quality center questions collection[1]

21
QUALITY CENTER QUESTIONS Q. 1: You can export the data in a grid as a ______ A. Text file, Microsoft Excel, Microsoft Word, or HTML document. B. Text file, Microsoft Excel, Microsoft Word C. Text file, Microsoft Excel, or HTML document. D: Microsoft Excel, Microsoft Word, or HTML document. Q. 2: When a requirement, test, or defect changes, Quality Center alerts the associated entities and can notify those responsible for any associated entities. A. True B. False Q. 3: A ______ indicates that the alert is new. A gray flag indicates that the alert has already been read. A. Green flag B. Pink flag C. Red flag D: Blue flag Q. 4: Quality Center enables you to add your own alerts, in addition to automatic traceability notifications. You can use ______ flags to remind yourself to follow up on something. A. Alert Me B. Follow up C. Follow Me D: Follow Q. 5: Throughout the testing process, you can add attachments to help illustrate your work. A. True B. False Q. 6: You can use a Uniform Resource Locator (URL) to a Quality Center record as an attachment. A. True B. False Q. 7: A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert. A. True B. False Q. 8: A _________ is a view of a Quality Center window with the settings you apply to it. A. Personal view B. My view C. Favorite view D: Fav view

Upload: swathi18777

Post on 29-Nov-2014

83 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quality Center Questions Collection[1]

QUALITY CENTER QUESTIONS

Q. 1: You can export the data in a grid as a ______

A. Text file, Microsoft Excel, Microsoft Word, or HTML document.B. Text file, Microsoft Excel, Microsoft WordC. Text file, Microsoft Excel, or HTML document.D: Microsoft Excel, Microsoft Word, or HTML document.

Q. 2: When a requirement, test, or defect changes, Quality Center alerts the associated entities and can notify those responsible for any associated entities.

A. True B. False

Q. 3: A ______ indicates that the alert is new. A gray flag indicates that the alert has already been read.

A. Green flag B. Pink flagC. Red flag D: Blue flag

Q. 4: Quality Center enables you to add your own alerts, in addition to automatic traceability notifications. You can use ______ flags to remind yourself to follow up on something.

A. Alert Me B. Follow upC. Follow Me D: Follow

Q. 5: Throughout the testing process, you can add attachments to help illustrate your work.

A. True B. False

Q. 6: You can use a Uniform Resource Locator (URL) to a Quality Center record as an attachment.

A. True B. False

Q. 7: A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.

A. True B. False

Q. 8: A _________ is a view of a Quality Center window with the settings you apply to it.

A. Personal view B. My viewC. Favorite view D: Fav view

Q. 9: By default, Quality Center displays the four most recently used views on the Favorites menu. You can define the number of views displayed on the menu by setting the ______ parameter in the Site Configuration tab in Site Administration.

A. FAVORITES_DEPTH B. FAVORITES-DEPTHC. FAVORITE_DEPTH D: FAVORITE_DEPTHS

Q. 10: You save favorite views in either a ______ folder or a _______ folder. Views in a________ folder are accessible to all users. Views in a ________ folder are accessible only to the user who created them.

Page 2: Quality Center Questions Collection[1]

A. Public, private, public, private B. Root, Base, Root, Base,C. Locked, unlocked, locked, unlocked D: Both B & C

Q. 11: You access Quality Center over the _______ via a Web browser.

A. Internet B. a corporate intranetC. Mobile Internet D: Both A & B

Q. 12:Quality Center also features a sophisticated system for tracking application defects, enabling you to monitor defects closely from initial detection until resolution.

A. True B. False

Q. 13: Test management with Quality Center involves five phases:

A. Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Run Tests.B. Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects.C. Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Analyze Tests.D: Specify Releases, Specify Requirements, Plan Tests, Analyze Tests, Track Defects.

Q. 14: Each Quality Center project is supported by a _______ that stores project information.

A. Root folder B. DatabaseC. Flat File D: Both B & C

Q. 15: Quality Center enables you to manage user access to a project. The_______ determines the privileges that the user has within a project.

