REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 1 of 7 PRINCE WILLIAM SOUND AQUACULTURE CORPORATION REQUEST FOR PROPOSALS WASTEWATER TREATMENT SYSTEM UPGRADES SCOPE OF SERVICES: The Prince William Sound Aquaculture Corporation (“PWSAC”) hereby invites qualified general contractors (“Contractor”) to submit proposals for wastewater treatment collection, treatment, and disposal. The scope of work includes all materials, labor, and equipment to refurbish domestic wastewater collection and treatment systems in three locations in Prince William Sound; Main Bay Hatchery, Armin F. Koernig Hatchery and Wally Noerenberg Hatchery. The successful contractor will be required to submit proof of business licensure, insurances, and tax certification as noted in the RFP. The RFP does not commit the PWSAC to award a contract, nor to pay any of the costs incurred in the preparation and submission of Proposals in anticipation of a contract. The PWSAC reserves the right to waive irregularities and accept or reject any or all Proposals. PRE-PROPOSAL CONFERENCE: A non-mandatory pre-Proposal Q&A meeting will be held via Teams on March 26 th , 2021. Detailed connection information will be distributed the day prior. To attend, please submit interest via email to Geoff Clark, [email protected]. DEADLINE FOR PROPOSALS: Proposals must be received by PWSAC no later than 5:00 PM April 2 nd , 2021. Proposals shall be clearly marked REQUEST FOR PROPOSALS, PWSAC WASTEWATER TREATMENT SYSTEM UPGRADES. If presented in hard-copy, proposals must be sealed and delivered in person, by courier, or by U.S. Mail postage paid, to PWSAC at the address below. If by Courier or In-Person Delivery: If by U.S. Postal Service: 6148 Nielsen Way, Anchorage, AK 99518 P.O. Box 1110, Cordova, AK 99574 Alternatively, proposal documents if delivered via email shall be submitted to Geoff Clark, [email protected] Acknowledgement of addenda may be delivered by email, and confirmation of receipt of any submitted documents is the sole responsibility of the Proposer. 1.0 GENERAL TERMS AND CONDITIONS 1.1 Pre-Proposal Proposers should carefully examine this entire RFP, its addenda, and all related materials and data referenced herein. Proposers shall be fully aware of the nature of the work and the conditions likely to be encountered in performing the work. This duty of full preparation

Upload: others

Post on 04-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

PWSAC Wastewater Treatment Upgrades RFP.pdfREQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 1 of 7
PRINCE WILLIAM SOUND AQUACULTURE CORPORATION
REQUEST FOR PROPOSALS
SCOPE OF SERVICES: The Prince William Sound Aquaculture Corporation (“PWSAC”) hereby invites qualified general contractors (“Contractor”) to submit proposals for wastewater treatment collection, treatment, and disposal.
The scope of work includes all materials, labor, and equipment to refurbish domestic wastewater collection and treatment systems in three locations in Prince William Sound; Main Bay Hatchery, Armin F. Koernig Hatchery and Wally Noerenberg Hatchery.
The successful contractor will be required to submit proof of business licensure, insurances, and tax certification as noted in the RFP.
The RFP does not commit the PWSAC to award a contract, nor to pay any of the costs incurred in the preparation and submission of Proposals in anticipation of a contract. The PWSAC reserves the right to waive irregularities and accept or reject any or all Proposals.
PRE-PROPOSAL CONFERENCE: A non-mandatory pre-Proposal Q&A meeting will be held via Teams on March 26th, 2021. Detailed connection information will be distributed the day prior. To attend, please submit interest via email to Geoff Clark, [email protected].
DEADLINE FOR PROPOSALS: Proposals must be received by PWSAC no later than 5:00 PM April 2nd, 2021. Proposals shall be clearly marked REQUEST FOR PROPOSALS, PWSAC WASTEWATER TREATMENT SYSTEM UPGRADES. If presented in hard-copy, proposals must be sealed and delivered in person, by courier, or by U.S. Mail postage paid, to PWSAC at the address below.
If by Courier or In-Person Delivery: If by U.S. Postal Service:
6148 Nielsen Way, Anchorage, AK 99518 P.O. Box 1110, Cordova, AK 99574
Alternatively, proposal documents if delivered via email shall be submitted to Geoff Clark, [email protected] Acknowledgement of addenda may be delivered by email, and confirmation of receipt of any submitted documents is the sole responsibility of the Proposer.
1.0 GENERAL TERMS AND CONDITIONS
1.1 Pre-Proposal
Proposers should carefully examine this entire RFP, its addenda, and all related materials and data referenced herein. Proposers shall be fully aware of the nature of the work and the conditions likely to be encountered in performing the work. This duty of full preparation
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 2 of 7
falls to each Proposer. By submitting a bid each proposer represents and warrants that it has fulfilled this duty.
1.2 Proposal Format
Proposals are to be prepared in such a way as to provide a straightforward and concise delineation of the Proposer’s capability to satisfy the requirements of this RFP.
1.3 Proposal Development and Submittal
Emphasis should be concentrated on conformance to the RFP instructions, responsiveness to the RFP requirements, and on completeness and clarity of content.
This solicitation does not commit the PWSAC to select any Contractor for the requested services. All costs associated with the respondents’ preparations, submission and oral presentations shall be the responsibility of the Proposer.
1.4 Signature Requirement
Proposals must be signed by an employee, officer or other agent of the proposer authorized to sign contracts on its behalf. Submission of such an acceptable signature shall be construed as binding the submitting party to the Proposal.
1.5 Questions
Questions must be submitted via email to Geoff Clark, [email protected].
1.6 Late Submissions
Proposals not received prior to the date and time specified in the RFP, or otherwise modified by Addendum, shall not be considered, and will be returned unopened after recommendation of award.
1.7 Withdrawal of Proposals
At any time prior to the scheduled closing time for receipt of RFP submittals, any responding firm may withdraw its submittal via email to Geoff Clark, [email protected]. However, a Proposal shall not be withdrawn after opening without the written consent of PWSAC.
1.8 Proposal Acceptance Period
It is anticipated that award will be announced within 30 calendar days of the proposal submittal date; however, all offers must be irrevocable for 60 days following the proposal submission date.
1.9 Right to Reject / Award
The PWSAC may reject any or all Proposals, if the PWSAC Manager determines that it is in the best interest of the PWSAC, and may waive irregularities, other than the requirements for timeliness and manual signature, if the irregularities do not affect the competitive advantage of any Proposer.
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 3 of 7
Award will be made to the most qualified Proposer, whose offer is deemed most advantageous to the PWSAC, all evaluation criteria considered. The PWSAC may choose to interview only the top-ranking firms as based on proposal review and scores. Unsuccessful offerors will be notified.
1.10 Licenses and Certification
Proposers shall include with their Proposals copies of all licenses, certificates, registrations, and other credentials required for performance under the contract. Documentation of the same must be current and must have been issued by or under authority of the State of Alaska or, if documentation is from an outside jurisdiction, such documentation submitted must be of a form accepted as valid by the State of Alaska for performance in Alaska. Such documentation shall include, but is not limited to, a current Alaska business license for the business to be conducted, applicable professional licenses, registrations, and all necessary certificates.
2.0 SCOPE OF WORK
The following is presented for assessment purposes only. The final scope of work will be that agreed to as part of the final signed contract between PWSAC and the prevailing bidder. In the event there is any alleged conflict or inconsistency between the scope of work discussed in these bid documents (including the attached plans), and the scope of work in the parties’ contract, the latter will prevail.
