Quarterly Accomplishment Report for FY 2017 from October to December 2017
(1) (2) (3) (4) (5) (6)
Support to OperationsA. Internal Support Standards, Procedures, and Systems Development
2. Systems Development ProgramDevelopment and Enhancement of Internal ICT
infrastructure
Accomplishments reflected are from
January to June 20171. eProcurement System Completion of Planning - Database
design and Structure100% 100% 0%
Development of Modules Completion of the following
Planning Modules:a. User Management 100% 100% 0%
b. Procurement Planning 100% 100% 0%
c. Annual Procurement Plan 100% 100% 0%
d. Preparation of Pre-
Procurement Documents85% 85% 0%
e. Routing and Tracking of
Documents55% 55% 0%
•Revised routing and tracking documents
f. Common Use Supplies 55% 55% 0%
g. Dashboard Layout 100% 100% 0%
Completion of the following
Acquisition Modules:a. Pre-Bid Conference 25% 25% 0%
b. Submission of PR and TOR 25% 25% 0%
c. Initial Meeting 25% 25% 0%
d. Pre-procurement 25% 25% 0%
External Websitea. Website design 55% 55% 0%
2. Asset Management Information System Creation of prototypes for the
following modules:
a. Motorpool
b. Real Property
75% 75% 0%
•The 25% was already completed in December
2016.
Accomplishments reflected are as of
September 2017
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
3. MITHI - ISSPMS Enhancement of the Online ICT
Infrastructure Survey 100% 100% 0%
•Updated the survey based on the comments
and recommendation from the MITHI
Technical Working Group
Accomplishments reflected are as of
September 2017
Creation of ICT Infrastructure
Survey Participants100% 100% 0%
•Created 169 accounts for the survey
participants
Accomplishments reflected are as of
September 2017Creation and testing of the
updated survey questions and
results
100% 100% 0%Accomplishments reflected are as of
September 2017
Creation of user stories100% 90% 10%
•User stories to be encoded in the Team
Foundation Server
Accomplishments reflected are as of
September 2017Development of system modules
50% 25% 25%
•Development of the following System
Modules:
a. User Management Module
b. ISSP Submission Module
c. ICT Inventory Module
•Coding for the system modules was
suspended due to the prioritization of PMIS
Accomplishments reflected are as of
September 2017
4. Project Management Information System
(PMIS)
Conduct of data gathering of
Business Processes 100% 90% 10%
Accomplishments reflected are as of
September 2017Conduct of research for the open
source PM tools100% 100% 0%
•Presented the open source tool, KanBoard, to
DICT-SID Service personnel
•Application is still under continuous
development and has some bugs
Accomplishments reflected are as of
September 2017
Creation of System Workflows
based on PRINCE2 Framework100% 100% 0%
Accomplishments reflected are as of
September 2017Creation of user stories
100% 90% 10%•To be updated Accomplishments reflected are as of
September 20175. Human Resource Management Information
System (HRMIS)
Conduct of data gathering for the
recruitment module and walk-in
applicants
100% 100% 0%Accomplishments reflected are as of
September 2017
Data gathering and creation of new
prototype for the module
Forecasted Withholding Tax for the
annualized computation of tax
withheld per employee
100% 100% 0%
Accomplishments reflected are as of
September 2017
Creation of Job Order personnel's'
PDS, Applicants' Notices,
Separation and Re-instatement
modules
100% 100% 0%
•Final design for the 201-PDS, Appointment
and Recruitment modules including the table
structure for each module were already
completed
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Creation of table structure
necessary for the Recruitment,
Notices, Appointments, Separation
and Re-instatement modules
100% 100% 0%
Accomplishments reflected are as of
September 2017
Enhancement of the processing of
Special Payroll for the use of eight
(8) FOO Cluster
100% 100% 0%Accomplishments reflected are as of
September 2017
Enhancement of the Utility Module
for importing Special Payroll from
the FOO Clusters
100% 100% 0%Accomplishments reflected are as of
September 2017
Conduct of Users' re-training for
201 and Training modules100% 100% 0%
Accomplishments reflected are as of
September 20176. Document Tracking System Development of Policy on Using
the DocTracks at the DICT 100% 100% 0%•Updated the policy based on the comments
from the Office of the Chief of Staff
Submissions made by SID-ADSD;
accomplishments are as of March 2017
7. Digital PH website Number of system updates
provided 3 30
(0%)
•System Updates:
- Validation of uploading of images
- UI layout (minor)
- Uploading function in Gallery
*Submissions made by SID-ADSD;
accomplishments are as of March 2017
8. Legal Management Information System
(LMIS)
Development of LMIS100% 0% 0%
•Continuous functionality testing *Submissions made by SID-ADSD;
accomplishments are as of March 20179. Electronic Official Receipt (EOR) System Development of User Manuals
100% 100% 0%
•Updated User Manuals:
- System Administrator
- Order of Payment Approver
- Order of Payment Creator
- EOR Generator
- COA
*Submissions made by SID-ADSD;
accomplishments are as of March 2017
Number of system updates
provided7 7
0
(0%)*Submissions made by SID-ADSD;
accomplishments are as of March 201710. Intranet Services Number of system updates
provided6 6
0
(0%)*Submissions made by SID-ADSD;
accomplishments are as of March 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
11. e-Treasury Enhancement of components
100% 0% 0%
•Continuous enhancement of the following:
- Journal Entry Voucher (JEV)
- Obligation and Request Status (ORS)
- Disbursement Voucher (DV)
*Submissions made by SID-ADSD;
accomplishments are as of March 2017
Legal Division Memorandum of Agreement51 51
•Reviewed and released Accomplishments reflected are as of
December 2017Memorandum of Understanding
16 16•Reviewed and released Accomplishments reflected are as of
December 2017Contracts/BAC
46 46•Reviewed and released Accomplishments reflected are as of
December 2017Agreement
18 18•Reviewed and released Accomplishments reflected are as of
December 2017Joint Pole Agreement
1 1•Reviewed and released Accomplishments reflected are as of
October 2017OperationsMFO 1: Government-wide ICT Policy Services
1. Development of ICT Policies, Standards, Plans, and Programsa. Promotion of Technical Assistance in the formulation of government technology plans and policies
Program 1: National ICT Policies and Plans Program1.1 Medium Term ICT Harmonization Initiative
(MITHI) Activities
Number of MITHI Steering
Committee decisions/ resolutions
on MITHI-related matters issued22 24
2
(8.33%)
•Refer to Annex A for the MITHI Steering
Committee decisions/ resolutions on MITHI-
related matters
Accomplishments reflected are from
January to November 2017
Number of MITHI issues and
concerns deliberated and resolved
by the MITHI TWG
30 1614
(46.66%)
•Refer to Annex B for the MITHI issues and
concerns deliberated and resolved by the
MITHI TWGNumber of agencies given ICT
budget recommendations
203 2030
(0%)
•The following were the number of agencies
provided with ICT budget recommendation for
Tier 1 per bureau:
◘ Bureau A - 43
◘ Bureau B - 45
◘ Bureau C - 21
◘ Bureau D - 39
◘ Bureau E - 55
Accomplishments reflected are from
January to November 2017
Conduct of MITHI Project Cluster
Meetings/Workshops
8 80
(0%)
Targets are as needed
Refer to Annex C for the list og MITHI Project
Cluster meetings/ workshops attended/
conducted
Accomplishments reflected are from
January to November 2017
Information Systems Strategic Plan (ISSP)ISSP Review and Evaluation Number of ISSP reviewed and
evaluated
40
•PMS, NLRC CWC, PIA, USP, PRC, DILG-OSEC,
PPA, CBAA, PCG, PSRTI, DOTr, PA, GSIS,
PCAARD, MIRDC, PRRC
•USP, PIA, PMS, NLRC, PHILMECH, VMMC,
PDEA, DDB, PN, DILG, PTTC, PSRTI, PA, CDA
•POPCOMM, FDA, TESDA, PIDS, PVAO, LTO,
CBAA, DOTr, PSRTI, PHILMECH
Accomplishment reflected are as of October
2017
Accomplishment reflected are as of
November 2017
Accomplishment reflected are as of
December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
ISSP Endorsed Number of ISSP endorsed
30
•PRC, NBDB, POPCOM (2017), WMU, ILS, SRA
(2017), TC, DCP, MDA, LGA, CHR, PCAARD,
MIRDC, DOST-OSEC (2015-2017), NAST (2015-
2017), PCIEERD (2015-2017), GSIS (2015-2017)
•PIA, NCCA, AMLC, COMELEC, NWPC, DILG,
PCPDM, NRCP
•DILG, CBAA, PSRTI, VMMC, DOTr
Accomplishment reflected are as of October
2017
Accomplishment reflected are as of
November 2017
Accomplishment reflected are as of
December 2017Conduct of ISSP presentation/ consultation Number of agency requested for
ISSP presentation/ consultation
22
•SRA, DILG-OSEC, DOTr-OSEC
