pvrs 1 pearl submittal template v1.3

Upload: shyamnair9667

Post on 01-Jun-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    1/19

    Pearl Villas 1 Pearl R

    Project Details

    Project Name

    Pearl Rating Stage

    Pearl Rating Targeted

    PVRS Professional Name

    PVRS Professional Number

    PVRS Professional Email Address

    Submission Date

    Design & Develoment Team

    Acoustic !onsultant

    Arc"itect

    !ommissioning Agent

    !onstruction #anager

    !ost !onsultant

    Develoer$%ner

    Environmental !onsultant

    'eotec"nical Engineer

    (andscae Arc"itect

    (ife !ycle Analyst

    #asterlanner

    #odelling Secialist

    Project #anager

    Safety and Security !onsultant

    )P! Develoment Revie *D

    +if alicable,

    PVRS Professional !ontact P"oneNumber

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    2/19

    -aste Secialist

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    3/19

      ating System

    Design

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    4/19

    Version 1./

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    5/19

    Design

    Construction

    Acoustic Consultant:

    Architect:

    Commissioning Agent:

    Construction Manager:

    Cost Consultant:

    Developer/Owner:

    Environmental Consultant:

    Geotechnical Engineer:

    Landscape Architect:

    Life Cycle Analyst:

    Masterplanner:

    Modelling pecialist:

    !ro"ect Manager:

    afety and ecurity Consultant:

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    6/19

    &aste pecialist:

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    7/19

    Pearl Villas 1 Pearl Rating System

    !redit Points Summary Reort a Temlate 0ug

    !redit Reference !redit Title Design !onstruction

    *DP *ntegrated Develoment Process

    'D!()* 'ntegrated Development trategy )e+uired No No

    'D!(), ystem - Envelope !erformance .erification )e+uired No No

    NS Natural Systems

    ()* atural ystems Assessment - !rotection )e+uired No No

    (V (ivable Villas

    L.(), Outdoor $hermal Comfort trategy )e+uired No No

    L.()0 Minimum .entilation )e+uired No No

    P- Precious -ater

    !&()* Minimum 'nterior &ater %se )eduction )e+uired No No

    !&(), &ater Monitoring )e+uired No No

    RE Resourceful Energy

    )E()* Minimum Energy !erformance )e+uired No No

    )E()0 O1one 'mpacts of )efrigerants - 2ire uppression ystems )e+uired No No

    S# Stearding #aterials

    M()* 3a1ardous Materials Elimination )e+uired No No

    M(), 4asic Construction &aste Management )e+uired No No

    M()0 torage - Collection of &aste - )ecycla#les )e+uired No No

    !.)5template6upc7gov7ae

    !redit PointsAvailable

    mailto:[email protected]?subject=Pearl%20Villa%20Scorecard%20Bug%20Reportmailto:[email protected]?subject=Pearl%20Villa%20Scorecard%20Bug%20Report

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    8/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    *DP2R1 *ntegrated Develoment Strategy

    Design

    Submission Re3uirements Resonsible Party

    o

    o

    'mplementation strategy for achieving transition #etween pro"ect stages and pro"ect pac8ages o

    o

    arrative highlighting the reasons for any changes from the initial 'D! process chart o

    Re3uired credit ac"ieved4 No

    ConstructionSubmission Requirements Responsible Party

    No

    Updated implementation strategy No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision $Draing Number5 Title and Revision

    !rocess chart for the 'D! developed at pro"ect inception9 detailing:( $eam structure listing team mem#ers and their roles( Design milestones and wor8shops listing participants9 goals9 epected outcomes9 re+uiredactions with tas8s assignments

    arrative summari1ing initial vision9 o#"ectives and targets set "ointly #y the pro"ect team for thepro"ect

    Meeting minutes9 action items and team mem#er responsi#ilities from 8ey wor8shops held as part

    of the 'D!

    Access Temlate 6older

    Achieved &Submitted?

