public services commission - new-ndpc … · draft sector medium term development plan under the...
TRANSCRIPT
..
DRAFT
SECTOR MEDIUM TERM DEVELOPMENT PLAN UNDER THE
NATIONAL MEDUIM TERM DEVELOPMET FRAMEWORK POLICY
2014 -2017
PUBLIC SERVICES COMMISSION
2
TABLE OF CONTENTS
ITEM PAGE
Executive Summary…………………………………………………………………… 4
CHAPTER 1: PROFILE/CURRENT SITUATION/BASELINE
1.0 INTRODUCTION.………………………………………………………….. 6
1.1 PERFORMANCE REVIEW (2010-2013)………………………………. .. 9
1.1.1 Budgetary Allocations and Application of Funds (2010-2013)… 15
1.1.2 Income and Expenditure…….………………………………………. 18
1.1.4 Current State of Development……………………………………… 22
1.1.5 Infrastructure, Facilities and Human Resources……….………….. 22
1.1.6 Human Resources…….………………………………………………… 23
1.1.7 Institutional Reforms…..……………………………………………….. 25
1.1.8 Analysis of Cross Cutting Issues and their Implications for Planning 26
1.1.9 Summary of Key Development Problems/Issues/Gaps…………. 28
CHAPTER 2:
2.0 PRIORITISATION OF DEVELOPMENT ISSUES……………… 30
2.1 Application of Strength, Weaknesses, Opportunities and Threats…………
CHAPTER 3:
3.0 Development Goal, Adopted Objectives and Strategies …………... 40
3.1 DEVELOPMENT PROJECTION FOR 2014-2017…………………….. . 41
3.2 SECTOR OBJECTIVES…………………..………………………………. 46
CHAPTER 4:
4.0 Development Programmes and sub-programmes of the MDA……………54
4.1 SECTOR PROGRAMME OF ACTIONS……………………………….. 56
4.2 INDICATIVE FINANCIAL PLAN..………………………………………. 104
CHAPTER 5
5.0 SECTOR ANNUAL ACTION PLAN…………….………………………. 105
3
LIST OF ACRONYMS
AAP Annual Action Plan
AGI Association of Ghana Industries
CSO’s Civil Society Organisations
CDM Capacity Development Mechanism
CVCP Committee of Vice Chancellors and Principals
COS Conditions of Service
EIA Environmental Impact Assessment GPRS I Ghana Poverty Reduction Strategy GPRS II Growth and Poverty Reduction Strategy GSGDA Ghana Shared Growth and Development Agenda GOG Government of Ghana
GEA Ghana Employers Association
GSMF Ghana Social Marketing Foundation
GSGDA Ghana Shared Growth and Development Agenda
HIV / AIDS Human Immuno Deficiency Virus / Acquired Immuno Deficiency
Syndrome
HRPD Human Resource Policy Division
ICT Information Communication and Technology
IGF Internally Generated Funds MDAs Ministries, Departments and Agencies
MMDAs Metropolitan, Municipal, District Assemblies MDGs Millennium Development Goals
MDPI Management Development and Productivity Institute
MTEF Medium Term Expenditure Framework
MOF Ministry of Finance
MOH Ministry of Health
MOU Memorandum of Understanding
M&E Monitoring and Evaluation
MSD Management Services Division
MTDP Medium-Term Development Plan NGO’s Non Governmental Organisations
NDPC National Development Planning Commission
NDPS National Development Planning System
NEPAD New Partnership for African Development
NMTDPF National Medium Term Development Policy Framework OHCS Office of the Head of Civil Service
PBB Programme Based Budgeting POA Programme of Action
POCC Potentials, Opportunities, Constraints, Challenges
PSC Public Services Commission
PLWA People Living With HIV / AIDS
PEF Private Enterprise Foundation
PPP Policies, Programmes and Projects PPME Policy, Planning, Monitoring and Evaluation SEC State Enterprise Commission
SEA Strategic Environmental Assessment
SEA Strategic Environmental Assessment SIF Social Investment Fund
4
EXECUTIVE SUMMARY
The Public Services Commission (PSC) is the Central Management Agency
responsible for providing strategic policy guidance for human resource
management for public service organizations listed under Article 190(1) of the 1992
Republican Constitution of Ghana.The PSC is an independent constitutional organ of
the State established by Article 196 of the 1992 Constitution and the PSC Act, Act 482.
The PSC’s Medium Term Development Plan (MTDP) for the period 2014-2017 has
been developed based on the Commission’s Mission, that is, “To safeguard and
promote a high calibre of integrity, accountability and competence in public
service organisations in Ghana, through advisory, consultative, regulatory and
supervisory services”. The Plan was developed in accordance with the National
Medium Term Development Plan Policy Framework (MTDPF), 2014-2017 and with
reference to the 2010-2013 National Development Plan Policy Framework.
Six major policy objectives have been identified and would be pursued under
National Medium Term Development Policy Framework (NMTDPF) 2014-2017 and will
be implemented during the planning period (2014-2017).The key objectives are:
a) Human Resource Management Information System (HR Database);
b) Performance Management Policy Framework and System;
c) Manpower Audit of public service organizations;
d) Human Resource Management Policy Framework and Manual for the
public services;
e) Improve the working environment and condition of the Commission;
and
f) Promote the reduction of HIV/AIDS/STI/TB transmission, its proper
management and promote healthy lifestyle.
The PSC will embark on a number of projects/initiatives as contained in the Sector
Medium Term Development Plan (2014-2017) and the Annual Action Plans of the
Commission. The purpose of the initiatives is to meet and address some of the critical
challenges which public service organizations face in the discharge of their
functions, especially, in the area of human resource management.
The PSC is not directly involved in the implementation of these initiatives at the level
of the organizations but rather the Commission seeks to provide broad general
policy framework for the management of human resource functions in public service
organizations. This is to improve on efficiency, effectiveness and acceptable levels
of performance in the delivery of services to the government, the citizens and other
non-state actors.
Some of the challenges which influence the consideration of these initiatives/policy
objectives came about as a result of the concerns raised by key stakeholders/clients
of the Commission and the outcome of analysis of the strengths, weaknesses,
5
opportunities and threats (SWOT) of the Commission, which were undertaken prior to
the preparation of the Commission’s Medium Term Development Plan under the
National Medium Term Development Policy Framework (NMTDPF) 2014-2017.
The Plan was developed after thorough cross-consultation and participation by
middle and senior management level personnel of the Commission, the
Development Planning Committee consisting of nineteen (19) officers chaired by
the Chairman of the Commission. Nine (9) out of the nineteen (19) were constituted
into a Technical Committee to conclude with the plan preparation. The Technical
Team was led by the Director in charge of Finance and Administration who provided
technical back-stopping to the plan preparation exercise. The output of this smaller
group was discussed by the SMTDP Preparation Team.
The PSC will collaborate with identifiable stakeholders, including the governing
Councils and Boards of the various Public Service Institutions to ensure effective and
efficient implementation of the MTDP.
The total estimated cost of implementing the plan for the desired results is
GH¢12,664,427.00. The chunk of the funds for the implementation of some of the
activities identified will come from the Government of Ghana. Proposals will be
written to development partners to assist financially in the implementation of the
Medium Term Development Plan, if necessary.
This estimate shall cover costs of investment and service activities. These would
include renovation of the PSC building, re-equipping and updating the logistical
strength of PSC for effective performance.
The service activities will include the following:
addressing the training needs of the Commission;
establishment of the Human Resource Management Information
System(HRMIS);
development and implementation of Human Resource Policy Framework and
Manual for the public services;
launching and the implementation of the Governance Manual;
development and implementation of the Performance Management System;
organisation of lectures, conferences and workshops, training of staff of the
Commission; and
participation in both local and international meetings.
These activities shall be funded from Government of Ghana (GoG) allocated funds
from the Ministry of Finance.
As part of the strategy, the Commission will provide the necessary justification to the
Ministry of Finance (MOF) for the upward adjustment of the PSC’s budget ceiling
and approval for the use of internally generated funds for the implementation of
activities in the MTDP.
Proposals to Development Partners for support will be vigorously pursued. To avoid
duplication of financial resources, the PSC shall collaborate with other MDAs with
similar activities and programmes. The PSC will also ensure a prudent financial
management in the areas of expenditure controls.
6
To ensure value for money, all procurements will be done in accordance with the
provision as outlined in the Public Procurement Act, Act 663.
The Commission will actively mobilize resources for the effective implementation of
its activities and programmes as stated in the MTDP.
7
TECHNICAL COMMITTEE SECTOR MEDIUM TERM DEVELOPMENT PLAN PREPARATION
TEAM
In coming out with the Medium Term Development Plan, a technical committee
team was set-up. The membership was as follows;
Table 1
NO.
NAME
POSITION
1. Mrs. Bridget Katsriku Chairman
2. Dr. Lawrence A. Kannae Vice Chairman
3. Mrs. Janet. A. Fofie Member I
4. Mr. Robertson N.A Allotey Member II
5. Mr. M.K. Gabah Member III
6. Mr. Michael Owusu-Nimako Secretary
7. Mr. Theodore Apedo Director (HRPD)
8. Mr.Victor Forfoe Director (F&A)
9. Mr.Kwesi Ohemeng-Agyei Director (RIME)
10. Mr.Zakaria Sumaila Principal Accountant
11 Mr.Victor Way Kuvodu Asst. Director I
12 Mrs. Harriet Bani Deputy Director
13 Mr. George D. Owoo Principal Budget Officer
14 Mr. Isaac Akrofi Asst. Director IIA
15 Mr. Seth Frimpong-Manso IT Officer
16 Mr. Paul Acheampong-Boakye Asst. Director IIB
17 Miss. Pearl Ofeibea Twum Asst. Director IIB
18 Mr. David Aneere Asst. Director IIB
19 Mrs. Fuseina Yakubu Asst. Director IIB
The Plan was developed after thorough cross-consultation and participation by
middle and senior management level personnel of the Commission, the
Development Planning Committee consisting of nineteen (19) officers chaired by
the Chairman of the Commission. Nine (9) out of the nineteen (19) were constituted
into a Technical Committee to conclude with the plan preparation. The Technical
Team was led by the Director in charge of Finance and Administration who provided
technical back-stopping to the plan preparation exercise. The output of this smaller
group was discussed by the SMTDP Preparation Team.
8
Table 2
TECHNICAL SUB-COMMITTEE
NO.
NAME
POSITION
1. Mr. Victor Forfoe Director (F&A)
2. Mr. Kwesi Ohemeng-Agyei Director (RIME)
3. Mr. Theodore Apedo Director (HRPD)
4 Mrs. Harriet Bani Deputy Director
5 Mr. Victor Way Kuvodu Asst. Director I
6 Mr. George D. Owoo Principal Budget Officer
7 Mr. Isaac Akrofi Asst. Director IIA
8 Mr. Seth Frimpong-Manso IT Officer
9 Mr. Paul Acheampong-Boakye Asst. Director IIB
9
CHAPTER 1
PROFILE/CURRENT SITUATION/ BASELINE
This chapter deals with the profile of the Public Services Commission (PSC) relating to
its mandate, vision and mission, human resource, infrastructure and facilities. It also
indicates the performance of the PSC from 2010 to 2013. It has also identified critical
issues that confronted the Commission during the period under review which have
implications for 2014 - 2017 planning period.
Mandate
The Public Services Commission is a key strategic Central Management Agency
(CMA) established under the 1992 Constitution and the PSC Act, 1994 (Act 482)
responsible for the human resource management of the public service through
advisory, consultative, regulatory and supervisory services.
The responsibilities of the PSC as a Central Management Agency, impact on
Ghana’s public administration system, especially, in the thematic areas of the MTDPF
2014-2017 which is; “Ensuring Transparent and Accountable Governance”.
In pursuance of the above mandate, the Commission engages in, among other
functions, advising government on the criteria for appointment to Public Offices, the
development of policy guidelines on appointments, promotion and disciplinary
procedures within the Public Service, guidelines on manpower planning and
performance for maximum utilization of human resource in the public services of
Ghana.
Mission
“To safeguard and promote a high level of integrity, accountability and
competence in public service organisations in Ghana, through advisory,
consultative, regulatory and supervisory services”.
Vision
“A Public Services Commission whose guidelines and advice result in a well
managed workforce capable of and committed to delivering high quality services
to the people of Ghana.”
Functions
The core functions of the PSC are as follows:
1) To advise Government on the criteria for appointment to public offices as well
as persons to hold or act in Public Services,
2) To promote efficiency, accountability and integrity in the Public Services,
3) To prescribe appropriate systems and procedures for the management of
personnel records within the Public Services,
10
4) To identify, explore and promote the recruitment of suitable personnel into
the Public Services acting in collaboration with educational authorities,
5) To undertake planning of manpower requirements of the Public Services using
data from the educational institutions and other sources,
6) To improve recruitment policies and techniques by introducing modern
methods of judging suitability of officers,
7) To conduct examinations and interviews for appointment to posts and for
promotions in the public Service or within public corporations to ensure
uniformity of standards of selection and qualifications,
8) To review the organization, structure and manpower requirements of
agencies and bodies in the Public Services and advise Government on such
manpower rationalization as may be necessary for maximum utilization of
human resources in the Public Services,
9) To oversee the human resources development activities of the Public Services
organizations to ensure career planning and career development in the
Public Services,
10) To conduct in collaboration with training institutions, personnel research into
human resources management in the Public Services in order to improve
personnel practices and their utilization in the Public Services, and
11) To perform any other duties assigned to it under the Constitution or any other
enactment.
11
1.1 Performance Review (2010-2013)
In order to ensure that the stated objectives of the MTDP are achieved, a
monitoring and evaluation plan has been prepared as an integral part of the
MTDP. The main objective of the monitoring and evaluation plan is to
strengthen the capacities of key stakeholders to be able to document the
performance of the MTDP, provide regular reports on progress being made as
well as contribute to learning for improved performance.