If the Proposer has any questions regarding the scope of work and attached plans, including a belief that the bid documents are insufficiently specific, the Proposer must raise these issues prior to submitting their Proposal, otherwise they are waived. All work will require consultation with PWSAC. PWSAC will purchase the tanks and stage them in Anchorage. The Contractor shall acquire and/or furnish all other necessary materials as specified in the attached plans including but not limited to piping, fittings, lift stations, tools, and fill materials/aggregate. The Contractor shall mobilize all materials in Anchorage for PWSAC to transport to Whittier then to each site. The Contractor shall provide details as to the mobilization of all materials and aggregate to the construction site, including any needs or requests for PWSAC support, via the Anchorage Distribution Center and/or the Alaskan Challenger. A loader shall be made available for use at site upon Contractor request and all detail of its use will be formalized at the time of contract approval.
Transport to each site will require close coordination and planning with PWSAC. PWSAC has only one landing craft to service all its remote facilities. It is not available “as needed.” Further, certain sites have very specific tide restrictions for materials delivery. Finally, weather is always a factor in accessing and leaving these sites. The Contractor shall coordinate with PWSAC regarding landing craft limitations and schedule. Housing at each site shall be provided to Contractor by PWSAC, and Contractor will abide by all PWSAC policies and restrictions while at PWSAC sites. Armin F. Koernig Hatchery, Prince William Sound: See attached plans. (Final plans will be provided prior to construction.) Time if of the essence and all work MUST be completed by September 30, 2021.
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 4 of 7
Wally Noerenberg Hatchery, Prince William Sound: See attached plans. (Final plans will be provided prior to construction.) Time if of the essence and all work MUST be completed by September 30, 2021. Main Bay Hatchery, Prince William Sound: See attached plans. (Final plans will be provided prior to construction.) Time if of the essence and all work MUST be completed by September 30, 2022.
3.0 PROPOSAL AND SUBMISSION REQUIREMENTS
To achieve a uniform review process and obtain the maximum degree of comparability, it is required that the Proposals be organized in the manner specified below. There is a 20-page limit for the Proposal, including resumes, licenses, and addenda.
3.1 Capability to Perform
• Provide a history of the firm, technical qualifications and areas of expertise, address
of office that will manage project, length of time in business, firm’s legal structure, firm’s commitment to provide necessary resources to perform and complete project in a timely manner.
• List names of the persons who are authorized to make representations for your firm, their titles, address, and telephone numbers.
• The letter must be signed by a corporate officer or other individual who has the authority to bind the firm.
3.2 Qualifications and Experience of the Firm
• Detail the firm's expertise and experience in the same or similar projects and scale
executed by the firm that demonstrate relevant experience. • Provide a list of public sector clients with an emphasis on remote projects and fish
hatchery related projects for whom you have performed similar work in the past five years. Include name, address, and a phone number of a person who can be contacted regarding the firm’s performance on each project.
3.3 Key Project Staff and Consultants
• Identify key project staff with their roles within the project clearly identified, as well as
those key staff for subconsultants expected to provide services on behalf of the firm. • Identify the project manager who will be responsible for the day-to-day management
of project tasks and will be the Owner’s primary point of contact. • Provide a qualification synopsis or resumes for each of the individuals referenced. • Be specific about the proposed staff regarding experience and qualifications on
projects of similar size and scope. • The Proposal should discuss the current workload of proposed staff and the
organization’s ability to perform the services within the established timeline.
3.4 Methodologies, Approach, Timeline
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 5 of 7
• Provide detailed information on the firm's methodology in meeting the scope of work requirements in this RFP, which provides interest and insight to the specific details of the project. This should consist of a detailed work plan indicating the tasks to be accomplished, the resources that will be utilized and the timeline for completion.
• Describe overall approach to executing the project, to include any unique aspects
envisioned or alternative approaches, including budget sensitivity, efficiency, completeness, pertinence of the tasks, and logic of the overall approach.
3.5 Fixed Cost
Provide a fixed cost Proposal, with a detailed breakdown by discipline and by man hours, in spreadsheet form, including estimated reimbursables.
Cost will be evaluated using a ratio method after all qualitative scoring is completed. The Proposal with the lowest cost receives the maximum points allowed. All other Proposals receive a percentage of the points available based on their cost relationship to the lowest cost Proposal. The following formula will be used:
• lowest cost Proposal/cost Proposal being evaluated (x) maximum points available =
awarded points for Cost criteria.
4.0 PROPOSAL EVALUATION PROCESS
Evaluation Process
An evaluation committee, of not less than three people, representing the PWSAC will review, evaluate, score and rank Proposals, in accordance with criteria identified in this RFP.
PWSAC also reserves the right to request oral interviews with the highest ranked individuals or firms (short list). The purpose of the interviews with the highest ranked firms is to allow for clarification to, expansion upon, and possible refinement of, the written responses. If interviews are conducted, a maximum of three firms will be short-listed. A second score sheet, with the same categories and score points used for the first evaluation, will be used to score those firms interviewed as a second evaluation. The final recommendation for selection will be based on the total of all evaluators scores achieved on the second rating.
The evaluation committee will forward a recommendation for contract award based on points awarded. The General Manager will review the results of the selection committee. The company, whose Proposal is ranked highest, subject to approval by the PWSAC General Manager, may be invited to enter final negotiations with the PWSAC for the purposes of contract award. The criteria to be considered during evaluations, and the associated point values, are as follows:
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 6 of 7
Capability to Perform 10 Points
Qualifications and Experience of the firm 10 Points
Key Project Staff and Subconsultants 10 Points
Methodology, Approach, Timeline 20 Points
Cost 50 Points
Total Points 100 Points
5.0 Qualitative Rating Factor
Firms will be ranked using the following qualitative rating factors, excluding cost, for each RFP criteria:
1.0 = Outstanding .8 = Excellent .6 = Good .4 = Fair .2 = Poor 0.0 = Unsatisfactory
The rating factor for each criteria category, except for cost, will be multiplied against the points available to determine the total points for that category.
6.0 SELECTION PROCESS
The Proposer with the highest total evaluation points will be invited to enter contract negotiations with PWSAC. If an agreement cannot be reached with the highest ranked Proposer, the PWSAC shall notify the Proposer and terminate the negotiations. If Proposals are submitted by one or more other proposers determined to be qualified, negotiations may then be conducted with such other Proposers in the order of their respective rankings. This process may continue until successful negotiations are achieved. PWSAC reserves the right to reject any and all Proposals submitted.
REQUEST FOR PROPOSALS PWSAC WASTEWATER UPGRADES Page 7 of 7
7.0 FIXED COST PROPOSAL FORM
Payments to Contractor shall be made based upon the phased progress of the project as measured by reference to Contractor's Cost Proposal. Additional Services requested outside the scope of work will be compensated in accordance with the Contractor’s Fee Schedule. Contractor’s Fixed cost shall include all labor, expenses, overhead and profit associated with performing the scope of work. Detailed estimates of each task shall be provided as attachments to this proposal but are for reference purposes only.
Construction Services By Phase 2021 Mobilization ________________ Armin F. Koernig Hatchery Sewer Installation _________________ Wally Noerenberg Hatchery Sewer Installation _________________ 2022 Mobilization _________________ Main Bay Hatchery Sewer Installation _________________ Proposed Fixed Cost Budget _________________
Consultant acknowledges receipt of Addenda No(s).1, 2, and 3, and hereby represents that if awarded a contract they will enter into and execute a contract with PWSAC for construction services referenced in this Request for Proposal at the Fixed Cost compensation stated above.