A. QC group B. User_Account groupC. Account group D: user group

Q. 16: You can import data from _______ to a Quality Center project.

A. Word or Notepad B. Word or WordpadC. Word or Excel D: Word or Power Point

Q. 17: You launch Quality Center on your machine from your Web browser.

A. True B. False

Q. 18: Quality Center prompts you to install _______ if it is not already installed on your machine.

A. Microsoft Java 2.0 B. Microsoft Visio 13.0C. Microsoft Visual studio 2.0 D: Microsoft .NET Framework 2.0

Q. 19: Quality Center has the following modules, which are accessible from the sidebar:

A. Releases, Requirements, Test Plan, Test Lab, Defects, AnalysisB. Releases, Requirements, Test Plan, Test Lab, Defects, Business ComponentsC. Releases, Requirements, Test Plan, Test Lab, Defects, AnalysisD: Releases, Requirements, Test Plan, Test Lab, Defects

Q. 20: When you customize your project, you can instruct Quality Center to preserve a log of values for the system and user fields in your Requirement, Test, Test Set, Test

Page 3: Quality Center Questions Collection[1]

Instance, and Defect entities.

A. True B. False

Q. 21: The ________ can send messages to users connected to Quality Center projects informing them about important maintenance or other issues.

A. Site administer B. Site ControllerC. Site Analyser D: Site administrator

Q. 22: Quality Center organizes and displays data in ________

A. Grids B. TreesC. Folders D: Both A & B

Q. 23: You can no longer customize data by specifying the order in which columns appear, and by changing column size.

A. True B. False

Q. 24: You can filter Quality Center data to display only those records that meet the criteria that you define.

A. True B. False

Q. 25: When defining a filter, you can also include a cross filter. This is an advanced ________ on an associated item such as requirements, tests, test sets, or defects.

A. Secondary filter B. Primary filterC. Cross filter D: Second filter

Q. 26: By default, records appear in Quality Center according to the ________

A. Increasing order B. Decreasing orderC. Order in which they were added. D: Order in which they were deleted.

Q. 27: You cannot copy and paste the filter, sort, and group by settings to and from the Clipboard.

A. True B. False

Q. 28: You can use text search to search for records in predefined fields of the ________

A. Requirements, Test Plan, and Defects modules.B. Releases, Test Plan, and Defects modules.C. Requirements and Defects modules.D: Requirements, Execute Tests, and Defects modules.

Q. 29: If you have defined filter conditions for a module, you can restrict the search to the filtered records, or you can search all records in the module

A. True B. False

Q. 30: Text search is only available if it has been enabled for the project.

A. True B. False

Page 4: Quality Center Questions Collection[1]

Q. 31: QA Manager changes a requirement from a ___________ status to a Reviewed status once it is approved.

A. Released B. TestedC. Not reviewed D. None of the above

Q. 32: You can also import requirements to your Quality Center project from Microsoft Word, Excel, or other third-party requirement management tools. To import requirements, you must first install the appropriate _____________

A. HP Third Party add-in. B. HP Quality Center add-in.C. HP Quality Center D. HP Quality Center License

Q. 33: The Requirements Grid view enables you to display requirements in a _________ view.

A. Flat B. HierarchicalC. Flat-hierarchical D. Flat non-hierarchical

Q. 34: The _________ view enables you to analyze the breakdown of child requirements according to test coverage status.

A. Coverage Analysis B. Coverage RequirementsC. Coverage D. Coverage Tests

Q. 35: You can access the Requirements menu bar from the Requirements module by pressing the shortcut key ___________.

A. F1 B. F9C. Ctrl + R D. Alt + R

Q. 36: You can use the ____________to restrict and dynamically change the fields and values in the Requirements module.

A. Script Edit B. Scriptor EditorC. Script Editor D. Script Editing

Q. 37: The Requirements module enables you to define and manage your _________

A. Requirements B. All requirementsC. Some requirements D. Tedious requirements

38: You can rename or delete Requirements root folder.

A. True B. False

Q. 39: You can search for a particular requirement in the requirements tree or in the requirements grid using the _________ command.

A. Search B. FindC. Search All D. Find All

Q. 40: You can replace field values in the requirements tree or in the requirements grid using the ___________command.

A. Replace B. Replace All C. Find & Replace D. Replace & Find

Page 5: Quality Center Questions Collection[1]

Q. 41: To set a Quick Test Professional test as a template test, right-click the test in the test plan tree, and choose _________

A. Template Test B. Template TreeC. Template Plan D. Template

Q. 42: You can change the label of any of the test detail fields.

A. True B. False

Q. 43: A question mark icon in the test plan tree indicates that the QuickTest Professional add-in is _________ on your machine.

