pwd, govt. of delhi · welcome to 45th meeting of the governing body uttipec pwd, govt. of delhi....

20
Welcome to 45 th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi

Upload: others

Post on 04-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Welcome to 45th meeting of the Governing Body

UTTIPEC

PWD, Govt. of Delhi

Page 2: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

KALINDI BYE-PASS PROJECT

being planned by PWD, Govt. of Delhi

Page 3: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Project Features

• The proposed Kalindi Kunj road is located in south eastern part ofDelhi connecting from Maharani Bagh near Noida toll bridge toBadarpur border

• This bypass is planned to decongest National Highway-2 (NH-2)and to alleviate the traffic of ring road

• Based on preliminary alignment plans, the project road is 14 km

Page 4: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Background • The need of this Project was identified long back and

work on ground was also started in 2006

• A solution for the clogged DND interchange and ringroad section is required.

• Kalindi bypass is the bypass of NH-2 from Ashramchowk in Delhi to Ballabhgarh in Haryana. It startsfrom Ring road near DND flyway and terminate atBorder near Faridabad via Kalindi kunj (Road no-13A)

• It will also share the traffic of Road No-13A (KalindiKunj-Sarita Vihar) which make the smooth trafficflow near Border area.

Page 5: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Surroundings of Study Area

Page 6: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Outcome of Classified Volume Count Survey

Traffic Volume (In ADT)

Traffic Volume(In PCU)

Peak Hour(Morning)

Peak Hour(Peak Hour)

1,73,181 1,81,427 09:00 – 10:00 18:00 – 19:00

Traffic Volume (In ADT)

Traffic Volume(In PCU)

Peak Hour(Morning)

Peak Hour(Peak Hour)

1,03,432 1,28,553 09:00 – 10:00 19:00 – 20:00

Traffic Volume (In ADT)

Traffic Volume(In PCU)

Peak Hour(Morning)

Peak Hour(Peak Hour)

80,119 1,03,811 09:00 – 10:00 19:00 – 20:00

Traffic at Road no. 13 A near Kalindi Kunj

Traffic at NH2 Ashram Chowk

Traffic at Road no. NH2, Badarpur Border

Page 7: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Comparison of AlternativesS

NoDescription Alignment -01 Alignment-02 Alignment-03

1 Total Length (Km) 14.100 13.4 13.0

2Length of elevated structure (km)

6.550 5.500 4.500

3 Land Acquisition in Hec. 57.73 56.62 50.38

4Rehabilitation & Resettlement

Applicable and very complicated

NIL Nominal

5 Effected Agencies.

UP irrigation Bird Centaury.Delhi Jal BoardEnclaveDDA.MCD., DMRC.

UP irrigation Delhi Jal BoardDDA.MCD.DMRC.

UP irrigation Delhi Jal BoardHoly Family HospitalJMI UniversityGraveyardDDA., MCD., DMRC.

6 Effected ColonyAbul FazalShaheen Bagh

NIl

New Friends Zakir NagarGaffar manzilOkhla VihatHaji Colony

7 Estimated Cost (Cr) EPC- 800 EPC- 750 EPC- 680

8 Remarks Not Recommended Recommended Not Recommended

Page 8: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment-01 (River bank to Bird Sanctuary, Kalindi Kunj park, Madanpur Khadar Ash (NTPC) Molarband, Mithapur, Agra Canal )

Alignment Length in Km1 14.100

GAIL

KALINDI KUNJ

YAMUNA RIVER

START POINT

END POINT AT NH-2 BYPASS

Alignment Length in Km

1 14.100

Alingment 01

Page 9: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment-01 Summary of Land use pattern & Encroachment

S. No.

ChainageFrom To

Length (Km)

