Quality Assurance Requirements for Nuclear Facility Applications AN AMERICAN NATIONAL STANDARD ASME NQA-1–2012 (Revision of ASME NQA-1–2008)

Upload: dinhduong

Post on 03-Apr-2018

222 views

Category:

Documents


3 download

TRANSCRIPT

Quality Assurance Requirements for Nuclear Facility Applications

A N A M E R I C A N N A T I O N A L S T A N D A R D

ASME NQA-1–2012(Revision of ASME NQA-1–2008)

ASME NQA-1–2012(Revision of ASME NQA-1–2008)

Quality AssuranceRequirements forNuclear FacilityApplications

A N A M E R I C A N N A T I O N A L S T A N D A R D

Two Park Avenue • New York, NY • 10016 USA

Date of Issuance: March 15, 2013

The next edition of this Standard is scheduled for publication in 2014.

ASME issues written replies to inquiries concerning interpretations of technical aspects of thisStandard. Interpretations are published on the ASME Web site under the Committee Pages athttp://cstools.asme.org/. [Interpretations are also included with each edition.]

Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and standards. Such errata shall be used on the date posted.

The Committee Pages can be found at http://cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee Page after selecting “Errata” in the “PublicationInformation” section.

ASME is the registered trademark of The American Society of Mechanical Engineers.

This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public-at-large.

ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with any

items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement of such rights, isentirely their own responsibility.

Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.

ASME accepts responsibility for only those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.

No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,

without the prior written permission of the publisher.

The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990

Copyright © 2013 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERS

All rights reservedPrinted in U.S.A.

CONTENTS(A detailed Contents precedes each NQA Part.)

Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ivPreparation of Technical Inquiries to the Nuclear Quality Assurance Committee . . . . . . . . . viiCommittee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiiSummary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix

Part I Requirements for Quality Assurance Programs for Nuclear Facilities(From Former NQA-1). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Part II Quality Assurance Requirements for Nuclear Facility Applications . . . . . . . . . . . . . . . . . 34

Part III Guidance for Implementing Part I and II Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . 115

Part IV Guidance on the Application and Use of NQA-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 184

iii

ASME NQA-1–2012 PART I, CONTENTS

PART I: REQUIREMENTS FOR QUALITYASSURANCE PROGRAMS FOR NUCLEAR

FACILITIES(FROM FORMER NQA-1)

CONTENTS

Introduction 4100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4300 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4400 Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Requirement 1 Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8200 Structure and Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8300 Interface Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Requirement 2 Quality Assurance Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9200 Indoctrination and Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9300 Qualification Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9400 Records of Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11500 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Requirement 3 Design Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12200 Design Input . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12300 Design Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12400 Design Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12500 Design Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13600 Change Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13700 Interface Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14800 Software Design Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14900 Documentation and Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Requirement 4 Procurement Document Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16200 Content of the Procurement Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16300 Procurement Document Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16400 Procurement Document Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Requirement 5 Instructions, Procedures, and Drawings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Requirement 6 Document Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

1

PART I, CONTENTS ASME NQA-1–2012

200 Document Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18300 Document Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

Requirement 7 Control of Purchased Items and Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19200 Supplier Evaluation and Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19300 Bid Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19400 Control of Supplier-Generated Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19500 Acceptance of Item or Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19600 Control of Supplier Nonconformances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20700 Commercial Grade Items and Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Requirement 8 Identification and Control of Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21200 Identification Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21300 Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

Requirement 9 Control of Special Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22200 Process Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22300 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Requirement 10 Inspection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23200 Inspection Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23300 Inspection Hold Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23400 Inspection Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23500 In-Process Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23600 Final Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23700 Inspections During Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Requirement 11 Test Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24200 Test Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24300 Test Procedures (Other Than for Computer Programs) . . . . . . . . . . . . . . . . . . 24400 Computer Program Test Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24500 Test Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25600 Test Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Requirement 12 Control of Measuring and Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26200 Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26300 Calibration and Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