A. Not activated B. Not installedC. Not enabled D. Not set

Q. 44: A ________ link is included in the e-mail, enabling the recipient to go directly to the test.

A. Link To Test B. Move To TestC. Go To Test D. Test

Q. 45: In the Test Plan module, you create ________ by selecting requirements to link to a test.

A. RTM B. Requirements coverageC. Test coverage D. SRS

Q. 46: Alternatively, in the Requirements module, you create _______ by selecting tests to link to a requirement.

A. RTM B. Requirements coverageC. Test coverage D. SRS

Q. 47: A test can cover more than one requirement, and a requirement can be covered by only one test.

A. True B. False

Q. 48: You can also create coverage between test instances and requirements. You can enable this feature using the __________ parameter in Site Administration

A. ALLOW_REQ_COVERAGE_BY_TEST_INSTANCEB. ALLOW_TEST_COVERAGE_BY_REQ_INSTANCEC. ALLOW_R_COVERAGE_BY_T_INSTANCED. None of above

Q. 49: Requirements coverage is created automatically when you convert a requirement to a test. Therefore, even if you have not yet added requirements coverage, it may already exist.

A. True B. False

Q. 50: You can also define requirements coverage by dragging a requirement in the requirements tree to the coverage grid. The requirement is added to the coverage grid without its child requirements.

A. True B. FalseQ. 51: Each requirement type with risk-based quality management enabled supports either.

Page 6: Quality Center Questions Collection[1]

A. Risk analysis or risk assessment B. Risk breakdown or risk assessmentC. Risk breakdown or risk review D. Risk analysis or risk evaluation

Q. 52: Performing a risk-based quality management analysis for an analysis requirement involves the following steps

A. Determine Risk groups, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing StrategyB. Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing StrategyC. Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing StrategyD. Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy

Q. 53: A __________ requirement is a requirement belonging to a type that represents higher levels in the requirements tree hierarchy, such as the Folder type.

A. Analysis B. AssessmentC. Policy D. Test

Q. 54: A _________ requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.

A. Analysis B. AssessmentC. Policy D. Test

Q. 55: For each assessment requirement under the analysis requirement, you determine the Risk Category. The Risk Category is composed of two factors.

A. Business Probability and Failure CriticalityB. Business Vitality and Failure ProbabilityC. Business Criticality and Failure ProbabilityD. Business Criticality and Failure Possibility

Q. 56: The Business Criticality of a requirement has three possible values:

A. Critical, Important, Nice to Have B. Critical, Importance, Nice to HaveC. Critical, Important, Nice to Had D. None of these

Q. 57: The Failure Probability of a requirement has three possible values:

A. High, Standard, Low B. High, Average, LowC. High, Medium, Low D. None of these

Q. 58: Quality Center defines four Testing Levels.

A. Full, Partial, Basic, and Low B. Full, Partial, Basic, and NoneC. Full, Half, Basic, and None D. Full, Partial, Critical, and None

Q. 59: The Business Criticality of a requirement is a measure of how likely a test on the requirement is to fail, based on the technical complexity of the requirements implementation, without consideration of the requirements impact on the business.

A. True B. False

Page 7: Quality Center Questions Collection[1]

Q. 60: The Failure Probability of a requirement is a measure of how important the requirement is to your business

A. True B. FalseQ. 61: You can add a new defect to a Quality Center project from any module at any stage of the testing process.

A. True B. False

Q. 62: There are two methods you can use to conduct a search for similar/related defects:

A. Find parallel Defects & Find parallel Text. B. Find related Defects & Find related Text.C. Find Similar Defects & Find Similar Text. D. Find all Defects & Find all Text.

Q. 63: You can update defects directly in the _____ or in the ______ dialog box.

A. Defects Grid B. Defects DetailC. Defects Module D. Both A & BE: Both B & C

Q. 64: You can only see changes made to a defect for selected fields predefined by the project administrator in Project Customization.

A. True B. False

Q. 65: By default, Quality Center sends e-mail in HTML format. To send e-mail as plain text instead, edit the parameter in the Site Configuration tab in Site Administration

A. M_FORMAT B. MAIL_FORMAT_ID C. MAIL_FORM D. MAIL_FORMAT

Q. 66: You can link a defect to the run steps and other defects.

A. True B. False

Q. 67: You can only remove direct links from the Linked Defects grid. Indirect links are removed automatically when the direct links are removed.