Review of realignment: DOF-OSEC, PCC, FPA,
DOST-OSEC, SSS, NAMRIA
•DICT, DOTr-OSEC, PHILMECH, DBP, PRRC
Review of realignment: PPA RO-XIII
Review of ISSP Ammendments: NBI
•NLRC, PCC, PMS, CDA, VMMC, PPA, DOTr,
PHIVOLCS, NTC, PSHS, SEI, PHILEMIX, NKTI,
PCIC
Review of request for Release of Funds:
Review of realignment: BOC (SGL Fund), PPA
ROIV-B, PCGG, PPA-CO, (Single Carpeta
System), BOC (Network Communcications
Project), PPA RO-X, IC
Accomplishment reflected are as of October
2017
Accomplishment reflected are as of
November 2017
Accomplishment reflected are as of
December 2017
Public Wi-FiTesting and acceptance of bandwidth delivery
and installation of access points for Wi-Fi
project
Number of access points where
testing and installation have been
conducted
41
•CONVERGE:
◘Bagong Brgy. Health Center
◘Bagong Lipunan Health Center
◘Bernardo Park Health Center
◘Brgy. 310 Health Center
◘Mabini Health Center
◘Old Balara Health Center
◘Pedro Gil Health Center
◘Philhealth Center
◘San Sebastian Health Center
•A&A:
◘Dimasalang Health Center
◘F. Lanuza Health Center
◘Brgy. 310 Health Center
◘M. Icasiano Health Center
◘E. Rodriguez Health Center
◘A. Mabini Health Center
•A&A:
◘Dimasalang Health Center
◘F. Lanuza Health Center
◘Brgy. 310 Health Center
◘M. Icasiano Health Center
◘E. Rodriguez Health Center
◘A. Mabini Health Center
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
•A&A & PLDT:
◘Bagbaguin Health Center
◘Concepcion Health Center
◘Dalandan Health Center
◘Punturin Health Center
•A&A (only):
◘NGC Health Center
◘Dona Nena Health Center
◘Buhay Mahalaga Health Center
◘Domingo Santiago Health Center
◘MF Jhocson Health Center
◘Rosario Reyes Health Center
◘Pamana Health Center
◘Patricia Health Center
◘Jose Vivencio Health Center
◘Jose Fabella Health Center
◘Bacood Health Center
1.1 Medium Term ICT Harmonization Initiative
(MITHI) Activities
Number of MITHI Steering
Committee decisions/ resolutions
on MITHI-related matters issued18 24
>3
(>33%)
•Refer to Annex A for the MITHI Steering
Committee decisions/ resolutions on MITHI-
related matters
Accomplishments reflected are from
January to September 2017
Number of MITHI issues and
concerns deliberated and resolved
by the MITHI TWG
90 106>16
(>18%)
•Refer to Annex B for the MITHI issues and
concerns deliberated and resolved by the
MITHI TWG
Accomplishments reflected are as of
September 2017
Number of agencies given ICT
budget recommendations
203 2030
(0%)
•The following were the number of agencies
provided with ICT budget recommendation for
Tier 1 per bureau:
◘ Bureau A - 43
◘ Bureau B - 45
◘ Bureau C - 21
◘ Bureau D - 39
◘ Bureau E - 55
Accomplishments reflected are as of
September 2017
Conduct of MITHI Project Cluster
Meetings/Workshops
8 80
(0%)
•Targets are as needed
•Refer to Annex C for the list og MITHI Project
Cluster meetings/ workshops attended/
conducted
Accomplishments reflected are as of
September 2017
1.2 ICT Plans Development Activities Accomplishments reflected are from March
to June 2017Development of eGovernment Masterplan
2017-2022
Final draft of eGovernment
Masterplan 2017-2022
(unabridged)
0 00
(0%)
•Draft of eGMP outline was submitted for
comments
Published e Government
Masterplan 2017-20220 0
0
(0%)•Target delivery by August 2017. Accomplishments reflected are as of
September 2017Number of focus group discussion
(FGDs) conducted8 8
0
(0%)•Completed the FGDs for eight (8)
topics/clusters
Accomplishments reflected are from
January to December 2017National Broadband Plan Development and
Implementation
Number of technical meetings
conducted 11 110
(0%)
•December meetings: Discussed with NTC the
frequencies to be auctioned in the future.
Accomplishments reflected are from
October - December 2017
Approved National Broadband Plan
1 10
(0%)
•NBP was unveiled on 23 June 2017 on the
occasion of "National ICT Month 2017: One
Connection, One Nation"
Accomplishments reflected are from
January to December 2017
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Published National Broadband Plan
1 10
(0%)
•NBP was printed and published on the
occasion of "National ICT Month 2017: One
Connection, One Nation"; The printed copy of
National Broadband Plan is available at NIPD
Accomplishments reflected are from
January to December 2017
Development of National ICT Ecosystem
Framework
Draft of the conceptual National
ICT Ecosystem Framework1 1
0
(0%)
•Draft Terms of Reference for Hiring of Highly
Technical Consultant ready for first pass review
with target hiring date set second week of
June
Accomplishments reflected are as of
September 2017
Draft outline of National ICT
Ecosystem Framework 1 10
(0%)
•Final draft outline document is subject for
updating of the incoming consultant.
Issue/Concern: Hiring of Consultant for NIEF
Manage the Government Computer
Emergency Readiness Team (G-CERT)
Issuance of security alert on
website defacement to LGU and
NGAs
4Accomplishments reflected are as of
October 2017
Addressed compromised websites7
Accomplishments reflected are as of
October 2017Securtity Audit (Network Scan) Network Vulnerability Assessment
1 1Accomplishments reflected are as of
October 2017Security Audit (Vulnerability Scan) Web Vulnerability Assessment
10 11Accomplishments reflected are as of
October 20171.3 ICT Policies and Standards Development
Activities
Accomplishments reflected are for January
2017 onlyDevelopment of National Broadband Policy Number of research/ meetings
conducted
1 10
(0%)
•Prepared and submitted the revised draft of
part I of the National Broadband Plan to Engr.
George Tardio (of NIPD).
•Continuous conduct of research on different
policy considerations to be included in the
National Broadband Plan.
Accomplishments reflected are as of
September 2017
Development of policy f the eGovernment
MasterPlan
Number of preparatory meetings
conducted 1 10
(0%)
•Attended the eGovernment Masterplan
Secretariat Committee Preparatory meeting.
Accomplishments reflected are as of
September 2017
Development of policy on the Telecom
Summit 2017
Number of preparatory meetings
conducted
3 30
(0%)
•Attended the Telecom Summit meetings on
13, 20 and 27 January 2017. Provided
secretariat and documentation during the
preparatory meeting for the Telecom Summit
and prepared a after meeting reports.
Accomplishments reflected are as of
September 2017
Development of Free Wi-Fi Policies Number of policies updated3 1
0
(0%)
•Revised and submitted for further review the
three policies for Free Wi-Fi (Ms. Anna Aguilar)
Accomplishment reflected is from October
to December 2017
Legislative Matters/ Activities Conduct of research and creation
of position papers 1•Assisted in the drafting of position paper on
Mobile Portability Bill (Mr. Ariel Gonzales)
Accomplishment reflected is from October
to December 2017
Number of House of
Representatives and Senate
Hearings
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
National ICT Standards and Codes Number of meetings attended
1 40
(0%)
•Attended the Annaul BPS TC Forum, Oct. 12,
F1 Hotel (Alberto B. Salvador, Jr.)
•Processing of Documents for the conduct of
BPS/TC 60 meeting. (Ms. Gemma Baysic, Ms.
Anna Teresa Aguilar & Mr. Julius Corpuz)
•Conducted the BPS TC 60 meeting on 11
December 2017 (Ms. Gemma Baysic, Ms. Anna
Teresa Aguilar & Mr. Julius Corpuz)
•Provide technical and administrative support
during the conduct of BPS/TC 60 meeting and
SC 1,2, and 3 meetings last 11 Dec 2017 (Ms.
Gemma Baysic, Ms. Anna Teresa Aguilar & Mr.
Julius Corpuz)
Accomplishment reflected is from October
to December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
National LinkageseHealth Data Privacy Expert Group Number of meetings attended
1 10
(0%)
•Attended the 18th Meeting of the National
eHealth Privacy Experts Group Meeting, Oct. 5,
Philhealth Office (Alberto B. Salvador)
Accomplishment reflected is from October
to December 2017
Inter Agency Council Against Child
Pornography
Number of meetings/ events
attended/ facilitated
2 20
(0%)
•Facilitated the inputs and comments for DICT-
SIM Service on the Manual for
#StopChildPornPH Project Web Portal
•Drafted and finalized the Proclamation Order
of the Safer Internet Day Philippines
Accomplishments reflected are as of
September 2017
International LinkagesAPEC Number of meetings attended
1 10
(0%)
•Attended the 1st TBAM meeting on 23
January 2017 at DFA
Accomplishments reflected are as of
September 2017
APT Conduct of APT Survey 20171 1
0
(0%)Accomplishments reflected are as of
September 2017ASEAN Number of meetings attended
2 20
(0%)
•Attended the Preparation meeting re: ASEAN-
Japan Regional Conference on Promoting
Services Trade on 23 January at CITEM-DTI.
