(qdfwhg 5rdg 3odq · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )<...

336
2018 Enacted Road Plan Amended Senate Draft Report Date: 4/16/2018 1:04:00PM

Upload: others

Post on 21-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

2018 Enacted Road Plan

Amended Senate Draft

Report Date:4/16/2018 1:04:00PM

Page 2: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ADAIR KY-704 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 (11.909) OVER PETTY'S FORK. (001B00078N)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

490,000

0 175,000 490,000 0 0 0 0

1068

ADAIR LN-9008 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 43.02 TO MILEPOINT 57.79

PL

Project Cost:

CN

UT

RW

DN PM

PM

400,000

4,000,000

0 0 0 0 0 4,400,000 0

20000

ADAIR KY 55 CONGESTION MITIGTN(O)

KY 55 NEW TURNING LANE AT BETTY'S OK COUNTRY COOKING

PL

Project Cost:

CN

UT

RW

DN SPP 250,000

0 0 250,000 0 0 0 0

80003

Total for ADAIR county PL

Total Amounts:

CN

UT

RW

DN 175,000 250,000

490,000 4,000,000

400,000

0 175,000 740,000 0 0 4,400,000 0

ALLEN KY-100 RECONSTRUCTION(O)IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTION IMPROVEMENTS FROM NEAR THE STONY POINT ROAD INTERSECTION TO EAST OF THE ALONZO LONG HOLLOW

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

1,880,000

1,300,000

12,000,000

0 0 1,880,000 1,300,000 0 12,000,000 0

320

2

Page 3: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ALLEN KY-100 RECONSTRUCTION(O)IMPROVE KY-100 (OLD GALLATIN ROAD) FROM SOUTH OF KY-2160 TO KY-980. (06CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 1,250,000

1,250,000 0 0 0 0 0 0

8305

ALLEN KY-100 MAJOR WIDENING(O) WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 LANES WITH URBAN SECTION FROM OLIVER STREET TO US 31E TO INCREASE CAPACITY/SAFETYMP 11.800-12.700 (14CCN)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

480,000

380,000

670,000

3,800,000

0 0 0 480,000 380,000 670,000 3,800,000

8802

ALLEN ECONOMIC DEVEL(O)IMPROVE ACCESS ROAD ON EACH END OF INDUSTRIAL ACCESS ROAD IN SCOTTSVILLE

PL

Project Cost:

CN

UT

RW

DN

SPP 300,000

0 0 300,000 0 0 0 0

8901

ALLEN KY-3499 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3499 BRIDGE OVER BAYS FORK. (002B00004N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

525,000

0 175,000 525,000 0 0 0 0

10000

ALLEN KY-585 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 585 BRIDGE OVER MIDDLE FORK DRAKES CREEK. (002B00021N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

822,500

0 245,000 822,500 0 0 0 0

10011

3

Page 4: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ALLEN US 231 AIR QUALITY(P) CONSTRUCT A NEW TURN LANE ON US 231 AT JOHNSON ROAD TO IMPROVE ACCESS TO INDUSTRIAL PARK

PL

Project Cost:

CN

UT

RW

DN

SPP 250,000

0 0 250,000 0 0 0 0

80004

Total for ALLEN county PL

Total Amounts:

CN

UT

RW

DN

1,250,000

420,000

1,880,000

1,897,500

480,000

1,300,000

380,000

12,000,000

670,000

3,800,000

1,250,000 420,000 3,777,500 1,780,000 380,000 12,670,000 3,800,000

ANDERSON BG-9002 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 58.3 TO MILEPOINT 61.84

PL

Project Cost:

CN

UT

RW

DN PM

PM

150,000

1,500,000

0 0 0 0 0 0 1,650,000

20001

ANDERSON US-62 SPOT IMPROVEMENTS(O)

IMPROVE US-62 (VERSAILLES RD.) FROM HILLTOP DR. TO WEST END OF BRIDGE OVER KENTUCKY RIVER AT TYRONE

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,200,000

3,300,000

4,000,000

11,300,000

0 0 1,200,000 3,300,000 4,000,000 11,300,000 0

80001

Total for ANDERSON county PL

Total Amounts:

CN

UT

RW

DN 1,200,000

3,300,000

4,000,000

11,300,000

150,000

1,500,000

0 0 1,200,000 3,300,000 4,000,000 11,300,000 1,650,000

4

Page 5: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BALLARD US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10) (06CCR)(12CCR)(14CCR).

PL

Project Cost:

CN

UT

RW

DN

NH

NH

2,500,000

3,500,000

0 0 2,500,000 3,500,000 0 0 0

115

BALLARD US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1-115.10) (06CCR)(12CCR)(14CCR).

PL

Project Cost:

CN

UT

RW

DN

NH 2,500,000

0 0 0 2,500,000 0 0 0

115.01

BALLARD US-60 MAJOR WIDENING(O) IMPROVE US-60 FROM PROPOSED SOUTHERN BYPASS OF LA CENTER TO EAST OF DENIS JONES ROAD. (02CCR

PL

Project Cost:

CN

UT

RW

DN

NH

NH

2,370,000

1,900,000

0 0 0 0 0 0 4,270,000

118

BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDE EXISTING LOCATION. (004B00021N)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

BR

BR

2,500,000

1,000,000

100,000

49,500,000

0 0 2,500,000 0 0 50,600,000 0

1140.01

BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDE EXISTING LOCATION.(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

6,500,000

49,500,000

0 0 0 0 6,500,000 0 49,500,000

1140.02

5

Page 6: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDE EXISTING LOCATION.

PL

Project Cost:

CN

UT

RW

DN BR 20,000,000

0 0 0 20,000,000 0 0 0

1140.03

BALLARD US-51 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

275,000

2,750,000

0 0 3,025,000 0 0 0 0

20000

Total for BALLARD county PL

Total Amounts:

CN

UT

RW

DN 2,775,000

2,500,000

2,750,000

20,000,000

2,500,000

3,500,000

6,500,000

49,500,000

1,000,000

100,000

2,370,000

1,900,000

49,500,000

0 0 8,025,000 26,000,000 6,500,000 50,600,000 53,770,000

BARREN KY-90 RECONSTRUCTION(O)PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVER FALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE. (2002BOPC(08CCR)(10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 3,950,000

0 0 0 0 3,950,000 0 0

108.5

BARREN KY-90 PREFINANCD CONVRSN(P)

PRIORITY SECTION 3: IMPROVE KY-90 EAST OF GLASGOW FROM BRIDGE OVER FALLEN TIMBER CREEK TO THE METCALFE COUNTY LINE. (2002BOPC(08CCR)(10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 9,210,000

0 0 0 0 0 9,210,000 0

108.51

6

Page 7: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BARREN LN-9008 AM-BRG PAINTING(P) LOUIE B NUNN PKWY (LN-9008) BRIDGE PAINTING, CLEANING, AND MINOR REPAIRS ON BRIDGE OVER I-65 IN BARREN CO. KY. 005B00067R, 005B00067L (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

NH 500,000

500,000 0 0 0 0 0 0

195

BARREN KY-1297 MAJOR WIDENING(O) IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS), AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.

PL

Project Cost:

CN

UT

RW

DN

STP

STP

2,250,000

2,000,000

0 0 0 0 4,250,000 0 0

8821

BARREN KY-1297 PREFINANCD CONVRSN(O)

IMPROVE KY-1297 FROM CR-1366 (DONNELLY DRIVE) TO US-31E (ROGER WELLS), AND IMPROVE CR-1366 (DONNELLY DRIVE) FROM KY-1297 TO US-68 IN GLASGOW.

PL

Project Cost:

CN

UT

RW

DN

STP

STP

2,250,000

2,000,000

0 0 0 0 0 4,250,000 0

8821.01

BARREN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31EX BRIDGE OVER WATER STREET. (005B00058N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

945,000

0 245,000 945,000 0 0 0 0

10001

BARREN I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 42.89 TO MILEPOINT 43.307

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 550,000 0 0 0 0 0

20000

7

Page 8: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BARREN I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 45.935 TO MILEPOINT 46.881

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 0 0 0 550,000

20001

BARREN LN-9008 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 16.117 TO MILEPOINT 20.1

PL

Project Cost:

CN

UT

RW

DN PM

PM

320,000

3,200,000

0 3,520,000 0 0 0 0 0

20003

BARREN LN-9008 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 20.1 TO MILEPOINT 22.357

PL

Project Cost:

CN

UT

RW

DN PM

PM

180,000

1,800,000

0 0 0 1,980,000 0 0 0

20004

BARREN LN-9008 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 9.375 TO MILEPOINT 14.85

PL

Project Cost:

CN

UT

RW

DN PM

PM

440,000

4,400,000

0 0 0 4,840,000 0 0 0

20005

BARREN US-68 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

400,000

4,000,000

0 0 0 4,400,000 0 0 0

20006

8

Page 9: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BARREN US-68 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 0.00 TO MILEPOINT 9.70

PL

Project Cost:

CN

UT

RW

DN

PM 1,180,000

0 0 0 0 1,180,000 0 0

20020

BARREN US-68 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-68 FROM MILEPOINT 16.95 TO MILEPOINT 23.16

PL

Project Cost:

CN

UT

RW

DN

PM 920,000

0 0 0 0 920,000 0 0

20021

BARREN LN-9008 NEW INTERCHANGE(O)

NEW INTERCHANGE ON THE LOUIE NUNN CUMBERLAND PARKWAY AT KY-249 IN GLASGOW

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,500,000

2,000,000

750,000

8,000,000

0 0 1,500,000 2,000,000 750,000 0 8,000,000

80002

Total for BARREN county PL

Total Amounts:

CN

UT

RW

DN

500,000

615,000

3,700,000

1,500,000

945,000

1,020,000

2,000,000

10,200,000

2,250,000

2,750,000

9,210,000

2,250,000

2,000,000

6,050,000

50,000

8,500,000

500,000 4,315,000 2,445,000 13,220,000 11,050,000 13,460,000 8,550,000

BATH US-60 SAFETY(P) IMPROVE SAFETY AND EFFICIENCY AT THE KY-211 AND US-60 INTERSECTION IN SALT LICK. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 1,000,000 0 0 0 0

8813

9

Page 10: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BATH KY-1106 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1106 BRIDGE OVER FLAT CREEK. (006B00069N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

595,000

2,258,000

0 595,000 2,258,000 0 0 0 0

10000

BATH KY-1944 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1944 BRIDGE OVER WHITE OAK CREEK. (006B00076N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

473,000

1,015,000

0 473,000 1,015,000 0 0 0 0

10001

BATH KY-211 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 211 BRIDGE OVER COW CREEK. (006B00043N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

315,000

717,500

0 315,000 717,500 0 0 0 0

10017

BATH US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM 410,000

0 410,000 0 0 0 0 0

20001

Total for BATH county PL

Total Amounts:

CN

UT

RW

DN 1,793,000

4,990,500

0 1,793,000 4,990,500 0 0 0 0

10

Page 11: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK. (007B00071N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

441,000

0 175,000 441,000 0 0 0 0

10000

BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE OVER RED BIRD CREEK. (007B00072N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

791,000

0 175,000 791,000 0 0 0 0

10001

BELL CR-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1041 BRIDGE OVER YORK BRANCH. (007C00003N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

193,000

595,000

0 193,000 595,000 0 0 0 0

10002

BELL KY-92 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER GREASY CREEK. (007B00040N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

490,000

0 175,000 490,000 0 0 0 0

10038

BELL KY-2012 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT, SCHOOL BUS SAFETY ISSUE.

PL

Project Cost:

CN

UT

RW

DN PM

PM

61,000

610,000

0 671,000 0 0 0 0 0

20000

11

Page 12: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BELL US-25 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 0.90 TO MILEPOINT 2.86

PL

Project Cost:

CN

UT

RW

DN

PM 1,391,000

0 0 0 0 1,391,000 0 0

20021

BELL NEW ROUTE(O) CONSTRUCT A NEW ROADWAY ON PAGE SPUR RD.

PL

Project Cost:

CN

UT

RW

DN

SPP 650,000

0 0 0 650,000 0 0 0

80050

Total for BELL county PL

Total Amounts:

CN

UT

RW

DN 779,000

610,000 2,317,000 650,000 1,391,000

0 1,389,000 2,317,000 650,000 1,391,000 0 0

BOONE I-75 I-CHANGE RECONST(O)

IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

5,430,000

5,000,000

5,430,000 0 0 5,000,000 0 0 0

14

BOONE I-75 PREFINANCD CONVRSN(O)

IMPROVE THE KY-536 (MT. ZION ROAD) INTERCHANGE. (14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 17,080,000

0 0 0 0 17,080,000 0 0

14.02

12

Page 13: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE I-75 MINOR WIDENING(O) ADD AUXILIARY LANES ON I-71/75 FROM KY-536 TO US-42 (NB & SB) AS PER THE INTERCHANGE JUSTIFICATION STUDY (IJS).(10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,060,000

10,000,000

1,060,000 0 0 0 0 0 10,000,000

14.5

BOONE I-275 NEW INTERCHANGE(O)

IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD).

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

3,000,000

4,000,000

3,000,000

5,000,000

0 3,000,000 12,000,000 0 0 0 0

78

BOONE I-275 PREFINANCD CONVRSN(O)

IMPROVE FREIGHT MOBILITY AT I-275 AND GRAVES ROAD (CONTINUATION OF 6-8953: INTERCHANGE JUSTIFICATION STUDY ON I-275/GRAVES RD).

PL

Project Cost:

CN

UT

RW

DN

NH

NH

4,000,000

10,000,000

0 0 0 4,000,000 10,000,000 0 0

78.01

BOONE I-75 CONGESTION MITIGTN(O)

IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM RAMPS.

PL

Project Cost:

CN

UT

RW

DN NH 2,000,000

0 2,000,000 0 0 0 0 0

79

BOONE I-75 CONGESTION MITIGTN(O)

REDUCE CONGESTION AND IMPROVE TRAFFIC MOBILITY AT THE INTERCHANGE OF I-75 AND KY-14 IN WALTON.

PL

Project Cost:

CN

UT

RW

DN

NH 500,000

0 0 0 500,000 0 0 0

80

13

Page 14: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE US-25 MINOR WIDENING(O) MINOR WIDENING AND CONSTRUCT A SOUTHBOUND LEFT TURN LANE ON US-25 (DRY RIDGE-FLORENCE ROAD) AT MUBEA.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,100,000

0 1,100,000 0 0 0 0 0

351.45

BOONE US-42 SAFETY(P) IMPROVE MOBILITY AT THE INTERSECTION OF KY-842 AND US-42(12CCR)(16CCN)

PL

Project Cost:

CN

UT

RW

DN

STP 2,500,000

2,500,000 0 0 0 0 0 0

367

BOONE -0 MATCHED FED FUNDS(O)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 414,000

414,000 0 0 0 0 0 0

400.03

BOONE -0 MATCHED FED FUNDS(O)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 44,000

0 44,000 0 0 0 0 0

400.14

BOONE -0 MATCHED FED FUNDS(O)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 44,000

0 0 44,000 0 0 0 0

400.15

14

Page 15: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE -0 MATCHED FED FUNDS(O)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 44,000

0 0 0 44,000 0 0 0

400.16

BOONE -0 MATCHED FED FUNDS(O)

NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 44,000

0 0 0 0 44,000 0 0

400.17

BOONE -0 MATCHED FED FUNDS(O)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 280,000

280,000 0 0 0 0 0 0

401.09

BOONE -0 MATCHED FED FUNDS(O)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 56,000

0 56,000 0 0 0 0 0

401.14

BOONE -0 MATCHED FED FUNDS(O)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 56,000

0 0 56,000 0 0 0 0

401.15

15

Page 16: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE -0 MATCHED FED FUNDS(O)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 56,000

0 0 0 56,000 0 0 0

401.16

BOONE -0 MATCHED FED FUNDS(O)

OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK 56,000

0 0 0 0 56,000 0 0

401.17

BOONE -0 MATCHED FED FUNDS(O)

N KY PLANNING FY18 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

SNK 150,000

150,000 0 0 0 0 0 0

401.18

BOONE -0 MATCHED FED FUNDS(O)

N KY PLANNING FY 2019 AIR QUALITY, FIAM, LAND USE, RIDESHARE. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

SNK 150,000

0 150,000 0 0 0 0 0

401.19

BOONE -0 MATCHED FED FUNDS(O)

N KY PLANNING FY 2020 AIR QUALITY, FIAM, LAND USE, RIDESHARE.

PL

Project Cost:

CN

UT

RW

DN

SNK 150,000

0 0 150,000 0 0 0 0

401.2

16

Page 17: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE -0 MATCHED FED FUNDS(O)

N KY PLANNING FY 2021 AIR QUALITY, FIAM, LAND USE, RIDESHARE.

PL

Project Cost:

CN

UT

RW

DN

SNK 150,000

0 0 0 150,000 0 0 0

401.21

BOONE KY-237 MATCHED FED FUNDS(O)

INCREASE THROUGH LANE CAPACITY ON KY 237 FROM I-275 RAMPS TO CARDINAL WAY AND IMPROVE WORLDWIDE BLVD WITH TWO-WAY LEFT TURN AND ADDITIONAL RIGHT

PL

Project Cost:

CN

UT

RW

DN

SNK 3,000,000

3,000,000 0 0 0 0 0 0

415

BOONE CR-1002 MATCHED FED FUNDS(O)

RECONSTRUCTION OF THE INTERSECTION OF CAMP ERNST ROAD AND LONGBRANCH ROAD. WIDENING OF 1,900 FEET OF LONGBRANCH ROAD. (2012BOP)

PL

Project Cost:

CN

UT

RW

DN

SNK 524,640

524,640 0 0 0 0 0 0

422

BOONE KY-3060 MATCHED FED FUNDS(O)

CORRECT GEOMETRIC DEFICIENCIES AND ADD LEFT TURN LANES ON FROGTOWN ROAD AT TRIPLE CROWN BLVD AND CEDARWOOD.(2012BOP)(ADM. BY KYTC)

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

200,000

120,000

1,200,000

1,520,000 0 0 0 0 0 0

423

BOONE KY-717 SAFETY(P) IMPROVE SAFETY ALONG KY 717 AT THE 90 DEGREE BEND NEAR THE CIN/NKY AIRPORT, 0.337 MI N OF KY 1017. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

1,500,000

250,000

1,000,000

2,750,000 0 0 0 0 0 0

433

17

Page 18: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE KY-3159 MATCHED FED FUNDS(O)

WIDEN KY 3159 (TED BUSHELMAN BLVD) FROM DOERING DRIVE TO KY 1017 (AERO PARKWAY) TO PROVIDE A TWO-WAY LEFT TURN LANE TO IMPROVE TRAFFIC FLOW FOR FUTURE

PL

Project Cost:

CN

UT

RW

DN

SNK 1,000,000

1,000,000 0 0 0 0 0 0

439

BOONE KY-237 MATCHED FED FUNDS(O)

CONSTRUCT A MULTI-MODAL PATH ALONG KY 237 FROM STEPHENS ELEMENTARY SCHOOL NORTH TO KY 20/PETERSBURG ROAD (2016BOP).

PL

Project Cost:

CN

UT

RW

DN

SNK 1,786,400

1,786,400 0 0 0 0 0 0

440

BOONE KY-3076 BIKE/PED FACIL(O) CONSTRUCT NEW SIDEWALKS, DEDICATED BIKE LANES AND RETAINING WALLS ALONG DOLWICK ROAD TO MINEOLA PIKE TO OLYMPIC BLVD IN THE CITY OF ERLANGER.

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

80,000

200,000

1,576,000

280,000 1,576,000 0 0 0 0 0

441

BOONE CR-1001 MATCHED FED FUNDS(O)

ADD A LEFT TURN LANE ON SB CAMP ERNST ROAD AT LONGBRANCH ROAD (2016BOP).

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

400,000

69,271

461,809

469,271 461,809 0 0 0 0 0

442

BOONE KY-236 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-236 (DONALDSON ROAD) FROM KY-842 (HOUSTON ROAD) TO KY-3076 (MINEOLA PIKE).

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

2,000,000

5,000,000

1,000,000

0 2,000,000 5,000,000 0 0 1,000,000 0

444

18

Page 19: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE KY-3076 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON KY-3076 (MINEOLA PIKE) FROM KY-236 TO I-275.

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

1,500,000

4,000,000

750,000

0 1,500,000 0 0 4,000,000 750,000 0

445

BOONE US-42 NEW ROUTE(O) PROVIDE EAST-WEST CONNECTIVITY AND IMPROVED MOBILITY FROM KY-237 (PLEASANT VALLEY ROAD) THRU KY-842 (HOPEFUL CHURCH ROAD) TO MALL ROAD/I-75

PL

Project Cost:

CN

UT

RW

DN NH 1,500,000

0 0 1,500,000 0 0 0 0

446

BOONE US-25 MAJOR WIDENING(O) IMPROVE MOBILITY AND REDUCE CONGESTION ON US-25 FROM WINNING COLORS DRIVE TO THE NORFOLK SOUTHERN RAILROAD CROSSING SOUTH OF KY-1829

PL

Project Cost:

CN

UT

RW

DN STP 3,300,000

0 0 0 0 0 3,300,000 0

447

BOONE -0 SAFETY(P) SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FOR AMAZON DEVELOPMENT.

PL

Project Cost:

CN

UT

RW

DN

SPP 2,000,000

2,000,000 0 0 0 0 0 0

937

BOONE -0 PREFINANCD CONVRSN(O)

SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FOR AMAZON DEVELOPMENT. (ADDITIONAL FUNDING FOR 6-937.00)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,000,000

0 2,000,000 0 0 0 0 0

937.01

19

Page 20: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SNK 35,140,000

35,140,000 0 0 0 0 0 0

966

BOONE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019 (FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SNK 9,100,000

0 9,100,000 0 0 0 0 0

966.07

BOONE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SNK 9,200,000

0 0 9,200,000 0 0 0 0

966.08

BOONE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SNK 9,200,000

0 0 0 9,200,000 0 0 0

966.09

BOONE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SNK 9,200,000

0 0 0 0 9,200,000 0 0

966.1

20

Page 21: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SNK 9,200,000

0 0 0 0 0 9,200,000 0

966.11

BOONE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR NKY URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SNK 9,200,000

0 0 0 0 0 0 9,200,000

966.12

BOONE KY-842 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON RICHARDSON ROAD (KY 842) 0.14 MI E OF US 25 NEAR INDEPENDENCE (008B00092N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

BR

BR

480,000

2,800,000

350,000

3,500,000

0 480,000 3,150,000 0 3,500,000 0 0

1087

BOONE KY-338 TRANSP ENHANCEMENT(P)

PHASE II: IMPROVE INTERSECTION OPERATIONS AT THE INTERSECTIONS OF IDLEWILD RD. (KY-338)/JEFFERSON ST./TEMPERATE ST. AND IMPROVE PEDESTRIAN SAFETY ALONG

PL

Project Cost:

CN

UT

RW

DN

STP 500,000

500,000 0 0 0 0 0 0

3019.1

BOONE KY-237 RECONSTRUCTION(O)IMPROVE KY-237 FROM VALLEY VIEW DRIVE TO ROGERS LANE. (14CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 22,180,000

22,180,000 0 0 0 0 0 0

8001.21

21

Page 22: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE I-71 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 69.89 TO MILEPOINT 77.724

PL

Project Cost:

CN

UT

RW

DN PM

PM

650,000

6,500,000

0 0 0 0 0 0 7,150,000

20001

BOONE I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 169.439 TO MILEPOINT 183.08

PL

Project Cost:

CN

UT

RW

DN PM

PM

2,180,000

21,800,000

0 0 23,980,000 0 0 0 0

20002

BOONE I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-075 BOTH DIRECTION(S) FROM MILEPOINT 183.08 (182.9 NON-CARDINAL) TO MILEPOINT 183.312

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 1,100,000 0 0 0

20004

BOONE I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-275 BOTH DIRECTION(S) FROM MILEPOINT 13.076 TO MILEPOINT 13.7

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 550,000 0 0 0

20005

BOONE I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 1.58 TO MILEPOINT 7.25

PL

Project Cost:

CN

UT

RW

DN PM

PM

850,000

8,500,000

0 0 0 9,350,000 0 0 0

20006

22

Page 23: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 7.25 TO MILEPOINT 13.08 (13.56 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

650,000

6,500,000

0 0 0 0 0 0 7,150,000

20007

BOONE KY-18 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

225,000

2,250,000

0 2,475,000 0 0 0 0 0

20008

BOONE KY-237 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

320,000

3,200,000

0 0 0 3,520,000 0 0 0

20009

BOONE US-42 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-42 FROM MILEPOINT 8.71 TO MILEPOINT 11.63

PL

Project Cost:

CN

UT

RW

DN

PM 438,000

0 0 0 0 0 438,000 0

20047

BOONE KY-237 RECONSTRUCTION(O)RECONSTRUCT GUNPOWDER RD. FROM US-42 TO KY-536

PL

Project Cost:

CN

UT

RW

DN SPP 1,000,000

0 1,000,000 0 0 0 0 0

80000

23

Page 24: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOONE KY-237 CONGESTION MITIGTN(O)

EXPANSION OF ROUNDABOUTS ALONG KY-237 AT CARDINAL COVE AND GRAVES RD

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

500,000

250,000

250,000

0 1,000,000 0 0 0 0 0

80001

BOONE US 42 AIR QUALITY(P) INCREASE CAPACITY AND REDUCE CONGESTION ON US 42 AT I 71/75

PL

Project Cost:

CN

UT

RW

DN SPP 650,000

0 650,000 0 0 0 0 0

80003

Total for BOONE county PL

Total Amounts:

CN

UT

RW

DN

150,000

2,180,000

7,129,271

71,525,040

2,150,000

9,355,000

250,000

250,000

16,587,809

150,000

8,680,000

6,800,000

3,350,000

36,100,000

650,000

1,320,000

4,000,000

27,500,000

4,000,000

9,638,000

3,300,000

1,000,000

750,000

39,880,000

1,300,000

32,200,000

80,984,311 28,592,809 55,080,000 33,470,000 43,880,000 14,688,000 33,500,000

BOURBON KY-3364 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRUCTURE OVER SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH OF US 460 AT NORTH MIDDLETOWN (BRIDGE IMPROVEMENTS). (03KYDN)(2012BOP

PL

Project Cost:

CN

UT

RW

DN KYD 1,568,000

1,568,000 0 0 0 0 0 0

365.1

BOURBON US-460 RECONSTRUCTION(O)IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

1,000,000

1,000,000

5,620,000

0 2,000,000 0 5,620,000 0 0 0

8705

24

Page 25: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOURBON US-460 PREFINANCD CONVRSN(O)

IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

2,030,000

1,500,000

6,880,000

0 0 0 3,530,000 0 6,880,000 0

8705.01

BOURBON CR-1205 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOUSTON ANTIOCH RO BRIDGE OVER HOUSTON CREEK. (009C00031N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

143,500

325,500

0 143,500 325,500 0 0 0 0

10007

BOURBON CR-1320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER CSX RR. (009R00605N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

220,500

518,000

0 220,500 518,000 0 0 0 0

10008

BOURBON US-68 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

250,000

2,500,000

0 2,750,000 0 0 0 0 0

20002

Total for BOURBON county PL

Total Amounts:

CN

UT

RW

DN 1,568,000 614,000

1,000,000

1,000,000

2,500,000 843,500

2,030,000

1,500,000

5,620,000 6,880,000

1,568,000 5,114,000 843,500 9,150,000 0 6,880,000 0

25

Page 26: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOYD -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2018. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SAH 6,265,000

6,265,000 0 0 0 0 0 0

208.04

BOYD -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2019. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SAH 1,200,000

0 1,200,000 0 0 0 0 0

208.05

BOYD -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2020. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SAH 1,200,000

0 0 1,200,000 0 0 0 0

208.06

BOYD -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2021. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SAH 1,600,000

0 0 0 1,600,000 0 0 0

208.07

BOYD -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2022. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SAH 1,600,000

0 0 0 0 1,600,000 0 0

208.08

26

Page 27: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOYD -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2023. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SAH 1,600,000

0 0 0 0 0 1,600,000 0

208.09

BOYD -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HUNTINGTON-ASHLAND MPO FOR FY 2024. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SAH 1,600,000

0 0 0 0 0 0 1,600,000

208.1

BOYD -0 MATCHED FED FUNDS(O)

PLANNING STUDY/ENVIRONMENTAL ASSESSMENT FOR RUSH OFF ROAD (2016BOP)

PL

Project Cost:

CN

UT

RW

DN SAH 48,000

48,000 0 0 0 0 0 0

404

BOYD US-60 CONGESTION MITIGTN(O)

IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTION AT CANNONSBURG. (08CCN) (10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 5,000,000

0 0 5,000,000 0 0 0 0

8400

BOYD US-60 PREFINANCD CONVRSN(O)

IMPROVE US-60 FROM I-64 AT INTERCHANGE 181 TO THE KY-180 INTERSECTION AT CANNONSBURG. (08CCN) (10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 15,000,000

0 0 0 15,000,000 0 0 0

8400.01

27

Page 28: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOYD US-23 SAFETY(P) SAFETY UPGRADES AND CONSTRUCT TURN LANES ON US-23 AT 12TH STREET - CATLETTSBURG. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 920,000

920,000 0 0 0 0 0 0

8801

BOYD US-23 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON 12TH STREET BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (010B00040N)(BSBP)

PL

Project Cost:

CN

UT

RW

DN

BR 1,750,000

1,750,000 0 0 0 0 0 0

10014

BOYD US-60 AM-BRIDGE (P) PAINTING AND PREVENTIVE MAINTENANCE ON CATLETTSBURG KENOVA BRIDGE ON 35TH ST. OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (010B00062N)(BSBP)

PL

Project Cost:

CN

UT

RW

DN

BR 1,200,000

0 0 1,200,000 0 0 0 0

10015

BOYD I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON PERRY GENTRY BRIDGES OVER THE BIG SANDY RIVER. JOINT PROJECT WITH WEST VIRGINIA. (010B00046L AND 010B00046R)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 1,500,000

0 0 1,500,000 0 0 0 0

10016

BOYD KY-854 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 854 BRIDGE OVER GARNER CREEK. (010B00045N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

525,000

1,085,000

0 525,000 1,085,000 0 0 0 0

10018

28

Page 29: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOYD I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 180.812 TO MILEPOINT 183.95

PL

Project Cost:

CN

UT

RW

DN PM

PM

250,000

2,500,000

0 2,750,000 0 0 0 0 0

20002

BOYD I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 183.95 TO MILEPOINT 191.507

PL

Project Cost:

CN

UT

RW

DN PM

PM

600,000

6,000,000

0 0 0 0 0 6,600,000 0

20003

BOYD US-23 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.67 TO MILEPOINT 16.95

PL

Project Cost:

CN

UT

RW

DN

PM 2,365,000

0 0 0 0 2,365,000 0 0

20015

BOYD US-23 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 2.92 TO MILEPOINT 10.67

PL

Project Cost:

CN

UT

RW

DN

PM 4,288,000

0 0 0 0 0 4,288,000 0

20016

Total for BOYD county PL

Total Amounts:

CN

UT

RW

DN 48,000

8,935,000

775,000

3,700,000 9,985,000 16,600,000 11,888,000

600,000

3,965,000 1,600,000

8,983,000 4,475,000 9,985,000 16,600,000 3,965,000 12,488,000 1,600,000

29

Page 30: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BOYLE US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 AND US 150 BRIDGE OVER CHAPLIN RIVERPERRYVILLE. (SEE 7-242.01 FOR HPP FUNDS)(2005HPP-KY134)(011B00042N)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 1,253,000

0 0 1,253,000 0 0 0 0

242

BOYLE US-68 AM-BRIDGE (P) REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER CHAPLIN RIVER, PERRYVILLE. 011B00042N (2005HPP-KY134)(EARMARK DOES NOT COVER TOTAL PROJECT COST OF

PL

Project Cost:

CN

UT

RW

DN

HPP 487,797

487,797 0 0 0 0 0 0

242.01

BOYLE US-127 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-127B FROM MILEPOINT 0.00 TO MILEPOINT 5.27

PL

Project Cost:

CN

UT

RW

DN

PM 2,301,000

0 0 0 0 2,301,000 0 0

20024

BOYLE NEW ROUTE(O) CONSTRUCT A NEW CONNECTOR ROAD ON THE EAST SIDE OF DANVILLE CONNECTING KY-34 AND US-150 BYPASS

PL

Project Cost:

CN

UT

RW

DN SPP 1,500,000

0 0 0 1,500,000 0 0 0

80000

Total for BOYLE county PL

Total Amounts:

CN

UT

RW

DN

487,797 1,253,000

1,500,000

2,301,000

487,797 0 1,253,000 1,500,000 2,301,000 0 0

30

Page 31: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2019.(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 190,000

0 190,000 0 0 0 0 0

355.21

BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2020.(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 190,000

0 0 190,000 0 0 0 0

355.22

BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

SPP 190,000

0 0 0 190,000 0 0 0

355.23

BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

SPP 190,000

0 0 0 0 190,000 0 0

355.24

BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 190,000

0 0 0 0 0 190,000 0

355.25

31

Page 32: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BRACKEN KY-8 FERRY OPERATION(P)OPERATION OF AUGUSTA FERRY FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 190,000

0 0 0 0 0 0 190,000

355.26

BRACKEN KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 8 BRIDGE OVER HOLTS CREEK AT FOSTER. (012B00004N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

455,000

3,325,000

0 455,000 3,325,000 0 0 0 0

10008

BRACKEN KY-8 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 13.95 TO MILEPOINT 18.99

PL

Project Cost:

CN

UT

RW

DN

PM 552,000

0 0 0 0 0 0 552,000

20048

Total for BRACKEN county PL

Total Amounts:

CN

UT

RW

DN 455,000

190,000 3,515,000 190,000 190,000190,000 742,000

0 645,000 3,515,000 190,000 190,000 190,000 742,000

BREATHITT KY-205 MINOR WIDENING(O) IMPROVE KY-205 FROM NORTH OF KY-1812 TO SOUTH OF PEGGS FORK RD.

PL

Project Cost:

CN

UT

RW

DN STP

STP

1,000,000

1,030,000

0 0 0 1,000,000 0 1,030,000 0

375

32

Page 33: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BREATHITT KY-15 MAJOR WIDENING(O) IMPROVE KY-15 FROM THE INTERSECTION OF NEW KY-15/30 TO INTERSECTION OF KY-1812.

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

1,500,000

2,900,000

1,150,000

7,500,000

0 1,500,000 0 2,900,000 1,150,000 7,500,000 0

376

BREATHITT KY-378 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER FROZEN CREEK ON KY 378 0.7 MI N OF KY 1812. (013B00050N)

PL

Project Cost:

CN

UT

RW

DN

BR 735,000

0 0 735,000 0 0 0 0

1110

BREATHITT CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MORRIS FORK ROAD BRIDGE OVER BURTON FORK. (013C00050N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

315,000

0 140,000 315,000 0 0 0 0

10000

BREATHITT CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LITTLE BUCKHORN ROAD BRIDGE OVER BUCKHORN CREEK. (013C00016N)(SD

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

350,000

0 140,000 350,000 0 0 0 0

10001

BREATHITT KY-1812 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1812 BRIDGE OVER JOHNSON FORK. (013B00007N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

507,500

0 175,000 507,500 0 0 0 0

10010

33

Page 34: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BREATHITT CR-1104 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BIG BRANCH ROAD BRIDGE OVER BIG BRANCH CREEK. (013C00008N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

385,000

0 175,000 385,000 0 0 0 0

10011

Total for BREATHITT county PL

Total Amounts:

CN

UT

RW

DN 2,130,000

2,292,500

1,000,000

2,900,000

1,150,000

7,500,000

1,030,000

0 2,130,000 2,292,500 3,900,000 1,150,000 8,530,000 0

BRECKINRIDGE CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER SINKING CREEK ON DENTS BRIDGE ROAD (CR 1021) 1.4 MI W OF KY 333 (014C00003N)

PL

Project Cost:

CN

UT

RW

DN

BR 406,000

0 0 406,000 0 0 0 0

1090

BRECKINRIDGE KY-261 DRAINAGE IMPROVE(P)

REPLACE LOW WATER STRUCTURE ON KY 261 AT MP 15.74

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

100,000

25,000

25,000

400,000

0 0 0 100,000 450,000 0 0

8902

BRECKINRIDGE KY-992 MINOR WIDENING(O) MINOR WIDENING OF KY 992 BETWEEN ROCK QUARRY AND US 60.

PL

Project Cost:

CN

UT

RW

DN

SPP 580,000

0 0 0 580,000 0 0 0

8904

34

Page 35: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BRECKINRIDGE US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 0.00 TO MILEPOINT 2.78

PL

Project Cost:

CN

UT

RW

DN

PM 642,000

0 0 0 0 642,000 0 0

20025

BRECKINRIDGE US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 3.45 TO MILEPOINT 12.74

PL

Project Cost:

CN

UT

RW

DN

PM 1,739,000

0 0 0 0 1,739,000 0 0

20026

Total for BRECKINRIDGE county PL

Total Amounts:

CN

UT

RW

DN

406,000

100,000

580,000

25,000

25,000

2,781,000

0 0 406,000 680,000 2,831,000 0 0

BULLITT KY-44 RECONSTRUCTION(O)SECTION 5 - FROM US-31EX TO US-31E BYPASS. (2008BOPC).

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

1,000,000

1,550,000

550,000

0 1,000,000 0 0 0 0 2,100,000

150.5

BULLITT KY-44 SAFETY(P) NEW TURN LANES IN FRONT OF BULLITT EAST HIGH SCHOOL. BREAKOUT FROM 347.5

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

500,000

100,000

545,000

575,000

0 500,000 100,000 545,000 575,000 0 0

347.51

35

Page 36: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BULLITT KY-480 RECONSTRUCTION(O)WIDEN CEDAR GROVE ROAD (KY-480FROM CEDAR GROVE ELEMENTARY SCHOOL TO VALLEY VIEW DRIVE. (12CCR)(14CCR) (SEE 5-391.3 FOR INTERCHANGE IMPROVEMENTS)

PL

Project Cost:

CN

UT

RW

DN

STP 6,240,000

0 0 0 0 6,240,000 0 0

391.2

BULLITT KY-480 RECONSTRUCTION(O)IMPROVE OPERATIONAL PERFORMANCE OF THE I-65/KY-480 INTERCHANGE INCLUDING RAMP IMPROVEMENTS AND TURNING LANES(12CCR)(14CCR)(2014BOP)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 5,970,000

0 0 0 0 0 5,970,000 0

391.3

BULLITT I-65 NEW INTERCHANGE(O)

CONSTRUCT NEW I-65 INTERCHANGE BETWEEN KY-480 AND KY-245.

PL

Project Cost:

CN

UT

RW

DN

NH 18,720,000

18,720,000 0 0 0 0 0 0

538

BULLITT KY-44 BIKE/PED FACIL(O) INSTALLATION OF NEW SIDEWALKS AND REHABILITATION OF EXISTING SIDEWALKS TO FIX GAPS IN THE PEDESTRIAN NETWORK ALONG KY 44 FROM FRANK E. SIMON DRIVE (CITY

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

60,000

60,000

220,000

120,000 220,000 0 0 0 0 0

544

BULLITT I-65 MAJOR WIDENING(O) WIDEN I-65 FROM 6 TO 8 LANES FROM KY-61 (PRESTON HIGHWAY) IN LEBANON JUNCTION TO I-265 (GENE SNYDER FREEWAY)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

250,000

7,470,000

0 0 250,000 0 7,470,000 0 0

550

36

Page 37: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BULLITT -0 NEW ROUTE(O) STUDY NEW CONNECTION BETWEEN I-65 IN BULLITT COUNTY TO I-64 IN SHELBY COUNTY TO I-71 IN OLDHAM COUNTY.

PL

Project Cost:

CN

UT

RW

DN

STP 2,000,000

0 2,000,000 0 0 0 0 0

564

BULLITT KY-245 MINOR WIDENING(O) WIDEN KY-245 FROM BERNHEIM FOREST TO THE COMMUNITY COLLEGE. (08CCN)(10CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 12,640,000

0 0 0 0 12,640,000 0 0

8509

BULLITT I-65 TRANSP ENHANCEMENT(P)

SOUND BARRIERS ON EAST SIDE OF I-65 BETWEEN MP 117.4 AND MP 117.8(14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,000,000

0 0 0 0 2,000,000 0 0

8856

BULLITT KY-480 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-480 FROM MILEPOINT 0.00 TO MILEPOINT 5.14

PL

Project Cost:

CN

UT

RW

DN

PM 910,000

0 0 0 0 910,000 0 0

20036

BULLITT KY-245 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-245 FROM MILEPOINT 0.00 TO MILEPOINT 7.18

PL

Project Cost:

CN

UT

RW

DN

PM 1,094,000

0 0 0 0 0 1,094,000 0

20037

37

Page 38: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for BULLITT county PL

Total Amounts:

CN

UT

RW

DN60,000

60,000

18,720,000

2,000,000

1,500,000

220,000

250,000

100,000

545,000

7,470,000

7,064,00022,365,000

1,550,000

550,000

18,840,000 3,720,000 350,000 545,000 29,835,000 7,064,000 2,100,000

BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2019.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 157,200 0 0 0 0 0

125.14

BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2020.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 157,200 0 0 0 0

125.15

BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2021.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 157,200 0 0 0

125.16

BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2022.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 0 157,200 0 0

125.17

38

Page 39: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 0 0 157,200 0

125.18

BUTLER KY-269 FERRY OPERATION(P)OPERATION OF REED'S FERRY AT LOGANSPORT FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 0 0 0 157,200

125.19

BUTLER WN-9007 RECONSTRUCTION(O)I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAY FROM I-65 INTERCHANGE (EXIT 2) EXTENDING NORTH TO THE BUTLER-OHIO COUNTY LINE.

PL

Project Cost:

CN

UT

RW

DN

NH 18,250,000

0 18,250,000 0 0 0 0 0

2042.1

BUTLER WN-9007 I-CHANGE RECONST(O)

I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE (EXIT 36). (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

NH 6,750,000

0 0 0 6,750,000 0 0 0

2042.3

BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2019.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 157,200 0 0 0 0 0

8504.09

39

Page 40: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2020.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 157,200 0 0 0 0

8504.1

BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2021.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 157,200 0 0 0

8504.11

BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2022.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 0 157,200 0 0

8504.12

BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 0 0 157,200 0

8504.13

BUTLER KY-369 FERRY OPERATION(P)OPERATION OF THE ROCHESTER FERRY BY THE BUTLER AND OHIO COUNTY FERRY AUTHORITY FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 157,200

0 0 0 0 0 0 157,200

8504.14

40

Page 41: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BUTLER KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER PANTHER CREEK. (016B00019N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

889,000

0 245,000 889,000 0 0 0 0

10003

BUTLER CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WAVERLY SCHOOL ROAD BRIDGE OVER LITTLE BULL CREEK. (016C00031N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

266,000

0 157,500 266,000 0 0 0 0

10004

BUTLER WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 87.544 TO MILEPOINT 88.433

PL

Project Cost:

CN

UT

RW

DN PM

PM

70,000

700,000

0 0 0 770,000 0 0 0

20007

BUTLER WN-9007 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 21.78 TO MILEPOINT 28.5 (26.42 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

540,000

5,400,000

0 0 0 0 5,940,000 0 0

20008

BUTLER WN-9007 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 28.50 (26.42 NON-CARDINAL) TO MILEPOINT 34.72

PL

Project Cost:

CN

UT

RW

DN PM

PM

675,000

6,750,000

0 0 0 0 0 0 7,425,000

20009

41

Page 42: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

BUTLER WN-9007 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 34.724 TO MILEPOINT 37.143

PL

Project Cost:

CN

UT

RW

DN PM

PM

240,000

2,400,000

0 2,640,000 0 0 0 0 0

20010

Total for BUTLER county PL

Total Amounts:

CN

UT

RW

DN 642,500

20,964,400 1,469,400

70,000

7,764,400

540,000

314,4005,714,400

675,000

7,064,400

0 21,606,900 1,469,400 7,834,400 6,254,400 314,400 7,739,400

CALDWELL -0 NEW ROUTE(O) NEW CONNECTOR FROM HOPKINSVILLE ROAD (KY-91) TO WILSON WAREHOUSE ROAD (KY-293) NORTHEAST OF PRINCETON. (06CCR(10CCR)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

3,000,000

2,000,000

14,000,000

0 0 0 3,000,000 0 2,000,000 14,000,000

153

CALDWELL KY-126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-126 BRIDGE OVER DREEN CREEK. (017B00023N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

1,312,500

0 245,000 1,312,500 0 0 0 0

10000

CALDWELL I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-24 BOTH DIRECTION(S) FROM MILEPOINT 54.842 TO MILEPOINT 57.389

PL

Project Cost:

CN

UT

RW

DN PM

PM

250,000

2,500,000

0 0 0 0 2,750,000 0 0

20000

42

Page 43: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CALDWELL I-69 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 82.934 TO MILEPOINT 86.344

PL

Project Cost:

CN

UT

RW

DN PM

PM

400,000

4,000,000

0 0 0 4,400,000 0 0 0

20004

Total for CALDWELL county PL

Total Amounts:

CN

UT

RW

DN 245,000

1,312,500

400,000

3,000,000

4,000,000

250,000

2,000,000

2,500,000 14,000,000

0 245,000 1,312,500 7,400,000 2,750,000 2,000,000 14,000,000

CALLOWAY US-641 MAJOR WIDENING(O) MAJOR WIDENING FROM TENN. STATE LINE TO MURRAY PRIORITY SECTION FROM CLARKS RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING 4-LANE.(SEE 1-8852.00)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 6,040,000

6,040,000 0 0 0 0 0 0

314.1

CALLOWAY US-641 MAJOR WIDENING(O) IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITY SECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

2,000,000

2,000,000

3,000,000

15,000,000

2,000,000 5,000,000 0 15,000,000 0 0 0

314.2

CALLOWAY US-641 PREFINANCD CONVRSN(O)

IMPROVE US-641 FROM THE TENNESSEE STATE LINE TO MURRAY PRIORITY SECTION 2; FROM TENN. STATE LINE TO CLARKS RIVER BRIDGE.(SEE 1-8852.00)

PL

Project Cost:

CN

UT

RW

DN

NH 10,000,000

0 0 0 0 10,000,000 0 0

314.21

43

Page 44: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CALLOWAY KY-280 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 280 BRIDGE OVER PANTHER CREEK. (018B00054N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

735,000

0 140,000 735,000 0 0 0 0

10008

CALLOWAY KY-1327 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

175,000

1,750,000

0 1,925,000 0 0 0 0 0

20001

CALLOWAY KY-121 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 10.51 TO MILEPOINT 14.08

PL

Project Cost:

CN

UT

RW

DN

PM 635,000

0 0 0 0 0 635,000 0

20024

CALLOWAY KY-121 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-121 FROM MILEPOINT 0.00 TO MILEPOINT 10.51

PL

Project Cost:

CN

UT

RW

DN

PM 1,872,000

0 0 0 0 0 1,872,000 0

20025

CALLOWAY KY-94 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 13.11 TO MILEPOINT 24.21

PL

Project Cost:

CN

UT

RW

DN

PM 1,977,000

0 0 0 0 0 1,977,000 0

20026

44

Page 45: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for CALLOWAY county PL

Total Amounts:

CN

UT

RW

DN 2,000,000

6,040,000

315,000

2,000,000

3,000,000

1,750,000 735,000 15,000,000 4,484,00010,000,000

8,040,000 7,065,000 735,000 15,000,000 10,000,000 4,484,000 0

CAMPBELL I-471 MAJOR WIDENING(O) REDUCE CONGESTION ALONG THE I-471 CORRIDOR FROM US-27 TO OHIO STATE LINE.

PL

Project Cost:

CN

UT

RW

DN

NH 4,500,000

0 0 0 0 0 0 4,500,000

81

CAMPBELL I-471 RECONSTRUCTION(O)STUDY AND REHABILITATE THE I-471 CORRIDOR, CAMPBELL COUNTY, KENTUCKY. (SEE ALSO 6-8104.00)(2005HPP-KY120)

PL

Project Cost:

CN

UT

RW

DN

HPP 1,439,840

1,439,840 0 0 0 0 0 0

183

CAMPBELL I-275 AM-BRIDGE (P) BRIDGE REHABILITATION ON EXISTING COMBS HEHL BRIDGE CARRYING I-275 OVER THE OHIO RIVER. 019B00040L/R (LET BY ODOT) (2016BOP)(BSBP)

PL

Project Cost:

CN

UT

RW

DN

BR 4,500,000

0 4,500,000 0 0 0 0 0

369

CAMPBELL KY-1892 MATCHED FED FUNDS(O)

ROADWAY REHABILITATION ON CAROTHERS ROAD FROM MONMOUTH STREET (US 27) TO RIGHT TURN LANE INTO NEWPORT SHOPPING CENTER.