    Document Title and Revision /Drain! Number" Title and Revision

    Narrative showing an updated process chart of the IDP highlighting changes from the design stageand listing successes and challenges during construction stage

    Access Temlate 6older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20IDP%20Section%20:%20IDP-R1%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/IDP-R1%20Integrated%20Development%20Strategyhttp://var/www/apps/conversion/tmp/scratch_4/IDP-R1%20Integrated%20Development%20Strategyhttp://var/www/apps/conversion/tmp/scratch_4/IDP-R1%20Integrated%20Development%20Strategyhttp://var/www/apps/conversion/tmp/scratch_4/IDP-R1%20Integrated%20Development%20Strategymailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20IDP%20Section%20:%20IDP-R1%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    9/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    *DP2R7 System & Enveloe Performance Verification

    Design

    Submission Re3uirements Resonsible Party

    4rief narrative descri#ing the systems and envelope verification re+uirements for the villa o

    C. of the Competent !rofessional who will #e underta8ing the systems verification o

    C. of the Competent !rofessional who will #e underta8ing the #uilding envelope verification o

    Re3uired credit ac"ieved4 No

    Construction

    Submission Requirements Responsible Party

    No

    Occupant Handbook and confirmation that this has been provided to the villa owner No

    Copies of certificates of testing of all standard products and any custom made cladding systems No

    No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision $Draing Number5 Title and Revision

    Access $emplate 2older

    Achieved &Submitted?

    Document Title and Revision /Drain! Number" Title and Revision

    Commissioning report signed by the Competent Person detailing the results of the systemsverification and confirming that all systems are operating as intended

    uilding envelope verification report signed by the Competent Professional detailing the results ofthe testing and confirming that the performance of the building envelope is acceptable

    Access $emplate 2older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20IDP%20Section%20:%20IDP-R2%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/IDP-R2%20System%20&%20Envelope%20Performance%20Verificationhttp://var/www/apps/conversion/tmp/scratch_4/IDP-R2%20System%20&%20Envelope%20Performance%20Verificationhttp://var/www/apps/conversion/tmp/scratch_4/IDP-R2%20System%20&%20Envelope%20Performance%20Verificationhttp://var/www/apps/conversion/tmp/scratch_4/IDP-R2%20System%20&%20Envelope%20Performance%20Verificationmailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20IDP%20Section%20:%20IDP-R2%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    10/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    NS2R1 Natural Systems Assessment & Protection

    Design

    Submission Re3uirements Resonsible Party

    Re3uired credit ac"ieved4 No

    Construction

    Submission Requirements Responsible Party

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    atural ystems Assessment )eport including:

    ( arrative( Maps( ite photographs

    Access $emplate 2older

    Achieved &Submitted?

    Document Title and Revision/Drain! Number"Title and Revision

    Dated photographs post completion showing preserved or protected valuable assets !whererelevant"

    Access $emplate 2older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20NS%20Section%20:%20NS-R1%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/NS-R1%20Natural%20Systems%20Assessment%20&%20Protectionhttp://var/www/apps/conversion/tmp/scratch_4/NS-R1%20Natural%20Systems%20Assessment%20&%20Protectionhttp://var/www/apps/conversion/tmp/scratch_4/NS-R1%20Natural%20Systems%20Assessment%20&%20Protectionhttp://var/www/apps/conversion/tmp/scratch_4/NS-R1%20Natural%20Systems%20Assessment%20&%20Protectionmailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20NS%20Section%20:%20NS-R1%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    11/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    (V2R7 %utdoor T"ermal !omfort Strategy

    Design

    o

    Submission Re3uirements Resonsible Party

    o

    o

    Re3uired credit ac"ieved4 No

    Construction

    No

    Submission Requirements Responsible Party

    No

    #vidence that all purchased and installed covers have compliant outer surface $%Is No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    's suita#le shading provided to cover a minimum of ;?complete Design ta#le to the right@

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    hort narrative of shading systems designed to meet credit re+uirements for all relevant outdoorspaces