•Attended the meeting of the 1st PH-Russia
Joint Commission on Trade and Economic
Cooperation, 19 January 2017 at DTI-BITR
Accomplishments reflected are as of
September 2017
ITU Creation of ITU Briefing Note1 1
0
(0%)b. Promotion of information technology in local government
Program 2: DigitalPH2.1 Next Wave Cities Project Accomplishments reflected are from
January to June 2017IT-BPM Roadshow Number of legs conducted
1 10
(0%)
•Conducted one IT-BPM Roadshow in Kalibo,
Aklan on February 2017
Accomplishments reflected are as of
September 2017
Capability Development Workshop Number of legs conducted5 5
0
(0%)Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Convergence of Luzon ICT Champions (CLICk)
Conference (Luzon ICT Cluster Conference)
Number of Major Regional ICT
Cluster Conferences 1 10
(0%)
•A total of 567 participants attended the
conferences.
Accomplishments reflected are as of
September 2017
National Briefing and Finalization for RIS
Technical Training
Presence of final guideline for
implementation of RIS Technical
Writing
1 10
(0%)
Accomplishments reflected are as of
September 2017
MFO 2: Technical Advisory Services2. ICT Management and Infrastructure Advisory
Program 3: ICT Infostructure and Systems Development Program3.1 iGovPhil Operations Activities
Government Data Center Operations and
Maintenance
Accomplishments reflected are from
January to June 2017Government Network (GovNet NCR and
Cebu)
Number of agencies provided with
fiber connectivity
As needed 65
(71%)
•OCD patched in DND and connected to
GovNet
Issue encountered: Work Permit released at a
later date by LRMC due to multiplicity of
signatories
•Survey conducted in National Archives of the
Philippines (NAP)
•Fibercut restored in Pamantasang Lungsod ng
Maynila (PLM)
•Patched and configured OCD to GovNet
•Resolved seven reported incidents of
downtime
***Catch-up Plans:
•Schedule Ocular inspection/survey of nearest
splicing points for PNR and RMC
•Extend Fastel's contract to another year
•Send MOA for signing, procurement needed
equipment
• Continued maintenance of 162 agencies
***Catch-up Plans:
• Contract with Fastel to be extended to
another year; needed equipment will be
procured
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
Number of FOC re-cabled1 1
0
(0%)
•Completion of all FOC-related works for LRT1
and LRT2 on October 4, 2017
Accomplishments reflected are as of
October 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of agencies with fiber-cut
restored
3 30
(0%)
Targets are as needed
Fastel fixed the fiber-cut of the following
agencies:
- DBM
- PICC
- SEC
Number of documents drafted
3
•Extension Request submitted to Legal
Division for review and endorsement
*Billing documents for payment of supplier
•Documents required for the fund transfer to
PITC
Accomplishments reflected are as of
October 2017
Number operation and
maintenance activities of 160
agencies1 1
0
(0%)
•Targets are as needed
• Transferred the VLAN equipment in TELOF
Accomplishments reflected are as of
September 2017
Number of agencies surveyed for
possible connection to GovNet
5 50
(0%)
•The maintenance service provider of GovNet,
Fastel, conducted survey to the following
agencies:
◘ Professional Regulation Commission (PRC)
◘ National Parks Development Committee
(NPDC)
◘ Office of Civil Defense (OCD)
◘ Radio Television Malacañang (RTVM)
◘ Tourism Promotions Board (TPB)
***The next step will be the provision of
equipment and Public IP for the agencies from
July until August 2017
Accomplishments reflected are as of
September 2017
Number of equipment installed
2 20
(0%)
•Installed the following in the Metropolitan
Waterworks and Sewage System (MWSS)
◘ Optical Distribution Frame
◘ Media Converter
Accomplishments reflected are as of
September 2017
Number of train station laid out
with Fiber Optic Cable (FOC)
25
(25%)
•Completed and tested FOC in LRT1 and LRT2
on November 21 and 22, 2017
•Secured work permit for the repair and
maintenance of Apps and other equipment
installed
Conducted closure meeting and launchingof
regional GovNet Project in Butuan (November
8 and 9, 2017)
•Remaining switches already installed
Issue encountered: Re-scheduled closure
meeting and launching in Palo-Leyte to
December 2017; and in Iloilo set in January
2018
Accomplishments reflected are as of
November 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of train station laid out
with Fiber Optic Cable (FOC) 20 155
(25%)
•FOC delivered and laid out in 15 stations of
LRT1
Accomplishments reflected are as of
September 2017
Number of FOC-related issues
resolved1 1
0
(0%)
•Targets are as needed
• FOC successfully transferred in MGB and
UPCC
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Conduct of activities related to
Free Wi-Fi
2 20
(0%)
•Targets are as needed
• station-to-station and street level testing of
Wi-Fi in 13 stations (From North Ave to Taft
Ave Station)
• soft launch of EDSA Wi-Fi Free Public High
Speed Internet
Accomplishments reflected are as of
September 2017
Number of projects transferred to
PITC for procurement
3
•The funds for the following projects were
transferred to PITC, which will facilitate their
procurement:
◘Supply, installation and Configuration of
Next Generation Intrusion Prevention
System, Services and Support (Php
20,571,855.89)
◘Lease of Room Space in Data Center
Facility and Services - Makati SIte (Php
16,596,690.00)
◘National Data Center 1 Rehabilitation
Project (Php 133,450,611.00)
Accomplishments reflected are as of
December 2017
Number of procurement contracts
signed
2
Contracts signed
•1 Lot for the Delivery of Network Security
Software/Solution for NGDC 1
•1 Lot for the Construction of NGDC 3 (SBMA
site)
Pending contracts:
•Procurement of Lot 1 for NGDC 2 (Makati
side) is still pending
•Procurement of Lot 1 for NGDC 4 (Cebu side)
is still under negotiations
Accomplishments reflected are as of
December 2017
Regional GovNet Construction of FOC Network
100% 100% 0%
FOC Network in the following regions are
completed:
◘ Tuguegarao
◘ Iloilo
◘ Pampanga
◘ Baguio
◘ Palo, Leyte
◘ Legazpi
◘ Butuan
Accomplishments reflected are as of
September 2017
Maintenance 24 x 7 operation of
Data Center facilities 31 31Accomplishments reflected are as of
October 2017
Number of monitoring conducted
on the performance of equipment
and facilities
31 31Accomplishments reflected are as of
October 2017
Number of IP Transport terminated6 1
5
(83%)•IP Transport has been terminated in Baguio Accomplishments reflected are as of
September 2017Number of VLAN deployment
activities conducted
7 43
(43%)
•Complete deployment of VLAN Palo, Leyte,
Baguio, Legazpi, and Iloilo
•VLAN deployment in Butuan was put on hold
since the delivery of patchcord is delayed.