A. True B. False

Q. 68: Quality Center reports can be generated from the

A. Requirements,Test Plan,Test Lab,Defects modules.B. Requirements,Test Plan,Defects modules.C. Requirements & Test Plan modules.D. Requirements,Test Plan,Test Lab modules.

Q. 69: You can export grid data as a text file, Microsoft Excel spreadsheet, Microsoft Word document, or HTML document. You export data from the

A. Requirements Grid & Defects Grid.B. Requirements Grid,Execution Grid, or Defects Grid.C. Requirements Grid, Test Grid, Execution Grid, or Defects Grid.D. Requirements Grid, Test Grid, Execution Grid.

Q. 70: How many Reports (Not Sub-Reports: are available in Requirements module.

Page 8: Quality Center Questions Collection[1]

A. 5 B. 6C. 7 D. 4

Q. 71: Using Quality Center Test Lab module, executing tests also consists of __________

A. Run Tests Automatically B. Run Tests ManuallyC. Both A and B D. None of above

Q. 72: You can access the Test Lab menu bar from the Test Lab module by pressing the shortcut key ______

A. F6 B. F7C. F8 D. F9

Q. 73: The Test Lab module includes the following toolbars:

A. Test Set and Select Tests B. Test Select and Set TestsC. Set Test and Tests Select D. None of above

Q. 74: In the Test Lab Module, in Execution Grid Columns, the column Exec Date means

A. The date on which the test was first executed.B. The date on which the test was last executedC. The date on which the test was executedD. The date on which the test will be executed in future

Q. 75: You can add user-defined fields and change the label of any of the fields in the Execution Grid.

A. True B. False

Q. 76: You can organize test execution by creating _______

A. Test modules B. Test flowsC. Test beds D. Test sets

Q. 77: While creating test sets, after you design tests in the Test Plan module, you create a _______

A. Test sets tree B. Test sets flowC. Test sets grid D. Test sets rows

Q. 78: By default, the uppermost level in a test sets tree is the ________

A. Level 0 folder B. Top folderC. Highest level folder D. Root folder

Q. 79: You can also use the _________ in the Test Instance Properties dialog box (Changing the Default Failure Rules for Specific Tests) to set the on failure rules for a test in a test set.

A. Run Events view B. Run Events Grid C. Run Events menu D. Run Eventsmodule

Q. 80: You can also drag the test sets between lists.

A. True B. False

Page 9: Quality Center Questions Collection[1]

Q. 81: You can define a logo for the project document, and save the image so that it is available for other users in the current project. If you do not select an image, the Document Generator uses the Mercury logo in the project document.

A. True B. False

Q. 82: While specifying Requirements module data (Generating Project Documents) Microsoft Word is limited to _________ header levels in the table of contents.

A. Seven B. EightC. Nine D. Ten

Q. 83: You use the _________ pages to specify the information from the test plan tree view of the Test Plan module that should appear in the project document.

A. Subject Tree B. Subject TestsC. Subject plans D. Both A & B

Q. 84: You use the _________ pages to specify the information from the Test Lab module that should appear in the project document.

A. Tests Lab, Test Set, Tests, and RunB. Test Labs, Test Sets, Tests, and RunsC. Test Lab, Test Gets, Tests, and RunsD. Test Lab, Test Sets, Tests, and Runs

Q. 85: You can generate a _________ that enables you to quickly see how the document will look, without all the detail included.

A. View project document B. Preview project documentC. Pre project document D. None

Q. 86: You can generate Excel reports that enable you to export Quality Center data to Microsoft Excel and analyze the data from within Excel.

A. True B. False

Q. 87: You can export Quality Center data to Microsoft Excel. You cannot create a report with parameters.

A. True B. False

Q. 88: Most of the Excel Reports functionality is unavailable if you belong to a user group that has the necessary permissions.

A. True B. False

Q. 89: After you have added a report to the Excel Reports tree, you must define which project data you want to include in the report. You define this data by creating _______ to extract the data.

A. Test Queries B. Lotus QueriesC. Excel Macros D. SQL queries

Q. 90: To view the database type used for your project database, click the ________ button.

Page 10: Quality Center Questions Collection[1]

A. Database in use B. Database TypeC. Get Database D. Database version

Q. 91: The Requirements ________ view enables you to display requirements in a flatnon-hierarchical view. Each line in the ________ displays a separate requirement.

A. File, file B. Hierarchical, hierarchyC. Grid, Grid D. Both B & C

Q. 92: The _________ Analysis view enables you to analyze the breakdown of child requirements according to test __________ Status.

