Publish Date Due Date Project Number Owner Project Name Primary Service Estimated Project Cost Q&A Short List (Selection Starred) Notes 1/3/2017 1/27/2017 YSU-1718-18 Youngstown State University YSU Housing Masterplan Planning $80,000 N/A TBD 1/5/2017 1/25/2017 SFC-170415 Fairborn City School District Fairborn CSD - Segment 1 OA $50,984,299 N/A Resource International, *Hill International, Quandel Construction Cost does not include LFI 1/9/2017 1/26/2017 OSU-160973 Ohio State University Advanced Materials Corridor - Phase 1 CxA $59,100,000 N/A *Ruscilli Construction, Barton Malow, Whiting Turner Selection: *R uscilli Construction, Fee updated 1/19/2017 "Best Value Selection" (BVS) is a selection process in which proposals contain both pricing and performance components, and award is based upon a combination of pricing and performance considerations to determine the offer deemed most advantageous and of the greatest value to the public authority. For the...Construction Manager at Risk provider (CM); Design Builder (DB) and Energy Performance Contracting provider.. Qualifications-based Selection (QBS) Requests for Qualifications

Upload: vuongmien

Post on 17-May-2018

236 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

Publish Date Due Date Project Number Owner Project Name

Primary Service

Estimated Project Cost

Q&A Short List (Selection Starred)

Notes

1/3/2017 1/27/2017 YSU-1718-18 Youngstown State University

YSU Housing Masterplan

Planning $80,000 N/A TBD

1/5/2017 1/25/2017 SFC-170415 Fairborn City School District

Fairborn CSD - Segment 1

OA $50,984,299 N/A Resource International, *Hill International, Quandel Construction

Cost does not include LFI

1/9/2017 1/26/2017 OSU-160973 Ohio State University

Advanced Materials Corridor - Phase 1

CxA $59,100,000 N/A *Ruscilli Construction, Barton Malow, Whiting Turner

Selection: *Ruscilli Construction, Fee updated 1/19/2017

"Best Value Selection" (BVS) is a selection process in which proposals contain both pricing and performance components, and award is based upon a combination of pricing and performance considerations to determine the offer deemed most advantageous and of the greatest value to the public authority.

For the...Construction Manager at Risk provider (CM); Design Builder (DB) and Energy Performance Contracting provider..

Qualifications-based Selection (QBS) Requests for Qualifications

Page 2: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

1/9/2017 1/25/2017 OSU-160978 Ohio State University

Fire Alarm Replacements Phase 2

A/E $3,455,000 N/A *Van Auken Akins, Dynamix Engineering Inc., FTC&H, Jensen Hughes Inc.

Selection: *Van Auken Akins

1/9/2017 1/24/2017 OSU-160979 Ohio State University

HVAC Repair and Replacement

C-A/E $7,275,000 N/A *Dynamix Engineering, KLH Engineers, Prater Engineering

Selection: *Dynamix Engineering

1/17/2017 1/27/2017 SFC-170407 West Clermont Local School District

West Clermont LSD Segment 1

A/E $46,888,256 N/A *SFA Architects, MSA Architects, VSWC Architects

1/18/2017 2/2/2017 DNR-170027 Ohio Department of Natural Resources

Hocking Hills Visitor Center

A/E $5,600,000 Q&A Abbot Studios, *SPGB Architects, Feinknopf Macioce Schappa Architects, Star Consultants

1/19/2017 2/17/2017 UCN-17077A University of Cincinnati

Rhodes Hall Fire Protection Upgrades

A/E $3,000,000 N/A Fishbeck, Thompson, Carr & Huber, Prater Engineering Associates, *WA Architects

Selection: WA Architects

1/20/2017 2/2/2017 SFC-170417 Twin Valley Community Local School District

Twin Valley K-12 Roof

A/E $2,060,145 N/A *RDA Group Architects, Matrix Architects, Star Consultants

Selection: RDA Group

Page 3: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

1/23/2017 2/6/2017 CTI-170007 Columbus State Community College

Facility Condition Assessment / Master Planning

Planning $276,450 N/A DesignGroup, *Heapy Engineering, K2M Design, Inc.

1/24/2017 2/23/2017 OHU-170011 Ohio UniversityChilled Wate A/E $12,100,000 Q&A AECOM Technical Services, Inc., Fosdick & Hilmer, Inc., H.F. Lenz Company, M-Consultants, LLC, RMF Engineering, Inc.