Requirement 13 Handling, Storage, and Shipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27200 Special Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27300 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27400 Tools and Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27500 Operators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27600 Marking or Labeling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Requirement 14 Inspection, Test, and Operating Status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Requirement 15 Control of Nonconforming Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

2

ASME NQA-1–2012 PART I, CONTENTS

200 Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29300 Segregation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29400 Disposition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Requirement 16 Corrective Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

Requirement 17 Quality Assurance Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31200 Generation of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31300 Authentication of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31400 Classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31500 Receipt Control of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31600 Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31700 Retention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32800 Maintenance of Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

Requirement 18 Audits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33200 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33300 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33400 Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33500 Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33600 Response . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33700 Follow-Up Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

3

(12)

PART II, CONTENTS ASME NQA-1–2012

PART II: QUALITY ASSURANCE REQUIREMENTSFOR NUCLEAR

FACILITY APPLICATIONS

CONTENTS

Introduction 37100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37300 Responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37400 Planning and Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37500 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38600 Multiunit Facility Provisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

Subpart 2.1 Quality Assurance Requirements for Cleaning of Fluid Systems andAssociated Components for Nuclear Power Plants. . . . . . . . . . . . . . . . . . . . . . . . 39

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40300 Cleanness Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41400 Manufacturing Phase Cleanness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44500 Cleanness Prior to Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44600 Cleanness During Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45700 Maintenance of Installation Cleanness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45800 Preoperational Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46900 Layup and Postlayup Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 471000 Postoperational Repairs and Modifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 471100 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47

Tables302.5 Summary Table for Cleanness Classes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43304.1 Water Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44304.4 Flushing Requirements for Hydraulic, Instrument Control, and

Lubrication Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45

Subpart 2.2 Quality Assurance Requirements for Packaging, Shipping, Receiving,Storage, and Handling of Items for Nuclear Facilities . . . . . . . . . . . . . . . . . . . . 48

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48300 Packaging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49400 Shipping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55500 Receiving . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55600 Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57700 Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59800 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59

Subpart 2.3 Quality Assurance Requirements for Housekeeping at NuclearFacilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

34

ASME NQA-1–2012 PART II, CONTENTS

200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60300 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62

Subpart 2.4 Installation, Inspection, and Testing Requirements for Power,Instrumentation, and Control Equipment at Nuclear Facilities . . . . . . . . . . . . . 63

Subpart 2.5 Quality Assurance Requirements for Installation, Inspection, and Testing ofStructural Concrete, Structural Steel, Soils, and Foundations for NuclearFacilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65300 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65400 Preconstruction Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65500 Inspection of Soils and Earthwork . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66600 Inspection of Foundation Pile and Caisson Construction . . . . . . . . . . . . . . . . . 66700 Inspection of Concrete Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69800 Inspection of Steel Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72900 Data Analysis and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 731000 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74

Table506 Required In-Process Tests for Compacted Fill . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

Subpart 2.7 Quality Assurance Requirements for Computer Software for Nuclear FacilityApplications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76300 Software Acquisition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77400 Software Engineering Method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77500 Standards, Conventions, and Other Work Practices . . . . . . . . . . . . . . . . . . . . . . 78600 Support Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78700 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79

Subpart 2.8 Quality Assurance Requirements for Installation, Inspection, andTesting of Mechanical Items for Nuclear Facilities . . . . . . . . . . . . . . . . . . . . . . . . 80

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80300 Preinstallation Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81400 Installation Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82500 Systems Turnover Inspection and Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83600 Data Analysis and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85700 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85

Subpart 2.14 Quality Assurance Requirements for Commercial Grade Items andServices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86200 CGI Definition Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87300 Utilization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87400 Technical Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87500 Critical Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88600 Methods of Accepting Commercial Grade Items and Services . . . . . . . . . . . . 89700 Commercial Grade Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91800 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91900 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92

Subpart 2.15 Quality Assurance Requirements for Hoisting, Rigging, andTransporting of Items for Nuclear Power Plants . . . . . . . . . . . . . . . . . . . . . . . . . . 93