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of closure meeting and
launching event conducted
5 32
(40%)
•Conducted closure meeting in Legazpi on 22
March, launching event in Pampanga on 24
March, both closure meeting and launching
event in Baguio on 20 April 2017
Accomplishments reflected are as of
September 2017
Number of closure meeting and
launching event conducted
22
(40%)
•Deployed technical team to Iloilo (October 4-
6) and Butuan (October 11-13) for installation
of active equipment and testing of
aforementioned equipment
Restored five uprooted poles in Legazpi City
•Disseminated copies of the Deed of Donation
to seven (Regional Govet Projects
Issue encountered: Closure meeting and
launching were moved to November 9 and 10,
respectively as per Assistance Secretary Silor's
availability/ request
Accomplishments reflected are as of
October 2017
Number of agencies deployed with
active equipment
317 120197
(62%)
•Completed the deployment of active
equipment in the following:
◘ Pampanga - 33 agencies
◘ Baguio - 40 agencies
◘ Tuguegarao - 47 agencies
Accomplishments reflected are as of
September 2017
Number of consultation meeting
conducted
8 62
(25%)
Conducted meetings in the following
provinces:
- Batangas
- Zamboanga
- Cotabato
- Davao
- Marawi
- Cagayan de Oro
Accomplishments reflected are as of
September 2017
Conduct of procurement activities
50
(0%)
•Completed post-qualification for FOC
installation projects in Cotabato, La Union,
Zamboanga, and Marawi; and, for the
procurement of ICT Equipment
Issue encountered: three projects failed;
hence, funds will be transferred to PITC and PS
•Procurement of FOC for the following has
been awarded:
◘La Union
◘Zamboanga
◘Cotabato
◘Marawi
Concern: Funds for FOC projects in Davao,
CDO, Batangas, and Cebu were transferred to
PITC
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Regional GovNet Phase II Conduct of procurement activities
for the 7 FOC Projects
2 20
(0%)
- The bid documents for 6 FOC regions (
Batangas, Davao, La Union, Zamboanga,
Cotabato, Marawi) were posted in the
PhilGEPS
- Prebid Conference was held on June 16,
2017
Accomplishments reflected are as of
September 2017
Government Cloud (GovCloud) Number of agencies hosted138 133
5
(96%)
Accomplishments reflected are as of
December 2017
Number of virtual machines used699 699
0
(0%)
NGDC 1 - 455
NGDC 2 - 244
Accomplishments reflected are as of
December 2017
Number of activities reconfiguring
tool/s and systems for operations
and maintenance conducted
6
•Reconfigured the zabbixangent file to send
the appropriate MySQL status to the Zabbix
server
Reconfigured the temperature monitoring
Configured the bar code to detect the tape's
bar codes and use it as volume name which
will be the basis for the automatic tape media
change
•Implemented the MySWL monitoring on VMs
managed by the GovCloud team for testing -
95%
•Configured Ossec Manager and tested
integritychecking of files via Ossec
•Completed installation of ELK on bare metal -
20%
•Implemented the MySQL monitoring on VMs
managed by the GovCloudteam for testing
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
Number of knowledge sharing
sessions/ activities conducted 9 9
0
(0%)Targets are as needed Accomplishments reflected are as of
September 2017Percentage of manuals for
managed services transferred to
Redmine Wiki
100% 100% 0%Accomplishments reflected are as of
September 2017
Number of knowledge sharing
activities conducted
4
•Conducted knowledge sharing on the
following:
◘DHCP Linux Command
◘Idap command in Linux
◘Security Incident Response
◘Security Indicent Response
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
Number of activities re expansion
of the current GOvCloud setup to
accommodate whole-of-
government2
•Registered all Red Hat products to Satellite -
95%
Issue encountered: Some of the nodes return
an error status in satellite
•Registered all Red Hat products to Satellite
(95%)
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Enhancement activities
100% 100% 0%
The following devices were configured with
remote logging and can send the log files to
ELK:
- F5
- IBM BladeCenter
- IBM BladeCenter node switches
- Extreme X670
- Pfsense
Implemented the log rotation covering 1 year
of rotated logs for archiving on all GovCloud
hosted VMs and Ovrit hosts
Assessed the backup job transfer rate and
increased the bandwidth of the network
interface of the Bareos backup server, which
improves the speed of the backup file transfer
Completed the following:
- reconfiguration of the Denial of Service
(DoS) Profile by disabling unnecessary policies
applied in GWHS Server 2
- provision of support to MarkLogic in the
configuration of F5 virtual servers
Accomplishments reflected are as of
September 2017
Conduct of technical migration
workshop100% 100% 0%
Targets are as needed
A total of 22 government agencies participated
in the workshop
Accomplishments reflected are as of
September 2017
Number of cities visited re
GovCloud Caravan22 2
20
(90%)Target is cumulative from January to
December 2017
Accomplishments reflected are as of
September 2017Number of Terms of References
Revised
5
•Revised the the TOR and Market Research for
the following:
◘Sourcelife License (Renewal)
◘NGIPS
◘Modular ADC with managed services
◘Qualys
•Revised the TOR and Market Research for
Qualys
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
December 2017
Security Percentage of request to modify
security policies for clients under
F5 Web Application Firewall
completed
100% 100% 0%
Targets are as needed
Enabled all attack signatures related to SQL
injection
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
2 20
(0%)
Targets are as needed
Submitted the following:
- vulnerability report to GCP Team
- incident report regarding the intermittent
connection with 'gwhs-02-https-vs'
Accomplishments reflected are as of
September 2017
Completion of implementation
activities of KeePass100% 100% 0%
Accomplishments reflected are as of
September 2017Implementation of the Next-
generation Intrusion Prevention
System (NGIPS)
100% 55% 45%Recabled the 153 network under the iGov
Network and added to Sourcefire
Accomplishments reflected are as of
September 2017
Number of reports drafted
2
•Drafted the following:
◘Vulnerability report on various GCP servers
(75% done - Still awaiting for the Philippine
Business Data Bank application report)
◘Incident report regarding the intermittent
connection with 'gwhs-02-https-vs' 50% done -
For review of Technical Lead
Accomplishments reflected are as of
October 2017
Percentage vulnerability analysis
for the Philippine Business Data
Bank100% 80% 20%
•Follow-up the status of vulnerability scan to
consultants
Accomplishments reflected are as of
December 2017
Number of activities re
optimization of Depuding and
Matching Application; and,
development of Onboarding and
Registry Application conducted
3
•Upgraded Marklogic servers to 9 (DR ad
production environments)
•Performed enhancements on security (job
server) and other trivial functional
enhancements (non-work order/ part of
support)
•Vessel Registry is already available in the O&R
application
Concern: Other registries may now be created
in the O&R application; app is already
functional and available in the production
environment
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
December 2017
Authoritative Registries & Government
Common Platform (AR-GCP)
Number of activities re
development of Business Registry
(Philippine Business Data Bank)
conducted
10
•Installed application on the server
•Implemented minor enhancements:
◘Bigger font size in the results page
◘Captcha
◘If user is Public, displays the following only:
(1) Business Name,(2) Regulatory Reference ID,
(3) Registration Date, (4) Expiry Date, (5)
Status, (6) Address, (7) City/Municipality, (8)
Zip Code
◘Install SSL Certificate
◘SSO integration
◘Workflow for PBDB account requests
◘Migration to Registry
◘Expose PBDB APIs (search and upload) to
api.gov.ph
◘Load test new data from QC and SEC
Accomplishments reflected are as of
October 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of activities re setup and
implementation of middleware
conducted
3
•Connected portal.api.gov.ph to the identity
server
•Populated the api.gov.ph with available APIs
***Prepared initial draft of the middleware
service application process
Accomplishments reflected are as of
October 2017
Number of activities re setup and
implementation of analytics
conducted2
•SSL certificates applied
•FQDN applied
Accomplishments reflected are as of
October 2017
Existing Apps Number of forms in FormsGen
migrated to Forms Builder7 7
0
(0%)
Migrated the NGP onboarding forms A, B1, and
B2, Data harmonization, Inventory of data
sources, EGMP survey, and events forms
created on Forms Builder
Accomplishments reflected are as of
September 2017
Number of usage policies drafted
3 30
(0%)
Target are as needed
Developed the draft of the following:
- Terms and Condition
- Service Level Agreement
- EULA
Accomplishments reflected are as of
September 2017
Number of training conducted
2 20
(0%)
Targets are as needed
- Conducted PMGov Training for BCDA
- Conducted FormsBuilder Training (Basic) on
19 June
Accomplishments reflected are as of
September 2017
Number of source code analysis
(SCA) completed3 3
0
(0%)
Completed SCA of the following:
- ARMIS
- PMGov
- FormsGen
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Implementation activities of the
ARMIS
2 20
(0%)
Targets are as needed
- Site creation and accounts enrollment
- Training documentation and users' manual
sent to DOTr and Senate
- Ongoing coordination with DOTr for the
ARMIS demo
Accomplishments reflected are as of
September 2017
Open Data Number of policies/ documents
drafted
4 40
(0%)
- Drafted an Administrative Order
institutionalizing Open Data in the Philippine
Government through the DICT
- Developed the first draft of Action Plan for
2017-2019
- Developed a comparative document on
CKAN and DKAN
- Drafted Joint Memorandum Circular on the
Institutionalization of Open Data (copies were
sent to PCOO and PSA)
Accomplishments reflected are as of
September 2017
Number of Open Data portal
maintenance and enhancement of
activites conducted
6
•Uploaded Users Manual to the Open Data
portal
•Edited Resources tab to include policies,
knowledge products, presentations, and
videos
•Migrated/Uploaded 35 data sets from the
old open data portal
•Collected Agency Data Inventories from the
FOI Agency Information Inventory
Accomplishments reflected are for the
month of December only
Number of activities to introduce
Open Data to DICT initiative 1 10
(0%)
Started hosting a Pizza Friday session on 21
April 2017. Sessions are targeted to continue
throughout the year
Accomplishments reflected are as of
September 2017
Number of activities conducted in
maintaining collaboration with
government and non-government
stakeholders
3
•Worked with several agencies for the
following events:
◘Freedom of information Summit Resource
contributors on FOI and the NGP (December 5
and 6)
◘FOI Training of Trainors Participants
(December 14 and 15)
◘BIR2017 Functional Conference for
Statisticians Resource Person on Open Data
and Data Storytelling (December 14)
Accomplishments reflected are as of
December 2017
Number of maintenance and
enhancement activities conducted 2
•Conducted QA for 4th Quarter 2017
•Uploaded datasets on the status of FOI
request per agency
Accomplishments reflected are as of
December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of improvement activities
for the front-end system of the
Open Data portal conducted
3 30
(0%)
Targets are as needed
- Created a mock-up of the portal as the
basis for the creation of the new portal
- AMT was replaced by the DKAN
- Open Data portal underwent redesign and
functionality improvement, and has been
linked to the gov.ph
Accomplishments reflected are as of
September 2017
Number of Kapihan ng mga Hepe
activities conducted
3 30
(0%)
Creation of the sheet for the Kapihan
participants, letters of invitations, and
program design of the Kapihan ng mg Hepe.