    !lan to show shade provision ?highlighting minimum = of shading@9 measured at *:

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    12/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    (V2R/ #inimum Ventilation

    Design

    Submission Re3uirements Resonsible Party

    Natural Ventilation

    arrative descri#ing how the villa design meets the Credit )e+uirements for natural ventilation

    #ec"anical Ventilation

    Mechanical Drawings and system specifications or manufacturers data

    Re3uired credit ac"ieved4 No

    Construction

    Submission Requirements Responsible Party

    Confirm that the villa was built as designed- O% No

    Provide updated submission documents for any and all variations from design No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    !lans9 elevations and sections to highlight:( all window positions9 si1es and maimum opena#le distance and( opening areas #etween ad"oining spaces for those rooms and spaces that are ventilated throughad"oining rooms

    Calculations demonstrating compliance with the minimum opena#le area criteria for all occupiedspaces7

    arrative descri#ing how the mechanical design system meets the Credit )e+uirements9 includingdescription of mechanical ventilation system

    preadsheet calculations of fresh air ventilation rates #ased on the calculation procedure ofsection B

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    13/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    P-2R1 #inimum *nterior -ater )se Reduction

    Design

    Submission Re3uirements Resonsible Party

    o

    4rief narrative descri#ing all proposed water conservation strategies o

    o

    Etracts from specifications for all proposed appliances including information on their water use o

    Re3uired credit ac"ieved4 No

    Construction

    Submission Requirements Responsible Party

    No

    rief narrative describing all installed water conservation strategies No

    No

    .anufacturer information for all installed appliances including information on their water use No

    Photographic evidence confirming installation of specified fi,tures and appliances No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &

    Submitted4

    Document Title and Revision$

    Draing Number5Title and Revision

    .illa &ater Calculator confirming that the villas predicted interior pota#le water consumptionwill #e no greater than the #aseline villa interior pota#le water consumption using efficiencymeasures only

    Etracts from specifications for all proposed fitures and fittings indicating flow rates and flowregulation systems

    Access $emplate 2older

    Achieved &Submitted?

    Document Title and Revision/Drain! Number"Title and Revision

    Updated /illa 0ater Calculator !if changed from design"+ confirming that the villa1s predicted interiorpotable water consumption is no greater than the baseline villa interior potable water consumptionusing efficiency measures only

    .anufacturer information for all installed fi,tures and f ittings indicating flow rates and flow regulationsystems

    Access $emplate 2older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20PW%20Section%20:%20PW-R1%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/PW-R1%20Minimum%20Interior%20Water%20Use%20Reductionhttp://var/www/apps/conversion/tmp/scratch_4/PW-R1%20Minimum%20Interior%20Water%20Use%20Reductionhttp://var/www/apps/conversion/tmp/scratch_4/PW-R1%20Minimum%20Interior%20Water%20Use%20Reductionhttp://var/www/apps/conversion/tmp/scratch_4/PW-R1%20Minimum%20Interior%20Water%20Use%20Reductionmailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20PW%20Section%20:%20PW-R1%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    14/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    P-2R7 -ater #onitoring

    Design

    Submission Re3uirements Resonsible Party

    4rief narrative descri#ing how the re+uirements of the credit will #e achieved o

    o

    Re3uired credit ac"ieved4 No

    Construction

    Submission Requirements Responsible Party

    Updated narrative describing how the re2uirements of the credit have been met No

    No

    Photographic evidence confirming the installation of the re2uired meter No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    Etracts from specifications and #uilding services layout drawings clearly indicating the type9etent and locations of the su#(meter

    Access$emplate 2older

    Achieved &Submitted?