By executing this Proposal, I certify that I have the authority to bind the Contractor or other business entity, who is submitting this Proposal.
Contractor’s Signature:
PWSAC - AFK WWTS Upgrades 65% Plan Review Materials Estimate 3/18/2021
No. Pay Item Pay Unit Plan Quantity 1 Mobilization / Bonding / Insurance / Demob. / PM LS 1
2 Xerxes Recirc/Primary Tank and Comp. (FOB Anch) EA 1 3 Anua Tanks and Comp. (FOB Anch) EA 3 4 Other WWTP Components (FOB Anch) EA 1 5 Common Excavation Tank Sites (deposit on site) EA 2 6 Remove and Dispose Exist. Septic Tank EA 2 7 D-1 Fill & Compact (Recirc/Primary) CY 30 8 D-1 Fill & Compact (Pods) CY 30 9 Stackable Blocks EA 30 10 WWTP Piping (1.5") LF 150 11 WWTP Piping (4") LF 150 12 Pre-cast Concrete Vault EA 0 13 Salcor UV Units EA 4 14 Sampling Port EA 2 15 Flow Meter EA 1 16 Electrical system LS 1 17 Rock Trenching Blasting or Chipping LF 0
18 Hatchery Drain Re-route EA 2 19 4" PVC LF 345 20 6" PVC LF 230 21 Rock Trenching Blasting or Chipping LF 0 22 Sewer Manhole EA 2 23 Misc. Piping Materials EA 1
24 6" HDPE (Uplands) LF 160 25 6" HDPE (Marine) LF 315 26 Pipe Anchors EA 20
Marine Outfall Insallation
Collection System Installation
WasteWater Treatment Plant Installation
Assumptions: 1) This materials estimate is based on 65% review plans. ADEC review is active 2) These values to not account for redline revisions. 3) Housing and meals shall be provided while on-site (4 weeks)
Addenda No.1 Material Estimates for WWTS - AFK, WNH, MBH
PWSAC - WNH WWTS Upgrades 65% Plan Review Materials Estimate 3/18/2020
No. Pay Item Pay Unit Plan Quantity 1 Mobilization / Bonding / Insurance / Demob. LS 1
2 Xerxes Recirc/Primary Tank and Comp. (FOB Anch) EA 1 3 Anua Tanks and Comp. (FOB Anch) EA 6 4 Other WWTP Components (FOB Anch) EA 1 5 Common Excavation Tank Sites (deposit on site) EA 2 6 Remove and Dispose Exist. Septic Tank EA 1 7 D-1 Fill & Compact (Recirc/Primary) CY 30 8 D-1 Fill & Compact (Pods) CY 60 9 Stackable Blocks EA 60
10 WWTP Piping (1.5") LF 150 11 WWTP Piping (4") LF 150 12 Pre-cast Concrete Vault EA 0 13 Salcor UV Units EA 4 14 Sampling Port EA 2 15 Flow Meter EA 1 16 Electrical system LS 1 17 Rock Trenching Blasting or Chipping LF 0
18 Hatchery Drain Re-route EA 2 19 Liberty Pump Lift Station EA 2 20 Sand (Lift Station Decomission ) CY 5 21 2" HDPE Force Main LF 650 22 2" HDPE Force Main Connection EA 3 23 Flush Station EA 1 24 4" PVC LF 325 25 6" PVC LF 60 26 Rock Trenching Blasting or Chipping LF 0 27 Misc. Piping Materials EA 1
28 6" C900 (Uplands) LF 150 29 6" C900 (Marine) LF 150 30 Pipe Anchors EA 10
Marine Outfall Insallation
Collection System Installation
WasteWater Treatment Plant Installation
Assumptions: 1) This materials estimate is based on 65% review plans. ADEC review is active 2) These values to not account for redline revisions. 3) Housing and meals shall be provided while on-site (4 weeks)
Addenda No.1 Material Estimates for WWTS - AFK, WNH, MBH
PWSAC - MBH WWTS Upgrades 65% Plan Review Materials Estimate 3/18/2020
No. Pay Item Pay Unit Plan Quantity 1 Mobilization / Bonding / Insurance / Demob. LS 1
2 Xerxes Recirc/Primary Tank and Comp. (FOB Anch) EA 1 3 Anua Tanks and Comp. (FOB Anch) EA 3 4 Other WWTP Components (FOB Anch) EA 1 5 Common Excavation Tank Sites (deposit on site) EA 2 6 Abandon Exist. Septic Tank in place EA 1 7 D-1 Fill & Compact (Recirc/Primary) CY 30 8 D-1 Fill & Compact (Pods) CY 60 9 Stackable Blocks EA 60
10 WWTP Piping (1.5") LF 150 11 WWTP Piping (4") LF 150 12 Pre-cast Concrete Vault EA 0 13 Salcor UV Units EA 4 14 Sampling Port EA 2 15 Flow Meter EA 1 16 Electrical system LS 1 17 Rock Trenching Blasting or Chipping LF 0
18 Hatchery Drain Re-route EA 1 19 Liberty Pump Lift Station EA 2 20 2" HDPE Force Main LF 360 21 2" HDPE Force Main Connection EA 1 22 Flush Station EA 1 23 4" PVC LF 150 24 6" PVC LF 350 25 Rock Trenching Blasting or Chipping LF 0 26 Misc. Piping Materials EA 1 27 Storm Water Grading, LS 1
28 6" HDPE (Uplands) LF 100 29 6" HDPE (Marine) LF 600 30 Pipe Anchors EA 30
Marine Outfall Insallation
Collection System Installation
WasteWater Treatment Plant Installation
Assumptions: 1) This materials estimate is based on 65% review plans. ADEC review is active 2) These values to not account for redline revisions. 3) Housing and meals shall be provided while on-site (4 weeks)
Addenda No.1 Material Estimates for WWTS - AFK, WNH, MBH
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
PROJECT VICINITY MAP NOT TO SCALE
WASTEWATER TREATMENT SYSTEM UPGRADES
Addenda No.2 2021 Design Plans for AFK and WNH WWTS
AutoCAD SHX Text
AutoCAD SHX Text
C200 SITE PLAN
AutoCAD SHX Text
THIS PROJECT CONSISTS OF WASTEWATER TREATMENT UPGRADES FOR THE ARMIN F. KOERNIG HATCHERY OWNED AND OPERATED BY THE PRINCE WILLIAM SOUND AQUACULTURE CORPORATION. THE UPGRADES SHALL INCLUDE A NEW WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED COLLECTION AND PIPING SYSTEMS AND A MARINE OUTFALL.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