The rationale for monitoring was to involve continuous or ongoing collection and
analysis of information about implementation to review progress and to compare
actual progress with what was planned so that adjustments can be made in
implementation. Evaluation is a periodic assessment of the relevance, efficiency,
effectiveness, impact, and/or sustainability of an activity or intervention and also
measures the effects of an intervention and compares them with the goals and
objectives of the intervention.
It is against this backdrop that, the PSC developed a set of performance indicators
and targets that have been agreed upon by stakeholders to assess the progress of
implementation of the key policies and programmes undertaken to achieve the
development goals and objectives outlined in the GSGDA.
12
The table below indicates the performance of the policy objectives and the
programme implemented under the thematic areas during the planning period of
the GSGDA (2010-2013);
13
TABLE 3: PERFORMANCE OF THE SECTOR FROM 2010 – 2013
Table 3. Performance of the MDA from 2010-2013
TABLE 3: PERFORMANCE OF THE SECTOR FROM 2010 – 2013
Table 3.2: Performance of the MDA from 2010-2013
THEMATIC
AREA
POLICY OBJECTIVE PROGRAMME INDICATOR TARGET LEVEL OF ACHIEVEMENT REMARKS
2010 2011 2012 2013
Transparent
and
Accountable
Governance
Improve
database for
policy
formulation,
analysis and
decision making
Establish Human
Resource
Management
Information
System for the
public service
No. of MDAs
covered 60
Public
service
organiza
tions
- - - 8 Implementation will commence
in the eight MDAs by December,
2013.
Upgrade the
capacity of the
public and civil
service for
transparent,
accountable,
efficient, timely,
effective
performance
and service
delivery
Develop Human
Resource
Management
Policy
Framework and
Manual for the
public Service
Percentage
completion of the
draft manual
100% - 60% 90% 100%
THEMATIC AREA POLICY
OBJECTIVE
PROGRAMME INDICATOR TARGET LEVEL OF ACHIEVEMENT REMARKS
2010 2011 2012 2013
Transparent and
Accountable
Governance
Upgrade the
capacity of
the public
and civil
service for
transparent,
accountable,
efficient,
timely,
effective
performance
and service
delivery
Conduct
Manpower audit
in the Public
Services
Number of
Institutions
Audited
100 MDAs
to be
audited
- - 17 21 - Late and
inadequate
release of
funds
- Limited
capacity
14
TABLE 3: PERFORMANCE OF THE SECTOR FROM 2010 – 2013
Table 3.3: Performance of the MDA from 2010-2013
TABLE 3: PERFORMANCE OF THE SECTOR FROM 2010 – 2013
Table 3.4: Performance of the MDA from 2010-2013
Public Services
Commission staff
trained
in handling HRM
and other related
issues.
No. of staff
trained
All 72 Staff
of the
Commissio
n Trained
- staff were trained
- were trained
40 Staff were trained
60 Staff were trained
All staff except
Drivers and Cleaners
have received one or
more training
THEMATIC AREA POLICY
OBJECTIVE
PROGRAMME INDICATOR TARGET LEVEL OF ACHIEVEMENT REMARKS
2010 2011 2012 2013
Transparent and
Accountable
Governance
improve the
supervisory
role of the
PSC
Performance
Management
Policy
document
developed
and issued by
the Public
Services
Commission.
Number. of
Public Service
Organizations
implementing
the new
performance
appraisal
instruments
100 - 12
(pilot)
15 30 as at
August
2013
-Limited capacity in
MDAs
-Low leadership
commitment
THEMATIC AREA POLICY
OBJECTIVE
PROGRAMME INDICATOR TARGET LEVEL OF ACHIEVEMENT REMARKS
2010 2011 2012 2013
Transparent and
Accountable Upgrade the Scheme of service Number of 100 26 20 21 23 -Low
15
TABLE 3: PERFORMANCE OF THE SECTOR FROM 2010 – 2013
Table 3.5: Performance of the MDA from 2010-2013
Governance
capacity of
the public
and civil
service for
transparent,
accountable,
efficient,
timely,
effective
performance
and service
delivery
facilitated/develo
ped and
reviewed for
public service
Institutions.
Scheme of
service
facilitated/de
veloped and
reviewed for
the public
service
capacity
-low
leadership
commitment
Public Service
Qualifying
Promotion
Examinations.
Number of
promotion
exams
conducted
12 3 3 3 3
Conference of
Human
Resource
Management
Practitioners in
the Public
Service improved.
End of
Conference
Report
Submitted
1 100% Inaugural
Conference
held in 2013
THEMATIC AREA POLICY
OBJECTIVE
PROGRAMME INDICATOR TARGET LEVEL OF ACHIEVEMENT REMARKS
2010 2011 2012 2013
Transparent and
Accountable
Governance
Upgrade the
capacity of
the public
and civil
service for
transparent,
accountable,
efficient,
timely,
effective
performance
and service
delivery
Conference of
Chief Executives,
Governing
Boards, and Chief
Directors
Conference
organized
Annually 100% 100% 100% - Uncertainit
y about re-
constitution
of Boards
and
Councils
End of
Conference
Report
Submitted
Report
submitted
after 2
weeks
Report submitted
after 2 weeks
Report
submitted
after 2
weeks
Report
submitt
ed after
2weeks
-
16
TABLE 3: PERFORMANCE OF THE SECTOR FROM 2010 – 2013
17
TABLE 3: PERFORMANCE OF THE SECTOR FROM 2010 – 2013
Table 3.7: Performance of the MDA from 2010-2013
THEMATIC AREA POLICY
OBJECTIVE
PROGRAMME INDICATOR TARGET LEVEL OF ACHIEVEMENT REMARKS
2010 2011 2012 2013
Transparent and
Accountable
Governance
Recruitment/
promotion
interviews
conducted and
facilitated in the
public service
Number of
representation
on interview
panels (External
Interview
400 126 123 134 67 as at
August
2013
Category “A” and
“B” position holders
appointment in the
public service
Number of
appointments
made
98 public
servants
interviewed
and
appointed
125
public
servants
interviewe
d and
appointed
250
public
servants
intervie
wed and
appointe
d
151
public
servants
interview
ed and
appointed
Process Petitions
and Complaints
from public
servants, MDAs
and MMDAs
% of
Complaints/
Grievances
resolved
within the
year
At least
70% of
petitions
and
complain
ts
resolved
80% of
grievances
resolved
80% of
grievances
resolved
80% of
grievanc
es
resolved
80% of
grievance
s
resolved
THEMATIC AREA POLICY
OBJECTIVE
PROGRAMME INDICATOR TARGET LEVEL OF ACHIEVEMENT REMARKS
2010 2011 2012 2013
Transparent and
Accountable
Governance
Promote the
reduction of
HIV/AIDS/STI/T
B
transmission,
ensure its
proper
management
and promote
healthy
lifestyle
Distribution of
Male and Female
condoms to staff
of the
Commission
No. of
condoms
distributed to
staff
5,000 - - 1,000 2,000 Only male
condoms
were
distributed
18
iTEMS
2010
Budgetary
Allocation
GH¢
2010
Actual
expenditure
GH¢
2011
Budgetary
allocation
GH¢
2011
Actual
Expenditure
GH¢
2012
Budgetary
Allocation
GH¢
2012
Actual
Expenditure
GH¢
2013
Budgetary
Allocation
(Jan-Aug.)
GH¢
2013
Actual
Expenditure
(Jan. –Aug.)
GH¢
Personnel
Emolument
638,491 708,983.62 657,639 817,120.72 697,636 1,357,672 788,569 2,914,800
Administration
Expense
550,793 550,236.12 490,343 550,800
1,068,343
886,112
757,128
273,479.88
19
Incomes and Expenditure
The Statement of Incomes and Expenditure of the PSC for 2010 – 2013 is provided in
table 5
Table 5
STATEMENT OF INCOME (REVENUE) AND EXPENDITURE FOR THE PERIOD 2010-2013
BROAD BASED
ACCOUNT 2010 2011 2012 2013
(JAN.-AUG.)
INCOME GH¢ GH¢ GH¢ GH¢
GOG FUND GH¢1,521,105 GH¢1,558,584.36 GH¢2,243,784 GH¢3,188,280
IGF-CF - - - -
DONOR FUND - - -
OTHER (CONTINGENCY
FUND) - -
-
TOTAL INCOME GH¢1,521,105 GH¢1,558,584.36 GH¢2,243,784 GH¢3,188,280
EXPENDITURE
GOG FUND:
Personnel Emolument 708,983.62 817,120.72 1,357,672 2,914,800
Administration 550,236 550,800 886,112 273,479.88
Service Activity
Expense
15,600
81,095.68
78,000
77,974
Investment
Activity Expense
290,284
180,790
145,142
112,689.64
145,142
.
636,500
-
Contingency
-
-
-
-
72,766.29
-
78,6889
Total
1,495,168 1,521,105.42 1.371,124 1,558,584.36 1,911,121 2,243,784 2,182,197 3,188,280
20
Services 81,095.68 77,974 - -
Investment 180,790 112,689 - -
IGF Expenditure - - - -
IGF-Transfer to CF - 16,667.68 6,500.00 -
Donor Fund:
STATEMENT OF INCOME (REVENUE) AND EXPENDITURE FOR THE PERIOD 2010-2013
Programme - - - -
Project - - - -
HIPC - - - -
Other (Contingency
Fund) - - - -
Total Expenditure GH¢1,511,205.30 GH¢1,558,583 GH¢2,243,784 GH¢2,243,784.88
Excess of Revenue/Expenditure over
Expendiutre/Revenue -73,207 -114,389.67 -110,150.90 -38,468.83
21
1.1.4 CURRENT STATE OF DEVELOPMENT (SITUATION ANALYSIS)
PROFILE: Infrastructure, Facilities and Human Resources
Introduction
The existence and functions of the PSC are derived from the 1992 Constitution of the Republic of Ghana, the PSC Act 482 of
1994 and the Enabling Acts of the Public Service Institutions which constitute the PSC’s Clientele.
a) Infrastructure and Facilities
The Public Services Commission is located in a five-storey block in Accra, adjacent to the Ministry of Finance and within the
ministerial enclaves, with about forty (40) rooms. The Commission’s seventy (70) staff does not face any office
accommodation problems.
However, due to age (the block was built in the early 1970s) and poor maintenance practice, caused mainly by financial
constraints, the premises are not in the best of state. The implications of this are summarized in table 4.
Table 6: Infrastructure, Facilities and Human Resources
NO.
INFRASTRUCTURE/
FACILITY
STATE
IMPLICATIONS FOR DEVELOPMENT
1.
5-Storey office
block
a. aged electrical wiring
b. Broken down elevator
a. Proximity to the sea and its
harmful effects of salt spray
leading to high maintenance
cost.
b. Limits accessibility to people
with disabilities
2
Office Equipment
a. Inadequate
a. Inefficient and ineffective
22
printers,
b. No PABX System
work processes leading to (i) delays in service delivery
(ii) low staff morale,
3.
Office Furniture /
Logistics
a. Inadequate furniture
b. Inadequate Vehicles
for Commissioners
and Staff.
c. Two broken-down
elevators/lift of the
Commission
a. in congenial and unsafe
working environment leading
to low staff morale,
b. High attrition rate and low
productivity.
c. Low public image of the
Commission
1.1.6 Human Resources
Unlike similar constitutional bodies such as the Electoral Commission, National Commission for Civic Education and the
Commission on Human Rights and Administrative Justice, the PSC’s is unable to attract and retain staff with the appropriate
expertise due to the Commission’s inability to implement in full the existing Conditions of Service.
The total staff strength of the Commission, as at 31st August, 2013, is seventy (70). This is summarised in table 8 below:
23
Table 7
No.
CATEGORY
STRENGTH
1. 2. 3.
Full-Time Commissioners Part-Time Commissioners Secretariat Staff
5 3 62
Total
70
24
POSITION
APPROVED
ESTABLISHMENT
CURRENT
STRENGTH
GAP/ VACANCY
Secretary
Director
Deputy Director
Asst. Director I
Asst. Director IIA
Asst. Director IIB
Supply Officer
Principal Accountant
Budget Officer
Internal Auditor
Chief Exec. Officer
Chief Per. Officer
Asst. Chief Exec. Off
Private Secretary
Prin. Exec. Officer
Accountant
Library Assistant
Estate Officer
Steno. Secretary
Higher Exec. Officer
Principal Store Keeper
Executive Officer
1
4
5
5
4
4
1
1
1
1
6
2
3
5
2
2
2
1
4
3
2
3
1
3
2
1
2
3
0
1
1
0
4
1
2
3
1
2
1
1
2
2
1
2
0
1
3
4
2
1
1
0
0
1
2
1
1
2
1
0
1
0
2
1
1
1
Table 8
25
Steno. Secretary (G I)
Steno. Secretary (G II)
Snr. Telephonist
Snr. Receptionist
Snr. Typist
Yard Forman
Driver G I)
Driver (G II)
Driver (G III)
Security Guard
Cook (Un-Cert.)
Chief Messenger
Labourer
Night Watchman
3
4
2
2
3
3
1
4
3
2
2
4
4
3
2
2
1
1
1
2
1
1
3
1
2
3
2
2
1
2
1
1
2
1
0
3
0
1
0
1
2
1
From the table above, it is clear that the PSC will need more staff to man the various
departments. Vigorous attempts will be made within the medium term to attract
and retain qualified and competent staff to the Commission.
1.1.7 Institutional Reforms
Being part of the public services, the PSC has been affected by various reform
initiatives in the public services undertaken since the 1980s.
The PSC has over the years played a vital role in the various reform programmes
undertaken in Ghana. For example, under the National Institutional Renewal
Programme, the Commission chaired the National Oversight Committee and played
key roles on various committees established to implement aspects of the reform
programme.