LeftLand Use Encroachment

RightLand Use Encroachment

1 0.000 1.950 1.95

3.2

River Bank Nil Khizarabad Bhogal Nil

2 1.950 2.900 0.95 River Bank Nil Slum Area 10 Slum+2 Building

3 2.900 3.200 0.3 River Bank Nil Open Land Nil

4 3.200 4.100 0.9 0.9 River Bank Nil Canal Colony 10 Slum + 1 Building

5 4.100 4.450 0.35

2.1

River Bank/Bird Sanctuary

NilOpen Land Irrigation

Department U.PNil

6 4.450 5.200 0.75River Bank//Bird

SanctuaryNil Abul fazal Enclave 7 Slum + 40 Building

7 5.200 5.300 0.1River Bank//Bird

SanctuaryNil

Open Land Irrigation Department U.P

Nil

8 5.300 6.200 0.9River Bank//Bird

SanctuaryNil Saheen Bagh 2 Slum + 11 Building

9 6.200 6.600 0.4

7.89

Kalindi Kunj Park NilDDA land Reserved

by MetroNil

10 6.600 7.900 1.3 Gail India Limited Nil Agra Canal Nil

11 7.900 8.600 0.7 Madanpur Khadar Nil Agra Canal Nil

12 8.600 10.700 2.1 Ash (NTPC) Nil Agra Canal Nil

13 10.700 11.800 1.1 Molarband Nil Agra Canal Nil

14 11.800 13.850 2.05 Mithapur Nil Agra Canal Nil

15 13.850 14.098 0.248 Agra Canal Nil Sector -37 Faridabad Nil

Page 10: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment 01 Available Land Width

S NoChainage

From To Length (km) Land width (m)

1 0.000 3.700 3.700 Available

2 3.700 4,550 0.850 12-16

3 4.550 5,300 0.750 20-24

4 5.300 14.098 8.800 Available

Page 11: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment-02 (River Bank to Canal Colony to Abul Fazal Enclave to U.P .Irrigation land to Saheen Bagh to DDA land to Madanpur Khadar Ash (NTPC) Molarband, Mithapur, Agra Canal )

Alignment Length in Km2 13.398

YAMUNA RIVER

START POINT

GAIL

KALINDI KUNJ

END POINT AT NH-2 BYPASS

Page 12: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment-02 Summary of Land use pattern & EncroachmentS.

No.Chainage

From ToLength (Km)

LeftLand Use Encroachment

RightLand Use Encroachment

1 0 1.95 1.95

3.5

River Bank Nil Khizarabad Bhogal Nil

2 1.95 2.9 0.95 River Bank Slum Area 10 Slum + 2 Building

3 2.9 3.2 0.3 River Bank Nil Open Land Nil

4 3.2 3.5 0.3 River Bank Nil Canal Colony 1 Slum

5 3.5 3.85 0.35 0.35 Canal Colony 1 Slum Agra Canal Nil

6 3.85 5.35 1.5

2.5

Abul Fazal Enclave Police Station + 2 Slum + 1 Building Agra Canal Nil

7 5.35 5.45 0.1 Open Land Irrigation Department U.P Nil Agra Canal Nil

8 5.45 6.35 0.9 Saheen Bagh Police Station Agra Canal Nil

9 6.35 7 0.65

7.048

DDA land Reserved by Metro Nil Agra Canal Nil

10 7 7.2 0.2 Gail India Limited Nil Agra Canal Nil

11 7.2 7.9 0.7 Madanpur Khadar Nil Agra Canal Nil

12 7.9 10 2.1 Ash (NTPC) Nil Agra Canal Nil

13 10 10.7 0.7 Molarband Nil Agra Canal Nil

14 10.7 11.1 0.4 Molarband Nil Agra Canal Nil

15 11.1 13.15 2.05 Mithapur Nil Agra Canal Nil

16 13.15 13.398 0.248 Agra Canal Nil Sector -37 Faridabad Nil

Page 13: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment 02 Available Land width

S NoChainage

From To Length (km) Land width (m)

1 0.000 3.500 3.5 Available

2 3.500 3.850 0.35 15-20

3 3.850 13.398 9.548 Available

Page 14: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment-03 (River Bank to Khizarabad Bhogal to Ashoka Park to Zakir Nagar to ZakirNagar Park, Jamia College, Gaffar Manzil Extn.to Noor Nagar Extension to Okhla Vihar to Abul Fazal Enclave to UP Irrigation land to Saheen Bagh to DDA Land to Agra Canal to Madanpur to Khadar Ash (NTPC) to Molarband to Mithapur to Agra Canal)

KM 12.889

Length in Km

12.988YAMUNA RIVER

GAIL

KALINDI KUNJ

GAIL

KALINDI KUNJ

Page 15: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment-03 Summary of Land use pattern & Encroachment

S. No.

Chainagefrom To

Length (Km)

