Page 1: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

Quality Management Plan

Prepared by: Lindy Lee/John Ballantyne

Date: May 12, 2005

Page 2: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

Quality Plan Right of Way Certification Process

Page ii 5/12/05

TABLE OF CONTENTS

QUALITY MANAGEMENT APPROACH..............................................................................................................1

PROJECT OVERVIEW.............................................................................................................................................1 QUALITY STANDARDS ...............................................................................................................................................1 QUALITY TOOLS........................................................................................................................................................1

COMPLETENESS AND CORRECTNESS CRITERIA .........................................................................................1

QUALITY ASSURANCE MILESTONES................................................................................................................2 QUALITY ASSURANCE PROCEDURES:.........................................................................................................................4 QUALITY ASSURANCE ROLES AND RESPONSIBILITIES: ...............................................................................................4

QUALITY CONTROL ...............................................................................................................................................5

QUALITY CONTROL PROCEDURES .............................................................................................................................6 QUALITY CONTROL ROLES AND RESPONSIBILITIES:..................................................................................................6

ATTACHMENTS

EXHIBIT A "RIGHT OF WAY QUALITY MANAGEMENT PLAN" FLOWCHARTS ............................................................

Page 3: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

1 5/12/05

Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major processes. A project specific Quality Plan is completed during the planning phase to validate that the major deliverables are completed with an acceptable level of quality.

Completeness and Correctness Criteria: The project team and major stakeholders should agree up-front on when each major deliverable is complete and correct. The deliverables are then evaluated against these criteria before they are formally approved. Quality Assurance: Quality assurance activities focus on the processes being used to manage and deliver the solution, and can be performed by a manager, business sponsor or a third-party reviewer.

Quality Control: Quality control activities are performed continually throughout a project to verify that project management and project deliverables are of high quality.

Project Overview All transportation projects will have a Right of Way Certification.

Quality Standards Right of Way Certification will conform to the Title 23 of the Code of Federal Regulations (CFR) Subchapter H and Right of Way Manual Chapter 14.

The Right of Way Certification summarizes all Right of Way processes and procedures necessary to ensure a quality Right of Way delivery.

Quality Tools Various Right of Way tools are utilized in the delivery process. These tools are identified in the attached flowcharts along with their quality control elements.

Completeness and Correctness Criteria Right of Way Certification

Overview: Right of Way Certification is a written statement summarizing the status of each right of way related matter pertaining to a proposed construction project. The Right of Way Certification documents that the construction project is ready for advertising. The document states that real property interests have been or are being secured, physical obstructions have been or will be removed and that right of way acquisition and relocation assistance requirements were conducted in accordance with applicable Federal and State requirements.

Page 4: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

Quality Plan Right of Way Certification Process

Quality Assurance Milestones Right of Way processes assure that all property rights are sufficient, all utility conflicts are avoided or mitigated, all clearance and demolition work are addressed and that control of the right of way is achieved within the cost, scope and schedule of the State’s project.

Quality assurances are inherent in each Right of Way Quality Milestone identified in the Right of Way Quality Management Plan flowcharts attached as exhibit A of this document. Some highlighted quality assurances are identified here. PID

Right of Way will actively participate in working with the Project Development Team to develop a Right of Way schedule that meet the project’s specific requirement.

Right of Way will provide an estimate of the proposed right of way elements as identified at this stage.

Right of Way will communicate anticipated right of way needs with design and environmental divisions to affect the location of the Environmental Study Limits (ESL).

PAED

Right of Way will coordinate with design and utility owners to ensure accurate and timely verification of all utilities.

When the environmental draft is circulated, conflict plans will be finalized and utility relocation plans will be initiated in order to help ensure utility needs are not overlooked.

RW, Environmental, Geotech, and Design will confer when temporary access rights are needed (such as Permit to Enter for Environmental Studies or Temporary Construction Easements for drilling): ensures mapping reflects what the needs are.

RW will confer with design and environmental to complete Relocation Impact Studies in accordance with standard policies and procedures.

DESIGN

Design provides RW with utility conflict maps. Design also provides design specifications to Right of Way Engineering indicating the type and area of right of way required for a transportation project. RW, RWE, and Design will confer—Milestone 224.

Right of Way Engineering translates design specifications to right of way maps that are then reviewed by the Project Engineering for completeness. They then prepare all maps, documents, and descriptions needed to acquire right of way and dispose of excess land. RW, RWE, and Design will confer prior to maps being submitted to RW and before initiation of Milestone 225.