1/26/2017 2/17/2017 YSU-PREQUAL Youngstown State University

General Qualifications for Prequalification List of Professional Services - 330

A/E N/A TBD Project costs vary

1/27/2017 2/13/2017 OSU-170354 Ohio State University

700 Ackerman - Consolidated Call Center

A/E $21,800,000 N/A*Heapy Engineering; Engineering Economics; Korda Nemeth Engineering

1/27/2017 2/16/2017 DRC-17F005 Ohio Department of Rehabilitation and Correction

DRC - Franklin Medical Center Phase 1

A/E $8,283,600 N/A DS Architecture, LLC, K2M Design, Inc., *Schorr Architects, Inc.

Page 4: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

1/30/2017 2/15/2017 OSU-170192-AOR

Ohio State University

Wooster New Laboratory Building

A/E $33,500,000 N/A *Hasenstab Architects, Van Auken Akins, BHDP

Selection: *Hasenstab Architects

1/30/2017 2/15/2017 OSU-170192-MEP

Ohio State University

Wooster New Laboratory Building - MEP

A/E $33,500,000 N/A TBD

1/30/2017 2/28/2017 SFC-170888 Various OFCC Facilities Assessment / Master Planning Consultant List

Planning Q&A Selection List Project costs will vary

1/31/2017 3/3/2017 OHU-170010 Ohio University

Basic Renovation - Prequalification List

A/E Q&A TBD Due date changed to 3/3/17 Project costs will vary

2/1/2017 2/16/2017 OSU-160830 Ohio State University

Rhodes Hybrid IR

A/E $507,207 N/A TBD Selection: *Robert E. Euans Architects

2/1/2017 3/3/2017 YSU-171823 Youngstown State University

Campus Utility Distribution

A/E $1,100,000 N/A TBD

2/2/2017 2/21/2017 SFC-160397 Mason City Sch Mason CSD S A/E $39,933,155 N/A *VSWC Architects, BSHM Architects, Moody Nolan

Selection: VSWC Architects

Page 5: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

2/3/2017 2/21/2017 OSU-160589 Ohio State Uni Morehouse - CxA $8,750,000 Q&A *Regency Construction

Services, Inc., Turner

Construction Company

Selection: *Regency Construction Services, Inc.

2/3/2017 2/17/2017 SFC-17P110 Ohio History Connection

Ohio History Master Planning

Planning $258,000 Q&A *DesignGroup, GlaserWorks, Schooley Caldwell Associates

Selection: DesignGroup

2/6/2017 3/7/2017 SFC-170888 Various OFCC Regional Program Management Consultant Services

Regional Program Management

Q&A Selection List

2/6/2017 3/1/2017 DNR-170073 Ohio Department of Natural Resources

Water & Wastewater Technical Assistance FY 17-18

A/E Q&A TBD Project costs will vary

2/9/2017 2/23/2017 OHU-170013 Ohio University

Peden Speaker Replacement

A/E $300,000 N/A TBD

2/9/2017 3/3/2017 BGU-176257 Bowling Green Hanna Hall RA/E $44,200,000 Q&A *The Collaborative, Bostwick Design Partnership, Schooley Caldwell Associates, Design Group

Selection: The Collaborative

Page 6: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

2/28/2017 3/16/2017 OSU-160933 The Ohio State Newark - Ca A/E $1,582,615 *Monks, Korda/Nemeth Engineering, Dynamix Engineering

Selection: Monks

3/1/2017 3/17/2017 OSU-160010 Ohio State University

Harding - 5th Floor Patient Rooms

A/E $1,736,137 Q&A *Shremshock Architects & Engineers, DesignLevel, Abbot Studios

Selection: Shremshock Architects & Engineers,

3/2/2017 3/22/2017 OSU-170358 Ohio State University

2001 Polaris Parkway - Molecular Pathology

A/E $2,850,000 N/A *Array Architects, Baxter Hodell Donnelly Preston, Davis Wince

3/8/2017 4/7/2017 CLS-17FILM Cleveland State University

School of Film, Television and Interactive Media - Tenant Build-Out

A/E $7,500,000 Q&A Van Auken Akins Architects, Richard Fleischman + Partners Architects, DLR Group | Westlake Reed Leskosky

3/8/2017 3/23/2017 DMH-170021 Ohio Department of Mental Health and Addiction Services

Patient Unit Renovations

A/E $4,000,000 Q&A Duket Architects Planners, Makovich & Pusti Architects, *John Poe Architects, Matrix Architects

Selection: John Poe Architects

3/10/2017 4/3/2017 DNR-170099 Ohio Department of Natural Resources

Statewide Restrooms Technical Assistance

A/E N/A TBD Project costs will vary

Page 7: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

3/10/2017 4/3/2017 DNR-170098 Ohio Department of Natural Resources

Statewide Dam Safety Technical Services FY18

A/E N/A TBD Project costs will vary

3/10/2017 3/30/2017 COM-170001 Ohio Department of Commerce

Improvement Forensic Storage Maintenance Structure

A/E $4,087,500 Q&A *Braun & Steidl Architects, MSA Architects, Star Consultants

Selection: Braun & Steidl Architects

3/10/2017 3/21/2017 OHU-170013 Ohio University

Peden Speaker Replacement - Repost

A/E $300,000 Q&A TBD This is a repost of a previous RFQ.

