
1 Rebuild 2020 ITP $7,108,395 $0
210581 11/17/2020 122745 BEPC Watford City 230/115
kV Transformer Ckt 1 2020 ITP $3,389,739 $0
210581 11/17/2020 122746 BEPC
Watford City 230/115
kV Ckt 2 Terminal
Equipment
2020 ITP $173,041 $0
210582 11/23/2020 122803 SEPC Russell 115 kV
Capacitor Bank 2020 ITP $2,841,951 $0
210583 11/17/2020 122804 KCPL/EM Northeast 161 kV
Breakers 2020 ITP $887,479 $0
210583 11/17/2020 122805 KCPL/EM Stilwell 161 kV Breaker 2020 ITP $566,485 $0
210583 11/17/2020 122806 KCPL/EM Leeds 161 kV Breaker 2020 ITP $566,485 $0
210583 11/17/2020 122807 KCPL/EM Shawnee Mission 161
kV Breaker 2020 ITP $566,485 $0
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 7
NTC
ID
NTC ISSUE
DATE UID OWNER UPGRADE NAME
SOURCE
STUDY
COST
ESTIMATE
OF NEW
UPGRADES
COST
ESTIMATE OF
PREVIOUSLY
APPROVED
UPGRADES
210583 11/17/2020 122808 KCPL/EM Southtown 161 kV
Breaker 2020 ITP $566,485 $0
210583 11/17/2020 122809 KCPL/EM Lake Road 161 kV
Breakers 2020 ITP $1,132,970 $0
210583 11/17/2020 122810 KCPL/EM Craig 161 kV Breakers 2020 ITP $1,132,970 $0
210584 11/17/2020 132893 NWE
Aberdeen Junction
115 kV Terminal
Upgrades
2020 ITP $1,060,000 $0
210584 11/17/2020 143181 NWE
Aberdeen Jct -
Richmond 115 kV Ckt
1 (NWE)
2020 ITP $3,277,500 $0
210585 11/17/2020 143159 MRES Moorehead 230 kV
Reactor 2020 ITP $1,515,440 $0
210586 11/17/2020 112443 WFEC Russett - South Brown
138 kV Ckt 1 Rebuild 2020 ITP $9,959,291 $0
210586 11/17/2020 122577 WFEC
Anadarko -
Gracemont 138kV Ckt
1 Rebuild
2020 ITP $2,850,000 $0
210586 11/17/2020 122722 WFEC
Dover Switch -
O'Keene 138 kV Ckt 1
Terminal Upgrades
2020 ITP $1,010,000 $0
210586 11/17/2020 122753 WFEC
Anadarko -
Gracemont 138 kV Ckt
2 Rebuild
2020 ITP $5,260,000 $0
210586 11/17/2020 122756 WFEC Anadarko 138 kV Ckt
2 Terminal Equipment 2020 ITP $6,075,003 $0
210586 11/17/2020 122864 WFEC Anadarko 138 kV
Breakers #2 2020 ITP $850,000 $0
210586 11/17/2020 122865 WFEC
Mooreland - Aspen
138 kV Terminal
Upgrades
2020 ITP $202,500 $0
210586 11/17/2020 122866 WFEC Mooreland - Pic 138
kV Terminal Upgrades 2020 ITP $405,000 $0
210587 11/17/2020 122823 OGE Border - Woodward
Tap 345 kV Substation 2020 ITP $18,427,752 $0
210587 11/17/2020 122824 OGE Chisholm - Woodward
Border 345 kV Ckt 1 2020 ITP $1,259,660 $0
210587 11/17/2020 122848 OGE Minco 345 kV
Terminal Equipment 2020 ITP $2,288,668 $0
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 8
NTC
ID
NTC ISSUE
DATE UID OWNER UPGRADE NAME
SOURCE
STUDY
COST
ESTIMATE
OF NEW
UPGRADES
COST
ESTIMATE OF
PREVIOUSLY
APPROVED
UPGRADES
210587 11/17/2020 122849 OGE Pleasant Valley 345 kV
Substation 2020 ITP $25,500,000 $0
210587 11/17/2020 122850 OGE
Pleasant Valley
345/138 kV
Transformer Ckt 1
2020 ITP $4,225,000 $0
210587 11/17/2020 122851 OGE
Pleasant Valley
345/138 kV
Transformer Ckt 2
2020 ITP $4,225,000 $0
210587 11/17/2020 122858 OGE
Cimarron - Draper 345
kV Terminal Upgrades