PL

Project Cost:

CN

UT

RW

DN

SNK 1,005,052

1,005,052 0 0 0 0 0 0

427

45

Page 46: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CAMPBELL -0 MATCHED FED FUNDS(O)

NEWPORT RIVERFRONT COMMONS - CONSTRUCT TWO NEW PEDESTRIAN/BICYCLE BRIDGES TO CONNECT BOTH SIDES OF THE TAYLOR SOUTHGATE BRIDGE TO THE

PL

Project Cost:

CN

UT

RW

DN

SNK 1,097,427

1,097,427 0 0 0 0 0 0

434

CAMPBELL US-27 MATCHED FED FUNDS(O)

ADD LANE ON US 27 TO PROVIDE THREE CONTINUOUS SOUTHBOUND THROUGH-LANES FROM MARSHALL LANE TO JOHNS HILL ROAD (KY 3490). (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

200,000

100,000

500,000

300,000 500,000 0 0 0 0 0

443

CAMPBELL KY-9 CONGESTION MITIGTN(O)

IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-275 INTERCHANGE WITH KY-9 (AA HWY.)

PL

Project Cost:

CN

UT

RW

DN

NH 700,000

0 0 0 700,000 0 0 0

448

CAMPBELL US-27 BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1. IMPROVE/ADD SIDEWALKS, ACCESS MANAGEMENT, STREET LIGHTING, IMPROVE SAFETY FROM NEWPORT/SOUTHGATE CITY LIMITS TO

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

SNK

SNK

454,960

61,600

1,496,000

1,200,000

454,960 1,557,600 1,200,000 0 0 0 0

451

CAMPBELL US-27 BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH UNDERPASS. IMPROVE FOR PEDESTRIANS BY REPLACING OBSOLETE STAIRS/WALKWAY WITH 10' SIDEWALK, LIGHTING BUS STOPS

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

SNK

SNK

378,400

32,000

24,000

1,320,000

0 0 434,400 1,320,000 0 0 0

452

46

Page 47: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CAMPBELL -0 BIKE/PED FACIL(O) RIVERFRONT COMMONS. CONSTRUCT A 15' WIDE CONCRETE BICYCLE/PEDESTRIAN TRAIL AND CONDUIT FOR FUTURE LIGHTING FROM BERRY STREET TO FOURTH AVENUE

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

126,000

760,000

0 126,000 760,000 0 0 0 0

453

CAMPBELL KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER TWELVEMILE CREEK ON KY 8 0.1 MI N OF NEISES ROAD (CR 1009). (019B00003N)

PL

Project Cost:

CN

UT

RW

DN

BR

BR

BR

50,000

150,000

2,500,000

0 200,000 2,500,000 0 0 0 0

1085

CAMPBELL CR-1363 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON COVERT RUN PIKE (CR-1363) (0.048) OVER TRIBUTARY TO TAYLOR CREEK019C00069N

PL

Project Cost:

CN

UT

RW

DN BR

BR

122,500

630,000

0 122,500 630,000 0 0 0 0

1095

CAMPBELL I-275 NEW ROUTE(O) TRANSPORTATION IMPROVEMENTS TO AA-I-275 CONNECTOR, CAMPBELL COUNTY. (2005HPP-KY155)(SEE 6-8105.00 FOR "KYD" COMPONENT)(06CCR)(10CCR)

PL

Project Cost:

CN

UT

RW

DN

HPP 690,401

690,401 0 0 0 0 0 0

8105.01

CAMPBELL -0 NEW ROUTE(O) CONSTRUCT NEW TECHNOLOGY TRIANGLE ACCESS ROAD, CAMPBELL COUNTY, KENTUCKY. (2005HPP-KY126)(2006BOPC).(10CCR)

PL

Project Cost:

CN

UT

RW

DN

HPP 1,439,840

1,439,840 0 0 0 0 0 0

8105.03

47

Page 48: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CAMPBELL KY-2238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GIBSON ROAD BRIDGE OVER THREEMILE CREEK. (019B00060N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

318,500

0 140,000 318,500 0 0 0 0

10000

CAMPBELL US-27 AM-BRIDGE (P) SAFETY CABLE REPAIR AND PREVENTIVE MAINTENANCE ON TAYLOR SOUTHGATE BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (019B00076N)(BSBP)

PL

Project Cost:

CN

UT

RW

DN

BR 250,000

250,000 0 0 0 0 0 0

10007

CAMPBELL I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 73.061 TO MILEPOINT 77.58

PL

Project Cost:

CN

UT

RW

DN PM

PM

675,000

6,750,000

0 0 0 0 0 0 7,425,000

20010

CAMPBELL I-471 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-471 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 4.75

PL

Project Cost:

CN

UT

RW

DN PM

PM

575,000

5,750,000

0 0 0 0 0 0 6,325,000

20011

CAMPBELL KY-8 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

225,000

2,250,000

0 0 0 2,475,000 0 0 0

20012

48

Page 49: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CAMPBELL KY-9 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

225,000

2,250,000

0 0 0 2,475,000 0 0 0

20013

CAMPBELL KY-1892 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

250,000

2,500,000

0 0 0 2,750,000 0 0 0

20014

CAMPBELL US-27 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

275,000

2,750,000

0 0 0 3,025,000 0 0 0

20015

CAMPBELL US-27 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

75,000

750,000

0 825,000 0 0 0 0 0

20016

CAMPBELL US-27 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

75,000

750,000

0 0 0 825,000 0 0 0

20017

49

Page 50: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CAMPBELL KY-8 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-8 FROM MILEPOINT 15.97 TO MILEPOINT 19.36

PL

Project Cost:

CN

UT

RW

DN

PM 583,000

0 0 0 0 0 0 583,000

20049

Total for CAMPBELL county PL

Total Amounts:

CN

UT

RW

DN 454,960

200,000

100,000

5,922,560

463,500

111,600

1,646,000

5,750,000

378,400

32,000

24,000

5,408,500

700,000

1,050,000

11,820,000

4,500,000

1,250,000

13,083,000

6,677,520 7,971,100 5,842,900 13,570,000 0 0 18,833,000

CARLISLE US-51 SAFETY(P) CORRECT GEOMETRIC DEFICIENCIES AT INTERSECTION OF US-51/US-62/FRONT ST/ELM ST IN BARDWELL TO ADDRESS FLOW, SAFETY, AND ACCESS ISSUES(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 250,000

0 0 250,000 0 0 0 0

333

CARLISLE US-51 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-51 FROM MILEPOINT 7.86 TO MILEPOINT 12.66

PL

Project Cost:

CN

UT

RW

DN

PM 746,000

0 0 746,000 0 0 0 0

20027

Total for CARLISLE county PL

Total Amounts:

CN

UT

RW

DN

996,000

0 0 996,000 0 0 0 0

50

Page 51: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CARROLL US-42 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER KENTUCKY RIVER ON US 42 IN PRESTONSVILLE/CARROLLTON 0.13 MI E OF KY 55. (021B00043N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

BR

BR

1,460,000

1,218,000

476,000

17,717,000

0 1,460,000 1,694,000 0 17,717,000 0 0

1084

CARROLL KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 55 BRIDGE OVER MAJORS RUN CREEK. (021B00019N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

980,000

0 140,000 980,000 0 0 0 0

10009

CARROLL I-71 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 50.808 TO MILEPOINT 53.433

PL

Project Cost:

CN

UT

RW

DN PM

PM

275,000

2,750,000

0 0 0 0 0 0 3,025,000

20020

CARROLL KY-467 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-467 FROM MILEPOINT 0.00 TO MILEPOINT 4.52

PL

Project Cost:

CN

UT

RW

DN

PM 365,000

0 0 0 0 365,000 0 0

20050

Total for CARROLL county PL

Total Amounts:

CN

UT

RW

DN 1,600,000

1,218,000

476,000

980,000 18,082,000

275,000

2,750,000

0 1,600,000 2,674,000 0 18,082,000 0 3,025,000

51

Page 52: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CARTER I-64 CONGESTION MITIGTN(O)

IMPROVE MOBILITY AND REDUCE CONGESTION AT THE KY 1/I-64 WESTBOUND OFF-RAMP INTERSECTION.

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

80,000

80,000

80,000

500,000

0 740,000 0 0 0 0 0

62

CARTER KY-7 MAJOR WIDENING(O) IMPROVE KY-7/KY-1 (CAROL MALONE BLVD.) FROM LITTLE SANDY RIVER BRIDGE TO ACADEMIC PARKWAY. (08CCR)(12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,120,000

0 0 0 3,120,000 0 0 0

144

CARTER KY-67 SAFETY(P) SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FOR INDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FOR BRAIDY INDUSTRIES

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

2,000,000

2,500,000

2,500,000

2,000,000

2,000,000 5,000,000 2,000,000 0 0 0 0

397

CARTER KY-67 PREFINANCD CONVRSN(O)

SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FOR INDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FOR BRAIDY INDUSTRIES

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 0 5,000,000 0 0 0

397.01

CARTER KY-67 PREFINANCD CONVRSN(O)

SAFETY, SPOT IMPROVEMENTS AND CONGESTION MITIGATION FOR INDUSTRIAL PARKWAY (KY 67) IN CARTER, BOYD, AND GREENUP COUNTIES FOR BRAIDY INDUSTRIES

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 0 0 0 5,000,000 0

397.02

52

Page 53: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CARTER US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US-60 (MP 4.111) OVER TYGARTS CREEK; .75 MI E OF JCT KY 1662; 022B00037N

PL

Project Cost:

CN

UT

RW

DN

BR 693,000

693,000 0 0 0 0 0 0

1075

CARTER KY-1 SAFETY(P) IMPROVE SAFETY AT THE EAST CARTER HIGH SCHOOL. (06CCN)(08CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

720,000

490,000

2,000,000

0 0 720,000 490,000 2,000,000 0 0

8311

CARTER KY-773 AM-BRIDGE (P) REPLACEMENT OF TWO TRUSS BRIDGES ON KY 773 OVER THE LITTLE SANDY RIVER. (022B00074N)(022B00075N)

PL

Project Cost:

CN

UT

RW

DN

BR 5,019,000

0 5,019,000 0 0 0 0 0

8506

CARTER KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1 BRIDGE OVER POWELL BRANCH. (022B00006N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

525,000

1,015,000

0 525,000 1,015,000 0 0 0 0

10002

CARTER KY-182 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-182 BRIDGE OVER SINKING CREEK. (022B00140N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

490,000

1,750,000

0 490,000 1,750,000 0 0 0 0

10003

53

Page 54: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CARTER KY-9 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

320,000

3,200,000

0 0 0 3,520,000 0 0 0

20006

CARTER KY-9 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

150,000

1,500,000

0 0 0 1,650,000 0 0 0

20007

CARTER KY-9 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

350,000

3,500,000

0 0 0 3,850,000 0 0 0

20008

CARTER US-60 RECONSTRUCTION(O)IMPROVE US-60 GEOMETRY BEGINNING TERMINI AT NEW CONSTRUCTION AT OLIVE HILL MP 12EXTENDING 1.1 MILES TO I-64 EXIT 161

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,900,000

2,750,000

2,300,000

7,500,000

0 0 0 0 1,900,000 0 12,550,000

80050

Total for CARTER county PL

Total Amounts:

CN

UT

RW

DN 2,000,000

693,000

1,095,000

2,580,000

2,580,000

5,519,000

720,000

4,765,000

820,000

490,000

16,320,000

1,900,000

5,000,0002,000,000

2,750,000

2,300,000

7,500,000

2,693,000 11,774,000 5,485,000 17,630,000 3,900,000 5,000,000 12,550,000

54

Page 55: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CASEY CR-1169 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1169 (0.059) OVER SOUTH FORK CREEK. (023C00029N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

532,000

0 175,000 532,000 0 0 0 0

1067

CASEY KY-70 RECONSTRUCTION(O)RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

1,560,000

3,420,000

0 0 0 1,560,000 0 3,420,000 0

8703

CASEY KY-49 RECONSTRUCTION(O)RECONSTRUCT BRUSHY CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

1,250,000

1,320,000

1,040,000

0 1,250,000 0 0 0 1,320,000 1,040,000

8704

CASEY KY-2310 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2310 BRIDGE OVER LUTTRELL CREEK. (023B00066N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

927,500

0 192,500 927,500 0 0 0 0

10000

CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER BR OF BRUSH CREEK. (023B00061N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

70,000

266,000

0 70,000 266,000 0 0 0 0

10006

55

Page 56: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE OVER LONG BRANCH. (023B00062N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

70,000

266,000

0 70,000 266,000 0 0 0 0

10007

CASEY KY-3270 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3270 BRIDGE OVER HOWE BRANCH. (023B00077N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

70,000

234,500

0 70,000 234,500 0 0 0 0

10008

CASEY KY-70 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

375,000

3,750,000

0 4,125,000 0 0 0 0 0

20001

Total for CASEY county PL

Total Amounts:

CN

UT

RW

DN 2,202,500

3,750,000 2,226,000

1,560,000

4,740,000

1,040,000

0 5,952,500 2,226,000 1,560,000 0 4,740,000 1,040,000

CHRISTIAN KY-1682 NEW ROUTE(O) EXTEND KY-1682 FROM THE E.T. BREATHITT PARKWAY TO US-68/KY-80 EAST OF HOPKINSVILLE (HOPKINSVILLE NORTHEAST BYPASS).

PL

Project Cost:

CN

UT

RW

DN SPP 1,000,000

0 0 0 0 0 0 1,000,000

136

56

Page 57: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CHRISTIAN KY-911 MAJOR WIDENING(O) IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR).

PL

Project Cost:

CN

UT

RW

DN

STP 2,530,000

0 0 2,530,000 0 0 0 0

180

CHRISTIAN KY-911 PREFINANCD CONVRSN(O)

IMPROVE KY-911 FROM US-41A TO OAK GROVE.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 5,910,000

0 0 0 5,910,000 0 0 0

180.01

CHRISTIAN KY-1007 RECONSTRUCTION(O)RECONSTRUCT KY 1007 FROM US 68 TO SANDERSON ROAD IN HOPKINSVILLE.(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

3,250,000

11,250,000

0 0 3,250,000 0 11,250,000 0 0

227

CHRISTIAN US-41 NEW ROUTE(O) CONSTRUCT NEW CONNECTOR FROM US 41 NEAR THE INDUSTRIAL PARK TO KY 115 SOUTH OF PEMBROKE.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

300,000

700,000

12,000,000

0 0 1,000,000 0 1,000,000 12,000,000 0

381

CHRISTIAN EB-9004 RECONSTRUCTION(O)RECONSTRUCT THE BREATHITT PARKWAY INTERCHANGE AT KY 1682 NORTH OF HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE INTERSTATE SPUR PROJECT)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

250,000

1,000,000

1,000,000

5,000,000

0 250,000 1,000,000 1,000,000 0 5,000,000 0

898

57

Page 58: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CHRISTIAN US-68 RECONSTRUCTION(O)ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 IN HOPKINSVILLE.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,200,000

1,750,000

1,500,000

5,500,000

0 0 0 1,200,000 0 3,250,000 5,500,000

899

CHRISTIAN CR-1116 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SUB STATION RD (CR 1116) OVER CSX RR 0.04 MILE E OF US 41 024C00034N

PL

Project Cost:

CN

UT

RW

DN

BR 880,000

880,000 0 0 0 0 0 0

1085

CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CSX RR ON WALNUT STREET (US 41A) IN HOPKINSVILLE 475 FT NE OF EAST 21ST STREET (CS 1016) (024B00112N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

385,000

2,002,000

0 385,000 2,002,000 0 0 0 0

1089

CHRISTIAN CS-1262 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER N FORK LITTLE RIVER ON MILBROOKE DRIVE (CS 1262) 500 FT SW OF KAREN DRIVE (CS 1268) 024C00081N

PL

Project Cost:

CN

UT

RW

DN

BR 1,470,000

0 0 1,470,000 0 0 0 0

1094

CHRISTIAN KY-107 MINOR WIDENING(O) IMPROVE KY-107 FROM GATEWAY LANE TO KY-380.(12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

1,280,000

1,530,000

2,540,000

0 0 0 0 1,280,000 1,530,000 2,540,000

8703

58

Page 59: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CHRISTIAN KY-115 MINOR WIDENING(O) IMPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO JUST SOUTH OF PEMBROKE (MP 9.625)

PL

Project Cost:

CN

UT

RW

DN SPP 1,000,000

0 0 0 1,000,000 0 0 0

8953

CHRISTIAN KY-189 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-189 BRIDGE OVER BRANCH OF BUCK FORK. (024B00064N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

1,032,500

0 245,000 1,032,500 0 0 0 0

10001

CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 41 BRIDGE OVER NORTH FORK LITTLE RIVER. (024B00005N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

35,000

175,000

0 35,000 175,000 0 0 0 0

10022

CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 4.719

PL

Project Cost:

CN

UT

RW

DN PM

PM

400,000

4,000,000

0 400,000 4,000,000 0 0 0 0

20005

CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 12.13 TO MILEPOINT 16.5 (16.7 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN

PM 4,120,000

0 0 4,120,000 0 0 0 0

20006

59

Page 60: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 4.719 TO MILEPOINT 6.77

PL

Project Cost:

CN

UT

RW

DN PM

PM

175,000

1,750,000

0 0 0 0 0 1,925,000 0

20008

CHRISTIAN I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 76.142

PL

Project Cost:

CN

UT

RW

DN PM

PM

325,000

3,250,000

0 0 0 0 3,575,000 0 0

20010

CHRISTIAN I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 69.83 TO MILEPOINT 81.83

PL

Project Cost:

CN

UT

RW

DN PM

PM

600,000

6,000,000

0 0 0 0 0 0 6,600,000

20011

CHRISTIAN I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 76.142 TO MILEPOINT 85.563

PL

Project Cost:

CN

UT

RW

DN PM

PM

475,000

4,750,000

0 0 0 0 0 5,225,000 0

20012

CHRISTIAN I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 BOTH DIRECTION(S) FROM MILEPOINT 85.563 TO MILEPOINT 92

PL

Project Cost:

CN

UT

RW

DN PM

PM

650,000

6,500,000

0 0 0 0 7,150,000 0 0

20013

60

Page 61: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CHRISTIAN US-68 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

75,000

750,000

0 0 0 825,000 0 0 0

20016

CHRISTIAN US-41 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-41 FROM MILEPOINT 14.79 TO MILEPOINT 31.57

PL

Project Cost:

CN

UT

RW

DN

PM 1,635,000

0 0 0 0 1,635,000 0 0

20046

CHRISTIAN KY 115 RESURFACING(P) RESURFACING ON KY 115 FROM CARNEAL LANE TO US 41

PL

Project Cost:

CN

UT

RW

DN

PM 730,000

0 730,000 0 0 0 0 0

80000

CHRISTIAN US 41A NEW INTERCHANGE(O)

US 41A NEW TURNING LANE NORTHBOUND AT EXISTING MEDIAN CROSSOVER NEAR MILEPOST 11.4. CITY TO CONSTRUCT AND BE REIMBURSED.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

8,000

67,000

0 75,000 0 0 0 0 0

80001

CHRISTIAN KY 1026 RESURFACING(P) RESURFACING ON KY 1026 FROM GRACEY SINKING FORK ROAD TO SHURDAN CREEK ROAD

PL

Project Cost:

CN

UT

RW

DN

PM 200,000

0 200,000 0 0 0 0 0

80002

61

Page 62: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for CHRISTIAN county PL

Total Amounts:

CN

UT

RW

DN

880,000

1,323,000

997,000

1,000,000

1,000,000

3,250,000

15,329,500

2,275,000

1,000,000

6,660,000

975,000

1,580,000

700,000

23,500,000

650,000

1,750,000

3,030,000

22,635,000

1,600,000

14,040,000

880,000 2,320,000 20,579,500 9,935,000 25,890,000 28,930,000 15,640,000

CLARK KY-1958 NEW ROUTE(O) EXTEND THE WINCHESTER EAST BYPASS (KY 1958) FROM IRVINE ROAD (KY 89) TO KY 627 SOUTH OF WINCHESTER. (08CCN)(10CCR)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

250,000

7,000,000

11,000,000

12,000,000

0 250,000 7,000,000 0 11,000,000 0 12,000,000

8401

CLARK -0 NEW ROUTE(O) EXTEND FULTON ROAD. (BY COUNTY(10CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 1,410,000

0 0 0 1,410,000 0 0 0

8639

CLARK US-60 AIR QUALITY(P) RECONSTRUCT US 60 FOR SAFETY IMPROVEMENTS FROM I-64 IN CLARK COUNTY (MP 14.210) TO 500 FEET WEST OF SEWELL SHOP ROAD. (MP 17.032)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

2,000,000

6,000,000

10,500,000

36,500,000

0 0 0 0 2,000,000 0 53,000,000

8952

CLARK I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 89.48 TO MILEPOINT 94.7

PL

Project Cost:

CN

UT

RW

DN PM

PM

630,000

6,300,000

0 0 0 0 6,930,000 0 0

20004

62

Page 63: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CLARK I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 94.65 TO MILEPOINT 98.1

PL

Project Cost:

CN

UT

RW

DN PM

PM

525,000

5,250,000

0 0 0 0 5,775,000 0 0

20005

CLARK I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 98.1 TO MILEPOINT 101.78

PL

Project Cost:

CN

UT

RW

DN PM

PM

430,000

4,300,000

0 0 4,730,000 0 0 0 0

20006

CLARK KY-9000 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 9.45 (5.311 NON-CARDINAL) TO MILEPOINT 11.913

PL

Project Cost:

CN

UT

RW

DN PM

PM

530,000

5,300,000

0 0 0 5,830,000 0 0 0

20007

Total for CLARK county PL

Total Amounts:

CN

UT

RW

DN 250,000 430,000

7,000,000

4,300,000

530,000

6,710,000

3,155,000

11,000,000

11,550,000

6,000,000

10,500,000

48,500,000

0 250,000 11,730,000 7,240,000 25,705,000 0 65,000,000

CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER OTTER CREEK ON OTTER CREEK ROAD (CR 1160) AT JUNCTION WITH MAY FORK ROAD (CR 1158)(026C00031N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

105,000

364,000

0 105,000 364,000 0 0 0 0

1099

63

Page 64: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CLAY US-421 MINOR WIDENING(O) IMPROVE US-421/KY-80 FROM KY-80 SOUTH TO KY-149 (LOCKARTS CREEK ROAD). (00CCN)(10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 20,000,000

0 0 20,000,000 0 0 0 0

8003

CLAY CR-1263 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CURRY BRANCH ROAD IN CLAY COUNTY.(12CCN)

PL

Project Cost:

CN

UT

RW

DN

BR 960,000

0 960,000 0 0 0 0 0

8711

CLAY KY-66 RECONSTRUCTION(O)IMPROVE GEOMETRICS ON THE S-CURVE FROM NORTHEAST OF KY-3135 (COLLEGE STREET) TO NORTHEAST OF PR-1006 (MULBERRY STREET).(14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 405,000

0 405,000 0 0 0 0 0

8856

CLAY KY-638 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ALONG KY 638 (MP 6.7 TO MP 7.1) AND ITS INTERSECTION WITH KY 3476. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

250,000

650,000

1,840,000

0 0 900,000 1,840,000 0 0 0

8861

CLAY CR-1286 SAFETY(P) IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND, INCLUDING INTERSECTIONS AT HAL ROGERS PARKWAY AND KY 687. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 6,100,000

0 0 0 6,100,000 0 0 0

8864

64

Page 65: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CLAY HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM CLAY/LAUREL LINE TO MANCHESTER (JUST PAST EXIT 20 AT BRIDGE OVER

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

15,000,000

11,000,000

98,000,000

0 0 0 1,000,000 15,000,000 11,000,000 98,000,000

8910

CLAY HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM MANCHESTER TO CLAY/LESLIE LINE; MP 21.498 TO MP 35.929 (SEGMENT 8)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

18,000,000

13,000,000

129,900,000

0 0 0 1,000,000 18,000,000 13,000,000 129,900,000

8911

CLAY KY-1850 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1850 BRIDGE OVER PHILLIPS FORK. (026B00087N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

595,000

0 175,000 595,000 0 0 0 0

10003

CLAY KY-577 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-577 BRIDGE OVER LITTLE SEXTON CREEK(026B00093N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

424,000

0 175,000 424,000 0 0 0 0

10004

CLAY CR-1055 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1055 BRIDGE OVER WILES BRANCH. (026C00010N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

400,000

0 175,000 400,000 0 0 0 0

10005

65

Page 66: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CLAY CR-1117 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ARNETTS FORK ROAD BRIDGE OVER DOUBLE CREEK. (026C00018N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

364,000

0 140,000 364,000 0 0 0 0

10006

CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OTTER CREEK ROAD BRIDGE OVER GOOSE CREEK. (026C00032N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

595,000

0 175,000 595,000 0 0 0 0

10007

CLAY CR-1255 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1255 BRIDGE OVER HORSE CREEK. (026C00070N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

371,000

0 175,000 371,000 0 0 0 0

10008

CLAY CR-1118 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD HIGHWAY 66 BRIDGE OVER RED BIRD RIVER. (026C00099N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

2,177,000

0 350,000 2,177,000 0 0 0 0

10009

CLAY US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 421 BRIDGE OVER BRANCH OF ISLAND CREEK. (026B00002N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

647,500

0 175,000 647,500 0 0 0 0

10039

66

Page 67: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CLAY HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 13.93 TO MILEPOINT 15.958

PL

Project Cost:

CN

UT

RW

DN PM

PM

80,000

800,000

0 0 0 0 880,000 0 0

20001

CLAY HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 15.958 TO MILEPOINT 19.527

PL

Project Cost:

CN

UT

RW

DN PM

PM

150,000

1,500,000

0 0 0 0 0 1,650,000 0

20002

CLAY HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 19.527 TO MILEPOINT 28.4

PL

Project Cost:

CN

UT

RW

DN PM

PM

350,000

3,500,000

0 3,850,000 0 0 0 0 0

20003

CLAY HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 28.4 TO MILEPOINT 31

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 1,100,000 0 0 0 0 0

20004

CLAY HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 31 TO MILEPOINT 35.08

PL

Project Cost:

CN

UT

RW

DN PM

PM

160,000

1,600,000

0 1,760,000 0 0 0 0 0

20005

67

Page 68: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CLAY HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 35.08 TO MILEPOINT 39

PL

Project Cost:

CN

UT

RW

DN PM

PM

150,000

1,500,000

0 0 0 0 1,650,000 0 0

20006

Total for CLAY county PL

Total Amounts:

CN

UT

RW

DN 2,255,000

7,465,000

250,000

650,000

25,937,500

2,000,000

7,940,000

230,000

33,000,000

1,500,000

150,000

24,000,000

2,300,000 227,900,000

0 9,720,000 26,837,500 9,940,000 35,530,000 25,650,000 227,900,000

CLINTON KY-738 AM-BRIDGE (P) REPLACE BRIDGE OVER CLEAR FORK CREEK ON KY 738 0.2 MI S OF US 127X. (027B00011N)(SR=31.5)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

525,000

0 175,000 525,000 0 0 0 0

1062

CLINTON US-127 RELOCATION(O) RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127 INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 AND MANTOWN INTERSECTION. (SEE

PL

Project Cost:

CN

UT

RW

DN

NH 10,060,000

0 0 0 0 0 10,060,000 0

8601.26

CLINTON US-127 PREFINANCD CONVRSN(O)

RELOCATE US-127 FROM NORTH OF THE KY-3063 AND OLD US-127 INTERSECTION, AND EXTENDING NORTHERLY TO EAST OF KY-1730 AND MANTOWN INTERSECTION. (SEE

PL

Project Cost:

CN

UT

RW

DN

NH 11,070,000

0 0 0 0 0 0 11,070,000

8601.28

68

Page 69: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CLINTON US-127 RELOCATION(O) RELOCATION OF US-127 FROM EAST OF THE AARON RIDGE RD AND OLD US-127 INTERSECTION, EXTENDING NORTHERLY TO NORTH OF THE KY-3063 AND OLD US-127

PL

Project Cost:

CN

UT

RW

DN SPP 1,600,000

0 0 0 0 0 0 1,600,000

8601.3

Total for CLINTON county PL

Total Amounts:

CN

UT

RW

DN 175,000

525,000 10,060,000

1,600,000

11,070,000

0 175,000 525,000 0 0 10,060,000 12,670,000

CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2019.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 402,000

0 402,000 0 0 0 0 0

326.16

CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2020.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 402,000

0 0 402,000 0 0 0 0

326.17

CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

SPP 402,000

0 0 0 402,000 0 0 0

326.18

69

Page 70: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

SPP 402,000

0 0 0 0 402,000 0 0

326.19

CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 402,000

0 0 0 0 0 402,000 0

326.2

CRITTENDEN KY-91 FERRY OPERATION(P)OPERATION OF CAVE-IN-ROCK FERRY AT OHIO RIVER FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 402,000

0 0 0 0 0 0 402,000

326.21

CRITTENDEN CR-1085 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1085 (0.048) OVER HUGHES BRANCH 028C00053N

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

546,000

0 210,000 546,000 0 0 0 0

1159

CRITTENDEN KY-91 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-91 BRIDGE OVER CROOKED CREEK. (028B00021N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

980,000

0 245,000 980,000 0 0 0 0

10000

70

Page 71: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for CRITTENDEN county PL

Total Amounts:

CN

UT

RW

DN 455,000

402,000 1,928,000 402,000 402,000402,000 402,000

0 857,000 1,928,000 402,000 402,000 402,000 402,000

CUMBERLAND KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVER ON KY 61 0.1 MI N OF COLD SPRINGS ROAD (CR 1204).(029B00012N)

PL

Project Cost:

CN

UT

RW

DN

BR 3,640,000

0 0 3,640,000 0 0 0 0

1060

CUMBERLAND KY-90 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF BRIDGE OVER CUMBERLAND RIVER ON KY 90 0.27 MI SE OF KY 61 AT THE SCL OF BURKESVILLE. (029B00027N)

PL

Project Cost:

CN

UT

RW

DN

BR 5,200,000

0 0 5,200,000 0 0 0 0

1061

CUMBERLAND KY-90 RECONSTRUCTION(O)IMPROVE KY-90 FROM NORRIS BRANCH ROAD EXTENDING WESTERLY TO PA DUERSON ROAD NEAR MARROWBONE. (14CCN)

PL

Project Cost:

CN

UT

RW

DN SPP 3,500,000

0 0 3,500,000 0 0 0 0

8852

CUMBERLAND CR-1012 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHETSTONE ROAD BRIDGE OVER BIG WHETSTONE CREEK. (029C00057N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

556,500

0 175,000 556,500 0 0 0 0

10001

71

Page 72: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

CUMBERLAND KY-379 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 379 BRIDGE OVER BIG WILLIS CREEK. (029B00005N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

129,500

952,000

0 129,500 952,000 0 0 0 0

10009

Total for CUMBERLAND county PL

Total Amounts:

CN

UT

RW

DN 304,500 3,500,000

10,348,500

0 304,500 13,848,500 0 0 0 0

DAVIESS KY-298 SAFETY(P) RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND KY 298. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 1,800,000

0 1,800,000 0 0 0 0 0

229

DAVIESS US-60 RECONSTRUCTION(O)RECONSTRUCT ON US 60 BETWEEN OAKFORD RD LOOP (CR 1370) TO ADDRESS FLOODING PROBLEM IN THE VICINITY OF THE KIMBERLY-CLARK PLANT (14CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 2,000,000

0 2,000,000 0 0 0 0 0

237

DAVIESS WN-9007 RECONSTRUCTION(O)I-65 SPUR CORRIDOR; MODERNIZATION OF EXISTING NATCHER PARKWAY FROM THE OHIO-BUTLER COUNTY LINE (MP 37.143) TO THE US-60 INTERCHANGE (MP 72.264) IN

PL

Project Cost:

CN

UT

RW

DN

NH

NH

200,000

4,750,000

200,000 0 4,750,000 0 0 0 0

2092.1

72

Page 73: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

DAVIESS KY-54 MAJOR WIDENING(O) IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTON ROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

10,540,000

5,750,000

34,000,000

0 10,540,000 0 0 5,750,000 0 34,000,000

8300

DAVIESS KY-54 PREFINANCD CONVRSN(O)

IMPROVE KY-54 FROM WEST OF THE US-60 BYPASS TO CR-1021 (JACK HINTON ROAD). (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

4,520,000

13,420,000

0 0 0 4,520,000 0 13,420,000 0

8300.01

DAVIESS CR-1053 AM-BRIDGE (P) GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E JCT KY 405 (MM 1.005-1.009) OVER ALLGOOD DITCH. (14CCN) 030C00016N

PL

Project Cost:

CN

UT

RW

DN

BR 619,500

0 0 619,500 0 0 0 0

8813

DAVIESS KY-81 MINOR WIDENING(O) EXTEND THE CURRENT 4 LANES TO THE ROUNDABOUT AT KY-56/KY-81. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,750,000

3,750,000 0 0 0 0 0 0

8851

DAVIESS KY-3143 MINOR WIDENING(O) IMPROVE KY-3143 FROM KY-3335 TO KY 54. (14CCN)

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

680,000

2,730,000

3,380,000

0 0 0 680,000 0 0 6,110,000

8854

73

Page 74: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

DAVIESS CR-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCKPORT FERRY RD BRIDGE OVER KELLY CREEK. (030C00021N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

647,500

0 175,000 647,500 0 0 0 0

10002

DAVIESS CR-1129 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD KY 54 BRIDGE OVER BR OF N FK PANTHER CREEK. (030C00029N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

647,500

0 175,000 647,500 0 0 0 0

10003

DAVIESS CR-1257 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LYDANNE BRIDGE S BRIDGE OVER FLAT LICK CREEK. (030C00069N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

717,500

0 175,000 717,500 0 0 0 0

10004

DAVIESS KY-2262 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH GLOVER CARY BRIDGE OVER OHIO RIVER. JOINT PROJECT WITH INDIANA. (030B00118N)(BSBP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

200,000

2,250,000

0 200,000 2,250,000 0 0 0 0

10020

DAVIESS US-231 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH NATCHER BRIDGE OVER OHIO RIVERJOINT PROJECT WITH INDIANA. (030B00164N)(BSBP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

10,000,000

0 175,000 10,000,000 0 0 0 0

10021

74

Page 75: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

DAVIESS KY-764 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 764 BRIDGE OVER UNNAMED STREAM. (030B00111N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

70,000

350,000

0 70,000 350,000 0 0 0 0

10023

DAVIESS KY-81 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

250,000

2,500,000

0 0 0 0 2,750,000 0 0

20017

DAVIESS KY-331 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC & AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 550,000 0 0 0

20018

DAVIESS KY-2155 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

150,000

1,500,000

0 1,650,000 0 0 0 0 0

20019

DAVIESS WN-9007 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 61.553 TO MILEPOINT 66.08

PL

Project Cost:

CN

UT

RW

DN

PM 4,238,000

0 0 4,238,000 0 0 0 0

20020

75

Page 76: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

DAVIESS WN-9007 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 66.08 TO MILEPOINT 72.26

PL

Project Cost:

CN

UT

RW

DN

PM 5,768,000

0 0 5,768,000 0 0 0 0

20021

DAVIESS US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 23.77 TO MILEPOINT 27.54

PL

Project Cost:

CN

UT

RW

DN

PM 1,609,000

0 0 0 0 1,609,000 0 0

20047

Total for DAVIESS county PL

Total Amounts:

CN

UT

RW

DN200,000

3,750,000

1,120,000

10,540,000

5,300,000 29,988,000

730,000

4,520,000

500,000

250,000

5,750,000 13,420,000

4,109,000

2,730,000

3,380,000

34,000,000

3,950,000 16,960,000 29,988,000 5,750,000 10,109,000 13,420,000 40,110,000

EDMONSON KY-259 SPOT IMPROVEMENTS(O)

RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE NORTH GREEN RIVER BRIDGE AT BROWNSVILLE TO 0.42 MILE NORTH OF THE KY-70/KY-259 INTERSECTION.(06CCR)(2004BOPC)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

1,540,000

1,470,000

5,480,000

0 1,540,000 1,470,000 5,480,000 0 0 0

7030.1

EDMONSON KY-743 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 743 BRIDGE OVER BEAVER DAM CREEK. (031B00004N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

402,500

0 157,500 402,500 0 0 0 0

10012

76

Page 77: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

EDMONSON I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 43.307 TO MILEPOINT 43.6

PL

Project Cost:

CN

UT

RW

DN PM

PM

40,000

400,000

0 440,000 0 0 0 0 0

20011

EDMONSON I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 43.6 TO MILEPOINT 45.935.

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 0 0 0 1,100,000

20012

EDMONSON US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TO MILEPOINT 8.00

PL

Project Cost:

CN

UT

RW

DN

PM 1,301,000

0 0 0 0 1,301,000 0 0

20022

Total for EDMONSON county PL

Total Amounts:

CN

UT

RW

DN 197,500

1,540,000

400,000

1,470,000

402,500 5,480,000 1,301,000

100,000

1,000,000

0 2,137,500 1,872,500 5,480,000 1,301,000 0 1,100,000

ELLIOTT KY-32 RECONSTRUCTION(O)IMPROVE KY-32 FROM WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR(10CCR)(12CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

3,900,000

5,000,000

15,500,000

0 0 0 3,900,000 5,000,000 15,500,000 0

192.01

77

Page 78: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ELLIOTT KY-32 RECONSTRUCTION(O)RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

3,820,000

15,500,000

0 0 0 3,820,000 15,500,000 0 0

192.02

ELLIOTT KY-32 RECONSTRUCTION(O)RECONSTRUCT KY-32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROAD TO KY-7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)

PL

Project Cost:

CN

UT

RW

DN

STP 15,500,000

0 0 0 0 0 15,500,000 0

192.03

ELLIOTT KY-7 RECONSTRUCTION(O)IMPROVE KY-7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARD WRIGLEY. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

2,890,000

6,620,000

6,490,000

15,420,000

0 0 0 2,890,000 6,620,000 6,490,000 15,420,000

228

ELLIOTT KY-32 MAJOR WIDENING(O) KY-32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING. (14CCN)

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

220,000

480,000

320,000

9,340,000

0 0 0 220,000 480,000 320,000 9,340,000

8802

ELLIOTT CR-1206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR 1206 BRIDGE OVER OVER LITTLE SANDY. (030C00032N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

455,000

1,663,000

0 455,000 1,663,000 0 0 0 0

10004

78

Page 79: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for ELLIOTT county PL

Total Amounts:

CN

UT

RW

DN 455,000

1,663,000

3,110,000

7,720,000 7,100,000

5,000,000

31,000,000

6,810,000

15,500,000 24,760,000

0 455,000 1,663,000 10,830,000 27,600,000 37,810,000 24,760,000

ESTILL KY-82 RECONSTRUCTION(O)IMPROVE LEVEL OF SERVICE, SAFETY, AND CONNECTIVITY ON KY-82 FROM KY-89 IN ESTILL CO. TO NEW CONSTRUCTION LOCATED NORTH OF HUDSON MILL ROAD IN

PL

Project Cost:

CN

UT

RW

DN STP 1,500,000

0 0 0 0 0 1,500,000 0

205

ESTILL KY-2459 SPOT IMPROVEMENTS(O)

IMPROVE SAFETY ON KY-2459 (CARHARTT AVE.) FROM KY-89 TO THE RAILROAD BRIDGE.

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

250,000

250,000

250,000

0 0 250,000 500,000 0 0 0

206

ESTILL KY-89 MAJOR WIDENING(O) IMPROVE GEOMETRICS ON KY-89 IN ESTILL COUNTY FROM KY-1886 TO THE ESTILL/CLARK COUNTY LINE.

PL

Project Cost:

CN

UT

RW

DN STP 1,200,000

0 0 0 1,200,000 0 0 0

207

ESTILL KY-1645 RECONSTRUCTION(O)IMPROVE SAFETY AND MOBILITY ON KY-1645 (KIRKLAND AVE) NEAR CR-1087 (LOCK 12 ROAD).

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

100,000

100,000

50,000

320,000

0 100,000 470,000 0 0 0 0

208

79

Page 80: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ESTILL KY-794 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 794 BRIDGE OVER WHITE OAK CREEK. (033B00038N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

735,000

0 245,000 735,000 0 0 0 0

10012

Total for ESTILL county PL

Total Amounts:

CN

UT

RW

DN 345,000 250,000

100,000

50,000

1,055,000

1,200,000

250,000

250,000

1,500,000

0 345,000 1,455,000 1,700,000 0 1,500,000 0

FAYETTE KY-4 MAJOR WIDENING(O) IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWN ROAD. (12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

1,300,000

1,500,000

11,780,000

0 0 0 2,800,000 0 0 11,780,000

113.02

FAYETTE KY-4 PREFINANCD CONVRSN(O)

IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWN ROAD. (12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 1,500,000

0 0 0 1,500,000 0 0 0

113.03

FAYETTE CS-4174 MINOR WIDENING(O) CLAYS MILL ROAD; WIDEN FROM HARRODSBURG ROAD TO NEW CIRCLE ROAD (SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH) (ALL WORK BY LFUCG) (CONSTRUCTION SEQU. 2)

PL

Project Cost:

CN

UT

RW

DN

SLX

SLX

1,900,000

11,000,000

0 12,900,000 0 0 0 0 0

224.1

80

Page 81: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO

PL

Project Cost:

CN

UT

RW

DN

SLX 49,200,000

0 0 0 0 0 0 49,200,000

227

FAYETTE -0 MATCHED FED FUNDS(O)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2018. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT

PL

Project Cost:

CN

UT

RW

DN

SLX 730,000

730,000 0 0 0 0 0 0

227.07

FAYETTE -0 MATCHED FED FUNDS(O)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2019. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT

PL

Project Cost:

CN

UT

RW

DN

SLX 756,000

0 756,000 0 0 0 0 0

227.08

FAYETTE -0 MATCHED FED FUNDS(O)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2020. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT

PL

Project Cost:

CN

UT

RW

DN

SLX 756,000

0 0 756,000 0 0 0 0

227.09

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLX 12,400,000

12,400,000 0 0 0 0 0 0

227.1

81

Page 82: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2019. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLX 8,000,000

0 8,000,000 0 0 0 0 0

227.13

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2020. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLX 8,200,000

0 0 8,200,000 0 0 0 0

227.14

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLX 8,200,000

0 0 0 8,200,000 0 0 0

227.15

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLX 8,200,000

0 0 0 0 8,200,000 0 0

227.16

FAYETTE -0 MATCHED FED FUNDS(O)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2021. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT

PL

Project Cost:

CN

UT

RW

DN

SLX 756,000

0 0 0 756,000 0 0 0

227.17

82

Page 83: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE -0 MATCHED FED FUNDS(O)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2022. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT

PL

Project Cost:

CN

UT

RW

DN

SLX 756,000

0 0 0 0 756,000 0 0

227.18

FAYETTE -0 MATCHED FED FUNDS(O)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2023. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT

PL

Project Cost:

CN

UT

RW

DN

SLX 756,000

0 0 0 0 0 756,000 0

227.19

FAYETTE -0 MATCHED FED FUNDS(O)

VARIOUS 'SLX' CONTINUING PROGRAM PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY PLANNING, TRAFFIC SIGNALFOR FY 2024. (LOCAL MATCH) (ALL WORK BY LFUCG) (FUNDING SUBJECT

PL

Project Cost:

CN

UT

RW

DN

SLX 756,000

0 0 0 0 0 0 756,000

227.2

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLX 8,200,000

0 0 0 0 0 8,200,000 0

227.21

FAYETTE -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL-AID STP FUNDS EARMARKED FOR LEXINGTON URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLX 8,200,000

0 0 0 0 0 0 8,200,000

227.22

83

Page 84: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL IN LEXINGTON (PRIORITY SECTION 2); FROM JOSEPH BRYAN WAY THROUGH NS RAILROAD TUNNEL TO WAVELAND HISTORIC SITE (ALL WORK BY LFUCG). (FUNDING

PL

Project Cost:

CN

UT

RW

DN

SLX 400,000

400,000 0 0 0 0 0 0

229.2

FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL(PRIORITY SECTION 3); FROM LOCHDALE TERRACE, EXTENDING NORTHERLY UNDER MAN O' WAR BOULEVARD TO SHILLITO PARK.(LOCAL MATCH)

PL

Project Cost:

CN

UT

RW

DN

SLX 625,000

625,000 0 0 0 0 0 0

229.3

FAYETTE KY-922 MAJOR WIDENING(O) IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

2,000,000

3,000,000

4,950,000

0 5,000,000 0 4,950,000 0 0 0

252

FAYETTE KY-922 PREFINANCD CONVRSN(O)

IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 10,050,000

0 0 0 10,050,000 0 0 0

252.02

FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2019.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 330,000

0 330,000 0 0 0 0 0

357.16

84

Page 85: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2020.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 330,000

0 0 330,000 0 0 0 0

357.17

FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2021.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 180,000

0 0 0 180,000 0 0 0

357.18

FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2022.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 180,000

0 0 0 0 180,000 0 0

357.19

FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 180,000

0 0 0 0 0 180,000 0

357.2

FAYETTE KY-169 FERRY OPERATION(P)OPERATION OF VALLEY VIEW FERRY AT KY RIVER FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 180,000

0 0 0 0 0 0 180,000

357.21

85

Page 86: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE KY-4 MAJOR WIDENING(O) WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TO BOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION AT NEWTOWN PIKE

PL

Project Cost:

CN

UT

RW

DN

NH 10,000,000

0 0 10,000,000 0 0 0 0

366

FAYETTE KY-4 PREFINANCD CONVRSN(O)

WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM GEORGETOWN ROAD TO BOARDWALK AVENUE INCLUDING INTERCHANGE RECONSTRUCTION AT NEWTOWN PIKE

PL

Project Cost:

CN

UT

RW

DN

NH 22,300,000

0 0 0 22,300,000 0 0 0

366.02

FAYETTE US-27 RECONSTRUCTION(O)REPLACE L&N RAILROAD BRIDGE OVERPASS (MP 8.378), IMPROVE DRAINAGE AND TYPICAL SECTION ON US 27 (NORTH BROADWAY)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

2,440,000

1,550,000

12,040,000

0 0 2,440,000 1,550,000 0 12,040,000 0

412

FAYETTE CS-4524 RECONSTRUCTION(O)CONSTRUCT TURN LANES AT THE INTERSECTION OF MAN O' WAR BLVD (CS-4524) AND RICHMOND ROAD (US-25).

PL

Project Cost:

CN

UT

RW

DN

SLX 262,000

262,000 0 0 0 0 0 0

428

FAYETTE KY-4 MAJOR WIDENING(O) REDUCE CONGESTION ON KY-4 (NEW CIRCLE RD) FROM TRADE CENTER DR TO WOODHILL DR.

PL

Project Cost:

CN

UT

RW

DN NH 2,000,000

0 0 0 0 0 0 2,000,000

438

86

Page 87: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE KY-4 MINOR WIDENING(O) NEW CIRCLE RD: IMPROVE SAFETY AND REDUCE CONGESTION FROM US-68 (HARRODSBURG RD) TO US-60 (VERSAILLES RD). SEE SEGMENTS 2A & 2B IN AUGUST, 1998 ADVANCE

PL

Project Cost:

CN

UT

RW

DN NH 2,200,000

0 0 0 0 0 0 2,200,000

439

FAYETTE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 421 OVER FORK OF TOWN BRANCH AT INTERSECTION OF US 421 AND BRACKTOWN RD (CS 4008) (034B00018N)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 800,000

0 800,000 0 0 0 0 0

1129

FAYETTE CS-3605 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MALABU DRIVE (CS 3605) OVER BRANCH HICKMAN CREEK AT JCT WITH TATES CREEK ROAD (KY 1974) 034C00038N

PL

Project Cost:

CN

UT

RW

DN

BR 427,000

427,000 0 0 0 0 0 0

1132

FAYETTE CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF NORTH ELKHORN CREEK ON HUME ROAD (CR 1001) 0.7 MI NW OF US 60 (034C00001N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

735,000

0 210,000 735,000 0 0 0 0

1141

FAYETTE CS-7038 MATCHED FED FUNDS(O)

REPLACE DETERIORATED WEST BOUND LANE BRIDGE SECTION OF WILSON DOWNING ROAD BRIDGE ACROSS WEST HICKMAN CREEK.