Assurances are provided through a Certificate of Sufficiency (COS) that all identified right of way on the referenced mapping is required for construction of the project. The COS also affirms that parcels have been reviewed for Hazardous Waste contamination. Any findings from this review are noted along with a remediation plan if necessary. Exemptions from Headquarters Environmental are necessary when purchasing property rights on contaminated property. Proposed QM--COS should be completed between initial submittal of final maps and final submittal.

Right of Way maps are assigned for appraisal when each parcel has a Certificate of Sufficiency. Appraisal reports are generated to establish fair market value prior to acquiring right of way, leasing air space, and disposing of excess land. Both the Federal and State uniform Relocation Assistance and Real Property Acquisition Policies Acts contain basic requirements for the appraisal of real property for public project purposes.

Appraisals are assigned for acquisition. The acquisition agent and the appraiser review all appraisals, before a first written offer is made. The acquisition agent conducts all acquisition activities necessary to acquire the property rights needed to construct the transportation facility, including the condemnation process if necessary.

Page 2 5/12/05

Page 5: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

Quality Plan Right of Way Certification Process

Page 3 5/12/05

Quality Assurance Milestones – Continued

Railroad requirements and clearances are met.

Relocation of all people, personal property, and businesses is accomplished through full implementation of the Uniform Relocation Assistance and Real Property Acquisition Policies Act.

Utility Relocation conducts all activities necessary to adjust or relocate utility facilities that are in conflict with planned construction of the transportation facility

Property Management ensures all property is cleared for construction and manages the leasing of space for Resident Engineer offices as needed on construction projects.

PS&E

Prior to RW Cert (Milestone 410), RW will compare final PS&E package with what is being certed to ensure nothing has been overlooked.

Page 6: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

Quality Plan Right of Way Certification Process

Page 4 5/12/05

Quality Assurance Procedures The Right of Way Certification has the following quality assurance activities in the project workplan:

A Certificate of Sufficiency (COS) is signed by the Project Engineer as a check that all requirements for land acquisitions are acceptable for acquisitions and that all land has been reviewed for hazardous waste.

Right of Way maps are assigned for appraisal when each parcel has a Certificate of Sufficiency.

Fair Market Value is established.

Appraisal Summary Statement relating to real property is completed.

Property rights are obtained.

Railroad Clearance is signed.

Utility Clearance is achieved. Notices to Utility owners are processed.

Relocation Assistance Program information and guidance is provided to impacted property owners and tenants.

Demolition contracts are processed.

Completion and signing of the Right of Way Certification is processed.

Quality Assurance Roles and Responsibilities:

Role Quality Assurance Responsibilities

Principal Right of Way Agent Reviews and signs appraisals; signs condemnation documents; completes and signs right of way certification based on delegation.

Supervisor Right of Way Agent Reviews and signs appraisals, signs right of way contracts and condemnation documents; completes and signs right of way certification based on delegation.

Right of Way Senior Reviews and signs appraisals, signs right of way contracts and condemnation documents; completes and signs right of way certification based on delegation.

Right of Way Agent Reviews and signs appraisals; signs right of way contact and condemnation documents.

Page 7: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

Quality Plan Right of Way Certification Process

Page 5 5/12/05

Quality Control The following highlights are among those Quality Control Elements identified for each Quality Milestones addressed in the Right of Way Quality Management Plan flowcharts in exhibit A.

Review by Project Engineer that all requirements for land acquisitions are acceptable.

Review by Environmental as to hazardous waste identification and remediation plans.

Review of Right of Way maps by Senior Right of Way Agent; maps assigned for appraisal when a Certificate of Sufficiency has been executed for each parcel.

Review of appraisal to verify content and calculations are accurate.

Senior Appraiser reviews the appraisal and comparable sales to ensure comparability and correctness; Senior Appraiser signs the Senior Field Review Certificate.

Reviewer, Appraisal Agent and Senior Appraiser sign appraisal Title page.

Certificate of Appraiser is signed.

Fair Market Value is established.

Appraisal Summary Statement relating to real property is completed.

Execution of Right of Way Contract or Acquisition document containing possession date.

Property Deeds are signed and recorded.

Relocation assistance is provided in accordance to State and Federal requirements.

Resolution documents are processed in condemnation cases. Deposits are made to the court and orders of possession are obtained, filed, and served.

Resident Engineer inspects Railroad work and Railroad clearance is signed.

Review of Liability performed by senior utility agent. Utility clearance is achieved and Notices to Utility Owners are processed.

Relocation claims are processed.

Demolition of improvements occurs resulting in cleared parcel ready for construction.

Right of Way Certification completed and signed.