3/13/2017 4/7/2017 OHU-170014 Ohio University

Ohio University Heritage College of Osteopathic Medicine Utilities Phase I

A/E $4,370,000 Q&A

Dynamix Engineering H.F. Lenz Company Osborn Engineering *RMF Engineering, Inc.

3/13/2017 3/31/2017 SFC-170420 Akron Public Schools

Akron Segment 6

OA $70,444,245 Q&A *G. Stephens, Ozanne

Construction, Construction

Support Solutions

3/15/2017 4/3/2017 MUN-100072 Miami University

South Quad/Bunger Field Hot Water Conversion

A/E $12,000,000 Q&A TBD

Page 8: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

3/20/2017 4/7/2017 OHU-170002 Ohio University

Seigfred Hall Renovation - 2017

CxA $10,600,000 N/A TBD

3/24/2017 4/7/2017 SFC-170418 Winton Woods City School District

Winton Woods CSD

A/E $110,375,958 Q&A *SHP Leading Design, Fanning Howey Associates, Richard Fleischman + Partners

Selection: SHP Leading Design, Cost includes LFI

3/24/2017 4/21/2017 OHU-170015 Ohio University

Heritage College of Osteopathic Medicine - Athens Campus Phase I (Academic Replacement Space)

A/E $65,000,000 Q&A Design Group, Moody Nolan, Inc., SLAM Collaborative

3/27/2017 4/17/2017 OSU-160982 Ohio State University

Roof Repair and Replacements Phase 2

A/E $4,750,000 N/A *eS Architecture and Development, Inc., Schorr Architects, Inc., BDTAID, Inc.

Updated 3/28/17 to remove requirement of Registered Roof Consultant

3/27/2017 4/17/2017 DNR-170096 Ohio Department of Natural Resources

Stewart Lake Dam Master Planning and Assessment

A/E $350,000 Q&A TBD

Page 9: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

3/27/2017 4/12/2017 OSU-170011 Ohio State University

Fry Hall-Optometry Clinic Entrance

CxA $6,480,000 Q&A *Karpinski Engineering, FTCH, Engineering Economics Inc.

3/28/2017 4/20/2017 SFC-170426 Canal Winchester Local School District

Canal Winchester - High School Renovations/Additions

A/E $23,507,142 N/A BSHM Architects, *Schorr Architects, Legat & Kingscott

Selection: Schorr Architects

3/29/2017 4/21/2017 SFC-170555 Various Owner Agent Services List

OA Q&A Selection List Project costs will vary

3/30/2017 4/13/2017 OSU-170489 Ohio State University

Material Recovery Facility Study

A/E $30,000 N/A TBD

3/30/2017 4/21/2017 BGU-176273 Bowling Green State University

Hanna Hall Renovation/Addition

CMA $44,200,000 N/A *Resource International

Selection: Resource International

3/30/2017 4/24/2017 SFC-170880 Various Hazardous Materials Consultant List

Hazardous Materials

Q&A Selection List Project costs will vary, Project number changed on 5/25/2017 from SFC-17E999 to SFC-170880

Page 10: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

4/3/2017 4/21/2017 OHU-170016 Ohio University

Ohio University 2018 Campus Steam System Repairs

A/E $1,500,000 N/A*RMF Engineering Advanced Engineering Dynamix Engineering

4/7/2017 4/24/2017 OSU-170459 Ohio State University

Morehouse Tower - Elevator

A/E $1,551,236 N/A *BDTAID, Inc., Oregon Group Architects, Inc.,

4/11/2017 4/26/2017 OSU-170662 Ohio State University

Health Sciences Campus Program

A/E Q&A *CO Architects, The S/L/A/M Collaborative, Inc., Perkings+Will, The Ballinger Co.

Project cost to be determined

4/11/2017 4/26/2017 OSU-170665 Ohio State University

Wexner Medical Center Hospital Program

A/E Q&A *HDR, Perkins+Will, HKS,NBBJ

Project cost to be determined

4/11/2017 4/26/2017 OSU-170663 Ohio State University

Wexner Medical Center Ambulatory

A/E

N/A

*Perkins+Will, HKS, HDR

Project cost to be determined

4/11/2017 4/26/2017 OSU-170641 Ohio State University

Arts District Program

A/E View master plan Q&A *DLR Group/Westlake Reed Leskosky, LMN Architects, LLP, Steven Holl Architects PC