PL

Project Cost:

CN

UT

RW

DN SLX

SLX

75,000

275,000

350,000 0 0 0 0 0 0

1145

87

Page 88: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE US-60 SCOPING STUDY(O) SCOPING STUDY TO RECONSTRUCT/WIDEN US-60/WINCHESTER ROAD TO FOUR LANES. (06CCN)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 280,000

0 0 0 280,000 0 0 0

8340

FAYETTE CS-2548 NEW ROUTE(O) COMPLETE CONSTRUCTION ON POLO CLUB BOULEVARD AT DEERHAVEN LANE AND TODDS ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)(LET

PL

Project Cost:

CN

UT

RW

DN

SLX 1,600,000

1,600,000 0 0 0 0 0 0

8507

FAYETTE KY-4 TRANSP ENHANCEMENT(P)

SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATES CREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,300,000

0 0 2,300,000 0 0 0 0

8801

FAYETTE KY-4 AIR QUALITY(P) SOUND BARRIERS ALONG OUTER LOOP OF NEW CIRCLE ROAD BETWEEN TATES CREEK ROAD AND NICHOLASVILLE ROAD. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,300,000

0 0 0 2,300,000 0 0 0

8801.1

FAYETTE KY-1927 MAJOR WIDENING(O) IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROAD AND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

1,000,000

1,730,000

6,190,000

0 0 0 1,000,000 1,730,000 0 6,190,000

8902

88

Page 89: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE KY-1927 PREFINANCD CONVRSN(O)

IMPROVE LIBERTY ROAD FROM GRAFTONS MILL LANE TO NEW CIRCLE ROAD AND IMPROVE INTERSECTION WITH NEW CIRCLE ROAD. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

3,300,000

2,600,000

0 0 0 3,300,000 0 2,600,000 0

8902.01

FAYETTE I-75 MAJOR WIDENING(O) REDUCE CONGESTION ON I-64/I-75 FROM THE C&O RAILROAD BRIDGE TO THE NORTHERN SPLIT (SECTION 1). (16CCN)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

3,000,000

1,000,000

1,000,000

25,000,000

0 0 0 5,000,000 25,000,000 0 0

8909

FAYETTE CR-1121 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MCCALLS MILL RD BRIDGE OVER BOGGS FORK(034C00009N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

360,500

0 157,500 360,500 0 0 0 0

10009

FAYETTE I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 71 TO MILEPOINT 73.94

PL

Project Cost:

CN

UT

RW

DN PM

PM

390,000

3,900,000

0 0 0 0 4,290,000 0 0

20008

FAYETTE I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 CARDINAL DIRECTION(S) FROM MILEPOINT 73.94 TO MILEPOINT 74.729

PL

Project Cost:

CN

UT

RW

DN PM

PM

30,000

3,000,000

0 3,030,000 0 0 0 0 0

20009

89

Page 90: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-064 BOTH DIRECTION(S) FROM MILEPOINT 81.037 TO MILEPOINT 82.19

PL

Project Cost:

CN

UT

RW

DN PM

PM

175,000

1,750,000

0 0 0 0 0 1,925,000 0

20010

FAYETTE I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 82.19 TO MILEPOINT 89.48

PL

Project Cost:

CN

UT

RW

DN PM

PM

870,000

8,700,000

0 0 0 9,570,000 0 0 0

20011

FAYETTE I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 107.453 TO MILEPOINT 110.213

PL

Project Cost:

CN

UT

RW

DN PM

PM

330,000

3,300,000

0 0 0 3,630,000 0 0 0

20013

FAYETTE I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 110.264 TO MILEPOINT 111.82

PL

Project Cost:

CN

UT

RW

DN PM

PM

190,000

1,900,000

0 0 0 0 2,090,000 0 0

20014

FAYETTE I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 111.82 TO MILEPOINT 120.792

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,080,000

10,800,000

0 0 11,880,000 0 0 0 0

20015

90

Page 91: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FAYETTE US-421 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 550,000 0 0 0 0 0

20016

FAYETTE US-25 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-25 FROM MILEPOINT 19.10 TO MILEPOINT 22.29

PL

Project Cost:

CN

UT

RW

DN

PM 1,440,000

0 0 0 0 1,440,000 0 0

20025

FAYETTE KY-1974 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-1974 FROM MILEPOINT 7.50 TO MILEPOINT 11.55

PL

Project Cost:

CN

UT

RW

DN

PM 2,748,000

0 0 0 0 0 2,748,000 0

20026

Total for FAYETTE county PL

Total Amounts:

CN

UT

RW

DN 75,000

16,719,000

447,500

2,000,000

4,900,000

24,386,000

1,080,000

2,440,000

33,481,500

280,000

4,200,000

6,600,000

5,550,000

60,736,000

580,000

1,730,000

25,674,000

175,000

2,600,000

41,376,000

4,200,000

76,306,000

16,794,000 31,733,500 37,001,500 77,366,000 43,686,000 28,449,000 80,506,000

FLEMING KY-32 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 32 OVER MUD LICK CREEK 0.2 MILES W OF CRAINTOWN RD (CR 1302)035B00038N

PL

Project Cost:

CN

UT

RW

DN

BR 560,000

0 0 560,000 0 0 0 0

1084

91

Page 92: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER ALLISON CREEK ON KY 111 1.2 MI N OF KY 156. (035B00016N)(EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

455,000

2,135,000

0 455,000 2,135,000 0 0 0 0

1091

FLEMING CR-1240 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER FLEMING CREEK ON MCINTIRE ROAD (CR 1240) AT THE JCT WITH PIKE BLUFF (CR 1305)(035C00065N)

PL

Project Cost:

CN

UT

RW

DN

BR

BR

BR

75,000

50,000

600,000

0 125,000 600,000 0 0 0 0

1092

FLEMING KY-111 BRIDGE REHAB(P) RESTORATION OF GRANGE CITY COVERED BRIDGE LOCATED ON KY-111 BETWEEN FLEMINGSBURG AND GRANGE CITY. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

TE 1,200,000

0 1,200,000 0 0 0 0 0

8804

FLEMING KY-11 SAFETY(P) IMPROVE ACCESS AND RESPONSE TIMES FOR THE FLEMINGSBURG FIRE DEPARTMENT TO THE BYPASS AT MP 11.574.

PL

Project Cost:

CN

UT

RW

DN

SPP 80,000

0 80,000 0 0 0 0 0

8902

FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-111 BRIDGE OVER BR OF HILLSBORO CREEK. (035B00018N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

455,000

1,015,000

0 455,000 1,015,000 0 0 0 0

10005

92

Page 93: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FLEMING KY-367 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-367 BRIDGE OVER JOHNSON CREEK. (035B00074N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

375,000

980,000

0 375,000 980,000 0 0 0 0

10006

FLEMING KY-2508 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2508 BRIDGE OVER TOWN BRANCH. (035B00030N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

315,000

875,000

0 315,000 875,000 0 0 0 0

10019

FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 111 BRIDGE OVER DAVIS BRANCH. (035B00075N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

315,000

752,500

0 315,000 752,500 0 0 0 0

10020

FLEMING KY-681 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 681 BRIDGE OVER DELANEY CREEK. (035B00103N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

315,000

822,500

0 315,000 822,500 0 0 0 0

10021

FLEMING KY-32 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,250,000

12,500,000

0 13,750,000 0 0 0 0 0

20009

93

Page 94: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FLEMING US-32 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ON KY-32 BEGINNING AT 0.MILES WEST OF FLEMING/ROWAN CO LINE AND ENDING 0.3 MILES EAST OF THE LINE.

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

SPP

SPP

50,000

800,000

1,000,000

750,000

7,000,000

0 0 50,000 800,000 0 1,750,000 7,000,000

80051

Total for FLEMING county PL

Total Amounts:

CN

UT

RW

DN 3,480,000

75,000

50,000

13,780,000

50,000

7,740,000

800,000

1,000,000

750,000

7,000,000

0 17,385,000 7,790,000 800,000 0 1,750,000 7,000,000

FLOYD US-23 SAFETY(P) IMPROVE SAFETY AND ACCESS ON US-23 BETWEEN KY-80 AND KY-3384.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

420,000

520,000

1,880,000

0 940,000 0 1,880,000 0 0 0

191

FLOYD KY-979 SPOT IMPROVEMENTS(O)

SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBO SCHOOL.(12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 5,540,000

0 0 0 0 5,540,000 0 0

195

FLOYD KY-979 PREFINANCD CONVRSN(O)

SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBO SCHOOL.(12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,370,000

0 0 0 0 0 2,370,000 0

195.01

94

Page 95: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FLOYD KY-680 NEW ROUTE(O) IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TO THE MOUTH OF TACKETT CREEK (ALT.3B SEC.2)(08CCN)(10CCR)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 13,310,000

0 0 0 13,310,000 0 0 0

301.2

FLOYD KY-680 PREFINANCD CONVRSN(O)

IMPROVE THE MINNIE-HAROLD CONNECTOR FROM LITTLE MUD CREEK RD TO THE MOUTH OF TACKETT CREEK (ALT.3B SEC.2)(08CCN)(10CCR)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 19,970,000

0 0 0 0 19,970,000 0 0

301.22

FLOYD KY-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1100 OVER LITTLE PAINT CREEK NEAR FLOYD/JOHNSON COUNTY LINE 036B00002N

PL

Project Cost:

CN

UT

RW

DN

BR 322,000

322,000 0 0 0 0 0 0

1111

FLOYD KY-2557 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON KY 2557 AT JCT US 23 IN JUSTELL. (036B00040N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

525,000

3,010,000

0 525,000 3,010,000 0 0 0 0

1119

FLOYD KY-550 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRUSH CREEK ON KY 550 AT JCT WITH KY 850. (036B00015N)(EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

1,050,000

0 210,000 1,050,000 0 0 0 0

1121

95

Page 96: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FLOYD KY-122 SAFETY(P) CURVE REVISION TO INCLUDE IMPROVED SIGHT DISTANCE AND A LEFT TURN LANE ON KY-122 AT THE KY-680 INTERSECTION IN MCDOWELL(02CCN)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,950,000

0 3,950,000 0 0 0 0 0

8100

FLOYD KY-80 CONGESTION MITIGTN(O)

IMPROVE ACCESS TO KY 80 AT GARRETT EASTBOUND AND ELIMINATE NECESSITY FOR CROSSING WESTBOUND LANES TO MERGE INTO EASTBOUND LANES. MP 1.527 TO MP

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

500,000

3,000,000

0 0 0 500,000 3,000,000 0 0

8703

FLOYD CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRYANT BRANCH LEFT FORK OF CLEAR CREEK ROAD BRIDGE OVER LEFT FK OF BEAVER CREEK. (036C00017N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

384,000

0 175,000 384,000 0 0 0 0

10000

FLOYD KY-466 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 466 BRIDGE OVER LEFT FORK BEAVER CREEK. (036B00032N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

274,750

0 140,000 274,750 0 0 0 0

10014

FLOYD KY-80 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,225,000

12,250,000

0 13,475,000 0 0 0 0 0

20000

96

Page 97: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FLOYD US-23 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-23 FROM MILEPOINT 10.18 TO MILEPOINT 15.79

PL

Project Cost:

CN

UT

RW

DN

PM 2,557,000

0 0 0 0 0 2,557,000 0

20004

FLOYD US-23 SAFETY(P) CONSTRUCT NEW INTERSECTION ON US-23 AT THE ENTRANCE TO BETSY LANE HIGH SCHOOL

PL

Project Cost:

CN

UT

RW

DN SPP 250,000

0 0 250,000 0 0 0 0

80000

Total for FLOYD county PL

Total Amounts:

CN

UT

RW

DN

322,000

2,275,000

420,000

520,000

16,200,000

250,000

4,718,750

500,000

15,190,000 4,927,00028,510,000

322,000 19,415,000 4,968,750 15,690,000 28,510,000 4,927,000 0

FRANKLIN I-64 MAJOR WIDENING(O) IMPROVE SAFETY, TRUCK MOBILITY, AND REDUCE CONGESTION ALONG I-64 FROM DIRECTLY EAST OF US-127 TO US-60 SOUTH OF FRANKFORT.

PL

Project Cost:

CN

UT

RW

DN NH 4,300,000

0 0 0 0 4,300,000 0 0

551

FRANKLIN KY-3506 AM-BRIDGE (P) DEMOLITION OF THE CLOSED ROADWAY SECTION OF THE BROADWAY BRIDGE IN FRANKFORT.

PL

Project Cost:

CN

UT

RW

DN

BR 300,000

0 300,000 0 0 0 0 0

805

97

Page 98: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FRANKLIN CR-1230 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BENSON CREEK ON CRAB ORCHARD ROAD (CR 1230) 200 FT NW OF KY 151 NEAR I-64 EXIT 48 (037C00010N) (EBRP)(16CCR)

PL

Project Cost:

CN

UT

RW

DN BR

BR

105,000

633,500

105,000 633,500 0 0 0 0 0

1078

FRANKLIN I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6 LANES FROM KY-151 TO WEST OF THE KY-420 BRIDGE. (2004BOPC)(DESIGN FUNDED UNDER 5-2035.40)(16CCN)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

120,000

120,000

20,330,000

0 0 0 0 240,000 0 20,330,000

2035.7

FRANKLIN KY-420 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 420 BRIDGE OVER CEDAR RUN CREEK. (037B00011N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

350,000

0 210,000 350,000 0 0 0 0

10000

FRANKLIN KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER TRIB TO N. ELKHORN CREEK. (037B00034N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

332,500

0 210,000 332,500 0 0 0 0

10001

FRANKLIN US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

200,000

2,000,000

0 0 0 2,200,000 0 0 0

20001

98

Page 99: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FRANKLIN US-127 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 11.90 TO MILEPOINT 19.00

PL

Project Cost:

CN

UT

RW

DN

PM 1,228,000

0 0 0 0 1,228,000 0 0

20038

Total for FRANKLIN county PL

Total Amounts:

CN

UT

RW

DN 105,000 420,000

933,500 682,500

200,000

2,000,000

4,300,000

120,000

120,000

1,228,000 20,330,000

105,000 1,353,500 682,500 2,200,000 5,768,000 0 20,330,000

FULTON JC-9003 RECONSTRUCTION(O)IMPROVE THE PURCHASE PARKWAY AT THE KENTUCKY/TENNESSEE LINE TO SOUTHWEST OF THE US-51 INTERCHANGE.(I-69 CORRIDOR IMPROVEMENT)(2012BOP)

PL

Project Cost:

CN

UT

RW

DN

NH 2,500,000

0 0 0 0 0 0 2,500,000

25

FULTON JC-9003 RECONSTRUCTION(O)IMPROVE THE PURCHASE PARKWAY FROM SOUTHWEST OF THE US-51 INTERCHANGE TO CARDINAL ROAD NEAR MAYFIELD INCLUDING THE KY-339 INTERCHANGE IN WINGO, KY.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,000,000

500,000

0 0 0 0 0 1,500,000 0

26

FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2019.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 126,000

0 126,000 0 0 0 0 0

320.16

99

Page 100: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2020.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 126,000

0 0 126,000 0 0 0 0

320.17

FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

SPP 126,000

0 0 0 126,000 0 0 0

320.18

FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

SPP 126,000

0 0 0 0 126,000 0 0

320.19

FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 126,000

0 0 0 0 0 126,000 0

320.2

FULTON KY-1354 FERRY OPERATION(P)OPERATION OF HICKMAN FERRY AT MISSISSIPPI RIVER FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 126,000

0 0 0 0 0 0 126,000

320.21

100

Page 101: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

FULTON KY-1099 SAFETY(P) SAFETY IMPROVEMENT AT INTERSECTION OF KY-1099 AND KY-125. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

500,000

780,000

1,460,000

0 0 0 1,280,000 0 1,460,000 0

8853

FULTON KY-1909 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1909 BRIDGE OVER LITTLE BAYOU DE CHIEN CR. (038B00075N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

490,000

0 175,000 490,000 0 0 0 0

10009

FULTON JC-9003 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.78

PL

Project Cost:

CN

UT

RW

DN PM

PM

175,000

1,750,000

0 1,925,000 0 0 0 0 0

20002

Total for FULTON county PL

Total Amounts:

CN

UT

RW

DN 350,000

1,876,000 616,000

500,000

780,000

126,000 1,586,000

1,000,000

500,000

126,000

2,500,000

126,000

0 2,226,000 616,000 1,406,000 126,000 3,086,000 2,626,000

GALLATIN -0 NEW ROUTE(O) STUDY NEW CORRIDOR BETWEEN I-71 IN GALLATIN COUNTY AND AA HIGHWAY IN CAMPBELL COUNTY.

PL

Project Cost:

CN

UT

RW

DN

STP 2,000,000

0 0 0 2,000,000 0 0 0

458

101

Page 102: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GALLATIN I-71 RECONSTRUCTION(O)IMPROVE GEOMETRICS ON I-71 FROM US-127 TO MP 64. (16CCN).

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

2,200,000

1,500,000

500,000

0 0 0 2,200,000 2,000,000 0 0

8910

GALLATIN I-71 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 53.433 TO MILEPOINT 56.763

PL

Project Cost:

CN

UT

RW

DN PM

PM

500,000

5,000,000

0 0 0 0 0 0 5,500,000

20021

GALLATIN I-71 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 59.673 TO MILEPOINT 69.89

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,025,000

10,250,000

0 0 0 0 11,275,000 0 0

20022

Total for GALLATIN county PL

Total Amounts:

CN

UT

RW

DN

2,000,000

2,200,000 1,025,000

1,500,000

500,000

10,250,000

500,000

5,000,000

0 0 0 4,200,000 13,275,000 0 5,500,000

GARRARD US-27 RELOCATION(O) IMPROVE US-27 FROM WEST LANCASTER BYPASS TO KY-34. (2006BOPC) (16CCN)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

500,000

10,000,000

9,000,000

38,000,000

0 500,000 10,000,000 9,000,000 38,000,000 0 0

196.3

102

Page 103: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GARRARD KY-563 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-563 (MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39; 040B00034N

PL

Project Cost:

CN

UT

RW

DN

BR 406,000

406,000 0 0 0 0 0 0

1122

GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER GILBERTS CREEK ON KY 1972 1.4 MI E OF CRAB ORCHARD ROAD (CR 1226) AT SECL OF LANCASTER. (040B00024N)(EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

647,500

0 210,000 647,500 0 0 0 0

1138

GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1972 BRIDGE OVER BRANCH OF GILBERTS CREEK. (040B00025N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

416,500

0 175,000 416,500 0 0 0 0

10010

Total for GARRARD county PL

Total Amounts:

CN

UT

RW

DN

406,000

885,000

10,000,000

1,064,000

9,000,000

38,000,000

406,000 885,000 11,064,000 9,000,000 38,000,000 0 0

GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SOUTH END OF BLANCHET ROAD 0.3 MILES NORTHEAST OF US 25. 041C00012N (12CCN)

PL

Project Cost:

CN

UT

RW

DN

BR 1,141,000

0 1,141,000 0 0 0 0 0

8714

103

Page 104: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF BLANCHET ROAD 0.2 MILES SOUTHEAST OF THE JUNCTION WITH US 25. 041C00014N (12CCN)

PL

Project Cost:

CN

UT

RW

DN

BR 2,604,000

0 0 2,604,000 0 0 0 0

8715

GRANT CR-1142 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH END OF DELANEY ROAD 0.1 MILE NORTH OF THE JUNCTION WITH US 25. 041C00016N (12CCN)

PL

Project Cost:

CN

UT

RW

DN

BR 2,240,000

0 0 2,240,000 0 0 0 0

8716

GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGE OVER CLARKS CRK+BATON ROUGE R. (041B00011N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

1,732,500

0 210,000 1,732,500 0 0 0 0

10001

GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGES OVER EAGLE CREEK (041B00014N) AND RATTLESNAKE CREEK (041B00013N).

PL

Project Cost:

CN

UT

RW

DN BR

BR

577,500

4,165,000

0 577,500 4,165,000 0 0 0 0

10002

GRANT CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CYNTHIANA ROAD BRIDGE OVER COOPERTOWN CREEK. (041C00008N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

367,500

0 175,000 367,500 0 0 0 0

10003

104

Page 105: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 22 BRIDGE OVER CLARKS CRK+BATON ROUGE R. (041B00011N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

420,000

2,940,000

0 420,000 2,940,000 0 0 0 0

10010

GRANT I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 143.239 TO MILEPOINT 145.5

PL

Project Cost:

CN

UT

RW

DN PM

PM

90,000

900,000

0 0 990,000 0 0 0 0

20023

GRANT I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 145.5 TO MILEPOINT 152.122

PL

Project Cost:

CN

UT

RW

DN PM

PM

275,000

2,750,000

0 0 0 0 3,025,000 0 0

20024

GRANT I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 152.112 TO MILEPOINT 157.7

PL

Project Cost:

CN

UT

RW

DN PM

PM

970,000

9,700,000

0 10,670,000 0 0 0 0 0

20025

GRANT I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 162.52 TO MILEPOINT 164

PL

Project Cost:

CN

UT

RW

DN PM

PM

220,000

2,200,000

0 2,420,000 0 0 0 0 0

20027

105

Page 106: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GRANT I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 164.4 TO MILEPOINT 166.263

PL

Project Cost:

CN

UT

RW

DN PM

PM

125,000

1,250,000

0 0 0 0 0 1,375,000 0

20028

GRANT KY-22 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

47,500

475,000

0 0 0 522,500 0 0 0

20029

Total for GRANT county PL

Total Amounts:

CN

UT

RW

DN 2,572,500

13,041,000

90,000

14,949,000

47,500

475,000

275,000

1,250,000

125,000

2,750,000

0 15,613,500 15,039,000 522,500 3,025,000 1,375,000 0

GRAVES KY-80 NEW ROUTE(O) MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303 SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY (PURCHASE PARKWAY).

PL

Project Cost:

CN

UT

RW

DN

SPP 7,280,000

0 0 7,280,000 0 0 0 0

181.5

GRAVES KY-80 PREFINANCD CONVRSN(O)

MURRAY-MAYFIELD RD; EXTEND MAYFIELD SOUTHERN BYPASS FROM KY-303 SOUTH OF MAYFIELD, NORTHWEST TO JULIAN M. CARROLL PARKWAY (PURCHASE PARKWAY).

PL

Project Cost:

CN

UT

RW

DN

SPP 7,280,000

0 0 0 7,280,000 0 0 0

181.51

106

Page 107: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GRAVES CR-1088 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER PANTHER CREEK ON MCKENDREE CHURCH RD (CR 1088) 0.3 MI E OF KY 301 042C00010N

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

553,000

0 280,000 0 0 553,000 0 0

1157

GRAVES KY-1890 AM-BRIDGE (P) REPLACE KY-1890 BRIDGE OVER LITTLE MAYFIELD CREEK. (042B00191N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

507,500

0 140,000 507,500 0 0 0 0

10001

GRAVES CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MARTIN ROAD BRIDGE OVER BRANCH-OBION CREEK. (042C00250N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

200,000

423,500

0 200,000 0 423,500 0 0 0

10002

GRAVES KY-1485 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1485 BRIDGE OVER TERRAPIN CREEK. (042B00136N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

875,000

0 210,000 875,000 0 0 0 0

10010

GRAVES JC-9003 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF JULIAN M. CARROLL PURCHASE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 22 TO MILEPOINT 34.49

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,000,000

1,000,000

0 0 0 0 2,000,000 0 0

20004

107

Page 108: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GRAVES KY-94 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-94 FROM MILEPOINT 10.49 TO MILEPOINT 15.78

PL

Project Cost:

CN

UT

RW

DN

PM 825,000

0 0 0 0 825,000 0 0

20028

GRAVES KY-339 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-339 FROM MILEPOINT 6.04 TO MILEPOINT 13.40

PL

Project Cost:

CN

UT

RW

DN

PM 1,274,000

0 0 0 0 0 1,274,000 0

20029

Total for GRAVES county PL

Total Amounts:

CN

UT

RW

DN 830,000

8,662,500 7,703,500

1,000,000

1,274,0002,378,000

0 830,000 8,662,500 7,703,500 3,378,000 1,274,000 0

GRAYSON US-62 MINOR WIDENING(O) IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY3155) TO JUST EAST OF BEEHIVE CURVE. CONSTRUCTION SEGMENT 1.

PL

Project Cost:

CN

UT

RW

DN

STP 2,000,000

0 0 2,000,000 0 0 0 0

8502.1

GRAYSON US-62 PREFINANCD CONVRSN(O)

IMPROVE US 62 FROM LEITCHFIELD BYPASS (KY3155) TO JUST EAST OF BEEHIVE CURVE. CONSTRUCTION SEGMENT 1.

PL

Project Cost:

CN

UT

RW

DN

STP 2,000,000

0 0 0 2,000,000 0 0 0

8502.11

108

Page 109: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GRAYSON US-62 MINOR WIDENING(O) IMPROVE US 62 FROM JUST EAST OF BEEHIVE CURVE TO KY224. CONSTRUCTION SEGMENT 2.

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 0 0 0 0 5,000,000

8502.2

GRAYSON KY-3155 NEW ROUTE(O) EXTEND THE WILLIAM THOMASON BYWAY (KY 3155) FROM THE SOUTHERN INTERSECTION AT KY 259 WESTERLY TO KY 54

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

2,500,000

1,500,000

14,500,000

0 1,000,000 0 4,000,000 14,500,000 0 0

8954

GRAYSON CR-1161 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HORNTOWN RD BRIDGE OVER ROCK CREEK. (043C00011N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

100,000

220,000

0 100,000 220,000 0 0 0 0

10000

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 108.00 TO MILEPOINT 111.(110.50 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

230,000

2,300,000

0 0 2,530,000 0 0 0 0

20000

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 111.25 TO MILEPOINT 112.48

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 0 550,000 0 0

20001

109

Page 110: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 112.4 TO MILEPOINT 114.8

PL

Project Cost:

CN

UT

RW

DN PM

PM

190,000

1,900,000

0 0 0 2,090,000 0 0 0

20002

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 114.8 TO MILEPOINT 116.95

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 0 0 1,100,000 0

20003

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 88.433 TO MILEPOINT 91.2

PL

Project Cost:

CN

UT

RW

DN

PM 2,590,000

0 0 2,590,000 0 0 0 0

20004

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY NON-CARDINAL DIRECTION(S) FROM MILEPOINT 91.2 TO MILEPOINT 95

PL

Project Cost:

CN

UT

RW

DN PM

PM

150,000

1,500,000

0 0 1,650,000 0 0 0 0

20006

GRAYSON US-62 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 14.49 TO MILEPOINT 20.79

PL

Project Cost:

CN

UT

RW

DN

PM 999,000

0 0 0 0 0 0 999,000

20027

110

Page 111: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for GRAYSON county PL

Total Amounts:

CN

UT

RW

DN 1,100,000 380,000

8,610,000

190,000

2,500,000

1,500,000

3,900,000

50,000

1,000,000

100,000

15,000,000 5,999,000

0 1,100,000 8,990,000 8,090,000 15,050,000 1,100,000 5,999,000

GREEN US-68 RECONSTRUCTION(O)US68 IMPROVEMENTS FROM T DAVIS RD TO CLOVER LICK CREEK (MP 6.425 TO 11.744) AS PER 3-203 SCOPING STUDY (SPOT IMPROVEMENTS #11, 12 & 13). (DESIGN UNDER 4-397)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

2,000,000

2,000,000

9,000,000

0 0 0 2,000,000 2,000,000 9,000,000 0

397.1

GREEN US-68 RECONSTRUCTION(O)ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG US 68 FROM 1600 FEET WEST OF SOUTH THURLOW RD(MP 9.682) EXTENDING TO THE

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

250,000

720,000

2,740,000

0 970,000 2,740,000 0 0 0 0

397.12

GREEN -0 NEW ROUTE(O) CONSTRUCT NEW CONNECTOR FROM VAUGHN CURVE ON US-68 BYPASS EAST OF GREENSBURG CROSSING KY-61 AND KY-417 AND CONNECTING WITH KY-3535 NORTH OF

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

2,000,000

3,000,000

2,000,000

0 0 0 2,000,000 0 3,000,000 2,000,000

398

GREEN KY-61 MAJOR WIDENING(O) IMPROVE SAFETY AND MOBILITY ON KY-61 FROM PITMAN CREEK BRIDGE TO DOC WARD RD (CR 1314). (12CCN)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

2,000,000

2,750,000

6,000,000

0 0 0 0 2,000,000 2,750,000 6,000,000

8712

111

Page 112: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GREEN KY-88 SPOT IMPROVEMENTS(O)

SPOT IMPROVEMENTS & IMPROVE EXISTING ALIGNMENT ON KY 88 FROM 0.20 MILES WEST OF AKIN NARROWS OF PITMAN RD (MP 8.996) TO KY 61 (MP 11.232). (14CCN)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

500,000

2,900,000

1,000,000

3,000,000

0 0 0 500,000 2,900,000 1,000,000 3,000,000

8853

GREEN CR-1347 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JONES SCHOOL RD BRIDGE OVER BRUSH CREEK. (044C00023N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

100,000

203,000

0 100,000 203,000 0 0 0 0

10001

GREEN US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 BRIDGE OVER GREASY CREEK. (044B00013N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

105,000

402,500

0 105,000 402,500 0 0 0 0

10009

Total for GREEN county PL

Total Amounts:

CN

UT

RW

DN 205,000

250,000

720,000

3,345,500

2,500,000

2,000,000 4,900,000

2,000,000

9,000,000

3,000,000

3,750,000 2,000,000

9,000,000

0 1,175,000 3,345,500 4,500,000 6,900,000 15,750,000 11,000,000

GREENUP KY-2 PE & ENVIRONMENTAL(O)

RECONSTRUCT KY-2 FROM MP 13.2 TO US-23 (MP 17.2)(08CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

6,070,000

3,380,000

36,000,000

0 0 0 6,070,000 0 3,380,000 36,000,000

132

112

Page 113: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GREENUP CS-3060 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS-PHASE B ALONG GESLING RD (CS-3060) FROM INTERSECTION OF CARDINAL RD (CS-3061) & SEATON DR (KY-750) TO KENWOOD DR (CS-3054/KY-1093) &

PL

Project Cost:

CN

UT

RW

DN SAH

SAH

SAH

SAH

68,000

20,000

80,000

444,000

88,000 524,000 0 0 0 0 0

401

GREENUP KY-750 MATCHED FED FUNDS(O)

DESIGN AND CONSTRUCTION OF SIDEWALKS ALONG POWELL LANE (KY-750) IN FLATWOODS, KY BEGINNING AT END OF THE EXISTING SIDEWALK AT MP 1.74 AND

PL

Project Cost:

CN

UT

RW

DN

SAH

SAH

SAH

32,000

64,000

370,000

466,000 0 0 0 0 0 0

402

GREENUP KY-244 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-244 (MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF JCT US 23; 045B00039N (16CCR)

PL

Project Cost:

CN

UT

RW

DN

BR 11,655,000

11,655,000 0 0 0 0 0 0

1073

GREENUP CS-4041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POND RUN ON WILLIAMS AVE (CS 4041) IN RACELAND 250 FT NW OF POND RUN ROAD (CS 4001) (045C00119N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

840,000

0 245,000 840,000 0 0 0 0

1094

GREENUP KY-207 NEW ROUTE(O) IMPROVE KY-207 FROM THE INDUSTRIAL PARKWAY TO THE KY-693 INTERSECTION IN FLATWOODS.(08CCN)(16CCR)

PL

Project Cost:

CN

UT

RW

DN STP 2,000,000

0 0 0 0 0 0 2,000,000

8509

113

Page 114: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

GREENUP KY-503 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-503 BRIDGE OVER INDIAN RUN CREEK. (045B00033N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

753,000

0 245,000 753,000 0 0 0 0

10007

GREENUP CR-1018 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SMITH BRANCH RD BRIDGE OVER LEFT FK SMITH BRANCH. (045C00114N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

595,000

0 280,000 595,000 0 0 0 0

10008

GREENUP LA-1000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MUSKETEER DRIVE BRIDGE OVER SLASH BRANCH. (045C00150N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

300,000

0 245,000 300,000 0 0 0 0

10009

GREENUP KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1 BRIDGE OVER LOST CREEK. (045B00006N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

1,015,000

0 350,000 1,015,000 0 0 0 0

10022

Total for GREENUP county PL

Total Amounts:

CN

UT

RW

DN 68,000

52,000

64,000

12,025,000

1,365,000

80,000

444,000 3,503,000

6,070,000

3,380,000

2,000,000

36,000,000

12,209,000 1,889,000 3,503,000 6,070,000 0 3,380,000 38,000,000

114

Page 115: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HANCOCK US-60 MINOR WIDENING(O) IMPROVE THE WESTBOUND LANES OF US-60 FROM KY-1957 TO 0.2 MILE WEST OF KY-6106. (12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

90,000

960,000

6,090,000

0 90,000 960,000 6,090,000 0 0 0

226

HANCOCK US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

525,000

5,250,000

0 0 0 0 5,775,000 0 0

20022

Total for HANCOCK county PL

Total Amounts:

CN

UT

RW

DN90,000

960,000

6,090,000

525,000

5,250,000

0 90,000 960,000 6,090,000 5,775,000 0 0

HARDIN KY-251 PHASE I DESIGN(O) KY 251 IMPROVEMENTS FROM KY 3005 TO KY 434.

PL

Project Cost:

CN

UT

RW

DN

BR2

BR2

4,200,000

8,700,000

0 4,200,000 0 8,700,000 0 0 0

153.01

HARDIN US-31 CONGESTION MITIGTN(O)

IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-31WB TO CS-2255 (WILSON ROAD). (10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

500,000

1,000,000

1,000,000

9,000,000

0 0 0 500,000 0 0 11,000,000

154

115

Page 116: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARDIN KY-313 MAJOR WIDENING(O) WIDEN KY 313 TO 4 LANES BETWEEN PATRIOT PARKWAY (MP 10.598) AND THE BULLION BOULEVARD CONNECTOR (MP 14.534). (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

BR2

BR2

750,000

12,000,000

0 750,000 12,000,000 0 0 0 0

170

HARDIN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER P&L AND CSX RAILROADS (MP 36.4 TO 36.8 IN WEST POINT) (047B00007N).(16CCR)

PL

Project Cost:

CN

UT

RW

DN

BR 10,500,000

0 10,500,000 0 0 0 0 0

199

HARDIN US-62 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON US-62 FROM I-65 TO UPPER COLESBURG ROAD (CR-1038)

PL

Project Cost:

CN

UT

RW

DN STP 1,500,000

0 0 0 0 1,500,000 0 0

442

HARDIN US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER ROLLING FORK AT THE HARDIN-NELSON CO LINE. 047B00023N

PL

Project Cost:

CN

UT

RW

DN

BR 3,381,000

0 0 3,381,000 0 0 0 0

1093

HARDIN KY-361 SAFETY(P) RELOCATE INTERSECTION OF WOODLAND DRIVE AT US-31W. (98CCN)(06CCR)(REMAINING FUNDS FOR AGREEMENT)(12CCR)(LET BY KYTC)

PL

Project Cost:

CN

UT

RW

DN

BR2 2,500,000

0 0 2,500,000 0 0 0 0

7020

116

Page 117: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARDIN KY-1357 SAFETY(P) IMPROVE SAFETY, GEOMETRICS, DRAINAGE AND MAINTENANCE ISSUES ALONG KY-1357 (ST. JOHNS RD) FROM US-31W BYPASS TO KY-3005 (RING ROAD). (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

3,000,000

2,500,000

9,000,000

0 0 3,000,000 2,500,000 0 0 9,000,000

8801

HARDIN KY-220 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 220 BRIDGE OVER MARTINS BRANCH CREEK. (047B00080N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

87,500

192,500

0 87,500 192,500 0 0 0 0

10010

HARDIN KY-2212 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2212 BRIDGE OVER PAWLEY CREEK. (047B00134N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

91,000

206,500

0 91,000 206,500 0 0 0 0

10011

HARDIN KY-2800 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2800 BRIDGE OVER SANDY CREEK. (047B00137N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

87,500

206,500

0 87,500 206,500 0 0 0 0

10012

HARDIN CR-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEWLEY HOLLOW RD BRIDGE OVER MILL CREEK. (047C00014N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

91,000

227,500

0 91,000 227,500 0 0 0 0

10013

117

Page 118: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARDIN BG-9002 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 5.82 TO MILEPOINT 8.837

PL

Project Cost:

CN

UT

RW

DN PM

PM

240,000

2,400,000

0 2,640,000 0 0 0 0 0

20007

HARDIN US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

550,000

5,500,000

0 6,050,000 0 0 0 0 0

20011

HARDIN US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

250,000

2,500,000

0 2,750,000 0 0 0 0 0

20012

HARDIN US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

325,000

3,250,000

0 0 0 3,575,000 0 0 0

20013

HARDIN US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

25,000

250,000

0 0 275,000 0 0 0 0

20014

118

Page 119: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARDIN WK-9001 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 119.649 TO MILEPOINT 120.649

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 0 0 0 1,100,000

20015

HARDIN WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 120.93 (120.65 NON-CARDINAL) TO MILEPOINT 132.4

PL

Project Cost:

CN

UT

RW

DN PM

PM

920,000

9,200,000

0 0 0 10,120,000 0 0 0

20016

HARDIN WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY CARDINAL DIRECTION(S) FROM MILEPOINT 132.4 TO MILEPOINT 134.923

PL

Project Cost:

CN

UT

RW

DN PM

PM

200,000

2,000,000

0 2,200,000 0 0 0 0 0

20018

HARDIN WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 134.923 TO MILEPOINT 135.923

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 0 0 0 1,100,000

20019

HARDIN US-62 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 9.57 TO MILEPOINT 13.77

PL

Project Cost:

CN

UT

RW

DN

PM 689,000

0 0 0 0 689,000 0 0

20028

119

Page 120: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for HARDIN county PL

Total Amounts:

CN

UT

RW

DN 1,597,000

4,950,000

22,900,000

25,000

3,000,000

18,964,000

1,745,000

2,500,000

21,150,000

1,500,000

689,000

200,000

1,000,000

1,000,000

20,000,000

0 29,447,000 21,989,000 25,395,000 2,189,000 0 22,200,000

HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WALLINS CREEK ON KY 219 3.0 MILE SOUTH OF SCL OF WALLINS CREEK. (048B00047N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

510,000

0 175,000 510,000 0 0 0 0

1097

HARLAN US-119 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 119 OVER KY 160/MAIN ST IN HARLAN COUNTY, KY. 048B00126N

PL

Project Cost:

CN

UT

RW

DN BR

BR

560,000

5,460,000

0 560,000 5,460,000 0 0 0 0

1101

HARLAN CR-1328 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SWEET BALL RD (CR-1328) (0.175) OVER AGES BRANCH. 048C00072N

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

455,000

0 175,000 455,000 0 0 0 0

1107

HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00046N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

490,000

0 175,000 490,000 0 0 0 0

10010

120

Page 121: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE OVER WALLINS CREEK. (048B00048N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

367,500

0 175,000 367,500 0 0 0 0

10011

HARLAN KY-72 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-72 BRIDGE OVER CLOVER FK CUMBERLAND RVR. (048B00095N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

910,000

0 245,000 910,000 0 0 0 0

10012

HARLAN KY-179 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-179 BRIDGE OVER FUGETT CREEK. (048B00097N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

612,500

0 175,000 612,500 0 0 0 0

10013

HARLAN KY-3451 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3451 BRIDGE OVER EWING CREEK. (048B00146N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

525,000

0 175,000 525,000 0 0 0 0

10014

HARLAN KY-2007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2007 BRIDGE OVER WALLINS CREEK. (048B00179N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

469,000

0 192,500 469,000 0 0 0 0

10015

121

Page 122: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARLAN CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RASNICK RD BRIDGE OVER POOR FK CUMBERLAND RVR. (048C00008N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

630,000

0 192,500 630,000 0 0 0 0

10016

HARLAN CR-1218 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BLUE LN BRIDGE OVER PATH FK OF PUCKETT CREEK. (048C00043N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

581,000

0 175,000 581,000 0 0 0 0

10017

HARLAN CS-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KENTUCKY AV BRIDGE OVER MARTINS FK CUMBERLAND RV. (048C00067N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

647,500

0 175,000 647,500 0 0 0 0

10018

HARLAN CR-1082 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PRICE LN BRIDGE OVER CLOVER FK CUMBERLAND RVR. (048C00094N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

598,500

0 192,500 598,500 0 0 0 0

10019

HARLAN CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BANNER FORK RD BRIDGE OVER WALLINS CREEK. (048C00138N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

427,000

0 175,000 427,000 0 0 0 0

10020

122

Page 123: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARLAN KY-1604 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1601 BRIDGE OVER JONES CREEK. (048B00073N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

740,600

0 175,000 740,600 0 0 0 0

10040

Total for HARLAN county PL

Total Amounts:

CN

UT

RW

DN 3,132,500

13,423,600

0 3,132,500 13,423,600 0 0 0 0

HARRISON KY-32 SAFETY(P) IMPROVE SAFETY ON KY-32 AT THE ENTRANCE TO HARRISON MEMORIAL HOSPITAL IN CYNTHIANA.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,290,000

0 0 0 2,290,000 0 0 0

908

HARRISON CR-1124 BRIDGE REPLACEMENT(P)

REPLACE BRIDGE ON OLD LAIR RD (CR-1124) (0.071) OVER S. FORK LICKING RIVER. (SR=14.2) 049C00035N

PL

Project Cost:

CN

UT

RW

DN SPP 500,000

0 0 0 500,000 0 0 0

1093

HARRISON US-62 RECONSTRUCTION(O)IMPROVE US-62 FROM SALEM PIKE (CR-1005) TO APPROXIMATELY MP 12.3. (12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,920,000

0 0 0 0 2,920,000 0 0

8707

123

Page 124: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HARRISON US-27 RECONSTRUCTION(O)RECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4. (12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

500,000

5,500,000

0 0 0 500,000 0 5,500,000 0

8708

Total for HARRISON county PL

Total Amounts:

CN

UT

RW

DN 500,000

500,000

2,290,000 5,500,0002,920,000

0 0 0 3,290,000 2,920,000 5,500,000 0

HART KY-335 ECONOMIC DEVEL(O)IMPROVE MOBILITY, CONNECTIVITY AND SAFETY BY ADDRESSING COMMERCIAL AND INDUSTRIAL TRAFFIC MOVEMENT FROM US-31W SOUTH OF KY-218 TO I-65. (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,500,000

1,000,000

0 0 1,500,000 1,000,000 0 0 0

441

HART US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-31E FROM MILEPOINT 13.18 TO MILEPOINT 21.58

PL

Project Cost:

CN

UT

RW

DN

PM 964,000

0 0 0 0 0 964,000 0

20029

Total for HART county PL

Total Amounts:

CN

UT

RW

DN1,500,000

1,000,000

964,000

0 0 1,500,000 1,000,000 0 964,000 0

124

Page 125: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HENDERSON US-60 RECONSTRUCTION(O)WATHEN LANE: UPGRADE WITH WIDENED LANES, CURB, GUTTER AND SIDEWALK FROM US 60 TO CITY LIMITS.

PL

Project Cost:

CN

UT

RW

DN SHN 304,000

304,000 0 0 0 0 0 0

382

HENDERSON CS-1372 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON CS-1372 (WATSON LANE)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

400,000

1,400,000

1,400,000

5,000,000

0 400,000 1,400,000 1,400,000 5,000,000 0 0

383

HENDERSON -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2018. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SHN 1,176,000

1,176,000 0 0 0 0 0 0

700.13

HENDERSON -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2019. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

PL

Project Cost:

CN

UT

RW

DN

SHN 700,000

0 700,000 0 0 0 0 0

700.14

HENDERSON -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2020. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

PL

Project Cost:

CN

UT

RW

DN

SHN 700,000

0 0 700,000 0 0 0 0

700.15

125

Page 126: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HENDERSON -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2021. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

PL

Project Cost:

CN

UT

RW

DN

SHN 700,000

0 0 0 700,000 0 0 0

700.16

HENDERSON -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2022. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

PL

Project Cost:

CN

UT

RW

DN

SHN 700,000

0 0 0 0 700,000 0 0

700.17

HENDERSON -0 MATCHED FED FUNDS(O)

FEDERAL 'STP' FUNDS DEDICATED TO HENDERSON FOR FY 2023. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

PL

Project Cost:

CN

UT

RW

DN

SHN 700,000

0 0 0 0 0 700,000 0

700.18

HENDERSON US-41 SAFETY(P) US 41/KY 812 INTERSECTION UPGRADE: ADD RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASING. KYTC PROJECT WITH KYTC PROVIDING 20% MATCH.(TOLL

PL

Project Cost:

CN

UT

RW

DN

SHN

SHN

SHN

50,000

100,000

950,000

1,100,000 0 0 0 0 0 0

711

HENDERSON CS-1453 AM-BRIDGE (P) WATHEN BRIDGE REPLACEMENT: REPLACE EXISTING BRIDGE WITH 6FT PRECAST CONCRETE BOX CULVERT, PAVEMENT AND GUARDRAIL. LPA PROJECT. CITY TO PROVIDE MATCH.

PL

Project Cost:

CN

UT

RW

DN

SHN

SHN

20,000

160,000

180,000 0 0 0 0 0 0

713

126

Page 127: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HENDERSON KY-2183 MATCHED FED FUNDS(O)

KY 2183 / KY 1539 INTERSECTION AND UPGRADE: PROJECT WILL RECONSTRUCT THE INTERSECTION AND MAKE IMPROVEMENTS TO THE SOUTHBOUND APPROACH. (2012BOP

PL

Project Cost:

CN

UT

RW

DN

SHN

SHN

SHN

150,000

400,000

600,000

550,000 600,000 0 0 0 0 0

714

HENDERSON US-41 MATCHED FED FUNDS(O)

US 41/ WOLF HILLS ROAD INTERSECTION UPGRADE: PROJECT WILL ADD DEDICATED RIGHT TURN AND LEFT TURN LANES INCLUDING SIGNAL PHASING TO BE MODIFIED OR

PL

Project Cost:

CN

UT

RW

DN

SHN

SHN

SHN

50,000

100,000

500,000

150,000 500,000 0 0 0 0 0

715

HENDERSON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078 051B00015N.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

BR 6,000,000

0 6,000,000 0 0 0 0 0

1080

HENDERSON US-60 PREFINANCD CONVRSN(O)

ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER GREEN RIVER AT INTERSECTION WITH KY 1078. (SR 39051B00015N (ADDITIONAL FUNDING FOR C PHASE)

PL

Project Cost:

CN

UT

RW

DN

BR 6,000,000

0 0 6,000,000 0 0 0 0

1080.01

HENDERSON I-69 NEW ROUTE(O) DEVELOP ALIGNMENT FOR I-69 HENDERSON/EVANSVILLE OHIO RIVER CROSSING (TO BE DEVELOPED IN CONCERT WITH 2-1088.00).(16CCR)(C-COST=$1.0 BILLION; KYTC SHARE

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

500,000

19,900,000

8,000,000

0 500,000 0 19,900,000 8,000,000 0 0

1088.1

127

Page 128: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HENDERSON US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING ON US 41 BRIDGES OVER OHIO RIVERJOINT PROJECT WITH INDIANA. (051B0002R, 051B0007L)(BSBP)

PL

Project Cost:

CN

UT

RW

DN

BR 21,200,000

0 0 0 0 21,200,000 0 0

2091.1

HENDERSON I-69 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 142.146 TO MILEPOINT 148.09 (150.142 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

640,000

6,400,000

0 0 0 7,040,000 0 0 0

20023

Total for HENDERSON county PL

Total Amounts:

CN

UT

RW

DN 304,000

250,000

620,000

2,286,000

900,000

7,800,000

1,400,000

6,700,000

640,000

19,900,000

1,400,000

7,100,000

8,000,000

700,00026,900,000

3,460,000 8,700,000 8,100,000 29,040,000 34,900,000 700,000 0

HENRY I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY-53 TO KY-153.

PL

Project Cost:

CN

UT

RW

DN NH 5,600,000

0 0 0 0 0 5,600,000 0

552

HENRY KY-146 RECONSTRUCTION(O)MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 AND PENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY 153) TO LOST CREEK (1/2 MILE EAST

PL

Project Cost:

CN

UT

RW

DN

SPP 6,930,000

0 6,930,000 0 0 0 0 0

8300

128

Page 129: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HENRY KY-146 PREFINANCD CONVRSN(O)

MAJOR RECONSTRUCTION OF KY-146 BETWEEN NEW CASTLE AT US-421 AND PENDLETON AT KY-153. SEGMENT 1: PENDLETON ROAD (KY-153) TO LOST CREEK (1/2 MILE

PL

Project Cost:

CN

UT

RW

DN

SPP 6,930,000

0 0 0 0 0 6,930,000 0

8300.01

HENRY KY-997 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 997 BRIDGE OVER WHITE SULPHUR CREEK(052B00060N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

266,000

0 192,500 266,000 0 0 0 0

10002

HENRY KY-3175 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3175 BRIDGE OVER WHITE SULPHUR FORK(052B00064N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

262,500

574,000

0 262,500 574,000 0 0 0 0

10003

HENRY KY-3320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3320 BRIDGE OVER TRIB OF HARRODS CREEK. (052B00070N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

287,000

0 210,000 287,000 0 0 0 0

10004

HENRY CR-1027 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GULLION RUN RD BRIDGE OVER TRIB OF GULLION RUN. (052C00045N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

231,000

0 175,000 231,000 0 0 0 0

10006

129

Page 130: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HENRY KY-1606 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1606 BRIDGE OVER WHITE SULPHUR FORK(052B00048N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

1,022,000

0 245,000 1,022,000 0 0 0 0

10017

HENRY I-71 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 24.727 TO MILEPOINT 28.173.