Page 8: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

Quality Plan Right of Way Certification Process

Page 6 5/12/05

Quality Control Procedures Right of Way Certification has the following quality control activities in the project workplan:

Headquarters functional seniors will review files each year for compliance with the Right of Way Manual, Federal and State Laws. Right of Way will conform to Title 23 of the Code of Federal Regulations (CFR) Subchapter H and 49 Code of Federal Regulations part 24 and the Uniform Relocation Assistance and Real Properties Acquisition Policies Act of 1970 (as amended).

Federal Highway Administration will review all files for compliance of all Federal Regulations in relation to federal funded projects.

Headquarters conducts Quality Joint Enhancement Reviews quarterly for compliance with the Right of Way Manual.

Quality Control Roles and Responsibilities: Role Quality Assurance Responsibilities

Supervisor Right of Way Agent Review of undelegated products.

Right of Way Senior Review of all products.

Right of Way Agent Review and completion of all products.

Page 9: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

RIGHT OF WA LITY MANAGEMENT PLAN -P C VELOPMENT – PID PHASE-

QUALITY CONTROL TOOLS

PROJECT INIA DO T (PID) PHASE

DRAFTPS & EPHASE

RTL PHASE

PA&ED PHASE

• Review conceptual project and schedule

• Attend im

• ERWMP

Last revised: 11/08/05

RIGHT OF WAY QUALITY MILESTONES

PDT Commencement

WBS 100.05

QUALITY CONTROL ELEMENTS

CONST PHASE

Begin Right of Way Data Sheet

WBS 150.15.05

Complete Right of Way Data Sheet

WBS 150.15.05

PID

• Review Right of Way Data Sheet request and mapping.

• Review resources required in order to meet other functional needs such as environmental (PEAR) and drilling Permits to Enter, etc…

• Establish RW Duration • Establish Right of Way resources

ight of Way schedule y Data Sheet complete ht of Way Risk Plan pleted Data Sheet with Design findings with design and tal for setting ESL

• Staff • RW Data She• Project Repor

Checklist

• Right of Way Manual • RW Agent’s Desktop Reference • Senior Right of Way Agent Review • Parcel information checklist

checklist plate Template

agement Implementation Guide

• Maps are to be in compliance with RW manual section

• Right of Way QC/QA plan.

• Routes PSR tofunctional sen r review

• Makes sure Radequate resohours for all ta

heet and documents the assumptions and e. delivery seniors, creates a project specific isk Management Plan including change res. eniors, refines required resource hours and ates. th design and environmental to review RW ings and recommendations.

• TRca

• TpQ

• TR

TASK MANAGEMENT

ADV PHASE

PID

RW Review ofPrior to circul

WBS 150.25

RT

L

Cer

tific

atio

n

Aw

a

rdC

ontr

act

Pct

ro

jeA

ccep

tanc

e

Fct

iona

l Uni

t un

Del

iver

y

omplete Functional Unit Task

Ready to Circ

PA&

ED

PCon

Conc

DESIGN MILESTONES

• Verify projinformatio

• Verify RighWay Data

• Verify RWassumption conditions

• Verify RighWay sched

• Verify RighWay resou

et t

RW iors fo

W has urce sks.

PID ation

ulate

ect n t of

s and

t of ule t of

rces

Begin Functional Unit Tasks

CDT ceptual urrence

UAT DECUMEN

Y QROJE

TION

nitial PDT eeting stablish ight of ay Quality anagement

lan

• Establish R• Right of Wa• Develop Rig• Review com• Coordinate

environmen

• Reviews Data Sconditions mad

• In concert withRight of Way Rcontrol procedu

• With delivery slead-time estim

• Coordinates wiData Sheet find

• Reviews the maps and request form

• Coordinates with design to obtain information

• Communicates acceptance

ask manager or W project oordinator ttends PDT. M creates a roject specific C/QA plan. M creates a isk Plan.