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93

35

PART II, CONTENTS ASME NQA-1–2012

300 Types of Handling Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94400 Design Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95500 Acceptance Criteria for Manufactured Handling Equipment . . . . . . . . . . . . . 97600 Testing, Inspection, and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97700 Control of the Use of Handling Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99800 Qualifications of Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100900 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100

Subpart 2.16 Requirements for the Calibration and Control of Measuring and TestEquipment Used in Nuclear Facilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101

Subpart 2.18 Quality Assurance Requirements for Maintenance of NuclearFacilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102300 Preventive Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103400 Corrective Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104500 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104

Subpart 2.20 Quality Assurance Requirements for Subsurface Investigations for NuclearFacilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105200 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105300 Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106400 Field Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107500 Laboratory Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109600 Engineering Evaluation and Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110700 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110

Subpart 2.22 Quality Assurance Requirements for Management Assessment and QualityImprovement for Compliance With 10 CFR 830 and Department ofEnergy (DOE) Order 414.1 for DOE Nuclear Facilities . . . . . . . . . . . . . . . . . . . . . 111

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111200 Management Assessment Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112300 Quality Improvement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114500 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114

36

ASME NQA-1–2012 PART III, CONTENTS

PART III: GUIDANCE FOR IMPLEMENTING PARTI AND II REQUIREMENTS

CONTENTS

Introduction 117100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117

SUBPART 3.1 GUIDANCE FOR IMPLEMENTING PART I REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . . . 118

Subparts3.1-1.1 Implementing Guidance for Part I, Requirement 1: Organization . . . . . . . . . . 1193.1-2.1 Implementing Guidance for Part I, Requirement 2: Quality Assurance

Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1203.1-2.2 Implementing Guidance for Part I, Requirement 2: Quality Assurance

Programs, Lead Auditor Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1233.1-2.3 Implementing Guidance for Part I, Requirement 2: Quality Assurance

Programs, Inspection and Test Personnel Qualification . . . . . . . . . . . . . . . . . . 1253.1-2.4 Implementing Guidance for Part I, Requirement 2: Quality Assurance

Programs, Management Assessment of the QA Program UsingSurveillance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127

3.1-3.1 Implementing Guidance for Part I, Requirement 3: Design Control . . . . . . . . 1303.1-4.1 Implementing Guidance for Part I, Requirement 4: Procurement Document

Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1343.1-7.1 Implementing Guidance for Part I, Requirement 7: Control of

Purchased Items and Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1393.1-10.1 Implementing Guidance for Part I, Requirement 10: Inspection . . . . . . . . . . . . 1423.1-16.1 Implementing Guidance for Part I, Requirement 16: Corrective Action . . . . . 1433.1-17.1 Implementing Guidance for Part I, Requirement 17: Quality Assurance

Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1463.1-17.2 Implementing Guidance for Part I, Requirement 17: Quality Assurance

Records, Electronic Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1493.1-18.1 Implementing Guidance for Part I, Requirement 18: Audits . . . . . . . . . . . . . . . 151

Figures300 Sample Form for Record of Lead Auditor Qualification . . . . . . . . . . . . . . . . . . . 124600 Logic Chart for Determining Appropriate Quality Requirements . . . . . . . . . . 137300 Corrective Action Process Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145

SUBPART 3.2 GUIDANCE FOR IMPLEMENTING PART II REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . 155

Subparts3.2-2.1 Implementing Guidance for Part II, Requirement 2.1: Cleaning of Fluid

Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1563.2-2.7 Implementing Guidance for Part II, Requirement 2.7: Quality Assurance

Requirements for Computer Software for Nuclear FacilityApplications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157

115

(12)

PART III, CONTENTS ASME NQA-1–2012

3.2-2.14 Implementing Guidance for Part II, Requirement 2.14: Quality AssuranceRequirements for Commercial Grade Items and Services,Commercial Grade Computer Programs, and Software Services . . . . . . . . . 162