#2
2020 ITP $2,288,668 $0
210587 11/17/2020 122863 OGE Midwest 138 kV Ckt 1
Terminal Upgrades 2020 ITP $65,000 $0
210587 11/17/2020 143176 OGE Draper 345 kV
Terminal Equipment 2020 ITP $2,288,668 $0
210589 11/17/2020 122755 OGE Gracemont 138 kV Ckt
2 Terminal Equipment 2020 ITP $405,535 $0
210589 11/17/2020 122818 OGE
Cushing - Shell
Pipeline Cushing Tap
69 kV Ckt 1 Rebuild
2020 ITP $4,281,150 $0
210589 11/17/2020 122819 OGE
Pipeline - Shell
Pipeline Cushing Tap
69 kV Ckt 1 Rebuild
2020 ITP $1,081,649 $0
210590 11/24/2020 143183 KCPL/EM Greenwood 161 kV
Terminal Upgrades
SPP-2020-
AG1-AFS-3 $800,000 $0
210590 11/24/2020 143184 KCPL/EM
Pleasant Hill 161kV
and Lake Winnebago
161 kV Terminal
Upgrades
SPP-2020-
AG1-AFS-3 $430,000 $0
210591 11/23/2020 143162 CPEC Agate 115 kV Reactor 2020 ITP $571,200 $0
210592 1/21/2021 112509 WR/EKC
Wolf Creek -
Blackberry 345kV
Terminal Equipment
2019 ITP $10,056,365 $0
69 Upgrade(s) Issued $375,323,274 $0
Table 2: NTCs Issued
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 9
NTCS WITHDRAWN
Figure 3: NTCs Withdrawn
NTC
ID
NTC
WITHDRAWN
DATE
UID OWNER UPGRADE NAME SOURCE
STUDY
COST
ESTIMATE OF
WITHDRAWN
UPGRADES
210571 11/12/2020 51757 KCPL/EM Crosstown 161 kV
Terminal Upgrades 2018 ITPNT $1,120,000
210571 11/12/2020 51758 KCPL/EM Blue Valley 161 kV
Terminal Upgrades 2018 ITPNT $1,400,000
210571 11/12/2020 51759 KCPL/EM Blue Valley - Crosstown
161kV Ckt1 2018 ITPNT $36,644
210572 11/12/2020 51521 OPPD S964 69 kV Cap Bank 2016 ITPNT $722,660
4 Upgrade(s) Withdrawn $3,279,304
Table 3: NTCs Withdrawn
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 10
PORTFOLIO SUMMARY
SPP staff solicits quarterly feedback from the project owners to determine the progress of each approved
transmission project. This quarterly report charts the progress of projects approved by the SPP Board or
through a FERC filed service agreement under the SPP OATT. Projects included in the portfolio are:
1. Upgrades required to satisfy requests for transmission service (TS)
2. Upgrades required to satisfy requests for generator interconnection (GI)
3. Approved projects from the Integrated Transmission Planning Assessment (ITP)
4. Upgrades within approved Balanced Portfolios2 (BP)
5. Approved high priority upgrades (HP)
6. Endorsed Sponsored Upgrades (SP)
7. Approved Interregional Projects3 (IR)
8. Approved projects from the 20-Year Assessment (ITP20)
9. Approved projects from Generator Retirement Process (GR)
This report will document changes over the previous quarter to report on projects captured in the
Quarterly Project Tracking Portfolio as well as new projects added from various processes listed above. A
summary of the project portfolio is also included.
Figure 3: Total Active Portfolio (Millions)
2 There are currently no Generator Retirement, Balanced Portfolio or Interregional projects included in Quarterly Project Tracking.