PL

Project Cost:

CN

UT

RW

DN PM

PM

450,000

4,500,000

0 4,950,000 0 0 0 0 0

20002

HENRY I-71 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-071 CARDINAL DIRECTION(S) FROM MILEPOINT 37.183 TO MILEPOINT 38.086

PL

Project Cost:

CN

UT

RW

DN PM

PM

40,000

400,000

0 0 440,000 0 0 0 0

20007

Total for HENRY county PL

Total Amounts:

CN

UT

RW

DN 1,535,000

11,430,000

40,000

2,780,000 6,930,000

5,600,000

0 12,965,000 2,820,000 0 0 12,530,000 0

HICKMAN KY-1826 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON KY-1826 OVER TOWN CREEK (B79) IN CLINTON. (053B00079N)

PL

Project Cost:

CN

UT

RW

DN

BR 1,400,000

0 1,400,000 0 0 0 0 0

1062

130

Page 131: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HICKMAN CR-1011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER IC RR ON BALTIMORE RD (CR 1011) 0.3 MI NW OF HICKMAN/GRAVES CO LINE 053C00003N

PL

Project Cost:

CN

UT

RW

DN BR

BR

266,000

1,613,500

0 266,000 1,613,500 0 0 0 0

1156

HICKMAN KY-2206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2206 BRIDGE OVER CANE CR FK -OBION CRK. (053B00090N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

875,000

0 210,000 875,000 0 0 0 0

10011

Total for HICKMAN county PL

Total Amounts:

CN

UT

RW

DN 476,000

1,400,000 2,488,500

0 1,876,000 2,488,500 0 0 0 0

HOPKINS US-41 MAJOR WIDENING(O) US 41A PHASE II DESIGN AND RIGHT-OF-WAY. (2005HPP-KY135)(SEE 2-137.01 FOR "STP" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

HPP 2,879,680

2,879,680 0 0 0 0 0 0

137.02

HOPKINS US-41 MAJOR WIDENING(O) IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1) (2012BOP)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 5,000,000

0 0 5,000,000 0 0 0 0

137.1

131

Page 132: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HOPKINS US-41 PREFINANCD CONVRSN(O)

IMPROVE US-41A FROM INDUSTRIAL DRIVE TO YORKWOOD PLACE. (SECTION 1) (2012BOP)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 5,000,000

0 0 0 5,000,000 0 0 0

137.11

HOPKINS US-41 MAJOR WIDENING(O) WIDEN US-41A FROM YORKWOOD PLACE TO US-41 / KY-281. (SECTION 2) (2012BOP)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 8,000,000

8,000,000 0 0 0 0 0 0

137.2

HOPKINS KY-281 MAJOR WIDENING(O) IMPROVE KY-281 FROM ISLAND PARK DRIVE TO CARRIAGE LANE (KY-2281).

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

500,000

1,000,000

1,000,000

0 0 0 0 0 500,000 2,000,000

384

HOPKINS -0 NEW ROUTE(O) CONSTRUCTION OF THE CENTER STREET CONNECTOR ROAD BEGINNING AT CENTER STREET AND PROCEEDING TO THE CSX RAILROADSECTION 1, A DISTANCE 5,173 LINEAR

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

400,000

200,000

800,000

4,000,000

0 600,000 800,000 4,000,000 0 0 0

804

HOPKINS KY-260 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-260 (MP 2.14) OVER OTTER CREEK; .20 MI EAST OF PENNYRILE PARKWAY; 054B00022N (14CCR)

PL

Project Cost:

CN

UT

RW

DN

BR 1,085,000

1,085,000 0 0 0 0 0 0

1072

132

Page 133: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HOPKINS US-41 MAJOR WIDENING(O) IMPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY-281. (06CCN)(12CCR)

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

900,000

1,180,000

1,440,000

8,860,000

0 0 0 2,080,000 1,440,000 0 8,860,000

8305

HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER SUGAR CREEK. (054B00088N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

1,242,500

0 210,000 1,242,500 0 0 0 0

10005

HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER CLEAR CREEK. (054B00182N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

1,295,000

0 210,000 1,295,000 0 0 0 0

10006

HOPKINS KY-138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 138 BRIDGE OVER POND RIVER. (054B00009N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

35,000

245,000

0 35,000 245,000 0 0 0 0

10024

HOPKINS KY-109 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 109 BRIDGE OVER TRADEWATER RIVER. (054B00079N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

35,000

175,000

0 35,000 175,000 0 0 0 0

10025

133

Page 134: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HOPKINS EB-9004 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF EDWARD T. BREATHITT PENNYRILE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 32.825 TO MILEPOINT 34.256

PL

Project Cost:

CN

UT

RW

DN PM

PM

170,000

1,700,000

0 0 0 1,870,000 0 0 0

20025

HOPKINS I-69 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 114.254 TO MILEPOINT 117.936

PL

Project Cost:

CN

UT

RW

DN PM

PM

290,000

2,900,000

0 0 0 0 0 3,190,000 0

20029

HOPKINS I-69 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 124.946 TO MILEPOINT 133.677

PL

Project Cost:

CN

UT

RW

DN PM

PM

875,000

8,750,000

0 0 0 0 0 9,625,000 0

20031

HOPKINS I-69 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 93.724 TO MILEPOINT 95.604

PL

Project Cost:

CN

UT

RW

DN PM

PM

150,000

1,500,000

0 0 0 0 1,650,000 0 0

20033

HOPKINS I-69 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-069 BOTH DIRECTION(S) FROM MILEPOINT 95.604 TO MILEPOINT 105.046

PL

Project Cost:

CN

UT

RW

DN PM

PM

760,000

7,600,000

0 0 0 8,360,000 0 0 0

20034

134

Page 135: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

HOPKINS WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 42.807 TO MILEPOINT 43.424

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 0 0 550,000 0

20035

HOPKINS US-41 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-41A FROM MILEPOINT 0.00 TO MILEPOINT 9.69

PL

Project Cost:

CN

UT

RW

DN

PM 1,069,000

0 0 0 0 0 1,069,000 0

20048

Total for HOPKINS county PL

Total Amounts:

CN

UT

RW

DN

11,964,680

890,000

200,000

800,000

7,957,500

1,830,000

1,180,000

18,300,000

150,000

1,440,000

13,219,000

1,715,000

1,500,000

1,000,000

1,000,000

8,860,000

11,964,680 1,090,000 8,757,500 21,310,000 3,090,000 14,934,000 10,860,000

JACKSON KY-30 RECONSTRUCTION(O)IMPROVE KY-30 FROM US-421 TO THE OWSLEY COUNTY LINE. (14CCR)(SEE 10-279.60 FOR PE & ENVIR)(16CCR)(TO BE LET WITH 10-279.61)

PL

Project Cost:

CN

UT

RW

DN

STP 18,500,000

0 18,500,000 0 0 0 0 0

278.3

JACKSON KY-89 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 89 BRIDGE OVER HORSE LICK CREEK. (055B00028N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

1,820,000

0 175,000 1,820,000 0 0 0 0

10041

135

Page 136: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for JACKSON county PL

Total Amounts:

CN

UT

RW

DN 175,000

18,500,000 1,820,000

0 18,675,000 1,820,000 0 0 0 0

JEFFERSON I-71 RECONSTRUCTION(O)ADDITION OF NB AND SB AUXILIARY LANES ON I-71 NEAR KENNEDY, INCLUDING OPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (2004BOPC)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

800,000

1,500,000

1,000,000

12,380,000

0 800,000 2,500,000 0 12,380,000 0 0

48.1

JEFFERSON I-71 PREFINANCD CONVRSN(O)

ADDITION OF NB AND SB AUX. LANES ON I-71 NEAR KENNEDY, INCLUDING OPERATIONAL IMPROVEMENTS TO THE ZORN INTERCHANGE. (ADDITIONAL FUNDING FOR C PHASE)

PL

Project Cost:

CN

UT

RW

DN

NH 12,380,000

0 0 0 0 0 12,380,000 0

48.11

JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)(BSBP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

2,000,000

5,000,000

0 2,000,000 5,000,000 0 0 0 0

64

JEFFERSON I-64 PREFINANCD CONVRSN(O)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

PL

Project Cost:

CN

UT

RW

DN

BR 10,000,000

0 0 0 10,000,000 0 0 0

64.01

136

Page 137: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-64 PREFINANCD CONVRSN(O)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

PL

Project Cost:

CN

UT

RW

DN

BR 10,000,000

0 0 0 0 10,000,000 0 0

64.02

JEFFERSON I-64 PREFINANCD CONVRSN(O)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

PL

Project Cost:

CN

UT

RW

DN

BR 10,000,000

0 0 0 0 0 10,000,000 0

64.03

JEFFERSON I-64 PREFINANCD CONVRSN(O)

ADDRESS DEFICIENCIES ON I-64 SHERMAN MINTON BRIDGE OVER THE OHIO RIVER. (JOINT PROJECT WITH INDIANA)(056B00279N)

PL

Project Cost:

CN

UT

RW

DN

BR 10,000,000

0 0 0 0 0 0 10,000,000

64.04

JEFFERSON CS-1001 MAJOR WIDENING(O) WIDEN RIVER ROAD FROM 2 TO 4 LANES FROM EAST OF BEARGRASS CREEK NEAR POPE AVENUE TO ZORN AVENUE. TO INCLUDE BIKE LANES. PROJECT LENGTH 1.3 MILES.

PL

Project Cost:

CN

UT

RW

DN

SLO 11,500,000

0 11,500,000 0 0 0 0 0

91.02

JEFFERSON CS-1001 NEW ROUTE(O) EXTENSION OF RIVER ROAD, LOUISVILLE. (2006KYD)(SEE 5-512.00 FOR PROJECT INFORMATION)

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

SLO

550,000

540,000

540,000

550,000 540,000 540,000 0 0 0 0

91.08

137

Page 138: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-265 AM-BRG PAINTING(P) CLEAN AND PAINT ALL STEEL BRIDGES AND STEEL BEARINGS ON THE GENE SNYDER FREEWAY(10CCR)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 3,790,000

0 0 0 3,790,000 0 0 0

136

JEFFERSON I-64 RECONSTRUCTION(O)IMPROVE RAMP CAPACITY OF THE I-64 WESTBOUND RAMP TO I-264 WESTBOUND FROM ONE TO TWO LANES FOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO

PL

Project Cost:

CN

UT

RW

DN

NH 10,130,000

0 10,130,000 0 0 0 0 0

159

JEFFERSON KY-1450 MAJOR WIDENING(O) WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.) (SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 4,500,000

0 0 4,500,000 0 0 0 0

247.1

JEFFERSON KY-1450 PREFINANCD CONVRSN(O)

WIDEN BLUE LICK ROAD FROM SNYDER FREEWAY NORTH TO KY-61 (LOU T.I.P.) (SECTION 2) (RU-04DEOB)(08CCR)(12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 6,500,000

0 0 0 6,500,000 0 0 0

247.11

JEFFERSON KY-1931 MAJOR WIDENING(O) WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)

PL

Project Cost:

CN

UT

RW

DN

SPP 4,860,000

0 0 0 0 4,860,000 0 0

323.01

138

Page 139: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON KY-1931 PREFINANCD CONVRSN(O)

WIDEN GREENWOOD ROAD FROM GREENBELT HWY TO DIXIE HWY (US-31W) (3-LANE IMPROVEMENT) FROM MP 0.54 TO MP 3.148. (98CCR)(R-04DEOB)(04CCR)(BOP2006P)

PL

Project Cost:

CN

UT

RW

DN

SPP 4,860,000

0 0 0 0 0 4,860,000 0

323.03

JEFFERSON CR-1006 MINOR WIDENING(O) WIDEN ENGLISH STATION ROAD FROM 2 TO 3 LANES (3RD LANE WILL BE A CENTER TURN LANE) FROM AIKEN ROAD TO AVOCA ROAD.(FUNDING SUBJECT TO FISCAL CONSTRAINT

PL

Project Cost:

CN

UT

RW

DN

SLO 6,408,000

0 0 6,408,000 0 0 0 0

353

JEFFERSON KY-22 SAFETY(P) RECONSTRUCT KY-22 AT SPRINGCREST DRIVE. (06CCN) (2004BOPC)(14CCR)(EMERGENCY CULVERT REPLACEMENT AWARDED UNDER 5-371.12)

PL

Project Cost:

CN

UT

RW

DN

STP 1,740,000

0 0 0 0 1,740,000 0 0

371.1

JEFFERSON KY-22 SAFETY(P) RECONSTRUCT KY-22 AT GOOSE CREEK ROAD. (06CCN) (2004BOPC)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 1,320,000

0 0 1,320,000 0 0 0 0

371.13

JEFFERSON I-65 RECONSTRUCTION(O)EXTEND AND RECONSTRUCT I-65 SB RAMP TO BROOK STREET AND FLOYD STREET. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

750,000

750,000

750,000 750,000 0 0 0 0 0

378.1

139

Page 140: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON -0 NEW ROUTE(O) PHASE 3.EXTEND AND CONSTRUCT 2 LANE ROADWAY WITH CONTINUOUS CENTER-TURN LANE FROM KY 864 (BEULAH CHURCH RD) TO US 31E (BARDSTOWN RD) AT BARDSTOWN

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

3,200,000

1,500,000

4,700,000 0 0 0 0 0 0

404.01

JEFFERSON US-150 SAFETY(P) ALIGN INTERSECTION OF BROADWAY AND 18TH STREET BY MOVING THE SOUTH LEG OF 18TH STREET TO THE EAST. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SLO 1,000,000

1,000,000 0 0 0 0 0 0

413

JEFFERSON -0 BIKE/PED FACIL(O) REHABILITATION AND CONSTRUCTION OF VARIOUS SIDEWALK PROJECTS IN LOUISVILLE METRO. (2006BOPC) (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP).

PL

Project Cost:

CN

UT

RW

DN

SLO 100,000

100,000 0 0 0 0 0 0

439.05

JEFFERSON CS-1014 RECONSTRUCTION(O)CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAY TRAFFIC (MAIN,JEFFERSON,LIBERTY, MUHAMMAD ALI, CHESTNUT,3RD

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

195,000

4,000,000

4,195,000 0 0 0 0 0 0

470

JEFFERSON CS-1049 RECONSTRUCTION(O)CONVERSION OF ONE-WAY STREETS IN DOWNTOWN LOUISVILLE TO TWO-WAY TRAFFIC (8TH, 7TH, SHELBY, CAMPBELL STREETS). PHASE 2

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

60,000

600,000

60,000 600,000 0 0 0 0 0

470.1

140

Page 141: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON US-31 SAFETY(P) DIXIE HIGHWAY ADDITIONAL DESIGN FUNDS. IMPROVE DIXIE HIGHWAY BETWEEN CRUMS LANE (KY 2049) AND ROCKFORD LANE (KY 2051)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SLO 4,000,000

4,000,000 0 0 0 0 0 0

478

JEFFERSON CR-1005 RECONSTRUCTION(O)WIDEN HUBBARDS LANE FROM 2 TO LANES (3RD LANE WILL BE A CENTER TURN LANE) FROM US 60 (SHELBYVILLE ROAD) TO KY 1447 (WESTPORT ROAD). ADD BIKE LANES

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

260,000

350,000

2,900,000

610,000 2,900,000 0 0 0 0 0

479

JEFFERSON KY-864 MATCHED FED FUNDS(O)

KY 864 - WIDEN BEULAH CHURCH ROAD FROM 2 TO 3 LANES FROM I-265 TO CEDAR CREEK ROAD.(2010BOP)

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

2,950,000

1,975,000

2,950,000 1,975,000 0 0 0 0 0

481

JEFFERSON I-71 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

500,000

500,000

15,000,000

1,000,000 15,000,000 0 0 0 0 0

483

JEFFERSON I-71 PREFINANCD CONVRSN(O)

SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 15,000,000

0 0 15,000,000 0 0 0 0

483.01

141

Page 142: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-71 PREFINANCD CONVRSN(O)

SIX LANE PRIORITY SECTION OF I-71 BETWEEN I-265 AND KY-329.(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 30,000,000

0 0 0 30,000,000 0 0 0

483.02

JEFFERSON -0 BIKE/PED FACIL(O) GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL CONNECTOR:CONSTRUCT A MULTI-USE BICYCLE & PEDESTRIAN TRAIL ALONG OLD TAYLORSVILLE ROAD &

PL

Project Cost:

CN

UT

RW

DN

SLO 1,300,000

1,300,000 0 0 0 0 0 0

486

JEFFERSON -0 BIKE/PED FACIL(O) DESIGN & CONSTRUCT SHARED USE PATH & LOUISVILLE LOOP TRAILHEAD FACILITIES THRU JEFFERSON MEMORIAL FOREST FROM NORTH END OF SAND QUARRY TUNNEL AT GENE

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

100,000

55,000

2,000,000

155,000 2,000,000 0 0 0 0 0

489

JEFFERSON -0 BIKE/PED FACIL(O) MISCELLANEOUS SIDEWALKS AND HANDICAP RAMPS: CONSTRUCT AND REPLACE VARIOUS SIDEWALKS AND HANDICAP RAMPS THROUGHOUT THE CITY ON A REOCCURRING ANNUAL

PL

Project Cost:

CN

UT

RW

DN

SLO 37,800

37,800 0 0 0 0 0 0

493

JEFFERSON KY-1020 BIKE/PED FACIL(O) OLMSTED PARKWAYS MULTI-USE PATH SYSTEM-SOUTHERN PKWY: CONSTRUCTION OF A 2.5 MILE SHARED USE PATH SYSTEM ALONG SOUTHERN PARKWAY BETWEEN

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

400,000

100,000

4,672,877

400,000 100,000 0 4,672,877 0 0 0

495

142

Page 143: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.5 MILE SHARED USE PATH SYSTEM ALONG ALGONQUIN PARKWAY BETWEEN WILSON AVENUE AND CYPRESS STREET.

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

160,000

80,000

1,500,000

160,000 80,000 1,500,000 0 0 0 0

496

JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.45 MILE SHARED USE PATH SYSTEM ALONG ALGONQUIN PARKWAY BETWEEN CYPRESS STREET AND DIXIE HWY.

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

160,000

80,000

1,148,945

240,000 1,148,945 0 0 0 0 0

497

JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 1.2 MILE SHARED USE PATH SYSTEM ALONG ALGONQUIN PARKWAY BETWEEN DIXIE HIGHWAY AND SHARP AVE.

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

200,000

160,000

3,063,854

200,000 160,000 3,063,854 0 0 0 0

498

JEFFERSON CR-1001 BIKE/PED FACIL(O) RIVER ROAD BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM DOWNTOWN LOUISVILLE TO THE CITY OF PROSPECT (US 42), 8.5 MILES. (SEE 5-3036.00)

PL

Project Cost:

CN

UT

RW

DN SLO 200,000

0 0 200,000 0 0 0 0

499

JEFFERSON -0 BIKE/PED FACIL(O) OHIO RIVER LEVEE TRAIL PHASE III. CONSTRUCT BICYCLE/PEDESTRIAN FACILITIES ALONG CAMPGROUND ROAD FROM END OF SHARED USE PATH AT THE RAILROAD CROSSING ON

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

800,000

750,000

3,000,000

800,000 750,000 3,000,000 0 0 0 0

505

143

Page 144: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON CR-1004 MINOR WIDENING(O) WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM RUCKRIEGEL PARKWAY TO MAPLE ROAD, AND WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES FROM OLD TAYLORSVILLE

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

264,000

352,000

1,232,000

616,000 1,232,000 0 0 0 0 0

518

JEFFERSON I-64 AM-BRIDGE (P) REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE OVER N.S. RAILROAD AND THE LEVEE AND REPAIR THE LEVEE.(056B00284N)(2014BOP)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 400,000

0 0 400,000 0 0 0 0

521

JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOP TRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROM BLEVINS GAP ROAD TO NORTH END

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

55,000

60,000

2,000,000

115,000 2,000,000 0 0 0 0 0

523

JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH AND LOUISVILLE LOOP TRAILHEAD FACILITIES THROUGH JEFFERSON MEMORIAL FOREST FROM PENDLETON RD AT MEDORA RD TO

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

100,000

1,000,000

100,000 1,000,000 0 0 0 0 0

524

JEFFERSON KY-2841 MATCHED FED FUNDS(O)

NORTHEAST LOUISVILLE LOOP SECTION II. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM EASTWOOD CUTOFF TO EASTWOOD RECREATION CENTER. (METRO PARKS

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

533,333

45,000

450,000

578,333 450,000 0 0 0 0 0

525

144

Page 145: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON -0 BIKE/PED FACIL(O) CONST MULTIUSE PATH THRU AB SAWYER PK CONNECT TO SURROUNDING NEIGHBORHOODS INCLUDE: UNDERPASS/BRIDGE/SITE AMENITIES/CONSTRUCTION OF

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

50,000

300,000

1,500,000

350,000 1,500,000 0 0 0 0 0

529

JEFFERSON KY-1932 MATCHED FED FUNDS(O)

IMPROVE THE SAFETY AND CONGESTION OF KY 1932 (CHENOWETH LANE) FROM US 60 (SHELBYVILLE ROAD) TO US 42 (BROWNSBORO ROAD)

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

650,000

215,000

865,000 0 0 0 0 0 0

531

JEFFERSON KY-1931 MINOR WIDENING(O) WIDEN KY 1931 (MANSLICK ROAD) FROM 2 TO 3 LANES FROM US 31W (DIXIE HWY) TO DOSS HIGH SCHOOL. 1.7 MILES (2014BOP)

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

3,000,000

6,000,000

3,000,000 6,000,000 0 0 0 0 0

536

JEFFERSON I-265 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

5,800,000

1,580,000

2,080,000

15,000,000

5,800,000 0 3,660,000 0 15,000,000 0 0

537

JEFFERSON I-265 PREFINANCD CONVRSN(O)

SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

1,580,000

2,080,000

15,000,000

0 0 0 3,660,000 0 15,000,000 0

537.01

145

Page 146: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-265 PREFINANCD CONVRSN(O)

SIX LANE PRIORITY SECTION OF I-265 BETWEEN TAYLORSVILLE ROAD AND I-71.

PL

Project Cost:

CN

UT

RW

DN

NH 25,000,000

0 0 0 0 0 0 25,000,000

537.02

JEFFERSON I-71 RECONSTRUCTION(O)PROVIDE COLLECTOR-DISTRIBUTOR LANE ON SOUTHBOUND I-71 TO FACILITATE RAMP MOVEMENTS TO AND FROM I-265.

PL

Project Cost:

CN

UT

RW

DN

NH 5,400,000

0 5,400,000 0 0 0 0 0

539

JEFFERSON CS-1002 MATCHED FED FUNDS(O)

BLUEGRASS COMMERCE PARK BICYCLE/PEDESTRIAN TRAIL PROJECT PHASE II ALONG BLUEGRASS PARKWAY FROM WATTERSON TRAIL TO TUCKER STATION ROAD AND

PL

Project Cost:

CN

UT

RW

DN

SLO 1,300,000

1,300,000 0 0 0 0 0 0

543

JEFFERSON I-265 I-CHANGE RECONST(O)

RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

1,000,000

1,000,000

1,000,000

10,000,000

1,000,000 2,000,000 10,000,000 0 0 0 0

549

JEFFERSON I-265 I-CHANGE RECONST(O)

RECONSTRUCTION OF THE I-265/I-64 INTERCHANGE. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

NH 15,000,000

0 0 0 15,000,000 0 0 0

549.01

146

Page 147: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-64 CONGESTION MITIGTN(O)

IMPROVEMENTS WITHIN THE I-64 CORRIDOR FROM THE KENNEDY INTERCHANGE TO I-264 (WATTERSON EXPRESSWAY) ADDRESSING SAFETY AND CONGESTION ISSUES. THE

PL

Project Cost:

CN

UT

RW

DN

NH

NH

250,000

2,550,000

0 250,000 0 0 2,550,000 0 0

553

JEFFERSON I-265 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM I-65 TO US-31E.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,000,000

3,000,000

0 0 0 1,000,000 0 3,000,000 0

554

JEFFERSON KY-1747 CONGESTION MITIGTN(O)

REDUCE CONGESTION AND IMPROVE SAFETY ALONG KY-1747 (HURSTBOURNE PARKWAY) FROM STONY BROOK DRIVE TO I-64.

PL

Project Cost:

CN

UT

RW

DN

NH 250,000

0 250,000 0 0 0 0 0

555

JEFFERSON I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM ZORN AVE TO I-264.

PL

Project Cost:

CN

UT

RW

DN NH 2,000,000

0 0 0 0 0 2,000,000 0

556

JEFFERSON I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM I-264 TO I-265.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

2,000,000

3,000,000

0 2,000,000 0 0 3,000,000 0 0

557

147

Page 148: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-265 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM US-31E (BARDSTOWN RD) TO KY-155 (TAYLORSVILLE RD).

PL

Project Cost:

CN

UT

RW

DN NH 7,500,000

0 0 0 0 0 7,500,000 0

558

JEFFERSON I-65 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSON EXPRESSWAY) INTERCHANGE.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

500,000

3,000,000

0 500,000 0 3,000,000 0 0 0

559

JEFFERSON I-65 PREFINANCD CONVRSN(O)

IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSON EXPRESSWAY) INTERCHANGE.

PL

Project Cost:

CN

UT

RW

DN NH 3,000,000

0 0 0 0 3,000,000 0 0

559.01

JEFFERSON I-65 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-265 (GENE SNYDER FREEWAY) INTERCHANGE.

PL

Project Cost:

CN

UT

RW

DN

NH 400,000

0 0 0 400,000 0 0 0

560

JEFFERSON -0 RECONSTRUCTION(O)INTERSECTION RE-BUILD AT MAIN STREET/ STORY AVENUE / BAXTER AVENUE INCLUDING TRANSITIONS BETWEEN WENTZEL STREET TO THE WEST AND JOHNSON STREET TO THE

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

SLO

176,000

176,000

3,314,319

176,000 176,000 0 3,314,319 0 0 0

561

148

Page 149: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON -0 SCOPING STUDY DD (O)

A COMPREHENSIVE OPERATIONAL ANALYSIS (COA) TO ANALYZE AND EVALUATE EXISTING TARC SERVICE IN COMPARISON WITH COMMUNITY GROWTH, ECONOMIC AND LAND USE

PL

Project Cost:

CN

UT

RW

DN

SLO 354,000

354,000 0 0 0 0 0 0

562

JEFFERSON -0 SCOPING STUDY DD (O)

PLANNING STUDY:EXAMINE NEED FOR BICYCLE/PED/VEHICULAR ACCESS IMPROVEMENTS TO PROPOSED DIXIE BRT IN CORRIDORS: KY 907 FR US 31W TO STONESTREET RD,

PL

Project Cost:

CN

UT

RW

DN

SLO 352,000

352,000 0 0 0 0 0 0

563

JEFFERSON I-264 RECONSTRUCTION(O)RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORT ROAD (KY-1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS A SPUI.(PROJECT INCLUDES 5-594

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

5,280,000

1,270,000

23,590,000

0 0 0 6,550,000 0 0 23,590,000

804

JEFFERSON KY-155 DESIGN ENGINEERING(O)

SAFETY PROJECT FOR RECONSTRUCTION OF TAYLORSVILLE ROAD AND SOUTH POPE LICK ROAD INTERSECTION AND BRIDGE OVER POPE LICK CREEK. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

180,000

150,000

1,800,000

0 2,130,000 0 0 0 0 0

808

JEFFERSON -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2018 (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLO 24,007,000

24,007,000 0 0 0 0 0 0

965.16

149

Page 150: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2021. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLO 11,670,000

0 0 0 11,670,000 0 0 0

965.19

JEFFERSON -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2022. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLO 23,500,000

0 0 0 0 23,500,000 0 0

965.2

JEFFERSON -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2023. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLO 9,262,000

0 0 0 0 0 9,262,000 0

965.21

JEFFERSON -0 MATCHED FED FUNDS(O)

DEDICATED FEDERAL AID STP FUNDS EARMARKED FOR LOUISVILLE URBANIZED AREA AND SUBJECT TO MPO CONTROL FOR FY 2024. (FUNDING SUBJECT TO FISCAL

PL

Project Cost:

CN

UT

RW

DN

SLO 23,500,000

0 0 0 0 0 0 23,500,000

965.22

JEFFERSON CR-1038 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1038L OVER BEE LICK CREEK 056C00104N

PL

Project Cost:

CN

UT

RW

DN

BR 231,000

231,000 0 0 0 0 0 0

1061

150

Page 151: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON US-150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E BROADWAY (US 150) OVER SOUTH FORK BEARGRASS CREEK AT INTERSECTION WITH BRENT STREET (CS 1312G)056B00348N (SD)

PL

Project Cost:

CN

UT

RW

DN

BR 850,000

0 850,000 0 0 0 0 0

1067

JEFFERSON CS-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E KENTUCKY ST (CS 1017G) OVER SOUTH FORK BEARGRASS CREEK 0.01 MILE E OF SCHILLER AVE (CS 1138G) 056C00083N

PL

Project Cost:

CN

UT

RW

DN

BR 497,000

0 497,000 0 0 0 0 0

1070

JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NORTHERN DITCH ON GRADE LANE (CR 1001G) 0.34 MI S OF KY 1747 (FERN VALLEY ROAD) (056C00064N)

PL

Project Cost:

CN

UT

RW

DN

BR

BR

BR

20,000

50,000

850,000

0 70,000 850,000 0 0 0 0

1077

JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER GOOSE CREEK ON RIVER ROAD (CR 1001B) 0.2 MI N OF LIME KILN ROAD (CR 1002B) (056C00130N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

315,000

917,000

0 315,000 917,000 0 0 0 0

1079

JEFFERSON US-60 TRANSP ENHANCEMENT(P)

NORTHEAST LOUISVILLE LOOP MET SECTION 1 BECKLEY WOODS TO BECKLEY STATION. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEY WOODS TO BECKLEY

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

50,000

700,000

750,000 0 0 0 0 0 0

3030.1

151

Page 152: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON US-60 TRANSP ENHANCEMENT(P)

NORTHEAST LOUISVILLE LOOP MET SECTION 2 BECKLEY STATION TO BIRCHAM ROAD. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEY STATION TO BIRCHAM

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

300,000

200,000

800,000

300,000 1,000,000 0 0 0 0 0

3030.2

JEFFERSON US-60 TRANSP ENHANCEMENT(P)

NORTHEAST LOUISVILLE LOOP MET SECTION 3 BIRCHAM ROAD TO BECKLEY CREEK PARK. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BIRCHAM ROAD TO BECKLEY

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

50,000

75,000

2,000,000

125,000 2,000,000 0 0 0 0 0

3030.3

JEFFERSON US-60 TRANSP ENHANCEMENT(P)

NORTHEAST LOUISVILLE LOOP MET SECTION 4 BECKLEY CREEK PARK TO EASTWOOD CUTOFF. CONSTRUCT A SHARED USE PATH ALONG US 60 FROM BECKLEY CREEK PARK TO

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

350,000

150,000

1,000,000

350,000 150,000 0 1,000,000 0 0 0

3030.4

JEFFERSON CS-1073 TRANSP ENHANCEMENT(P)

WATTERSON TRAIL PHASE I- IMPROVE STREETSCAPE, RECONSTRUCT SIDEWALKS AND ENHANCE LANDSCAPING FROM MAPLE ROAD TO OLD TAYLORSVILLE ROAD IN

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

792,000

1,856,800

792,000 1,856,800 0 0 0 0 0

3031

JEFFERSON CS-1367 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS ALONG KRATZ LANE FOR .35 MILES BETWEEN SHELBYVILLE RD. AND OLD SHELBYVILLE RD./MAIN ST., INCLUDING SOME DRAINAGE

PL

Project Cost:

CN

UT

RW

DN

SLO 234,382

234,382 0 0 0 0 0 0

3039

152

Page 153: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON CS-2048 BIKE/PED FACIL(O) CONSTRUCT A SIDEWALK ALONG CANNONS LANE BETWEEN WILLIS AVE. AND BOWMAN FIELD (SENECA LOOP), 1.0 MILES (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

100,000

100,000

500,000

100,000 100,000 0 500,000 0 0 0

3212

JEFFERSON KY-1819 RECONSTRUCTION(O)RECONSTRUCT BILLTOWN ROAD FROM NORTH OF COLONNADES PLACE TO SOUTH OF EASUM ROAD. (04CCN)(06CCN)(08CCR)(10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,700,000

0 0 0 0 0 0 2,700,000

8203

JEFFERSON KY-1931 MINOR WIDENING(O) THREE LANE WIDENING ALONG KY-1931 FROM THE DOSS HIGH SCHOOL ENTRANCE TO PALATKA ROAD, INCLUDING INTERSECTION IMPROVEMENTS WITH PALATKA ROAD

PL

Project Cost:

CN

UT

RW

DN

STP

STP

2,630,000

4,160,000

0 0 0 0 6,790,000 0 0

8810

JEFFERSON I-265 TRANSP ENHANCEMENT(P)

ERECT SOUND WALL ON NORTH SIDE OF GENE SNYDER FREEWAY FROM MP 15.3 TO MP 16.1. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,000,000

0 3,000,000 0 0 0 0 0

8855

JEFFERSON I-71 TRANSP ENHANCEMENT(P)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71 FROM MP 5.4 TO MP 6.3 FOR APPROX. 4700 FEET. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,961,000

0 0 0 0 0 0 2,961,000

8858

153

Page 154: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-71 TRANSP ENHANCEMENT(P)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE SOUTH SIDE OF I-71 FROM MP 7.5 TO MP 7.8 (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 1,152,000

0 0 0 0 0 1,152,000 0

8859

JEFFERSON I-71 TRANSP ENHANCEMENT(P)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71 FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,304,000

0 0 2,304,000 0 0 0 0

8860

JEFFERSON I-71 TRANSP ENHANCEMENT(P)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE NORTH SIDE OF I-71 FROM MP 7.5 TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,304,000

0 0 0 2,304,000 0 0 0

8860.1

JEFFERSON KY-155 MINOR WIDENING(O) WIDEN TAYLORSVILLE RD. TO 3 LANES FROM I-265 TO KY-148

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

SPP

SPP

915,000

1,495,000

1,000,000

500,000

15,930,000

0 915,000 1,495,000 0 1,500,000 15,930,000 0

8908

JEFFERSON I-64 SPOT IMPROVEMENTS(O)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON I-64 WESTBOUND BETWEEN MILEPOINTS 13.7 AND 14.2

PL

Project Cost:

CN

UT

RW

DN

SPP 2,100,000

0 2,100,000 0 0 0 0 0

8951

154

Page 155: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON US-60 MINOR WIDENING(O) WIDEN US-60 TO THREE LANES FROM EASTWOOD CUTOFF (MP 14.7) TO ROCKCREST WAY (MP 15.1). (16CCN) (LOCALS WILL DO DESIGN FOR $330,000)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

410,000

460,000

1,000,000

0 410,000 460,000 1,000,000 0 0 0

8952

JEFFERSON I-265 SPOT IMPROVEMENTS(O)

DESIGN AND BUILD A NOISE BARRIER WALL ON THE NORTH SIDE OF I-265 BETWEEN MP 15.3 AND MP 16.1 FOR APPROXIMATELY 4700 FEET.

PL

Project Cost:

CN

UT

RW

DN SPP 250,000

250,000 0 0 0 0 0 0

8957

JEFFERSON CR-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLARK STATION RD BRIDGE OVER S LONG RUN. (056C00091N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

350,000

0 280,000 350,000 0 0 0 0

10007

JEFFERSON CS-1079 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD WESTPORT RD BRIDGE OVER GOOSE CREEK. (056C00113N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

301,000

0 175,000 301,000 0 0 0 0

10008

JEFFERSON CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PENDLETON RD BRIDGE OVER POND CREEK. (056C00118N)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

1,106,000

0 245,000 1,106,000 0 0 0 0

10009

155

Page 156: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON CR-1005 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF S WATTERSON TRL BRIDGE OVER FERN CREEK. (056C00159N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

301,000

0 245,000 301,000 0 0 0 0

10010

JEFFERSON CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STONEBRIDGE RD BRIDGE OVER TRIB MUDDY FK BEARGRASS. (056C00240N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

266,000

0 210,000 266,000 0 0 0 0

10011

JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 RIVERSIDE EXPRESSWAY BRIDGES. (056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B001

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

4,600,000

0 4,950,000 0 0 0 0 0

10015

JEFFERSON I-64 AM-BRG PAINTING(P) BRIDGE PAINTING OF I-64 RIVERSIDE EXPRESSWAY BRIDGES.(056B00298N,056B00299N,056B00300N,056B00301N,056B00302N,056B00285N,056B00292N,056B00293N,056B001

PL

Project Cost:

CN

UT

RW

DN

BR 30,000,000

0 0 0 30,000,000 0 0 0

10016

JEFFERSON US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31E BRIDGE OVER S FK BEARGRASS CREEK. (056B00137N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

966,000

0 350,000 966,000 0 0 0 0

10018

156

Page 157: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON CS-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SCENIC LOOP BRIDGE OVER MID FK BEARGRASS CREEK. (056C00027N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

406,000

0 140,000 406,000 0 0 0 0

10019

JEFFERSON CS-3396 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARK BOUNDARY RD BRIDGE OVER MID FK BEARGRASS CREEK. (056C00033N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

441,000

0 140,000 441,000 0 0 0 0

10020

JEFFERSON CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CHAMPIONS TRACE LN BRIDGE OVER S FK BEARGRASS CREEK. (056C00096N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

1,190,000

0 280,000 1,190,000 0 0 0 0

10021

JEFFERSON CS-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD CLARK STATION BRIDGE OVER BRUSH RUN. (056C00167N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

357,000

0 140,000 357,000 0 0 0 0

10022

JEFFERSON CS-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KIMBERLY WAY BRIDGE OVER LITTLE CEDAR CREEK. (056C00182N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

217,000

0 140,000 217,000 0 0 0 0

10023

157

Page 158: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 6 TO MILEPOINT 11.57

PL

Project Cost:

CN

UT

RW

DN PM

PM

575,000

5,750,000

0 0 0 0 0 0 6,325,000

20009

JEFFERSON I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-064 CARDINAL DIRECTION(S) FROM MILEPOINT 0.65 TO MILEPOINT 0.828

PL

Project Cost:

CN

UT

RW

DN PM

PM

10,000

100,000

0 110,000 0 0 0 0 0

20010

JEFFERSON I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 128.13 TO MILEPOINT 131.24

PL

Project Cost:

CN

UT

RW

DN PM

PM

620,000

6,200,000

0 0 6,820,000 0 0 0 0

20012

JEFFERSON I-71 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-071 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 11.32

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,150,000

11,500,000

0 0 0 0 0 0 12,650,000

20014

JEFFERSON I-264 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-264 CARDINAL DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 0.46

PL

Project Cost:

CN

UT

RW

DN PM

PM

30,000

300,000

0 330,000 0 0 0 0 0

20015

158

Page 159: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-264 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTH DIRECTION(S) FROM MILEPOINT 12.7 TO MILEPOINT 18.41

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,150,000

11,500,000

0 0 0 0 0 0 12,650,000

20016

JEFFERSON I-264 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-264 BOTH DIRECTION(S) FROM MILEPOINT 20.7 TO MILEPOINT 22.927

PL

Project Cost:

CN

UT

RW

DN PM

PM

450,000

4,500,000

0 0 0 0 0 4,950,000 0

20017

JEFFERSON I-264 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-264 BOTH DIRECTION(S) FROM MILEPOINT 0.46 TO MILEPOINT 12.7

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,220,000

12,200,000

0 0 13,420,000 0 0 0 0

20018

JEFFERSON I-265 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTH DIRECTION(S) FROM MILEPOINT 15.66 TO MILEPOINT 18.8

PL

Project Cost:

CN

UT

RW

DN PM

PM

325,000

3,250,000

0 0 0 0 3,575,000 0 0

20019

JEFFERSON I-265 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-265 BOTH DIRECTION(S) FROM MILEPOINT 18.8 TO MILEPOINT 23.364

PL

Project Cost:

CN

UT

RW

DN PM

PM

460,000

4,600,000

0 5,060,000 0 0 0 0 0

20020

159

Page 160: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-265 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-265 BOTH DIRECTION(S) FROM MILEPOINT 23.364 TO MILEPOINT 26.6

PL

Project Cost:

CN

UT

RW

DN PM

PM

350,000

3,500,000

0 0 0 0 3,850,000 0 0

20021

JEFFERSON KY-841 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

725,000

7,250,000

0 0 0 0 7,975,000 0 0

20022

JEFFERSON KY-864 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

325,000

3,250,000

0 3,575,000 0 0 0 0 0

20023

JEFFERSON KY-913 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 550,000 0 0 0

20024

JEFFERSON KY-1020 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

75,000

750,000

0 0 0 825,000 0 0 0

20025

160

Page 161: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON KY-1065 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

200,000

2,000,000

0 2,200,000 0 0 0 0 0

20026

JEFFERSON KY-1932 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 550,000 0 0 0

20027

JEFFERSON KY-1934 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

325,000

3,250,000

0 0 0 3,575,000 0 0 0

20028

JEFFERSON KY-1934 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

375,000

3,750,000

0 0 0 0 4,125,000 0 0

20029

JEFFERSON KY-2048 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 0 1,100,000 0 0

20030

161

Page 162: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON KY-2052 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

300,000

3,000,000

0 0 0 3,300,000 0 0 0

20031

JEFFERSON US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

75,000

750,000

0 0 825,000 0 0 0 0

20032

JEFFERSON US-31 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-31W FROM MILEPOINT 0.00 TO MILEPOINT 7.25

PL

Project Cost:

CN

UT

RW

DN

PM 965,000

0 0 0 0 965,000 0 0

20039

JEFFERSON KY-1531 NEW INTERCHANGE(O)

EASTWOOD FISHERSVILLE CONNECTOR TO I-64

PL

Project Cost:

CN

UT

RW

DN

SPP 750,000

750,000 0 0 0 0 0 0

80000

JEFFERSON US-60 MAJOR WIDENING(O) WIDEN US-60 TO 6 LANES FROM OLD SHELBYVILLE RD. TO NORTH ENGLISH STATION RD.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,255,000

550,000

720,000

1,500,000

0 1,255,000 0 550,000 720,000 1,500,000 0

80001

162

Page 163: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON I-64 NEW INTERCHANGE(O)

NEW INTERCHANGE ON I-64E EAST OF THE GENE SNYDER FREEWAY

PL

Project Cost:

CN

UT

RW

DN

SPP 650,000

0 0 0 650,000 0 0 0

80002

JEFFERSON AIR QUALITY(P) EXTEND PLANTSIDE DRIVE FROM REHL ROAD TO TAYLORSVILLE ROAD

PL

Project Cost:

CN

UT

RW

DN SPP 750,000

0 0 750,000 0 0 0 0

80003

JEFFERSON KY-841 ECONOMIC DEVEL(O)CONSTRUCT NEW INTERCHANGE ON KY-841 AT THE RENAISSANCE SOUTH BUSINESS PARK

PL

Project Cost:

CN

UT

RW

DN

SPP 12,500,000

0 0 0 12,500,000 0 0 0

80006

JEFFERSON I-264 SPOT IMPROVEMENTS(O)

EXTEND EXISTING SOUND WALL ON I-264 NEAR NEWBURG RD. APPROXIMATELY 750' WEST.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

50,000

325,000

0 0 0 375,000 0 0 0

80051

JEFFERSON I-64 SPOT IMPROVEMENTS(O)

DESIGN AND CONSTRUCT A SOUND BARRIER WALL ON THE WESTBOUND SIDE OF I-64 FROM MP 10.3 TO MP 11.FOR APPROXIMATELY 4800 FEET

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

250,000

3,206,000

0 0 0 250,000 3,206,000 0 0

80052

163

Page 164: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM FIRST ST TO JOHNSON ST TO IMPROVE PEDESTRIAN SAFETY AND ENHANCE ECONOMIC DEVELOPMENT

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 5,000,000 0 0 0 0 0

80053

JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM FIRST ST TO JOHNSON ST TO IMPROVE PEDESTRIAN SAFETY AND ENHANCE ECONOMIC DEVELOPMENT

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 5,000,000 0 0 0 0

80053.1

Total for JEFFERSON county PL

Total Amounts:

CN

UT

RW

DN

1,456,000

9,431,000

13,647,333

4,259,000

36,910,182

3,915,000

8,090,000

2,150,000

11,641,000

87,614,745

4,360,000

3,080,000

4,080,000

84,313,854

2,050,000

4,100,000

7,410,000

3,350,000

140,576,196

10,425,000

3,630,000

5,380,000

74,584,000

12,950,000

90,401,000

2,875,000

116,501,000

65,703,515 113,410,745 95,833,854 157,486,196 109,836,000 87,534,000 119,376,000

JESSAMINE -0 NEW ROUTE(O) EAST NICHOLASVILLE BYPASS SECTION IA: IMPROVE CONNECTIVITY AND MOBILITY EAST AROUND NICHOLASVILLE FROM SOUTH OF KY-39 TO NORTH OF KY-169.

PL

Project Cost:

CN

UT

RW

DN

SPP 7,800,000

0 0 0 0 0 0 7,800,000

87.2

JESSAMINE KY-1980 SAFETY(P) IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAY HAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RDTO US 27 (NICHOLASVILLE RD)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

5,500,000

5,000,000

12,000,000

0 0 0 5,500,000 0 5,000,000 12,000,000

414

164

Page 165: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JESSAMINE KY-1980 SAFETY(P) IMPROVE ROADWAY GEOMETRICS, TYPICAL SECTION, AND ROADWAY HAZARDS ON KY 1980 (BRANNON RD) FROM US 68 (HARRODSBURG RDTO US 27 (NICHOLASVILLE RD)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,000,000

0 0 2,000,000 0 0 0 0

414.1

JESSAMINE US-68 SAFETY(P) IMPROVE INTERSECTION OF KY-29 NORTH OF WILMORE.(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

650,000

1,080,000

0 650,000 1,080,000 0 0 0 0

915

JESSAMINE KY-39 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER HICKMAN CREEK AT BLACK BRIDGE ON KY 39 1.3 MI N OF KY 1268. (057B00002N)(EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

1,365,000

0 350,000 1,365,000 0 0 0 0

1136

JESSAMINE CR-1238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1238 (0.88) OVER NS SYSTEM. 057R00605N

PL

Project Cost:

CN

UT

RW

DN BR

BR

260,000

805,000

0 260,000 805,000 0 0 0 0

1144

JESSAMINE KY-169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BRIDGE ON KY 169 (NORTH 3RD STREET) BETWEEN MEADOWLARK LANE & ILHARDT AVENUE. (057R00603N)(14CCN)(16CCR)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 1,500,000

0 0 1,500,000 0 0 0 0

8851

165

Page 166: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

JESSAMINE KY-1268 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1268 BRIDGE OVER HICKMAN CREEK. (057B00022N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

308,000

1,232,000

0 308,000 1,232,000 0 0 0 0

10011

Total for JESSAMINE county PL

Total Amounts:

CN

UT

RW

DN 918,000

650,000

2,000,000

5,982,000

5,500,000

5,000,000

19,800,000

0 1,568,000 7,982,000 5,500,000 0 5,000,000 19,800,000

JOHNSON KY-172 RECONSTRUCTION(O)FEDERAL HIGHWAY FUNDS DEDICATED TO RECONSTRUCT STONE COAL ROAD IN JOHNSON COUNTY. ("KYD" FUNDS NOT AVAILABLE FOR ADDITIONAL AMOUNT NEEDED TO

PL

Project Cost:

CN

UT

RW

DN

KYD 203,005

203,005 0 0 0 0 0 0

134.02

JOHNSON KY-40 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 40 OVER BRANCH OF LITTLE PAINT CREEK 0.38 MILE NE OF JOHNSON/MAGOFFIN COUNTY LINE 058B00012N

PL

Project Cost:

CN

UT

RW

DN

BR 665,000

665,000 0 0 0 0 0 0

1114

Total for JOHNSON county PL

Total Amounts:

CN

UT

RW

DN

868,005

868,005 0 0 0 0 0 0

166

Page 167: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON I-75 AM-BRIDGE (P) KY 143 HPP EARMARK "ADDRESS DEFICIENCIES OF BRENT SPENCE BRIDGE, KENTON COUNTY, KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR ADDITIONAL 2005HPP

PL

Project Cost:

CN

UT

RW

DN

HPP 1,439,840

1,439,840 0 0 0 0 0 0

17.05

KENTON I-75 AM-BRIDGE (P) BRENT SPENCE BRIDGE PROJECT (ADDITIONAL PROJECT FUNDS FOR MAINTENANCE, REPAIR AND PAINTING(10CCR)(12CCR)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 30,000,000

0 30,000,000 0 0 0 0 0

17.09

KENTON KY-1303 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON KY-1303 FROM KY-536 TO BEECHGROVE ELEMENTARY (PRIORITY SECTION 4). DESIGN PHASE UNDER PARENT NO.

