Quality Management Gökrem Tekir 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EclipseCrossword.com Across 1. is a structured tool, usually component-specifi c, used to verify that a set of required steps has been performed. 4. One of internal falure cost 5. The goal value in the middle of the control chart 8. ________ is a prevention cost. 9. the measured value is very close to the true value 12. This diagram shows the relationship between two variables 13. A graphical representation of a process showing the relationships among process steps. 14. the total cost of all efforts related to quality throughout the product lif cycle 15. The technique which is comparing actual or planned project practices to those of comparable projects to identify best practices, generate ideas for improvement, and provide a basis for measuring performance. Down 2. It is a vertical bar chart showing how often a particular variable state occurred 3. the degree to which a set of inherent characteristics fulfi ll requirements 6. the values of repeated measurements are clustered and have little scatter. 7. Inspection 10. is a category assigned to products or services having the same functional use but different technical characteristics 11. Cause and effect diagram

Upload: goekrem-tekir-pmp

Post on 08-Jul-2015

129 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quality management

Quality ManagementGökrem Tekir

1 2

3

4

5

6

7 8

9

10

11 12

13

14

15

EclipseCrossword.com

Across1. is a structured tool, usually component-specifi c,

used to verify that a set of required steps hasbeen performed.

4. One of internal falure cost

5. The goal value in the middle of the control chart

8. ________ is a prevention cost.

9. the measured value is very close to the truevalue

12. This diagram shows the relationship betweentwo variables

13. A graphical representation of a process showingthe relationships among process steps.

14. the total cost of all efforts related to qualitythroughout the product lif cycle

15. The technique which is comparing actual orplanned project practices to those ofcomparable projects to identify best practices,generate ideas for improvement, and provide abasis for measuring performance.

Down2. It is a vertical bar chart showing how often a

particular variable state occurred

3. the degree to which a set of inherentcharacteristics fulfi ll requirements

6. the values of repeated measurements areclustered and have little scatter.

7. Inspection

10. is a category assigned to products or serviceshaving the same functional use but differenttechnical characteristics

11. Cause and effect diagram