A. Plan B. RequirementC. Coverage D. Task

Q. 93: You can access the Requirements menu bar from the Requirements module by pressing the shortcut key ________

A. F6 B. F7C. F8 D. F9

Q. 94: The Requirement module field Direct Cover Status means

A. The current status of the requirement B. The previous status of the requirementC. The coming status of the requirement D. The fixed status of the requirement

Q. 95: You can add user-defined fields and change the label of any of the fields in the Requirements module.

A. True B. False

Q. 96: You start a requirements tree by adding requirements to the Requirements root folder.

A. True B. False

Q. 97: You can add, view, and edit Microsoft Word rich text from within Quality Center, without the need to edit the text in Word.

A. True B. False

Q. 98: You cannot update your requirements directly in the requirements tree or grid, or in the Requirement Details dialog box.

A. True B. False

Q. 99: You can search for a particular requirement in the requirements tree or in the requirements grid using the _________ command.

A. Search B. FindC. Look D. Get

Q. 100: You can send e-mail about a requirement to other users in your Quality Center project

A. True B. False

Page 11: Quality Center Questions Collection[1]

Q. 101: You can view a list of alerts for a _____________ entity.

A. A test in the test plan tree or Test Grid B. A test instance in the Execution GridC. None of above D. Both A. & B.

Q. 102: A red flag indicates that the alert is _____________

A. New B. OldC. Follow up D. Urgent

Q. 103: A gray flag indicates that the alert __________.

A. New B. has already been readC. Follow up D. Urgent

Q. 104: A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.

A. True B. False

Q. 105: Quality Center assigns the image a unique file name with a _______ Extension.

A. .jpeg B. .gifC. .doc D. .jpg

Q. 106: A __________ is a view of a Quality Center window with the settings you apply to it.

A. Personal View B. My viewC. Favorite View D. My QC View

Q. 107: You save favorite views in ______

A. Favorite folder B. Personal folderC. Both A & B D. Public & Private folder

Q. 108: You can define the number of views displayed on the menu by setting the ________ parameter in the Site Configuration tab in Site Administration.

A. favorites B. favorites_DepthC. favorites_view D. favorites_Path

Q. 109: The requirements specification workflow consists of the following:

A. Define Testing Scope, Create Requirements, Detail Requirements, Assign to Releases, Analyze RequirementsB. Define Testing Scope, Detail Requirements, Create Requirements, Assign to Releases, Analyze RequirementsC. Define Testing Scope, Create Requirements, Detail Requirements, Analyze Requirements, Assign to ReleasesD. Define Testing Scope, Create Requirements, Analyze Requirements, Detail Requirements, Assign to Releases

Q. 110: Requirement topics are recorded in the Requirements module by creating a

A. Requirements cycle B. Requirements treeC. Requirements plan D. Requirements module

Q. 111: You cannot copy a requirement within the same project or between projects.

Page 12: Quality Center Questions Collection[1]

A. True B. False

Q. 112: Test coverage, defect linkage, and risk-based quality management data for the requirement are not copied.

A. True B. False

Q. 113: Methods you can use to create tests from requirements:

A. Convert Requirements to Tests B. Generate a Test from Requirements.C. Get a test from a requirement D. Both A & BE: Both B & C

Q. 114: Using the Requirements Traceability tab in the Requirement Details view, you can add traceability links to and from a selected requirement. _______ Links indicate requirements that affect a selected requirement. _________ Links indicate requirements that are affected by a selected requirement.

A. Trace from, Trace to B. Trace to, Trace fromC. Trace from select, Trace to select D. Trace to select, Trace from select

Q. 115: When a requirement changes, Quality Center alerts the affected requirements. The alerts can be seen by all users.

A. True B. False

Q. 116: You can display traceability relationships that exist between requirements in the ________ tab. This tab contains the Trace From and Trace To grids.

A. Traceability B. RelationshipsC. Req-traceability D. Traceability-Req

Q. 117: The __________ feature enables you to calculate at which level to test each requirement, based on the nature of the requirement and the resources you have available.