The expertise of the Commission has been utilized in reforms undertaken by National
Institutional Renewal Programme and the Ministry of Public Sector Reform. The PSC
also played a vital role in the reform of salary administration, initially as the lead
agency on the preparatory works leading to the implementation of the Ghana
26
Universal Salary Structure (GUSS). The PSC’s views and active participation are also
evident in the current single-spine salary structure.
As a result of PSC’s participation in the various reforms initiatives, there was a transfer
of skills to staff, especially in the area of human resource management and
development; which enhanced the capacity of the Public Services Commission as a
whole.
The Commission itself was restructured in the late 1990s and designated as a Central
Management Agency responsible for Human Resource Management of the entire
Public Service. It was to have the capacity to recruit its own staff and also to work
towards introducing a separate salary structure in conformity with its status as an
independent constitutional body.
The structure was accordingly, amended to give the Commission only four (4)
divisions – Human Resource Policy Division (HRPD), Management Services Division
(MSD),Finance and Administration (F&A) and Research, Information, Monitoring and
Evaluation(RIME) - instead of the old seven (7) Divisions.
To date, the Commission has no approved Conditions of Service and efforts are also
being made to have its own salary structure.
1.1.8 Spatial Distribution
The offices of the Public Services Commission are located in Accra. Currently, the
Commission does not have personnel operating outside Accra. It may be stated,
however, that, until 2008 the Commission had its staff located in the Ghana High
Commission, London, to enable it to process application and other documentation
from Ghanaians and other person’s resident abroad who were seeking employment
within Ghana.
The PSC also conducts promotional examinations at regional centres throughout the
country.
1.1.9 Analysis of Production and Distribution Characteristics
The Public Services Commission provides consultative, regulatory, advisory and
supervisory services in human resource management and development to about
150 public service institutions.
These institutions are located at the national, regional and district levels as well as
outside the country, namely within Ghana’s diplomatic missions abroad. The
Commission also collaborates with private and civil society organisations.
In view of the scope of activities and the organisations involved, the Commission’s
services go a long way to improve the conditions of work in our client organisations,
and to enhance morale and productivity in the Public Service.
27
1.1.10 Analysis of cross cutting issues and their implications for planning
(a) Environment
The PSC will ensure a high performance of the Public Service which will lead to high
productivity within the Public Services and the creation of an enabling environment
where hard working public servants are rewarded through fair processes for
promotion. Recalcitrant and non-performing workers will also be sanctioned. This will
be done through the effective implementation of the Performance Management
System and the new appraisal system to ensure a fair and realistic means of
evaluation. The principles, rule and regulations of an effective performance
management system will be adopted and implemented to the letter to ensure that
public servants function effectively and efficiently. This would be done through an
effective collaboration between the Commission and the MDAs.
As part of its policy objectives, the PSC will among other things, ensure the creation
of a vibrant public service to drive the private sector which is the engine of growth.
Gender
Gender in developmental terminology can be defined as role assigned to female
and male in a society. It involves the specific roles of the sexes. Gender issues tend to
analyse roles men and women play in national development. The role of women in
national development cannot be overemphasised. According to the 2010 housing
and population census, women contribute about fifty-one (51%) of the population.
Women can be found in the area of agriculture, commerce, science and
technology, intelligentsia, politics and so on.
The non-involvement of women, and in some cases, the relegation of women to the
background in national development means that Ghana is losing a lot of its
potential workforce. The PSC, as part of its policy objective and activities in the
Medium Term Development Plan will build the capacity and encourage other
MDA’s to encourage women to assume leadership and strategic positions in the
Public Service.
As a deliberate policy initiative, the PSC will collaborate with the Ministry of Women
and Children’s Affairs to encourage the implementation of the affirmative action
policy and plan to enhance women’s empowerment in the public service.
Through its guidelines on recruitment, promotion and training, the Commission
ensures that there is no discrimination on the basis of sex, religion, disability and
ethnicity.
1.1.10 HIV/ AIDS
Currently, the PSC does not have a comprehensive Human Resource Policy on
HIV/AIDS. There is no desk in-charge of HIV/AIDS and no workplace policy on it.
28
This situation is not the best as the impact of HIV/AIDS has been relegated to the
background. The PSC as a strategic agency has recognised the seriousness of the
HIV/AIDS pandemic as not only a health issue but also a developmental one.
It is in line with this that the PSC will as part of its Medium Term Development Plan
draw out a comprehensive HIV/AIDS Policy objectives and a comprehensive
programme of action. The PSC will also collaborate with the Ghana Aids Commission
and other stakeholders to draw up an elaborate programme of action for the entire
public service.
The loss of quality human resource as a result of the pandemic cannot be
overemphasised. Indeed, in some African countries the HIV / AIDS pandemic has
affected the workforce of the public services.
It is in this light, that the PSC being the fulcrum of Human Resource Management for
the public service of Ghana has identified the HIV/AIDS pandemic as a serious
threat to the effective functioning of the public service.
29
CHAPTER 2
2.0 Prioritisation of Development Issues
Introduction
This Chapter outlines the prioritised development issues for the PSC as set out in the National Medium Term Development Plan
Policy Framework. It outlines the potentials, opportunities, constraints and addresses the challenges associated with its
implementation.
2.1 Summary of Key Development Issues (2014 – 2017)
The under-listed were the issues identified:
(i) Ineffective supervision and human resource management;
(ii) Lack of reliable database for human resource planning and decision making;
(iii) Absence of a comprehensive human resource management policy framework for public servants;
(iv) Ineffective governance systems;
(v) Unsatisfactory working conditions and environment for staff of PSC; and
(vi) Loss of quality human and material resource.
30
Table 9 : Key development problems issues identified from the NMTDPF (2014-2017)
NATIONAL MEDUIM TERM DEVELOPMENT POLICY FRAMEWORK (NMTDPF) 2014-2017
THEMATIC AREA
DEVELOPMENT ISSUES
Transparent And Accountable Governance
Ineffective supervision and human resource management
Lack of reliable database for human resource planning and decision
making
Absence of a comprehensive human resource management policy
framework for public servants
Ineffective governance systems
Unsatisfactory working conditions and environment for staff of PSC
Loss of quality human and material resource
The development priorities for the PSC has been captured under one key thematic area of the MTDPF 2014-2017. This is: ‘Ensuring
Transparent and Accountable Governance’
Under the Medium Term Development Plan (2014-2017), the prioritised issues are the following:
(I) Lack of reliable database for human resource planning and decision making;
31
(II) Absence of a comprehensive human resource management policy framework for public servants;
(III) Ineffective supervision and human resource management;
(IV) Ineffective governance systems;
(V) Unsatisfactory working conditions and environment for staff of PSC; and
(VI) Loss of quality human and material resource.
2.1.1 Transition from GSGDA 2010-2013 to NMTDPF 2014-2017
In line with Article 35 Section 7 of the 1992 Constitution of Ghana, all MDAs are expected to roll-over programmes and projects
commenced under GSGDA 2010-2013 unto the next planning cycle for continuity and consistency execution of the plans. The
Commission has identified these programmes and projects that require a roll-over and also outlined its prioritised issues from the
National Medium Term Development Plan Framework (NMTDPF) 2014-2017 for implementation.
The table below indicates the prioritised issues, programmes and projects. Table 10
PSCDP 2010-2013
PSCDP 2014-2017
THEMATIC AREA
ISSUES
POLICY
OBJECTIVES
THEMATIC AREAS
PSCDP 2014 – 2017
ISSUES
PSCDP POLICY
OBJECTIVES 2014-2017
TRANSPARENT AND
ACCOUNTABLE
GOVERNANCE
Lack of adequate
and reliable data-
base to inform
decision-making
Improve data base for
policy formulation, analysis
and decision making
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
Lack of reliable database for human
resource planning and decision
making
Establish a reliable
public service-wide
human resource
management
information system
TRANSPARENT AND
ACCOUNTABLE
GOVERNANCE
Ineffective
supervision
To improve the supervisory
role of the PSC
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
Ineffective supervision and human
resource management
Enhance supervision
and productivity in the
public service
32
TRANSPARENT AND
ACCOUNTABLE
GOVERNANCE
Loss of quality
human and material
resources
Promote the reduction of
HIV/AIDS/STI/TB transmission,
ensure its proper
management and promote
healthy lifestyle
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
Loss of quality human and material
resource
Promote the reduction
of HIV/AIDS/STI/TB
transmission, ensure its
proper management
and promote healthy
lifestyle
TRANSPARENT AND
ACCOUNTABLE
GOVERNANCE
Absence of human
resource
development policy
for Public Servants.
Upgrade the capacity of
the public service for
transparent, accountable,
efficient, timely, effective
performance and service
delivery
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
Absence of a comprehensive
human resource management policy
framework for public servants
Promote excellence in
people management
TRANSPARENT AND
ACCOUNTABLE
GOVERNANCE
Unattractive
conditions of
service
To improve and enhance
conditions of service to
attract and retain qualified
staff
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
Unsatisfactory working conditions
and environment for staff of PS
Improve the working
environment and
conditions
33
2.2 Prioritization of the Programmes and Sub-programmes
The Programmes and sub-programmes were prioritized through consensus to ensure
efficiency in utilization of resources and to deliver result-oriented outputs. The
prioritisation process was guided by the following criteria:
Impact nationally (e.g. Employment generation, economic, educational, health
enhancement, poverty reduction etc.);
Impact spatially (e.g. Nationwide / Selected Regions etc.);
Emanate from credible source (e.g. Cabinet Decision, International Agreement,
Civil Society, Executive etc.);
Have reliable source of funding; and
Have identified target group(s).
Each programme or sub-programme was awarded a score ranging from 0-3 through
consensus as defined in Table 3.3. The scores were summed and ranked. The scores
were summed up and ranked using simple ranking method. The programme with the
highest score was adjudged as top priority as presented in Table 3.4.
Table 11 Definition of Score
Definition Score
Very strong results 3
Results 2
Weak results 1
No results 0
The table below shows the outcome of the scores and ranking of each of the
programmes and sub-programme.
Table 12 Prioritisation Model
PROGRAMME
CRITERIA Total Score
Rank
National Impact (e.g. Employment generation, economic enhancement, educational, health, poverty reduction etc. /
Spatial Impact (e.g. Nationwide / Selected Region etc.
Source of Programme. (e.g. Cabinet Decision, International Agreement, Civil Society, Executive etc.)
Source of Funding
Programme 1: Management and Administration
2 2 3 3 10
34
Sub-Programme: General Administration and Finance
2
3
3
2
10
5th
Programme 2: Public Service Human Resource Management
3 3 3 3 12
Sub-Programme: Recruitment and Career Development
2 2 3 3 10 3rd
Sub-Programme: Performance Management and Organisational Development
2 3 3 3 11 2nd
Sub-Programme: Research, Information, Monitoring and Evaluation
3 3 3 3 12 1st
Sub-Programme: Governance
2 1 3 3 9 4th
PRIORITISED ISSUES (2014-2017)
In determining the priority issues a number of outstanding issues were considered and
thoroughly deliberated upon by the Commission at an intra-planning workshop. The
following emerged as the ranked issues (see table below).
Table 13
POSITION
THEMATIC
AREA
FOCUS
AREA
PSCDP 2014 – 2017 ISSUES
PROGRAMME/SUB PROGRAMME
1ST
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
PUBLIC
SECTOR
REFORMS
Lack of reliable
database for human
resource planning and
decision making
Sub-Programme: Research, Information, Monitoring and Evaluation
35
2ND
HIV/AIDS,
STDs,
and TB
Absence of a
comprehensive human
resource management
policy framework for
public servants
Sub-Programme: Recruitment and Career
Development
3RD
Ineffective supervision
and human resource
management
Sub-Programme: Recruitment and Career
Development
4TH
Ineffective
Governance systems
Sub-Programme:
Governance
5TH
Unsatisfactory working
conditions and
environment for staff of
PSC
Sub-Programme: Recruitment and Career
Development
6TH
Loss of quality human
and material resource
Sub-Programme: General Administration and
Finance
36
The table below indicates the potentials, opportunities, constraints and the mitigating measures identified to address the
challenges.
TABLE 14: APPLICATIONS OF POTENTIALS, OPPORTUNITIES, CONSTRAINTS AND CHALLENGES
ISSUES TO BE
ADDRESSED
POTENTIALS
(FROM BASELINE
SITUATION ETC,)
OPPORTUNITIES
CONSTRAINTS
CHALLENGES
1. Lack of
reliable
database for
human
resource
planning and
decision
making
Legal authority
of the PSC (PSC
Act 482, 1994)
to establish and
maintain
adequate and
reliable human
resource
database to
inform decision
making
i) Draft policy
document on
HRMIS available.
ii) Availability of
human resource
consultants to
provide technical
support in
establishing
database
iv) Availability of
policy analysts in
other
organisations
v) Availability of
training institutions
vi) Donor support
vii) Political will
i. Inadequate
logistics within the
PSC
ii. Inadequate
capacity for
knowledge
management
within the division
at the PSC
i) Inadequate budgetary
allocation from MOF
ii) Delayed budgetary
releases from MOF
iii) Inadequate co-operation
from other MDAs.
iv) Inadequate capacity of
HR managers in other
organisations.
CONCLUSION: The PSC has the legal mandate to establish and maintain a Public Service-wide Human
Resource Management Information System to inform decision-making. The existing logistical inadequacies
will be addressed by management through effective lobbying and negotiations with MOF and donors. The
staff will also be trained adequately in the areas of data management, information, communication
technology and knowledge management.