The scheduled Kapihan ng mga Hepe was
postponed due to the ASEAN Summit
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Conduct of events for Open Data
stakeholders
2 20
(0%)
- Launched the new Open Data portal with
new datasets and features on 23 June
- Conducted Pizza Friday with representatives
from various NGAs on 9 June
Accomplishments reflected are as of
September 2017
Shared Services Operations and Maintenance
GovMail Number of GovMail Traffic
- 5,194,305 >5,194,305
GovMail Traffic:
New Tickets - 109
Closed Tickets - 99
Applications Received - 1
Agencies Provisioned - 2
Accounts provisioned - 18
Cleared deferred mail - 18,658
received mail - 654,559
delivered mails - 3,301,444
forwarded mails - 3,671
deferred mails - 28,456
bounced mails - 83,591
rejected mails - 1,103,697
reject warnings - 0
held mails - 0
discarded mails - 0
Accomplishments reflected are as of
September 2017
Process creation of new GovMail
accounts upon receipt of the
approved request
14 140
(0%)
Targets are as needed Accomplishments reflected are as of
September 2017
Reactivated or reset password of
DICT email users43 43
0
(0%)
Targets are as needed
Requests are due to lock out or forgotten
passwords
Accomplishments reflected are as of
September 2017
Creation and updating of
requested email distribution list16 16
0
(0%)
Targets are as needed
Modified detail information of the email
account upon request
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of collaterals designed and
laid-out
21
•3 InfoAd on GovCloud Pampanga caravan,
GovCloud Batangas caravan NGDC
•iGov Multi-page brochure (100%)
•Revised Logos iGov Website Footer
•Tradenet banners (2 studies) - 30%
•iGov pull-up banner
•GovCloud Literature
•iGov Service Icons to NGP
◘eGovFrame, GovCloud, Aral and FormsGen
•Pegif workbook
•Forms Builder graphics
•Tradenet banners
•Andres Bonifacio FB post
•DICT Certificate template layout
•DICT Certificate of Participation in A4 and
2ups in Folio Size
•SO diagram
•iGov Services icons in vector file
•Christmas and New Year Institutional posts
(2)
Accomplishments reflected are as of
October 2017
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
Dissemination of spam/ phishing or
any GovMail related advisories 23 230
(0%)
Targets are as needed Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
GovMail Accounts Number of agencies with GovMail
accounts130 130
0
(0%)Accomplishments reflected are as of
September 2017Number of accounts provided
29,209 29,2090
(0%)Accomplishments reflected are as of
September 2017Public Key Infrastructure (ARMIS, Gabay-
Aral, PMGov, Formsbuilder)
Number of user created 22 22
0
(0%)Accomplishments reflected are as of
September 2017Number of technical support
provided3 3
0
(0%)Accomplishments reflected are as of
September 2017Backup Database/ System
maintenance2 2
0
(0%)Accomplishments reflected are as of
September 2017All Websites Monitoring In the process of migration to
GWHS75 51
24
(68%)Accomplishments reflected are as of
October 2017Websites hosted in GWHS
600 54555
(90.83%)
Concern: the transitions from iGovPhil were
currently put on hold. Current No. of Staff is 5
Accomplishments reflected are as of
October 2017
GWT-complaint websites600 627
27
(104.5%)
Concern: Request for replacement of resigned
staff was not approved due to freeze hiring
Accomplishments reflected are as of
October 2017
Partial GWT-compliance50 9
41
(18%)Accomplishments reflected are as of
October 2017Total websites not hosted in GWHS
1,300 1,37878
(106%)Accomplishments reflected are as of
October 2017Total agencies in list
1,975 1,9741
(99.99%)Accomplishments reflected are as of
October 2017Incidents Hacked Third Party
0 332Accomplishments reflected are as of
October 2017GWHS Application thru Helpdesk .gov.ph DNS Registration
5 127
(240%)Accomplishments reflected are as of
October 2017DNS Hosting
5 138
(260%)Accomplishments reflected are as of
October 2017Web Hosting
7 125
(171%)Accomplishments reflected are as of
October 2017GWHS Account Information
Update1 5
4
(500%)Accomplishments reflected are as of
October 2017AO 39/ Government Web Hosting System Number of websites hosted in
GWHS 1,954 5251
(0.05%)
62 websites are in the process of migrating;
1,368 websites are not yet hosted
Accomplishments reflected are as of
September 2017
GWT-compliant websites582 573
9
(2%)9 are in partial compliance Accomplishments reflected are as of
September 2017Number of accounts hacked
410 4100
(0%)
Hacked by Anonymous Philippines - 0
Hacked by third party - 410
Accomplishments reflected are as of
September 2017
Number of .gov.ph DNS
registration3 3
Accomplishments reflected are as of
September 2017Number of DNS hosting
4 4Accomplishments reflected are as of
September 2017Number of Web hosting through
GWHS helpdesk6 6
Accomplishments reflected are as of
September 20173.2 ICT Development Consulting Activities
Development of Business Permit and
Licensing System (BPLS) project
Accomplishments reflected are from
January to March 2017e-BPLS software deployment Number of LGUs deployed with e-
BPLS software 5 23
(60%)
Deployed eBPLS in Talisay, Camarines Norte
and Baler, Aurora in 2016.
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of LGUs trained
5 23
(60%)
Trained LGU users at Talisay, Camarines Norte
on 7-19 February 2017 and LGU users at Baler,
Aurora on 22-23 March 2017. Partnerships
between DICT Central an LC 3 and LC 2
representatives were created.
Accomplishments reflected are as of
September 2017
e-BPLS software updates Number of updated unified form
and added security features
developed
1 01
(100%)
Waiting for the final unified form from the NCC
and DILG
Accomplishments reflected are as of
September 2017
BPLS Automation Training Program for
LGUs
Number of training conducted2 1
1
(50%)
Conducted BPLS Automation and Streamlining
Briefing for DICT Clusters and DILG-BLGD
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Forging of partnerships Number of development partners1 0
1
(100%)
Still discussing the formal partnership with
DILG-BLGD
Accomplishments reflected are as of
September 2017
Consultative Meeting with the DICT units re:
prospective projects for PPP
Consolidation of DICT's programs/
projects that may be
procured/implemented through
PPP
100 1000
(0%)
Accomplishments reflected are as of
October 2017
Partnership and Linkages to Support R&D
Initiatives in ICT
Accomplishments reflected are from
January to April 2017
Establishment of Linkages with prospective
partners (Local and International
Number of collaborative meetings
conducted
4 6>2
(>50%)
Conducted meetings on the following dates:
- 17 January - Philippine Development Plan
- 30 January - Ateneo Innovation Center
regarding APT Project Proposal
- 03 February - Roundtable Discussion for
DOST Artificial Intelligence (AI)
- 17 February - CAC Inspection of PCOS
Machine in Cabuyao, Laguna
- 09 March - PAGASA Meeting at iGovPhil
- 05 April - meeting with System Developers
at SID Director Office
Accomplishments reflected are as of
September 2017
Number of linkages established4 6
>2
(>50%)Accomplishments reflected are as of
September 2017Project Conceptualization/ Implementation Number of meeting conducted for
project conceptualization0 1 >1
Conducted a meeting on 05 April PCIEERD
regarding ePC Project Proposal
Accomplishments reflected are as of
September 2017Number of collaborative projects
conceptualized/ supported/
shepherd
0 1 >2Conducted meetings on 21 March with DOTr
and DOST regarding Intelligent Transport
System Update
Accomplishments reflected are as of
September 2017
Capability / Capacity Building Number of trainings/ seminars/
conferences attended4 21
>17
(>425%)Accomplishments reflected are as of
September 20173.3 Government Emergency Communications
System (GECS)
No submissions made
Program 4: National Connectivity Program4.1 Digital Terrestrial Television Broadcasting
(DTTB) Migration Project
Approved DTTB Migration Plan0 0
•NTC submitted additional comments on the
DTTB Migration Plan
Accomplishments reflected are from
October to December 2017Published DTTB Migration Plan
0 0•Printing of DTTB Migration Plan Framework is
ongoing
Accomplishments reflected are from
October to December 2017
No. of DTTB Migration
awareness/seminars
4 40
(0%)
•More Digital TV Migration Seminars will be
conducted
•Conducted Digital TV Migration Awareness
Seminar at IECEP First and AGM in November
Accomplishments reflected are from
October to December 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of developed and
activated platforms and FGDs4 0
•Activated Social Media Presence (Facebook
Page: www.facebook.com/digitaltvph)
Accomplishments reflected are from
October to December 2017
4.2 TV White Space (TVWS) Technologies
Adoption Project
Creation of Team to conduct
survey 75% 75% 0%*Submissions made by SID-SIDD;
accomplishments are from March-June 2017
Development of survey form50% 50% 0%
Accomplishments reflected are as of
September 2017Procurement of equipment,
devices, office supplies 100% 58.45% 41.55%
Some of the items have already been
delivered. The abstract for the rest has been
completed.
Accomplishments reflected are as of
September 2017
Number of sites surveyed for the
deployment of TVWS180 105
75
(42%)Accomplishments reflected are as of
September 2017Online installation of the software
for the Acquisition of TVWS
Database
75% 75% 0%Accomplishments reflected are as of
September 2017
4.3 Privatization of Decommissioned Public
Telecom Infrastructure (NTPs) Project
Percent completion of the
validation/ updating of NTP/ RTDP
facilities status
80% 60% 20%On-going validation of data obtained from
FOOs and SIM-NIIDD.