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

3,000,000

3,000,000

9,000,000

0 0 0 0 0 6,000,000 9,000,000

162.1

KENTON KY-536 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST END OF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 1). DESIGN PHASE UNDER

PL

Project Cost:

CN

UT

RW

DN

STP

STP

1,000,000

5,410,000

0 1,000,000 5,410,000 0 0 0 0

162.2

KENTON KY-536 PREFINANCD CONVRSN(O)

IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM THE WEST END OF THE NS RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY SECTION 1). DESIGN PHASE UNDER

PL

Project Cost:

CN

UT

RW

DN

STP 5,410,000

0 0 0 5,410,000 0 0 0

162.21

167

Page 168: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON KY-536 AIR QUALITY(P) IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM KY 1303 TO WILLIAMSWOOD ROAD/CALVARY DRIVE (PRIORITY SECTION 2). DESIGN PHASE UNDER

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

3,000,000

1,500,000

13,500,000

0 0 4,500,000 0 13,500,000 0 0

162.3

KENTON KY-536 RECONSTRUCTION(O)IMPROVE SAFETY AND REDUCE CONGESTION ON KY-536 FROM WILLIAMSWOOD ROAD/CALVARY DRIVE TO KY-17 (PRIORITY SECTION 3). DESIGN PHASE UNDER PARENT

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

12,080,000

1,560,000

0 0 0 0 12,080,000 0 1,560,000

162.4

KENTON CR-1316 MATCHED FED FUNDS(O)

PHASE I MULTI-USE PATH ALONG BROMLEY CRESCENT SPRINGS RD FROM ANDERSON ROAD TO AMSTERDAM ROAD. (2012BOP)

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

400,000

800,000

4,045,000

1,200,000 4,045,000 0 0 0 0 0

419

KENTON CS-3806 MATCHED FED FUNDS(O)

PHASE 2 BROMLEY CRESCENT SPRINGS ROAD BETWEEN THE TWO SEGMENTS OF AMSTERDAM ROAD. RECONSTRUCT BROMLEY CRESCENT SPRINGS ROAD AND IMPROVE

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

SNK

SNK

269,600

504,000

560,000

276,000

269,600 1,064,000 276,000 0 0 0 0

419.01

KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM WINDING TRAILS TO THOMAS MORE PARKWAY (PHASE 1). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).

PL

Project Cost:

CN

UT

RW

DN

SNK 1,044,000

1,044,000 0 0 0 0 0 0

428.1

168

Page 169: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM THOMAS MORE PARKWAY TO CATHERINE DRIVE (PHASE 2). (2014BOPC)(MOA WITH CITY OF EDGEWOOD).

PL

Project Cost:

CN

UT

RW

DN

SNK 924,000

924,000 0 0 0 0 0 0

428.2

KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 3. ROADWAY RESURFACING AND STABILIZATION. CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROM CATHERINE DRIVE TO THE SUMMIT

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

178,000

1,080,000

178,000 1,080,000 0 0 0 0 0

428.3

KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 4. ROADWAY RESURFACING AND STABILIZATION. CONSTRUCT CONSISTENT 11' TRAVEL LANE IN EACH DIRECTION FROM SUMMIT HILLS COUNTRY CLUB

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

271,000

1,636,800

0 271,000 1,636,800 0 0 0 0

428.4

KENTON CS-2023 RECONSTRUCTION(O)WIDEN SIDEWALK FOR ADA COMPLIANCE AND ROADWAY RECONSTRUCTION ON JOHNSON ST W RIVERCENTER BLVD FROM 3RD STREET TO THE EXISTING CONCRETE

PL

Project Cost:

CN

UT

RW

DN

SNK 677,800

677,800 0 0 0 0 0 0

430

KENTON US-25 SAFETY(P) CONSTRUCT LEFT TURN LANE ON NB APPROACH AT THE INTERSECTION OF US 25 AND BEECHWOOD RD JUST S OF I-75. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

100,000

250,000

1,600,000

1,950,000 0 0 0 0 0 0

432

169

Page 170: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON -0 MATCHED FED FUNDS(O)

LUDLOW RIVERFRONT COMMONS TRAIL- CONSTRUCT A ONE-MILE MULTI-USE PATH ALONG THE OHIO RIVER FROM HOOPER STREET TO ASH STREET IN THE CITY OF LUDLOW

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

5,000

240,133

245,133 0 0 0 0 0 0

435

KENTON CS-6142 SAFETY(P) IMPROVE SAFETY, TRAFFIC FLOW AND DRAINAGE ISSUES ALONG BUTTERMILK PIKE (CS 6142) FROM ROGERS ROAD TO COLLINS ROAD IN THE CITY OF VILLA HILLS. A

PL

Project Cost:

CN

UT

RW

DN

SNK 313,857

313,857 0 0 0 0 0 0

437

KENTON CS-9004 RECONSTRUCTION(O)RECONSTRUCT AMSTERDAM ROAD FROM GENERAL DRIVE TO REDWOOD DRIVE WITH CURB, GUTTER, STORM SEWERS AND SIDEWALK (2016BOP).

PL

Project Cost:

CN

UT

RW

DN

SNK

SNK

SNK

56,000

32,000

2,080,000

88,000 2,080,000 0 0 0 0 0

438

KENTON KY-17 CONGESTION MITIGTN(O)

IMPROVE SAFETY AND REDUCE CONGESTION ON KY-17 AT THE I-275 INTERCHANGE.

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

450,000

200,000

350,000

0 450,000 550,000 0 0 0 0

449

KENTON KY-1303 CONGESTION MITIGTN(O)

IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY-1303 (TURKEYFOOT RD) FROM DUDLEY RD TO US-25 (DIXIE HWY).

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

1,500,000

2,000,000

1,000,000

0 3,500,000 1,000,000 0 0 0 0

450

170

Page 171: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON CS-1560 RESURFACING(P) ADELA AVENUE. CURB-LINE MILLING, ASPHALT RESURFACING, REPLACE SIDEWALK/CURBING AND NEW SIDEWALK AS NEEDED FROM KY 1072 (SLEEPY HOLLOW ROAD/DEVERILL

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

SNK

35,000

20,000

200,000

255,000 0 0 0 0 0 0

454

KENTON CS-1045 DRAINAGE IMPROVE(P)

CODY ROAD. REPLACE CULVERT FOR BANKLICK CREEK. MILL AND OVERLAY WITH NEW ASPHALT FROM BANKLICK CREEK TO INDEPENDENCE STATION ROAD.

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

SNK

57,000

120,000

346,000

57,000 466,000 0 0 0 0 0

455

KENTON -0 TRANSP ENHANCEMENT(P)

MADISON AVENUE. UNDERGROUND UTILITIES, STREET TREES, MAST ARM POLES, STREETLIGHTS, RESURFACING, SIGNAL IMPROVEMENTS FROM 11TH STREET

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

SNK

280,000

240,000

1,650,000

280,000 1,890,000 0 0 0 0 0

456

KENTON CS-2217 TRANSP ENHANCEMENT(P)

7TH STREET. SIDEWALK REPLACEMENT, UNDERGROUND UTILITIES, STREET TREES, MAST ARM TRAFFIC SIGNALS, LIGHTING, RESURFACING FROM WASHINGTON

PL

Project Cost:

CN

UT

RW

DN SNK

SNK

SNK

280,000

240,000

2,450,000

280,000 2,690,000 0 0 0 0 0

457

KENTON CS-2097 AM-BRIDGE (P) WEST 15TH STREET; ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES OVER CSX RR IN COVINGTON. (059C00029N)(12CCR)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR

BR

BR

830,000

550,000

2,110,000

3,490,000 0 0 0 0 0 0

1070

171

Page 172: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON KY-1120 AM-BRIDGE (P) EVALUATE BRIDGE ON KY-1120 (MP 0.621) OVER CSX RAILROAD; 11TH ST E OF RUSSELL ST; 059B00083N

PL

Project Cost:

CN

UT

RW

DN

BR 520,000

520,000 0 0 0 0 0 0

1075

KENTON KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LICKING RIVER ON WEST 4TH STREET (KY 8) IN COVINGTON/NEWPORT AT KENTON/CAMPBELL CO LN.

PL

Project Cost:

CN

UT

RW

DN BR

BR

BR

BR

3,900,000

2,440,000

1,170,000

32,900,000

0 0 0 3,900,000 3,610,000 0 32,900,000

1086

KENTON KY-1501 RECONSTRUCTION(O)IMPROVE HANDS PIKE (KY-1501) FROM KY-17 TO CRYSTAL LAKE DRIVE.(12CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 8,010,000

0 8,010,000 0 0 0 0 0

8307.1

KENTON NEW ROUTE(O) EXTEND HOUSTON ROAD TO CINEMA PROPERTY

PL

Project Cost:

CN

UT

RW

DN SPP 250,000

0 250,000 0 0 0 0 0

8916

KENTON US-25 REALIGNMENT IMPROVE EXISTING ALIGNMENT WITH BUTTERMILK PIKE, ORPHANAGE ROAD, AND US 25. FT. MITCHELL WILL PAY $50,000 TOWARD DESIGN.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

250,000

5,000,000

2,000,000

5,000,000

0 250,000 0 5,000,000 2,000,000 5,000,000 0

8951

172

Page 173: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON KY-17 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON JOHN A. ROEBLING BRIDGE OVER OHIO RIVER(059B00048N)(BSBP)

PL

Project Cost:

CN

UT

RW

DN

BR 1,200,000

0 1,200,000 0 0 0 0 0

10005

KENTON US-25 AM-BRIDGE (P) JOINT REPLACEMENT AND PREVENTIVE MAINTENANCE ON CLAY WADE BAILEY BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (059B00049N)

PL

Project Cost:

CN

UT

RW

DN

BR 350,000

350,000 0 0 0 0 0 0

10006

KENTON KY-177 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 177 BRIDGE OVER BOWMAN CREEK. (059B00011N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

420,000

2,695,000

0 420,000 2,695,000 0 0 0 0

10011

KENTON KY-2045 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2045 BRIDGE OVER BRUSHY CREEK. (059B00025N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

3,605,000

0 350,000 3,605,000 0 0 0 0

10012

KENTON I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 166.263 TO MILEPOINT 169.439

PL

Project Cost:

CN

UT

RW

DN PM

PM

390,000

3,900,000

0 0 0 4,290,000 0 0 0

20030

173

Page 174: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 166.263 TO MILEPOINT 169.439

PL

Project Cost:

CN

UT

RW

DN PM

PM

390,000

3,900,000

0 0 0 0 0 4,290,000 0

20031

KENTON I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-075 BOTH DIRECTION(S) FROM MILEPOINT 186.95 TO MILEPOINT 190.721

PL

Project Cost:

CN

UT

RW

DN PM

PM

750,000

7,500,000

0 0 0 0 0 0 8,250,000

20032

KENTON I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 190.68 TO MILEPOINT 191.22

PL

Project Cost:

CN

UT

RW

DN PM

PM

30,000

300,000

0 330,000 0 0 0 0 0

20033

KENTON I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 190.721 TO MILEPOINT 191.777

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 0 1,100,000 0 0

20034

KENTON I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 1.582 (1.05 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,420,000

14,200,000

0 15,620,000 0 0 0 0 0

20035

174

Page 175: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 1.054 TO MILEPOINT 1.582

PL

Project Cost:

CN

UT

RW

DN PM

PM

40,000

400,000

0 0 0 440,000 0 0 0

20036

KENTON I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 77.759 TO MILEPOINT 79.796

PL

Project Cost:

CN

UT

RW

DN PM

PM

300,000

3,000,000

0 0 0 0 0 0 3,300,000

20037

KENTON I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 80.12 TO MILEPOINT 82.475

PL

Project Cost:

CN

UT

RW

DN PM

PM

350,000

3,500,000

0 0 0 0 0 0 3,850,000

20038

KENTON I-275 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-275 BOTH DIRECTION(S) FROM MILEPOINT 82.475 TO MILEPOINT 83.78

PL

Project Cost:

CN

UT

RW

DN PM

PM

200,000

2,000,000

0 2,200,000 0 0 0 0 0

20039

KENTON KY-16 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

400,000

4,000,000

0 0 0 4,400,000 0 0 0

20040

175

Page 176: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON KY-16 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

75,000

750,000

0 0 0 825,000 0 0 0

20041

KENTON KY-16 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 550,000 0 0 0

20042

KENTON KY-17 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

880,000

8,800,000

0 0 0 9,680,000 0 0 0

20043

KENTON KY-236 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

30,000

300,000

0 0 0 330,000 0 0 0

20044

KENTON KY-1072 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

20,000

200,000

0 0 0 220,000 0 0 0

20045

176

Page 177: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KENTON US-25 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

325,000

3,250,000

0 0 0 3,575,000 0 0 0

20046

KENTON KY-177 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-177 FROM MILEPOINT 9.17 TO MILEPOINT 15.99

PL

Project Cost:

CN

UT

RW

DN

PM 893,000

0 0 0 0 893,000 0 0

20051

KENTON KY 236 AIR QUALITY(P) RECONSTRUCT KY 236 (STEVENSON ROAD) FROM ALICE STREET TO JACQUELINE DRIVE

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

800,000

1,000,000

1,000,000

5,300,000

0 800,000 1,000,000 1,000,000 5,300,000 0 0

80002

Total for KENTON county PL

Total Amounts:

CN

UT

RW

DN 1,104,600

1,406,000

1,632,000

9,419,630

5,941,000

2,504,000

2,160,000

67,361,000

4,200,000

2,850,000

13,622,800

6,110,000

5,000,000

1,000,000

27,510,000

100,000

14,520,000

3,170,000

8,900,000

390,000

3,000,000

3,000,000

20,693,000

1,400,000

1,560,000

55,900,000

13,562,230 77,966,000 20,672,800 39,620,000 38,483,000 15,290,000 58,860,000

KNOTT CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOON CREEK AT INTERSECTION WITH COON CREEK (CR 1371) (060C00006N)

PL

Project Cost:

CN

UT

RW

DN

BR 420,000

420,000 0 0 0 0 0 0

1116

177

Page 178: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KNOTT CS-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER RIGHT FORK TROUBLESOME CREEK ON FIELDWOOD DRIVE (CS1016) IN HINDMAN (060C00060N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

455,000

0 210,000 455,000 0 0 0 0

1124

KNOTT KY-3209 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BALLS FORK ON KY 3209. (16CCN) 060B00053N

PL

Project Cost:

CN

UT

RW

DN

BR 700,000

700,000 0 0 0 0 0 0

8904

KNOTT KY-1098 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1098 BRIDGE OVER LAUREL FK OF QUICKSAND C. (060B00035N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

680,000

0 175,000 680,000 0 0 0 0

10001

KNOTT CR-1130 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF COLLINS BRANCH RD BRIDGE OVER CARR FORK. (060C00029N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

398,650

0 157,500 398,650 0 0 0 0

10002

KNOTT CR-1565 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FRANKIE JANE DR BRIDGE OVER CANEY CREEK. (060C00071N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

337,890

0 175,000 337,890 0 0 0 0

10015

178

Page 179: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for KNOTT county PL

Total Amounts:

CN

UT

RW

DN

1,120,000

717,500

1,871,540

1,120,000 717,500 1,871,540 0 0 0 0

KNOX US-25 MAJOR WIDENING(O) IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 2,300,000

0 0 2,300,000 0 0 0 0

188

KNOX US-25 PREFINANCD CONVRSN(O)

IMPROVE SAFETY AND ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM CORBIN BYPASS TO KNOX/LAUREL COUNTY LINE.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 6,920,000

0 0 0 6,920,000 0 0 0

188.01

KNOX CR-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD HWY 25 (CR 1325) JUST WEST OF US 25E. 061C00063N

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

350,000

0 175,000 350,000 0 0 0 0

1102

KNOX CR-1353 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SPIDER CREEK RD BRIDGE OVER EAST FORK LYNN CAMP CREEK. (061C00048N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

469,000

0 192,500 469,000 0 0 0 0

10021

179

Page 180: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KNOX CR-1162 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DETHERAGE CEMETERY BRIDGE OVER BRUSH CREEK. (061C00056N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

367,500

0 157,500 367,500 0 0 0 0

10022

KNOX CR-1065 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BURTON BRANCH RD BRIDGE OVER BURTON BRANCH. (061C00086N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

360,000

0 175,000 360,000 0 0 0 0

10023

KNOX KY-6 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

30,000

300,000

0 0 330,000 0 0 0 0

20007

KNOX US-25 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

125,000

1,250,000

0 1,375,000 0 0 0 0 0

20008

KNOX US-25 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-25E FROM MILEPOINT 21.72 TO MILEPOINT 26.20

PL

Project Cost:

CN

UT

RW

DN

PM 2,267,000

0 0 0 0 0 2,267,000 0

20022

180

Page 181: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

KNOX US 25E AIR QUALITY(P) US 25E VARIOUS TURNING LANES. CROSSOVER AND TURNING LANE AT THE PALLET STORE. LEFT TURNING LANE AT THE SAWMILL AT THE KNOX/BELL COUNTY LINE. RIGHT

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

30,000

270,000

0 300,000 0 0 0 0 0

80000

KNOX US 25E AIR QUALITY(P) CONDUCT A TRAFFIC SAFETY STUDY ON US 25E AT HEIDRICK, KY IN KNOX COUNTY

PL

Project Cost:

CN

UT

RW

DN

SPP 50,000

0 50,000 0 0 0 0 0

80009

Total for KNOX county PL

Total Amounts:

CN

UT

RW

DN

50,000

855,000

1,520,000

30,000

4,146,500 6,920,000 2,267,000

0 2,425,000 4,176,500 6,920,000 0 2,267,000 0

LARUE KY-222 CONGESTION MITIGTN(O)

CONNECTOR IMPROVEMENTS HODGENVILLE TO I-65

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

125,000

50,000

100,000

400,000

0 175,000 500,000 0 0 0 0

8909

LARUE KY-84 SPOT IMPROVEMENTS(O)

SPOT IMPROVEMENTS ON KY 84 FROM HODGENVILLE TO I-65.

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

450,000

0 0 500,000 0 0 0 0

8911

181

Page 182: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LARUE KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-61 BRIDGE OVER SOUTH FORK BRANCH(062B00008N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

87,500

605,500

0 87,500 605,500 0 0 0 0

10002

Total for LARUE county PL

Total Amounts:

CN

UT

RW

DN 212,500

50,000

50,000

100,000

1,455,500

0 262,500 1,605,500 0 0 0 0

LAUREL I-75 MAJOR WIDENING(O) IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

70,000

50,000

10,000,000

0 120,000 10,000,000 0 0 0 0

9.1

LAUREL I-75 PREFINANCD CONVRSN(O)

IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 20,000,000

0 0 0 20,000,000 0 0 0

9.14

LAUREL I-75 PREFINANCD CONVRSN(O)

IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 18,500,000

0 0 0 0 18,500,000 0 0

9.15

182

Page 183: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LAUREL I-75 PREFINANCD CONVRSN(O)

IMPROVE I-75 FROM US-25E TO THE LITTLE LAUREL RIVER (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 18,500,000

0 0 0 0 0 18,500,000 0

9.16

LAUREL I-75 MAJOR WIDENING(O) IMPROVE I-75 FROM KY 80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.

PL

Project Cost:

CN

UT

RW

DN

NH 20,750,000

0 0 0 0 20,750,000 0 0

11

LAUREL I-75 PREFINANCD CONVRSN(O)

IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.

PL

Project Cost:

CN

UT

RW

DN

NH 20,750,000

0 0 0 0 0 20,750,000 0

11.02

LAUREL I-75 PREFINANCD CONVRSN(O)

IMPROVE I-75 FROM KY-80 AT LONDON TO SOUTH OF THE KY-909 UNDERPASS.

PL

Project Cost:

CN

UT

RW

DN

NH 20,750,000

0 0 0 0 0 0 20,750,000

11.03

LAUREL US-25 MAJOR WIDENING(O) REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVE CONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROM THE NEW CONNECTOR NORTH

PL

Project Cost:

CN

UT

RW

DN

STP 10,000,000

0 0 0 0 10,000,000 0 0

147

183

Page 184: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LAUREL US-25 PREFINANCD CONVRSN(O)

REDUCE CONGESTION ON US-25 FROM KY-1006 TO KY-2069; IMPROVE CONNECTIVITY FROM US-25 NEAR KY-2069 TO KY-229; IMPROVE KY-229 FROM THE NEW CONNECTOR NORTH

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 0 0 0 5,000,000 0

147.01

LAUREL KY-363 MAJOR WIDENING(O) ADDRESS SAFETY, CAPACITY, AND ACCESS MANAGEMENT ON KY-363 FROM KY-1006 TO KY-192. (06CCR)(2006BOPC).(10CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,000,000

3,000,000 0 0 0 0 0 0

147.1

LAUREL US-25 MAJOR WIDENING(O) IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770 (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 4,580,000

0 0 4,580,000 0 0 0 0

185

LAUREL US-25 PREFINANCD CONVRSN(O)

IMPROVE SAFETY, IMPROVE ACCESS MANAGEMENT, AND REDUCE CONGESTION ON US-25E FROM THE KNOX/LAUREL COUNTY LINE TO KY-770 (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 6,860,000

0 0 0 6,860,000 0 0 0

185.01

LAUREL KY-192 MAJOR WIDENING(O) IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; AND REDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

NH

1,000,000

2,500,000

6,000,000

3,500,000 0 0 0 6,000,000 0 0

187

184

Page 185: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LAUREL KY-192 PREFINANCD CONVRSN(O)

IMPROVE SAFETY, ACCESS MANAGEMENT, AND FREIGHT MOBILITY; AND REDUCE CONGESTION ON KY-192 NEAR KY-1006 TO US-25 IN LONDON. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 12,000,000

0 0 0 0 0 12,000,000 0

187.01

LAUREL HR-9006 MAJOR WIDENING(O) REDUCE CONGESTION ON THE HAL ROGERS PARKWAY FROM RELOCATED KY-30 TO KY-192.

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

1,870,000

2,080,000

1,250,000

4,510,000

0 0 0 1,870,000 3,330,000 4,510,000 0

365

LAUREL CR-1341 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON DOG BRANCH SCHOOL RD (CR 1341) OVER SINKING CREEK 0.56 MILE NW OF SINKING CREEK RD (FD 781) 063C00025N

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

770,000

0 175,000 770,000 0 0 0 0

1094

LAUREL KY-312 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CRAIG CREEK ON KY 312 1.8 MILE SE OF KY 192. (063B00053N)(14CCR)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 1,200,000

1,200,000 0 0 0 0 0 0

1096

LAUREL I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER LAUREL RIVER (SR 34.1) (B00043R AND B00043L)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 2,800,000

2,800,000 0 0 0 0 0 0

1105.01

185

Page 186: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LAUREL US-25 DESIGN ENGINEERING(O)

IMPROVE CONNECTIVITY BETWEEN CORBIN AND LONDON FROM KY-1006 TO US-25E. (08CCN)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

500,000

3,000,000

0 0 500,000 0 3,000,000 0 0

8515

LAUREL CR-1221 BRIDGE REPLACEMENT(P)

REPLACE BRIDGE LOCATED ON LILY ROAD (CR 1221) (MP 1.045) (AREA ADJACENT TO FARISTON INDUSTRIAL PARK WITH NEW ROADWAY ALIGNMENT). (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 1,343,900

0 1,343,900 0 0 0 0 0

8811

LAUREL HR-9006 RECONSTRUCTION(O)IMPROVE THE HAL ROGERS PARKWAY TO INTERSTATE STANDARDS FROM 4MI EAST OF KY 192 TO LAUREL/CLAY CO. LINE. (I-75 TO HAZARD) (16CCN).

PL

Project Cost:

CN

UT

RW

DN NH

SPP

SPP

SPP

1,000,000

2,200,000

1,000,000

27,000,000

0 0 0 1,000,000 2,200,000 1,000,000 27,000,000

8909

LAUREL KY-1223 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1223 BRIDGE OVER HORSE CREEK. (063B00007N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

378,000

0 175,000 378,000 0 0 0 0

10024

LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER LICK FORK CREEK. (063B00013N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

525,000

0 210,000 525,000 0 0 0 0

10025

186

Page 187: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER HOOPPOLE CREEK. (063B00017N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

507,500

0 175,000 507,500 0 0 0 0

10026

LAUREL KY-490 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 490 BRIDGE OVER ROCKCASTLE RIVER. (063B00004N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

2,492,000

0 245,000 2,492,000 0 0 0 0

10042

LAUREL KY-638 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 638 BRIDGE OVER BIG RACCOON CREEK(063B00061N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

829,500

0 192,500 829,500 0 0 0 0

10043

LAUREL HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 3.877

PL

Project Cost:

CN

UT

RW

DN PM

PM

310,000

3,100,000

0 3,410,000 0 0 0 0 0

20009

LAUREL I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 29.39 TO MILEPOINT 32.49 (33.2 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

300,000

3,000,000

0 0 0 0 0 3,300,000 0

20010

187

Page 188: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LAUREL I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION ON PCC PAVEMENT ON I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 32.485 TO MILEPOINT 32.9

PL

Project Cost:

CN

UT

RW

DN PM

PM

120,000

1,200,000

0 1,320,000 0 0 0 0 0

20011

LAUREL I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 41.4 TO MILEPOINT 50.524 (49.87 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,100,000

11,000,000

0 0 0 0 0 12,100,000 0

20012

LAUREL I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 50.524 (49.87 NON-CARDINAL) TO MILEPOINT 50.714

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 1,100,000 0 0 0 0 0

20013

LAUREL KY-490 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-490 FROM MILEPOINT 0.00 TO MILEPOINT 6.14

PL

Project Cost:

CN

UT

RW

DN

PM 924,000

0 0 0 0 924,000 0 0

20023

Total for LAUREL county PL

Total Amounts:

CN

UT

RW

DN1,000,000

2,500,000

7,000,000

1,702,500

70,000

50,000

6,643,900

500,000

20,082,000

2,870,000

26,860,000

3,000,000

4,280,000

1,250,000

74,760,000

1,400,000

1,000,000

56,174,000 47,750,000

10,500,000 8,466,400 20,582,000 29,730,000 64,704,000 77,160,000 47,750,000

188

Page 189: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LAWRENCE KY-2565 RECONSTRUCTION(O)RECONSTRUCT KY 2565 FROM APPROX. 550' NW OF CR 1529/KY2565/KY2563 INTERSECTION TO APPROX. 1150' SE OF THE INTERSECTION (SECTION 2).

PL

Project Cost:

CN

UT

RW

DN

SPP 790,000

790,000 0 0 0 0 0 0

196.1

LAWRENCE CR-1044 SPOT IMPROVEMENTS(O)

SPOT IMPROVEMENTS ON SPANKEM BRANCH ROAD (CR 1044).

PL

Project Cost:

CN

UT

RW

DN

SPP 500,000

0 500,000 0 0 0 0 0

8951

LAWRENCE CR-1234 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MAXIE BRANCH RD BRIDGE OVER RT FORK-BLAINE CREEK. (064C00076N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

478,000

0 140,000 478,000 0 0 0 0

10003

LAWRENCE KY-644 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 644 BRIDGE OVER LEVISA FORK OF BIG SANDY. (064B00038N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

560,000

2,880,500

0 560,000 2,880,500 0 0 0 0

10016

Total for LAWRENCE county PL

Total Amounts:

CN

UT

RW

DN

790,000

700,000

500,000 3,358,500

790,000 1,200,000 3,358,500 0 0 0 0

189

Page 190: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LEE KY-11 RECONSTRUCTION(O)I-75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY-11 FROM KY-30 AT LEVI IN OWSLEY COUNTY TO 0.5 MILE SOUTH OF KY-587 IN LEE COUNTY. START AT KY-30 AT LEVI IN OWSLEY

PL

Project Cost:

CN

UT

RW

DN

SPP 22,620,000

0 0 0 22,620,000 0 0 0

292.1

LEE CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GOOSE CREEK RD BRIDGE OVER CSX RAILROAD. (065R00604N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

770,000

0 245,000 770,000 0 0 0 0

10013

Total for LEE county PL

Total Amounts:

CN

UT

RW

DN 245,000

770,000 22,620,000

0 245,000 770,000 22,620,000 0 0 0

LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON US-421 OVER STINNET CREEK 0.028 MILE SOUTH OF KY-406 NEAR STINNETT(10CCR)(066B00008N)

PL

Project Cost:

CN

UT

RW

DN

BR 2,128,000

0 2,128,000 0 0 0 0 0

1078

LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER MUNCY CREEK ON US 421 0.5 MILE SOUTH OF TAYLOR MORGAN ROAD (CR 1090).(066B00006N)

PL

Project Cost:

CN

UT

RW

DN

BR 612,500

0 0 612,500 0 0 0 0

1095

190

Page 191: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LESLIE CR-1528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WOLF CREEK ON COON CREEK ROAD (CR 1528) AT JCT WITH KY 3427 (066C00039N) (EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

123,000

445,000

0 123,000 445,000 0 0 0 0

1100

LESLIE CR-1219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MILE BRANCH RD (CR 1219) (MP 0.022OVER BEECH FORK. 066C00048N

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

613,000

0 245,000 613,000 0 0 0 0

1104

LESLIE CR-1207 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON WILLIAMS BRANCH RD (CR-1207) (0.028) OVER MIDDLE FORK KENTUCKY RIVER. 066C00020N

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

560,000

0 245,000 560,000 0 0 0 0

1106

LESLIE KY-1482 NEW ROUTE(O) CONSTRUCT A NEW APPROACH FROM KY-1482 ONTO THE HAL ROGERS PARKWAY AT MP 39. (08CCN)(10CCR)(2011BOPP)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

920,000

420,000

5,300,000

0 0 0 1,000,000 1,340,000 5,300,000 0

8516

LESLIE HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM CLAY/LESLIE LINE TO HYDEN SPUR, MP 35.929 TO MP 44.188 (SEGMENT 9)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

12,000,000

9,000,000

94,400,000

0 0 0 1,000,000 21,000,000 94,400,000 0

8912

191

Page 192: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LESLIE HR-9006 MAJOR WIDENING(O) UPGRADE ROUTE FROM SOMERSET TO HAZARD TO INTERSTATE STANDARDS: 4 LANE FROM HYDEN SPUR TO LESLIE/PERRY LINE (SEGMENT 10)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

10,000,000

7,000,000

61,600,000

0 0 0 1,000,000 17,000,000 0 61,600,000

8913

LESLIE US-421 CONGESTION MITIGTN(O)

CONSTRUCT RIGHT TURN LANE ON US 421 AT INTERSECTION WITH KY 80.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

500,000

100,000

250,000

1,200,000

0 0 0 500,000 350,000 1,200,000 0

8951

LESLIE KY-1780 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1780 BRIDGE OVER BEECH FORK. (066B00027N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

857,500

0 210,000 857,500 0 0 0 0

10027

LESLIE KY-699 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-699 BRIDGE OVER MAGGARDS BRANCH. (066B00031N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

525,000

0 175,000 525,000 0 0 0 0

10028

LESLIE KY-2431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2431 BRIDGE OVER MIDDLE FORK OF KY RIVER. (066B00039N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

BR

BR

300,000

75,000

180,000

1,100,000

0 0 0 300,000 255,000 0 1,100,000

10029

192

Page 193: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LESLIE CR-1006 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1006 BRIDGE OVER RACCOON CREEK. (066C00002N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

451,500

0 192,500 451,500 0 0 0 0

10030

LESLIE CR-1271 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1271 BRIDGE OVER MIDDLE FK KENTUCKY RVR. (066C00023N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

525,000

0 210,000 525,000 0 0 0 0

10031

LESLIE KY 3424 AIR QUALITY(P) SAFETY IMPROVEMENTS ON KY 3424 FROM MP 1.1 TO MP 1.5

PL

Project Cost:

CN

UT

RW

DN

SPP 1,300,000

0 0 0 1,300,000 0 0 0

80002

LESLIE KY 2009 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 2009 FROM MP 13.418 TO MP 14.767

PL

Project Cost:

CN

UT

RW

DN

SPP 500,000

0 0 0 500,000 0 0 0

80003

LESLIE KY 1482 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 1482 FROM MP 0 TO MP 1.9

PL

Project Cost:

CN

UT

RW

DN

SPP 107,000

0 0 0 107,000 0 0 0

80004

193

Page 194: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LESLIE KY 257 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 257 FROM MP 5.723 TO MP 5.853

PL

Project Cost:

CN

UT

RW

DN

SPP 22,000

0 0 0 22,000 0 0 0

80005

LESLIE KY 1807 AIR QUALITY(P) INSTALL NEW GUARDRAIL ON KY 1807 FROM MP 0.914 TO MP 1.256

PL

Project Cost:

CN

UT

RW

DN

SPP 45,000

0 0 0 45,000 0 0 0

80006

LESLIE KY 118 AIR QUALITY(P) CONSTRUCT A SECONDARY RUNAWAY TRUCK RAMP ON KY 118 (HYDEN SPUR) JUST BEFORE THE INTERSECTION WITH KY 80/US 421 TO INCLUDE A NEW BOX CULVERT OR

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

400,000

300,000

50,000

1,300,000

0 0 0 400,000 1,650,000 0 0

80007

Total for LESLIE county PL

Total Amounts:

CN

UT

RW

DN 1,400,500

2,128,000 4,589,500

4,200,000

1,974,000

23,395,000

16,900,000

100,900,0001,300,000 62,700,000

0 3,528,500 4,589,500 6,174,000 41,595,000 100,900,000 62,700,000

LETCHER US-119 RECONSTRUCTION(O)IMPROVE US-119 FROM NORTH OF KY-15 TO BRASS DRIVE (SOUTH).(16CCN)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,300,000

1,200,000

0 0 0 2,500,000 0 0 0

199.1

194

Page 195: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LETCHER US-119 RECONSTRUCTION(O)IMPROVE US-119 FROM NORTH OF KY-15 TO THE KY 2034/COUGAR DRIVE INTERSECTION.(16CCN)(SEE 12-199.10 FOR D, R, U)

PL

Project Cost:

CN

UT

RW

DN

NH 1,000,000

1,000,000 0 0 0 0 0 0

199.11

LETCHER US-119 RECONSTRUCTION(O)IMPROVE US-119 FROM KY 2034/COUGAR DRIVE TO BRASS DRIVE (SOUTH).(16CCN)(SEE 12-199.10 FOR D, R, U)

PL

Project Cost:

CN

UT

RW

DN

NH 6,000,000

0 0 0 6,000,000 0 0 0

199.15

LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 2034C OVER N FORK KY RIVER 0.02 E OF US 119 067B00121N

PL

Project Cost:

CN

UT

RW

DN

BR 973,000

973,000 0 0 0 0 0 0

1113

LETCHER KY-3404 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POOR FORK OF CUMBERLAND RIVER ON KY 3404 100 FT SOUTH OF US 119. (067B00114N)

PL

Project Cost:

CN

UT

RW

DN

BR 420,000

0 0 420,000 0 0 0 0

1120

LETCHER CR-1226 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON HAMPTON BRANCH (CR 1226) (MP 0.01) OVER COWAN CREEK. 067C00021N

PL

Project Cost:

CN

UT

RW

DN

BR 385,000

0 0 385,000 0 0 0 0

1125

195

Page 196: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LETCHER CR-1225 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1225 (0.034) OVER COWAN CREEK. 067C00020N

PL

Project Cost:

CN

UT

RW

DN BR

BR

420,000

385,000

0 420,000 385,000 0 0 0 0

1126

LETCHER KY-805 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-805 BRIDGE OVER POTTERS FORK. (067B00022N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

616,840

0 210,000 616,840 0 0 0 0

10004

LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2034 BRIDGE OVER CRAFTS COLLY CREEK(067B00069N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

406,105

0 140,000 406,105 0 0 0 0

10005

LETCHER CR-1433 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CORNFIELD DR BRIDGE OVER BOONE FORK. (067C00004N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

427,840

0 140,000 427,840 0 0 0 0

10006

LETCHER CR-1386 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF TURKEY CRK BRIDGE OVER TURKEY CREEK. (067C00050N)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

697,000

0 175,000 697,000 0 0 0 0

10007

196

Page 197: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LETCHER KY-7 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 7 BRIDGE OVER CSX RR & N FK KY RIVER. (067B00038N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

525,000

4,900,000

0 525,000 4,900,000 0 0 0 0

10017

LETCHER KY-343 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 343 BRIDGE OVER WRIGHT FORK. (067B00078N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

378,560

0 175,000 378,560 0 0 0 0

10018

LETCHER CS-3000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF E POTTER RD BRIDGE OVER YONTS FORK. (067C00007N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

372,400

0 157,500 372,400 0 0 0 0

10019

LETCHER CR-1149 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOLBROOK TOWN BRIDGE OVER N.FK.KENTUCKY RVR. (067C00017N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

516,810

0 210,000 516,810 0 0 0 0

10020

LETCHER CR-1799 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARADISE LN BRIDGE OVER KINGDOM COME CREEK. (067C00051N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

269,500

0 140,000 269,500 0 0 0 0

10021

197

Page 198: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LETCHER CR-1737 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ORCHARD RD BRIDGE OVER NORTH FORK KY RIVER. (067C00065N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

655,900

0 210,000 655,900 0 0 0 0

10022

LETCHER US-119 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-119 FROM MILEPOINT 17.00 TO MILEPOINT 22.63

PL

Project Cost:

CN

UT

RW

DN

PM 1,477,000

0 0 0 0 1,477,000 0 0

20005

Total for LETCHER county PL

Total Amounts:

CN

UT

RW

DN

1,973,000

2,502,500

10,430,955

1,300,000

1,200,000

6,000,000 1,477,000

1,973,000 2,502,500 10,430,955 8,500,000 1,477,000 0 0

LEWIS KY-59 RECONSTRUCTION(O)RECONSTRUCT KY-59 FROM KY-9 (AA) IN VANCEBURG TO JUNCTION OF KY-344 MP 18.1 TO MP 23.19

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

6,000,000

5,000,000

3,000,000

40,000,000

0 0 0 6,000,000 5,000,000 3,000,000 40,000,000

231

LEWIS KY-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LAUREL FORK ON KY 1068 30 FT S OF DEEP HOLE BRANCH ROAD (CR 1125).(068B00057N)(16CCR)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR

BR

BR

75,000

75,000

900,000

150,000 900,000 0 0 0 0 0

1090

198

Page 199: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LEWIS KY-57 AM-BRIDGE (P) CONSTRUCT A NEW BRIDGE CROSSING THE NORTH FORK OF THE LICKING RIVER AT THE LEWIS-FLEMING COUNTY LINE. (08CCN): (068B00027N)

PL

Project Cost:

CN

UT

RW

DN

BR 3,640,000

0 3,640,000 0 0 0 0 0

8507

LEWIS KY-8 NEW ROUTE(O) RECONSTRUCT KY-8 FROM KY-8C IN GARRISON TO SCAFFOLD LICK ROAD

PL

Project Cost:

CN

UT

RW

DN SPP 500,000

0 0 0 500,000 0 0 0

8806.1

LEWIS KY-57 RECONSTRUCTION(O)RECONSTRUCT KY-57 FROM KY-9 TO FLEMING/LEWIS COUNTY LINE. (14CCN)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

2,100,000

5,200,000

3,400,000

20,000,000

0 0 0 0 2,100,000 8,600,000 20,000,000

8807

LEWIS KY-344 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-344 BRIDGE OVER GRASSY BRANCH. (068B00015N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

1,540,000

0 350,000 1,540,000 0 0 0 0

10010

LEWIS KY-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1021 BRIDGE OVER BRIERY CREEK. (068B00075N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

315,000

857,500

0 315,000 857,500 0 0 0 0

10023

199

Page 200: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LEWIS KY-9 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

210,000

2,100,000

0 0 0 2,310,000 0 0 0

20010

LEWIS KY-9 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-9 FROM MILEPOINT 15.77 TO MILEPOINT 21.03

PL

Project Cost:

CN

UT

RW

DN

PM 1,070,000

0 0 0 0 1,070,000 0 0

20017

Total for LEWIS county PL

Total Amounts:

CN

UT

RW

DN75,000

75,000

665,000

4,540,000 2,397,500

6,710,000

2,100,000

2,100,000

5,000,000 5,200,000

6,400,000

1,070,000 60,000,000

150,000 5,205,000 2,397,500 8,810,000 8,170,000 11,600,000 60,000,000

LINCOLN US-27 RECONSTRUCTION(O)US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

4,720,000

3,000,000

0 0 0 0 7,720,000 0 0

167

LINCOLN US-27 PREFINANCD CONVRSN(O)

US-27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE CONGESTION ON US-27 FROM KY-1247 TO EDUCATION WAY.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

7,080,000

4,500,000

0 0 0 0 0 11,580,000 0

167.01

200

Page 201: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LINCOLN US-27 MAJOR WIDENING(O) IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEW GOSHEN CUT-OFF ROAD)(2005HPP-KY115)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

1,400,000

1,100,000

3,250,000

0 2,500,000 3,250,000 0 0 0 0

196

LINCOLN US-27 PREFINANCD CONVRSN(O)

IMPROVE US-27 FROM KY-590 TO BELL STREET IN STANFORD. (INCLUDES NEW GOSHEN CUT-OFF ROAD)(2005HPP-KY115)

PL

Project Cost:

CN

UT

RW

DN

NH 3,250,000

0 0 0 3,250,000 0 0 0

196.01

LINCOLN KY-1247 AM-BRIDGE (P) REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH CREEK 0.044 S OF KY 78(SR 45.4) 069B00055N

PL

Project Cost:

CN

UT

RW

DN

BR 567,000

567,000 0 0 0 0 0 0

1055

LINCOLN CR-1043 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1043 (0.643) OVER LOGAN CREEK. (SR=20.2) 069C00008N

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

497,000

0 175,000 497,000 0 0 0 0

1066

LINCOLN US 127 NEW INTERCHANGE(O)

NEW TURNING LANE AT ARCADIA VIEW DRIVE

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

100,000

50,000

50,000

800,000

0 1,000,000 0 0 0 0 0

80000

201

Page 202: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LINCOLN US 150 NEW INTERCHANGE(O)

US 150 NEW TURNING LANE NEAR HOBBLE ROAD AND CRAWFORD LANE

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

100,000

50,000

350,000

500,000 0 0 0 0 0 0

80001

LINCOLN US 127 NEW INTERCHANGE(O)

US 127 NEW TURNING LANE AT KY 1194

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

100,000

50,000

50,000

800,000

0 1,000,000 0 0 0 0 0

80002

LINCOLN US 150 AIR QUALITY(P) ADD A TURNING LANE ON US 150 AT WILDERNESS TRAIL ROAD

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

100,000

50,000

350,000

0 500,000 0 0 0 0 0

80008

LINCOLN US-27 MINOR WIDENING(O) EXPAND US-27 TO FOUR LANES FROM THE WALMART IN STANFORD TO THE DIX RIVER

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

2,100,000

7,500,000

6,500,000

24,300,000

0 0 0 2,100,000 7,500,000 6,500,000 24,300,000

80009

Total for LINCOLN county PL

Total Amounts:

CN

UT

RW

DN 100,000

50,000

917,000

475,000

1,500,000

1,250,000

1,950,000 3,747,000

2,100,000

3,250,000

12,220,000

3,000,000

7,080,000

11,000,000

24,300,000

1,067,000 5,175,000 3,747,000 5,350,000 15,220,000 18,080,000 24,300,000

202

Page 203: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LIVINGSTON US-60 RELOCATION(O) PADUCAH-HENDERSON; RELOCATE US-60 FROM EAST OF THE TENNESSEE RIVER BRIDGE TO EAST OF RUDD-SPEES ROAD (00CCR)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,580,000

1,560,000

0 0 0 3,140,000 0 0 0

330

LIVINGSTON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70 070B00017N.

PL

Project Cost:

CN

UT

RW

DN

BR 16,000,000

0 16,000,000 0 0 0 0 0

1142

LIVINGSTON US-60 PREFINANCD CONVRSN(O)

ADDRESS DEFICIENCIES OF BRIDGE ON US 60 OVER THE CUMBERLAND RIVER 0.27 MILE N OF KY 70 (SR 32.7) 070B00017N (ADDITIONAL FUNDING FOR C PHASE)

PL

Project Cost:

CN

UT

RW

DN

BR 16,000,000

0 0 16,000,000 0 0 0 0

1142.01

LIVINGSTON I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 29.543 TO MILEPOINT 33.88

PL

Project Cost:

CN

UT

RW

DN PM

PM

350,000

3,500,000

0 0 0 0 0 3,850,000 0

20007

LIVINGSTON KY-453 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-453 FROM MILEPOINT 0.00 TO MILEPOINT 4.57

PL

Project Cost:

CN

UT

RW

DN

PM 879,000

0 0 0 0 879,000 0 0

20030

203

Page 204: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for LIVINGSTON county PL

Total Amounts:

CN

UT

RW

DN

16,000,000 16,000,000

1,580,000

1,560,000

3,500,000

350,000

879,000

0 16,000,000 16,000,000 3,140,000 879,000 3,850,000 0

LOGAN KY-2349 SAFETY(P) IMPROVE SAFETY BY IMPROVING SIGHT LINES CROSSING RAILROAD BETWEEN STOCKYARDS AND INDUSTRIAL PARK

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

150,000

100,000

150,000

850,000

0 0 0 150,000 250,000 850,000 0

8908

LOGAN US-79 AM-BRIDGE (P) IMPROVE SAFETY AND BRIDGE CONDITION ON WHIPPORWILL CREEK BRIDGE NEAR KY-1151. BRIDGE ID 071B00025 (SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

250,000

1,715,000

0 250,000 1,715,000 0 0 0 0

10010

LOGAN US-79 MINOR WIDENING(O) WIDEN US-79 TO 3 LANES FROM TODD COUNTY LINE TO INTERSECTION WITH RUSSELLVILLE BYPASS.

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

4,300,000

6,500,000

10,700,000

28,100,000

0 0 0 4,300,000 6,500,000 10,700,000 28,100,000

80050

Total for LOGAN county PL

Total Amounts:

CN

UT

RW

DN 250,000

1,715,000

4,450,000

6,600,000

150,000

850,000

10,700,000

28,100,000

0 250,000 1,715,000 4,450,000 6,750,000 11,550,000 28,100,000

204

Page 205: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LYON I-24 WEIGH STA REHAB(P)ADD RESTROOM FACILITY TO I-24 EASTBOUND & WESTBOUND WEIGH STATIONS IN LYON COUNTY (DESIGN FUNDS AUTHORIZED UNDER ITEM NO99-44.00)

PL

Project Cost:

CN

UT

RW

DN

NH 1,900,000

0 0 0 0 0 1,900,000 0

7

LYON US-641 RELOCATION(O) RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THE LYON/CALDWELL COUNTY LINE.

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

2,500,000

2,000,000

500,000

6,000,000

0 2,500,000 2,500,000 0 6,000,000 0 0

187.5

LYON US-641 PREFINANCD CONVRSN(O)

RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THE LYON/CALDWELL COUNTY LINE.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

2,000,000

500,000

6,000,000

0 0 0 2,500,000 0 6,000,000 0

187.51

LYON US-641 PREFINANCD CONVRSN(O)

RELOCATE US-641 FROM US-62 NEAR EDDYVILLE TO SOUTH OF THE LYON/CALDWELL COUNTY LINE. (ADDITIONAL FUNDING FOR 1-187.50)

PL

Project Cost:

CN

UT

RW

DN

NH 6,000,000

0 0 0 0 0 0 6,000,000

187.52

LYON US-641 RELOCATION(O) RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES.

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

STP

1,800,000

2,000,000

800,000

7,500,000

0 1,800,000 2,800,000 0 7,500,000 0 0

187.6

205

Page 206: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LYON US-641 PREFINANCD CONVRSN(O)

RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

STP

2,000,000

800,000

7,500,000

0 0 0 2,800,000 0 7,500,000 0

187.61

LYON US-641 PREFINANCD CONVRSN(O)

RELOCATE US-641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 4.5 MILES. (ADDITIONAL FUNDING FOR 1-187.60)

PL

Project Cost:

CN

UT

RW

DN

STP 7,500,000

0 0 0 0 0 0 7,500,000

187.62

LYON I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 33.988 TO MILEPOINT 45.133

PL

Project Cost:

CN

UT

RW

DN PM

PM

900,000

9,000,000

0 0 0 0 0 0 9,900,000

20008

LYON I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 45.133 TO MILEPOINT 51.886

PL

Project Cost:

CN

UT

RW

DN PM

PM

270,000

2,700,000

0 0 2,970,000 0 0 0 0

20009

LYON I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 45.171 TO MILEPOINT 51

PL

Project Cost:

CN

UT

RW

DN PM

PM

300,000

3,000,000

0 0 0 0 0 0 3,300,000

20010

206

Page 207: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

LYON I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 BOTH DIRECTION(S) FROM MILEPOINT 51.89 (51.0 NON-CARDINAL) TO MILEPOINT 54.862

PL

Project Cost:

CN

UT

RW

DN PM

PM

400,000

4,000,000

0 0 0 0 0 0 4,400,000

20011

Total for LYON county PL

Total Amounts:

CN

UT

RW

DN 4,300,000 270,000

4,000,000

1,300,000

2,700,000

4,000,000

1,300,000

15,400,00013,500,000

1,600,000

29,500,000

0 4,300,000 8,270,000 5,300,000 13,500,000 15,400,000 31,100,000

MADISON -0 NEW ROUTE(O) CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TO KY-21. (2004BOPC)(08CCR)(12CCR) PHASE 1 - BEREA BYPASS FROM US-25 TO KY-1016.