1) THE EXISTING UNDERGROUND UTILITIES WERE DRAWN USING THE BEST AVAILABLE INFORMATION INCLUDING SURFACE EVIDENCES MEASURED DURING THE SITE SURVEY, OWNER SUPPLIED ASBUILT/RECORD DRAWINGS, AND INTERVIEWS WITH PLANT MANAGERS AND STAFF. THE UNDERGROUND UTILITIES SHOWN HEREON ARE SYMBOLIC ONLY AND MAY NOT REFLECT THE ACTUAL LOCATION. 2) THESE PLANS WERE PREPARED USING INFORMATION FROM A SITE INSPECTION BY AN R&M ENGINEERING-KETCHIKAN REPRESENTATIVE CONDUCTED ON 9/21-23/2020. THIS SITE INSPECTION INCLUDED A SITE SURVEY USING HIGH-PRECISION, TRIMBLE R8/R10 GPS HIGH-PRECISION, TRIMBLE R8/R10 GPS RECEIVERS DIFFERENTIALLY CORRECTED AND PROCESSED USING TRIMBLE BUSINESS CENTER V 5.10 SOFTWARE 3) THESE PLANS DEPICT STRUCTURES AND FEATURES PERTINENT TO THE WASTEWATER TREATMENT SYSTEM DESIGN ONLY. NOT ALL DECKS, AWNINGS, ETC. ARE SHOWN. ADDITIONALLY, ANY UNDERGROUND UTILITIES OR FEATURES NOT MADE APPARENT BY EVIDENCES DESCRIBED IN NOTE 1) ARE NOT SHOWN. 4) THE VERTICAL DATUM FOR THIS PROJECT IS MEAN LOWER LOW WATER 5) NO PROPERTY INFORMATION IS SHOWN ON THESE DRAWINGS. IT IS THE RESPONSIBILITY OF PWSAC TO COORDINATE ALL LEASES WITH THE STATE OF ALASKA AND THE U.S. FOREST SERVICE AS NEEDED FOR CONSTRUCTION AND/OR ENSURE THAT ALL PROPOSED UPGRADES SHOWN ON THESE PLANS DO NOT CONFLICT WITH EXISTING LEASES AND LAND USE PERMITS. 6) CLIENT OR CONTRACTOR SHALL USE TRACER DYE TO VERIFY ALL HATCHERY WATER DISCHARGES (FLOOR DRAINS, ETC.) HAVE BEEN REMOVED FROM THE DOMESTIC WASTEWATER COLLECTION, TREATMENT, AND OUTFALL SYSTEMS. ADDITIONALLY, ANY OTHER NON-DOMESTIC WASTEWATER IS NOT PERMITTED TO DISCHARGE TO SAID SYSTEMS. 7) GREASE TRAPS SHALL BE INSTALLED ON ALL KITCHENS. 8) THESE PLANS SHALL BE SENT TO THE LIFT STATION MANUFACTURER OR AREA DISTRIBUTOR FOR COMMENT PRIOR TO ORDERING LIFT STATIONS OR PUMPS. 9) THE WWTP MUST BE INSTALLED BELOW THE GROUND SURFACE OR IN AN ENCLOSURE INSULATED AND HEATED TO A MINIMUM OF 50°F.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
4" HDPE OUTFALL REPORTED BROKEN AND NOT SECURED IN THIS AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" PVC CLEANOUT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
12" HDPE FISH TENDER LINE SECURED TO EDGE OF DOCK
AutoCAD SHX Text
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
REMOVE OR ABANDON EXISTING TANK IN PLACE. FILL WITH SAND
AutoCAD SHX Text
REPLACE ALL ABOVE GROUND HDPE WATER LINES WITH SIMILAR TYPE AND SIZE ARCTIC PIPE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SECURE 6" HDPE OUTFALL TO PILINGS OF TIMBER DOCK WITH GALVANIZED PIPE CLAMPS AND LAG BOLTS EVERY 10'
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING 4" PVC
AutoCAD SHX Text
INSTALL 6" HDPE GRAVITY EFFLUENT LINE FROM WASTEWATER TREATMENT PLANT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 6" HDPE GRAVITY EFFLUENT LINE FROM WASTEWATER TREATMENT PLANT
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING 12" HDPE FISH TENDER LINE SECURED TO EDGE OF DOCK
AutoCAD SHX Text
AutoCAD SHX Text
SECURE 6" HDPE OUTFALL TO PILINGS OF TIMBER DOCK WITH GALVANIZED PIPE CLAMPS AND LAG BOLTS EVERY 10'
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
1) THIS WASTEWATER TREATMENT PLANT PLAN DEPICTS THE TREATMENT ORDER OF THE PROPOSED SYSTEM. TANK LAYOUT/LOCATION IS PERMITTED TO VARY BASED ON SITE CONDITIONS. FURTHERMORE, THE PRIMARY TREATMENT AND RECIRCULATION/PUMP TANK MAY BE SPLIT INTO MULTIPLE, SEPARATE TANKS; CHAMBER VOLUMES SHOWN ON THIS WWTP MUST BE MAINTAINED. ALL MODIFICATIONS MUST BE APPROVED BY THE DESIGN ENGINEER BEFORE IMPLEMENTATION. 2) THE SYSTEM SHALL BE INSTALLED COMPLETELY BELOW GRADE, ABOVE GRADE IN A HEATED ENCLOSURE, OR A COMBINATION OF BOTH. 3) INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR HOUSING. 4) EACH STA-RITE PUMP SHALL SUPPLY PRIMARY TREATED WASTE WATER TO THE AEROCELL PODS ON AN ALTERNATING TIME BASIS. AFTER THE WATER PASSES THROUGH THE PODS, 80% SHALL FLOW BACK TO THE RECIRCULATION/PUMP CHAMBER, AND 20% SHALL CONTINUE ALONG THE TREATMENT AND EFFLUENT DISPOSAL PATH. 5) TANKS THAT ARE BURIED MUST BE ANCHORED PER MANUFACTURER TANKS THAT ARE BURIED MUST BE ANCHORED PER MANUFACTURER RECOMMENDATIONS.
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
AutoCAD SHX Text
THIRD CHAMBER SHALL ACT AS A RECIRCULATION/PUMP CHAMBER WITH THE FOLLOWING COMPONENTS: 1) (2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMP IN SIM/TECH NO VAULT PUMP FILTER. INSTALL CHECK VALVES AND WEEP HOLE ABOVE EACH PUMP. INSTALL PUMP ON 36"x36"x12" TALL PLATFORMS (MANUFACTURER INSTALLED) 2) DRYDEN AQUA FINE BUBBLE AI DIFFUSER POWERED BY A HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING. 3) SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" SCH 40 PVC FEED LINES. INSTALL TO DRAIN BACK TO XERXES TANK AFTER EACH PUMP CYCLE VIA WEEP HOLE.
AutoCAD SHX Text
QUANICS AEROCELL NS-1000-AC TREATMENT UNIT WITH INSULATION AND TOPCOAT, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW BACK TO THIRD CHAMBER OF XERXES TANK AT 2% MIN. SLOPE (80% RETURN LINES)
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW AT 2% MIN. SLOPE (20% DISCHARGE LINES)
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCUALTION LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
80% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCULATION LINE)
AutoCAD SHX Text
20% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
4" CROSSOVER TEES
AutoCAD SHX Text
AutoCAD SHX Text
36" BY 36" BY 12" TALL PUMP PLATFORMS. (MANUFACTURER INSTALLED)
AutoCAD SHX Text
(2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMPS IN SIM/TECH IN SIM/TECH NO VAULT PUMP FILTER
AutoCAD SHX Text
INSTALL CHECK VALVES ABOVE EACH PUMP AND INSTALL WEEP HOLE ABOVE EACH CHECK VALVE
AutoCAD SHX Text
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER WITH DUPLEX PUMP SYSTEM.
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE TREATMENT TANK AND UP STREAM OF THE SAMPLING PORT
AutoCAD SHX Text
EFFLUENT FORM TANK
AutoCAD SHX Text
TO MARINE OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DOWN STREAM OF THE SAMPLING PORTS. INSTALL SO FLOW METER HEADER IS ALWAYS FILLED WITH WATER.
AutoCAD SHX Text
FLOW METER DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAMPLING PORT DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE DISINFECTION UNITS
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: RIGID BOARD INSULATION JOINTS SHALL BE RIGID BOARD INSULATION JOINTS SHALL BE LAPPED *H: ALSO REFERS TO CLEAR SPACING BETWEEN THE PIPE AND OTHER DRAINAGE STRUCTURES OR THE WATER LINE.