Accomplishments reflected are from
January to June 2017
Development of guideline in the
preparation, review and approval,
and implementation of ICT projects
for PPP
85 7510
(12%)
On-going review on the comments/
recommendations of NEDA-PPP Center on the
proposed revisions to the guidelines
Accomplishments reflected are as of
September 2017
Acted/Prepared Memorandum
Recommendation Regarding Claim
of the Ilocos Norte Electric
Cooperative (INEC) for the
payment of pole rentals of the
RTDP Phase C
100% 100% 0%
Accomplishments reflected are as of
September 2017
Number of workshops/seminars
attended2 2
0
(0%)
- Attended the Workshop On the Preparation
of Bidding Documents
- Attended the In-House Seminar on
Government Procurement Reform Act (RA
9184) and its 2016 IRR
Accomplishments reflected are as of
September 2017
Preparation of Job Descriptions for
the proposed positions of the ICT
Management Bureau
100% 100% 0%Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Performed Functions of the
Internal Audit Team as Co-Lead
and Members
100% 100% 0%Accomplishments reflected are as of
September 2017
3. Formulation, Coordination, Evaluation of the ICT Plans, Programs, and ServicesProgram 2: DigitalPH
2.2 ICT Enabled Startup Development (seed.ph)
Project
Accomplishments reflected are from
January to June 2017Startup Workshop Number of workshop conducted
2 20
(0%)
Conducted a Startup Workshop in San
Fernando, Pampanga with 148 participants
Conducted a Startup Workshop in Siquijor on 1
June 2017 with 132 participants
Accomplishments reflected are as of
September 2017
PSC 4 Mentor's Boot Camp Number of legs conducted4 7
•Added additional leg from FOO savings Accomplishments reflected are for
December 2017Philippine Startup Challenge Regional
Mentoring
Number of finalist teams attended
0 28 >28
Target is 0 since qualifying teams are based on
actual judging and cannot be targeted
although participation from all major islands
were encouraged.
Conducted the PSC Regional Mentoring in
Cagayan de Oro, Cebu, Davao, and Manila
Accomplishments reflected are as of
September 2017
Philippine Startup Challenge 2016 Participation of finalist teams in
software track and IOT track 13 130
(0%)
10 finalist teams participated in software track;
3 finalist teams participated in IOT track
Accomplishments reflected are as of
September 2017
ICT PPP Management DivisionIssued Certificates of Services Rendered
to various Providers
Issued Certificates of Services
Rendered for IPTSC WIT within
deadline
8 80
(0%)
•Issued five (5) Certificates of Services
Rendered for IPTSC WIT for the lots 0243,
0942, 0809, 04188
•Issued five (5) Certificates of Services
Rendered for IPTSC WIT for the lots 0942,
0243, 0418
Accomplishments reflected are as of
November 2017
Accomplishments reflected are as of
December 2017
Issued Certificates of Services
Rendered for IPTI PLDT within
deadline
100 1000
(0%)
•Issued Certificate of Services Rendered for
IPTI PLDT for April - May 2017
Accomplishments reflected are from
November 2017
Issued Certificate of Services
Rendered for Converge
Information and Communications
Technology Solutions, Inc. within
the deadline
100 1000
(0%)
Accomplishments reflected are as of
December 2017
Issued Certificate of Services
Rendered for that Abratique and
Associates (A&A) within the
deadline
100 100
0
(0%)
Accomplishments reflected are as of
December 2017
Issued Certificate of Services
Rendered for AZ Communications,
Inc. (AZCom) within the deadline
100 100
0
(0%)
Accomplishments reflected are as of
December 2017
Development of Cybersecurity Laboratory Number of meetings deployed70 5
<65
(7.14%)
Accomplishments reflected are from
October 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
ASEAN 2017 TG Signal Number of coordination meetings11 5
<6
(45.45%)Accomplishments reflected are from
October 2017
Number of presentation plans8 4
<4
(50%)
Accomplishments reflected are from
October 2017
Safety and Security Evaluation and
Audit Activity14 14
0
(0%)
•Conduict of IT and Facility Audit Accomplishments reflected are from
October 2017
Participation of Challenge mentors6 7
>1
(>17%)Accomplishments reflected are as of
September 2017Philippine Startup Challenge 4 Conduct of the Philippine Startup
Challenge 4 - Launch 1 10
(0%)
Conducted the launching of the Philippine
Startup Challenge 4; attended by a total of 56
participants
Accomplishments reflected are as of
September 2017
Conduct of the PSC 4 Mentors'
Bootcamp
4 6>2
(>50%)
Conducted the PSC 4 Mentors' Bootcamp in
the following locations:
- Naga
- Tacloban
- Zamboanga
- Manila
- Iloilo
- Roxas
A total of 376 participants attended the event
Accomplishments reflected are as of
September 2017
Geeks on a Beach Conduct of the Geeks on an Beach
2017 1 10
(0%)
Conducted the Geeks on a Beach on August
2017 with a total of 400 participants who
attended the event
Accomplishments reflected are as of
September 2017
MFO 3: ICT Training Services4. ICT Literacy and Manpower Development a. Provision of technical assistance in the professionalism of ICT personnel
Program 5: Human Capability Development Program5.1 ICT Competency Development Activities Accomplishments reflected are from
January to April 2017Conduct of ICT Competency Certification
Exams (IT Proficiency and ICDL)
Number of certification exams
administered- 3
Target is cumulative from January to
December 2017
Accomplishments reflected are from
October to December 2017Number of examinees
- 54Target is cumulative from January to
December 2017
Accomplishments reflected are from
October to December 2017Number of Assessments/
Diagnostics conducted- 27
Accomplishments reflected are from
October to December 2017Number of assessees
- 992Accomplishments reflected are from
October to December 2017Number of Assessment exams
developed- -
0
(0%)Accomplishments reflected are from
October to December 2017
No target is due to the implementation of the
Assess-Build-Certify Principle in certification of
CSCM
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
5.2 Training Administration and Management
Activities
Accomplishments reflected are from
January to April 2017Conduct of ICT Competency-based Training
Courses
Number of courses conducted12 76
>64
(633.33%)
Accomplishment reflected are from January
to December 2017
Number of participants trained 300 5,310
>5,010
(>1,770%)
Accomplishment reflected are from January
to December 2017
Conduct of ICT events2 1
1
(50%)The total number of participants is 104 Accomplishment reflected are from January
to December 2017
Animehanasyon No. of attendees250 260
10
(104%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
DICT-IBPAP Learning Sessions No. of attendees250 525
>275
(210%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
DICT-PSIA Enablement Seminar Series No. of attendees250 203
47
(81.2%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
b. Development and conduct of ICT education and training programs Program 6: Digital Communities Program
6.1 Technology Empowerment for Education,
Employment, Entrepreneurship, and Economic
Development (Tech4ED) Project
Accomplishments reflected are from
January to June 2017
Establishment of Tech4ED centers Number of Tech4ED centers- 259
Target indicated is for FY 2017 Accomplishment reflected are for months of
November and December 2017 only
Content Development NGP - Tech4ED portals integration
- Integration on-going -
Targets were not specified
Designed and developed sitemap, writeframe,
and functional specifications; ongoing Java
training for programmers; ongoing
consultation with Liferay TeamIntegration on-going based on Dec 2017
Report
Enhanced Tech4ED Content and
Services
- Ongoing -
•Ongoing development of sites and pages;
continuing development of Tech4ED Center
Management System to include dashboard
and data analytics. Released Guidelines for roll-
put plan of Tech4ED Center Management
System
•Released guidelines for roll-out plan of
Tech4ED Center Management System
Accomplishment reflected are for
November 2017
Accomplishment reflected are for December
2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Capability Building Number of Center Managers
trained 14001813 CMs (89
batches)
>413
(>29.5%)
Target is 26 CMs trained per month
89 Accomplishment reflected are from January
to December 2017
Advocacy and Promotions Number of newsletter released2 2
0
(0%)Accomplishments reflected are as of
September 20176.2 Rural Impact Sourcing Project Accomplishments reflected are from
January to June 2017Rural Impact Sourcing Workshop Number of RIS legs conducted
8 80
(0%)
Conducted RIS workshops in the following
locations:
- Cauayan City, Isabela
- La Libertad, Negros Oriental
- Ligao City, Albay
- Baler Aurora
- Guimaras Province
- Pilar, Sorsogon
- Siquijor Province
- Mindoro Province
A total of 1,713 participants participated
Rural Impact Sourcing Workshop Number of Rural Impact Sourcing
(RIS) workshops conducted 7 70
(0%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
Number of participants/ delegates1400 1601
>55
(18%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
Positive response from the activity
assessment70% 98% >28%
Accomplishments reflected are as of
September 2017Conduct of 1st Philippine Impact Sourcing
Conference
Number of participants/ delegates300 355
>55
(18%)Accomplishments reflected are as of
September 2017Number of partner organizations
participated10 37
>27
(>270%)Accomplishments reflected are as of
September 2017Percentage of attendees who rate
the conference as satisfactory or
better
70% 90% >20%Accomplishments reflected are as of
September 2017
Trainers' Briefing and Alignment for RIS
Technical Training
Presence of module, guidelines,
and targeted timeline for
implementation of RIS Technical
training1 1
0
(0%)
Accomplishments reflected are as of
September 2017
Number of trainings launched
8 80
(0%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
6.3 Characterization of Thin Client Cached
Cloud Technologies
Accomplishments reflected are from
January to June 2017Procurement for Thin Clients, Servers and
Peripherals
Revised TOR for Thin Client
Manufacturing2 2
0
(0%)Accomplishments reflected are as of
September 2017Procurement for Integration Services Drafted TOR for Integration
Services
2 20
(0%)
Released approved TOR and Purchase Request
Finalizing Bid Documents with the advice of
the BAC, ongoing consultation
Submitted Catch-up Plan for the Thin Client
Project
Accomplishments reflected are as of
September 2017
Market Research with Industry3 3
0
(0%)Completed the POC for the Market Research Accomplishments reflected are as of
September 2017Compatibility Tests Percent of completion/
accomplishment100% 100%
0
(0%)
-Issues were in the Software compatibility
Testing for Leap Software.