PL

Project Cost:

CN

UT

RW

DN

SPP 12,000,000

0 12,000,000 0 0 0 0 0

192.2

MADISON -0 NEW ROUTE(O) CONSTRUCT 4-LANE BEREA BYPASS SECTION 2; FROM 150' EAST OF US-25, SE TO KY-21. (2004BOPC)(08CCR)(12CCR) PHASE 2 - BEREA BYPASS FROM KY-1016 TO KY-21.

PL

Project Cost:

CN

UT

RW

DN

SPP 12,000,000

0 0 0 12,000,000 0 0 0

192.21

MADISON KY-52 RECONSTRUCTION(O)IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

4,000,000

4,000,000

4,000,000

0 4,000,000 8,000,000 0 0 0 0

235

207

Page 208: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MADISON KY-52 RECONSTRUCTION(O)IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 9,000,000

0 0 0 9,000,000 0 0 0

235.1

MADISON KY-52 RECONSTRUCTION(O)IMPROVE KY-52 FROM WALLACE MILL ROAD TO INTERSTATE 75 AT THE DUNCANNON ROAD INTERCHANGE. (02CCR)(12CCN)(14CCR) (DESIGN/BUILD)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 10,000,000

0 0 0 0 10,000,000 0 0

235.2

MADISON KY-595 SCOPING STUDY(O) COMPREHENSIVE TRAFFIC STUDY FOR INTERSECTION OF MAIN STREET AND BEREA COLLEGE CAMPUS, BEREA. (2005HPP-KY112)(MOA WITH BEREA). (16CCR)(LET BY CITY)

PL

Project Cost:

CN

UT

RW

DN

HPP 266,952

266,952 0 0 0 0 0 0

236

MADISON US-25 MAJOR WIDENING(O) WIDEN US-25 FROM US-421 NORTH TO KY-876. STATE TO PROVIDE DESIGN AND PLANS, AND FUNDS FOR THIS PROJECT ARE REQUESTED TO BE PAID TO THE MADISON COUNTY FISCAL

PL

Project Cost:

CN

UT

RW

DN

HPP 719,921

719,921 0 0 0 0 0 0

251.01

MADISON US-25 MAJOR WIDENING(O) PRIORITY SECTION II & III: WIDEN US-FROM US-421 TO PUMPKIN RUN.(SEE 7-251.10 FOR SEC III UTIL & CONST) (2006BOPC)(08CCR)(10CCR)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 3,750,000

0 0 0 0 0 0 3,750,000

251.4

208

Page 209: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MADISON US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON BATTLEFIELD MEMORIAL HWY (US 421) OVER COWBELL CREEK AT JCT WITH HIGHWAY 21 E (KY 21)076B00021

PL

Project Cost:

CN

UT

RW

DN

BR

BR

BR

90,000

90,000

625,000

805,000 0 0 0 0 0 0

1130

MADISON CR-1158 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD HAYS FORK LN (CR 1158) OVER BRANCH OF HAYS FORK 0.2 MILE SE OF BATTLEFIELD MEMORIAL HWY (US 421) 076C00023N

PL

Project Cost:

CN

UT

RW

DN

BR 336,000

0 336,000 0 0 0 0 0

1131

MADISON KY-3376 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER TERRILL BRANCH ROAD ON KY 3376 IN BEREA 200 FT N OF PEACHTREE DRIVE (CS 2072).(076B00085N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

857,500

0 210,000 857,500 0 0 0 0

1137

MADISON CR-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1017 (3.405) OVER MUDDY CREEK076C00004N (SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

190,000

420,000

0 190,000 420,000 0 0 0 0

1142

MADISON CR-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1044 (0.007) OVER BR OF MUDDY CREEK. 076C00066N

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

455,000

0 210,000 455,000 0 0 0 0

1143

209

Page 210: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MADISON KY-627 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75. (INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 5,000,000

5,000,000 0 0 0 0 0 0

8403

MADISON KY-627 PREFINANCD CONVRSN(O)

IMPROVE SAFETY AND REDUCE CONGESTION AT THE KY-627 BRIDGE OVER I-75. (INCLUDES 7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 5,000,000

0 5,000,000 0 0 0 0 0

8403.01

MADISON US-25 SAFETY(P) IMPROVE ROADWAY, SIDEWALKS, AND BIKE PATHS ON US-25 BETWEEN ELLIPSE STREET TO GLADES ROAD AND THEN CONTINUES ON TO THE BEREA BYPASS. (08CCN)(10CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 7,200,000

7,200,000 0 0 0 0 0 0

8505

MADISON KY-2881 SPOT IMPROVEMENTS(O)

PROPOSED ROADWAY IMPROVEMENTS FROM DUNCANNON RD TO THE MADISON CO AIRPORT TO INCLUDE CALEAST RD (KY 2881 MP.783-MP 2.780), JOHN BALLARD RD

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

500,000

2,700,000

9,000,000

0 1,000,000 500,000 2,700,000 9,000,000 0 0

8853

MADISON KY-1984 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1984 BRIDGE OVER TATES CREEK. (076B00071N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

665,000

0 210,000 665,000 0 0 0 0

10001

210

Page 211: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MADISON CR-1056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD BRIDGE OVER E. FK. OTTER CREEK. (076C00011N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

665,000

0 210,000 665,000 0 0 0 0

10002

MADISON I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 73.408 TO MILEPOINT 83.4

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,200,000

12,000,000

0 0 0 13,200,000 0 0 0

20017

Total for MADISON county PL

Total Amounts:

CN

UT

RW

DN90,000

90,000

13,811,873

2,030,000

4,000,000

17,336,000

500,000

4,000,000

7,062,500

1,200,000

2,700,000

33,000,000 19,000,000 3,750,000

13,991,873 23,366,000 11,562,500 36,900,000 19,000,000 0 3,750,000

MAGOFFIN KY-9009 MAJOR WIDENING(O) MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).

PL

Project Cost:

CN

UT

RW

DN

NH 15,000,000

0 15,000,000 0 0 0 0 0

126.4

MAGOFFIN KY-9009 PREFINANCD CONVRSN(O)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).

PL

Project Cost:

CN

UT

RW

DN

NH 10,000,000

0 0 10,000,000 0 0 0 0

126.41

211

Page 212: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MAGOFFIN KY-9009 PREFINANCD CONVRSN(O)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).

PL

Project Cost:

CN

UT

RW

DN

NH 30,000,000

0 0 0 30,000,000 0 0 0

126.42

MAGOFFIN KY-9009 PREFINANCD CONVRSN(O)

MOUNTAIN PARKWAY CORRIDOR: WIDEN THE MOUNTAIN PARKWAY TO LANES FROM 0.3MI W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE FORK LICKING RIVER BRIDGE (69.6).

PL

Project Cost:

CN

UT

RW

DN

NH 25,000,000

0 0 0 0 25,000,000 0 0

126.43

MAGOFFIN US-460 RECONSTRUCTION(O)IMPROVE US-460 IN MAGOFFIN COUNTY AT IVY POINT HILL WEST OF SALYERSVILLE. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

1,660,000

220,000

2,490,000

0 0 0 0 1,880,000 0 2,490,000

8901

MAGOFFIN KY-1635 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1635 BRIDGE OVER OAKLEY CREEK. (077B00029N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

595,000

0 140,000 595,000 0 0 0 0

10002

MAGOFFIN KY-30 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-30 BRIDGE OVER LICKING RIVER. (077B00059N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

945,000

0 175,000 945,000 0 0 0 0

10003

212

Page 213: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MAGOFFIN KY-3049 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3049 BRIDGE OVER JOHNSON CREEK. (077B00069N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

402,500

0 175,000 402,500 0 0 0 0

10014

MAGOFFIN CR-1032 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE BRANCH BRIDGE OVER STATE ROAD FORK. (077C00036N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

437,500

0 175,000 437,500 0 0 0 0

10015

MAGOFFIN KY-9009 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 63.123 TO MILEPOINT 69.98

PL

Project Cost:

CN

UT

RW

DN PM

PM

400,000

4,000,000

0 0 4,400,000 0 0 0 0

20000

MAGOFFIN US-460 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-460 FROM MILEPOINT 14.57 TO MILEPOINT 20.37

PL

Project Cost:

CN

UT

RW

DN

PM 1,485,000

0 0 0 0 1,485,000 0 0

20013

Total for MAGOFFIN county PL

Total Amounts:

CN

UT

RW

DN 665,000

15,000,000

400,000

16,380,000 30,000,000

1,660,000

220,000

26,485,000 2,490,000

0 15,665,000 16,780,000 30,000,000 28,365,000 0 2,490,000

213

Page 214: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MARION KY-49 SPOT IMPROVEMENTS(O)

SPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO MP 21.830) AS PER THE KY-49 PLANNING STUDY. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

800,000

700,000

2,400,000

0 0 800,000 700,000 0 2,400,000 0

8802

MARION KY-49 SPOT IMPROVEMENTS(O)

IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON KY-49 NEAR SOUTHERN KY-52 INTERSECTION. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,300,000

0 0 3,300,000 0 0 0 0

8803

MARION KY-84 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 84 OVER HARDINS CREEK. (16CCN)(078B00025N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

94,500

616,000

94,500 616,000 0 0 0 0 0

8914

MARION KY-55 RECONSTRUCTION(O)HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TO BOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

350,000

350,000

5,000,000

0 700,000 0 0 5,000,000 0 0

8916

MARION KY-55 PREFINANCD CONVRSN(O)

HEARTLAND PARKWAY: IMPROVE MOBILITY FROM THE LEBANON BYPASS TO BOOKER ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

NH 4,000,000

0 0 0 0 0 4,000,000 0

8916.01

214

Page 215: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MARION US-68 MAJOR WIDENING(O) HEARTLAND PARKWAY: MARION/TAYLOR LINE TO LEBANON BYPASS

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

600,000

900,000

900,000

11,000,000

0 0 0 600,000 0 900,000 11,900,000

8917

MARION CR-1127 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE OAK CRK RD BRIDGE OVER WHITE OAK CREEK. (078C00035N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

98,000

217,000

0 98,000 217,000 0 0 0 0

10003

Total for MARION county PL

Total Amounts:

CN

UT

RW

DN 94,500 98,000

350,000

350,000

616,000

800,000

3,517,000

600,000

700,000

6,400,000

900,000

5,000,000

900,000

11,000,000

94,500 1,414,000 4,317,000 1,300,000 5,000,000 7,300,000 11,900,000

MARSHALL US-62 MAJOR WIDENING(O) IMPROVE ACCESS AND REDUCE CONGESTION ON US-62 FROM KY-95 TO THE EXISTING FOUR-LANE HIGHWAY AT LONE VALLEY RD NEAR I-24 INTERCHANGE AND FUTURE I-69

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

750,000

250,000

500,000

3,500,000

0 0 0 750,000 0 750,000 3,500,000

398

MARSHALL KY-1949 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1949 BRIDGE OVER SMITH CREEK. (079B00110N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

250,000

455,000

0 250,000 0 455,000 0 0 0

10003

215

Page 216: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MARSHALL I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 17.32 TO MILEPOINT 29.14

PL

Project Cost:

CN

UT

RW

DN PM

PM

950,000

9,500,000

0 0 0 0 0 10,450,000 0

20013

MARSHALL US-641 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

75,000

750,000

0 825,000 0 0 0 0 0

20016

Total for MARSHALL county PL

Total Amounts:

CN

UT

RW

DN 325,000

750,000

750,000

455,000 9,500,000

950,000

250,000

500,000

3,500,000

0 1,075,000 0 1,205,000 0 11,200,000 3,500,000

MARTIN KY-40 RECONSTRUCTION(O)IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUST BEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES BEFORE GORDON HOLLOW ROAD,

PL

Project Cost:

CN

UT

RW

DN

SPP 1,460,000

0 0 0 0 0 0 1,460,000

192

MARTIN CR-1324 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES ON PR-1015 OVER ROCKCASTLE CREEK (C26) 275 FEET WEST JCT. KY-3 JUST SOUTH OF CROOKED RUN ROAD. (080C00026N)

PL

Project Cost:

CN

UT

RW

DN

BR 60,000

60,000 0 0 0 0 0 0

1092

216

Page 217: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MARTIN CR-1215 AM-BRIDGE (P) SETSER BRANCH ROAD BRIDGE AND APPROACHES OVER MIDDLE FORK OF ROCKCASTLE CREEK (C43) (OFF NHS) (FD04) (2000BOP): (080C00043N)

PL

Project Cost:

CN

UT

RW

DN

SPP 350,000

0 0 0 0 0 0 350,000

4093

MARTIN CR-1120 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WILLIS DIALS RD BRIDGE OVER PIGEONROOST FORK. (080C00053N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

467,880

0 157,500 467,880 0 0 0 0

10023

MARTIN KY-645 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-645 FROM MILEPOINT 0.00 TO MILEPOINT 6.11

PL

Project Cost:

CN

UT

RW

DN

PM 2,015,000

0 0 0 0 2,015,000 0 0

20006

Total for MARTIN county PL

Total Amounts:

CN

UT

RW

DN

60,000

157,500

467,880 2,015,000 1,810,000

60,000 157,500 467,880 0 2,015,000 0 1,810,000

MASON US-68 NEW ROUTE(O) NEW FULLY CONTROLLED ACCESS ROUTE FROM US 68 NEAR WASHINGTON EAST TO KY 11 INCLUDING A NEW I-CHNG AT KY 11. (PRIORITY SECTION)(2004BOPC)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

780,000

1,580,000

1,820,000

32,450,000

0 0 0 780,000 0 3,400,000 32,450,000

147.2

217

Page 218: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MASON US-68 NEW ROUTE(O) NEW FULLY CONTROLLED ACCESS ROUTE FROM KY 11 NORTHEAST TO KY 9 (AA HWY) INCLUDING NEW I-CHNG AT KY 9. (2004BOPC)(06CCR)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

780,000

1,580,000

1,820,000

33,750,000

0 0 0 780,000 3,400,000 0 33,750,000

147.6

MASON US-68 AM-BRIDGE (P) REPAIR BRIDGE ON US 68 OVER LAWRENCE CREEK 0.13 MI SW OF KY 3056. (081B00067N)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

BR 1,400,000

1,400,000 0 0 0 0 0 0

1095

MASON KY-3056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 3056 OVER SOUTH FORK LAWRENCE CREEK. (16CCN)(081B00020N)

PL

Project Cost:

CN

UT

RW

DN

BR 1,120,000

0 0 1,120,000 0 0 0 0

8906

MASON CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON DAVIS LANE. (16CCN)(081C00022N)

PL

Project Cost:

CN

UT

RW

DN

BR 875,000

0 0 875,000 0 0 0 0

8910

MASON CR-1019 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON KENNEDY CREEK ROAD. (16CCN)(081C00009N)

PL

Project Cost:

CN

UT

RW

DN

BR 560,000

0 0 560,000 0 0 0 0

8911

218

Page 219: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MASON CR-1122 AM-BRIDGE (P) REPAIR BRIDGE (081C00018N) ON DIXIE PIKE. (16CCN)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 60,000

60,000 0 0 0 0 0 0

8916

MASON US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON WILLIAM HARSHA BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH OHIO. (081B00069N)(BSBP)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

100,000

2,800,000

0 100,000 2,800,000 0 0 0 0

10013

MASON US-68 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

825,000

8,250,000

0 0 9,075,000 0 0 0 0

20011

Total for MASON county PL

Total Amounts:

CN

UT

RW

DN

1,460,000

100,000 825,000

13,605,000

1,560,000

1,580,000

1,820,000

1,580,000

1,820,000

66,200,000

1,460,000 100,000 14,430,000 1,560,000 3,400,000 3,400,000 66,200,000

MCCRACKEN I-24 AM-BRIDGE (P) I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH (B100); JOINT PROJECT WITH ILLINOIS TO MITIGATE SCOUR (073B00100N)(BSBP)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 260,000

0 0 260,000 0 0 0 0

2

219

Page 220: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MCCRACKEN US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,320,000

2,710,000

0 1,320,000 0 0 2,710,000 0 0

115.1

MCCRACKEN US-60 PREFINANCD CONVRSN(O)

PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM BETHEL CHURCH ROAD TO KY-1154 (MARTIN MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).(10CCR)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 1,320,000

0 1,320,000 0 0 0 0 0

115.11

MCCRACKEN US-62 MAJOR WIDENING(O) MAJOR WIDENING OF US-62 FROM KY-998 TO PADUCAH INFORMATION AGE PARK. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

2,340,000

5,740,000

0 2,340,000 0 5,740,000 0 0 0

152

MCCRACKEN KY-1286 RECONSTRUCTION(O)IMPROVE KY-1286 (FRIENDSHIP ROADFROM MP 3.6 TO MP 6.4 IN PADUCAH. (PRELIMINARY ENGINEERING) (12CCR(14CCR)(16CCN)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,500,000

2,480,000

2,310,000

10,000,000

0 1,500,000 2,480,000 0 0 0 12,310,000

153

MCCRACKEN US-60 I-CHANGE RECONST(O)

CONSTRUCT A DOUBLE-CROSSOVER DIAMOND INTERCHANGE ON US-60 AT THE I-24 INTERCHANGE NEAR KENTUCKY OAKS MALL.

PL

Project Cost:

CN

UT

RW

DN

NH 3,960,000

0 3,960,000 0 0 0 0 0

154

220

Page 221: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MCCRACKEN KY-1954 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BOTTOM DITCH ON KY 1954 0.7 MILE NORTH OF KY 348 (073B00096N) .

PL

Project Cost:

CN

UT

RW

DN

BR 574,000

0 0 574,000 0 0 0 0

1152

MCCRACKEN KY-994 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF BOTTOM DITCH ON KY 994 0.8 MI NW OF KY 348 (073B00015N)(EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

168,000

791,000

0 168,000 791,000 0 0 0 0

1154

MCCRACKEN KY-305 NEW ROUTE(O) NEW ACCESS ROAD FROM KY-305 NEAR KY-998, EXTENDING WEST TO THE OHIO RIVER MEGAPARK. (2-LANE INITIAL, 4-LANE ULTIMATE)(12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

4,200,000

3,250,000

16,230,000

0 0 0 4,200,000 0 3,250,000 16,230,000

8702

MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-24 BRIDGE OVER OHIO RIVER. JOINT PROJECT WITH ILLINOIS. (073B00100N(BSBP)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 2,000,000

0 0 2,000,000 0 0 0 0

10006

MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH BRIDGE LIGHTING ON I-24 BRIDGE OVER THE OHIO RIVER. JOINT PROJECT WITH ILLINOIS. (073B000100N)(BSBP)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 375,000

0 375,000 0 0 0 0 0

10007

221

Page 222: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MCCRACKEN KY-339 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 339 BRIDGE OVER MASSAC CREEK. (073B00058N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

892,500

0 210,000 892,500 0 0 0 0

10012

MCCRACKEN I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-024 BOTH DIRECTION(S) FROM MILEPOINT 16.172 TO MILEPOINT 17.32

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 0 0 0 0 1,100,000 0

20017

MCCRACKEN US-45 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

1,000,000

0 1,100,000 0 0 0 0 0

20019

MCCRACKEN US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-60 FROM MILEPOINT 2.22 TO MILEPOINT 7.70

PL

Project Cost:

CN

UT

RW

DN

PM 853,000

0 0 0 0 853,000 0 0

20031

Total for MCCRACKEN county PL

Total Amounts:

CN

UT

RW

DN 1,978,000

2,640,000

2,340,000

5,335,000

2,480,000

4,517,500

4,200,000

5,740,000

2,710,000

1,000,000

100,000

3,250,000

853,000

2,310,000

26,230,000

0 12,293,000 6,997,500 9,940,000 3,563,000 4,350,000 28,540,000

222

Page 223: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MCCREARY KY-92 RELOCATION(O) IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)

PL

Project Cost:

CN

UT

RW

DN

STP 8,000,000

0 8,000,000 0 0 0 0 0

261.3

MCCREARY KY-92 PREFINANCD CONVRSN(O)

IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)

PL

Project Cost:

CN

UT

RW

DN

STP 7,000,000

0 0 7,000,000 0 0 0 0

261.31

MCCREARY KY-92 PREFINANCD CONVRSN(O)

IMPROVE KY-92 FROM WEST OF KY-592 TO EAST OF THE WHITLEY/MCCREARY COUNTY LINE (SECTION 2).(2014BOP)(SAME AS 11-184.20)

PL

Project Cost:

CN

UT

RW

DN

STP 9,000,000

0 0 0 9,000,000 0 0 0

261.32

MCCREARY CR-1239 AM-BRIDGE (P) BRIDGE OVER ROCK CREEK ON OLD FIDELITY-BELL FARM ROAD (CR 1239) 0.25 MI W OF ROCK CREEK ROAD (CR 1236) (074C00008N)(SR=22)

PL

Project Cost:

CN

UT

RW

DN BR

BR

196,000

448,000

0 196,000 448,000 0 0 0 0

1065

MCCREARY KY-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1044 BRIDGE OVER MARSH CREEK. (074B00023N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

451,500

0 175,000 451,500 0 0 0 0

10002

223

Page 224: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MCCREARY KY-700 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-700 BRIDGE OVER INDIAN CREEK. (074B00026N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

1,155,000

0 210,000 1,155,000 0 0 0 0

10003

MCCREARY KY-478 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-478 BRIDGE OVER MARSH CREEK. (074B00027N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

521,500

0 175,000 521,500 0 0 0 0

10004

Total for MCCREARY county PL

Total Amounts:

CN

UT

RW

DN 756,000

8,000,000 9,576,000 9,000,000

0 8,756,000 9,576,000 9,000,000 0 0 0

MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OVERFLOW STRUCTURE ON US-431 AT THE MUHLENBERG-MCLEAN CO LINE B00056N.

PL

Project Cost:

CN

UT

RW

DN

BR 2,500,000

2,500,000 0 0 0 0 0 0

1078

MCLEAN KY-2385 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BRANCH OF POND DRAIN CREEK ON KY 2385 0.9 MI SW OF KY 81 (075B00066N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

308,000

784,000

0 308,000 784,000 0 0 0 0

1090

224

Page 225: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MCLEAN US-431 SPOT IMPROVEMENTS(O)

SPOT IMPROVEMENTS AT THE INTERSECTION OF US-431 AND KY-250. (08CCN)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

200,000

180,000

500,000

0 380,000 500,000 0 0 0 0

8400

MCLEAN KY-56 RECONSTRUCTION(O)CORRECT LINE OF SIGHT WITH INTERSECTION OF KY 56 & KY 1233. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 450,000

0 0 450,000 0 0 0 0

8852

MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US-431 BRIDGE OVER DRAIN TO CYPRESS CREEK. (075B00019N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

3,010,000

0 280,000 3,010,000 0 0 0 0

10007

MCLEAN KY-81 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-81 BRIDGE OVER SLOUGH. (075B00026N

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

892,500

0 245,000 892,500 0 0 0 0

10008

Total for MCLEAN county PL

Total Amounts:

CN

UT

RW

DN

2,500,000

833,000

200,000

180,000

5,636,500

2,500,000 1,213,000 5,636,500 0 0 0 0

225

Page 226: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MEADE KY-823 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CULVERT OVER UNNAMED STREAM ON KY 823 0.5 MILE WEST OF KY 2734.(082B00008N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

105,000

560,000

0 105,000 560,000 0 0 0 0

1088

MEADE KY-79 RECONSTRUCTION(O)RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,040,000

3,250,000

1,770,000

11,410,000

0 0 0 1,040,000 0 3,250,000 13,180,000

8702

MEADE KY-79 RECONSTRUCTION(O)RECONSTRUCT KY 79 FROM KY 144 TO KY 1051. (12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

2,030,000

13,530,000

0 0 0 2,030,000 0 13,530,000 0

8705

Total for MEADE county PL

Total Amounts:

CN

UT

RW

DN 105,000

560,000

1,040,000

2,030,000

13,530,000

3,250,000

1,770,000

11,410,000

0 105,000 560,000 3,070,000 0 16,780,000 13,180,000

MENIFEE KY-77 FOREST HIGHWAY(P) RESURFACING AND WIDENING EXISTING GRAVEL PARKING PULL-OFFS AND INSTALLATION OF GUARDRAIL ALONG KY 77 AND KY 715 IN THE RED RIVER GORGE AREA IN

PL

Project Cost:

CN

UT

RW

DN

FH 765,000

765,000 0 0 0 0 0 0

371

226

Page 227: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 NORTH OF THE LONG BOW BOAT RAMP IN MENIFEE COUNTY. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

FH

FH

FH

100,000

100,000

2,625,000

2,825,000 0 0 0 0 0 0

372

MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY 1274 SOUTH OF THE MENIFEE/ROWAN COUNTY LINE. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

FH

FH

FH

250,000

250,000

4,010,000

4,510,000 0 0 0 0 0 0

373

MENIFEE US-460 SAFETY(P) IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELL HILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

2,180,000

1,000,000

6,020,000

0 0 3,180,000 6,020,000 0 0 0

8802

MENIFEE US-460 PREFINANCD CONVRSN(O)

IMPROVE SAFETY AND GEOMETRICS ON US-460 FROM THE END OF ROTHWELL HILL IMPROVEMENTS TO THE BRIDGE OVER BEAVER CREEK. (14CCN)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 6,020,000

0 0 0 0 6,020,000 0 0

8802.01

Total for MENIFEE county PL

Total Amounts:

CN

UT

RW

DN350,000

350,000

7,400,000

2,180,000

1,000,000

6,020,000 6,020,000

8,100,000 0 3,180,000 6,020,000 6,020,000 0 0

227

Page 228: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MERCER US-127 SAFETY(P) SAFETY IMPROVEMENTS ON US 127 SALVISA. (14CCN)

PL

Project Cost:

CN

UT

RW

DN SPP 200,000

0 200,000 0 0 0 0 0

8858

MERCER KY-1941 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1941 BRIDGE OVER CHAPLIN RIVER. (084B00030N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

300,000

682,000

0 300,000 682,000 0 0 0 0

10003

MERCER CR-1322 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRATTON RD BRIDGE OVER BRUSH CREEK. (084C00029N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

595,000

0 192,500 595,000 0 0 0 0

10004

Total for MERCER county PL

Total Amounts:

CN

UT

RW

DN 692,500

1,277,000

0 692,500 1,277,000 0 0 0 0

METCALFE KY-496 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER OIL WELL BRANCH ON KY 496 0.5 MILE SE OF KY 533.(085B00025N) EBRP)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

287,000

0 175,000 287,000 0 0 0 0

1087

228

Page 229: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

METCALFE KY-163 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND APPROACHES OVER ROGERS CREEK AT MP 7.307. (DESIGN HANDLED UNDER 3-8506.00) 085B00010N (2014BOP)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 3,000,000

3,000,000 0 0 0 0 0 0

8506.2

METCALFE US-68 SCOPING STUDY(O) SPOT IMPROVEMENTS ON US-68 FROM THE CUMBERLAND PARKWAY TO THE GREEN/METCALFE COUNTY LINE.(12CCN)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

775,000

970,000

8,650,000

0 0 0 775,000 970,000 8,650,000 0

8706

METCALFE KY-163 RECONSTRUCTION(O)RECONSTRUCT KY 163 AS A NEW ROUTE ON THE WEST SIDE OF EDMONTON FROM KY 163 AT GARY BELL RD (MP 10.0) S OF EDMONTON, CROSSING US 68 (STOCKTON ST)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,000,000

3,000,000

2,190,000

11,945,000

0 0 1,000,000 3,000,000 2,190,000 11,945,000 0

8859

METCALFE KY-163 CONGESTION MITIGTN(O)

IMPROVE HIGHWAY SAFETY AND SYSTEMS MOBILITY IN THE KY 163 CORRIDOR BETWEEN KY 90 (MP 2.907AND THE PROPOSED WEST EDMONTON BYPASS (MP 9.777)

PL

Project Cost:

CN

UT

RW

DN SPP 2,500,000

0 0 0 2,500,000 0 0 0

8955

METCALFE KY-1243 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1243 BRIDGE OVER KNOB LICK SPRINGS. (085B00034N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

262,500

0 157,500 262,500 0 0 0 0

10005

229

Page 230: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

METCALFE CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOSBY RIDGE RD BRIDGE OVER E FORK LITTLE BARREN RVR. (085C00005N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

896,000

0 210,000 896,000 0 0 0 0

10006

METCALFE LN-9008 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 22.357 TO MILEPOINT 36.16

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,100,000

11,000,000

0 0 0 12,100,000 0 0 0

20013

Total for METCALFE county PL

Total Amounts:

CN

UT

RW

DN

3,000,000

542,500 1,000,000

1,445,500

3,600,000

3,775,000

11,000,000

3,160,000

20,595,000

3,000,000 542,500 2,445,500 18,375,000 3,160,000 20,595,000 0

MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2019.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 444,000

0 444,000 0 0 0 0 0

128.1

MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2020.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 444,000

0 0 444,000 0 0 0 0

128.11

230

Page 231: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2021.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 444,000

0 0 0 444,000 0 0 0

128.12

MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2022.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 444,000

0 0 0 0 444,000 0 0

128.13

MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 444,000

0 0 0 0 0 444,000 0

128.14

MONROE KY-214 FERRY OPERATION(P)OPERATION OF TURKEY NECK BEND FERRY FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 444,000

0 0 0 0 0 0 444,000

128.15

MONROE -0 NEW ROUTE(O) CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACING ONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BE SUPPLEMENTAL TO THE

PL

Project Cost:

CN

UT

RW

DN

STP 730,000

0 730,000 0 0 0 0 0

7020.17

231

Page 232: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MONROE -0 PREFINANCD CONVRSN(O)

CONSTRUCT NEW ROUTE FOR THE EAST TOMPKINSVILLE BYPASS "SURFACING ONLY". (98CCN)(02CCR) (2002BOPC)(DESIGN "STP" FUNDING SHALL BE SUPPLEMENTAL TO THE

PL

Project Cost:

CN

UT

RW

DN

STP 6,580,000

0 0 6,580,000 0 0 0 0

7020.18

MONROE KY-100 BRIDGE REPLACEMENT(P)

REPLACE BRIDGE ON KY-100 BETWEEN MP 14.7 AND 14.9

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

250,000

150,000

500,000

700,000

0 250,000 650,000 700,000 0 0 0

80003

Total for MONROE county PL

Total Amounts:

CN

UT

RW

DN 250,000

1,174,000

150,000

500,000

7,024,000 1,144,000 444,000444,000 444,000

0 1,424,000 7,674,000 1,144,000 444,000 444,000 444,000

MONTGOMERY KY-1991 MAJOR WIDENING(O) WIDEN KY 1991 FROM MAYSVILLE ROAD TO MIDLAND TRAIL INDUSTRIAL PARK, MONTGOMERY COUNTY (SEE 7-8501.00 FOR "SPB" FUNDS)(2005HPP-KY129)

PL

Project Cost:

CN

UT

RW

DN

HPP 559,899

559,899 0 0 0 0 0 0

240.01

MONTGOMERY US-460 RECONSTRUCTION(O)IMPROVE US-460 AT LUCKY STOP HILL. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 9,450,000

9,450,000 0 0 0 0 0 0

250.1

232

Page 233: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MONTGOMERY KY-1991 MINOR WIDENING(O) UPGRADE HINKSTON PIKE IN MT. STERLING FROM NEW MIDLAND TRAIL TO THE NEW INDUSTRIAL PARK ENTRANCE (INCLUDES EXTENSION OF INDUSTRIAL ACCESS ROAD TO

PL

Project Cost:

CN

UT

RW

DN

SPP 4,010,000

0 4,010,000 0 0 0 0 0

411

MONTGOMERY US-60 MAJOR WIDENING(O) WIDEN EXISTING PAVEMENT AND IMPROVE VERTICAL AND HORIZONTAL CURVES FROM EXISTING MOUNT STERLING BYPASS (KY 686) TO 500' WEST OF BENTBROOK SUBDIVISION.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

800,000

1,500,000

1,500,000

8,000,000

0 0 800,000 0 3,000,000 0 8,000,000

8810

MONTGOMERY I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 104.26 TO MILEPOINT 112.

PL

Project Cost:

CN

UT

RW

DN PM

PM

650,000

6,500,000

0 0 0 0 0 0 7,150,000

20018

Total for MONTGOMERY county PL

Total Amounts:

CN

UT

RW

DN

10,009,899 4,010,000

800,000

1,500,000

1,500,000

650,000

14,500,000

10,009,899 4,010,000 800,000 0 3,000,000 0 15,150,000

MORGAN KY-7 RECONSTRUCTION(O)RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN WEST LIBERTY BEGINNING AT RIVERSIDE DR. (CS 1058) AND EXTENDING NORTH TO 0.159 MILES NORTH OF INTERSECTION WITH CEDAR

PL

Project Cost:

CN

UT

RW

DN

STP 3,300,000

3,300,000 0 0 0 0 0 0

293.1

233

Page 234: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WHITE OAK CREEK ON US 460 0.5 MILE NW OF KY 1000. (088B00021N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

224,000

1,239,000

0 224,000 1,239,000 0 0 0 0

1111

MORGAN KY-2498 RECONSTRUCTION(O)IMPROVE KY-2498 FROM US-460 TO THE ARH HOSPITAL. (14CCN)(16CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

1,580,000

350,000

2,560,000

0 0 0 0 1,580,000 350,000 2,560,000

8804

MORGAN KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 191 OVER CANEY CREEK .5 MILES WEST OF KY 1162. (16CCN)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

182,000

756,000

0 182,000 756,000 0 0 0 0

8902

MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 460 BRIDGE OVER BIG SPRING BRANCH. (088B00022N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

472,500

0 175,000 472,500 0 0 0 0

10016

MORGAN KY-9009 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 57.72 TO MILEPOINT 63.08

PL

Project Cost:

CN

UT

RW

DN PM

PM

210,000

2,100,000

0 2,310,000 0 0 0 0 0

20001

234

Page 235: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MORGAN KY-7 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-7 FROM MILEPOINT 3.90 TO MILEPOINT 8.14

PL

Project Cost:

CN

UT

RW

DN

PM 1,207,000

0 0 0 0 1,207,000 0 0

20014

MORGAN KY-519 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-519 FROM MILEPOINT 0.00 TO MILEPOINT 3.94

PL

Project Cost:

CN

UT

RW

DN

PM 1,981,000

0 0 0 0 0 1,981,000 0

20015

Total for MORGAN county PL

Total Amounts:

CN

UT

RW

DN

3,300,000

791,000

2,100,000 2,467,500

1,580,000

1,981,000

350,000

1,207,000 2,560,000

3,300,000 2,891,000 2,467,500 0 2,787,000 2,331,000 2,560,000

MUHLENBERG US-62 MAJOR WIDENING(O) WIDEN US-62 FROM WAL-MART TO US-431. (08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES 2-8301)

PL

Project Cost:

CN

UT

RW

DN

SPP 7,500,000

7,500,000 0 0 0 0 0 0

8506

MUHLENBERG KY-181 MINOR WIDENING(O) WIDEN KY-181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION 601 TO WENDELL FORD CENTER. (14CCN

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

530,000

1,820,000

2,710,000

0 0 530,000 1,820,000 2,710,000 0 0

8802

235

Page 236: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

MUHLENBERG KY-2533 RECONSTRUCTION(O)STRAIGHTEN DEAN ROAD INTERSECTION OF 189 BYPASS TO KY 181 NORTH NEAR THE INTERSECTION WITH THE WKY PARKWAY, WENDELL FORD NATIONAL GUARD CENTER, AND

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

780,000

500,000

820,000

4,500,000

0 780,000 500,000 820,000 4,500,000 0 0

8803

MUHLENBERG CR-1141 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF UNION RIDGE RD BRIDGE OVER ROCKY CREEK. (089C00004N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

647,500

0 175,000 647,500 0 0 0 0

10009

MUHLENBERG WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 43.424 TO MILEPOINT 45.95

PL

Project Cost:

CN

UT

RW

DN PM

PM

200,000

2,000,000

0 0 0 0 0 2,200,000 0

20036

Total for MUHLENBERG county PL

Total Amounts:

CN

UT

RW

DN

7,500,000

955,000

1,030,000

647,500

2,640,000

2,000,000

200,000

7,210,000

7,500,000 955,000 1,677,500 2,640,000 7,210,000 2,200,000 0

NELSON US-150 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM THE BLUEGRASS PARKWAY TO THE NELSON/WASHINGTON COUNTY LINE(2016BOP)

PL

Project Cost:

CN

UT

RW

DN STP 600,000

0 0 600,000 0 0 0 0

396.1

236

Page 237: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

NELSON US-150 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US-150 FROM THE BLUEGRASS PARKWAY TO THE NELSON/WASHINGTON COUNTY LINE(2016BOP)

PL

Project Cost:

CN

UT

RW

DN STP

STP

600,000

2,450,000

0 0 0 600,000 0 0 2,450,000

396.12

NELSON US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGES ON US 62 (HINKLE CREEK) AND KY 48 IN BLOOMFIELD 090B00096N (SR 28.2090B00095N (12CCR)

PL

Project Cost:

CN

UT

RW

DN

BR 1,260,000

1,260,000 0 0 0 0 0 0

1078

NELSON KY-509 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER FROMAN CREEK ON KY 509 0.9 MI W OF US 31E (090B00068N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

105,000

756,000

0 105,000 756,000 0 0 0 0

1089

NELSON US-150 MAJOR WIDENING(O) IMPROVE US-150 FROM WEST OF KY-245 THROUGH THE BLUEGRASS PARKWAY INTERCHANGE TO EAST OF LESLIE BALLARD LN (CR 1110). (06CCN)(2006BOPC)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

1,000,000

4,000,000

0 1,000,000 4,000,000 0 0 0 0

8309.1

NELSON US-150 MAJOR WIDENING(O) IMPROVE US-150 FROM WEST OF KY-245 THROUGH THE BLUEGRASS PARKWAY INTERCHANGE TO EAST OF LESLIE BALLARD LN (CR 1110). (06CCN)(2006BOPC)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 4,800,000

0 0 0 4,800,000 0 0 0

8309.2

237

Page 238: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

NELSON -0 NEW ROUTE(O) NEW ROUTE BETWEEN US 62 AND KY 245 WEST OF BARDSTOWN.

PL

Project Cost:

CN

UT

RW

DN SPP 500,000

0 0 500,000 0 0 0 0

8809

NELSON KY-52 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-52 BRIDGE OVER MONKS CREEK. (090B00033N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

105,000

1,015,000

0 105,000 1,015,000 0 0 0 0

10004

NELSON CS-4003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DEPOT ST BRIDGE OVER SIMPSON CREEK. (090C00045N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

98,000

406,000

0 98,000 406,000 0 0 0 0

10005

NELSON CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF POTTERSHOP LOOP BRIDGE OVER ROWAN CREEK. (090C00021N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

91,000

227,500

0 91,000 227,500 0 0 0 0

10014

NELSON BG-9002 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 24.24 TO MILEPOINT 35.15

PL

Project Cost:

CN

UT

RW

DN PM

PM

875,000

8,750,000

0 0 0 0 9,625,000 0 0

20022

238

Page 239: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

NELSON BG-9002 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 8.837 TO MILEPOINT 10.172

PL

Project Cost:

CN

UT

RW

DN PM

PM

110,000

1,100,000

0 1,210,000 0 0 0 0 0

20023

NELSON KY-49 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-49 FROM MILEPOINT 0.00 TO MILEPOINT 4.52

PL

Project Cost:

CN

UT

RW

DN

PM 484,000

0 0 0 0 484,000 0 0

20030

NELSON US-62 CONGESTION MITIGTN(O)

CONSTRUCT A ROUNDABOUT AT THE INTERSECTION OF US-31E AND US-62(NELSON COUNTY FISCAL COURT WILL DO DESIGN AND BUILD ROUNDABOUT)

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 0 1,500,000 0 0 0 0

80050

Total for NELSON county PL

Total Amounts:

CN

UT

RW

DN

1,260,000

509,000

1,000,000

1,100,000

1,100,000

7,904,500

600,000

4,800,000

875,000

9,234,000 2,450,000

1,260,000 2,609,000 9,004,500 5,400,000 10,109,000 0 2,450,000

NICHOLAS KY-36 SAFETY(P) IMPROVE THE KY-36/KY-32 INTERSECTION NEAR THE NICHOLAS COUNTY SCHOOL PROPERTY. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

1,380,000

890,000

0 0 0 0 0 0 2,270,000

205

239

Page 240: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

NICHOLAS US-68 MAJOR WIDENING(O) PARIS-MAYSVILLE ROAD; RECONSTRUCT FROM MILLERSBURG TO KY-1455 AT CARLISLE (SECTION 3).(08CCR)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 17,000,000

0 0 0 17,000,000 0 0 0

310.3

NICHOLAS KY-36 RECONSTRUCTION(O)RECONSTRUCT KY 36/KY 928 INTERSECTION. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

200,000

150,000

1,400,000

0 0 0 350,000 0 1,400,000 0

8811

NICHOLAS KY-32 SAFETY(P) SAFETY IMPROVEMENTS ALONG KY 32 FROM LAKE ROAD (MP 9.5) TO SCRUBGRASS CREEK (MP 12.5) TO CORRECT HORIZONTAL, VERTICAL, PAVEMENT WITH DEFICIENCIES.

PL

Project Cost:

CN

UT

RW

DN

SPP 100,000

0 0 0 0 100,000 0 0

8812

NICHOLAS CR-1010 BRIDGE REPLACEMENT(P)

REPLACE BRIDGE ON ABNER'S MILL ROAD (CR 1010) 2.4 MILES NORTH OF KY 32.

PL

Project Cost:

CN

UT

RW

DN

BR 100,000

0 0 0 100,000 0 0 0

8951

NICHOLAS KY-36 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-36 BRIDGE OVER BRUSHY FORK. (091B00018N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

525,000

1,610,000

0 525,000 1,610,000 0 0 0 0

10011

240

Page 241: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

NICHOLAS CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DORSEY AVE BRIDGE OVER BRUSH FORK. (091C00029N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

595,000

0 280,000 595,000 0 0 0 0

10012

Total for NICHOLAS county PL

Total Amounts:

CN

UT

RW

DN 805,000

2,205,000

200,000

150,000

17,100,000

100,000

1,400,000

1,380,000

890,000

0 805,000 2,205,000 17,450,000 100,000 1,400,000 2,270,000

OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62 OVER BRANCH OF THREE LICK FORK 0.23 MILE E OF GREEN MEADOWS DR (CS 6068)092B00032 (SD)

PL

Project Cost:

CN

UT

RW

DN

BR 1,148,000

1,148,000 0 0 0 0 0 0

1083

OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER THREELICK FORK ON US 62 0.4 MILE E OF GREEN MEADOWS DRIVE (CS 6068) IN BEAVER DAM. (092B00033N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

308,000

1,029,000

0 308,000 1,029,000 0 0 0 0

1091

OHIO WN-9007 I-CHANGE RECONST(O)

I-65 SPUR CORRIDOR; RECONSTRUCT THE EXISTING NATCHER PARKWAY/KY-69 INTERCHANGE (EXIT 50) IN OHIO COUNTY. (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

1,350,000

1,250,000

8,700,000

0 2,600,000 0 8,700,000 0 0 0

2092.2

241

Page 242: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OHIO KY-136 RECONSTRUCTION(O)REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETY ISSUES WITH BRIDGES ON KY-136 FROM KY-56 IN MCLEAN COUNTY TO US-231 IN OHIO

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

450,000

1,250,000

6,540,000

0 0 0 0 1,700,000 0 6,540,000

8812

OHIO KY-54 MINOR WIDENING(O) IMPROVE SAFETY ON KY 54 BY UPGRADING MP 7.0 TO MP 8.0 TO THREE LANES INCLUDING CURB AND GUTTER AND ADDRESSING TWO SHARP TURNS

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

750,000

1,000,000

2,000,000

7,000,000

0 0 0 750,000 0 1,000,000 9,000,000

8951

OHIO KY-85 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-85 BRIDGE OVER BR OF W FK LEWIS CREEK. (092B00053N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

962,500

0 210,000 962,500 0 0 0 0

10010

OHIO CR-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST HALLS CREEK R BRIDGE OVER BRANCH OF HALLS CREEK. (092C00001N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

630,000

0 175,000 630,000 0 0 0 0

10011

OHIO CR-1067 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SUNNYDALE RD BRIDGE OVER BRANCH OF ROUGH RIVER. (092C00020N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

630,000

0 175,000 630,000 0 0 0 0

10012

242

Page 243: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OHIO CR-1036 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BED RD BRIDGE OVER WFK ADAMS CREEK. (092C00067N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

735,000

0 210,000 735,000 0 0 0 0

10013

OHIO CR-1414 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JOHNSON SCHOOL RD BRIDGE OVER BARASS DITCH. (092C00080N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

647,500

0 175,000 647,500 0 0 0 0

10014

OHIO CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCK CREEK LN BRIDGE OVER BR-S.FK PANTHER CK. (092C00097N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

840,000

0 210,000 840,000 0 0 0 0

10015

OHIO CR-1510 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF QUARTERHORSE LN BRIDGE OVER N FK PANTHER CREEK. (092C00133N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

892,500

0 245,000 892,500 0 0 0 0

10016

OHIO US-62 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

500,000

5,000,000

0 0 0 0 5,500,000 0 0

20038

243

Page 244: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OHIO WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 65.68 TO MILEPOINT 83.3

PL

Project Cost:

CN

UT

RW

DN

PM 16,596,000

0 0 16,596,000 0 0 0 0

20039

OHIO WK-9001 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WENDELL H. FORD WESTERN KY PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 83.3 TO MILEPOINT 87.544

PL

Project Cost:

CN

UT

RW

DN

PM 4,282,000

0 0 4,282,000 0 0 0 0

20040

OHIO WN-9007 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 49.8 TO MILEPOINT 59.86 (61.553 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN

PM 11,064,000

0 0 11,064,000 0 0 0 0

20041

OHIO KY-136 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-136 FROM MILEPOINT 0.00 TO MILEPOINT 9.60

PL

Project Cost:

CN

UT

RW

DN

PM 1,177,000

0 0 0 0 1,177,000 0 0

20049

Total for OHIO county PL

Total Amounts:

CN

UT

RW

DN

1,148,000

1,708,000

1,350,000

1,250,000

38,308,500

750,000

8,700,000

500,000

450,000

1,250,000

1,000,000

6,177,000

2,000,000

13,540,000

1,148,000 4,308,000 38,308,500 9,450,000 8,377,000 1,000,000 15,540,000

244

Page 245: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OLDHAM -0 NEW ROUTE(O) EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 10,000,000

0 0 0 10,000,000 0 0 0

367.2

OLDHAM -0 NEW ROUTE(O) EXTENSION OF OLD HENRY ROAD EAST TO ASH AVENUE (KY362). (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 8,500,000

0 0 0 0 8,500,000 0 0

367.21

OLDHAM -0 BIKE/PED FACIL(O) INTER-URBAN GREENWAY: CONSTRUCT A NON-MOTORIZED CORRIDOR FROM LAGRANGE TO JEFFERSON COUNTY LINE. (LOU T.I.P(LOCAL MATCH)(ALL WORK BY

PL

Project Cost:

CN

UT

RW

DN SLO 500,000

0 0 0 500,000 0 0 0

410

OLDHAM -0 BIKE/PED FACIL(O) OLDHAM COUNTY BICYCLE & PEDESTRIAN TRAIL - OLD LAGRANGE RD. CONSTRUCT A BICYCLE AND PEDESTRIAN TRAIL ALONG OLD LAGRANGE ROAD FROM KY 146 TO

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

250,000

500,000

0 250,000 500,000 0 0 0 0

410.01

OLDHAM CR-1002 SAFETY(P) CONSTRUCT A 4-LANE UNINTERRUPTED RAIL UNDERPASS WEST OF LAGRANGE. (LOCAL MATCH)(ALL WORK BY OLDHAM COUNTY) (FUNDING SUBJECT TO

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

100,000

10,000,000

100,000 10,000,000 0 0 0 0 0

434

245

Page 246: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OLDHAM KY-1793 SAFETY(P) CONSTRUCT SIDEWALKS ON KY 1793 FROM RIDGEVIEW DRIVE TO SETTLERS POINT TRAIL.(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SLO 100,000

100,000 0 0 0 0 0 0

440.1

OLDHAM US-42 RECONSTRUCTION(O)RECONSTRUCT US 42 AND WIDEN FROM 2 LANES TO 3 LANES (3RD LANE WILL BE A CENTER TURN LANE) FROM JEFFERSON/OLDHAM COUNTY LINE TO RIDGEMOOR DRIVE. PROJECT

PL

Project Cost:

CN

UT

RW

DN

SLO 5,320,000

5,320,000 0 0 0 0 0 0

441.01

OLDHAM KY-22 RECONSTRUCTION(O)INTERSECTION IMPROVEMENT AT KY 22 AND KY 329 IN CRESTWOOD. (ALL WORK BY KYTC)(2006BOPC)(FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

PL

Project Cost:

CN

UT

RW

DN

SLO 300,000

300,000 0 0 0 0 0 0

449

OLDHAM CS-2102 CONGESTION MITIGTN(O)

CONSTRUCTION OF A PARK AND RIDE FACILITY INCLUDING A PARKING LOT, SHELTER, PLAYGROUND, BIKE LOCKERS, WALKWAYS, AND A 1000' ACCESS ROAD LOCATED ON APPLE

PL

Project Cost:

CN

UT

RW

DN

SLO 1,174,800

1,174,800 0 0 0 0 0 0

468.1

OLDHAM I-71 MAJOR WIDENING(O) WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-329 (MP 14.1) TO KY-393 (MP 18.0). (16CCN)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

3,500,000

1,900,000

1,700,000

24,000,000

0 3,500,000 0 0 3,600,000 0 24,000,000

483.1

246

Page 247: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OLDHAM I-71 MAJOR WIDENING(O) WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4). (16CCN)

PL

Project Cost:

CN

UT

RW

DN NH 2,750,000

0 0 0 0 0 2,750,000 0

483.2

OLDHAM I-71 PREFINANCD CONVRSN(O)

WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 (MP 18.0) TO KY-53 (MP 22.4), INCLUDING A NEW INTERCHANGE AT MP 20.6. (16CCN)

PL

Project Cost:

CN

UT

RW

DN NH 2,750,000

0 0 0 0 0 0 2,750,000

483.21

OLDHAM I-71 NEW INTERCHANGE(O)

CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVE CONGESTION IN LAGRANGE

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

1,500,000

3,000,000

1,900,000

6,000,000

1,500,000 4,900,000 6,000,000 0 0 0 0

483.3

OLDHAM I-71 PREFINANCD CONVRSN(O)

CONSTRUCT NEW I-71 INTERCHANGE BETWEEN KY-393 AND KY-53 TO RELIEVE CONGESTION IN LAGRANGE

PL

Project Cost:

CN

UT

RW

DN

NH 6,000,000

0 0 0 6,000,000 0 0 0

483.31

OLDHAM CR-1209 SAFETY-HAZARD ELIM(P)

OLD FLOYDSBURG ROAD SAFETY IMPROVEMENTS: REPLACE NARROW ONE-LANE CULVERT CROSSING; CLEAR TREES AND VEGETATION OUT OF RIGHT-OF-WAY; ADD SHOULDER

PL

Project Cost:

CN

UT

RW

DN

SLO 700,000

700,000 0 0 0 0 0 0

494

247

Page 248: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OLDHAM KY-329 RECONSTRUCTION(O)INTERSECTION REALIGNMENT/RECONSTRUCTION AT KY 329 AND KY 329 BYPASS (2016BOP).