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 11
Figure 4: Upgrade by Type Cost Summary3
Figure 5: Estimated Cost for Upgrades by In-Service Year
3 Line mileage not available for all upgrade categories.
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 12
Figure 6: Estimated Cost of Upgrades Completed in Past 4 Quarters4
Figure 7: Number of Upgrades Completed in Past Four Quarters
4 Figures 6 and 7 include Network Upgrades not yet confirmed as completed. Note that the previous quarter’s updated results are
listed as the Transmission Owners may make adjustments to final costs and status of projects completed during the year.
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 13
PROJECT STATUS SUMMARY
SPP assigns a project status to all Network Upgrades based on the projected in-service dates provided by
the DTOs relative to the Need Date determined for the project. Project status definitions are provided
below:
Closed Out: Upgrade is operation, all project activities are complete, & all close-out requirements
fulfilled in accordance with Business Practice 7060. These upgrades will not appear in future
Quarterly Project Tracking reports
Complete: Upgrade is operation and all project activities are complete
Delayed: Projected In-Service Date beyond Need Date; interim mitigation provided or project
may change but time permits the implementation of project
Identified: Upgrade identified and included in Board approved study results
In Service: Upgrade is operational, but not all project activities are complete
On Schedule < 4: On Schedule within 4-year horizon
On Schedule > 4: On Schedule beyond 4-year horizon
Re-evaluation: Project active; pending re-evaluation
RFP Issued: Request for proposal has been issued for competitive upgrade
RFP Pending: Request for proposal issuance for a competitive upgrade is pending
NTC Commitment Window: NTC/NTC-C issued, still within the 90-day written commitment to
construct window and no commitment received
NTC-C Project Estimate Window: Within the NTC-C Project Estimate (CPE) window
Figure 8: Portfolio Project Status (Millions)
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 14
OUT-OF-BANDWIDTH PROJECTS
In adherence to the Business Practice 7060, SPP reports projects that have updated cost values that
exceed their established baseline values based upon a ±20% bandwidth. Variances are determined by
total project cost. The following projects with a cost estimate greater than $5 million were identified as
having exceeded the ±20% bandwidth requirement during the reporting period. Tables below provide
summary information and lists cost detail for out-of-bandwidth projects identified during the reporting
quarter.
PID Project Name Owner NTC Source
Study Upgrade Type In-Service Date
41202 Line - Tulsa Southeast -
E.61st 138 kV Rebuild AEP 2017 ITPNT
Regional
Reliability 12/20/2019
31021
Line - Mustang -
Seminole 115 kV Ckt 1
New Line
SPS 2016 ITPNT Regional
Reliability 12/15/2020
Table 3: Out-of-Bandwidth Project Summary
PID
Baseline
Cost
Estimate
Baseline Cost
Estimate Year
Baseline Cost
Estimate with
Escalation
Latest
Estimate or
Final Cost
$ Variance Variance %
41202 $6,014,381 2017 $6,318,859 $8,151,314 $1,832,455 29.0%
31021 $19,736,026 2016 $21,784,880 $16,064,921 -$5,719,959 -26.3%
Table 4: Out-o- f-Bandwidth Cost Detail
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 15
RESPONSIVENESS REPORT
The table and figures below provide insight into the responsiveness of DTOs constructing Network
Upgrades within SPP in the Quarterly Project Tracking Report. Note: Network Upgrades with statuses of
“Suspended”, “Re-evaluation”, “Within NTC Commitment Window”, “Within NTC-C Project Estimate
Window”, and “Within RFP Response Window” were excluded from this analysis.