-There is a pending Full-suite testing for the
Software compatibility Testing for DOST-STII’s
Starbooks Software
Accomplishments reflected are as of
September 2017
Capacity Building activities Percent of completion/
accomplishment
100% 100%0
(0%)
-Open-ended Workplan for Technology &
Knowledge Transfer
-Completed knowledge transfer from UP
CloudTop Team
-Performed back-up of one of the Thin Client
System for Team’s safekeeping and studies
Accomplishments reflected are as of
September 2017
Training in T2/T3 Installation Configuration
and Troubleshooting for TCCCT
Development/SysAd Team
Number of trainings conducted2 2
0
(0%)
Accomplishments reflected are as of
September 2017
Loaned out one thin client system from UP
CloudTop Team for testing and training
purposes
Number of equipment loaned
1 10
(0%)
Returned loaned equipment to CloudTop for
the bringing up of the Alpha Sites. System was
assembled and operational upon returning to
UP CloudTop Lab.
Accomplishments reflected are as of
September 2017
Developed a workshop plan for Training of
Trainer (ToT) for Regional Officers
Number of workshop plan
developed
1 10
(0%)
-Deployed a system in Zamboanga City for
Hands-on Training of Regional Officers
-Conducted kick-off, workshop-training for
Regional Officers
-After-action report for the Training of Trainers
held in Zamboanga
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Program 5: Human Capability Development Program5.3 Digital Literacy (including Special Needs
Sector) Activities
Accomplishments reflected are from
January to May 2017Conduct of basic ICT training Number of courses conducted
9 72
(77.77%)Continuous collaboration with CAMANAVA
areas and Quezon CityConduct of educational trip and seminars for
Universities and Colleges in Valenzuela
Campus
Number of requests handled
2 7>5
(>350%)
A total of 727 students attended, IT students
from University of Luzon (Dagupan City),
Cainta Catholic Colleges (Cainta, Rizal), Colegio
de Dagupan (Dagupan), Lorma Colleges (La
Union), Laguna University
Conduct of Training of Trainers Number of courses conducted2 2
0
(0%)A total pf 39 participants attended Accomplishments reflected are from
January to December 2017
ICT Creatives Award Night No. of attendees200 205
0
(0%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
ITU Telecom World 2017 No. of attendees- 2
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
HIMS Career 101 No. of attendees400 403
(0%)
Target is cumulative from December 1-31 2017
only
Accomplishments reflected are as for
December 2017 only
Conduct of Competency-based Training No. of Courses Conducted4 28
7
(>700%)Targets are ommulative from October to
December 2017
Accomplishments are commulative from
October to December 2017No. of Participants
100 205820.58
(>2058%)Targets are ommulative from October to
December 2017
Accomplishments are commulative from
October to December 2017Program 7: Cybersecurity
7.1 Cyber Safety Advocacy and Promotions
Activities
Accomplishments reflected are from
January to June 2017National Cybersecurity Plan (NCSP) 2022
Roundtable Discussion
Facilitation of the NCSP Roundtable
Discussion 100% 100% 0%The roundtable discussion was focused on the
Businesses and Supply Chain Imperative
Accomplishments reflected are as of
September 2017
Manage the Government Computer
Emergency Readiness Team (G-CERT)
Issuance of the security alert on
website defacement to LGU and
NGAs
100 205>105
(>105%)
Accomplishments reflected are as of
September 2017
Number of comprised websites
addressed- 41
>41
(>0%)Accomplishments reflected are as of
September 2017Monitoring of agency, local government,
GOCC and CII CERT websites and on line
applications system
Issuance of daily monitoring report- 12
>12
(>0%)
Accomplishments reflected are as of
September 2017
Manpower capability building Number of Trained Personnel in
the use of BGAN26 26
0
(0%)Accomplishments reflected are as of
September 2017Assist in the regular operation of the
Cybercrime Investigation and Coordinating
Center
Number of analysis and
recommendation report issued - 7>7
(>0%)
Accomplishments reflected are as of
September 2017
Security Audit Web Vulnerability Assessment4 9
>5
(>125%)Accomplishments reflected are as of
September 2017Network Vulnerability Assessment
1 10
(0%)Accomplishments reflected are as of
September 2017Conduct of Seminars, Meetings, Trainings,
and Advocacy Campaign
Number of Seminars, Meetings,
Trainings, and Advocacy Campaign 2 20
(0%)
Accomplishments reflected are as of
September 2017
Development of Cybersecurity Laboratory Building Repair for Cybersecurity
Laboratory30% 20% 10%
Accomplishments reflected are as of
September 2017Repair and upgrade of existing
office equipment100% 30% 70%
Accomplishments reflected are as of
September 2017Number of trainees for the In-
house Security Training Linux16 16
0
(0%)Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of trainees for the In-
house Forensic Training16 16
0
(0%)Accomplishments reflected are as of
September 2017Number of trainees for the In-
house Incident Response Training 0 00
(0%)
Accomplishments reflected are as of
September 2017
Completion of the delivery of ICT
equipment80% 90% >10%
Accomplishments reflected are as of
September 2017Number of software subscription
2 20
(0%)Accomplishments reflected are as of
September 2017Operation of Cybersecurity Laboratory and
Technical Advisory Services
Number of Incidents Processed17 29
>12
(>70%)Accomplishments reflected are as of
September 2017Number of trained responders
0 5>5
(>500%)Accomplishments reflected are as of
September 2017Improvement of response time
100% 75% 25%Accomplishments reflected are as of
September 2017Number of Forensic Investigation
Conducted0 2
>2
(>200%)Accomplishments reflected are as of
September 2017Knowledge sharing experience Completion of the DICT-
Cybersecurity Engagement to the
Stakeholders
100% 100% 100%
DICT-OASCET has organized, as well as co-
organized, several cybersecurity events:
•NALECC-SCILEC Technical Working Group on
Virtual Currency meeting on October 20, 2017
•ASEAN-Japan CyberSecurity Cooperation Hub
CYDER Exercise on October 26-27, 2017
Accomplishments reflected are for October
2017 only
Focus Group Discussion with the Critical Infostructure
(CIIs)
Completion of the Focus Group
Discussion with the Critical
Infostructure
The team with the Energy Sector
representatives on October 23, 2017 at the
OSEC Conference Room to officially issue the
DICT Memorandum Circular for the Protection
of CIIs. Included in the discussion were the
creation of the Energy Sectoral CERT and
inputs on the DICT CERT Manual.
Accomplishments reflected are for October
2017 only
Meeting on
Program 2: DigitalPH Program2.3 Stepping Up the Value Chain Accomplishments reflected are from
January to May 2017
Software Development Expo and Conference
(SODEC) 2017
Number of delegates attended/
participated10 47
>37
(>370%)Accomplishments reflected are as of
September 2017Number of companies participated
10 20>10
(>100%)Accomplishments reflected are as of
September 2017Percentage of attendees who rate
the delegation participation as
satisfactory or better75% 87%
>12
(16%)
Accomplishments reflected are as of
September 2017
CommunicAsia 2017 Number of delegates attended/
participated10 22
>12
(>120%)Accomplishments reflected are as of
September 2017Number of companies participated
10 100
(0%)Accomplishments reflected are as of
September 2017Percentage of attendees who rate
the delegation participation as
satisfactory or better75% 100% >25%
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
LOCALLY FUNDED PROJECTSProgram 4: National Connectivity Program
4.4 National Government Data Center (NGDC)
Infrastructure Project
Number of procurement activities
commenced
100% 100% 0%
For NGDC 1, 3 procurement projects were
approved for posting:
-2x15Tr PACUs emergency purchase
-Facility rehabilitation
-Network security infrastructure
Accomplishments reflected are from
January to June 2017
Number procurement projects
under post-qualification stage2 2
0
(0%)
Targets are as needed
- lease of space for NGDC 2 (Makati site)
- lease of space for NGDC 4 (Cebu site)
Accomplishments reflected are as of
September 2017
Structural retro-fitting activities in
NGDC 3 100% 100% 0%
For NGDC 3, the following activities were
completed:
-Structural retro-fitting
-Data Center build tendering
Accomplishments reflected are as of
September 2017
Strategic Engagement and Collaboration to
Undertake a Reliable and Efficient
Government Internet (SECURE GovNet)
Number of repeater station sites
identified4 4
0
(0%)
Repeater stations will built in 4 locations:
- Rosario, La Union
- Sta. Maria, Pangasinan
- San Jose, Nueva Ecija
- Pantabangan, Nueva Ecija
Accomplishments reflected are as of
September 2017
Number of lots for the repeater
station sites acquired
4 22
(50%)
- Securing of the special permit from Muñoz
CENRO for Marikit lot
- Securing of the Cataguintingan lot with
Rosario LGU
***complete land acquisition for repeater
stations by the end of August 2017
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
4.5 Free Wi-Fi Internet Connectivity in Public
Places
Accomplishments reflected are from
January to June 2017PMT: Management, Supervision &
Administration of Internet Connectivity
Number of established Free Wi-Fi
live sites
27,506 22627280
Established operational 46 live sites:
- 34 public schools
- 18 LGUs
- 16 NGAs
- 3 library
- 14 hospitals
- 57 RHUs
- 19 plazas
- 4 train stations
- 1 airport
Accomplishments reflected are from
October to December 2017
Social Marketing and Stakeholders Engagement Development of Communications
Plan100% 100% 0%
The Communications Plan is 100% complete,
while the Branding and Identity Guide is 30%
complete while the Strategic Communications
Plan is 20% complete as of June 2017.