• Resource hours• Workplan Tem• RW Datasheet • WBS Guide. • RW Task Man

04.01.08.00 • Regional

Directive, RW cost estimate mapping, 02/01/01

Page 10: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

RIGHT OF WAY QUALITY MANAGEMENT PLAN -PRO OPMENT - PA & ED PHASE-

PreliminApprais

MapWBS 100

RW Review of Draft Project

Report WBS 160.15.25

Begin Updated

Data Sheet WBS 160.10.40

PA&ED Begin Draft Relocation

Impact StudyWBS 165.10.55

Begin Utility potholing

WBS 200.10

Begin Utility Verification

WBS 200.05

Begin Permits to

Enter WBS 165.10.10

RIGHT OF WAY QUALITY MILESTONES

PDT Commencement

WBS 100.10

PID PHASE

DRAFT PS & E PHASE

RTL PHASE

PROJECT APPROVAL L DOCUMENT (PA&ED) CONST PHASE

ADV PHASE

PA&

ED

PID

Fct

iona

l uni

t un

Del

iver

y

RT

L

Cer

tific

atio

n

Pct

ro

jeA

ccep

tanc

e

Aw

ad

r

Con

trac

t

Ready to Circulate

Complete Functional Unit

Tasks

Begin Functional Unit Tasks

PDT Concurrence

DESIGN MILESTONES

• Review PID • Review Data

Sheet • Review

resource hours

• Review Rightof Way Project Risk Plan

• Reviewmaps

• RequeCertifiof Suffici

• ExcessLand Review

• Utilityeasemereview

• Verify project information

• Verify Right of Way Data

• Review Env. Document for Hazardous waste identificationand remediation plans.

• Compamaps arequestData S

• Reviewresourchours fWBS 2

• Updatepercencomple

TASK MANAGEMENT PROCEEDURES

• Review required resource hours for all tasks

• Review necessary PYs

• Route PR to

RW functionalseniors

• Document variances from baseline assumptions

• Review request to initial assumptions

• Update assumptions

• Update Risk Plan

• Review request with initial data sheet assumptions

• Review available resource hours for WBS 165

• Review number of pothole to initial estimate

• Reviews resource hours for WBS 200

• Updates percent complete

• Review number of owners to initial estimate

• Reviews resource hours

• Updates percent complete

• Identity and document changes

• Review request with initial data sheet assumptions

• Review resource hours for WBS 165

• Review request • Review maps • Review utility

of the request sufficient to allow the project to stay on schedule?

• Review request • Review maps • Validate need

funding lity

tility

tion

timeliness of request in comparison to project schedule and constraints.

• Review request

• Review map

• Compare estimated utility easement area with Environmental Study Limits

• Review request

• Review maps

QUALITY CONTROL ELEMENTS

• Review Request

• Review

be done; duration of work; time of work; number of people

• RW Manual • RW Risk Plan • RW Quality

Management Plan

• RW M• RW ex

land m16.01.0

• RW utcoordinmanuachapter

• Appraimap recheckli

• RW Staff • RW Data

Sheet • Project Report

Checklist

• RW Manual• RW Agent’s

desktop Reference

• RW Website RAP

• Appendix A; Relocation Impact Doc.

• RW Manual• RW Agent’s

desktop Reference

• Parcel information checklist

• Resource hours checklist

• RW Manual Chapter 13 section 13.03.03

• NR Policy • PosLoc Contract • Policy on High

and Low Risk Utilities

Verify maps comply with RW Manual section 13.03.02

• NR Policy guide

• RW Manual • RW

Acquisition Desktop Reference

• Right of entry guideline for env. Work 05/22/02

QUALITY CONTROL TOOLS

Last revised: 11/08/05

ary al

.10

st a cate

ency

nt

re nd to heet e or 25 t te

anualcess anual 5.0

ility ation

l 13 sal view st

DEVELRONMENTA

PHASE

JECT/ENVI

owner information

• Review timeliness of submittal. Is the timeliness

• Validateavailabi

• Review uowner informa

• Review

location information

• Review specifics for entry, such as: work to

Page 11: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

• RW Manual Chapter 14

• Staff • Advertising

policy 5/8/02• Cooperative

Agreement Fact Sheet 10/9/02

• RW Manual Chapter 13

• NR RW Policy

• Policy on High and Low Risk Utilities

• RW Manual Chapter 12

• NR RW Policy

• RW Manual Chapter 9

• NR RW Poli

• RW Manual Chapter 10

• The “Uniform Act”

• NR RW Policy

• RW Manual Chapter 8

• NR RW Policy

• RW Manual Chapter 7

• NR Policy • RW Mapping

Standards 08/21/01

• RW Manual Ch. 8

• NR RW Policy

• Appraise/acquire guideline 11/28/01

• RR Agrmts flowchart

• High & Low Risk Manual

• RW Manual • Permit Manual • NR RW Policy

• RW Manual • RW Risk Plan • RW Quality

Plan

Begin Right of Way Certification Process WBS 225.50

Begin Right of way Utility Relocation Coordination WBS 225.25

Begin Right of Way Clearance and Demolition WBS 225.55.20

Begin Right of Way Condem-nation WBS 225.55.25

Begin Right of Way Relocation Assistance WBS 225.55.15

Begin Right of Way Acquisitions WBS 225.55.10

Begin Right of Way Appraisals WBS 225.55.05

Begin Railroad Con-currence WBS 205.15.