    Document Title and Revision/Drain! Number"Title and Revision

    .anufacturer1s data and as*built drawings clearly indicating the type+ e,tent and locations of thesub*meter 

    Access$emplate 2older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20PW%20Section%20:%20PW-R2%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/PW-R2%20Water%20Monitoringhttp://var/www/apps/conversion/tmp/scratch_4/PW-R2%20Water%20Monitoringhttp://var/www/apps/conversion/tmp/scratch_4/PW-R2%20Water%20Monitoringhttp://var/www/apps/conversion/tmp/scratch_4/PW-R2%20Water%20Monitoringmailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20PW%20Section%20:%20PW-R2%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    15/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    RE2R1 #inimum Energy Performance

    Design

    #et"odology selected

    Submission Re3uirements Resonsible Party

    Prescritive #et"od

    4rief narrative descri#ing how the re+uirements of each section of the credit will #e achieved o

    o

    o

    o

    o

    o

    o

    o

    Performance #et"od

    4rief narrative descri#ing how the re+uirements of each section of the credit will #e achieved No

    No

    Re3uired credit ac"ieved4 No

    !.)5template6upc7gov7ae

    Prescritive#et"od

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    Energy system schematics illustrating the proposed 3& generation strategy confirming that there+uired level of 3& generation will #e achieved

    Etracts from specifications9 calculations and #uilding services layout design drawings clearlyindicating the type9 etent and location of the 3& generation system

    Manufacturers details for each installed appliance9 light fiture9 fan9 AC unit and electrical usageitem not specifically detailed within this section9 detailing the energy rating/unitefficiency/power rating of the proposed electrical item

    3ighlight the areas on the plans where the future renewa#le energy systems could #e installed9along with any indicative services routing from the renewa#le energy e+uipment to the mainresidential #uilding ?if renewa#le energy e+uipment is not installed on main residential #uilding@

    !rovide sections/details for each #uilding faade element ?including details on gla1ing type andareas@ and detail how each of these elements meets the re+uirements of the credit

    ummary list of all appliances to #e installed in the #uilding9 including +uantity and energyefficiency certification

    Etracts from specifications detailing appliance energy use or proof of certification #y Energytar program9 E% Energy Efficiency La#eling cheme or e+uivalent

    Energy Model $emplate summari1ing the dynamic energy simulation and confirming thepercentage reduction that will #e achieved

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20RE%20Section%20:%20RE-R1%20Pagemailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20RE%20Section%20:%20RE-R1%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    16/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    RE2R/ %8one *macts of Refrigerants

    Design

    Submission Re3uirements Resonsible Party

    4rief narrative descri#ing how the pro"ect meets the credit re+uirements o

    o

    Re3uired credit ac"ieved4 No

    ConstructionSubmission Requirements Responsible Party

    Updated narrative describing how the pro7ect meets the credit re2uirements No

    .anufacturer1s data for all proposed refrigerant systems confirming ODP of each refrigerant is 8ero No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    pecification etracts for all proposed refrigerant systems confirming OD! of each refrigerant is1ero

    Access $emplate 2older

    Achieved &Submitted?

    Document Title and Revision/Drain! Number"Title and Revision

    Access $emplate 2older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20RE%20Section%20:%20RE-R3%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/RE-R3%20Ozone%20Impacts%20of%20Refrigerants%20Systemshttp://var/www/apps/conversion/tmp/scratch_4/RE-R3%20Ozone%20Impacts%20of%20Refrigerants%20Systemshttp://var/www/apps/conversion/tmp/scratch_4/RE-R3%20Ozone%20Impacts%20of%20Refrigerants%20Systemshttp://var/www/apps/conversion/tmp/scratch_4/RE-R3%20Ozone%20Impacts%20of%20Refrigerants%20Systemsmailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20RE%20Section%20:%20RE-R3%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    17/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    S#2R1 9a8ardous #aterials Elimination

    Design

    Submission Re3uirements Resonsible Party

    o

    o

    Re3uired credit ac"ieved4 No

    Construction

    Submission Requirements Responsible Party

    No

    No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    Etracts from specifications indicating that no ACMs or CCA(treated tim#er are to #e used in thepro"ect as per the Credit )e+uirements