AutoCAD SHX Text
4'0" OR GREATER NONE REQUIRED NONE REQUIRED 3'6" 1 INCH 1 INCH 3' 2 INCHES 2 INCHES 2'6"(MINIMUM) 4 INCHES 4 INCHES
AutoCAD SHX Text
AutoCAD SHX Text
PLACE CONCRETE OR STACK BALLAST ROCKS OVER PIPE. BALLAST SECTION TO BE A MINIMUM 1'x1'X2' LONG AND PLACED 10' O/C AND AT EVERY PIPE JOINT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. 2. TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA REGULATIONS AND TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA REGULATIONS AND REQUIREMENTS. 3. INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL GRAVEL AND INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL GRAVEL AND RESURFACING REQUIREMENTS. 4. IF UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT IF UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT THE CONTRACTOR TO OVER-EXCAVATE AND BACKFILL WITH SUITABLE MATERIAL. 5. THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER TO ALLOW POSITIVE THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER TO ALLOW POSITIVE DRAINAGE TO MATCH PRE-CONSTRUCTION CONDITIONS.
AutoCAD SHX Text
6" DEPTH OF 3/4" MINUS GRAVEL SURFACE COARSE COMPACTED TO 95% OF MAX. DENSITY
AutoCAD SHX Text
BACKFILL MATERIAL SHALL CONTAIN NO ORGANIC MATTER AND SHALL BE 6" DIAMETER OR LESS IN SIZE COMPACTED TO 95% WITHIN TRAFFIC AREAS AND 90% OUTSIDE OF TRAFFIC AREAS. EXCAVATED MATERIAL MAY BE USED AS BACKFILL IF APPROVED BY THE ENGINEER.
AutoCAD SHX Text
PIPE BEDDING MATERIAL PLACED IN 6" LIFTS AND COMPACTED TO 95% OF MAXIMUM DENSITY.
AutoCAD SHX Text
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
PROJECT LOCATION MAP NOT TO SCALE
PROJECT VICINITY MAP NOT TO SCALE
Addenda No.2 2021 Design Plans for AFK and WNH WWTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
THIS PROJECT CONSISTS OF WASTEWATER TREATMENT UPGRADES FOR THE WALLY NOERENBERG HATCHERY OWNED AND OPERATED BY THE PRINCE WILLIAM SOUND AQUACULTURE CORPORATION. THE UPGRADES SHALL INCLUDE A NEW WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED COLLECTION AND PIPING SYSTEMS AND A MARINE OUTFALL.
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
1) THE EXISTING UNDERGROUND UTILITIES WERE DRAWN USING THE BEST AVAILABLE INFORMATION INCLUDING SURFACE EVIDENCES MEASURED DURING THE SITE SURVEY, OWNER SUPPLIED ASBUILT/RECORD DRAWINGS, AND INTERVIEWS WITH PLANT MANAGERS AND STAFF. THE UNDERGROUND UTILITIES SHOWN HEREON ARE SYMBOLIC ONLY AND MAY NOT REFLECT THE ACTUAL LOCATION. 2) THESE PLANS WERE PREPARED USING INFORMATION FROM A SITE INSPECTION BY AN R&M ENGINEERING-KETCHIKAN REPRESENTATIVE CONDUCTED ON 9/21-23/2020. THIS SITE INSPECTION INCLUDED A SITE SURVEY USING HIGH-PRECISION, TRIMBLE R8/R10 GPS HIGH-PRECISION, TRIMBLE R8/R10 GPS RECEIVERS DIFFERENTIALLY CORRECTED AND PROCESSED USING TRIMBLE BUSINESS CENTER V 5.10 SOFTWARE 3) THESE PLANS DEPICT STRUCTURES AND FEATURES PERTINENT TO THE WASTEWATER TREATMENT SYSTEM DESIGN ONLY. NOT ALL DECKS, AWNINGS, ETC. ARE SHOWN. ADDITIONALLY, ANY UNDERGROUND UTILITIES OR FEATURES NOT MADE APPARENT BY EVIDENCES DESCRIBED IN NOTES 1 AND 5 ARE NOT SHOWN. 4) THE VERTICAL DATUM FOR THIS PROJECT IS MEAN LOWER LOW WATER 5) A PIPE CAMERA VIDEO PERFORMED ON MAY, 19, 2017 WAS PROVIDED BY THE CLIENT TO ASSIST IN RE-CREATION OF THE EXISTING SEWER LINE LOCATIONS, TYPES, AND SIZES. ADDITIONALLY, NO BREAKS OR MAJOR FLAWS WERE FOUND IN THE SEWER MAIN FROM THE MAIN HATCHERY BUILDING SERVICE LINES TO THE EXISTING SEPTIC TANK AT THAT TIME. 6) NO PROPERTY INFORMATION IS SHOWN ON THESE DRAWINGS. IT IS THE RESPONSIBILITY OF PWSAC TO COORDINATE ALL LEASES WITH THE STATE OF ALASKA AND THE U.S. FOREST SERVICE AS NEEDED FOR CONSTRUCTION AND/OR ENSURE THAT ALL PROPOSED UPGRADES SHOWN ON THESE PLANS DO NOT CONFLICT WITH EXISTING LEASES AND LAND USE PERMITS. 7) IF THE EXISTING MARINE OUTFALL IS FOUND TO BE BROKEN, UNSECURED, OR DISCHARGING TO A DEPTH SHALLOWER THAN SHOWN ON THESE PLANS; CONSULT THE DESIGN ENGINEER. THE LINE MUST BE REPAIRED, EXTENDED AND SECURED, OR REPLACED AS NECESSARY. 8) CLIENT OR CONTRACTOR SHALL USE TRACER DYE TO VERIFY ALL HATCHERY WATER DISCHARGES (FLOOR DRAINS, ETC.) HAVE BEEN REMOVED FROM THE DOMESTIC WASTEWATER COLLECTION, TREATMENT, AND OUTFALL SYSTEMS. ADDITIONALLY, ANY OTHER NON-DOMESTIC WASTEWATER IS NOT PERMITTED TO DISCHARGE TO SAID SYSTEMS. 9) GREASE TRAPS SHALL BE INSTALLED ON ALL KITCHENS. 10) THESE PLANS SHALL BE SUBMITTED TO THE LIFT STATION MANUFACTURER OR AREA DISTRIBUTOR FOR COMMENT PRIOR TO ORDERING LIFT STATIONS OR PUMPS. 11) THE WWTP MUST BE INSTALLED BELOW THE GROUND SURFACE OR IN AN ENCLOSURE INSULATED AND HEATED TO A MINIMUM OF 50°F.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=40'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
20
10
40
20
80
30
AutoCAD SHX Text
LIFT STATION MANHOLE SUMP I.E. = 9.0' 4" PVC IN (EAST) I.E. = 13.3' 4" PVC IN (NW) I.E. = 15.2' PLUGGED 4" PVC (WEST) I.E. = 13.4' 2" PVC OUT (SOUTH) I.E. = 13.4'
AutoCAD SHX Text
4" SALTWATER INTAKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RECORD LOCATION OF (2) 18" SUPPLY LINES TO INCUBATION ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" PVC LATERAL
AutoCAD SHX Text
EXISTING MARINE OUTFALL
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
THIS DRAWING MAY BE REDUCED, VERIFY SCALE BEFORE USING
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
MAGNETIC 18° 34'
AutoCAD SHX Text
INSTALL LIBERTY D3696 BASIN W/LSG200 2HP SINGLE-STAGE DUPLEX GRINDER PUMP SYSTEM W/RISERS N: 100155.33 E: 500259.36
AutoCAD SHX Text
INSTALL 4" PVC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY D3696 BASIN W/LSG200 2HP SINGLE-STAGE DUPLEX GRINDER PUMP SYSTEM W/RISERS RIM ELEV = 19.1' +/- LOWEST INLET IE = 13.3' +/-
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING 2" PVC
AutoCAD SHX Text
EXISTING 8" PVC
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
1) THIS WASTEWATER TREATMENT PLANT PLAN DEPICTS THE TREATMENT ORDER OF THE PROPOSED SYSTEM. TANK LAYOUT/LOCATION IS PERMITTED TO VARY BASED ON SITE CONDITIONS. FURTHERMORE, THE PRIMARY TREATMENT AND RECIRCULATION/PUMP TANK MAY BE SPLIT INTO MULTIPLE, SEPARATE TANKS; CHAMBER VOLUMES SHOWN ON THIS WWTP MUST BE MAINTAINED. ALL MODIFICATIONS MUST BE APPROVED BY THE DESIGN ENGINEER BEFORE IMPLEMENTATION. 2) THE SYSTEM SHALL BE INSTALLED COMPLETELY BELOW GRADE, ABOVE GRADE IN A HEATED ENCLOSURE, OR A COMBINATION OF BOTH. 3) INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR HOUSING. 4) EACH STA-RITE PUMP SHALL SUPPLY PRIMARY TREATED WASTE WATER TO THE AEROCELL PODS ON AN ALTERNATING TIME BASIS. AFTER THE WATER PASSES THROUGH THE PODS, 80% SHALL FLOW BACK TO THE RECIRCULATION/PUMP CHAMBER, AND 20% SHALL CONTINUE ALONG THE TREATMENT AND EFFLUENT DISPOSAL PATH. 5) TANKS THAT ARE BURIED MUST BE ANCHORED PER MANUFACTURER TANKS THAT ARE BURIED MUST BE ANCHORED PER MANUFACTURER RECOMMENDATIONS.