Accomplishments reflected are from
January to December 2017
Conduct of National Event100% 100 0%
National event was already done last June, The
PR situation for the Project calls not for
national events, but local events
Accomplishments reflected are from
January to December 2017
•October 03, 2017-PAGASA Product
Presentation Telecom-Mr. Reyes
•October 02, 2017 - Meeting with Asec. Silor
regarding GECS-Ms. Romasanta and Mr.
Cordura
•October 09, 2017-Meeting with Asec. Silor
regarding GECS-Mr. Reyes and Mr. Cordura
•October 10, 2017-Meeting with Asec. Silor
regarding the GECS
•October 11-13, 2017-Acceptance Test Free Wi-
Fi Sites-Mr. Reyes
•October 19, 2017-Acceptance Mandaluyong
Free Wi-Fi-Mr. Reyes
Accomplishments reflected are as of
October 2017
•November 6-10, 2017-Wrap-up
Meeting/Project Closure and Finalization of
Report to Asia-Pacific Telecommunity (APT) for
its funded project "International Collaborative
Research on Disaster Response Model Using
Vehicle Communication"
•November 03, 2017-GECS Meeting with Asec.
Silor-Mr. Condura
•November 20,2017 - GECS Meeting with Engr.
Gladys, Engr. Cordura, Richarc Buenafe, Asec.
Silor and Dir. Varilla
•November 27, 2017-GECS Meeting with Asec.
Silor-Mr. Cordura
Accomplishments reflected are as of
November 2017
Meetings conducted Number of meetings conducted
1014
1.4
(140%)
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
•December 13, 2017-Meeting with Ms.
Romantasa, Usec. Rio and Asec. Silor re: MOU
& IP Agreement with NICT
•December 14, 2017-GOMP-iGOv-Inspectionn-
Mr. Reyes
•December 29, 2017-GOMP-iGOv-Inspectionn-
Mr. Reyes
•December 1-2, 2017-HNICEM 2017 at Hotel
Jen-Ms. Romantasa
•December 4-8, 2017-ICT Conference-Mr.
Laoagan, Mr. Enzon, Mr. Cordura, Mr.
Camacho and Mr. Reyes
•December 4-5, 2017-GAD Planning-Ms.
Romasanta
•December 7, 2017-Mark Logic Technology-
Mr. Aberion
December 8, 2017-Big Data for Development -
Ms. Romasanta and Mr. Aberion
•December 14, 2017-iPLay Commerce Inc. -Ms.
Romasanta
•December 14, 2017-7th IATWG Regular
Meeting at GPPB-Mr. Camacho
Accomplishments reflected are as of
December 2017
Conduct of National Event
- 2 -
Targets are as needed
1. EDSA Wi-Fi Launch
2. One Connection, One Nation - Launch of
DICT Priority Projects
Accomplishments reflected are as of
September 2017
Number of recipients surveyed
33 330
(0%)
Targets are as needed
The 33 health centers surveyed were the
recipients of the Free Public Wi-Fi Project
connections in Metro Manila.
7 health centers, public libraries and
government offices in Metro Manila were
surveyed for Acceptance and Testing of the
Project.
Accomplishments reflected are as of
September 2017
Capacity Building Number of trainings conducted for
the Training of Trainers (ToT) for
the Digital Literacy Program0 11 >11
Will converge ToT with PKI-RA Training; to be
conducted next yearAccomplishments reflected are from
October to December 2017
Number of trainings conducted for
the Training of Trainers (ToT) for
the PKI-RA
3 0 0Will converge ToT with PKI-RA Training; to be
conducted next year Accomplishments reflected are from
October to December 2017
Meetings conducted Number of meetings conducted
1014
1.4
(140%)
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of trainings conducted for
the Conduct of Digital Literacy
Program for Training for Users/
Internet Media and Information
Literacy Training
3 28
>25
(>933%)
IMIL and DL trainings at the Clusters are lined
up for implementation in the Q4
Accomplishments reflected are from
October to December 2017
Number of trainings conducted for
the Conduct of Digital Literacy
Program for the Digital Literacy
Training
3 50>47
(>1666%)
IMIL and DL trainings at the Clusters are lined
up for implementation in the Q4Accomplishments reflected are from
October to December 2017
Conduct of PKI-RA Training
2 02
(200%)
Will re-strategize on PKI training
implementations
Trainings delayed due to TMSRA/system full,
certificate policy non-issuance and outdated
ADSS and RedHat OS licenses
Accomplishments reflected are from
October to December 2017
Conduct of M&E activities
10 28
(80%)
M&E activities will be conducted once 20% of
targeted number of TOT, IMIL and DL trainings
were conducted;
Currently refining M&E strategy;
Will conduct actual FGDs in 2018
Accomplishments reflected are from
October to December 2017
4.6 National Government Portal Number of activities conducted to
prepare the portal for production
100% 100% 0%
Targets as needed
Conducted the following activities:
- ongoing documentation of network
configuration of network configuration and
system architecture
- re-design and re-configured network
topology and VMs (NGP openstack)
- created additional VMs and deployed portal
instances for testing and beta (NGP openstack)
- launched gov.ph portal on 23 June
Accomplishments reflected are from
January to June 2017
Percentage of websites hosted in
the GWHS migrated to the portal
100% 90% 10%
- Completed the API content migration and is
ready for testing on live websites
- Replicated content of the DICT websites
and its attached agencies' websites to be
available in gov.ph
-
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
Number of workshops conducted
2 20
(0%)
Targets as needed
Conducted a 3-day onboarding workshop for
the S&T cluster; created onboarding forms B1
(non-transactional) and B2 (transactional)
Conduct of NGP Primer workshop among the
top 10 agencies with the most relevant
services
Accomplishments reflected are as of
September 2017
Authoritative Registries & Government
Common Platform (AR&GCP)
Implementation activities of the
Business Registry/ Philippine
Business Data Bank
2 20
(0%)
Targets are as needed
- Updated PBDB Sandbox, created Prod
instance for PBDB
- Added feature to decouple APIs and loaded
data such that when API becomes unavailable,
the search function is still usable
Accomplishments reflected are as of
September 2017
Implementation activities of the
GCP
3 30
(0%)
Targets are as needed
- Completed the installation of NoSql licenses
- Completed Analytics UAT
- Provided test access to DOTr thru Transport
registry team
Accomplishments reflected are as of
September 2017
Optimization and packaging of the
Dedup and Matching Application
100% 100%0
(0%)
5 additional agencies engagement for DMA:
1. On-cloud DMA training for PRC and
PhilHealth - DONE
2. Scheduled for On-cloud DMA training - BIR,
CHED, and DA
Accomplishments reflected are as of
September 2017
(1) (2) (3) (4) (5) (6)
Status of SubmissionRemarksPROGRAMS / ACTIVITIES / PROJECTS Performance Measures Physical Target Accomplishment Variance
4.7 National Spectrum Monitoring System Project
(Spectrum Policy Assessment System)
Accomplishments reflected are from
January to May 2017Conduct of SPAS Critical Infrastructure Buildup SPAS training and Project
Management Office1 1
0
(0%)Utilize 2016 budget for remaining equipment
to be procured
Accomplishments reflected are as of
September 2017Capacity building Conduct of workshop
4 13
(75%)
A TVWS workshop was conducted for the
conduct of public consultation in Manila
attended by NTC, DICT, Kapisanan ng
Broadcasters ng Pilipinas, and other relevant
stakeholders for the policy involving 470Mhz-
786 Mhz.
Accomplishments reflected are as of
September 2017
Prepared by: Noted by:
Zeus Joseph A. Ebora Dan Joshua D. Valenton Jocelyn V. TendenillaPlanning Officer I Planning Officer I Officer in ChargeNIG-SMPD NIG-SMPD NIG-SMPD