37
TABLE 15: APPLICATION OF POTENTIALS, OPPORTUNITIES, CONSTRAINTS AND CHALLENGES
ISSUES TO BE
ADDRESSED
POTENTIALS
(FROM BASELINE
SITUATION ETC,)
OPPORTUNITIES
CONSTRAINTS
CHALLENGES
2. Absence of a
comprehensive
human resource
management
policy
framework for
public servants
i) Draft policy
document on
HR
management
policy and
Manual
available.
ii) Committed
staff iii) Availability of
human resource
capacity in the
public service vi) Dedicated
and committed
staff
i) HR practitioners
in other MDAs
ii) Availability of
human resource
consultants to
provide technical
support
iii) Donor support
i) Inadequate
skilled HR
practitioners in
other MDAs
ii) Inadequate
logistics
iii) Inadequate
budgetary
allocation.
i) Insufficient stakeholders’
support and commitment.
ii) Inadequate budgetary
support from MOF
CONCLUSION: The PSC has developed a comprehensive Human Resource Development Policy Framework
and Manual for the public service. For effective implementation of the new policy, HR managers in the
public service shall be trained to implement the New Policy Manual. MOF and Donors will be contacted to
sponsor the training.
38
TABLE16 : APPLICATION OF POTENTIALS, OPPORTUNITIES, CONSTRAINTS AND CHALLENGES
ISSUES TO BE
ADDRESSED
POTENTIALS
(FROM BASELINE
SITUATION ETC,)
OPPORTUNITIES
CONSTRAINTS
CHALLENGES
5. Unsatisfactory
working
conditions and
environment for
staff of PSC
i. Existing
Conditions of
Service
Document
i. Similar
Conditions of
Service with
other sister
organizations, e.g. the
Electoral
Commission,
CHRAJ, NCCE,
PURC, Energy
Commission,
i. The delay in the
development of
the Conditions of
Service by the
PSC Welfare
Association
i. Delay in the
release of funds
from MOF for
administrative
expenditures
ii. Inadequate
budgetary
allocation for
administrative
activities from
MOF
CONCLUSION: Process initiated for the development of PSC’s Conditions of Service. The PSC
remains committed to negotiating and lobbying MOF for approval and implementation.
39
TABLE 17: APPLICATION OF POTENTIALS, OPPORTUNITIES, CONSTRAINTS AND CHALLENGES
ISSUES TO BE
ADDRESSED
POTENTIALS
(FROM BASELINE
SITUATION ETC,)
OPPORTUNITIES
CONSTRAINTS
CHALLENGES
3. Ineffective
supervision and
human resource
management.
i. Mandate of
the PSC ii. Committed
and
experienced
staff to carry out
effective
supervision. iii.
Independence
of PSC by law
i. Trust & respect
from clientele.
ii. Goodwill of
Government
iii. Training
Institutions
available to
build capacity
of staff
i. Inadequate
logistics.
i. Stakeholders
laisez-faire
attitude .
ii. Inadequate
budgetary
allocation from
MOF.
CONCLUSION: The PSC has a supervisory role over the MDAs. The existing logistical
inadequacies will be addressed by Management through effective lobbying and negotiations
with the MOF. Staff will also be trained adequately in the areas of organisational development
and knowledge management. Continued sensitisation of staff and management of the various
MDAs will be pursued.
40
TABLE 18: APPLICATION OF POTENTIALS, OPPORTUNITIES, CONSTRAINTS AND CHALLENGES
ISSUES TO BE
ADDRESSED
POTENTIALS
(FROM BASELINE
SITUATION ETC,)
OPPORTUNITIES
CONSTRAINTS
CHALLENGES
4. Ineffective
governance
systems.
i. Mandate of
the PSC
ii. Competent
staff who have
skills in
corporate
governance
issues
i. Existence of
Public training
institutions which
offer training in
Governance.
Example, GIMPA,
NDPC
ii. Availability of
consultants on
Corporate
Governance
i. Inadequate
budgetary
support for
training of staff on
Governance
ii. Inadequate
skilled staff on Governance
related issues
i. Lack of
commitment from
MDAs
ii. Lack of
feedback from
MDAs on
governance
related issues
CONCLUSION: The PSC will, in accordance with its mandate, collaborate with other Central
Management Agencies to develop a comprehensive governance system for the public
service.
41
TABLE 19: APPLICATION OF POTENTIALS, OPPORTUNITIES, CONSTRAINTS AND CHALLENGES
ISSUES TO BE
ADDRESSED
POTENTIALS
(FROM BASELINE
SITUATION ETC,)
OPPORTUNITIES
CONSTRAINTS
CHALLENGES
6. Loss of quality
human and
material
resources
through HIV &
AIDS infection
i. Some level of
information and
awareness on
the HIV & AIDS
pandemic
among staff.
i. Ghana Aids Commission
support for HIV&
AIDS
programmes.
ii. Expertise of the
Ghana AIDS
Commission to
support the
education
programmes of
the staff.
i. Inadequate
training on HIV&
AIDs issues
among staff.
i. Staff
unwillingness to go for VCT
services to determine their HIV/AIDS status
CONCLUSION: The PSC is committed to promoting HIV & AIDS education among staff while
efforts are made to replicate its programmes on HIV & AIDS education in the MDAs in
collaboration with Ghana AIDS Commission.
42
CHAPTER 3
3.0 INTRODUCTION
This PSC’s development goals, objectives and strategies and their linkages with the National goal have been addressed
in this Chapter. The goal of the National Medium Term Development Policy is to invest in people to promote sustainable
growth and reduce poverty through employment creation.
3.1 DEVELOPMENT GOALS, OBJECTIVES AND STRATEGIES
In line with the above National goal, the PSC seeks through its programmes and activities to contribute in promoting a
well-managed workforce capable and committed to delivering high quality services to the people of Ghana. The
National goal was juxtaposed with the PSC’s sector goal in order to establish compatibility if any. The indicators and the
matching scores have been provided in order to establish a compatibility matrix as indicated below:
Table 20
INDICATORS
SCORING
Strongly compatible
2
Weakly compatible
0
Not compatible
0
Weakly incompatible
0
Strongly incompatible
0
During the analysis of the compatibility matrix, the PSC scored two (2) due to the following reasons;
The sector goal of the PSC aims to reduce poverty and to enhance growth through a highly motivated and skilled
employees to manage the various public services. The PSC has established a mutually agreed partnership and
NATIONAL GOAL
Addressing the economic imbalances,
re-stabilizing the economy and placing it
on a path of sustained accelerated
growth and poverty reduction towards
achieving the Millennium Development
Goals and sustainable development.
PSC SECTOR GOAL
Promoting a well managed workforce
capable and committed to delivering
high quality services for accelerated
growth and sustainable development.
43
collaboration with other MDAs and MMDAs, especially, in the area of Human Resource Management and
Development.
Availability of an efficient and effective workforce in the Public Service.
A vibrant and well-informed local level Stakeholders who are committed to improving service delivery in the areas
of education, health, water services, electricity, housing, etc.
3.2 Development Projections for 2014-2017
The developmental projections of the PSC will be analyzed within the context of the Commission’s deliverables. The
development projections for the PSC’s issues would include inter alia;
a) Human Resource Management Information System
b) A Comprehensive Human Resource Management Policy Framework and Manual
c) Development of a Performance Management System for the public services
d) An effective Governance System in the public services
The table below indicates the identified issues, their respective deliverables and the projections under the medium
term
TABLE 21: PROJECTION FOR 2014-2017
NO.
ISSUE
DELIVERABLES
2014
2015
2016
2017
ASSUMPTION
1.
Lack of reliable
database for
human resource
planning and
decision making
Human
Resource
management
information
system in place
1.Engagement
of
implementation
partner
2.Recruitment
and Training of
Technical Team
conducted
3.Platform for
database inter-
operability
established
1.Infrastructure
for PSC database
developed
2.Hardware and
software for data
mgt. procured
3.Databank
equipment
installed and
configured
4.Data migration
completed
1.HRMIS launched
2. HRMIS
operational
service-wide
1. monitoring
and evaluation
Conducted on
the HRMIS
2.HRM
Information
regularly
updated
I. Availability and
timely release of
GoG and Donor
funds
ii. Co-operation
from stakeholders
and collaborators
44
2.
Absence of a
comprehensive
human resource
management
policy framework
for public
servants
Human
Resource
Management
Policy
developed
and
implemented
1. HRM Policy
document
launched
2. Sensitization
workshops
organized for
key
stakeholders in
the Public
Service
HRM Policy
document
operational
service-wide
Assessment on the
implementation of
the new policy
conducted half
yearly
Monitoring and
evaluation
conducted.
Commitment of
MDAs
TABLE 22: PROJECTION FOR 2014-2017
NO.
ISSUE
DELIVERABLES
2014
TARGETS
2015
TARGETS
2016
TARGETS
2017
TARGETS
ASSUMPTION
3.
Unsatisfactory
working
conditions and
environment for
staff of PSC
Revised
Conditions of
Service fully
operational
1. Conditions of
Service
document
developed
2. Revised
Conditions of
Service
approved by
MOF and Fair
Wages and
Salaries
1.Revised
Condition of
Service is fully
implemented
1 Assessment on the
Revised Conditions
of Service
conducted
Monitoring and
evaluation on
the Conditions
of Service
undertaken
i. Co-operation
from stakeholders
and collaborators
ii. Commitment of
PSC
iii. Adequate and
timely release of
funds from MOF
45
Commission
3.Sensitisation
organized for
Staff of PSC on
their
responsibilities
Infrastructure
base of the
Commission
improved
(buildings and
office logistics)
1.Structural
defects of PSC
building
assessed
2. Reception,
2nd floor offices
and the drivers
rest rooms
renovated
3. Vehicles and
office
equipments
procured
1.PSC building
renovated(pha
se one)
2. Vehicles and
office
equipments
procured
(phase one)
1.PSC building
renovated (phase
two)
2. Vehicles and
office equipments
procured(phase
two)
1.PSC building
renovated
(phase three)
2. Vehicles and
office
equipments
procured
(phase three)
Availability and
timely release of
funds from MOF
4. Ineffective
supervision and
human
resource
management.
Performance
management
system
operational in
the public
service
1. Sensitization
and
consultative
meetings
undertaken
2.Performance
Mgt. Policy
Framework and
Manual
launched
3. New
Performance
Mgt. Appraisal
Instruments
rolled out
1. New
Performance
Mgt. Appraisal
Instruments
operational
service-wide
(performance
agreements
and staff
performance
appraisal
1. Assessment of the
usability of the New
Mgt. Appraisal
Instruments
conducted
1. Monitoring
and evaluation
on the New
Mgt. Appraisal
Instruments
conducted
i. Availability and
timely release of
funds
ii. Co-operation
from stakeholders
and collaborators
iii. Commitment of
PSC
46
TABLE 23: PROJECTION FOR 2014-2017
NO.
ISSUE
DELIVERABLES
2014
TARGETS
2015
TARGETS
2016
TARGETS
2017
TARGETS
ASSUMPTION
5.
Ineffective
governance
systems.
Governance
Manual
developed and
implemented in
the public
service
1.Sensitization
and interactive
meetings with
stakeholders
organized
2. Governance
Manual
launched
MDAs and
MMDAs fully
implementing
the
Governance
Manual
1.Assessment of the
usability of the
Manual
2. Reports
produced and
submitted
Monitoring and
evaluation
undertaken
i. Co-operation
from stakeholders
and collaborators
6. Loss of quality
human and
material
resources
through HIV &
AIDS infection
HIV / AIDS Desk
establish and
sensitization
workshops
organized
Sensitization
workshops
organized
2. Report
generated and
submitted
3. HIV / AIDS
Desk
established
Counseling
services
undertaken
Counseling services
undertaken
Counseling
services
undertaken
i. Co-operation
from stakeholders
and collaborators
47
DEVELOPMENT PROJECTION FOR 2014-2017 (INDICATORS AND TARGETS)
An indicator is a quantitative or qualitative factor or variable that provides a simple and reliable basis for assessing
achievement, change or performance. It is a unit of information measured over time that can help show changes in a
specific condition. A given goal or objective can have multiple indicators.
Target can be defined as a specified objective that indicates the number, timing and location of that which is to be
realised.