Project cost to be determined

4/11/2017 4/26/2017 OSU-170664 Ohio State University

Interdisciplinary

A/E Q&A *Ennead Architects, The

Project cost to be

4/14/2017 5/10/2017 NSC-170001 Northwest State Community College

Welding Shop Renovation

A/E $2,010,000 Q&A JDI Group, Garmin/Miller, Fanning /Howey

Page 11: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

4/14/2017 5/5/2017 DNR-170109 Ohio Department of Natural Resources

Boch Hollow Trailhead Improvements

A/E $450,000 N/A TBD

4/17/2017 5/23/2017 OSU-170665 Ohio State University

Wexner Medical Center Hospital Program

CMA Q&A *Walsh Construction, Gilbane Building Co., Mortenson Messer

4/17/2017 5/23/2017 OSU-170662 Ohio State University

Health Sciences Campus Program

CMA N/A *CO Architects, The S/L/A/M Collaborative, Inc., Perkings + Will, The Ballinger Co.

Selection: *CO Architects

4/17/2017 5/23/2017 OSU-170641 Ohio State University

Arts District Program

CMA N/A TBD

4/17/2017 5/23/2017 OSU-170663 Ohio State University

Wexner Medical Center Ambulatory

CMA Q&A *Gilbane Building Co., Walsh Construction, The Daimler Group4/17/2017 5/23/2017 OSU-170664 Ohio State

UniversityInterdisciplinary Research Building Program

CMA N/A TBD

4/19/2017 5/15/2017 SSC0100055 Shawnee State University

Campus Facility Assessment

Planning $75,000 Q&A TBD

4/21/2017 5/12/2017 DRC-17F018 Ohio Department of Rehabilitation and Correction

PCI Master Plan Demo and Design

A/E $118,700,000 Q&A AECOM Services of Ohio, Inc., Hellmuth, Obata & Kassabaum, P.C. (HOK), *DLR Group Inc.

Selection: DLR Group Inc.

Page 12: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

4/25/2017 5/11/2017 SFC-TBD Berkshire Local Schools

Architectural Pre-Bond Issue Assistance Services

Pre-Bond Issue Services

N/A TBD This scope would be limited to Pre-Design and does not imply continuance into full design service for the project should the OSFC project become funded.

4/25/2017 5/16/2017 DRC-17F022 Ohio Department of Rehabilitation and Correction

Statewide Population Management Fences - Phase 3

A/E $9,300,963 N/A *GPD Group

4/26/2017 5/17/2017 DNR-160057 Ohio Department of Natural Resources

Magee Marsh Shoreline Protection Barrier Rehabilitation

A/E $4,900,000 Q&A TBD

Page 13: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

5/5/2017 5/12/2017 DOT-170000 Ohio Department of Transportation

ODOT Project Constructability Services

A/E $93,364,500 Q&A M-Engineering, VAA Architects, LLC, Prater Engineering Associates, Inc., Matrix Architects, Inc., *ConstructAbility, Inc., Fishbeck, Thompson, Carr & Huber, Inc., Star Consultants, Inc., *Construction Process Solutions, Inc.

FY17-18 Constructability Schedule

5/5/2017 5/19/2017 OSU-170529 Ohio State University

Winter Sports Pavilion Study

Planning $75,000 Q&A *Moody Nolan, Crawford, Rossetti

5/9/2017 5/30/2017 JSC-170002 The Supreme Court of Ohio

Exterior Repairs

A/E $7,143,930 Q&A Chambers, Murphy & Burge, Moody Nolan, Inc., *OHM Advisors

5/12/2017 6/2/2017 SFC-170422 Minster Local Schools

Minster Local Schools

A/E $10,390,235 N/A *Garmann/Miller & Associates, BSHM Architects, Richard Fleischman + Partners

Page 14: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

5/15/2017 6/2/2017 WSU-Varies Wright State University

Prequalification List for Professional Services

A/E Q&A TBD Project costs will vary

5/19/2017 6/2/2017 HTC-17DENT Hocking College

Perry Campus Community Room Renovation/Upgrade - Dental Hygiene

A/E $1,000,000 Q&A

TBD N/A

5/19/2017 6/2/2017 HTC-17EQUI Hocking College

Equine/Vet Tech Facilities Renovation/Upgrade

$2,000,000 Q&A

TBD N/A

5/15/2017 6/8/2017 MUN-100074 Miami University

Regional Campuses Facilities Assessment

Planning Q&A TBD

5/15/2017 6/15/2017 MUN-100073 Miami University

Roof Replacement/Repairs 2018/2019

A/E $1,875,000 Q&A TBD

5/22/2017 6/6/2017 SFC-170444 Various Enhanced Commissioning Agents List

CxA Q&A Selection Project costs will vary

5/22/2017 6/13/2017 ELPP-NorthRoyalton

North Royalton City School District

ELPP - Design Services and Roofing Consultant

Design/Roofing

$89,900,000 N/A TBD This is an ELPP project.