3.2-2.15 Implementing Guidance for Part II, Requirement 2.15: Hoisting, Rigging,and Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 176

3.2-2.18.1 Implementing Guidance for Part II, Requirement 2.18: Maintenance ofNuclear Facilities, Establishing and Maintaining EquipmentHistories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 177

3.2-2.18.2 Implementing Guidance for Part II, Requirement 2.18: Maintenance ofNuclear Facilities, Engineering Evaluations of Equipment Failures . . . . . . 178

3.2-2.20 Implementing Guidance for Part II, Requirement 2.20: SubsurfaceInvestigations for Nuclear Power Plants, Sample Control andIdentification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 180

Table501 Typical Critical Characteristics to Consider for Computer Programs . . . . . . . 169

SUBPART 3.3 NONMANDATORY GUIDANCE ON QUALITY ASSURANCE PROGRAMREQUIREMENTS FOR COLLECTION OF SCIENTIFIC AND TECHNICALINFORMATION FOR SITE CHARACTERIZATION OF HIGH-LEVEL NUCLEARWASTE REPOSITORIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181

Nonmandatory Appendix 7A-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182Nonmandatory Appendix 11A-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 183

116

(12)

PART IV, CONTENTS ASME NQA-1–2012

PART IV: GUIDANCE ON THE APPLICATION ANDUSE OF NQA-1

CONTENTS

Introduction 187100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 187

SUBPART 4.1 GUIDES ON USE AND COMPARISON OF NQA-1 WITH OTHER QUALITYREQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188

Subparts4.1.1 Guidance to Modification of an ISO 9001:2008, Quality Management

Systems Standard for Compliance With NQA-1–2008, Part I With theNQA-1a–2009 Addenda . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188

100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188200 NQA Reference Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188300 Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 188400 Application of NQA-1 to ISO 9001 QMS Program . . . . . . . . . . . . . . . . . . . . . . . . 1894.1.2 Guidance on the Use of NQA-1–2008/1a–2009 for Compliance With

Department of Energy Quality Assurance Requirements 10 CFR 830,Subpart A and DOE O 414.1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202

100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202200 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202300 DOE Rule and Order General QAP Requirements . . . . . . . . . . . . . . . . . . . . . . . . 202400 DOE Rule and Order QA Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2024.1.3 Guidance on the Use of NQA-1–2000 for Compliance With 10 CFR 71

and/or 10 CFR 72 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207100 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207200 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 207300 Summary Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2074.1.4 Guidance to Modification of an IAEA GS-R-3 Quality Program to Meet

NQA-1a–2009 Requirements and Modification of an NQA-1a–2009Quality Program to Meet IAEA GS-R-3 Requirements . . . . . . . . . . . . . . . . . . 214

100 Purpose and Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214300 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214400 How to Use This Guide to Achieve Compliance With GS-R-3 or

NQA-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215

Tables200-1 Corresponding NQA Sections (Requirement 1) to ISO Sections . . . . . . . . . . . . 189200-2 Corresponding NQA Sections (Requirement 2) to ISO Sections . . . . . . . . . . . . 190200-3 Corresponding NQA Sections (Requirement 3) to ISO Sections . . . . . . . . . . . . 191200-4 Corresponding NQA Sections (Requirement 4) to ISO Sections . . . . . . . . . . . . 192200-5 Corresponding NQA Sections (Requirement 5) to ISO Sections . . . . . . . . . . . . 192200-6 Corresponding NQA Sections (Requirement 6) to ISO Sections . . . . . . . . . . . . 193