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
19,OOO GALLON (~18,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
AutoCAD SHX Text
THIRD CHAMBER SHALL ACT AS A RECIRCULATION/PUMP CHAMBER WITH THE FOLLOWING COMPONENTS: 1) (2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMPS IN SIM/TECH NO VAULT PUMP FILTER. INSTALL CHECK VALVES AND WEEP HOLE ABOVE EACH PUMP. INSTALL PUMP ON 36"x36"x12" TALL PLATFORMS (MANUFACTURER INSTALLED) 2) DRYDEN AQUA FINE BUBBLE AI DIFFUSER POWERED BY A HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING. 3) SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" SCH 40 PVC FEED LINES. INSTALL TO DRAIN BACK TO XERXES TANK AFTER EACH PUMP CYCLE VIA WEEP HOLE.
AutoCAD SHX Text
QUANICS AEROCELL NS-1000-AC TREATMENT UNIT WITH INSULATION AND TOPCOAT, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW BACK TO THIRD CHAMBER OF XERXES TANK AT 2% MIN. SLOPE (80% RETURN LINES)
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW AT 2% MIN. SLOPE (20% DISCHARGE LINES)
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCUALTION LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
36" BY 36" BY 12" TALL PUMP PLATFORMS. (MANUFACTURER INSTALLED)
AutoCAD SHX Text
(2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMPS IN SIM/TECH IN SIM/TECH NO VAULT PUMP FILTER
AutoCAD SHX Text
INSTALL CHECK VALVES ABOVE EACH PUMP AND INSTALL WEEP HOLE ABOVE EACH CHECK VALVE
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
4" CROSSOVER TEES
AutoCAD SHX Text
INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
80% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCULATION LINE)
AutoCAD SHX Text
20% COLLECTION PIPING
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
19,OOO GALLON (~18,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE TREATMENT TANK AND UP STREAM OF THE SAMPLING PORT
AutoCAD SHX Text
EFFLUENT FORM TANK
AutoCAD SHX Text
TO MARINE OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAMPLING PORT DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE DISINFECTION UNITS
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
TYPICAL TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. 2. TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA REGULATIONS AND TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA REGULATIONS AND REQUIREMENTS. 3. INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL GRAVEL AND INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL GRAVEL AND RESURFACING REQUIREMENTS. 4. IF UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT IF UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT THE CONTRACTOR TO OVER-EXCAVATE AND BACKFILL WITH SUITABLE MATERIAL. 5. THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER TO ALLOW POSITIVE THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER TO ALLOW POSITIVE DRAINAGE TO MATCH PRE-CONSTRUCTION CONDITIONS.
AutoCAD SHX Text
6" DEPTH OF 3/4" MINUS GRAVEL SURFACE COARSE COMPACTED TO 95% OF MAX. DENSITY
AutoCAD SHX Text
BACKFILL MATERIAL SHALL CONTAIN NO ORGANIC MATTER AND SHALL BE 6" DIAMETER OR LESS IN SIZE COMPACTED TO 95% WITHIN TRAFFIC AREAS AND 90% OUTSIDE OF TRAFFIC AREAS. EXCAVATED MATERIAL MAY BE USED AS BACKFILL IF APPROVED BY THE ENGINEER.
AutoCAD SHX Text
PIPE BEDDING MATERIAL PLACED IN 6" LIFTS AND COMPACTED TO 95% OF MAXIMUM DENSITY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: RIGID BOARD INSULATION JOINTS SHALL BE RIGID BOARD INSULATION JOINTS SHALL BE LAPPED *H: ALSO REFERS TO CLEAR SPACING BETWEEN THE PIPE AND OTHER DRAINAGE STRUCTURES OR THE WATER LINE.
AutoCAD SHX Text
4'0" OR GREATER NONE REQUIRED NONE REQUIRED 3'6" 1 INCH 1 INCH 3' 2 INCHES 2 INCHES 2'6"(MINIMUM) 4 INCHES 4 INCHES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLACE CONCRETE OR STACK BALLAST ROCKS OVER PIPE. BALLAST SECTION TO BE A MINIMUM 1'x1'X2' LONG AND PLACED 10' O/C AND AT EVERY PIPE JOINT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DOWN STREAM OF THE SAMPLING PORTS. INSTALL SO FLOW METER HEADER IS ALWAYS FILLED WITH WATER.