Page 15: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

5/30/2017 6/16/2017 DRC-17F088 Ohio Department of Rehabilitation and Correction

LORCI/GCI/TCI General Renovations

A/E $6,681,541 N/A *GPD Group, K2M Design, Inc., Olsavsky Jaminet Architects, Inc.,Poggemeyer Design Group, Inc.

6/1/2017 6/16/2017 OSU-160920 Ohio State University

Franklin County Extension Office

CxA $5,300,000 N/A*Motz Engineering, Fishbeck, Thompson, Carr & Huber, Inc., Horizon Engineering Association, Inc.

6/7/2017 6/30/2017 SFC-TBD Firelands Local Schools

Architectural Pre-Bond Issue Assistance Services

A/E N/A TBD

6/8/2017 6/22/2017 OSB-170002 Ohio School for the Blind

OSB/Early Learning Center - Retrofit

A/E $800,000 Q&A Abbot Studios, *Jerome M. Scott Architects, Inc., Star Consultants

6/7/2017 6/19/2017 DRC-17F173 Ohio Department of Rehabilitation and

MCI Electrical Upgrades and Door Controls

A/E $1,936,930 N/A *Advanced Engineering Consultants, Inc. Kramer Engineers, Star

6/26/2017 7/13/2017 OSU-170533 The Ohio State University

Lincoln Tower 14th Floor Renovation

A/E $2,099,700 Q&A *Schooley Caldwell Associates, Davis Wince Architects, Jerome Scott Architects

N/A

Page 16: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

6/27/2017 7/12/2017 OSU-170535 The Ohio State

Mansfield - Molyet

A/E $1,588,997 Q&A *WSA Studio, M+A Architects,

6/28/2017 8/2/2017 OSU-170319 The Ohio State University

OSU East-West Wing Expansion/Renovation

A/E $21,200,000 Q&A *Moody Nolan, Design Group, NBBJ, GS&P

6/29/2017 7/14/2017 CTI-170001 Columbus State Community College

Culinary & Hospitality School

CxA $33,600,000 Q&ATBD NA

6/30/2017 7/13/2017 DRC-17F002 Ohio Department of Rehabilitation and Correction

CCI RCI LECI WCI GEN Renovation

A/E $20,466,130 Q&A K2M Design, Inc., Matrix Architects, Inc., *Schorr Architects, Inc.

N/A

7/7/2017 8/8/2017 MUN-100075 Miami University

Glos Center Reconfiguration

A/E $1,850,000 Q&A2 Q&A

7/10/2017 7/31/2017 SFC-170427 Licking Heights Local School District

Licking Heights Local School District

A/E $63,808,834 Q&AMoody Nolan, *BSHM Architects, VSWC Architects

7/12/2017 8/11/2017 YSU-1718-14 Youngstown State University

YSU Excellence Training Center

Architectural

$6,000,000

N/ASSOE Group, MS Consultants, Domokur Architects

7/26/2017 8/16/2017 SFC-170421 Fremont City School District

Fremont City Schools - Elementary Schools

A/E $56,498,048 Q&ACollaborative, Garmann Miller,*SSOE, Inc.

Page 17: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

7/26/2017 8/16/2017 SFC-170421 Fremont City School District

Fremont City Schools - High School & CT

A/E $50,632,524 Q&AGarmann Miller & Associates, *Then Design Architecture, SSOE, Inc.

7/27/2017 8/11/2017 OSU-170858 The Ohio State University

Research Foundation - 3rd Floor Renovation

A/E $1,400,000 TBD *SPGB, BHDP, SHP

7/28/2017 8/11/2017 OSU-120059 The Ohio State University

Cannon Drive Relocation - Phase 1

A/E $51,611,000

TBD TBD

7/31/2017 8/14/2017 OSU-160807 The Ohio State University

Postle Partial Replacement

Commissioning Services

$95,000,000

N/A

*Engineering Economics, Inc., Fishbeck, Thompson, Carr & Huber Inc., Osborn Engineering Co.

8/4/2017 8/18/2017 SFC-180430 Warren Local Schools

Warren Local Schools

A/E $53,430,964 Q&A JBA Architects, *Fanning Howey Associates, OHM Advisors

8/2/2017 8/25/2017 UCN-17183A University of Cincinnati

Campus Master Plan

Planning $500,000 Q&A *Ayers Saint Gross, Inc., Land

Short List

8/7/2017 8/25/2017 SFC-170424 New Bremen Local Schools

New Bremen Local Schools

A/E $20,041,930 Q&A *Garmann/Miller & Associates, Inc., Fanning/Howey Associates, Inc., BSHM Architects

Page 18: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

8/8/2017 8/23/2017 OSU-160919 The Ohio State University

Controlled Environment Food Production Complex (CEFPC)

A/E $24,000,000 N/A *Corna Kokosing, Elford,Whiting Turner, Granger Construction Co.

