qbpm system installation
DESCRIPTION
QBPM System Installation. Systems Rack mount chassis LO and CAL RF cable plant ( need 714Mhz from eels bedroom) Down mix boxes DC power cable plant IF signal cable plant Analog read back cable plant SIS Signal assignments. DC power distribution. SLAC supplied. 4 Units. - PowerPoint PPT PresentationTRANSCRIPT
QBPM System Installation
• Systems– Rack mount chassis– LO and CAL RF cable plant ( need 714Mhz
from eels bedroom)– Down mix boxes– DC power cable plant– IF signal cable plant– Analog read back cable plant– SIS Signal assignments
DC power distribution
DC power supply
BPM signal patch panel
VME crate
Analog signal interface
Cable Feed through
RF amplifier pwr supply
Cal Tone Generator
Cable Feed through
Cable Feed through
SLAC supplied
SLAC supplied
SLAC supplied
SLAC supplied
Cable Feed through
6446 MHz LO Locking box
QBPM Rack Layout
40 Rack units required
Existing unit 5 Units
2 Units
4 Units
2 Units
2 Units
3 Units
9 Units
2 Units
2 Units
4 Units
4 Units
1 Unit
Still to be designed
Need 15V at 5 amps
Could use existing Nanobpm VME crate but should buy a new VME 64x crate Also need a new CPU
LO power budget/ cable plant33 dbm max amp output
29.5dbm after splitter
7m of LDF4-50 cable = 1.4 dbplus 0.25 db per connector=1.9db loss
27.6dbm
26.88dbm
13.5m of LDF4-50 cable = 2.71 dbplus 0.25 db per connector=3.25db loss
23.63dbm
20.13dbm after splitter
20m of LDF4-50 cable = 4 dbplus 0.25 db per connector=4.5db loss
15.63 dbm
1db loss in these cables
17.6dbm
26.88dbm
16.6dbm
27.6dbm
16.6dbm
10m of LDF4-50 cable = 2dbplus 0.25 db per connector=2.5db loss
24.3dbm
All 8 way splitters have 10db loss
All cables from 8 way to down mix boxes should have no more than 2db loss
These cables should be made from LDF2-50 0.32db/meter
Some where in this location is an ideal location for QBPM electronics
42 db gain 33dbm amp with 2way splitter
8 way splitters10db directional couplers
2 way 3 db splitterLDF4-50 cable or equivalent
LDF2-50 cable
8 way splitter
LDF4-50 cable or equivalent
6 way splitter
LDF2-50 cable
8 way splitters
LDF4-50 cable or equivalent
LDF2-50 cable
Some where in this location is an ideal location for QBPM electronics
Downmix boxes
• Downmix boxes and hybrids to be mounted on to the steel plate fixed to the side of the concrete magnet supports
• Downmix boxes to be on 25mm standoffs (SLAC supplied)
Hybrid
Downmix box
standoffs
Put a connector on the drain wire as shown for grounding the connector shell if needed
DC Power Distribution
…
DB9 male connector
SIS QBPM channel assignments
7
6
5
4
3
2
1
0
SIS1
QD10X Y
QD10X X
QF11X Y
QF11X X
QD12X Y
QD12X X
QD16X Y
QD16X X
7
6
5
4
3
2
1
0
SIS2
QF17X Y
QF17X X
QD18X Y
QD18X X
QF19X Y
QF19X X
QD20X Y
QD20X X
7
6
5
4
3
2
1
0
SIS3
QM16FF Y
QM16FF X
QM15FF Y
QM15FF X
QM14FF Y
QM14FF X
QM13FF Y
QM13FF X
7
6
5
4
3
2
1
0
SIS4
QM12FF Y
QM12FF X
QM11FF Y
QM11FF X
QD10AFF Y
QD10BFF X
QF9AFF Y
QF9BFF X
7
6
5
4
3
2
1
0
SIS5
SF6FF Y
SF6FF X
QF9AFF Y
QF9AFF X
QD8FF Y
QD8FF X
QF7FF Y
QF7FF X
7
6
5
4
3
2
1
0
SIS6
QD6FF Y
QD6FF X
QF5BFF Y
QF5BFF X
SF5FF Y
SF5FF X
QF5AFF Y
QF5AFF X
7
6
5
4
3
2
1
0
SIS7
QD4BFF Y
QD4BFF X
SD4FF Y
SD4FF X
QD4AFF Y
QD4AFF X
QF3FF Y
QF3FF X
7
6
5
4
3
2
1
0
SIS8
QD2BFF Y
QD2BFF X
QD2AFF Y
QD2AFF X
SF1FF Y
SF1FF X
QF1FF Y
QF1FF X
7
6
5
4
3
2
1
0
SIS9
RC1FF
RC1X
RC3FF
RC2FF
7
6
5
4
3
2
1
0
SIS
SIS QBPM channel assignments
SD0FF Y
SD0FF X
QD0FF Y
QD0FF X
Parts to buy to complete RF BPM system
• RF BPM LO and CAL cable plant – 500 ft of Andrews LDF4-50 or equivalent LO from source to splitters. With a
loss/meter at 6400MHz of 6.5 db/30m. • 44 L4NM-C type N male connectors for both ends.• Flare tool Andrews part# 224363• Cable preparation tool Andrews part# MCPT-L4
– 1000 ft of Andrews LDF2-50 or equivalent for LO from splitters to electronics. With a loss/meter at 6400MHz of 10.2 db/30m.
• 156 L2PNM-HC type N male connectors.– Two 2 way 3db splitters that will work at 33dbm power levels.
• Pulsar Microwave PS2-13-450/3N or equivalent– Two 6 way splitters with Type N female connectors.
• Pulsar Microwave PS6-06-434/1N or equivalent– Conformal cable and connectors for LO and CAL jumpers. The length of these
cables have to be adjusted for the single pulse calibration setup.• 20 meters of 0.140 conformal cable or equivalent.• 80 female N 0.140 connectors• 80 male SMA 0.140 connectors.
• 21 slot VME crate and controller– Controller type yet to be determined.
• 2000m of 6 conductor wire for analog read back.– Wire should be either 18 or 20 gauge with foil shield
and drain wire.• 40 male 9 pin D connectors and pins.
– D Connector cases should be metal for shielding purposes.
• 15 V 5amp rack mount power supply for tunnel LO and CAL amplifiers.
Parts to buy to complete RF BPM system (cont)
Installation Plan
• Install equipment in the rack• Pull in:
• LO and CAL cables (still to be purchased)• DC power cables ( now at SLAC)• Analog signal cables (still to be purchased)• IF signal cables ( now at SLAC)
• Adjust LO phases for single pulse calibration
operation.• Test data acquisition software.