184

ASME NQA-1–2012 PART IV, CONTENTS

200-7 Corresponding NQA Sections (Requirement 7) to ISO Sections . . . . . . . . . . . . 194200-8 Corresponding NQA Sections (Requirement 8) to ISO Sections . . . . . . . . . . . . 195200-9 Corresponding NQA Sections (Requirement 9) to ISO Sections . . . . . . . . . . . . 196200-10 Corresponding NQA Sections (Requirement 10) to ISO Sections . . . . . . . . . . . 197200-11 Corresponding NQA Sections (Requirement 11) to ISO Sections . . . . . . . . . . . 197200-12 Corresponding NQA Sections (Requirement 12) to ISO Sections . . . . . . . . . . . 198200-13 Corresponding NQA Sections (Requirement 13) to ISO Sections . . . . . . . . . . . 199200-14 Corresponding NQA Sections (Requirement 14) to ISO Sections . . . . . . . . . . . 199200-15 Corresponding NQA Sections (Requirement 15) to ISO Sections . . . . . . . . . . . 200200-16 Corresponding NQA Sections (Requirement 16) to ISO Sections . . . . . . . . . . . 200200-17 Corresponding NQA Sections (Requirement 17) to ISO Sections . . . . . . . . . . . 201200-18 Corresponding NQA Sections (Requirement 18) to ISO Sections . . . . . . . . . . . 201300 10 CFR 830 Subpart A, Dated January 10, 2001; §830.121, Quality

Assurance Program; DOE O 414.1C, Dated June 17, 2005 . . . . . . . . . . . . . . . 203400 10 CFR 830 Subpart A, Dated January 10, 2001; §830.122, Quality

Assurance Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204300 10 CFR 71 and 10 CFR 72 Criteria Addressed by NQA-1 . . . . . . . . . . . . . . . . . . 208I The Extent to Which GS-R-3 Addresses NQA-1 Requirements . . . . . . . . . . . . . 216II The Extent to Which NQA-1 Addresses GS-R-3 Requirements . . . . . . . . . . . . . 226

SUBPART 4.2 GUIDES ON APPLICATION OF NQA-1 TO WORK PROCESSES ANDACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235

Subparts4.2.1 Guidance on Graded Application of Nuclear Quality Assurance (NQA)

Standard for Research and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235200 Research and Development Quality Assurance Through Peer Review . . . . . . 236300 A Graded Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 237400 Quality Assurance Research and Development Applications . . . . . . . . . . . . . . 238500 Research and Development Quality Assurance Glossary of Terms . . . . . . . . . 238600 Application of NQA-1 to Research and Development Activities . . . . . . . . . . . 238700 Technology Life Cycle (Subpart 4.2.1) and Technology Readiness

Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2434.2.2 Guidance for Managing Electronic Information . . . . . . . . . . . . . . . . . . . . . . . . . . . 245100 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245200 Electronic Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245300 Electronic Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 245400 Electronic Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2464.2.3 Guidance on the Qualification of Existing Data . . . . . . . . . . . . . . . . . . . . . . . . . . . 247100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247200 Selecting Data Sets for Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247300 Data Qualification Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247400 Qualification Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 247500 Documentation of Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2484.2.4 Guidance on the Control of Scientific Investigations . . . . . . . . . . . . . . . . . . . . . . 249100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 249200 Planning and Performing Scientific Investigations . . . . . . . . . . . . . . . . . . . . . . . . . 249300 Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 249400 Sample Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 250500 Peer Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2504.2.5 Guidance on the Transition From Construction to Operation for Nuclear

Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252200 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252300 Transition Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 252400 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 254

185

PART IV, CONTENTS ASME NQA-1–2012

4.2.6 Guidance on Quality Assurance for Decommissioning of NuclearFacilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255

100 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255200 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255300 Predecommissioning Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 256400 Control During Decommissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 258500 Postdecommissioning Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 259600 Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 259

Figure103 Technology Life Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 236

Table600-1 Applicability to Research and Development Activities . . . . . . . . . . . . . . . . . . . . 239600-2 Software Within Research and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 239700 Comparison of Subpart 4.2.1 Technology Life Cycle and Technology

Readiness Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244