The tables below indicate the main outputs, its indicators and projections through which the Commission has set
benchmarks for the measurement of the performance of these Sub-programmes. The past data indicates actual
performance whilst the projections are the Commission’s estimate of future performance
TABLE 24 SUB-PROGRAMME: RESEARCH, INFORMATION MONITORING AND EVALUATION
Outcome
Indicator
Description
Unit of
Measurement
Baseline
2012
Latest status
2013
Target
2014
Target
2015
Target
2016
Target
2017
Year Value Year Value
Development
of Public
Service HR
database
Number of
MDAs covered
2012
0
2013 0 70%
30%
100%
100%
48
Improved
Performance
and Service
Delivery in the
Public Service
Number. of
Public Service
Organizations
implementing the
new performance
appraisal
instruments
2012
23
2013 0 20
173
200
200
Implementation
of HR Policy
Framework and
Manual for the
public service
Percentage
completion of the
draft manual
2012
35%
2013 100% N/A
N/A
N/A
N/A
Number. of
Public Service
Organizations
implementing the
HR Policy
framework and
Manual
2012 Nil 2013 Nil 0
70%
30%
49
TABLE 25:SUB-PROGRAMME: GENERAL ADMINISTRATION AND FINANCE
Outcome
Indicator
Description
Unit of
Measurement
Baseline
2012
Latest status
2013
Target
2014
Target
2015
Target
2016
Target
2017
Year Value Year Value Year
Value
Financial
Reports
Financial
Report
produced by
2012 31st
March 2013
31st
March 31st March
31st March 31st
March
31st
March
Training of
Staff
Number of
Staff Trained 2012 67 2013 60 35
25
25
25
Conference
of Chief
Executives,
Governing
Boards, and
Chief
Directors
Conference
organized 2012 1 2013 Nil 1
1
1
1
Conference
Report
Submitted
2012
Report
submitted
after 4
weeks
2013 Nil
Report
submitted after
2 weeks
Report
submitted
after 2 weeks
Report
submitted
after 2
weeks
Report
submitted
after 2
weeks
50
TABLE 26:SUB-PROGRAMME: RESEARCH, INFORMATION, MONITORING AND EVALUATION
Outcome
Indicator
Description
Unit of
Measurement
Baseline
2012
Latest status
2013
Target
2014
Target
2015
Target
2016
Target
2017
Year Value Year Value
Research
results
produced on
HR
management
related issues
Number of
researches
Conducted
2012 1 2013 2 2
1
1
1
M&E reports
on the
implementation
of HR policies
Timely
production of
Reports
2012 - 2013 - Quarterly
Quarterly
Quarterly
Quarterly
51
TABLE 27:SUB-PROGRAMME: RECRUITMENT AND CAREER DEVELOPMENT
Outcome
Indicator
Description
Unit of
Measurement
Baseline
2012
Latest status
2013
Target
2014
Target
2015
Target
2016
Target
2017
Year Value Year Value
Public Service
Promotion
Examinations
Number of
promotion exams
conducted
2012 3 2013 3 3 3 3
3
Recruitment
and promotion
interviews
Number of
representation on
interview panels
2012 215 2013
61 as at
August
2013
89 98 100
112
Category “A”
and “B”
position
holders
appointment in
the public
service
Number of
appointments
made
2012 250 2013 151 167 180 196
200
52
TABLE 28:SUB-PROGRAMME: RECRUITMENT AND CAREER DEVELOPMENT
Outcome
Indicator
Description
Unit of
Measurement
Baseline
2012
Latest status
2013
Target
2014
Target
2015
Target
2016
Target
2017
Year Value Year Value
Development and
implementation of
Human Resource
Management
Policy Framework
and Manual
Percentage
Completion of the
document
2012 90% 2013 100% N/A N/A N/A
N/A
Percentage of
Public Service
Organizations
using the policy
and manual
2012 N/A 2013 N/A 100% 100% 100%
100%
Human Resource
Audit
Number of
Institutions
Audited
2012 17 2013 21 50 50 50
50
53
SECTOR POLICY OBJECTIVES AND STRATEGIES
INTRODUCTION
The PSC’s Medium Term Development Plan (MTDP) for the period 2014-2017 has been developed based on the
Commission’s Mission, that is, “To safeguard and promote a high calibre of integrity, accountability and competence in
public service organisations in Ghana, through advisory, consultative, regulatory and supervisory services”. The Plan was
developed in accordance with the National Medium Term Development Plan Policy Framework (MTDPF), 2014-2017 and
with reference to the 2010-2013 National Development Plan Policy Framework.
Six major policy objectives have been identified under the National Medium Term Development Plan Policy Framework
(MTDPF), 2014-2017 and with strategies to ensure that they were specific, measurable, accurate and realistic. Each of the
strategies adopted shall be subject to review to ensure that they achieve the objectives intended for.
The table below shows the linkage among the prioritised issues, the policy objectives and their overall strategies as set out
by the MTDPF.
54
PSC ISSUES, OBJECTIVES AND STRATEGIES (2014-2017)
Table 29
THEMATIC
AREA
FOCUS AREA
PSCDP 2014 – 2017 ISSUES
PSCDP 2014 – 2017 OBJECTIVES
PSCDP 20104– 2017 STRATEGIES
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
PUBLIC SECTOR
REFORMS
Lack of reliable database for
human resource planning
and decision making
Establish a reliable
public service-wide
human resource
management
information system
1. Design and implement
Human Resource
Management Information
System (HRMIS).
2. Co-ordinate capacity
building of public service.
organizations for effective
implementation of the HRMIS
3.Analyse and disseminate
data on HR in the public
service
Absence of a
comprehensive human
resource management
policy framework for public
servants
Promote excellence in
people management
1. Develop a comprehensive
policy framework and manual
to guide human resource
governance and
management in the Public
Service.
2. Sensitize staff of public
service organizations on the
Policy Framework and Manual.
3. Build capacity of the Public
Service for effective
implementation of the Policy
Framework and Manual.
55
Table 30
THEMATIC
AREA
FOCUS AREA
PSCDP 2014– 2017 ISSUES
PSCDP 2014 – 2017 OBJECTIVES
PSCDP 2014 – 2017 STRATEGIES
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
PUBLIC
SECTOR
REFORMS
Ineffective supervision and
Human resource
management
Enhance supervision
and productivity in the
public service
1. Institutionalise performance
management system in the public
service.
2.Strengthen capacity of HR
Managers to implement
performance management system
at all functional levels in public
service organisations
Ineffective governance
systems
Strengthen public
sector management
and oversight
1.Standardise rules, regulations and
systems governing public sector
management
2.Instutionalise training for Public
Service Governing Boards/Councils
and Chief Executives
56
Table 31
THEMATIC
AREA
FOCUS AREA
PSCDP 2014 – 2017 ISSUES
PSCDP 2014– 2017 OBJECTIVES
PSCDP 2014 – 2017 STRATEGIES
TRANSPARENT
AND
ACCOUNTABLE
GOVERNANCE
PUBLIC SECTOR
REFORMS
Unsatisfactory working
conditions and
environment for staff of PSC
Improve the
working
environment and
conditions
1.Upgrade the infrastructural
base of the Commission
2.Review Conditions of
Service in accordance with
prevailing Government
Policy
.
HIV/AIDS, STDs, and
TB
Loss of quality human and
material resources
Promote the
reduction of
HIV/AIDS/STI/TB
transmission,
ensure its proper
management
and promote
healthy lifestyle
1)Intensify advocacy to
reduce infection and impact
of HIV, AIDS and TB
2)Improve access to testing
and counseling, condoms use
and integrated youth friendly
services
57
PROGRAMMES AND SUB-PROGRAMMES OF MDA
Programme are groups of independent, but closely related, activities designed to achieve common goals and
objectives. The programmes were set within broader national strategic framework and disaggregated to activities to
support clear managerial responsibility for outputs.
During Medium Term Policy Plan (2014 to 2017) period, the Commission would undertake the following
programmes and sub programmes:
Programme 1
BP1: Management and Administration
Sub-Programme
BP1: General Administration and Finance
Programme 2
BP2: Public Service Human Resource Management
Sub-Programmes
BSP1: Recruitment and Career Development
BSP2: Performance Management and Organizational Development
BSP3: Research, Information, Monitoring and Evaluation
BSP4: Governance
The table below shows the adopted objectives, strategies and their linkages to the programmes and sub-programmes:
TABLE 32
ADOPTED OBJECTIVES ADOPTED STRATEGIES PROGRAMMES AND SUB-PROGRAMMES
Improve the working environment
and conditions of staff of PSC
1.Upgrade the infrastructural base
of the Commission
2.Review Conditions of Service in
accordance with prevailing
Government Policy
PROGRAME 1:Management and Administration
SUB-PROGRAMMES : General Administration and
Finance
58
Promote the reduction of
HIV/AIDS/STI/TB transmission, ensure
its proper management and
promote healthy lifestyle
1)Intensify advocacy to reduce
infection and impact of HIV, AIDS
and TB
2)Improve access to testing and
counseling, condoms use and
integrated youth friendly services
PROGRAME 1:Management and Administration
SUB-PROGRAMMES : General Administration and
Finance
TABLE 33
ADOPTED OBJECTIVES ADOPTED STRATEGIES PROGRAMMES AND SUB-PROGRAMMES
Establish a reliable public service-
wide human resource management
information system
1. Design and implement Human
Resource Management Information
System (HRMIS).
2. Co-ordinate capacity building of
public service organizations for effective
implementation of the HRMIS
3.Analyse and disseminate data on HR in
the public service
PROGRAME2 :
Public Service Human Resource
Management
SUBPROGRAMMES 2.3:
Research, Information, Monitoring and
Evaluation
59
Promote excellence in people
management
1. Develop a comprehensive policy
framework and manual to guide human
resource governance and management
in the Public Service.
2. Sensitize staff of public service
organizations on the HR Policy
Framework and Manual.
3. Build capacity of the Public Service for
effective implementation of the HR
Policy Framework and Manual.
PROGRAME2 :
Public Service Human Resource
Management
SUBPROGRAMMES 2.2:
Recruitment and Career Development
TABLE 34
ADOPTED OBJECTIVES ADOPTED STRATEGIES PROGRAMMES AND SUB-PROGRAMMES
Enhance supervision and
productivity in the public service
1. Institutionalise performance
management system in the public
service.
2.Strengthen capacity of HR
Managers to
implement performance
management system at all functional
levels in public service organisations
PROGRAME2 :
Public Service Human Resource
Management
SUBPROGRAMMES 2.3:
Performance Management Systems and
Organisational Development
60
Strengthen public sector
management
and oversight
1.Standardise rules, regulations and
systems governing public sector
management
2.Instutionalise training for Public
Service Boards/Councils and Chief
Executives
PROGRAME2 :
Public Service Human Resource
Management
SUBPROGRAMMES 2.4:
Governance
INTERNAL CONSISTENCY MATRIX FOR THE ANALYSIS OF SECTOR PROGRAMMES
Ensuring internal consistency among programmes adopted by individual divisions guarantees that organisational overall
objective is consistent with its given mandate. The rationale, therefore, is that divisional programmes are expected to be
supportive of each other in order to achieve the organisation’s general goal.
The various programmes of the four main divisions within the PSC namely the Finance and Administration, Management
Services, Research, Information, Monitoring and Evaluation and Human Resource Policy were subjected to the
consistency matrix test.
CONSISTENCY MATRIX - RECORD SHEET
Sector: Public Services Commission
PROG N0. SCORE REASONS FOR INCONSISTENCY
None, all the programmes are supportive of each other.
The matrix below provides a simple technique that can be used by all stakeholders to analyze policies, programmes and
projects. This tool is designed to give a visual and quantitative measure of the extent to which a particular policy,
programme or project is capable and supportive of each other to provide sustainable growth and development.
The analysis below depicts the extent to which policies, programmes and projects of the various divisions within the PSC
mutually support each other.
61
INTERNAL CONSISTENCY MATRIX TABLE
1
2
3
4
5
No. Sector
Programmes
Sector Programmes
Recruitment and Career development
Performance management and organisational development
Research ,information, monitoring and evaluation
Governance
General Administration and Finance
1 Recruitment and Career development
X X X X
2 Performance management and organisational development
X X X X
3 Research ,information, monitoring and evaluation
X X
4 Governance X X X
5 General Administration and Finance
X X X
62
STRATEGIC ENVIRONMENTAL ASSESSMENT
Table 35: SUSTAINABILITY TEST MATRIX FOR POLICY OBJECTIVES
1) Establish a reliable public service-wide human resource management information system
CRITERIA – BASIC AIMS AND OBJECTIVES
INDICATORS
PERFORMANCE MEASURE
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
Sensitive areas
shown on GIS map (0) 1 2 3 4 5
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
Vulnerable areas
shown on GIS map (0) 1 2 3 4 5
Energy: The PROGRAMME should encourage
efficient energy use, and maximize use of
renewable rather than fossil fuels.
Quantity /type of
fuel/energy required (0) 1 2 3 4 5
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
Quantity /type of
pollutants and waste (0) 1 2 3 4 5
Use of Raw Materials: All raw materials should
be used with maximum efficiency, and
recycled where practical.
Quantity and type of
materials (0) 1 2 3 4 5
Rivers and Water bodies: should retain their
natural character.
Minimum flows/
water levels set (0) 1 2 3 4 5
EFFECTS ON SOCIAL AND CULTURAL
CONDITIONS
Local Character: and cohesion of local
communities should be maintained and
enhanced where practical.
Use of GIS /
database to
highlight sensitive
areas
(0) 1 2 3 4 5
63
Health and Well-being: The PROGRAMME
should benefit the work force, and local
communities in terms of health and well-being,
nutrition, shelter, education and cultural
expression.
Financial or other
contribution (0) 1 2 3 4 5
Gender: The PROGRAMME should empower
women.
Number of women
empowered (0) 1 2 3 4 5
Work for Local People: Priority should be given
to providing jobs for local people and
particularly women and young people.
Number of people
employed (0) 1 2 3 4 5
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
Description of
proposals to meet
this aim
(0) 1 2 3 4 5
Access: to land should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to water should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to transport should be improved. Number of people
assisted (0) 1 2 3 4 5
Sanitation: Should be improved. Number of people
assisted (0) 1 2 3 4 5
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
Environmental Report
(or EIA) (0) 1 2 3 4 5
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
Occurrence
monitored (0) 1 2 3 4 5
EFFECTS ON THE ECONOMY
Growth: The PROGRAMME should result in
development that encourages strong and
stable conditions of economic growth.
Financial Plan
showing projected
growth and
(0) 1 2 3 4 5
64
monitoring
Use of local materials and services: The
PROGRAMME should result in the use of raw
materials and services from local industries
where possible.
Description of
sources (0) 1 2 3 4 5
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and
labour.
Description of
investment strategy (0) 1 2 3 4 5
Table 36: SUSTAINABILITY TEST RECORD SHEET
1) Establish a reliable public service-wide human resource management information system
CRITERIA – BASIC AIMS AND OBJECTIVES SCORE REASONS
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
4
This policy objective supports the protection of areas and
wildlife through the recruitment, retention and development of
the right personnel in the right numbers and skills mix at all
levels within the relevant agencies
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
4
This policy objective would reduce land degradation through
the recruitment, retention and development of the right
personnel in the right numbers and skills mix at all levels within
the relevant agencies
Energy: The Activity should encourage efficient
energy use, and maximize use of renewable
rather than fossil fuels.
4
This policy objective would encourage the efficient use of
energy through the recruitment, retention and development of
the right personnel in the right numbers and skills mix at all
levels within the relevant agencies
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
4
This policy objective would reduce pollution through the
recruitment, retention and development of the right personnel
in the right numbers and skills mix
65
Use of Raw Materials: All raw materials should be
used with maximum efficiency, and recycled
where practical.
4
This policy objective would impact on the use of raw materials
through the recruitment, retention and development of the
right personnel in the right numbers and skills mix at all levels
within the relevant agencies
Rivers and Water bodies: should retain their
natural character. 4
This policy objective would impact on the use of raw materials
through the recruitment, retention and development of the
right personnel in the right numbers and skills mix at all levels
within the relevant agencies
EFFECTS ON SOCIAL AND CULTURAL CONDITIONS
Local Character: and cohesion of local
communities should be and enhanced where
practical.