A. Level-based quality management B. Calculate-based quality managementC. Risk-based quality management D. None of above

Q. 118: You can assign or calculate the Risk Category of an assessment requirement. The Risk Category is composed of its __________

A. Business Criticality & Failure Probability B. Business Probability & Failure CriticalityC. Priority & Severity D. None of above

Q. 119: Quality Center defines four Testing Levels:

A. First, second, third, and fourth B. Full, Partial, Basic, and NoneC. Full, Partial, Basic, and moderate D. Partial, Basic, moderate and Advanced

Q. 120: The __________ link displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis.

A. Missing risk assessment B. Miss assessmentC. Missing assessment D. Exclude assessment

Q. 121: By default, Quality Center sends e-mail in HTML format. To send e-mail as plain text instead, edit the _________ parameter in the Site Configuration tab in Site Administration.

Page 13: Quality Center Questions Collection[1]

A. EMAIL_FORMAT B. EMAIL_FORMC. MAIL_FORMAT D. QC_MAIL_FORMAT

Q. 122: You can copy a requirement within the same project or between projects. Which of the below items are copied at the time of copying a requirement.

A. Test coverage. B. Defect linkage.C. Risk-based quality management data D. All of aboveE: None of above

Q. 123: You can also move a requirement to a new location in the requirements tree by dragging it.

A. True B. False

Q. 124: You can delete a requirement from the Requirements module. Deleting a requirement does not delete its child requirements, tests coverage, requirement traceability links, and defects linkage.

A.True B. False

Q. 125: There are two methods you can use to create tests from requirements:

A. Convert Requirements to Tests & Generate a Test from RequirementsB. Convert Requirements to Tests & Convert a Test from RequirementsC. Convert Requirements to Tests & Generate a Requirement from TestsD. Convert a Test from Requirements & Generate Requirements to Tests

Q. 126: When analyzing the impact of a change proposed in a specific requirement, the traceability links indicate the other ________ that the change might affect.

A. Tests B. RequirementsC. Tests & requirements D. None

Q. 127: The ______ links indicate requirements that affect a selected requirement _______ links indicate requirements that are affected by a selected requirement.

A. Trace from, Trace to B. Trace to, Trace fromC. From trace, To trace D. None of above

Q. 128: When a requirement changes, Quality Center alerts the affected requirements. The alerts can be seen by______

A. Author of the requirement B. Users authorized by the Author of the requirementC. All users D. Administrator

Q. 129: while Defining Traceability Relationships, You cannot add a requirement traceability link by dragging a requirement from the requirements tree to the appropriate grid.

A. True B. False

Q. 130: While viewing Traceability Impact, the Impact Analysis tab helps you understand the many associations and dependencies that exist between the ______ by displaying them in a hierarchical tree structure.

A. Tests B. RequirementsC. Both D. None

Page 14: Quality Center Questions Collection[1]

Q. 131: The requirements _________ is a graphical representation of your requirements specification, displaying the hierarchical relationship between different requirements.

A. Graph B. PlanC. Path D. Tree

Q. 132: For each requirement topic, a QA tester creates a list of __________ in the requirements tree.

A. Detailed requirements B. Detailed specificationsC. Detailed plans D. Detailed sub-requirements

Q. 133: Each requirement in the tree is described in detail and cannot include any relevant attachments.

A. True B. False

Q. 134: After defining your requirements, you can add traceability between the requirements. When analyzing the impact of a change proposed in a specific requirement _________ shows the other requirements that the change might affect.

A. Equality B. Link-abilityC. Traceability D. Cross-links

Q. 135: QA managers assign the requirements to releases and cycles in the releases tree in the Releases module.

A. True B. False

Q. 136: The assigned requirements are then used as a basis for the test plan in the Test Plan module. The tests you create during the test plan phase are then linked to these requirements to create _______

A. Linkages B. Linked-requirementsC. Requirements plan D. Coverage

Q. 137: QA managers review the requirements, they change a requirement from a Not Reviewed status to a _______ Status once it is approved.

A. Passed B. ReviewedC. Partially reviewed D. Both B & C

Q. 138: You can also import requirements to your Quality Center project from ________

A. Microsoft Word B. ExcelC. Other third-party requirement management tools D. All of above

Q. 139: In the Requirements Tree view, Indicator columns indicates that the specified requirement has

A. Attachments, linked defects, alerts, and follow up flagsB. Attachments, linked defects, alertsC. Attachments, linked defects and follow up flagsD. Linked defects, alerts, and follow up flags

Q. 140: To find a specific requirement by ReqID in the Requirements Tree view, choose __________ and enter the requirement ID.