Begin Utility Conflict and

Utility Easement

Identification WBS 200.10.25

PDT Commencement in Design Phase

WBS 100.15

RIGHT OF WAY QUALITY MILESTONES

PID PHASE

DRAFT PS & E PHASE

RTL PHASE

A&ED PHASE

CONST PHASE

RT

L

Cer

tific

atio

n

PA&

ED

PID

Pct

ro

jeA

ccep

tanc

e

Aw

ad

r

Con

trac

t

Fct

iona

l Uni

t un

Del

iver

y

PDT Concurrence

Functional Unit Delivery

Begin Functional Unit Tasks

Intermediate Checkpoints

DESIGN MILESTONES

ADV PHASE

• Review request for Cert.

• Route for functional review

• Verify easements

• Verify environ-mental permits

• Verify funding

• Review Appraisal

• Review Acquisition Agreement

• Review Inventory Disposal Report

• Review maps

• Review appraisal

• Review acquisition document

• Review Occupancy Certification

• Review appraisal

• Review Acquisition Agreement

• Review appraisal Report & Cert. Of Appraiser

• Review maps

• Meet with Design

• Review maps for all needed RW

• Meet with Design

• Review for content & calcs.

• Review maps

• Review Project Report

• Review Maps

• Review project schedule

• Review constraints to relocation

• Review PR • Review RW

Data Sheet • Review

resource hours

• Review RW Project Risk Plan

• Update percent complete

• Update percent complete

• Review resources hours for WBS 200

• Compare number of clearance and demolitions to initial estimate

• Compare number of condem-nations to initial estimate

• Compare displacees to initial estimate

• Monitor resource hours

• Update percent complete

• Monitor resource hours for WBS 225 and track percent complete

• Compare parcels to initial estimates

• Review available resource hours for WBS 225

• Review available resource hours for WBS 205

• Compare relocations to initial estimate

• Update percent complete

• Review RW Data Sheet

• Review resource hours for all tasks

• Review Risk Plan

• Review changes

TASK MANAGEMENT

QUALITY CONTROL ELEMENTS

QUALITY CONTROL TOOLS

RIGHT OF ALITY MANAGEMENT PLAN -P EC LOPMENT – DRAFT PS & E PHASE-

Last revised: 11/08/05

cy

Y QUT DEVE

WAROJ

P

Page 12: Quality Management Plan - · PDF file1 5/12/05 Quality Management Approach The approach for managing quality includes the Quality Plan (this document) and the following three major

DRAFT PS & E PHASE

READY TO LIST PHASE

PA&ED PHASE

CONST PHASE

ADV PHASE

RT

L C

ertif

icat

ion

Aw

ad

r

Con

trac

t

Pct

ro

jeA

ccep

tanc

e

Func

tiona

l Uni

t Del

iver

y

PA&

ED

PID

PID PHASE

RTL Certification

Draft PS&E Circulation

Initiate NROE

DESIGN MILESTONES

RIGHT OF A UALITY MANAGEMENT PLAN -PR T DEVELOPMENT - RTL PHASE-

C e Utility R on

200.25

Continue Clearance and

Demolitions WBS 245.55

Continue condemnation

actions WBS 245.55

Begin Utility Billing process

WBS 200.20.05

Review PS&E

WBS 100.25

RIGHT OF WAY QUALITY MILESTONES

Review RE File

WBS 100.25 WBS 200.20.05

• Coordinate with RW Utility Agent

• Coordinate with RW P&M

• dinate RW y Agent

• Coordinate with RW Real Property Services

• Coordinate with legal and RW management

• Check CCW work included

• Check for accurate depiction of proposed RW

• Check for accuracy of utilities work

• Review parcel fact sheets with resident engineer

• Review utility work and critical areas

QUALITY CONTROL ELEMENTS

• RW Manual Chapter 13.10.00

• Manual pter 13

• Desktop erence

• RW Manual 12• Policy on

Hazmat • Policy on Storm

Water requirements

• RW Manual chapter 9

• Caltrans North Region Constructability Review Checklist 9/13/00

• Resident Engineer File Checklist “Right of Way

• Check resources

• Verify invoices approved by Senior

• k rces and w ule for 200

• Review schedule and coordinate withRW utiliti

es

• Review resource hours

• Review percent complete

• Monitor schedule

• Review maps for accuracy

• Document lessons learned

on ts

hours

TASK MANAGEMENT

QUALITY CONTROL TOOLS

Last revised: 11/08/05

ontinuelocati

WBS

Coorwith Utilit

RWCha

RWRef

ChecresourevieschedWBS

Y QOJEC

W

• Review acquisitifact shee

• Review resource