3
This policy objective would impact on cohesion of local
communities through the recruitment, retention and
development of the right personnel in the right numbers and
skills mix at the local government level.
Health and Well-being: The Activity should
benefit the work force, and local communities in
terms of health and well-being, nutrition, shelter,
education and cultural expression.
3
The policy objective would identify lapses or shortfalls in
personnel numbers and skills and deployment in the social
development sector.
Gender: The PROGRAMME should empower
women. 4 The policy objective would support gender mainstreaming
Job Creation: The activity should create jobs for
local people particularly women and young
people.
4
The policy objective would enhance succession and
manpower planning that would open up opportunities for
women and young people.
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
4
The policy objective would support active participation at the
local level through the recruitment, retention and development
of the right personnel in the right numbers and skills mix at all
levels within the relevant agencies
Access to Land: Activity should improve access
to land. 4
The policy objective would support access to land through the
recruitment, retention and development of the right personnel
in the right numbers and skills at all levels within the relevant
agencies
Access to Water: Activity should improve access
to water. 4
The policy objective would support access to water through
the recruitment, retention and development of the right
personnel in the right numbers and skills mix at all levels within
the relevant agencies
Access to Transport: Activity should improve
access to transport. 4
The policy objective would support access to transport through
the recruitment, retention and development of the right
66
personnel in the right numbers and skills mix at all levels within
the relevant agencies
Sanitation: Activity should improve sanitation. 4
The policy objective would support improvement of sanitation
through the recruitment, retention and development of the
right personnel in the right numbers and skills mix at all levels
within the relevant agencies
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
4
The policy objective would support the equitable distribution of
development through the recruitment, retention and
development of the right personnel in the right numbers and
skills mix at all levels
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
4
The policy objective would support reduction in vulnerability
and risk through the recruitment, retention and development of
the right personnel in the right numbers and skills mix at all levels
within the relevant agencies
EFFECTS ON THE ECONOMY
Growth: The PPP should result in development
that encourages strong and stable conditions of
economic growth.
4
The policy objective will promote a strong and stable condition
of economic growth as public servants will be placed at where
they are needed most. The realignment of public servants
would improve efficiency in the public service and ensure
effective succession planning.
Use of local materials and services: The PPP
should result in the use of raw materials and
services from local industries where possible.
4
The policy objective would support efficient use of local raw
materials and services through the recruitment, retention and
development of the right personnel in the right numbers and
skills mix within the relevant agencies
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and labour.
4
The policy objective would support access to local investment
of capital through the recruitment, retention and development
of the right personnel in the right numbers and skills mix within
the relevant agencies
67
Table 37: SUSTAINABILITY TEST MATRIX
2) Promote excellence in people management
CRITERIA – BASIC AIMS AND OBJECTIVES INDICATORS
PERFORMANCE MEASURE
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
Sensitive areas
shown on GIS map (0) 1 2 3 4 5
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
Vulnerable areas
shown on GIS map (0) 1 2 3 4 5
Energy: The PROGRAMME should encourage
efficient energy use, and maximize use of
renewable rather than fossil fuels.
Quantity /type of
fuel/energy required (0) 1 2 3 4 5
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
Quantity /type of
pollutants and waste (0) 1 2 3 4 5
Use of Raw Materials: All raw materials should
be used with maximum efficiency, and
recycled where practical.
Quantity and type of
materials (0) 1 2 3 4 5
Rivers and Water bodies: should retain their
natural character.
Minimum flows/
water levels set (0) 1 2 3 4 5
EFFECTS ON SOCIAL AND CULTURAL
CONDITIONS
Local Character: and cohesion of local
communities should be maintained and
enhanced where practical.
Use of GIS /
database to
highlight sensitive
areas
(0) 1 2 3 4 5
68
Health and Well-being: The PROGRAMME
should benefit the work force, and local
communities in terms of health and well-being,
nutrition, shelter, education and cultural
expression.
Financial or other
contribution (0) 1 2 3 4 5
Gender: The PROGRAMME should empower
women.
Number of women
empowered (0) 1 2 3 4 5
Work for Local People: Priority should be given
to providing jobs for local people and
particularly women and young people.
Number of people
employed (0) 1 2 3 4 5
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
Description of
proposals to meet
this aim
(0) 1 2 3 4 5
Access: to land should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to water should be improved. Number of people
assisted
(0) 1 2 3 4 5
Access: to transport should be improved. Number of people
assisted (0) 1 2 3 4 5
Sanitation: Should be improved. Number of people
assisted (0) 1 2 3 4 5
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
Environmental
Report (or EIA) (0) 1 2 3 4 5
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
Occurrence
monitored (0) 1 2 3 4 5
(0) 1 2 3 4 5
EFFECTS ON THE ECONOMY
Growth: The PROGRAMME should result in
development that encourages strong and
Financial Plan
showing projected (0) 1 2 3 4 5
69
stable conditions of economic growth. growth and
monitoring
Use of local materials and services: The
PROGRAMME should result in the use of raw
materials and services from local industries
where possible.
Description of
sources (0) 1 2 3 4 5
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and
labour.
Description of
investment strategy (0) 1 2 3 4 5
Table38 : SUSTAINABILITY TEST RECORD SHEET
2) Promote excellence in people management
CRITERIA – BASIC AIMS AND OBJECTIVES SCORE REASONS
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc)
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Energy: The Activity should encourage efficient
energy use, and maximize use of renewable
rather than fossil fuels.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Use of Raw Materials: All raw materials should be
used with maximum efficiency, and recycled
where practical.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
70
Rivers and Water bodies: should retain their
natural character.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
EFFECTS ON SOCIAL AND CULTURAL CONDITIONS
Local Character: and cohesion of local
communities should be and enhanced where
practical.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Health and Well-being: The Activity should
benefit the work force, and local communities in
terms of health and well-being, nutrition, shelter,
education and cultural expression.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Job Creation: The activity should create jobs for
local people particularly women and young
people.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Access to Land: Activity should improve access
to land. 4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Access to Water: Activity should improve access
to water. 4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Access to Transport: Activity should improve
access to transport. 4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Sanitation: Activity should improve sanitation. 4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
3
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
71
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
EFFECTS ON THE ECONOMY
Growth: The PPP should result in development
that encourages strong and stable conditions of
economic growth.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Use of local materials and services: The PPP
should result in the use of raw materials and
services from local industries where possible.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and labour.
4
The policy objective would support capacity improvement in
all public service agencies through strategic institutional and
organizational change (i.e. systems, processes, procedures etc
Table 39 : SUSTAINABILITY TEST MATRIX
3)Ensure the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
CRITERIA – BASIC AIMS AND OBJECTIVES INDICATORS PERFORMANCE MEASURE
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
Sensitive areas
shown on GIS map (0) 1 2 3 4 5
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
Vulnerable areas
shown on GIS map (0) 1 2 3 4 5
Energy: The PROGRAMME should encourage
efficient energy use, and maximize use of
renewable rather than fossil fuels.
Quantity /type of
fuel/energy required (0) 1 2 3 4 5
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
Quantity /type of
pollutants and waste (0) 1 2 3 4 5
Use of Raw Materials: All raw materials should Quantity and type of (0) 1 2 3 4 5
72
be used with maximum efficiency, and
recycled where practical.
materials
Rivers and Water bodies: should retain their
natural character.
Minimum flows/
water levels set (0) 1 2 3 4 5
EFFECTS ON SOCIAL AND CULTURAL
CONDITIONS
Local Character: and cohesion of local
communities should be maintained and
enhanced where practical.
Use of GIS /
database to
highlight sensitive
areas
(0) 1 2 3 4 5
Health and Well-being: The PROGRAMME
should benefit the work force, and local
communities in terms of health and well-being,
nutrition, shelter, education and cultural
expression.
Financial or other
contribution (0) 1 2 3 4 5
Gender: The PROGRAMME should empower
women.
Number of women
empowered (0) 1 2 3 4 5
Work for Local People: Priority should be given
to providing jobs for local people and
particularly women and young people.
Number of people
employed (0) 1 2 3 4 5
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
Description of
proposals to meet
this aim
(0) 1 2 3 4 5
Access: to land should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to water should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to transport should be improved. Number of people
assisted (0) 1 2 3 4 5
Sanitation: Should be improved. Number of people
assisted (0) 1 2 3 4 5
Equity: Adverse and beneficial impacts from
development should be distributed equitably
Environmental
Report (or EIA) (0) 1 2 3 4 5
73
and should not discriminate against any groups,
especially vulnerable and excluded people.
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
Occurrence
monitored (0) 1 2 3 4 5
EFFECTS ON THE ECONOMY
Growth: The PROGRAMME should result in
development that encourages strong and
stable conditions of economic growth.
Financial Plan
showing projected
growth and
monitoring
(0) 1 2 3 4 5
Use of local materials and services: The
PROGRAMME should result in the use of raw
materials and services from local industries
where possible.
Description of
sources (0) 1 2 3 4 5
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and
labour.
Description of
investment strategy (0) 1 2 3 4 5
Table 40: SUSTAINABILITY TEST RECORD SHEET
3)Ensure the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
CRITERIA – BASIC AIMS AND OBJECTIVES SCORE REASONS
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Degraded Land: Areas vulnerable to
degradation should be avoided, and already 3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
74
degraded land should be enhanced. prevalence of HIV/AIDS infection
Energy: The Activity should encourage efficient
energy use, and maximize use of renewable
rather than fossil fuels.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Use of Raw Materials: All raw materials should be
used with maximum efficiency, and recycled
where practical.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Rivers and Water bodies: should retain their
natural character. 3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
EFFECTS ON SOCIAL AND CULTURAL CONDITIONS
Local Character: and cohesion of local
communities should be and enhanced where
practical.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Health and Well-being: The Activity should
benefit the work force, and local communities in
terms of health and well-being, nutrition, shelter,
education and cultural expression.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Job Creation: The activity should create jobs for
local people particularly women and young
people.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Access to Land: Activity should improve access
to land. 3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Access to Water: Activity should improve access
to water. 3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Access to Transport: Activity should improve
access to transport. 3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
75
prevalence of HIV/AIDS infection
Sanitation: Activity should improve sanitation. 3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
EFFECTS ON THE ECONOMY
Growth: The PPP should result in development
that encourages strong and stable conditions of
economic growth.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Use of local materials and services: The PPP
should result in the use of raw materials and
services from local industries where possible.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and labour.
3
The capacity of Public Services Commission to deliver on its
mandate would be severely impacted by high incidence and
prevalence of HIV/AIDS infection
76
Table 41: SUSTAINABILITY TEST MATRIX
4) Strengthen public sector management and oversight
CRITERIA – BASIC AIMS AND OBJECTIVES INDICATORS PERFORMANCE MEASURE
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
Sensitive areas
shown on GIS map (0) 1 2 3 4 5
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
Vulnerable areas
shown on GIS map (0) 1 2 3 4 5
Energy: The PROGRAMME should encourage
efficient energy use, and maximize use of
renewable rather than fossil fuels.
Quantity /type of
fuel/energy required (0) 1 2 3 4 5
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
Quantity /type of
pollutants and waste (0) 1 2 3 4 5
Use of Raw Materials: All raw materials should
be used with maximum efficiency, and
recycled where practical.
Quantity and type of
materials (0) 1 2 3 4 5
Rivers and Water bodies: should retain their
natural character.
Minimum flows/
water levels set (0) 1 2 3 4 5
(0) 1 2 3 4 5
EFFECTS ON SOCIAL AND CULTURAL CONDITIONS
Local Character: and cohesion of local
communities should be maintained and
enhanced where practical.
Use of GIS /
database to
highlight sensitive
areas
(0) 1 2 3 4 5
Health and Well-being: The PROGRAMME Financial or other (0) 1 2 3 4 5
77
should benefit the work force, and local
communities in terms of health and well-being,
nutrition, shelter, education and cultural
expression.
contribution
Gender: The PROGRAMME should empower
women.
Number of women
empowered (0) 1 2 3 4 5
Work for Local People: Priority should be given
to providing jobs for local people and
particularly women and young people.
Number of people
employed (0) 1 2 3 4 5
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
Description of
proposals to meet
this aim
(0) 1 2 3 4 5
Access: to land should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to water should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to transport should be improved. Number of people
assisted (0) 1 2 3 4 5
Sanitation: Should be improved. Number of people
assisted (0) 1 2 3 4 5
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
Environmental
Report (or EIA) (0) 1 2 3 4 5
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
Occurrence
monitored (0) 1 2 3 4 5
EFFECTS ON THE ECONOMY
Growth: The PROGRAMME should result in
development that encourages strong and
stable conditions of economic growth.
Financial Plan
showing projected
growth and
(0) 1 2 3 4 5
78
monitoring
Use of local materials and services: The
PROGRAMME should result in the use of raw
materials and services from local industries
where possible.
Description of
sources (0) 1 2 3 4 5
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and
labour.
Description of
investment strategy (0) 1 2 3 4 5
Table 42: SUSTAINABILITY TEST RECORD SHEET
4) Strengthen public sector management and oversight
CRITERIA – BASIC AIMS AND OBJECTIVES SCORE REASONS
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Energy: The Activity should encourage efficient
energy use, and maximize use of renewable
rather than fossil fuels.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Pollution: Discharges of pollutants and waste 4 This policy would enhance governance, evidence-based HR
79
products to the atmosphere, water and land
should be avoided or minimised.