Project
Owner
Number
of
Upgrades
Number
of
Upgrades
Reviewed
Reviewed
%
In-Service
Date
Changes
ISD
Change %
Cost
Changes
Cost
Change
%
AEP 22 21 95.5% 1 10.0% 8 30.0%
BEPC 4 4 100.0% 1 7.7% 1 7.7%
CBPC 2 0 0.0% 0 0.0% 0 0.0%
CPEC 1 1 100.0% 0 0.0% 1 0.0%
CUS 2 2 100.0% 0 0.0% 2 100.0%
EDE 4 1 25.0% 0 0.0% 0 0.0%
EREC 5 3 60.0% 3 57.1% 4 57.1%
GHP 1 0 0.0% 0 0.0% 0 0.0%
GMO/EMW 4 3 75.0% 0 0.0% 1 0.0%
GRDA 4 4 100.0% 0 0.0% 4 0.0%
KCPL/EM 12 11 91.7% 0 0.0% 6 50.0%
KPP 1 1 100.0% 1 100.0% 1 100.0%
MRES 1 1 100.0% 0 0.0% 1 0.0%
MWE 1 1 100.0% 0 0.0% 0 0.0%
NPPD 41 3 7.3% 3 4.5% 0 0.0%
NWE 4 2 50.0% 0 0.0% 2 0.0%
OGE 26 15 57.7% 5 14.6% 3 0.0%
OPPD 10 10 100.0% 1 5.6% 0 0.0%
SEPC 9 8 88.9% 3 50.0% 4 25.0%
SPS 103 81 78.6% 0 0.0% 74 53.4%
TBD 12 3 25.0% 0 0.0% 0 0.0%
TSMO 1 1 100.0% 0 0.0% 0 0.0%
TSOK 1 1 100.0% 0 100.0% 1 100.0%
WAPA 12 9 75.0% 0 16.7% 0 16.7%
WFEC 52 8 15.4% 4 3.4% 8 6.8%
WR/EKC 26 25 96.2% 9 20.0% 8 33.3%
Total 361 219 60.66% 31 8.59% 129 35.73%
Table 5: Responsiveness Summary
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 16
Figure 9: In-Service Date Changes
Figure 10: Cost Changes
Southwest Power Pool, Inc.
Q2 2021 Quarterly Projec t Tracking Report 17
ITP20 UPGRADES
ITP20 assessments were performed in 2010 and 2013. While the projects proposed by those studies are
incorporated into the STEP Project List, they were not included in SPP’s project tracking effort as part of
the Quarterly Tracking Report prior to Q1 2019. A list of active ITP20 projects will be maintained in the
STEP Report and Quarterly Project Tracking Report lists going forward. The current ITP20 projects are
listed in the table below.
Project ID Upgrade
ID Owner Upgrade Name
RTO Determined
Need Date
Latest Cost
Estimate
30401 50492 TBD Cass Co. - S.W. Omaha (aka S3454)
345 kV Ckt1 1/1/2033 $33,126,800
30599 50769 AEP South Fayetteville 345/161 kV
Transformer Ckt1 1/1/2033 $12,600,000
30599 50770 TBD Chamber Springs - South Fayetteville
345 kV Ckt1 1/1/2033 $21,295,800
30600 50771 GMO Maryville 345/161 kV Transformer
Ckt1 1/1/2033 $12,600,000
30601 50772 KCPL Nashua 345/161 kV Transformer
Upgrade Ckt11 1/1/2033 $12,600,000
30602 50773 TBD Keystone - Red Willow 345 kV Ckt1 1/1/2033 $130,141,000
30603 50774 TBD Tolk - Tuco 345 kV Ckt1 1/1/2033 $75,718,400
30604 50775 SEPC Holcomb 345/115 kV Transformer
Ckt2 1/1/2033 $12,600,000
30605 50776 TBD Neosho - Wolf Creek 345 kV Ckt1 1/1/2033 $117,126,900
30606 50777 TBD Clinton - Truman 161 kV Ckt1
Reconductor 1/1/2033 $15,701,325
30606 50778 TBD North Warsaw - Truman 161 kV Ckt1
Reconductor 1/1/2033 $1,082,850
30608 50779 WR Auburn 345/115 kV Transformer Ckt2 1/1/2033 $12,600,000
30608 50780 TBD Auburn - Swissvale 345 kV Ckt1
Voltage Conversion 1/1/2033 $20,112,700
30608 50781 TBD Auburn - Jeffrey EC 345 kV Ckt1
Voltage Conversion 1/1/2033 $35,493,000
30607 50782 OGE Muskogee/Pecan Creek 345 kV
Terminal Upgrades 1/1/2033 $34,605,675
Total $547,404,450
Table 6: ITP20 Upgrades