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT VICINITY MAP NOT TO SCALE
WASTEWATER TREATMENT SYSTEM UPGRADES
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
3
AutoCAD SHX Text
C200 SITE PLAN
AutoCAD SHX Text
C201 SITE PLAN
AutoCAD SHX Text
THIS PROJECT CONSISTS OF WASTEWATER TREATMENT UPGRADES FOR MAIN BAY HATCHERY OWNED AND OPERATED BY THE PRINCE WILLIAM SOUND AQUACULTURE CORPORATION. THE UPGRADES SHALL INCLUDE A NEW WASTEWATER TREATMENT SYSTEM WITH ASSOCIATED COLLECTION AND PIPING SYSTEMS AND A MARINE OUTFALL.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
1) THE EXISTING UNDERGROUND UTILITIES WERE DRAWN USING THE BEST AVAILABLE INFORMATION INCLUDING SURFACE EVIDENCES MEASURED DURING THE SITE SURVEY, OWNER SUPPLIED ASBUILT/RECORD DRAWINGS, AND INTERVIEWS WITH PLANT MANAGERS AND STAFF. THE UNDERGROUND UTILITIES SHOWN HEREON ARE SYMBOLIC ONLY AND MAY NOT REFLECT THE ACTUAL LOCATION. 2) THESE PLANS WERE PREPARED USING INFORMATION FROM A SITE INSPECTION BY AN R&M ENGINEERING-KETCHIKAN REPRESENTATIVE CONDUCTED ON 9/21-23/2020. THIS SITE INSPECTION INCLUDED A SITE SURVEY USING HIGH-PRECISION, TRIMBLE R8/R10 GPS HIGH-PRECISION, TRIMBLE R8/R10 GPS RECEIVERS DIFFERENTIALLY CORRECTED AND PROCESSED USING TRIMBLE BUSINESS CENTER V 5.10 SOFTWARE 3) THESE PLANS DEPICT STRUCTURES AND FEATURES PERTINENT TO THE WASTEWATER TREATMENT SYSTEM DESIGN ONLY. NOT ALL DECKS, AWNINGS, ETC. ARE SHOWN. ADDITIONALLY, ANY UNDERGROUND UTILITIES OR FEATURES NOT MADE APPARENT BY EVIDENCES DESCRIBED IN NOTE 1) ARE NOT SHOWN. 4) THE VERTICAL DATUM FOR THIS PROJECT IS MEAN LOWER LOW WATER 5) NO PROPERTY INFORMATION IS SHOWN ON THESE DRAWINGS. IT IS THE RESPONSIBILITY OF PWSAC TO COORDINATE ALL LEASES WITH THE STATE OF ALASKA AND THE U.S. FOREST SERVICE AS NEEDED FOR CONSTRUCTION AND/OR ENSURE THAT ALL PROPOSED UPGRADES SHOWN ON THESE PLANS DO NOT CONFLICT WITH EXISTING LEASES AND LAND USE PERMITS. 6) CLIENT OR CONTRACTOR SHALL USE TRACER DYE TO VERIFY ALL HATCHERY WATER DISCHARGES (FLOOR DRAINS, ETC.) HAVE BEEN REMOVED FROM THE DOMESTIC WASTEWATER COLLECTION, TREATMENT, AND OUTFALL SYSTEMS. ADDITIONALLY, ANY OTHER NON-DOMESTIC WASTEWATER IS NOT PERMITTED TO DISCHARGE TO SAID SYSTEMS. 7) GREASE TRAPS SHALL BE INSTALLED ON ALL KITCHENS. 8) THESE PLANS SHALL BE SUBMITTED TO THE LIFT STATION MANUFACTURER OR AREA DISTRIBUTOR FOR COMMENT PRIOR TO ORDERING LIFT STATIONS OR PUMPS. 9) THE WWTP MUST BE INSTALLED BELOW THE GROUND SURFACE OR IN AN ENCLOSURE INSULATED AND HEATED TO A MINIMUM OF 50°F.
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=40'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
20
10
40
20
80
30
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONCRETE RETAINING WALL
AutoCAD SHX Text
AutoCAD SHX Text
FUEL STORAGE TANK
AutoCAD SHX Text
FUEL STORAGE TANK
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
INSTALL LIBERTY PROVORE 680 W/PRG-SERIES DUPLEX GRINDER PUMP SYSTEM IN CRAWLSPACE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO SEWER/STORM OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL CHECK VALVE
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
INSTALL 4,000 GALLON XERXES 2-CHAMBERED PRIMARY TREATMENT TANK WITH POLYLOK PL-525 EFFLUENT FILTER ON OUTLET
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO STORM SYSTEM
AutoCAD SHX Text
AutoCAD SHX Text
S SE
R V
S S ERV
S S ERV
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
INSTALL 2" HDPE
AutoCAD SHX Text
INSTALL 4" PVC
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO TREATED SEWER/STORM WATER OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 6" C900
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY D3672 W/LSG200 2HP DUPLEX GRINDER PUMP SYSTEM N: 100366.01 E: 500032.44
AutoCAD SHX Text
S SERV
S SERV
S SERV
S SERV
S SERV
S SE
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
SCALE 1"=20'
1 METER = 3.2808333 U.S. SURVEY FEET 1 U.S. ACRE = 0.4047 HECTARES
0
0
10
5
20
10
40
15
AutoCAD SHX Text
INSTALL 4" PVC
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRAVITY SEWER MAIN TO BE CONVERTED TO STORM WATER SYSTEM
AutoCAD SHX Text
INSTALL 6" C900
AutoCAD SHX Text
NOTE: PROVIDE LAT/LONG LOCATION OF PROVIDE LAT/LONG LOCATION OF OUTFALL TERMINUS TO DESIGN ENGINEER IMMEDIATELY AFTER COMPLETION OF CONSTRUCTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 4,000 GALLON XERXES 2-CHAMBERED PRIMARY TREATMENT TANK WITH POLYLOK PL-525 EFFLUENT FILTER ON OUTLET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONNECT STORM WATER SYSTEM TO EXISTING OUTFALL. BY-PASS EXISTING WWTP
AutoCAD SHX Text
INSTALL LIBERTY 1100-SERIES BASIN W/LE100 1HP DUPLEX PUMP SYSTEM W/RISERS N: 100417.93 E: 499905.85
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL BACKFLOW PREVENTOR
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY D3672 W/LSG200 2HP SINGLE-STAGE DUPLEX GRINDER PUMP SYSTEM RIM ELEV = 19.6' +/- SUMP IE = 12.6' +/-
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING GRADE, TYP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL 6" C900
AutoCAD SHX Text
INSTALL 6" HDPE
AutoCAD SHX Text
EXISTING 8" PVC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL LIBERTY 1100-SERIES BASIN W/LE100 1HP DUPLEX PUMP SYSTEM W/RISERS RIM ELEV = 17.6' +/- INLET IE = 12.6' +/- +/-+/-
AutoCAD SHX Text
INSTALL 4,000 GALLON XERXES 2-CHAMBERED PRIMARY TREATMENT TANK WITH POLYLOK PL-525 EFFLUENT FILTER ON OUTLET
AutoCAD SHX Text
EXISTING 8" PVC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
1) THIS WASTEWATER TREATMENT PLANT PLAN DEPICTS THE TREATMENT ORDER OF THE PROPOSED SYSTEM. TANK LAYOUT/LOCATION IS PERMITTED TO VARY BASED ON SITE CONDITIONS. FURTHERMORE, THE PRIMARY TREATMENT AND RECIRCULATION/PUMP TANK MAY BE SPLIT INTO MULTIPLE, SEPARATE TANKS; CHAMBER VOLUMES SHOWN ON THIS WWTP MUST BE MAINTAINED. ALL MODIFICATIONS MUST BE APPROVED BY THE DESIGN ENGINEER BEFORE IMPLEMENTATION. 2) THE SYSTEM SHALL BE INSTALLED COMPLETELY BELOW GRADE, ABOVE GRADE IN A HEATED ENCLOSURE, OR A COMBINATION OF BOTH. 3) INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR HOUSING. 4) EACH STA-RITE PUMP SHALL SUPPLY PRIMARY TREATED WASTE WATER TO THE AEROCELL PODS ON AN ALTERNATING TIME BASIS. AFTER THE WATER PASSES THROUGH THE PODS, 80% SHALL FLOW BACK TO THE RECIRCULATION/PUMP CHAMBER, AND 20% SHALL CONTINUE ALONG THE TREATMENT AND EFFLUENT DISPOSAL PATH. 5) TANKS THAT ARE BURIED MUST BE ANCHORED PER MANUFACTURER RECOMMENDATIONS. 6) "ALTERNATE A" SHALL UTILIZE THE SAME WWTP PLAN SHOWN ON THIS SHEET WITH THE EXCEPTION OF THE 10,000 GALLON XERXES TANK. IN PLACE OF THIS TANK, INSTALL (2) XERXES PRIMARY TREATMENT TANKS AT DIFFERENT LOCATIONS ON THE SITE (PER PLAN) AND A 4,000 GALLON SINGLE CHAMBERED XERXES RECIRCULATING/PUMP TANK IN THE WWTP. ALL OTHER COMPONENTS AND TREATMENT ORDERS SHALL REMAIN IDENTICAL.