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Use of Raw Materials: All raw materials should be
used with maximum efficiency, and recycled
where practical.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Rivers and Water bodies: should retain their
natural character. 4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
EFFECTS ON SOCIAL AND CULTURAL CONDITIONS
Local Character: and cohesion of local
communities should be and enhanced where
practical.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Health and Well-being: The Activity should
benefit the work force, and local communities in
terms of health and well-being, nutrition, shelter,
education and cultural expression.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Job Creation: The activity should create jobs for
local people particularly women and young
people.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Access to Land: Activity should improve access
to land. 4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Access to Water: Activity should improve access
to water. 4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
80
Access to Transport: Activity should improve
access to transport. 4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Sanitation: Activity should improve sanitation. 4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
EFFECTS ON THE ECONOMY
Growth: The PPP should result in development
that encourages strong and stable conditions of
economic growth.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Use of local materials and services: The PPP
should result in the use of raw materials and
services from local industries where possible.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and labour.
4
This policy would enhance governance, evidence-based HR
decision making, prevent system failure through regular
feedback and modification for continuous improvement at all
levels.
81
Table 43: SUSTAINABILITY TEST MATRIX
5) Improve the working environment and conditions
CRITERIA – BASIC AIMS AND OBJECTIVES INDICATORS PERFORMANCE MEASURE
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
Sensitive areas
shown on GIS map (0) 1 2 3 4 5
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
Vulnerable areas
shown on GIS map (0) 1 2 3 4 5
Energy: The PROGRAMME should encourage
efficient energy use, and maximize use of
renewable rather than fossil fuels.
Quantity /type of
fuel/energy required (0) 1 2 3 4 5
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
Quantity /type of
pollutants and waste (0) 1 2 3 4 5
Use of Raw Materials: All raw materials should
be used with maximum efficiency, and
recycled where practical.
Quantity and type of
materials (0) 1 2 3 4 5
Rivers and Water bodies: should retain their
natural character.
Minimum flows/
water levels set (0) 1 2 3 4 5
EFFECTS ON SOCIAL AND CULTURAL CONDITIONS
Local Character: and cohesion of local
communities should be maintained and
enhanced where practical.
Use of GIS /
database to
highlight sensitive
areas
(0) 1 2 3 4 5
Health and Well-being: The PROGRAMME
should benefit the work force, and local
communities in terms of health and well-being,
nutrition, shelter, education and cultural
expression.
Financial or other
contribution (0) 1 2 3 4 5
82
Gender: The PROGRAMME should empower
women.
Number of women
empowered (0) 1 2 3 4 5
Work for Local People: Priority should be given
to providing jobs for local people and
particularly women and young people.
Number of people
employed (0) 1 2 3 4 5
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
Description of
proposals to meet
this aim
(0) 1 2 3 4 5
Access: to land should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to water should be improved. Number of people
assisted (0) 1 2 3 4 5
Access: to transport should be improved. Number of people
assisted (0) 1 2 3 4 5
Sanitation: Should be improved. Number of people
assisted (0) 1 2 3 4 5
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
Environmental
Report (or EIA) (0) 1 2 3 4 5
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
Occurrence
monitored (0) 1 2 3 4 5
EFFECTS ON THE ECONOMY
Growth: The PROGRAMME should result in
development that encourages strong and
stable conditions of economic growth.
Financial Plan
showing projected
growth and
monitoring
(0) 1 2 3 4 5
Use of local materials and services: The
PROGRAMME should result in the use of raw
materials and services from local industries
where possible.
Description of
sources (0) 1 2 3 4 5
83
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and
labour.
Description of
investment strategy (0) 1 2 3 4 5
Table 44: SUSTAINABILITY TEST RECORD SHEET
5) Improve the working environment and conditions
CRITERIA – BASIC AIMS AND OBJECTIVES SCORE REASONS
EFFECTS ON NATURAL RESOURCES
Protected Areas and Wildlife: should be
conserved, and these resources should be
enhanced where practical.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Degraded Land: Areas vulnerable to
degradation should be avoided, and already
degraded land should be enhanced.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Energy: The Activity should encourage efficient
energy use, and maximize use of renewable
rather than fossil fuels.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Pollution: Discharges of pollutants and waste
products to the atmosphere, water and land
should be avoided or minimised.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Use of Raw Materials: All raw materials should be
used with maximum efficiency, and recycled
where practical.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
84
Rivers and Water bodies: should retain their
natural character. 5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
EFFECTS ON SOCIAL AND CULTURAL CONDITIONS
Local Character: and cohesion of local
communities should be and enhanced where
practical.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Health and Well-being: The Activity should
benefit the work force, and local communities in
terms of health and well-being, nutrition, shelter,
education and cultural expression.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Job Creation: The activity should create jobs for
local people particularly women and young
people.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Participation: Active participation and
involvement of local communities should be
encouraged (especially vulnerable and
excluded sections).
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Access to Land: Activity should improve access
to land. 5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Access to Water: Activity should improve access
to water. 5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Access to Transport: Activity should improve
access to transport. 5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Sanitation: Activity should improve sanitation. 5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
85
on the performance of public service organizations at all levels.
Equity: Adverse and beneficial impacts from
development should be distributed equitably
and should not discriminate against any groups,
especially vulnerable and excluded people.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Vulnerability and Risk: of drought, bushfire,
floods crises and conflicts and epidemics should
be reduced.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
EFFECTS ON THE ECONOMY
Growth: The PPP should result in development
that encourages strong and stable conditions of
economic growth.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Use of local materials and services: The PPP
should result in the use of raw materials and
services from local industries where possible.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
Local Investment of Capital: Development
should encourage the local retention of capital
and the development of downstream industries,
utilising local raw materials, products and labour.
5
A well-resourced and functional Public Services Commission
with committed and dedicated staff would lead to enhanced
delivery of its functions which would thereby impact positively
on the performance of public service organizations at all levels.
86
CHAPTER FOUR
4.1 SECTOR PROGRAMME OF ACTION
INTRODUCTION
The programme of action was generated from the policy objectives, strategies and programmes of the Commission. It provides
detailed information of the activities, cost and corresponding collaborating agencies which will be engaged in the
implementation of the projects and programmes (see table below).
Table 45: Development Programmes and sub-programmes of the PSC for 2014-2017
Adopted objectives
Adopted strategies
Programmes and sub-
programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
1.Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Public Service Human Resource Management Sub; Performance Management System and Organisational Development and Management (PMS)
Develop and implement performance management systems in all public service organizations
Accra Number. of Public Service Organizations implementing the new performance appraisal instruments
149,989 PSC(MSD)
Selected Public Service Institutions
87
Table 46– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF
Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
Established HRMIS in all public service organizations
Country-Wide
Number of MDAs covered and captured into the HRMIS systems
1,434,990 PSC (MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
88
Table47 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2.Sensitize staff of public service organizations on the Policy Framework and Manual. 3.Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
Develop and implement Human Resource Management Policy Framework and Manual in the public services
Country-Wide
Number. of Public Service Organizations implementing the HR Policy framework and Manual
127,500 PSC OHCS, GSS, GHS, GES, LGSS, MOFEP, GIMPA, MDPI, SEC, IHP, AUDIT SERVICE, IMMIG. SERVICE, Consultant
89
Table 48 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Develop and implement the governance manual for the public service
Country-Wide
Number of Public Service Organizations trained and implementing the Governance Manual
307,700 PSC Governing Boards/Councils
90
Table 49 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted strategies Programmes
and sub-programmes
Projects Location
Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration
Sub-Programme: General Administration and Finance
Rehabilitate the commission building, purchase office equipment’s and review and implement the new conditions of service
Accra No. of Offices rehabilitated and rehabilitated b.percentage Level of implementation of the condition of service
270,000 PSC(F&A)
PWD,AESL
91
Table 50 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location
Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i) Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organise VCT for
Staff and distribute
6000 female and
male condoms to
staff of the
Commission
Accra Number of VCT organized No.of Male and female condoms distributed
30,000 PSC(F&A)
Ghana Aids Commission
SUB-TOTAL 2014 GH₡2,320,179.00
92
Table 51– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
1.Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Public Service Human Resource Management Sub; Performance Management System and Organizational Development and Management (PMS)
Implement performance management systems in all public service organizations 2.Organisational development in public service institutions
Country-Wide
Number. of Public Service Organizations implementing the new performance appraisal instruments
169,989 PSC (MSD)
Selected Public Service Institutions
93
Table 52– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF
Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
Established HRMIS in all public service organizations
Country-Wide
Number of MDAs covered and captured into the HRMIS systems
1,634,990 PSC (MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
94
Table 53– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2.Sensitize staff of public service organizations on the Policy Framework and Manual. 3.Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
Develop and implement Human Resource Management Policy Framework and Manual in the public services
Country-Wide
Number. of Public Service Organizations implementing the HR Policy framework and Manual
146,500 PSC OHCS, GSS, GHS, GES, LGSS, MOFEP, GIMPA, MDPI, SEC, IHP, AUDIT SERVICE, IMMIG. SERVICE, Consultant
95
Table 54 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Develop and implement the governance manual for the public service
Country-Wide
Number of Public Service Organizations trained and implementing the Governance Manual
407,700 PSC Governing Boards/Councils
96
Table 55– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration
Sub-Programme: General Administration and Finance
1.Rehabilitate the commission building and purchase office equipment 2.Review and implement the Conditions of service for PSC staff
Accra No. of Offices rehabilitated and rehabilitated b.percentage Level of implementation of the condition of service
363,900 PSC(F&A)
PWD,AESL
97
Table 56 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i)Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organise VCT
for Staff and
distribute 3000
female and
male condoms
to staff of the
Commission
Accra Number of VCT organized No.of Male and female condoms distributed
20,000 PSC(F&A) Ghana Aids Commission
SUB-TOTAL 2015 GH₡2,743,079.00
98
Table 57– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted strategies Programmes and
sub-programmes Projects Loca
tion Indicators Time frame Indicative Budget Implementing
Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
1.Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Public Service Human Resource Management Sub; Performance Management System and Organizational Development and Management
implement performance management systems in all public service organizations 2.Organisational development in public service institutions
Country-Wide
Number. of Public Service Organizations implementing the new performance appraisal instruments
189,004 PSC(MSD)
Selected Public Service Institutions
99
Table 58 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted strategies Programmes and
sub-programmes Projects Location Indicators Time frame Indicative Budget Implementing
Agencies
2014
2015
2016
2017
GoG GH₡
IGF
Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
Established HRMIS in all public service organizations
Country-Wide
Number of MDAs covered and captured into the HRMIS systems
1,934,789 PSC (MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
100
Table 59 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2.Sensitize staff of public service organizations on the Policy Framework and Manual. 3.Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
Develop and implement Human Resource Management Policy Framework and Manual in the public services
Country-Wide
Number. of Public Service Organizations implementing the HR Policy framework and Manual
227,500 PSC OHCS, GSS, GHS, GES, LGSS, MOFEP, GIMPA, MDPI, SEC, IHP, AUDIT SERVICE, IMMIG. SERVICE, Consultant
101
Table 60 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes and sub-programmes
Projects Location
Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Develop and implement the governance manual for the public service
Country-Wide
Number of Public Service Organizations trained and implementing the Governance Manual
487,700 PSC Governing Boards/Councils
102
Table 61– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration
Sub-Programme: General Administration and Finance
1.Rehabilitate the commission building and purchase office equipment 2.Review and implement the Conditions of service for PSC staff
Accra No. of Offices rehabilitated and rehabilitated b.percentage Level of implementation of the condition of service
473,900 PSC(F&A)
PWD,AESL
103
Table 62– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i) Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organize VCT for
Staff and
distribute 4000
female and male
condoms to staff
of the
Commission
Accra Number of VCT organized No.of Male and female condoms distributed
35,000 PSC(F&A) Ghana Aids Commission
SUB-TOTAL 2016 GH₡3,347,893.00
104
Table 63– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes and sub-programmes
Projects Location
Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
1.Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Public Service Human Resource Management Sub; Performance Management System and Organizational Development and Management (PMS)
Monitor and evaluate the performance management systems in all public service organizations 2.Organisational development in public service institutions
Country-Wide
Number. of Public Service Organizations implementing the new performance appraisal instruments
329,989 PSC(MSD)
Selected Public Service Institutions
105
Table 64 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes and sub-
programmes Projects Location Indicators Time frame Indicative Budget Implementing
Agencies
2014
2015
2016
2017
GoG GH₡
IGF
Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
Established HRMIS in all public service organizations
Country-Wide
Number of MDAs covered and captured into the HRMIS systems
2,434,990 PSC (MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
106
Table 65– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted strategies Programmes
and sub-programmes
Projects Location
Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2.Sensitize staff of public service organizations on the Policy Framework and Manual. 3.Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
Develop and implement Human Resource Management Policy Framework and Manual in the public services
Country-Wide
Number. of Public Service Organizations implementing the HR Policy framework and Manual
297,508 PSC OHCS, GSS, GHS, GES, LGSS, MOFEP, GIMPA, MDPI, SEC, IHP, AUDIT SERVICE, IMMIG. SERVICE, Consultant
107
Table 66– Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Develop and implement the governance manual for the public service
Country-Wide
Number of Public Service Organizations trained and implementing the Governance Manual
498,890 PSC Governing Boards/Councils
108
Table 67 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration
Sub-Programme: General Administration and Finance
1.Rehabilitate the commission building and purchase office equipment 2.Review and implement the Conditions of service for PSC staff
Accra No. of Offices rehabilitated and rehabilitated b.percentage Level of implementation of the condition of service
663,900 PSC(F&A)
PWD,AESL
109
Table 68 – Development Programmes and sub-programmes of the MDA for 2014-2017 Adopted
objectives Adopted
strategies Programmes
and sub-programmes
Projects Location Indicators Time frame Indicative Budget Implementing Agencies
2014
2015
2016
2017
GoG GH₡
IGF Donor
Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i) Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organize VCT
for Staff and
distribute 4000
female and
male condoms
to staff of the
Commission
Accra Number of VCT organized No.of Male and female condoms
28,000 PSC(F&A) Ghana Aids Commission
SUB-TOTAL 2017 GH₡4,253,277.00
GRAND TOTAL GH₡12,664,428.00
110
4.3 Indicative Financial Plan
In line with the Medium Term Development Plan, the PSC has come out with a comprehensive programme of action from 2014 –
2017. In order to facilitate the implementation of the plan, the PSC has prepared an Annual Action Plans for implementation from
2014 to 2017.The Annual Action Plan was taken from the Medium Term Development Plan of the PSC. The total cost for the
implementation of the Annual Action for 2014 is estimated at GH₡2,320,179.00.