LeftLand Use Encroachment

RightLand Use Encroachment

1 0.000 1.100 1.11.25

River Bank Nil Khizarabad Bhogal Nil

2 1.100 1.2500.15

Khizarabad Bhogal 1 Building Khizarabad Bhogal Nil

3 1.250 1.700 0.45 0.45 Ashoka Park Nil Ashoka Park Nil

4 1.700 1.8500.15 0.2

Zakir Nagar 15 Building Zakir Nagar Park Nil

5 1.850 1.9000.05

Zakir Nagar Park Nil New Friends Colony Nil

6 1.900 2.0250.125

0.125 Jamia Collage Nil Delhi Jal Board 2 Building

7 2.025 2.3500.325

1.175

Jamia Collage 4 Building Holi Family Hospital Nil

8 2.350 2.7000.35

Jamia Collage Nil Don BoscoTechnical Institute

Nil

9 2.700 3.2000.5

Jamia CollageR.M.C Mixing plant

+ 15 Huts Masihgarh Cemetery Nil

10 3.200 3.4000.2

0.2 Ghaffar Manzil Extn. Nil Hazi Colony 3 Huts

11 3.400 4.2000.8

0.8 Noor Nagar Extn. 1 Slum + 2 Huts Hazi Colony4 Huts + 2 Slums +

2 Building

Page 16: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment-03 Summary of Land use pattern & Encroachment(Cont..)

S. No.

ChainageFrom To

Length (Km)

LeftLand Use Encroachment

RightLand Use Encroachment

12 4.200 4.250 0.050.4

Okhla Vihar Nil Jasola 2 Building

13 4.250 4.6000.35

Okhla Vihar Nil Jasola Nil

14 4.600 4.850 0.25

1.250

Abul fazal Enclave Nil Agra Canal Nil

15 4.850 4.950 0.10 Open Land Irrigation Department U.P

Nil Agra Canal Nil

164.950 5.850

0.90 Saheen Bagh Nil Agra Canal Police Station

17 5.850 6.500 0.65

7.039

DDA land Reserved by Metro Nil Agra Canal Nil

186.500 6.700 0.2

Agra Canal Nil Agra Canal Nil

196.700 7.400 0.7 Madanpur Khadar Nil Agra Canal Nil

207.400 9.500 2.1 Ash (NTPC) Nil Agra Canal Nil

219.500 10.600 1.1 Molarband Nil Agra Canal Nil

2210.600 12.650 2.05 Mithapur Nil Agra Canal Nil

2312.650 12.889

0.239 Agra Canal Nil Sector -37 FAridabad

Nil

Page 17: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Alignment 03 Available Land width

S NoChainage

From To Length (Km) Land width (m)

1 0.000 1.100 1.100 Available

2 1.100 1.250 0.150 20

3 1.250 2.000 0.750 Available

4 2.000 2.350 0.350Land available belongs to Various Department.

5 2.350 4.200 1.850 Available

6 4.200 4.250 0.050 25

7 4.250 12.889 8.639 Available

Page 18: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

S No Description Alignment -01 Alignment-02 Alignment-03

1 Total Length (Km) 14.100 13.4 13.0

2Length of elevated structure (km)

6.550 5.500 4.500

3 Land Acquisition in Hec. 57.73 56.62 50.38

4Rehabilitation & Resettlement

Applicable and very complicated

NIL Nominal

5 Effected Agencies.

UP irrigation Bird Centaury.Delhi Jal BoardEnclaveDDA.MCD., DMRC.

UP irrigation Delhi Jal BoardDDA.MCD.DMRC.

UP irrigation Delhi Jal BoardHoly Family HospitalJMI UniversityGraveyardDDA., MCD., DMRC.

6 Effected ColonyAbul FazalShaheen Bagh

NIl

New Friends Zakir NagarGaffar manzilOkhla VihatHaji Colony

7 Estimated Cost (Cr) EPC- 800 EPC- 750 EPC- 700

8 Remarks Not Recommended Recommended Not Recommended

Connection with DND Flyway junction

Page 19: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Proposal of Junction to be Improved at end point

Option No:-01

Page 20: PWD, Govt. of Delhi · Welcome to 45th meeting of the Governing Body UTTIPEC PWD, Govt. of Delhi. KALINDI BYE-PASS PROJECT. being planned by . PWD, Govt. of Delhi. Project Features

Thank You