Selection: *Corna Kokosing, Revisions to Part E.

8/10/2017 8/25/2017 DYS-170166 Ohio Department of Youth Services

CJCF Program Building

A/E $5,000,000

N/A

Abbott Studios, *K2M Design, Inc., Renouveau Design, Inc.

8/10/2017 8/31/2017 OSU-160793 The Ohio State University

Parks - Pharmacy Practice Lab

A/E $1,708,727

N/A TBD

*WSA StudioSPGB ArchitectsBDTAID, Inc.Baxter Hodel Donnelly Preston

8/16/2017 8/31/2017 SFC-180428 Southwest Licking Local School District

Southwest Licking LSD

A/E $114,563,000

N/A

BSHM Architects, *Garmann Miller Associates, Fanning Howey Associates

8/16/2017 9/6/2017 SFC-180437 Warrensville Heights City School Distraict

New Warrensville Hgts Elementary School

A/E $21,282,183

N/A*GPD Group, Moody Nolan, Lesko Associates

8/16/2017 9/1/2017 CTI-180001 Columbus State Community College

Workforce Development Bldg. 4th floor Ballroom Audio Visual Renovation

A/E $500,000 Q&A TBD

Riffe - First Floor Renovations

A/E $1,200,105

N/A

8/11/2017 8/31/2017 OSU-170233 The Ohio State University

Page 19: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

8/18/2017 9/1/2017 SFC-180431 Carlisle Local Schools

Carlisle LSD A/E $42,178,974

Q&A

*SHP Leading Design, VSWC Architects, Levin Porter Architects

8/21/2017 8/31/2017 SFC-180429 Greenon Local Schools

Greenon Local Schools

A/E $50,643,442

N/A

*SHP Leading Design, Levin Porter Architects, Freytag & Associates

8/22/2017 9/18/2017 BGU-176287 City of Bowling Green & Bowling Green State University

City of Bowling Green & Bowling Green State University East Wooster Street Corridor Redevelopment Project

REA $ Q&A Juniper Solutions, W-ZHA, LLC, Development Strategies, Jones Lang LaSalle Americas, Inc.

8/30/2017 9/18/2017 OSU-160935 The Ohio State University

Jameson Crane-Surgical Skills Lab

A/E $1,014,171 Q&A *DLR/Westlake Reed Leskosky, Design Group, GS&P/OH, Inc., Andrews Architects

8/30/2017 9/15/2017 OSU-180042 The Ohio State University

Atwell - Entrance and First Floor Renovations

A/E $1,166,760 Q&A *Meyers Associates Architects, Miller/Watson Architects, The Oregon Group Architects

Page 20: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

8/30/2017 9/13/2017 OSU-170534 The Ohio State University

Lincoln - Exterior Repairs

A/E $2,849,472

NA

*ES Architecture, Barber Hoffman,WJE, Schooley Caldwell

8/31/2017 9/19/2017 OSU-170192 The Ohio State University

Wooster - New Laboratory Building

CxA $33,500,000

N/A

*Heapy Engineering, Karpinski Engineering, Engineering Economics, Inc., Aramark Management Services Limited Partnership

8/31/2017 9/18/2017 OSU-180086 The Ohio State University

OSUWMC - Pharmacy Compliance

A/E $1,000,000 Q&A *M+A Architects, Array Architects, Inc.,Harley Ellis Devereaux

9/1/2017 9/15/2017 OSU-170626 The Ohio State University

Reactor Building - Drive System

A/E $234,600 N/A *Assurance Technical Services

Selection: *Assurance Technical Services

9/6/2017 9/21/2017 OSU-180048 The Ohio State University

Waterman - Multi-Species Facility

A/E $15,400,000

N/A TBD

9/7/2017 9/22/2017 DAS-180010 Ohio Department of Administrative Services

SOCC Security Upgrades

A/E $4,500,000 Q&A *L J B, Inc., Prater Engineering Associates, Inc., Scheeser Buckley Mayfield LLC

Page 21: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

9/15/2017 10/5/2017 SFC-180436 Clark Shawnee LSD

Clark Shawnee LSD

A/E $52,884,068

N/A

*SHP Leading Design, BSHM Architects, Fanning/Howey Associates

9/15/2017 10/3/2017 OSU-180069 The Ohio State University

Cannon Drive Relocation - Phase 2

A/E $

N/A

*EMH&T, Michael Baker International, American Structurepoint,Pennoni

9/18/2017 10/6/2017 OSU-180021 The Ohio State University

WHAC - Indoor Field Roof Replacement

A/E $3,236,055

N/A

*MSA Architects, eS Architecture, Wheaton Sprague, Osborn Engineering

9/21/2017 10/11/2017 OSU-180070 The Ohio State University

680 Ackerman - IHC/Histology Lab

A/E $5,210,000 N/A *Davis Wince, Baxter Hodell Donnelly Preston, Inc., Van Auken Akins