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER WITH DUPLEX PUMP SYSTEM.
AutoCAD SHX Text
AutoCAD SHX Text
THIRD CHAMBER SHALL ACT AS A RECIRCULATION/PUMP CHAMBER WITH THE FOLLOWING COMPONENTS: 1) (2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMP IN SIM/TECH NO VAULT PUMP FILTER. INSTALL CHECK VALVES AND WEEP HOLE ABOVE EACH PUMP. INSTALL PUMP ON 36"x36"x12" TALL PLATFORMS (MANUFACTURER INSTALLED) 2) DRYDEN AQUA FINE BUBBLE AI DIFFUSER POWERED BY A HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING. 3) SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
AutoCAD SHX Text
1-1/2" SCH 40 PVC FEED LINES. INSTALL TO DRAIN BACK TO XERXES TANK AFTER EACH PUMP CYCLE VIA WEEP HOLE.
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW BACK TO THIRD CHAMBER OF XERXES TANK AT 2% MIN. SLOPE (80% RETURN LINES)
AutoCAD SHX Text
QUANICS AEROCELL NS-1000-AC TREATMENT UNIT WITH INSULATION AND TOPCOAT, TYP.
AutoCAD SHX Text
4" SDR35 PVC. INSTALL TO FLOW AT 2% MIN. SLOPE (20% DISCHARGE LINES)
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCUALTION LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (20% DISCHARGE LINE)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
80% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
4" D3034 PVC OR 2" SCH 40 PVC DRAIN PIPE (80% RECIRCULATION LINE)
AutoCAD SHX Text
20% COLLECTION PIPING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HIBLOW HP-200 LINEAR AIR COMPRESSOR TO BE LOCATED IN A WEATHER PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
SIM/TECH PRESSURE FILTER
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL SJE RHOMBUS DUPLEX DEMAND/TIMED CONTROL PANELS AND XPERT ALERT REMOTE MONITORING SYSTEM IN WEATHER PROOF LOCATION OR HOUSING.
AutoCAD SHX Text
24" ACCESS OPENING FOR PVC OR FIBERGLASS RISER (AS NECESSARY)
AutoCAD SHX Text
4" CROSSOVER TEES
AutoCAD SHX Text
AutoCAD SHX Text
36" BY 36" BY 12" TALL PUMP PLATFORMS. (MANUFACTURER INSTALLED)
AutoCAD SHX Text
(2) STA-RITE STEP PLUS SERIES STEP 50-05121 TURBINE PUMPS IN SIM/TECH IN SIM/TECH NO VAULT PUMP FILTER
AutoCAD SHX Text
INSTALL CHECK VALVES ABOVE EACH PUMP AND INSTALL WEEP HOLE ABOVE EACH CHECK VALVE
AutoCAD SHX Text
AutoCAD SHX Text
INFLUENT LINE PER PLAN (CONNECT PER DETAIL FOR FORCE MAIN)
AutoCAD SHX Text
10,OOO GALLON (~9,000 GALLON WORKING VOLUME) XERXES FIBERGLASS TANK WITH (3) CHAMBERS. FIRST AND SECOND CHAMBERS ARE FOR PRIMARY TREATMENT AND THE THIRD CHAMBER IS A RECIRCULATION/PUMP CHAMBER WITH DUPLEX PUMP SYSTEM.
SHEET DESCRIPTION:
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE TREATMENT TANK AND UP STREAM OF THE SAMPLING PORT
AutoCAD SHX Text
EFFLUENT FORM TANK
AutoCAD SHX Text
TO MARINE OUTFALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAMPLING PORT DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DIRECTLY DOWN STREAM OF THE DISINFECTION UNITS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
R &
71 80
R EV
IL LA
R O
AD , S
U IT
E 30
0 KE
TC H
IK AN
, A LA
SK A
9 99
01 PH
: 9 07
.2 25
.7 18
7 w w w .k et ch ik an en gi ne er .c om
R EV
IS IO
N S:
AutoCAD SHX Text
TYPICAL TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOTES: 1. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. BACKFILL MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS. 2. TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA REGULATIONS AND TRENCH EXCAVATION AND SHORING SHALL COMPLY WITH LOCAL, STATE, AND OSHA REGULATIONS AND REQUIREMENTS. 3. INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL GRAVEL AND INDICATED SLOPE IS FOR PAY QUANTITY DETERMINATION ONLY FOR IMPORTED BACKFILL GRAVEL AND RESURFACING REQUIREMENTS. 4. IF UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT IF UNSUITABLE PIPE FOUNDATION MATERIAL IS ENCOUNTERED DURING EXCAVATION, ENGINEER MAY DIRECT THE CONTRACTOR TO OVER-EXCAVATE AND BACKFILL WITH SUITABLE MATERIAL. 5. THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER TO ALLOW POSITIVE THE DITCH LINE, IF ONE EXISTS, SHALL BE RESHAPED IN SUCH A MANNER TO ALLOW POSITIVE DRAINAGE TO MATCH PRE-CONSTRUCTION CONDITIONS.
AutoCAD SHX Text
6" DEPTH OF 3/4" MINUS GRAVEL SURFACE COARSE COMPACTED TO 95% OF MAX. DENSITY
AutoCAD SHX Text
BACKFILL MATERIAL SHALL CONTAIN NO ORGANIC MATTER AND SHALL BE 6" DIAMETER OR LESS IN SIZE COMPACTED TO 95% WITHIN TRAFFIC AREAS AND 90% OUTSIDE OF TRAFFIC AREAS. EXCAVATED MATERIAL MAY BE USED AS BACKFILL IF APPROVED BY THE ENGINEER.
AutoCAD SHX Text
PIPE BEDDING MATERIAL PLACED IN 6" LIFTS AND COMPACTED TO 95% OF MAXIMUM DENSITY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: RIGID BOARD INSULATION JOINTS SHALL BE RIGID BOARD INSULATION JOINTS SHALL BE LAPPED *H: ALSO REFERS TO CLEAR SPACING BETWEEN THE PIPE AND OTHER DRAINAGE STRUCTURES OR THE WATER LINE.
AutoCAD SHX Text
4'0" OR GREATER NONE REQUIRED NONE REQUIRED 3'6" 1 INCH 1 INCH 3' 2 INCHES 2 INCHES 2'6"(MINIMUM) 4 INCHES 4 INCHES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PLACE CONCRETE OR STACK BALLAST ROCKS OVER PIPE. BALLAST SECTION TO BE A MINIMUM 1'x1'X2' LONG AND PLACED 10' O/C AND AT EVERY PIPE JOINT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOTE: THIS DETAIL MUST BE INSTALLED DOWN STREAM OF THE SAMPLING PORTS. INSTALL SO FLOW METER HEADER IS ALWAYS FILLED WITH WATER.
AutoCAD SHX Text
AutoCAD SHX Text