pump and treat permeable reactive barrier former intersil, inc. site sunnyvale, california presented...
TRANSCRIPT
Pump and TreatPump and Treat Permeable Reactive BarrierPermeable Reactive Barrier
Former Intersil, Inc. SiteFormer Intersil, Inc. Site
Sunnyvale, CaliforniaSunnyvale, California
Presented by Daniel CheungPresented by Daniel Cheung
Outline of PresentationOutline of Presentation
Site BackgroundSite Background Geotechnology AlternativesGeotechnology Alternatives Science/Principles Involved (PRB)Science/Principles Involved (PRB) Evaluation on RemediationEvaluation on Remediation ConclusionConclusion
Site BackgroundSite Background
Historical ActivitiesHistorical Activities Former Intersil, Inc. (Sunnyvale, California)Former Intersil, Inc. (Sunnyvale, California) 1970s–19831970s–1983 Semiconductor manufacturing Semiconductor manufacturing 19721972 Concrete, epoxy-lined, in-ground neutral Concrete, epoxy-lined, in-ground neutral
ization system installedization system installed 19861986 Identified as potential contaminant Identified as potential contaminant
sourcesource 1987-Present1987-Present Remediation Remediation
Site BackgroundSite Background
Site BackgroundSite Background
Hydrogeology of the Site (2.4 acres)Hydrogeology of the Site (2.4 acres) Semi-confined aquiferSemi-confined aquifer
• Upper silty clay (9-12 feet)Upper silty clay (9-12 feet)• Lower clay and silty clay (~65 feet)Lower clay and silty clay (~65 feet)
Interfingering zonesInterfingering zones of of (~1-8 feet, porosity = 0.3) (~1-8 feet, porosity = 0.3) • Silty fine grained sandSilty fine grained sand• Fine to medium grained sandFine to medium grained sand• Gravelly sandGravelly sand• Average flow rate = 0.8 ft/dayAverage flow rate = 0.8 ft/day
Not usable for consumption Not usable for consumption (high TDS)(high TDS)
Site BackgroundSite Background
ContaminationContamination HalogenatedHalogenated volatile organic compounds volatile organic compounds (VOC(VOC
s)s)
Maximum concentrations in 1986Maximum concentrations in 1986 Halogenated VOCsHalogenated VOCs μμg/Lg/L• Trichlorethene Trichlorethene ((TCETCE)) 13,000 13,000 • cis-1,2-dichloroethene cis-1,2-dichloroethene ((cis-1,2-DCEcis-1,2-DCE)) 19,00019,000• Vinyl chloride Vinyl chloride ((VCVC)) 1,800 1,800• Freon-133Freon-133 16,00016,000
Only detected in the Only detected in the upper aquiferupper aquifer
Geotechnology AlternativesGeotechnology Alternatives
Pump and Treat, P&TPump and Treat, P&T (11/87 – 02/95)(11/87 – 02/95)
4 extraction wells (pump)4 extraction wells (pump) 13 monitoring wells13 monitoring wells 1 Air stripper (treat) 1 Air stripper (treat) →→ Storm sewer (discharge) Storm sewer (discharge) 2 Carbon adsorption (unused)2 Carbon adsorption (unused)
Permeable Reactive Barrier, PRB Permeable Reactive Barrier, PRB (02/95 – Ongoing)(02/95 – Ongoing)
Granular iron treatment zoneGranular iron treatment zone Flow control zoneFlow control zone Hydraulic barrier system (2 slurry walls)Hydraulic barrier system (2 slurry walls)
Science/Principles Involved (PRB)Science/Principles Involved (PRB)
Science/Principles Involved (PRB)Science/Principles Involved (PRB)
Abiotic Reductive Dehalogenation
Evaluation on RemediationEvaluation on Remediation
Pump and TreatPump and Treat HVOCs < MCLs (NPDES)HVOCs < MCLs (NPDES) Inward hydraulic gradient contained the plumeInward hydraulic gradient contained the plume Removal rate Removal rate declined exponentiallydeclined exponentially $1,343,800 (24% capital cost, $1,343,800 (24% capital cost, 76% O/M cost76% O/M cost)) $24,000/kg of total contaminant$24,000/kg of total contaminant
1993 evaluation1993 evaluation Minimise costMinimise cost & & Increase effectivenessIncrease effectiveness Return the site to Return the site to leasableleasable conditions conditions
Evaluation on RemediationEvaluation on Remediation
Permeable Reactive BarrierPermeable Reactive Barrier TCE & Freon-133 < MCLs TCE & Freon-133 < MCLs (California & EPA)(California & EPA)
Cis-1,2-DCE & VC Cis-1,2-DCE & VC >> MCLs>> MCLs (California & EPA)(California & EPA)
Natural attenuationNatural attenuation & Non-migrated & Non-migrated Plume has been Plume has been containedcontained $762,000 (78% capital cost, $762,000 (78% capital cost, 22% O/M cost22% O/M cost)) $108,900/kg of total contaminant$108,900/kg of total contaminant The site was The site was releasedreleased in 1995 in 1995
Evaluation on Remediation Evaluation on Remediation PRB
2M gallons
7kg in 1.5yrs
P&T
36M gallons
56kg in 7.25yrs
98% Total Removal
ConclusionConclusion
Both P&T and PRB were usedBoth P&T and PRB were used Satisfactory overall clean up performanceSatisfactory overall clean up performance Appropriate methods were adoptedAppropriate methods were adopted
HydrogeologyHydrogeology Seriousness of contaminationSeriousness of contamination Cost effectivenessCost effectiveness Legal requirementLegal requirement
Q&AQ&A