PL

Project Cost:

CN

UT

RW

DN SLO

SLO

SLO

120,000

100,000

100,000

120,000 100,000 100,000 0 0 0 0

542

OLDHAM -0 NEW ROUTE(O) CONSTRUCTION OF A NEW CONNECTION FROM OLD LAGRANGE ROAD TO KY 393 AT BUCKNER. LPA CONTRACT. (BOP2012)

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

SLO

714,500

228,000

2,300,000

714,500 2,528,000 0 0 0 0 0

754

OLDHAM CS-2030 BIKE/PED FACIL(O) CONSTRUCT 5' CONCRETE SIDEWALKS IN THE EXISTING RIGHT-OF-WAY ALONG BOTH SIDES OF SPRING HILL TRACE FROM KY 329 TO THE END OF THE EXISTING

PL

Project Cost:

CN

UT

RW

DN

SLO

SLO

75,000

445,000

75,000 445,000 0 0 0 0 0

757

OLDHAM KY-53 DESIGN ENGINEERING(O)

DESIGN FOR IMPROVING KY-53 FROM ZHALE SMITH ROAD TO KY-22 (TOTAL 3.2 MILES). (14CCN)

PL

Project Cost:

CN

UT

RW

DN SPP 2,000,000

0 0 0 2,000,000 0 0 0

8852

OLDHAM KY-1488 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1488 BRIDGE OVER ORGAN CREEK. (093B00048N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

343,000

0 280,000 343,000 0 0 0 0

10012

248

Page 249: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OLDHAM KY 329 AIR QUALITY(P) IMPROVE THE INTERCHANGE OF I 71 AND KY 329

PL

Project Cost:

CN

UT

RW

DN SPP 250,000

0 250,000 0 0 0 0 0

80005

OLDHAM KY 329 AIR QUALITY(P) CONSTRUCT A TURN LANE ON KY 329 BYPASS AT DOVEFIELD DRIVE

PL

Project Cost:

CN

UT

RW

DN

SPP 300,000

0 0 0 0 300,000 0 0

80050

Total for OLDHAM county PL

Total Amounts:

CN

UT

RW

DN 1,720,000

714,500

75,000

7,594,800

4,280,000

3,100,000

2,128,000

12,745,000

500,000

100,000

6,343,000

2,500,000

16,000,000

1,900,000

1,700,000

2,750,000

8,800,000

2,750,000

24,000,000

10,104,300 22,253,000 6,943,000 18,500,000 12,400,000 2,750,000 26,750,000

OWEN KY-22 RECONSTRUCTION(O)IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845. (06CCR)(08CCN)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,500,000

0 0 3,500,000 0 0 0 0

198

OWEN KY-22 PREFINANCD CONVRSN(P)

IMPROVE SAFETY ON KY-22 FROM KY-227 TO KY-845. (06CCR)(08CCN)(12CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 3,500,000

0 0 0 3,500,000 0 0 0

198.01

249

Page 250: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OWEN CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CEDAR CREEK ON SAWDRIDGE CREEK W ROAD (CR 1214) 0.2 MI N OF US 127 (094C00011N)

PL

Project Cost:

CN

UT

RW

DN

BR 672,000

0 0 672,000 0 0 0 0

1088

OWEN KY-3102 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3102 BRIDGE OVER BRUSH CREEK. (094B00034N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

1,942,500

0 280,000 1,942,500 0 0 0 0

10013

OWEN KY-22 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-22 FROM MILEPOINT 11.33 TO MILEPOINT 18.56

PL

Project Cost:

CN

UT

RW

DN

PM 947,000

0 0 0 0 947,000 0 0

20052

Total for OWEN county PL

Total Amounts:

CN

UT

RW

DN 280,000

6,114,500 3,500,000 947,000

0 280,000 6,114,500 3,500,000 947,000 0 0

OWSLEY KY-30 RECONSTRUCTION(O)IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTY LINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE & ENVIR)(AR/W)

PL

Project Cost:

CN

UT

RW

DN

STP 14,500,000

0 14,500,000 0 0 0 0 0

279.61

250

Page 251: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

OWSLEY KY-30 PREFINANCD CONVRSN(P)

IMPROVE KY-30 FROM KY-847 IN OWSLEY COUNTY TO JACKSON COUNTY LINE.(LET W/ JACKSON CO. SECTION UNDER 11-278.30)(SEE 10-279.60 FOR PE & ENVIR)(AR/W)

PL

Project Cost:

CN

UT

RW

DN

STP 14,500,000

0 0 0 14,500,000 0 0 0

279.62

Total for OWSLEY county PL

Total Amounts:

CN

UT

RW

DN

14,500,000 14,500,000

0 14,500,000 0 14,500,000 0 0 0

PENDLETON US-27 MAJOR WIDENING(O) IMPROVE SAFETY ON US-27 FROM BUTLER IN PENDLETON COUNTY TO SOUTH OF KY-154 IN CAMPBELL COUNTY.(12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 5,000,000

0 0 5,000,000 0 0 0 0

8706

PENDLETON KY-159 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-159 BRIDGE OVER NORTH LITTLE KINCAID CRE. (096B00006N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

490,000

0 210,000 490,000 0 0 0 0

10004

Total for PENDLETON county PL

Total Amounts:

CN

UT

RW

DN 210,000

5,490,000

0 210,000 5,490,000 0 0 0 0

251

Page 252: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PERRY KY-15 RECONSTRUCTION(O)IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUES FOR KY-15 IN PERRY COUNTY FROM MORTON BOULEVARD TO KY-15 BYPASS

PL

Project Cost:

CN

UT

RW

DN

NH 47,000,000

47,000,000 0 0 0 0 0 0

158

PERRY KY-476 RECONSTRUCTION(O)IMPROVE KY-476 FROM KY-15X IN WALKERTOWN TO NORTH OF WALKER CORNETT ROAD IN WABACO.

PL

Project Cost:

CN

UT

RW

DN STP 600,000

0 0 0 600,000 0 0 0

209

PERRY CR-1114 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NORTH FORK KENTUCKY RIVER ON KENMONT ROAD (CR 1114) 380 FT SE OF KY 7 (097C00005N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

224,000

1,400,000

0 224,000 1,400,000 0 0 0 0

1113

PERRY CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER STRAIGHT FORK ON LITTLE LEATHERWOOD CREEK ROAD (CR 1140) AT JCT WITH KY 3348 (097C00013N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

182,000

504,000

0 182,000 504,000 0 0 0 0

1114

PERRY HR-9006 NEW INTERCHANGE(O)

NEW INTERCHANGE OFF OF A NEW EXIT 55 HAL ROGERS PARKWAY

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

1,200,000

320,000

1,632,000

0 1,200,000 320,000 1,632,000 0 0 0

8903

252

Page 253: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PERRY KY-80 SAFETY(P) SAFETY IMPROVEMENTS ON KY-80 FROM LESLIE COUNTY LINE TO KY-451. (16CCN)

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

700,000

350,000

280,000

5,400,000

0 700,000 630,000 0 5,400,000 0 0

8906

PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-1166 OVER RT. FK. MACES CREEK(16CCN) 097B00110N

PL

Project Cost:

CN

UT

RW

DN

BR 938,000

0 0 938,000 0 0 0 0

8910

PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1166 OVER MACES CREEK. (16CCN) 097B00072N (SD)

PL

Project Cost:

CN

UT

RW

DN

BR

BR

BR

155,000

103,000

742,000

155,000 103,000 742,000 0 0 0 0

8913

PERRY CR-1150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LEATHERWOOD CREEK. (16CCN) 097C00021N

PL

Project Cost:

CN

UT

RW

DN

BR 455,000

0 0 455,000 0 0 0 0

8915

PERRY CR-1115 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GEORGES BRANCH RD BRIDGE OVER GEORGES BRANCH. (097C00007N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

390,000

0 140,000 390,000 0 0 0 0

10004

253

Page 254: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PERRY CR-1145 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OWENS BR RD BRIDGE OVER OWENS BRANCH. (097C00018N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

340,000

0 140,000 340,000 0 0 0 0

10005

PERRY CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HALL OLD HOME PLACE BRIDGE OVER BIG CREEK. (097C00084N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

613,000

0 175,000 613,000 0 0 0 0

10006

PERRY KY-476 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 476 BRIDGE OVER BALL FORK. (097B00007N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

840,000

0 210,000 840,000 0 0 0 0

10017

PERRY HR-9006 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF HAL ROGERS DANIEL BOONE PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 55.966 TO MILEPOINT 57.166

PL

Project Cost:

CN

UT

RW

DN PM

PM

50,000

500,000

0 0 0 0 0 0 550,000

20002

PERRY KY-80 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

100,000

100,000

0 200,000 0 0 0 0 0

20003

254

Page 255: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for PERRY county PL

Total Amounts:

CN

UT

RW

DN155,000

47,000,000

1,871,000

1,200,000

103,000

100,000

350,000

600,000

6,222,000

600,000

1,632,000 5,400,000

50,000

500,000

47,155,000 3,274,000 7,172,000 2,232,000 5,400,000 0 550,000

PIKE KY-194 RECONSTRUCTION(O)IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TO NEAR DESKINS BRANCH CULVERT

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

2,100,000

1,560,000

6,760,000

0 0 0 3,660,000 0 6,760,000 0

198

PIKE KY-194 PREFINANCD CONVRSN(O)

IMPROVE KY-194 FROM US-119 RAMP NEAR SMITH FARMS BOTTOM (CR-1458) TO NEAR DESKINS BRANCH CULVERT

PL

Project Cost:

CN

UT

RW

DN

SPP 6,760,000

0 0 0 0 0 0 6,760,000

198.01

PIKE US-460 RELOCATION(O) PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 10,000,000

0 0 0 10,000,000 0 0 0

263.67

PIKE US-460 SURFACE(O) PIKEVILLE TO VA. STATE LINE; US-460/KY-80 FROM KY-195 TO DUNLEARY HOLLOW. (SURFACING FOR SECTIONS 6A & 6B) (2000BOP)(14CCN)

PL

Project Cost:

CN

UT

RW

DN

NH 9,000,000

0 0 0 0 0 0 9,000,000

263.69

255

Page 256: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PIKE US-460 PREFINANCD CONVRSN(O)

PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)(ADDITIONAL

PL

Project Cost:

CN

UT

RW

DN

NH 10,000,000

0 0 0 0 10,000,000 0 0

263.95

PIKE US-460 PREFINANCD CONVRSN(O)

PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)(ADDITIONAL

PL

Project Cost:

CN

UT

RW

DN

NH 10,000,000

0 0 0 0 0 10,000,000 0

263.96

PIKE US-460 PREFINANCD CONVRSN(O)

PIKEVILLE TO VA. STATE LINE: IMPROVE US 460/KY 80 FROM DUNLEARY HOLLOW TO KY 80 AT BEAVER CREEK (SECTION 6C) BRIDGE ONLY.(14CCN)(16CCR)(ADDITIONAL

PL

Project Cost:

CN

UT

RW

DN

NH 10,000,000

0 0 0 0 0 0 10,000,000

263.97

PIKE US-460 MINOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION AT THE US-460 AND KY-1460 INTERSECTION.

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

NH

240,000

400,000

160,000

1,470,000

0 0 0 240,000 560,000 0 1,470,000

346

PIKE -0 NEW ROUTE(O) MARION BRANCH INDUSTRIAL PARK ACCESS ROAD.

PL

Project Cost:

CN

UT

RW

DN

SPP 7,000,000

0 7,000,000 0 0 0 0 0

347

256

Page 257: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PIKE -0 PREFINANCD CONVRSN(O)

MARION BRANCH INDUSTRIAL PARK ACCESS ROAD. (ADDITIONAL FUNDING FOR 12-347.00)

PL

Project Cost:

CN

UT

RW

DN

SPP 7,000,000

0 0 7,000,000 0 0 0 0

347.01

PIKE KY-610 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-610 (MP 8.146) OVER LONG FORK; .1 MI S OF JCT KY-1469; (AR/W)098B00069N

PL

Project Cost:

CN

UT

RW

DN

BR 770,000

770,000 0 0 0 0 0 0

1104

PIKE KY-1441 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON FISHTRAP RD (KY 1441) OVER RACCOON CREEK AT INTERSECTION WITH COON CREEK (CR 1371) 098B00093N

PL

Project Cost:

CN

UT

RW

DN

BR 665,000

665,000 0 0 0 0 0 0

1115

PIKE CR-1181 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER LEVISA FORK ON SOUTH RIVER ROAD CONNECTOR (CR 1181-70) AT JCT WITH US 460 NEAR VIRGINIA STATE LN (098C00088N)

PL

Project Cost:

CN

UT

RW

DN

BR 980,000

0 980,000 0 0 0 0 0

1122

PIKE CR-1801 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BLACKBERRY CREEK ON BIG BLUE SPRINGS ROAD (CR 1801) AT JCT WITH KY 1056 (098C00028N)

PL

Project Cost:

CN

UT

RW

DN

BR 210,000

0 210,000 0 0 0 0 0

1123

257

Page 258: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PIKE CS-1215 NEW ROUTE(O) IMPROVE CONNECTIVITY BETWEEN THOMPSON ROAD AND US-23 AT STONECOAL.(12CCN)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

600,000

5,290,000

0 0 0 0 0 0 5,890,000

8705

PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER PINSONS CREEK. (098B00032N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

484,400

0 175,000 484,400 0 0 0 0

10008

PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE OVER POND CREEK. (098B00036N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

331,100

0 140,000 331,100 0 0 0 0

10009

PIKE KY-3419 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3419 BRIDGE OVER LEFT FK BLACKBERRY CR. (098B00180N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

618,450

0 210,000 618,450 0 0 0 0

10010

PIKE CR-1517 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PIGEON ROOST RD BRIDGE OVER BIG CREEK(098C00005N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

389,200

0 157,500 389,200 0 0 0 0

10011

258

Page 259: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PIKE CR-1545 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MULLEN FRK BRIDGE OVER POND CREEK. (098C00021N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

567,280

0 140,000 567,280 0 0 0 0

10012

PIKE CR-1906 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEEFHIDE CRK BRIDGE OVER BEEFHIDE CREEK(098C00119N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

506,100

0 175,000 506,100 0 0 0 0

10013

PIKE CR-1789 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ELWOOD RD BRIDGE OVER SHELBY CREEK. (098C00080N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

930,580

0 192,500 930,580 0 0 0 0

10024

PIKE CR-1360 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIGHT FORK OF BRUS BRIDGE OVER LEFT FK.BRUSHY FORK. (098C00091N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

444,500

0 157,500 444,500 0 0 0 0

10025

PIKE CR-1911 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CANEY HWY #1 BRIDGE OVER CANEY CREEK(098C00113N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

530,250

0 140,000 530,250 0 0 0 0

10026

259

Page 260: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PIKE CR-1460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DESKINS RD BRIDGE OVER JOHNS CREEK. (098C00170N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

227,500

875,000

0 227,500 875,000 0 0 0 0

10027

PIKE US-23 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

525,000

5,250,000

0 0 5,775,000 0 0 0 0

20002

PIKE US-119 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

175,000

1,750,000

0 0 0 1,925,000 0 0 0

20003

Total for PIKE county PL

Total Amounts:

CN

UT

RW

DN

1,435,000

1,715,000

8,190,000

525,000

17,926,860

415,000

2,100,000

1,560,000

11,750,000

400,000

160,000

16,760,00010,000,000

600,000

32,520,000

1,435,000 9,905,000 18,451,860 15,825,000 10,560,000 16,760,000 33,120,000

POWELL KY-213 SAFETY(P) IMPROVE SAFETY AND GEOMETRICSAND REDUCE CONGESTION KY-213 FROM KY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

4,000,000

1,100,000

2,000,000

0 5,100,000 2,000,000 0 0 0 0

163

260

Page 261: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

POWELL KY-213 PREFINANCD CONVRSN(O)

IMPROVE SAFETY AND GEOMETRICSAND REDUCE CONGESTION KY-213 FROM KY-11 TO BOTTOM OF MOUNTAIN. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 6,000,000

0 0 0 6,000,000 0 0 0

163.01

POWELL KY-213 SAFETY-HAZARD ELIM(P)

IMPROVE SAFETY AND LEVEL OF SERVICE ON KY-213 IN POWELL COUNTY FROM SONS ROAD TO REED COURT.

PL

Project Cost:

CN

UT

RW

DN STP 520,000

0 0 0 0 0 520,000 0

210

POWELL KY-2026 RECONSTRUCTION(O)CORRECT FLOODING ISSUES ON KY-2026 FROM KY-11 TO THE RED RIVER IN CLAY CITY.

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

500,000

200,000

150,000

1,100,000

0 500,000 350,000 1,100,000 0 0 0

211

POWELL KY-599 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-599 BRIDGE OVER CANE CREEK. (099B00069N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

770,000

0 175,000 770,000 0 0 0 0

10007

POWELL KY-2026 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2026 BRIDGE OVER RED RIVER. (099B00090N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

1,120,000

0 210,000 1,120,000 0 0 0 0

10008

261

Page 262: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

POWELL KY-3354 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3354 BRIDGE OVER CAT CREEK. (099B00081N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

560,000

0 175,000 560,000 0 0 0 0

10018

POWELL KY-9000 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 11.91 TO MILEPOINT 19.15

PL

Project Cost:

CN

UT

RW

DN PM

PM

580,000

5,800,000

0 0 0 0 6,380,000 0 0

20004

POWELL KY-9000 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 19.15 TO MILEPOINT 22.307

PL

Project Cost:

CN

UT

RW

DN PM

PM

250,000

2,500,000

0 0 0 0 0 2,750,000 0

20005

POWELL KY-9000 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 22.307 TO MILEPOINT 27.376

PL

Project Cost:

CN

UT

RW

DN PM

PM

410,000

4,100,000

0 4,510,000 0 0 0 0 0

20006

POWELL KY-9000 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 27.376 TO MILEPOINT 32.788

PL

Project Cost:

CN

UT

RW

DN

PM 5,416,000

0 0 5,416,000 0 0 0 0

20007

262

Page 263: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

POWELL KY-9000 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 32.788 TO MILEPOINT 36

PL

Project Cost:

CN

UT

RW

DN PM

PM

275,000

2,750,000

0 0 0 0 0 3,025,000 0

20008

Total for POWELL county PL

Total Amounts:

CN

UT

RW

DN 1,470,000

4,000,000

1,100,000

4,100,000

200,000

150,000

9,866,000 7,100,000

580,000

5,250,000

1,045,000

5,800,000

0 10,670,000 10,216,000 7,100,000 6,380,000 6,295,000 0

PULASKI KY-461 MAJOR WIDENING(O) IMPROVE KY-461 FROM KY-80 TO BUCK CREEK BRIDGE, INCLUDING INTERCHANGE AT KY-80.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

3,000,000

1,500,000

13,000,000

0 3,000,000 1,500,000 13,000,000 0 0 0

59.25

PULASKI KY-461 PREFINANCD CONVRSN(O)

IMPROVE KY-461 FROM KY-80 TO BUCK CREEK BRIDGE, INCLUDING INTERCHANGE AT KY-80.

PL

Project Cost:

CN

UT

RW

DN

NH

NH

3,000,000

1,500,000

0 3,000,000 1,500,000 0 0 0 0

59.26

PULASKI KY-635 SAFETY-RR SEPARATN(P)

SAFETY PROJECT TO RECONSTRUCT KY 635 TO ELIMINATE AT GRADE RAILROAD CROSSING AND REPLACE WITH RAILROAD SEPARATION CROSSING AT SCIENCE HILL,

PL

Project Cost:

CN

UT

RW

DN

RRS

RRS

RRS

1,800,000

1,300,000

6,500,000

0 0 3,100,000 0 6,500,000 0 0

9010

263

Page 264: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

PULASKI US-27 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-27 FROM MILEPOINT 0.00 TO MILEPOINT 6.78

PL

Project Cost:

CN

UT

RW

DN

PM 2,708,000

0 0 0 0 2,708,000 0 0

20008

Total for PULASKI county PL

Total Amounts:

CN

UT

RW

DN6,000,000 1,800,000

4,300,000

13,000,000 9,208,000

0 6,000,000 6,100,000 13,000,000 9,208,000 0 0

ROBERTSON KY-616 RECONSTRUCTION(O)IMPROVE CURVE ON KY 616 AND IMPROVE ROADWAY FROM THE NEW ROBERTSON COUNTY SCHOOL TO MT OLIVET. (12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

250,000

210,000

2,820,000

0 0 460,000 2,820,000 0 0 0

8711

ROBERTSON US-62 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-62 FROM MILEPOINT 0.00 TO MILEPOINT 11.00

PL

Project Cost:

CN

UT

RW

DN

PM 863,000

0 0 0 0 863,000 0 0

20053

Total for ROBERTSON county PL

Total Amounts:

CN

UT

RW

DN250,000

210,000

2,820,000 863,000

0 0 460,000 2,820,000 863,000 0 0

264

Page 265: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ROCKCASTLE I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 6 LANES FROM 1MI N SAND HILL ROAD UNDERPASS N TO 1.1 MILES N OF THE US-25 I-CHNG AT MTVERNON. (16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 41,110,000

41,110,000 0 0 0 0 0 0

6.1

ROCKCASTLE KY-461 RECONSTRUCTION(O)IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

1,200,000

1,450,000

2,230,000

0 1,200,000 1,450,000 2,230,000 0 0 0

8952

ROCKCASTLE KY-461 PREFINANCD CONVRSN(O)

IMPROVE KY-461 FROM US-150 TO THE EXISTING FOUR LANE APPROACH AT US-25.(16CCN)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

1,450,000

1,120,000

0 0 0 1,450,000 1,120,000 0 0

8952.01

ROCKCASTLE KY-1326 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1326 BRIDGE OVER LITTLE RENFRO CREEK(102B00026N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

70,000

210,000

0 70,000 210,000 0 0 0 0

10010

ROCKCASTLE I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 52.05 TO MILEPOINT 55.295

PL

Project Cost:

CN

UT

RW

DN PM

PM

390,000

3,900,000

0 4,290,000 0 0 0 0 0

20003

265

Page 266: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ROCKCASTLE I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 71.668 TO MILEPOINT 73.408

PL

Project Cost:

CN

UT

RW

DN PM

PM

210,000

2,100,000

0 0 2,310,000 0 0 0 0

20004

ROCKCASTLE US-25 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION PL

Project Cost:

CN

UT

RW

DN PM

PM

175,000

1,750,000

0 0 1,925,000 0 0 0 0

20005

Total for ROCKCASTLE county PL

Total Amounts:

CN

UT

RW

DN

41,110,000

1,660,000

3,900,000

385,000

1,450,000

4,060,000

1,450,000

2,230,000 1,120,000

41,110,000 5,560,000 5,895,000 3,680,000 1,120,000 0 0

ROWAN KY-32 RECONSTRUCTION(O)IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

5,500,000

4,210,000

10,000,000

0 0 5,500,000 14,210,000 0 0 0

204

ROWAN KY-32 PREFINANCD CONVRSN(O)

IMPROVE KY-32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 10,000,000

0 0 0 10,000,000 0 0 0

204.01

266

Page 267: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ROWAN US-60 SAFETY(P) CONSTRUCT TURN LANES INTO LAKESIDE CHRISTIAN ACADEMY TO IMPROVE SAFETY.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 520,000

520,000 0 0 0 0 0 0

227

ROWAN CR-1140 BRIDGE REPLACEMENT(P)

REPLACE BRIDGE OVER BULL FORK ON HORSEMAN CEMETERY ROAD (CR 1140) AT JCT WITH BULLFORK ROAD (CR 1222) (103C00108N)(SR=32.5)(EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

BR

BR

350,000

50,000

50,000

400,000

0 0 0 350,000 500,000 0 0

1093

ROWAN US-60 SAFETY(P) RECONSTRUCT US-60 FROM WEST OF GLENWOOD HOLLOW ROAD TO EAST OF KY-3296. THE PROJECT SHALL INCLUDE 12' LANES, WIDE PAVED SHOULDERS, UNOBSTRUCTED CLEAR

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

830,000

700,000

5,500,000

0 0 0 830,000 700,000 0 5,500,000

8401

ROWAN KY-377 RECONSTRUCTION(O)IMPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION ON KY-377 FROM KY-32 TO NORTH OF KY-799. (08CCN)(10CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP

STP

STP

2,600,000

7,700,000

9,100,000

0 0 2,600,000 7,700,000 9,100,000 0 0

8406

ROWAN US-60 CONGESTION MITIGTN(O)

PROVIDE WEST TURN LANES ON US 60 AT SUNNYBROOK.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

300,000

250,000

400,000

2,500,000

0 0 0 300,000 650,000 0 2,500,000

8913

267

Page 268: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ROWAN CR-1025 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON LITTLE PERRY ROAD OVER TRIPLETT CREEK.(16CCN)

PL

Project Cost:

CN

UT

RW

DN

BR 822,500

0 0 822,500 0 0 0 0

8914

ROWAN KY-801 MAJOR WIDENING(O) WIDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN FLEMING CO.

PL

Project Cost:

CN

UT

RW

DN

STP 100,000

0 100,000 0 0 0 0 0

8915

ROWAN I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 128.96 TO MILEPOINT 134.75

PL

Project Cost:

CN

UT

RW

DN PM

PM

475,000

4,750,000

0 0 0 0 0 5,225,000 0

20012

ROWAN I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 141.5 TO MILEPOINT 147.95

PL

Project Cost:

CN

UT

RW

DN PM

PM

525,000

5,250,000

0 0 0 0 5,775,000 0 0

20014

Total for ROWAN county PL

Total Amounts:

CN

UT

RW

DN

520,000

100,000

8,100,000

822,500

650,000

830,000

11,910,000

20,000,000

525,000

300,000

1,150,000

4,750,000

475,000

14,750,000 8,000,000

520,000 100,000 8,922,500 33,390,000 16,725,000 5,225,000 8,000,000

268

Page 269: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

RUSSELL LN-9008 NEW INTERCHANGE(O)

CONSTRUCT A NEW INTERCHANGE AT THE CUMBERLAND PARKWAY INTERSECTION WITH KY-910 AT WINDSOR. (08CCN)(10CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 6,740,000

6,740,000 0 0 0 0 0 0

8502

RUSSELL US-127 RELOCATION(O) RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RD INTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OF CUMBERLAND RIVER. POTENTIAL

PL

Project Cost:

CN

UT

RW

DN

NH 9,320,000

0 9,320,000 0 0 0 0 0

8601.21

RUSSELL US-127 PREFINANCD CONVRSN(O)

RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RD INTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OF CUMBERLAND RIVER (SEE

PL

Project Cost:

CN

UT

RW

DN

NH 8,280,000

0 0 8,280,000 0 0 0 0

8601.23

RUSSELL US-127 PREFINANCD CONVRSN(O)

RELOCATE US-127 FROM EAST OF THE KY-1730 AND MANNTOWN RD INTERSECTION, AND EXTENDING NORTHERLY TO NORTH BANK OF CUMBERLAND RIVER (SEE

PL

Project Cost:

CN

UT

RW

DN

NH 8,280,000

0 0 0 8,280,000 0 0 0

8601.24

RUSSELL LN-9008 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF LOUIE B. NUNN CUMBERLAND PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 62.544 TO MILEPOINT 72.087

PL

Project Cost:

CN

UT

RW

DN PM

PM

775,000

7,750,000

0 0 0 0 0 8,525,000 0

20007

269

Page 270: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

RUSSELL US-127 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-127 FROM MILEPOINT 19.03 TO MILEPOINT 26.21

PL

Project Cost:

CN

UT

RW

DN

PM 1,549,000

0 0 0 0 1,549,000 0 0

20009

RUSSELL US 127 AIR QUALITY(P) ADD A RIGHT TURNING ON US 127 SOUTHBOUND BEGINNING AT THE EASTBOUND EXIT OF THE CUMBERLAND PARKWAY FOR 0.2 MILES

PL

Project Cost:

CN

UT

RW

DN

SPP 400,000

0 400,000 0 0 0 0 0

80007

Total for RUSSELL county PL

Total Amounts:

CN

UT

RW

DN

6,740,000 9,720,000 8,280,000 8,280,000 7,750,000

775,000

1,549,000

6,740,000 9,720,000 8,280,000 8,280,000 1,549,000 8,525,000 0

SCOTT -0 BYPASS(O) GEORGETOWN NORTHWEST BYPASSIMPROVE CONNECTIVITY AND MOBILITY NORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75. (04CCR)(2004BOPC)(SEE 7-102.01

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 5,000,000 0 0 0 0

102.5

SCOTT -0 PREFINANCD CONVRSN(O)

GEORGETOWN NORTHWEST BYPASSIMPROVE CONNECTIVITY AND MOBILITY NORTHWEST AROUND GEORGETOWN FROM KY-32 TO I-75. (04CCR)(2004BOPC)(SEE 7-102.01

PL

Project Cost:

CN

UT

RW

DN

STP 10,000,000

0 0 0 10,000,000 0 0 0

102.51

270

Page 271: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1689 OVER LECOMPTES RUN 0.46 MILE W OF KY 227105B00038N

PL

Project Cost:

CN

UT

RW

DN

BR 462,000

462,000 0 0 0 0 0 0

1127

SCOTT CR-1022 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS (CNO&TP)RR ON FIELDS ROAD (CR 1022) AT SCOTT/HARRISON CO LINE (105R00607N) (EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

1,120,000

210,000 1,120,000 0 0 0 0 0

1139

SCOTT KY-227 RECONSTRUCTION(O)RECONSTRUCT KY-227 FROM MP 2.98 TO MP 3.34 TO IMPROVE HORIZONTAL CURVE. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

STP 200,000

200,000 0 0 0 0 0 0

8907

SCOTT KY-620 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-620 BRIDGE OVER ROGERS GAP CREEK. (105B00095N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

665,000

0 210,000 665,000 0 0 0 0

10005

SCOTT CS-1010 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LEMONS MILL RD BRIDGE OVER NS (CNO&AMP;TP) SYSTEM. (105C00112N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

350,000

1,295,000

0 350,000 1,295,000 0 0 0 0

10006

271

Page 272: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE OVER LOCUST FORK. (105B00039N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

133,000

308,000

0 133,000 308,000 0 0 0 0

10012

SCOTT CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HINTON RD BRIDGE OVER NS (CNO&TP) SYSTEM(105R00605N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

238,000

511,000

0 238,000 511,000 0 0 0 0

10013

SCOTT I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 120.792 TO MILEPOINT 121.117

PL

Project Cost:

CN

UT

RW

DN PM

PM

40,000

400,000

0 0 440,000 0 0 0 0

20019

SCOTT I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 138.424 TO MILEPOINT 143.24

PL

Project Cost:

CN

UT

RW

DN PM

PM

575,000

5,750,000

0 0 0 0 0 0 6,325,000

20021

Total for SCOTT county PL

Total Amounts:

CN

UT

RW

DN 210,000

662,000

931,000

1,120,000

40,000

8,179,000 10,000,000

575,000

5,750,000

872,000 2,051,000 8,219,000 10,000,000 0 0 6,325,000

272

Page 273: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SHELBY I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TO THE KY-1790 UNDERPASS. (2006BOPC)

PL

Project Cost:

CN

UT

RW

DN NH

NH

NH

2,000,000

2,000,000

19,800,000

0 2,000,000 2,000,000 0 19,800,000 0 0

65.4

SHELBY I-64 PREFINANCD CONVRSN(O)

WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY-55 INTERCHANGE TO THE KY-1790 UNDERPASS. (2006BOPC)

PL

Project Cost:

CN

UT

RW

DN

NH 19,800,000

0 0 0 0 0 19,800,000 0

65.41

SHELBY I-64 PREFINANCD CONVRSN(O)

WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST OF THE KY 55 INTERCHANGE TO THE KY 1790 UNDERPASS. (2006BOPC)

PL

Project Cost:

CN

UT

RW

DN

NH 19,800,000

0 0 0 0 0 0 19,800,000

65.42

SHELBY I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDING COVERS 5-2035.70 SECTION ALSO)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

100,000

100,000

16,330,000

0 0 0 200,000 0 16,330,000 0

2035.4

SHELBY I-64 PREFINANCD CONVRSN(P)

WIDEN I-64 TO 6 LANES FROM KY-395 TO KY-151. (2004BOPC)(DESIGN FUNDING COVERS 5-2035.70 SECTION ALSO)(ADDITIONAL FUNDING FOR C PHASE)

PL

Project Cost:

CN

UT

RW

DN

NH 16,330,000

0 0 0 0 0 0 16,330,000

2035.41

273

Page 274: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SHELBY KY-53 RECONSTRUCTION(O)WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN) (12CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 3,000,000

0 3,000,000 0 0 0 0 0

8511

SHELBY KY-53 PREFINANCD CONVRSN(O)

WIDEN KY-53 TO FOUR LANES FROM I-64 TO US-60.(08CCN)(10CCN) (12CCR)(14CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 7,700,000

0 0 7,700,000 0 0 0 0

8511.01

SHELBY US-60 RECONSTRUCTION(O)CONSTRUCT A THIRD LANE ON US-60 FROM THE MASONIC HOME TO ROCKET LANE. (12CCN)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,170,000

0 0 0 2,170,000 0 0 0

8713

SHELBY CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOODY PIKE BRIDGE OVER FOX RUN CREEK(106C00004N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

217,000

0 140,000 217,000 0 0 0 0

10024

SHELBY CR-1009 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLORE JACKSON RD BRIDGE OVER FOX RUN CREEK. (106C00007N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

406,000

0 140,000 406,000 0 0 0 0

10025

274

Page 275: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SHELBY I-64 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 38.18 (38 NON-CARDINAL) TO MILEPOINT 43.33 (43.892 NON-CARDINAL)

PL

Project Cost:

CN

UT

RW

DN PM

PM

775,000

7,750,000

0 0 0 0 8,525,000 0 0

20033

SHELBY KY-53 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-53 FROM MILEPOINT 8.01 TO MILEPOINT 13.79

PL

Project Cost:

CN

UT

RW

DN

PM 943,000

0 0 0 0 0 943,000 0

20040

SHELBY KY 55X AIR QUALITY(P) FOUR RIGHT TURNING LANES AT THE INTERSECTION OF KY 55X AND KY 43 AND TWO LEFT TURNING LANES FROM KY 55X ONTO KY 43.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

150,000

22,000

22,000

500,000

0 194,000 500,000 0 0 0 0

80004

Total for SHELBY county PL

Total Amounts:

CN

UT

RW

DN 2,430,000

22,000

22,000

3,000,000

2,000,000

8,823,000

100,000

100,000

2,170,000

775,000

37,073,00027,550,000 36,130,000

0 5,474,000 10,823,000 2,370,000 28,325,000 37,073,000 36,130,000

SIMPSON -0 NEW ROUTE(O) GARVIN LANE EXTENSION TO HENDERSON INDUSTRIAL PARK. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 300,000

0 300,000 0 0 0 0 0

8810

275

Page 276: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SIMPSON KY-1008 MAJOR WIDENING(O) IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

1,880,000

560,000

3,200,000

0 0 0 0 2,440,000 3,200,000 0

8855

SIMPSON KY-1008 PREFINANCD CONVRSN(O)

IMPROVE KY-1008 FROM KY-73 TO NORTH FRANKLIN STREET. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP 1,670,000

0 0 0 0 0 1,670,000 0

8855.01

SIMPSON US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM KY-1008 TO KY-621. (14CCN)(16CCR)

PL

Project Cost:

CN

UT

RW

DN STP

STP

1,000,000

2,000,000

0 0 0 1,000,000 0 2,000,000 0

8856

SIMPSON KY-621 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-621 BRIDGE OVER SINKING CREEK. (107B00018N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

332,500

0 157,500 332,500 0 0 0 0

10007

SIMPSON CR-1126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PLEASANT HILL ROAD BRIDGE OVER MAYS BRANCH. (107C00011N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

280,000

0 157,500 280,000 0 0 0 0

10008

276

Page 277: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SIMPSON I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 13.71

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,650,000

16,500,000

0 0 0 0 0 0 18,150,000

20014

Total for SIMPSON county PL

Total Amounts:

CN

UT

RW

DN 315,000

300,000 612,500

1,000,000

1,880,000

560,000

3,200,000

2,000,000

1,670,000

1,650,000

16,500,000

0 615,000 612,500 1,000,000 2,440,000 6,870,000 18,150,000

SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BUCK CREEK ON KY 1169 75 FT EAST OF YODER TIPTON ROAD (CR 1142). (108B00022N)(EBRP)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

497,000

0 245,000 497,000 0 0 0 0

1076

SPENCER KY-155 MAJOR WIDENING(O) CONSTRUCT A 2+1 ROAD ON KY 55/155 (TAYLORSVILLE ROAD) IN SPENCER COUNTY AND KY 155 (TAYLORSVILLE LAKE ROAD) IN JEFFERSON COUNTY BY ADDING A

PL

Project Cost:

CN

UT

RW

DN SPP 4,750,000

0 0 0 0 0 0 4,750,000

8954

SPENCER KY-44 SAFETY(P) IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ALONG KY-44 NEAR DUTCHMAN CREEK ROAD. (16CCN)

PL

Project Cost:

CN

UT

RW

DN STP 230,000

0 0 0 0 230,000 0 0

8955

277

Page 278: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1169 BRIDGE OVER ELK CREEK. (108B00040N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

490,000

0 210,000 490,000 0 0 0 0

10013

SPENCER CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WASHBURN LANE BRIDGE OVER ELK CREEK. (108B00017N)(SD)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

248,500

0 192,500 248,500 0 0 0 0

10014

SPENCER CR-1155 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FEATHERBED HOLW RD BRIDGE OVER LITTLE PLUM CREEK. (108C00019N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

567,000

0 777,000 0 0 0 0 0

10026

SPENCER KY-44 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-44 FROM MILEPOINT 9.93 TO MILEPOINT 14.89

PL

Project Cost:

CN

UT

RW

DN

PM 808,000

0 0 0 0 0 808,000 0

20041

Total for SPENCER county PL

Total Amounts:

CN

UT

RW

DN 857,500

567,000 1,235,500

230,000

808,000

4,750,000

0 1,424,500 1,235,500 0 230,000 808,000 4,750,000

278

Page 279: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

TAYLOR KY-555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEW CAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70. SECTION 1. (2010BOP)

PL

Project Cost:

CN

UT

RW

DN

NH 7,600,000

0 0 0 0 7,600,000 0 0

142.2

TAYLOR KY-555 PREFINANCD CONVRSN(O)

HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEW CAMPBELLSVILLE BYPASS FROM KY-55 SOUTH OF CAMPBELLSVILLE TO KY-70. SECTION 1. (2010BOP)

PL

Project Cost:

CN

UT

RW

DN

NH 7,600,000

0 0 7,600,000 0 0 0 0

142.21

TAYLOR KY-555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEW CAMPBELLSVILLE BYPASS FROM KY-70 TO US-68 EAST OF CAMPBELLSVILLE. SECTION 2.

PL

Project Cost:

CN

UT

RW

DN

NH 1,000,000

0 1,000,000 0 0 0 0 0

142.3

TAYLOR KY-70 RECONSTRUCTION(O)IMPROVE SAFETY, ACCESS, GEOMETRICS AND DRAINAGE ON KY-70 IN CAMPBELLSVILLE FROM US-68 TO COUNTRY VIEW COURT (CS-1305)

PL

Project Cost:

CN

UT

RW

DN STP 700,000

0 0 0 0 0 0 700,000

443

TAYLOR KY-55 RECONSTRUCTION(O)HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THE TAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

500,000

1,000,000

1,000,000

0 1,500,000 1,000,000 0 0 0 0

8920

279

Page 280: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

TAYLOR KY-55 PREFINANCD CONVRSN(O)

HEARTLAND PARKWAY: IMPROVE MOBILITY ON KY-55 FROM SOUTH OF THE TAYLOR/ADAIR COUNTY LINE TO THE CAMPBELLSVILLE BYPASS. (16CCN)

PL

Project Cost:

CN

UT

RW

DN

NH 7,000,000

0 0 7,000,000 0 0 0 0

8920.01

TAYLOR KY-323 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST MAIN STREET BRIDGE OVER BUCKHORN CRK.. (109B00051N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

805,000

0 157,500 805,000 0 0 0 0

10006

TAYLOR CS-1241 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SOUTH JACKSON ST BRIDGE OVER BUCKHORN CREEK. (109C00028N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

105,000

367,500

0 105,000 367,500 0 0 0 0

10007

Total for TAYLOR county PL

Total Amounts:

CN

UT

RW

DN 262,500

500,000

2,000,000

16,772,500 7,600,000

700,000

0 2,762,500 16,772,500 0 7,600,000 0 700,000

TODD KY-181 RECONSTRUCTION(O)RECONSTRUCT KY-181 (ELKTON ROAD) FROM US-79 (MP 0.000) TO NORTH OF INTERSECTION WITH US-41 (MP 0.214) TO INCLUDE A NEW INTERSECTION WITH KY-294. (MP

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

250,000

670,000

2,600,000

0 0 0 920,000 0 2,600,000 0

8811

280

Page 281: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

TODD CR-1333 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RATTLESNAKE RD BRIDGE OVER BUCK FORK. (110C00059N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

192,500

294,000

0 192,500 294,000 0 0 0 0

10009

TODD CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROGER Q MILL RD. BRIDGE OVER RED RIVER W FORK BRANCH. (110C00061N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

385,000

0 157,500 385,000 0 0 0 0

10013

TODD US 79 AIR QUALITY(P) US 79 WIDENING FROM MP 0 TO MP 3PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

1,200,000

2,000,000

3,000,000

8,000,000

0 1,200,000 0 5,000,000 8,000,000 0 0

80001

Total for TODD county PL

Total Amounts:

CN

UT

RW

DN 1,550,000

679,000

2,250,000

3,670,000

2,600,0008,000,000

0 1,550,000 679,000 5,920,000 8,000,000 2,600,000 0

TRIGG CR-1380 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1380 (0.014) OVER DYERS CREEK 111C00027N

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

381,500

0 140,000 381,500 0 0 0 0

1160

281

Page 282: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

TRIGG I-24 AM-BRIDGE (P) OVERLAY BRIDGE DECK AND ADDRESS DEFICIENCIES OF EXPANSION JOINTS ON EASTBOUND I-24 BRIDGE OVER TRW RAILROAD EAST OF US 68 AT (MP 66.515).