    &here portions of the pro"ect are reused from an eisting #uilding:( )esults of a ha1ardous materials survey documenting the eistence9 if any9 of ACMs in the#uilding7 't is recommended to follow internationally recogni1ed standards such as A$M E ,;(

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    18/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    S#2R7 0asic !onstruction -aste #anagementDesi

    Design Summ

    Submission Re3uirements Resonsible Party Measure

    CD&M! conforming to the Credit )e+uirements o

    chedule of items to #e recycled/salvaged ?complete Design ta#le to the right@ o

    Re3uired credit ac"ieved4 No

    Construction Estim

    Submission Requirements Responsible Party

    No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    Estimatdevelop

    Estimatsalvage

    Percentrecycle

    Access Temlate 6older

    Achieved &Submitted?

    Document Title and Revision/Drain! Number"Title and Revision

    Calculations+ supported with detailed receipts+ summari8ing final results of the CD0.P plusschedule of the recycled4salvaged items !complete Construction table to the r ight"

    Access Temlate 6older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20SM%20Section%20:%20SM-R2%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/SM-R2%20Basic%20Construction%20Waste%20Managementhttp://var/www/apps/conversion/tmp/scratch_4/SM-R2%20Basic%20Construction%20Waste%20Managementhttp://var/www/apps/conversion/tmp/scratch_4/SM-R2%20Basic%20Construction%20Waste%20Managementhttp://var/www/apps/conversion/tmp/scratch_4/SM-R2%20Basic%20Construction%20Waste%20Managementmailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20SM%20Section%20:%20SM-R2%20Page

  • 8/9/2019 PVRS 1 Pearl Submittal Template v1.3

    19/19

    Pearl Rating System for Estidama Reort a 0ug on t"is Page

    S#2R/ Storage & !ollection of -aste & Recyclables

    Design

    Submission Re3uirements Resonsible Party

    o

    Drawing indicating connection of the waste storage facility to water and wastewater networ8s o

    o

    o

    Re3uired credit ac"ieved4 No

    Construction

    Submission Requirements Responsible Party

    No

    No

    No

    Photographs of the proposed waste bins used in the kitchen and central waste storage faci li ty No

    Required credit achieved? No

    !.)5template6upc7gov7ae

    Ac"ieved &Submitted4

    Document Title and Revision$Draing Number5Title and Revision

    Drawing?s@ indicating location of the waste storage facility and access for collection services fromthe nearest road/passage

    Etracts from specifications addressing lighting9 floor and wall covering9 security and ventilation?for completely enclosed waste rooms only@

    !roduct sheets for the proposed waste #ins to #e used in the 8itchen and central waste storagefacility

    Access $emplate 2older

    Achieved &Submitted?

    Document Title and Revision/Drain! Number"Title and Revision

     3s*built drawing!s" and photographs indicating location of the waste storage facility and access forcollection services from the nearest road4passage

     3s*built drawing indicating connection of the waste storage facility to water and wastewaternetworks

    Photographs showing lighting+ floor and wall covering+ security+ and ventilation !for completelyenclosed waste rooms only" solutions for the waste storage facility

    Access $emplate 2older

    mailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20SM%20Section%20:%20SM-R3%20Pagehttp://var/www/apps/conversion/tmp/scratch_4/SM-R3%20Storage%20&%20Collection%20of%20Waste%20&%20Recyclableshttp://var/www/apps/conversion/tmp/scratch_4/SM-R3%20Storage%20&%20Collection%20of%20Waste%20&%20Recyclableshttp://var/www/apps/conversion/tmp/scratch_4/SM-R3%20Storage%20&%20Collection%20of%20Waste%20&%20Recyclableshttp://var/www/apps/conversion/tmp/scratch_4/SM-R3%20Storage%20&%20Collection%20of%20Waste%20&%20Recyclablesmailto:[email protected]?subject=PVRS%20Submittal%20Template%20:%20SM%20Section%20:%20SM-R3%20Page