Page 15: Quality Center Questions Collection[1]

A. Requirements > Find Requirement B. Requirements > Go to RequirementC. Requirements > Get Requirement D. Requirements > Display Requirement

Q. 141: During Requirement Risks calculation, the ________ displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis

A. Missing assessment link B. Missing assessment fieldC. Missing assessment value D. Missing assessment relation

Q. 142: A good test plan enables you to assess the quality of your application ________ in the testing process.

A. At the beginning B. At the endC. At the point D. At the middle

Q. 143: Which of the item is not a part of "Developing a test plan" in QC.

A. Design Test Steps B. Design TestsC. Automate Tests D. Define Testing Policy Settings

Q. 144: You can access the Test Plan menu bar from the Test Plan module by pressing the shortcut key ________

A. F7 B. F9C. F12 D. F11

Q. 145: To find a specific test by Test ID in the Test Grid, choose ________ and enter the test ID

A. Test > Go to Test B. Test > find TestC. Test > search Test D. Test > link Test

Q. 146: In relation to a test plan module, You can add user-defined fields and change the label of any of the fields in the Test Grid

A. True, B. False

Q. 147: You can use the ________ to restrict and dynamically change the fields and values in the Test Grid.

A. Text editor B. Script editorC. Scriptor editor D. Scripts editor

Q. 148: The typical application is too large to test as a whole. The Test Plan module enables you to divide your application according to ________

A. Functionality B. RequirementsC. Tst plans D. Test modules

Q. 149: During the testing process, you may need to modify your test plan. You can update the test plan tree ________

A. At the beginning B. At the endC. At any time D. In the middle

Q. 150: Developing and editing a test plan tree requires appropriate user ________

A. IDs B. RequirementsC. Permissions D. Passwords

Page 16: Quality Center Questions Collection[1]

Question No. Correct Answer Question No. Correct Answer Question No. Correct AnswerQ. 1 A Q. 51 A Q. 101 DQ. 2 A Q. 52 D Q. 102 AQ. 3 C Q. 53 A Q. 103 BQ. 4 B Q. 54 B Q. 104 AQ. 5 A Q. 55 C Q. 105 DQ. 6 A Q. 56 A Q. 106 CQ. 7 A Q. 57 C Q. 107 DQ. 8 C Q. 58 B Q. 108 BQ. 9 A Q. 59 B Q. 109 AQ. 10 A Q. 60 B Q. 110 BQ. 11 D Q. 61 A Q. 111 BQ. 12 A Q. 62 C Q. 112 AQ. 13 B Q. 63 D Q. 113 DQ. 14 B Q. 64 A Q. 114 AQ. 15 D Q. 65 D Q. 115 AQ. 16 C Q. 66 A Q. 116 BQ. 17 A Q. 67 A Q. 117 CQ. 18 D Q. 68 A Q. 118 AQ. 19 B Q. 69 C Q. 119 BQ. 20 A Q. 70 B Q. 120 CQ. 21 D Q. 71 C Q. 121 CQ. 22 D Q. 72 D Q. 122 EQ. 23 B Q. 73 A Q. 123 AQ. 24 A Q. 74 B Q. 124 BQ. 25 C Q. 75 A Q. 125 AQ. 26 C Q. 76 D Q. 126 BQ. 27 B Q. 77 A Q. 127 AQ. 28 A Q. 78 D Q. 128 CQ. 29 A Q. 79 A Q. 129 BQ. 30 A Q. 80 A Q. 130 BQ. 31 C Q. 81 B Q. 131 DQ. 32 B Q. 82 C Q. 132 AQ. 33 D Q. 83 D Q. 133 BQ. 34 A Q. 84 D Q. 134 CQ. 35 B Q. 85 B Q. 135 AQ. 36 C Q. 86 A Q. 136 DQ. 37 A Q. 87 B Q. 137 BQ. 38 B Q. 88 B Q. 138 DQ. 39 B Q. 89 D Q. 139 AQ. 40 A Q. 90 B Q. 140 BQ. 41 A Q. 91 C Q. 141 AQ. 42 A Q. 92 C Q. 142 CQ. 43 B Q. 93 D Q. 143 DQ. 44 C Q. 94 A Q. 144 BQ. 45 B Q. 95 A Q. 145 AQ. 46 C Q. 96 A Q. 146 AQ. 47 B Q. 97 A Q. 147 BQ. 48 A Q. 98 B Q. 148 AQ. 49 A Q. 99 B Q. 149 CQ. 50 A Q. 100 A Q. 150 C