PL

Project Cost:

CN

UT

RW

DN

BR 250,000

250,000 0 0 0 0 0 0

2039

TRIGG KY-139 REALIGNMENT REALIGN KY 124 APPROACH TO KY 139 TO IMPROVE INTERSECTION ANGLE AND SIGHT DISTANCE

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

200,000

150,000

150,000

600,000

0 200,000 900,000 0 0 0 0

8951

TRIGG KY-139 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-139 BRIDGE OVER BURGE CREEK. (111B00012N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

997,500

0 280,000 997,500 0 0 0 0

10005

TRIGG I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 CARDINAL DIRECTION(S) FROM MILEPOINT 57.39 TO MILEPOINT 69.83

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,220,000

12,200,000

0 0 0 0 0 0 13,420,000

20020

TRIGG I-24 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF PCC PAVEMENT ON I-024 NON-CARDINAL DIRECTION(S) FROM MILEPOINT 57.389 TO MILEPOINT 69.389

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,220,000

12,200,000

0 0 0 0 0 0 13,420,000

20022

282

Page 283: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

Total for TRIGG county PL

Total Amounts:

CN

UT

RW

DN

250,000

620,000

150,000

150,000

1,979,000

2,440,000

24,400,000

250,000 620,000 2,279,000 0 0 0 26,840,000

UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 0.971) OVER LOST CREEK; .95 MI N.E. OF JCT US-60; 113B00006N (LET W/ 2-1074)

PL

Project Cost:

CN

UT

RW

DN

BR 434,000

434,000 0 0 0 0 0 0

1073

UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359 (MP 1.193) OVER SINKING CREEK; 1.1 MI N.E. OF JCT US-60; 113B00007N (LET W/ 2-1073)

PL

Project Cost:

CN

UT

RW

DN

BR 511,000

511,000 0 0 0 0 0 0

1074

UNION US-60 RECONSTRUCTION(O)IMPROVE ROADWAY TO REDUCE FLOODING ON US-60 FROM EAST OF HOUSE BRIDGE ROAD (CR-1027) TO UNION/HENDERSON COUNTY LINE. (16CCN)

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

300,000

150,000

250,000

2,000,000

0 300,000 0 0 0 400,000 2,000,000

8955

UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-359 BRIDGE OVER LITTLE MASON CREEK(113B00008N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

682,500

0 210,000 682,500 0 0 0 0

10017

283

Page 284: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

UNION KY-492 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 492 BRIDGE OVER WASH CREEK. (113B00054N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

70,000

350,000

0 70,000 350,000 0 0 0 0

10026

Total for UNION county PL

Total Amounts:

CN

UT

RW

DN

945,000

580,000

1,032,500

150,000

250,000

2,000,000

945,000 580,000 1,032,500 0 0 400,000 2,000,000

WARREN KY-185 RECONSTRUCTION(O)IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEAR RICHARDSVILLE TO THE BUTLER COUNTY LINE. (02CCR)(04CCR)(06CCR)(10CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 5,000,000 0 0 0 0

110

WARREN KY-185 PREFINANCD CONVRSN(P)

IMPROVE KY-185 FROM NORTH OF THE JUNCTION WITH KY-263 NEAR RICHARDSVILLE TO THE BUTLER COUNTY LINE. (02CCR)(04CCR)(06CCR)(10CCR)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

0 0 0 5,000,000 0 0 0

110.01

WARREN US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 2,880,000

0 0 0 0 2,880,000 0 0

199

284

Page 285: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WARREN US-31 PREFINANCD CONVRSN(O)

IMPROVE US-31W FROM SOUTH OF KY-242 TO DILLARD ROAD.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 6,730,000

0 0 0 0 0 6,730,000 0

199.01

WARREN US-31 BIKE/PED FACIL(O) CONSTRUCT A PEDESTRIAN UNDERPASS UNDER US-31W CONNECTING BUCHANON PARK TRAIL TO CHANEY'S DAIRY BARN.(16CCN)

PL

Project Cost:

CN

UT

RW

DN STP

STP

50,000

400,000

0 0 0 0 50,000 0 400,000

199.99

WARREN KY-526 MINOR WIDENING(O) IMPROVE KY-526 FROM NEAR KY-2630 TO US-31W. (2014BOP)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

70,000

180,000

160,000

0 250,000 160,000 0 0 0 0

322

WARREN WN-9007 SIGNING(P) I-65 SPUR CORRIDOR SIGNING; EXISTING NATCHER PARKWAY FROM I-65 INTERCHANGE (EXIT 2) IN WARREN CO. EXTENDING NORTH TO THE US 60 INTERCHANGE IN DAVIESS

PL

Project Cost:

CN

UT

RW

DN

NH 2,150,000

0 2,150,000 0 0 0 0 0

2042.11

WARREN WN-9007 I-CHANGE RECONST(O)

I-65 SPUR CORRIDOR: IMPROVE THE NATCHER PARKWAY/US-231 INTERCHANGE (EXIT 9) ON THE WEST SIDE OF BOWLING GREEN. (SEE ITEM NO. 3-202 FOR DESIGN) (2016BOP)

PL

Project Cost:

CN

UT

RW

DN

NH 8,200,000

0 0 0 8,200,000 0 0 0

2042.2

285

Page 286: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WARREN US-231 MAJOR WIDENING(O) IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

2,500,000

2,600,000

2,500,000 2,600,000 0 0 0 0 0

8702

WARREN US-231 PREFINANCD CONVRSN(O)

IMPROVE US-231 FROM PASCOE BLVD. TO NORTH OF CAVE MILL ROAD. (12CCN)

PL

Project Cost:

CN

UT

RW

DN

NH 870,000

0 0 0 870,000 0 0 0

8702.01

WARREN KY-884 NEW ROUTE(O) THREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE NATCHER PARKWAY INCLUDING BRIDGE OVER PARKWAY. (14CCN)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

4,000,000

2,800,000

8,930,000

0 4,000,000 0 2,800,000 0 8,930,000 0

8818

WARREN US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM CAMPBELL LANE (US-231) TO UNIVERSITY BOULEVARD (US-231X). (14CCN)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

1,750,000

2,000,000

4,250,000

0 3,750,000 0 0 4,250,000 0 0

8857

WARREN US-31W MINOR WIDENING(O) WIDEN US-31W FROM PARK AVE. TO FAIRVIEW AVE MP 13.7-14.25

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

500,000

1,500,000

1,750,000

4,500,000

0 500,000 3,250,000 4,500,000 0 0 0

8904.1

286

Page 287: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WARREN US-31 RECONSTRUCTION(O)IMPROVE MOBILITY AND REDUCE CONGESTION ON US-31W FROM US-68 TO MIZPAH. (16CCN)

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

800,000

900,000

400,000

2,800,000

0 0 2,100,000 0 2,800,000 0 0

8905

WARREN KY-2632 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HAMMET HILL ROAD BRIDGE OVER SALT LICK CREEK. (114B00071N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

157,500

350,000

0 157,500 350,000 0 0 0 0

10014

WARREN KY-1435 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1435 BRIDGE OVER GASPER RIVER. (114B00074N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

280,000

1,172,500

0 280,000 1,172,500 0 0 0 0

10015

WARREN I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 13.711 TO MILEPOINT 25

PL

Project Cost:

CN

UT

RW

DN PM

PM

1,350,000

13,500,000

0 0 0 0 0 14,850,000 0

20016

WARREN I-65 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-065 BOTH DIRECTION(S) FROM MILEPOINT 35.616 TO MILEPOINT 42.89

PL

Project Cost:

CN

UT

RW

DN PM

PM

870,000

8,700,000

0 9,570,000 0 0 0 0 0

20017

287

Page 288: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WARREN WN-9007 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 2.473

PL

Project Cost:

CN

UT

RW

DN PM

PM

200,000

2,000,000

0 200,000 2,000,000 0 0 0 0

20018

WARREN WN-9007 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF WILLIAM H. NATCHER PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 9.2 TO MILEPOINT 20.246

PL

Project Cost:

CN

UT

RW

DN

PM 11,083,000

0 0 11,083,000 0 0 0 0

20019

WARREN US-68 NEW ROUTE(O) SOUTHWEST PARKWAY - NEW CONSTRUCTION FROM US-68 TO A CONNECTION AT KOBE WAY IN BOWLING GREEN

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

200,000

280,000

200,000

3,870,000

0 4,550,000 0 0 0 0 0

80000

WARREN KY 242 AIR QUALITY(P) ADD LEFT TURNING LANE ON KY 242 INTO RICHPOND ELEMENTARY SCHOOL AT MP 3.8 TO 3.95

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

50,000

125,000

250,000

200,000

0 50,000 575,000 0 0 0 0

80005

WARREN KY-3225 SAFETY(P) SAFETY IMPROVEMENTS AND REHABILITATION ON KY-3225. KEEP EXISTING FOOTPRINT BY REPLACING CURBLINE IN SAME LOCATION FROM MP 0 TO MP 1

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

200,000

1,110,000

100,000

1,200,000

0 0 200,000 1,210,000 1,200,000 0 0

80051

288

Page 289: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WARREN US-234 MINOR WIDENING(O) EXTEND THE 5 LANE SECTION ON KY-234 FROM MP 11.9 TO 12.4. IMPROVEMENTS MAY INCLUDE A ROUNDABOUT, TURN LANE, AND A SIGNAL AT HAMPTON DR.

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

250,000

180,000

1,500,000

1,400,000

0 0 0 0 250,000 1,680,000 1,400,000

80052

Total for WARREN county PL

Total Amounts:

CN

UT

RW

DN

2,500,000

2,257,500

6,100,000

2,380,000

17,320,000

1,000,000

2,525,000

2,400,000

19,965,500

1,110,000

2,900,000

18,570,000

300,000

29,160,000

1,350,000

180,000

1,500,000

11,130,000 1,800,000

2,500,000 28,057,500 25,890,500 22,580,000 11,430,000 32,190,000 1,800,000

WASHINGTON US-150 RECONSTRUCTION(O)IMPROVE US-150 FROM SPRINGFIELD TO BARDSTOWN.

PL

Project Cost:

CN

UT

RW

DN STP 3,000,000

0 0 3,000,000 0 0 0 0

396

WASHINGTON US-150 RECONSTRUCTION(O)IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ALONG US-150 FROM WEST OF OLD FREDERICKTOWN-BARDSTOWN ROAD (KY-1872) THROUGH GRUNDY HOME

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

500,000

500,000

750,000

4,000,000

0 0 0 500,000 1,250,000 0 4,000,000

396.2

WASHINGTON KY-528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 528 (MP 1.437) OVER ROAD RUN BRANCH.(115B00043N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

1,302,000

0 175,000 1,302,000 0 0 0 0

1094

289

Page 290: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WASHINGTON CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON TEXAS-MACKVILLE ROAD (CR 1140) AT MP 0.349 OVER LONG LICK CREEK(115C00039) (16CCN)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 175,000

0 0 175,000 0 0 0 0

8957

WASHINGTON US-150 SAFETY(P) ADDRESS SAFETY, MOBILITY, AND GEOMETRIC ISSUES ALONG US 150 IN WASHINGTON COUNTY FROM 400 FEET WEST OF OLD FREDERICKTOWN-BARDSTOWN ROAD

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

700,000

900,000

1,100,000

9,820,000

0 700,000 900,000 1,100,000 9,820,000 0 0

8958

WASHINGTON KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-55 BRIDGE OVER SEIBERT CREEK. (115B00026N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

87,500

511,000

0 87,500 511,000 0 0 0 0

10008

WASHINGTON KY-1920 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1920 BRIDGE OVER DEEP CREEK. (115B00061N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

87,500

262,500

0 87,500 262,500 0 0 0 0

10015

Total for WASHINGTON county PL

Total Amounts:

CN

UT

RW

DN 1,050,000 3,000,000

900,000

2,250,500

500,000

1,100,000

500,000

750,000

9,820,000 4,000,000

0 1,050,000 6,150,500 1,600,000 11,070,000 0 4,000,000

290

Page 291: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WAYNE KY-90 SAFETY(P) IMPROVE KY-90 FROM OLD MILL SPRINGS ROAD TO THE BRIDGE AT MP 19.5. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 4,220,000

0 0 4,220,000 0 0 0 0

109.1

WAYNE KY-90 SAFETY(P) IMPROVE KY-90 FROM OLD MILL SPRINGS ROA TO THE BRIDGE AT MP 19.5. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 4,220,000

0 0 0 4,220,000 0 0 0

109.2

WAYNE CR-1136 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1136 (MP 0.225) OVER LITTLE SOUTH FORK RIVER; 0.25 MI SE OF JCT CR-5137; 116C00007N

PL

Project Cost:

CN

UT

RW

DN

BR 455,000

0 455,000 0 0 0 0 0

1050

WAYNE CR-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DODSON HOLLOW RD BRIDGE OVER MEADOW CREEK. (116C00028N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

466,000

0 175,000 466,000 0 0 0 0

10005

WAYNE KY-90 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-90X FROM MILEPOINT 0.00 TO MILEPOINT 3.54

PL

Project Cost:

CN

UT

RW

DN

PM 1,623,000

0 0 0 0 0 0 1,623,000

20010

291

Page 292: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WAYNE KY-92 PLANNING-OKI(O) PRELIMINARY ENGINEERING AND ENVIRONMENTAL CORRIDOR STUDY FOR IMPROVING SAFETY AND MAKING KY-92 A SCENIC ROUTE FROM MONTICELLO TO STEARNS (FLEXIBLE

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 0 1,500,000 0 0 0 0

80004

WAYNE KY 1275 AIR QUALITY(P) IMPROVE CURVE ON KY 1275 AT KY 833/ROGERS GROVE ROAD AND RESURFACE FROM KY 1275 FROM BELL LANE TO KY 833/ROGERS GROVE ROAD

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

60,000

3,500

60,000

200,000

0 123,500 200,000 0 0 0 0

80005

WAYNE KY 1275 AIR QUALITY(P) WIDEN KY 1275 TO FOUR LANES WITH FOUR FOOT SHOULDERS AND FIVE FOOT SIDEWALKS FROM KY 90 TO BELL LANE

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

490,000

200,000

500,000

3,000,000

0 490,000 700,000 3,000,000 0 0 0

80006

Total for WAYNE county PL

Total Amounts:

CN

UT

RW

DN 725,000

3,500

60,000

455,000

1,500,000

200,000

500,000

4,886,000 7,220,000 1,623,000

0 1,243,500 7,086,000 7,220,000 0 0 1,623,000

WEBSTER KY-138 RECONSTRUCTION(O)RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS TO ALLEVIATE FLOODING. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP

SPP

SPP

100,000

250,000

1,200,000

0 350,000 1,200,000 0 0 0 0

228

292

Page 293: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WEBSTER KY-1835 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1835 BRIDGE OVER SUGAR CAMP CREEK. (117B00023N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

210,000

665,000

0 210,000 665,000 0 0 0 0

10018

WEBSTER KY-132 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-132 BRIDGE OVER NALL DITCH. (117B00064N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

1,102,500

0 245,000 1,102,500 0 0 0 0

10019

Total for WEBSTER county PL

Total Amounts:

CN

UT

RW

DN 455,000

100,000

250,000

2,967,500

0 805,000 2,967,500 0 0 0 0

WHITLEY I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN (C-COST=$87,500,000)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

500,000

500,000

10,000,000

0 1,000,000 10,000,000 0 0 0 0

14.8

WHITLEY I-75 PREFINANCD CONVRSN(O)

TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.

PL

Project Cost:

CN

UT

RW

DN

NH 25,000,000

0 0 0 25,000,000 0 0 0

14.81

293

Page 294: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WHITLEY I-75 PREFINANCD CONVRSN(O)

TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.

PL

Project Cost:

CN

UT

RW

DN

NH 25,000,000

0 0 0 0 25,000,000 0 0

14.82

WHITLEY I-75 PREFINANCD CONVRSN(O)

TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8 LANES FROM MP 20.2 IN WHITLEY COUNTY TO MP 28.85, US-25E NORTH OF CORBIN.

PL

Project Cost:

CN

UT

RW

DN

NH 25,000,000

0 0 0 0 0 25,000,000 0

14.83

WHITLEY KY-92 RELOCATION(O) RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTY LINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1)(14CCR)

PL

Project Cost:

CN

UT

RW

DN

STP 10,000,000

0 10,000,000 0 0 0 0 0

184.1

WHITLEY KY-92 PREFINANCD CONVRSN(O)

RECONSTRUCT KY-92 FROM 500 FT WEST OF THE WHITLEY/MCCREARY COUNTY LINE TO 1200 FT EAST OF OLD JELLICO CREEK ROAD. (SECTION 1) (ADDITIONAL FUNDING FOR

PL

Project Cost:

CN

UT

RW

DN

STP 6,000,000

0 0 0 6,000,000 0 0 0

184.11

WHITLEY US-25 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH

NH

NH

2,770,000

4,160,000

3,330,000

0 0 0 6,930,000 3,330,000 0 0

186

294

Page 295: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WHITLEY US-25 PREFINANCD CONVRSN(O)

IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US-25W FROM KY-727 TO KY-3041. (12CCR)(16CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 6,670,000

0 0 0 0 0 6,670,000 0

186.01

WHITLEY I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER LYNN CAMP CREEK (SR 34.1) (B00063R AND B00063L)(SD)

PL

Project Cost:

CN

UT

RW

DN

BR 2,800,000

2,800,000 0 0 0 0 0 0

1105

WHITLEY KY-904 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-904 BRIDGE OVER TYES FK OF BENNETTS BR. (118B00070N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

493,500

0 175,000 493,500 0 0 0 0

10032

WHITLEY KY-779 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-779 BRIDGE OVER BROWNS CREEK. (118B00079N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

448,000

0 175,000 448,000 0 0 0 0

10033

WHITLEY KY-204 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-204 BRIDGE OVER YOUNGS CREEK. (118B00084N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

262,500

910,000

0 262,500 910,000 0 0 0 0

10034

295

Page 296: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WHITLEY KY-2996 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2996 BRIDGE OVER WOLF CREEK. (118B00101N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

455,000

0 175,000 455,000 0 0 0 0

10035

WHITLEY CR-1275 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BETHEL ROAD BRIDGE OVER PATTERSON CREEK. (118C00029N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

140,000

315,000

0 140,000 315,000 0 0 0 0

10036

WHITLEY CR-1461 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIVER ROAD BRIDGE OVER SANDERS CREEK. (118C00039N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

406,000

0 175,000 406,000 0 0 0 0

10037

WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RVR. (118B00041N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

1,890,000

0 245,000 1,890,000 0 0 0 0

10044

WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE OVER CLEAR FORK RIVER. (118B00042N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

245,000

1,645,000

0 245,000 1,645,000 0 0 0 0

10045

296

Page 297: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WHITLEY I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT 11.27

PL

Project Cost:

CN

UT

RW

DN PM

PM

900,000

9,000,000

0 0 0 0 9,900,000 0 0

20015

WHITLEY I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 CARDINAL DIRECTION(S) FROM MILEPOINT 20.2 TO MILEPOINT 24.645

PL

Project Cost:

CN

UT

RW

DN PM

PM

200,000

2,000,000

0 0 0 0 2,200,000 0 0

20018

WHITLEY I-75 AM-PAVEMENT (INT)(P)

ADDRESS PAVEMENT CONDITION OF I-075 BOTH DIRECTION(S) FROM MILEPOINT 23.0 (25.26 NON-CARDINAL) TO MILEPOINT 28.872

PL

Project Cost:

CN

UT

RW

DN PM

PM

340,000

3,400,000

0 3,740,000 0 0 0 0 0

20019

WHITLEY KY-26 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-26 FROM MILEPOINT 5.46 TO MILEPOINT 13.33

PL

Project Cost:

CN

UT

RW

DN

PM 1,313,000

0 0 0 0 1,313,000 0 0

20024

WHITLEY KY-90 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-90 FROM MILEPOINT 2.78 TO MILEPOINT 8.33

PL

Project Cost:

CN

UT

RW

DN

PM 926,000

0 0 0 0 926,000 0 0

20025

297

Page 298: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WHITLEY US-25 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON US-25W FROM MILEPOINT 26.17 TO MILEPOINT 32.43

PL

Project Cost:

CN

UT

RW

DN

PM 2,135,000

0 0 0 0 0 0 2,135,000

20026

WHITLEY KY 204 AIR QUALITY(P) INSTALL GUARDRAIL ON KY 204 BETWEEN MP 10.7 AND 10.8

PL

Project Cost:

CN

UT

RW

DN

SPP 15,000

0 15,000 0 0 0 0 0

80001

Total for WHITLEY county PL

Total Amounts:

CN

UT

RW

DN

2,800,000

1,932,500

500,000

500,000

13,415,000 16,562,500

2,770,000

4,160,000

31,000,000

1,100,000

31,670,00041,569,000 2,135,000

2,800,000 16,347,500 16,562,500 37,930,000 42,669,000 31,670,000 2,135,000

WOLFE KY-191 RECONSTRUCTION(O)IMPROVE THE KY-191 AND KY-1812 INTERSECTION.

PL

Project Cost:

CN

UT

RW

DN STP

STP

STP

STP

260,000

80,000

100,000

800,000

0 0 0 0 0 440,000 800,000

212

WOLFE KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-191 BRIDGE OVER LACEY CREEK. (119B00001N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

150,000

564,000

0 150,000 564,000 0 0 0 0

10009

298

Page 299: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WOLFE KY-2491 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2491 BRIDGE OVER SWANGO FORK. (119B00058N)

PL

Project Cost:

CN

UT

RW

DN BR

BR

175,000

525,000

0 175,000 525,000 0 0 0 0

10019

WOLFE KY-9000 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 36 TO MILEPOINT 42.85

PL

Project Cost:

CN

UT

RW

DN PM

PM

550,000

5,500,000

0 0 0 6,050,000 0 0 0

20009

WOLFE KY-9009 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 42.853 TO MILEPOINT 46.208

PL

Project Cost:

CN

UT

RW

DN PM

PM

275,000

2,750,000

0 0 0 0 3,025,000 0 0

20010

WOLFE KY-9009 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 46.208 TO MILEPOINT 55.434

PL

Project Cost:

CN

UT

RW

DN PM

PM

370,000

3,700,000

0 0 0 4,070,000 0 0 0

20011

WOLFE KY-9009 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF BERT T. COMBS MOUNTAIN PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 55.434 TO MILEPOINT 57.72

PL

Project Cost:

CN

UT

RW

DN PM

PM

90,000

900,000

0 990,000 0 0 0 0 0

20012

299

Page 300: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WOLFE KY-15 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-15S FROM MILEPOINT 0.00 TO MILEPOINT 0.93

PL

Project Cost:

CN

UT

RW

DN

PM 896,000

0 0 0 0 896,000 0 0

20016

WOLFE KY-11 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION ON KY-11 FROM MILEPOINT 0.35 TO MILEPOINT 5.32

PL

Project Cost:

CN

UT

RW

DN

PM 1,228,000

0 0 0 0 0 0 1,228,000

20017

Total for WOLFE county PL

Total Amounts:

CN

UT

RW

DN 415,000

900,000 1,089,000

920,000

9,200,000

275,000 260,000

80,000

100,000

3,646,000 2,028,000

0 1,315,000 1,089,000 10,120,000 3,921,000 440,000 2,028,000

WOODFORD US-60 MAJOR WIDENING(O) IMPROVE US 60 (VERSAILLES ROAD) FROM THE BLUEGRASS PARKWAY/HUNTERTOWN PIKE TO PISGAH PIKE.

PL

Project Cost:

CN

UT

RW

DN NH 500,000

0 0 0 500,000 0 0 0

117

WOODFORD KY-169 RECONSTRUCTION(O)IMPROVE KY-169 FROM NORTH OF CLEAR CREEK RD IN JESSAMINE COUNTY TO NORTH OF KY-1967 IN WOODFORD COUNTY.

PL

Project Cost:

CN

UT

RW

DN STP 800,000

0 0 0 0 0 800,000 0

440

300

Page 301: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

WOODFORD CR-1015 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE WEISENBURG MILL ROAD BRIDGE AT THE WOODFORD/SCOTT COUNTY LINE. (10CCN)(120C00006N)

PL

Project Cost:

CN

UT

RW

DN

BR 966,000

0 0 966,000 0 0 0 0

8642

WOODFORD US-60 CONGESTION MITIGTN(O)

ACCESS MANAGEMENT IMPROVEMENTS ON US 60 FROM LEXINGTON ROAD AT WOODFORD FEED TO MARSAILLES DRIVE (MP 9.38 TO MP 9.70)

PL

Project Cost:

CN

UT

RW

DN SPP

SPP

SPP

SPP

400,000

950,000

750,000

2,000,000

0 0 400,000 950,000 750,000 2,000,000 0

8905

WOODFORD BG-9002 AM-PAVEMENT (PKY)(P)

ADDRESS PAVEMENT CONDITION OF MARTHA LAYNE COLLINS BLUEGRASS PARKWAY BOTH DIRECTION(S) FROM MILEPOINT 61.95 (62.05 NON-CARDINAL) TO MILEPOINT 70.70

PL

Project Cost:

CN

UT

RW

DN PM

PM

700,000

7,000,000

0 7,700,000 0 0 0 0 0

20022

WOODFORD US-60 AM-PAVEMENT (PRI)(P)

ADDRESS PAVEMENT CONDITION OF AC PAVEMENT

PL

Project Cost:

CN

UT

RW

DN PM

PM

350,000

3,500,000

0 0 3,850,000 0 0 0 0

20023

Total for WOODFORD county PL

Total Amounts:

CN

UT

RW

DN 700,000

7,000,000

750,000

4,466,000

500,000

950,000

750,000

2,000,000

800,000

0 7,700,000 5,216,000 1,450,000 750,000 2,800,000 0

301

Page 302: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2018. (2009BOPP)

PL

Project Cost:

CN

UT

RW

DN

BR 2,000,000

2,000,000 0 0 0 0 0 0

65.15

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

BR 2,000,000

0 2,000,000 0 0 0 0 0

65.16

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

BR 2,000,000

0 0 2,000,000 0 0 0 0

65.17

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

BR 30,000,000

0 0 0 30,000,000 0 0 0

65.18

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

BR 30,000,000

0 0 0 0 30,000,000 0 0

65.19

302

Page 303: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

BR 30,000,000

0 0 0 0 0 30,000,000 0

65.2

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

BR 30,000,000

0 0 0 0 0 0 30,000,000

65.21

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2018.

PL

Project Cost:

CN

UT

RW

DN

NH 2,000,000

2,000,000 0 0 0 0 0 0

66.13

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

NH 2,000,000

0 2,000,000 0 0 0 0 0

66.14

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

NH 2,000,000

0 0 2,000,000 0 0 0 0

66.15

303

Page 304: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

NH 2,000,000

0 0 0 2,000,000 0 0 0

66.16

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

NH 2,000,000

0 0 0 0 2,000,000 0 0

66.17

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

NH 2,000,000

0 0 0 0 0 2,000,000 0

66.18

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

NH 2,000,000

0 0 0 0 0 0 2,000,000

66.19

ZVARIOUS -0 TRANSP ENHANCEMENT(P)

STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2018. (98CCR

PL

Project Cost:

CN

UT

RW

DN

TE 12,800,000

12,800,000 0 0 0 0 0 0

195.14

304

Page 305: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 TRANSP ENHANCEMENT(P)

STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2019. (98CCR

PL

Project Cost:

CN

UT

RW

DN

TE 13,700,000

0 13,700,000 0 0 0 0 0

195.15

ZVARIOUS -0 TRANSP ENHANCEMENT(P)

STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2020 (98CCR

PL

Project Cost:

CN

UT

RW

DN

TE 13,700,000

0 0 13,700,000 0 0 0 0

195.16

ZVARIOUS -0 TRANSP ENHANCEMENT(P)

STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

TE 12,800,000

0 0 0 12,800,000 0 0 0

195.17

ZVARIOUS -0 TRANSP ENHANCEMENT(P)

STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

TE 12,800,000

0 0 0 0 12,800,000 0 0

195.18

ZVARIOUS -0 TRANSP ENHANCEMENT(P)

STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

TE 14,500,000

0 0 0 0 0 14,500,000 0

195.23

305

Page 306: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 TRANSP ENHANCEMENT(P)

STATEWIDE TRANSPORTATION ENHANCEMENT FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

TE 14,500,000

0 0 0 0 0 0 14,500,000

195.24

ZVARIOUS -0 CONGESTION MITIGTN(O)

NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2018.

PL

Project Cost:

CN

UT

RW

DN

CM 13,100,000

13,100,000 0 0 0 0 0 0

219.16

ZVARIOUS -0 CONGESTION MITIGTN(O)

NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

CM 13,100,000

0 13,100,000 0 0 0 0 0

219.17

ZVARIOUS -0 CONGESTION MITIGTN(O)

NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

CM 13,100,000

0 0 13,100,000 0 0 0 0

219.18

ZVARIOUS -0 CONGESTION MITIGTN(O)

NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

CM 17,800,000

0 0 0 17,800,000 0 0 0

219.19

306

Page 307: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 CONGESTION MITIGTN(O)

NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

CM 17,800,000

0 0 0 0 17,800,000 0 0

219.2

ZVARIOUS -0 CONGESTION MITIGTN(O)

NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

CM 17,800,000

0 0 0 0 0 17,800,000 0

219.21

ZVARIOUS -0 CONGESTION MITIGTN(O)

NON-ATTAINMENT AREAS STATEWIDE CMAQ FUNDED PROJECTS FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

CM 17,800,000

0 0 0 0 0 0 17,800,000

219.22

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN KENTUCKY FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

PM 2,000,000

0 2,000,000 0 0 0 0 0

224.13

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN KENTUCKY FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

PM 9,000,000

0 0 0 9,000,000 0 0 0

224.14

307

Page 308: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT REHAB ON STATE (NON RS) SYSTEM ROUTES IN KENTUCKY FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

PM 10,000,000

0 0 0 0 0 10,000,000 0

224.15

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2018.

PL

Project Cost:

CN

UT

RW

DN

BR 2,600,000

2,600,000 0 0 0 0 0 0

327.14

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

BR 2,600,000

0 2,600,000 0 0 0 0 0

327.15

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

BR 2,600,000

0 0 2,600,000 0 0 0 0

327.16

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

BR 2,600,000

0 0 0 2,600,000 0 0 0

327.17

308

Page 309: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

BR 2,600,000

0 0 0 0 2,600,000 0 0

327.18

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

BR 2,600,000

0 0 0 0 0 2,600,000 0

327.19

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE BRIDGE INSPECTION FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

BR 2,600,000

0 0 0 0 0 0 2,600,000

327.2

ZVARIOUS -0 FOREST HIGHWAY(P) STATEWIDE FEDERAL LANDS ACCESS PROGRAM FEDERAL HIGHWAY FUNDS FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

FH 1,641,000

0 0 0 0 1,641,000 0 0

333.15

ZVARIOUS -0 FOREST HIGHWAY(P) STATEWIDE FEDERAL LANDS ACCESS PROGRAM FEDERAL HIGHWAY FUNDS FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

FH 1,641,000

0 0 0 0 0 1,641,000 0

333.16

309

Page 310: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 FOREST HIGHWAY(P) STATEWIDE FEDERAL LANDS ACCESS PROGRAM FEDERAL HIGHWAY FUNDS FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

FH 1,641,000

0 0 0 0 0 0 1,641,000

333.17

ZVARIOUS -0 AM-PAVEMENT (INT)(P)

STATEWIDE I-STATE ROUTES FOR FY 2019.(14CCR)

PL

Project Cost:

CN

UT

RW

DN

PM 2,000,000

0 2,000,000 0 0 0 0 0

337.14

ZVARIOUS -0 AM-PAVEMENT (INT)(P)

STATEWIDE I-STATE ROUTES FOR FY 2021.(14CCR)

PL

Project Cost:

CN

UT

RW

DN

PM 9,000,000

0 0 0 9,000,000 0 0 0

337.15

ZVARIOUS -0 AM-PAVEMENT (INT)(P)

STATEWIDE I-STATE ROUTES FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

PM 10,000,000

0 0 0 0 0 10,000,000 0

337.16

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2018

PL

Project Cost:

CN

UT

RW

DN

BR 1,100,000

1,100,000 0 0 0 0 0 0

346.14

310

Page 311: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

BR 1,100,000

0 1,100,000 0 0 0 0 0

346.15

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

BR 1,100,000

0 0 1,100,000 0 0 0 0

346.16

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

BR 1,100,000

0 0 0 1,100,000 0 0 0

346.17

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

BR 1,100,000

0 0 0 0 1,100,000 0 0

346.18

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

BR 1,100,000

0 0 0 0 0 1,100,000 0

346.19

311

Page 312: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE OFF-SYSTEM BRIDGE INSPECTION FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

BR 1,100,000

0 0 0 0 0 0 1,100,000

346.2

ZVARIOUS -0 SAFETY-RR PROTECTN(P)

RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2018.

PL

Project Cost:

CN

UT

RW

DN

RRP 3,600,000

3,600,000 0 0 0 0 0 0

352.14

ZVARIOUS -0 SAFETY-RR PROTECTN(P)

RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

RRP 3,600,000

0 3,600,000 0 0 0 0 0

352.15

ZVARIOUS -0 SAFETY-RR PROTECTN(P)

RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

RRP 3,600,000

0 0 3,600,000 0 0 0 0

352.16

ZVARIOUS -0 SAFETY-RR PROTECTN(P)

RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

RRP 4,400,000

0 0 0 4,400,000 0 0 0

352.17

312

Page 313: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 SAFETY-RR PROTECTN(P)

RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

RRP 4,400,000

0 0 0 0 4,400,000 0 0

352.18

ZVARIOUS -0 SAFETY-RR PROTECTN(P)

RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

RRP 4,400,000

0 0 0 0 0 4,400,000 0

352.19

ZVARIOUS -0 SAFETY-RR PROTECTN(P)

RAIL PROTECTION ON VARIOUS ROUTES FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

RRP 4,400,000

0 0 0 0 0 0 4,400,000

352.2

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

PM 2,000,000

0 2,000,000 0 0 0 0 0

369.09

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

PM 9,000,000

0 0 0 9,000,000 0 0 0

369.1

313

Page 314: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT REHABILITATION FOR VARIOUS NHS ROUTES IN KENTUCKY FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

PM 10,000,000

0 0 0 0 0 10,000,000 0

369.11

ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2018. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

BR 1,600,000

1,600,000 0 0 0 0 0 0

388.08

ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

BR 1,600,000

0 1,600,000 0 0 0 0 0

388.09

ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

BR 1,600,000

0 0 1,600,000 0 0 0 0

388.1

ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

BR 1,600,000

0 0 0 1,600,000 0 0 0

388.11

314

Page 315: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

BR 1,600,000

0 0 0 0 1,600,000 0 0

388.12

ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

BR 1,600,000

0 0 0 0 0 1,600,000 0

388.13

ZVARIOUS -0 BRIDGE INSPECTION(P)OHIO RIVER BRIDGES FRACTURE CRITICAL FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

BR 1,600,000

0 0 0 0 0 0 1,600,000

388.14

ZVARIOUS -0 DESIGN ENGINEERING(O)

STATEWIDE STP HIGHWAY PROJECT ACTIVITIES.

PL

Project Cost:

CN

UT

RW

DN STP 2,000,000

0 2,000,000 0 0 0 0 0

391.04

ZVARIOUS -0 DESIGN ENGINEERING(O)

STATEWIDE HIGHWAY PROJECT DESIGN ACTIVITIES.

PL

Project Cost:

CN

UT

RW

DN STP 1,000,000

0 0 0 1,000,000 0 0 0

391.06

315

Page 316: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 DESIGN ENGINEERING(O)

STATEWIDE HIGHWAY PROJECT DESIGN ACTIVITIES.

PL

Project Cost:

CN

UT

RW

DN STP 5,000,000

0 0 0 0 0 5,000,000 0

391.07

ZVARIOUS -0 AM-PAVEMENT (INT)(P)

PAVEMENT REPAIR AT INTERSECTIONS FOR VARIOUS ROADWAYS FOR FY 2019.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

PM 2,000,000

0 2,000,000 0 0 0 0 0

395.07

ZVARIOUS -0 AM-PAVEMENT (INT)(P)

PAVEMENT REPAIR AT INTERSECTIONS FOR VARIOUS ROADWAYS FOR FY 2021.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

PM 5,000,000

0 0 0 5,000,000 0 0 0

395.08

ZVARIOUS -0 AM-PAVEMENT (INT)(P)

PAVEMENT REPAIR AT INTERSECTIONS FOR VARIOUS ROADWAYS FOR FY 2023.(12CCR)

PL

Project Cost:

CN

UT

RW

DN

PM 10,000,000

0 0 0 0 0 10,000,000 0

395.09

ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR STREAMS AND WATERWAYS FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,000,000

0 1,000,000 0 0 0 0 0

400.06

316

Page 317: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR STREAMS AND WATERWAYS FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,000,000

0 0 0 1,000,000 0 0 0

400.07

ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR BRIDGES OVER MAJOR STREAMS AND WATERWAYS FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,000,000

0 0 0 0 0 1,000,000 0

400.08

ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES(CANNOT BE MOVED).

PL

Project Cost:

CN

UT

RW

DN

BR 3,500,000

0 3,500,000 0 0 0 0 0

510.03

ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES(CANNOT BE MOVED).

PL

Project Cost:

CN

UT

RW

DN

BR 15,000,000

0 0 0 15,000,000 0 0 0

510.05

ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES(CANNOT BE MOVED).

PL

Project Cost:

CN

UT

RW

DN

BR 15,000,000

0 0 0 0 15,000,000 0 0

510.06

317

Page 318: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES (CANNOT BE MOVED).

PL

Project Cost:

CN

UT

RW

DN

BR 15,000,000

0 0 0 0 0 15,000,000 0

510.07

ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR EXISTING BRIDGES (CANNOT BE MOVED).

PL

Project Cost:

CN

UT

RW

DN

BR 15,000,000

0 0 0 0 0 0 15,000,000

510.08

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2018.

PL

Project Cost:

CN

UT

RW

DN

STP 5,000,000

5,000,000 0 0 0 0 0 0

511.02

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

STP 2,000,000

0 2,000,000 0 0 0 0 0

511.03

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 1,000,000 0 0 0 0

511.04

318

Page 319: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 0 1,000,000 0 0 0

511.05

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

STP 2,000,000

0 0 0 0 2,000,000 0 0

511.06

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

STP 8,500,000

0 0 0 0 0 8,500,000 0

511.07

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCK FALL OR EMBANKMENT STABILIZATION FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 0 0 0 0 1,000,000

511.08

ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

BR 3,000,000

0 3,000,000 0 0 0 0 0

514

319

Page 320: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

BR 10,000,000

0 0 0 10,000,000 0 0 0

514.01

ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE STRUCTURES FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

BR 10,000,000

0 0 0 0 0 10,000,000 0

514.02

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

NH 6,000,000

0 6,000,000 0 0 0 0 0

518

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

NH 1,000,000

0 0 1,000,000 0 0 0 0

518.01

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

NH 6,000,000

0 0 0 6,000,000 0 0 0

518.02

320

Page 321: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

NH 7,000,000

0 0 0 0 7,000,000 0 0

518.03

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

NH 9,500,000

0 0 0 0 0 9,500,000 0

518.04

ZVARIOUS -0 LANDSLIDE REPAIR(P)STATEWIDE CORRECTIONS OF ROCKFALL OR EMBANKMENT STABILIZATION ON NH ROUTES FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

NH 8,000,000

0 0 0 0 0 0 8,000,000

518.05

ZVARIOUS -0 SAFETY-HAZARD ELIM(P)

STATEWIDE SAFETY PROGRAM FOR FY 2019.(HSIP)

PL

Project Cost:

CN

UT

RW

DN

SAF 38,500,000

0 38,500,000 0 0 0 0 0

911.08

ZVARIOUS -0 SAFETY-HAZARD ELIM(P)

STATEWIDE SAFETY PROGRAM FOR FY 2020. (HSIP)

PL

Project Cost:

CN

UT

RW

DN

SAF 38,500,000

0 0 38,500,000 0 0 0 0

911.09

321

Page 322: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 SAFETY-HAZARD ELIM(P)

STATEWIDE SAFETY PROGRAM FOR FY 2021. (HSIP)

PL

Project Cost:

CN

UT

RW

DN

SAF 47,500,000

0 0 0 47,500,000 0 0 0

911.1

ZVARIOUS -0 SAFETY-HAZARD ELIM(P)

STATEWIDE SAFETY PROGRAM FOR FY 2022. (HSIP)

PL

Project Cost:

CN

UT

RW

DN

SAF 47,500,000

0 0 0 0 47,500,000 0 0

911.11

ZVARIOUS -0 SAFETY-HAZARD ELIM(P)

STATEWIDE SAFETY PROGRAM FOR FY 2023. (HSIP)

PL

Project Cost:

CN

UT

RW

DN

SAF 47,500,000

0 0 0 0 0 47,500,000 0

911.12

ZVARIOUS -0 SAFETY-HAZARD ELIM(P)

STATEWIDE SAFETY PROGRAM FOR FY 2024. (HSIP)

PL

Project Cost:

CN

UT

RW

DN

SAF 47,500,000

0 0 0 0 0 0 47,500,000

911.13

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2018

PL

Project Cost:

CN

UT

RW

DN

BR 500,000

500,000 0 0 0 0 0 0

1063.14

322

Page 323: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

BR 500,000

0 500,000 0 0 0 0 0

1063.15

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

BR 500,000

0 0 500,000 0 0 0 0

1063.16

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

BR 500,000

0 0 0 500,000 0 0 0

1063.17

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

BR 500,000

0 0 0 0 500,000 0 0

1063.18

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

BR 500,000

0 0 0 0 0 500,000 0

1063.19

323

Page 324: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE UNDERWATER BRIDGE INSPECTION FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

BR 500,000

0 0 0 0 0 0 500,000

1063.2

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2018.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

1,500,000 0 0 0 0 0 0

1071.06

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 1,500,000 0 0 0 0 0

1071.07

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 0 1,500,000 0 0 0 0

1071.08

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 0 0 1,500,000 0 0 0

1071.09

324

Page 325: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 0 0 0 1,500,000 0 0

1071.1

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 0 0 0 0 1,500,000 0

1071.11

ZVARIOUS -0 BRIDGE INSPECTION(P)STATEWIDE PROGRAM TO FUND BRIDGE SCOUR COUNTER-MEASURES FOR STATE-MAINTAINED BRIDGES FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,500,000

0 0 0 0 0 0 1,500,000

1071.12

ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

BR 3,000,000

0 3,000,000 0 0 0 0 0

1074.07

ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

BR 18,000,000

0 0 0 18,000,000 0 0 0

1074.08

325

Page 326: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

BR 20,000,000

0 0 0 0 20,000,000 0 0

1074.09

ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

BR 20,000,000

0 0 0 0 0 20,000,000 0

1074.1

ZVARIOUS -0 ECONOMIC DEVEL(O)ECONOMIC DEVELOPMENT TRANSPORTATION IMPROVEMENT FACILITIES.

PL

Project Cost:

CN

UT

RW

DN

SPP 1,000,000

0 0 1,000,000 0 0 0 0

1084

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

PM 2,000,000

0 2,000,000 0 0 0 0 0

2700.13

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

PM 2,000,000

0 0 2,000,000 0 0 0 0

2700.14

326

Page 327: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

PM 5,000,000

0 0 0 5,000,000 0 0 0

2700.15

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

PM 5,000,000

0 0 0 0 5,000,000 0 0

2700.16

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

PM 12,000,000

0 0 0 0 0 12,000,000 0

2700.17

ZVARIOUS -0 AM-PAVEMENT (PRI)(P)

PAVEMENT PREVENTATIVE MAINTENANCE PROGRAM FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

PM 12,000,000

0 0 0 0 0 0 12,000,000

2700.18

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 1,000,000 0 0 0 0 0

3011

327

Page 328: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 1,000,000 0 0 0 0

3011.01

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 0 1,000,000 0 0 0

3011.02

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 0 0 1,000,000 0 0

3011.03

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 0 0 0 1,000,000 0

3011.04

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA) TRANSITION PLAN IMPLEMENTATION PROJECTS.

PL

Project Cost:

CN

UT

RW

DN

STP 1,000,000

0 0 0 0 0 0 1,000,000

3011.05

328

Page 329: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. (08CCN)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 4,700,000

0 4,700,000 0 0 0 0 0

8500.15

ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. (08CCN)(12CCR)

PL

Project Cost:

CN

UT

RW

DN

SPP 5,000,000

0 0 0 0 5,000,000 0 0

8500.16

ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. PL

Project Cost:

CN

UT

RW

DN

SPP 5,000,000

0 0 0 0 0 0 5,000,000

8500.17

ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75; AND I-64 FOR FY 2018. (JM03-FD53 "IM" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 44,500,000

44,500,000 0 0 0 0 0 0

9050.08

ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75; AND I-64 FOR FY 2019. (JM03-FD53 "IM" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 44,500,000

0 44,500,000 0 0 0 0 0

9050.1

329

Page 330: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2018. (079B00023N, 111B00020N)

PL

Project Cost:

CN

UT

RW

DN

NH 9,100,000

9,100,000 0 0 0 0 0 0

9068.03

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2019. (079B00023N, 111B00020N)

PL

Project Cost:

CN

UT

RW

DN

NH 9,100,000

0 9,100,000 0 0 0 0 0

9068.05

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2020. (12CCR)

PL

Project Cost:

CN

UT

RW

DN

NH 9,100,000

0 0 9,100,000 0 0 0 0

9068.61

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2018.

PL

Project Cost:

CN

UT

RW

DN

STP 9,100,000

9,100,000 0 0 0 0 0 0

9068.64

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2019.

PL

Project Cost:

CN

UT

RW

DN

STP 9,100,000

0 9,100,000 0 0 0 0 0

9068.65

330

Page 331: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2020.

PL

Project Cost:

CN

UT

RW

DN

STP 9,100,000

0 0 9,100,000 0 0 0 0

9068.66

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

STP 9,100,000

0 0 0 9,100,000 0 0 0

9068.67

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

STP 9,100,000

0 0 0 0 9,100,000 0 0

9068.68

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2021.

PL

Project Cost:

CN

UT

RW

DN

NH 9,100,000

0 0 0 9,100,000 0 0 0

9068.69

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2022.

PL

Project Cost:

CN

UT

RW

DN

NH 9,100,000

0 0 0 0 9,100,000 0 0

9068.7

331

Page 332: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

NH 21,000,000

0 0 0 0 0 21,000,000 0

9068.71

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (NH) FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

NH 21,000,000

0 0 0 0 0 0 21,000,000

9068.72

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2023.

PL

Project Cost:

CN

UT

RW

DN

STP 21,000,000

0 0 0 0 0 21,000,000 0

9068.74

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY LAKE GARVEE BOND DEBT SERVICE (STP) FOR FY 2024.

PL

Project Cost:

CN

UT

RW

DN

STP 21,000,000

0 0 0 0 0 0 21,000,000

9068.75

ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2018. (JZ1-FD53 "NH" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 34,300,000

34,300,000 0 0 0 0 0 0

9659.18

332

Page 333: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2019. (JZ1-FD53 "NH" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 34,300,000

0 34,300,000 0 0 0 0 0

9659.21

ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2020. (JZ1-FD53 "NH" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 62,800,000

0 0 62,800,000 0 0 0 0

9659.23

ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2021. (JZ1-FD53 "NH" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 62,800,000

0 0 0 62,800,000 0 0 0

9659.25

ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES PROJECT FOR FY 2022. (JZ1-FD53 "NH" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 62,800,000

0 0 0 0 62,800,000 0 0

9659.27

ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES FOR FY 2023. (JZ1-FD53 "NH" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 30,000,000

0 0 0 0 0 30,000,000 0

9659.29

333

Page 334: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024

2018 Enacted Road Plan

ZVARIOUS -0 RECONSTRUCTION(O)GARVEE BOND DEBT SERVICE FOR LOUISVILLE BRIDGES FOR FY 2024. (JZ1-FD53 "NH" COMPONENT)

PL

Project Cost:

CN

UT

RW

DN

NH 30,000,000

0 0 0 0 0 0 30,000,000

9659.31

Total for ZVARIOUS county PL

Total Amounts:

CN

UT

RW

DN

142,800,000

2,000,000

211,400,000 167,200,000

1,000,000

291,800,000 314,141,000

5,000,000

259,441,000 239,141,000

142,800,000 213,400,000 167,200,000 292,800,000 259,441,000 319,141,000 239,141,000

334

Page 335: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

Biennium Fund Summary

TotalFY 2020FY 2019Fund DescriptionBR 178,066,500 315,800,085FEDERAL BRIDGE REPLACEMENT 493,866,585

BR2 4,950,000 14,500,000BRAC BOND PROJECTS SECOND PROGRAM 19,450,000

CM 13,100,000 13,100,000FEDERAL CONGESTION MITIGATION FUNDS 26,200,000

NH 247,370,000 226,060,000FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS 473,430,000

PM 180,456,000 176,043,000PAVEMENT MANAGEMENT 356,499,000

RRP 3,600,000 3,600,000SAFETY-RAILROAD PROTECTION 7,200,000

RRS 0 3,100,000SAFETY-RAILROAD SEPARATION 3,100,000

SAF 38,500,000 38,500,000FEDERAL SAFETY FUNDS 77,000,000

SAH 1,724,000 1,200,000FEDERAL STP FUNDS DEDICATED TO ASHLAND 2,924,000

SHN 1,800,000 700,000FEDERAL STP FUNDS DEDICATED TO HENDERSON 2,500,000

SLO 53,511,745 15,311,854FEDERAL STP FUNDS DEDICATED TO LOUISVILLE 68,823,599

SLX 21,656,000 8,956,000FEDERAL STP FUNDS DEDICATED TO LEXINGTON 30,612,000

SNK 27,157,409 13,757,200FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY 40,914,609

SPP 123,907,800 162,970,400STATE CONSTRUCTION HIGH PRIORITY PROJECTS 286,878,200

STP 94,460,000 85,840,000FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS 180,300,000

TE 14,900,000 13,700,000FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS 28,600,000

Total Amount 1,005,159,454 1,093,138,539 2,098,297,993

2018 Enacted Road Plan

335

Page 336: (QDFWHG 5RDG 3ODQ · &rxqw\,whp 1r 5rxwh7\sh ri :run'hvfulswlrq 3kdvh)xqg )< )< )< )< )< )< )< (qdfwhg 5rdg 3odq $'$,5 .< $0 %5,'*( 3 $''5(66 '(),&,(1&,(6 2) %5,'*( 21

Fund Summary

Fund Description FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 TotalBR FEDERAL BRIDGE REPLACEMENT 54,023,500 178,066,500 315,800,085 148,118,500 134,635,000 141,400,000 144,300,000 1,116,343,585

BR2 BRAC BOND PROJECTS SECOND PROGRAM 0 4,950,000 14,500,000 8,700,000 0 0 0 28,150,000

CM FEDERAL CONGESTION MITIGATION FUNDS 13,100,000 13,100,000 13,100,000 17,800,000 17,800,000 17,800,000 17,800,000 110,500,000

FH FEDERAL FOREST HIGHWAY FUNDS 8,100,000 0 0 0 1,641,000 1,641,000 1,641,000 13,023,000

HPP HIGH PRIORITY PROJECTS 9,924,170 0 0 0 0 0 0 9,924,170

KYD FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY 1,771,005 0 0 0 0 0 0 1,771,005

NH FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS 235,170,000 247,370,000 226,060,000 448,380,000 368,090,000 297,800,000 292,090,000 2,114,960,000

PM PAVEMENT MANAGEMENT 0 180,456,000 176,043,000 217,427,500 188,881,000 191,095,000 198,860,000 1,152,762,500

RRP SAFETY-RAILROAD PROTECTION 3,600,000 3,600,000 3,600,000 4,400,000 4,400,000 4,400,000 4,400,000 28,400,000

RRS SAFETY-RAILROAD SEPARATION 0 0 3,100,000 0 6,500,000 0 0 9,600,000

SAF FEDERAL SAFETY FUNDS 0 38,500,000 38,500,000 47,500,000 47,500,000 47,500,000 47,500,000 267,000,000

SAH FEDERAL STP FUNDS DEDICATED TO ASHLAND 6,867,000 1,724,000 1,200,000 1,600,000 1,600,000 1,600,000 1,600,000 16,191,000

SHN FEDERAL STP FUNDS DEDICATED TO HENDERSON 3,460,000 1,800,000 700,000 700,000 700,000 700,000 0 8,060,000

SLO FEDERAL STP FUNDS DEDICATED TO LOUISVILLE 65,396,815 53,511,745 15,311,854 21,657,196 23,500,000 9,262,000 23,500,000 212,139,610

SLX FEDERAL STP FUNDS DEDICATED TO LEXINGTON 16,367,000 21,656,000 8,956,000 8,956,000 8,956,000 8,956,000 58,156,000 132,003,000

SNK FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY 57,934,140 27,157,409 13,757,200 10,770,000 9,300,000 9,200,000 9,200,000 137,318,749

SPP STATE CONSTRUCTION HIGH PRIORITY PROJECTS 54,210,000 123,907,800 162,970,400 336,374,400 366,817,400 367,533,400 835,637,400 2,247,450,800

STP FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS 42,780,000 94,460,000 85,840,000 136,617,000 132,660,000 152,090,000 141,130,000 785,577,000

TE FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS 12,800,000 14,900,000 13,700,000 12,800,000 12,800,000 14,500,000 14,500,000 96,000,000

Total Amount 585,503,630 1,005,159,454 1,093,138,539 1,421,800,596 1,325,780,400 1,265,477,400 1,790,314,400 8,487,174,419

2018 Enacted Road Plan

336