Schedule of rates 1998TRANSCRIPT
SECTION - 1
1413Government of Balochistan
CSR-1998 (Volume I)
SECTION - 2
Sr.
No.DescriptionUnitRate
(Rs.)
2-1Loading or unloading into or from Railway wagons, shingle, sand, ballast, surkhi, ashes, kankar, brick bats, coall or lime etc. lead upto 30 meters.Cu.m
%Cft.49.15
139.18
2-2Loading or unloading bricks or tiles into or from Railway wagons properly laid and stacked lead upto 30 meters.%Nos.143.00
2-3Loading or unloading into or from Railway wagons cement in bags (from inside or outside the godown) and stacking lead upto 30 meters.%Nos.178.75
2-4Loading or unloading into or from Railway wagons empty cement bags (from inside or outside the godown) and stacking lead upto 30 meters.%Nos.13.40
2-5Loading or unloading into or from Railway wagons (from inside or outside the godown) and stacking, white lime in bags lead upto 30 meters.%kg
Cwt2.70
1.37
2-6Loading or unloading into or from Railway wagons structural steel, R.S. joists, broad, narrow, or meter gauge rails and rail fastenings etc lead upto 30 meters.Tonne
Ton75.95
77.16
2-7Loading or unloading 205 litre drums fuel into or from Railway wagons, lead upto 30 meters.Each10.70
2-8Loading or unloading packages of sorts weighing upto 50 kgs (1 Cwt).Each5.35
2-9Loading or unloading sleepers, other than wooden, including stacking lead upto 30 meters.
a)Broad gauge sleepers.%Nos.357.50
b)Meter gauge and narrow gauge sleepers.%Nos.178.75
2-10Loading or unloading timber logs or timber for shuttering, into or from Railway wagons including stacking lead upto 30 meters.Tonne
Ton40.20
40.84
2-11Loading or unloading bhoosa into or from Railway wagons lead upto 45m.%kg
Cwt.10.70
5.43
2-12Loading or unloading timber scrap or wooden plugs into or from Railway wagons, and stacking lead upto 30 m.Tonne
Ton67.05
68.11
2-13Loading or unloading pitching stone or spawl from Railway wagons (including clearing 1.5 m away from the rail).Cu.m
%Cft.24.15
68.39
2-14Loading or unloading building stone (including clearing 1.5 m away from rails).Cu.m
%Cft.24.15
68.39
2-15Unloading oils.
a)Crude oil (to be pumped from tank wagon into tank).%litre
%gallon40.20
182.51
b)Crude oil (drained by gravity)%litre
%gallon40.20
182.51
c)Crude oil material from Railway wagons.Cu.m.
%Cft.8.05
22.80
d)Fuel oil into empty drums including stacking upto 30 m.Tonne
Ton65.25
66.29
e)Petrol (4.5 litre tin).%No.53.65
f)Kerosene (18 litre tin)%No.178.75
2-16Removing and stacking lead upto 30 m.
a)Stone, spawl, brick bats, shingle, sand lime, surkhi, ashes, kankar and coal etc.Cu.m.
%Cft.25.00
70.80
b)Bricks%Nos.205.55
c)Broad gauge wooden sleepers.%Nos.111.70
d)Meter gauge or narrow gauge wooden sleepers.%Nos.62.55
e)Rails, girders, pipes, cement etc.Tonne
Ton31.30
31.80
f)Baily bridges and wooden structural members.Cu.m.
%Cft.35.75
101.25
2-17Loading into wagons girders, rails, permanent way material (except wooden sleepers) iron work, pipes, etc. including lead upto 30 M and stacking inside wagons.Tonne
Ton89.4
90.82
2-18Unloading from wagons girders, rails, permanent way material (except wooden sleepers) iron work, pipes, etc.Tonne
Ton44.70
45.41
2-19Loading into wagons wooden broad gauge sleepers, including lead upto 30 M and stacking.%Nos.286.00
2-20Unloading wooden broad gauge sleepers from wagons, including 30 M lead and stacking.%Nos.143.00
2-21Loading meter gauge or narrow gauge wooden sleepers including 30 M lead and stacking inside wagons.%Nos.156.40
2-22Unloading meter gauge or narrow gauge wooden sleepers, including 30 M lead but excluding stacking.%Nos.77.75
2-23Loading or unloading bitumen, asphalt or tar drums, into or from Railway wagons lead upto 30 M.Tonne
Ton40.20
40.84
2-24Loading bailey bridge wooden structural members including stacking lead upto 30 M.Cu.m.
%Cft.49.15
139.20
2-25Unloading bailey bridge wooden structural members excluding stacking lead upto 30 M.Cu.m.
%Cft.25.00
70.80
2-26Loading into wagons, steel fabrication/bars including lead upto 30 M and stacking inside wagons.Tonne
Ton98.30
99.86
2-27Unloading from wagons, steel fabrication/bars including lead upto 30 M an stacking.Tonne
Ton53.65
54.50
LOADING,
UN-LOADING
AND
STACKING
THE RATE FOR LOADING INTO AND UNLOADING FROM MOBILE TRUCKS, TROLLIES AND BOATS WILL BE THE SAME AS FOR RAILWAY WAGONS.