Selection: *Davis Wince

9/26/2017 10/25/2017 LCC-170401 Lake County Community College District

Site, Roadways, and Parking Lot Improvements Project

A/E $25,000,000 TBD TBD

9/27/2017 10/13/2017 WSU-170013 Wright State University

Campus Lab Modernization

A/E $3,000,000 TBD BHDP, SFA, SPGB Architects

Page 22: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

9/27/2017 10/13/2017 MUN-100076 Miami University

Campus Gateway and Safety Enhancements

A/E $921,000 TBD TBD

9/28/2017 10/19/2017 OSU-170319 The Ohio State University

OSU East - West Wing Expansion/Renovation

CxA $21,200,000 TBD *Engineering Economics, Karpinski, FTCH,Stan

Selection: *Engineering Economics

10/3/2017 10/16/2017 BGU-176326 Bowling Green State University

MPE - Harshman Quadrangle Demolition

A/E $1,600,000 Q&A *Evans, Mechwart, Hambleton & Tilton, Inc. (EMH&T), The Mannik & Smith Group, Inc, Poggemeyer Design Group

10/5/2017 10/17/2017 OHU-180002 Ohio University

Academic Success Center

A/E $2,880,000 Q&A Design Group, MSA Architects, *Legat & Kingscott.

Selection: Legat & Kingscott,

10/10/2017 11/3/2017 OHU-180003 Ohio University

Bromley Infrastructure Improvements

A/E $7,500,000 Q&A Short List Selection: *Prater Engineering Associates, Inc.

10/10/2017 10/20/2017 DYS-170172 Ohio Department of Youth Services

IRJCF Improvements

A/E $2,750,000

N/A

Kramer Engineers, *Poggemeyer Design Group, Inc., Richard Fleischman/DS Architecture

Page 23: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

10/12/2017 11/2/2017 UCN-17066B University of Cincinnati

French West HVAC Upgrade

A/E $7,560,000 TBD *Fishbeck, Thompson, Carr & Huber, Inc., Fosdick & Hilmer, Inc.,KLH Engineers

Selection: *Fishbeck, Thompson, Carr & Huber, Inc.

10/17/2017 11/9/2017

DNR-170127

Ohio Department of Natural Resources

Veto Lake Dam and Spillway Rehabilitation

A/E $9,200,000 TBD TBD RFQ Terminated 11/3/2017

10/18/2017 11/13/2017 MUN-100077 Miami University

Upham Hall Classroom Upgrades 2018

A/E $897,000 TBD

TBD

10/24/2017 11/17/2017 YSU-171835 Youngstown State University

YSU John J. & Janet Cafaro Hall Addition

A/E $2,000,000 TBD TBD

10/24/2017 11/10/2017 SOC-180002 Southern State Community College

Adams County Satellite Campus

A/E $5,000,000 Q&A TBD

10/24/2017 11/10/2017 OSU-180118 The Ohio State University

Morehouse Pavilion - Planning Study

Planning $80,000 TBD *CBLH, Inc., Andrews Architects, Inc., AECOM

Selection: *CBLH, Inc.

10/25/2017 11/8/2017 OSU-170469 The Ohio State University

Doan - 7th Floor NCH NICU

A/E $1,500,000 TBD *M+A Architects, NBBJ, Design Group, Array Architects

Selection: M+A Architects

11/9/2017 11/22/2017 OSU-180355 The Ohio State University

Interdisciplinary Research Facility

A/E QA *Moody Nolan, NBBJ, Ennead

Selection: *Moody Nolan

Page 24: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

11/9/2017 11/22/2017 OSU-180355 The Ohio State University

Interdisciplinary Research Facility

Design Architect

QA *Pelli Clarke Pelli, NBBJ, Ennead

Selection: *Pelli Clarke Pelli

11/9/2017 11/22/2017 OSU-180356 The Ohio State University

Health Sciences Faculty Office and Optometry Clinic Building

Criteria A/E

$2,000,000 QA *Acock Assoc., NBBJ, The Columbus Architectural Studio

Selection: *Acock Assoc.

11/9/2017 11/22/2017 OSU-180285 The Ohio State University

Arts District A/E QA *DLR Group, Schooley Caldwell, H3 Hardy Collaboration

Selection: *DLR Group

11/9/2017 11/22/2017 OSU-180354 The Ohio State University

Interdisciplinary Health Sciences Center

A/E QA *CO Architects, S/L/A/M Collaborative, DLR Group/Westlake Reed Leskosky

Selection: *CO Architects

11/9/2017 11/22/2017 OSU-180354 The Ohio State University

Interdisciplinary Health Sciences

Design Architect

QA *Acock Association, Schooley

Selection: *Acock Association

11/13/2017 11/30/2017 OSU-180186 The Ohio State University

Brain & Spine - Multidisciplinary Clinic

A/E $2,600,000 TBD *Welty Building, Adena Corporation, Elford Inc.

Selection:*Welty Building

11/15/2017 12/1/2017 SFC-180438 Talawanda School District

Marshall Elementary School

A/E $10,839,786 TBD *SHP Leading Design, VSWC Architects, Levin Porter Architects

Selection: *SHP Leading Design

Page 25: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

11/21/2017 12/6/2017 DOT-170000 Ohio Department of Transportation

ODOT Project Schedule Services Consultant

A/E $93,364,500 QA *Construct Ability, Inc., H.R. Gray, *Regency Construction Services, Inc., NV5, Inc., Construction Process Solutions, Ltd.

Selection: *Construct Ability, Inc., *Regency Construction Services, Inc.

11/27/2017 12/15/2017 Oberlin Board of Education, Oberlin City Schools

Facilities Master Plan

A/E

TBD

TBDTotal cost - TBD

11/28/2017 12/5/2017 DAS-170066 Ohio Department of Administrative Services

Riffe Elevator Modernization Schedule Services

A/E $6,971,600 TBD BSHM Architects Inc., Feinknopf Macioce Schappa Architects, Inc., *GTSA Construction Consulting LLC

Selection: *GTSA Construction Consulting LLC

11/30/2017 12/14/2017 OSU-180390 The Ohio State University

Wexner Medical Center Ambulatory Facility

A/E QA *Perkins & Will of Ohio, DLR Group/Westlake Reed Leskosky, EYP Architecture & Engineering, Cannon Design Ohio

Total Project Cost: TBD

11/30/2017 12/13/2017 OSU-180391 The Ohio State University

Wexner Medical Center Hospital

A/E QA *Henningson, Durham & Richardson P.C. (HDR), EYP Architecture & Engineering

Selection: *Henningson, Durham & Richardson P.C. (HDR)

Page 26: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

11/30/2017 12/20/2017 SFC-180440 Brunswick City Schools

New Brunswick Middle School

A/E $50,554,263 QA *ThenDesign Architecture

Selection: *ThenDesign Architecture

12/1/2017 1/5/2018 OSU-170213 The Ohio State University

Doan - Exterior Brick Repair

A/E $1,067,000 TBD *THP Limited, eS Architecture, Wiss, Janney, Elstner Associate, Prime AE

Selection: *THP Limited

12/1/2017 12/20/2017 Various The Ohio State University

General Qualifications for Prequalification List of Professional Services - 330, Part II

A/E TBD TBD

Project Cost: TBD

12/5/2017 12/19/2017 WSU-170047 Wright State University

WSU Extension Building

A/E $2,525,000 TBD TBD Updated to include POR

12/5/2017 12/21/2017 OSU-180173 The Ohio State University

Building Envelope Renovation FY 18

A/E $3,654,500 TBD TBD

12/6/2017 12/27/2017 BGU-176432 Bowling Green State University

BGSU Stroh and Sebo Athletic Upgrades

A/E $1,320,000 Q&A Short list

12/8/2017 1/26/2018 OSU-170509 The Ohio State University

Neurodiagnostics Renovations

A/E $786,900 TBD TBD

Page 27: Qualifications-based Selection (QBS) Requests for ...ofcc.ohio.gov/Portals/0/Documents/Opportunities/OhioReg/2017/2017... · 2/28/2017 3/16/2017. OSU-160933; The Ohio State Newark

12/11/2017 1/17/2018 DNR-180017 Ohio Department of Natural Resources

Lake White Reservoir Water Transfer

A/E $875,000 Q&A TBD Response Deadline has changed to 01/17/18

12/14/2017 1/30/2018 UCN-17185B University of Cincinnati

College of Law (renovation of ex. COB building)

A/E $40,000,000 Q&A Shortlist

12/21/2017 1/17/2018 OSU-180221 The Ohio State University

Drackett Tower - Boiler Replacements

A/E $2,032,644 TBD TBD

12/21/2017 1/3/2018 DMH-180002 Ohio Department of Mental Health and Addiction Services

Moritz Interior & HVAC Renovation, Security System & Generator Replacement

A/E $6,148,023 TBD Abbot Studios, Star Consultants, *Champlin Architecture

Selection: *Champlin Architecture