The chunk of the funds for the implementation of some of the activities identified will come from the Government of Ghana.
Proposals will be written to other donors to assist financially in the implementation of the Medium Term Development Plan. The total
cost of the MTDP is estimated at Twelve Million, Six Hundred and Forty-Four Thousand, Four Hundred and Twenty-Eight Ghana Cedis
(GH¢ 12,644,428.00. It is therefore incumbent on the Commission due to its experience of low budgetary allocation to explore other
indigenous ways of mobilizing revenue for the implementation of the plan as outlined in the strategic plan.
As part of the strategy, the Commission will lobby MOFEP to re-adjust upwards the budget ceiling for the Commission. Attempts will
be made to discuss with MOFEP the possibility of using part if not all of the internally generated funds for implementation of
activities in the annual action plans.
Proposal writing for donor support will vigorously be pursued. Collaboration and effective coordination will be encouraged among
MDAs with similar programmes to avoid duplication of financial resources. The PSC will also ensure a prudent financial
management in the areas of expenditure controls and management. Expenditure will be carried to ensure value for money and all
procurements will be done in accordance with the provision as outlined in the Public Procurement Act, Act 663.
In all the underlying issues above, the Commission will play a very proactive role in the seeking of donors, ensure an expeditious
financial management and collaborate and coordinate with other stakeholders especially those in the MDAs to avoid duplication
of financial and material resources
The implementation of the Annual Action Plan would among others address the training needs of the Commission as well as the re-
equipping and re-tooling of the necessary logistics and equipment for the effective functioning of the Commission.
The PSC will channel its budgetary allocation from the Government of Ghana for the implementation of the Annual action plan.
Other development partners and donors such as the Friedrich Ebert Foundation, USAID, GTZ, SNV and will be consulted for
technical, material and financial assistance to enable the Commission implement this Annual Action Plan.
111
Chapter 5
ANNUA ACTION PLANS
The Annual Action Plans was generated from the policy objectives, strategies and programmes of the Commission. It provides
detailed information of the activities, cost, the quarterly scheduled activities and corresponding collaborating agencies which will
be engaged in the implementation of the projects and programmes (see table below).
Table 69- ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG
GH₡
IGF
Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organisational Development and Management (PMS)
(I)Facilitate review and development of job description and scheme of service for fifty(50) public service organizations
Accra No.of job description and scheme of service develop and reviewed
12,000.00
PSC(MSD) Selected Public Service Institutions
112
Table 70- ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG
GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organisational Development and Management (PMS)
(ii) Issue out performance management policies to public service organizations
Accra No.of Public service urganisation issued with the PMS
8,000.00
PSC(MSD) Selected Public Service Institutions
113
Table 71- ANNUAL ACTION PLANS 2014
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
iii) Professionalize HR Function in the public service
Accra No.of public service organisation trained in the profesionalisation of their HR
50,000
PSC(MSD) Selected Public Service Institutions
114
Table 72- ANNUAL ACTION PLANS 2014
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organisational Development and Management (PMS)
iv) Facilitate training programmes in performance management
Accra No. of training organised for public service organisations in PMS
30,000
PSC(MSD) Selected Public Service Institutions
115
Table 73- ANNUAL ACTION PLANS 2014
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
v) Monitor and evaluate the Performance Management System
Accra 8,700.00
PSC(MSD) Selected Public Service Institutions
116
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
i)Sensitise
end users
of pilot
MDAs on
the
establishme
nt of the
HRMIS
Accra No.of staff trained in the HRMIS
17,500.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
ii)Build the
capacity of
the end
users of the
HRMIS
Accra
23,500.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
117
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
iii)Recruit
technical teams
for the
implementatio
n of the
HRMIS
Accra No.of Pilot MMDAs and MDAs established on the system
175,200.00
PSC MOFEP
iv)Facilitate
the
establishment
of the system
in the pilot
MDAs and
MMDAs
Accra
105,200.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
118
Table 76 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
v) Validate
the
operation
of the
HRMIS
Accra
27,000.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
vi)Monitor
and
evaluate
the
performanc
e of
HRMIS
Accra
45,000.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
119
Table 77 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1. Design and implement Human Resource Management Information System (HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
vii) Roll out
the system to
50 MDAs
and MMDAs
Accra No.of MDA s and MMDAs roll out
50,000.00
PSC(MSD) Selected Public Service Institutions
viii)Generate
annual report
on the state
of the
HRMIS
Accra
15,000.00
PSC(MSD) OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
120
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
i) Launch the
Human
Resource
Policy
Framework
and Manual
Accra No.of public service organisations sensitised
20,000.00
PSC(HRPD) Selected Public Service Institutions
ii) Sensitize
Heads of
public
service
organization
and Human
Resource
Managers
Accra 15,000.00
PSC(HRPD) Selected Public Service Institutions
121
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
iii)Build
capacity
of Human
Resource
Managers.
Accra
No.of human resource managers trained
21,000.00
PSC(HRPD)
Selected Public Service Institutions
iv)Monito
r and
Evaluate
the use of
the HR
manual in
the MDAs
and
MMDAs
21,000.00
PSC(HRPD)
Selected Public Service Institutions
122
Table 80 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF
Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
v) Generate
report on the
state of
recruitment
and career
development
in the public
service
Accra
No.of reports produced
18,000.00
PSC(HRPD) PSC
vi) Establish
Counseling
Unit.
7,000.00
PSC(HRPD) PSC
123
Table 81 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
vii) Conduct
three
promotional
Exams for
the Public
Services
annually.
Country-wide
No of
Public
Service
Qualifying
Promotion
Examinati
ons
Conducted
.
% of
petitions
and
complaint
s resolved
13,500.00
PSC(HRPD) Selected Public Service Institutions
viii)Process
Petitions
and
Complaints
from public
servants,
MDAs and
MMDAs
Country-wide
2,000.00
PSC(HRPD) Selected Public Service Institutions
124
Table 82 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
i) Launch
governance
manual for the
public service
Country-wide
No.of Boards members, CEO s and Chief Directors trained
20,000.00
PSC Presidency, Governing Board/Council, Council of State
ii) Sensitize
Boards and
Management
of public
service
organizations
on the manual
Country-wide
15,000.00
PSC Presidency, Governing Board/Council, Council of State
125
Table 83 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
iii)Monitor,
evaluate and
generate
report on
the use of
the manual
Country-wide
No.of Conference organized
20,000.00
PSC Presidency, Governing Board/Council, Council of State
Organize
Annual
Conference
of Chief
Directors,
Chief
Executives,
and
Governing
Boards.
Country-wide
40,000.00
PSC Presidency, Governing Board/Council, Council of State
Chief Directors,
Chief Executives
126
Table 84 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Organize
Annual
conference
of Human
Resource
Managers of
public
service
organization
Country-wide
No.of HR Managers conference organized No.of AU/Africa Public Service Day organized
21,000 PSC Selected Public Service Institutions
Organize
Annual
Activities to
commemora
te the
UN/AU
Public
Service Day
Country-wide
40,000 PSC Selected Public Service Institutions
127
Table 85 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd
3rd 4th GoG IGF
Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration
Sub-Programme: General Administration and Finance
i)Conduct structural
defects of the
Commission
building
ii) Purchase office
equipment
iii) Purchase 2
vehicles and a new
engine
Accra Commission building rehabilitated No.of computers,no.ofprinters procured No.of vehicles procured Condition of service document produced
1. OO
30,000 40,000 140,393
PSC PWD,AESL, Service Providers
2.Review and
develop a new
Conditions of
service for PSC
staff
Accra
10,000 PSC FW&SC,MOF
128
Table 86 ANNUAL ACTION PLANS 2014
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd
3rd 4th GoG IGF
Donor
Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i) Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organize VCT for
Staff of the
Commission
Accra No.VCT organized No. of male and female condoms distributed to staff
30,000
PSC Ghana Aids Commission
Distribute 3000
female and male
condoms to staff of
the Commission
10,000 PSC Ghana Aids Commission
129
Table 87 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG
GH₡
IGF
Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organisational Development and Management (PMS)
Develop a new Service Charter for the Commission
Accra No. of service charter developed for the commison
17,000.00
PSC(MSD) HRPD,RIME,F&A
130
Table 88 - ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG
GH₡
IGF
Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organisational Development and Management (PMS)
(I)Facilitate review and development of job description and scheme of service for Sixty (60) public service organizations
Accra No of job
description and scheme of service developed
27,000.00
PSC(MSD) Selected Public Service Institutions
131
Table 89- ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG
GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
(ii) Development
of Proposal and
Assessment
Instruments for
review
Accra No of proposals
developed 8,000.00
PSC(MSD) Selected Public Service Institutions
132
Table 90- ANNUAL ACTION PLANS 2015
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd 3rd 4th
GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
iii) Submission of
Second Draft for
approval by the
Commission for
Stakeholder
Consultations
Accra 50,000
PSC(MSD) Selected Public Service Institutions
133
Table 91- ANNUAL ACTION PLANS 2015
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th
GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
iv) Organize Stakeholder
Consultations on
the Draft
Document
Accra 30,000
PSC(MSD) Selected Public Service Institutions
134
Table 92- ANNUAL ACTION PLANS 2015
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
Printing of the
Guidelines for
distribution to
Client
Organizations
Launching/Pu
blication and
Distribution
of the
Instruments
Accra No of
guidelines
produced
8,700.00
PSC(MSD) Selected Public Service Institutions
135
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1. Design and implement Human Resource Management Information System (HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
i)Sensitise
end users
of some
selected
MDAs on
the
establishme
nt of the
HRMIS
(phase 2)
Accra 17,500.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
ii)Build the
capacity of
the end
users of the
HRMIS
Accra
43,500.00
PSC(MSD)
Selected Public Service Institutions
PSCs PSCs PSCs Annual Locati Output Quarterly Time schedule Indicative Budget Implementing Agencies
136
Adopted Policy objectives
Adopted Strategies
Programmes and Sub-programmes
Activities on Indicators 1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
iii)Recruit
Specialist(data
and computer
specialist) for
the
implementatio
n of the
HRMIS
Accra
75,200.00
PSC MOF
iv)Facilitate
the
establishment
of the system
in some
selected
MDAs and
MMDAs
Accra
105,200.00
PSC(MSD)
Selected Public Service Institutions
137
Table 95 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
v) Validate
the
operation
of the
HRMIS
Accra
27,000.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
vi)Monitor
and
evaluate
the
performanc
e of
HRMIS
Accra
45,000.00
PSC(MSD)
OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
138
Table 96 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1. Design and implement Human Resource Management Information System (HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
vii) Roll out
the system to
100 MDAs
and MMDAs
Accra
100,000.00
PSC(MSD) Selected Public Service Institutions
viii) Generate
annual report
on the state of
the HRMIS
Accra
25,000.00
PSC(MSD) OHCS, GSS, KACE, GHS, GES, NITA, LGSS, CAG, MOFEP
139
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
i) Print 2000
copies of the
Human
Resource
Management
Policy
Framework
and Manual
Accra
30,000.00
PSC(HRPD) Selected Public Service Institutions
ii) Sensitize
Heads of
public
service
organization
and Human
Resource
Managers
Accra 55,000.00
PSC(HRPD) Selected Public Service Institutions
140
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
iii) Build
capacity of
Human
Resource
Managers.
Accra
23,000.00
PSC(HRPD)
Selected Public Service Institutions
iv)Monitor
and
Evaluate
the use of
the HR
manual in
the MDAs
and
MMDAs
23,000.00
PSC(HRPD)
Selected Public Service Institutions
141
Table 99 : ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF
Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
v) Generate
report on
the state of
recruitment
and career
developmen
t in the
public
service
Accra
20,000.00
PSC(HRPD) PSC
vi) Purchase
office
equipment
for the
Counseling
Unit.
20,000.00
PSC(HRPD) PSC
142
Table 100 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
vii) Conduct
three
promotional
Exams for
the Public
Services
annually.
Country-wide
No.of
Public
Service
Qualifying
Promotion
Examinati
ons
Conducted
.
% of
petitions
and
complaint
s resolved
14,500.00
PSC(HRPD) Selected Public Service Institutions
viii)Process
Petitions
and
Complaints
from public
servants,
MDAs and
MMDAs
Country-wide
3,000.00
PSC(HRPD) Selected Public Service Institutions
143
Table 101 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
i) Print 2000
copies of the
Governance
manual for the
public service
Country-wide
25,000.00
PSC Presidency, Governing Board/Council, Council of State
ii) Sensitize
Boards and
Management
of public
service
organizations
on the manual
Country-wide
48,000.00
PSC Presidency, Governing Board/Council, Council of State
144
Table 102 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
iii)Monitor,
evaluate and
generate
report on
the use of
the manual
Country-wide
No of Conference organized
20,000.00
PSC Presidency, Governing Board/Council, Council of State
Organize
Annual
Conference
of Chief
Directors,
Chief
Executives,
and
Governing
Boards.
Country-wide
60,000.00
PSC Presidency, Governing Board/Council, Council of State
Chief Directors,
Chief Executives
145
Table 103 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Organize
Annual
conference
of Human
Resource
Managers of
public
service
organization
Country-wide
No.of HR Managers conference organized AU/Africa Public Service Day organized
31,000 PSC Selected Public Service Institutions
Organize
Annual
Activities to
commemora
te the
UN/AU
Public
Service Day
Country-wide
55,000 PSC Selected Public Service Institutions
146
Table 104 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd
3rd 4th GoG IGF
Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration Sub-Programme: General Administration and Finance
i) Rehabilitee some
selected offices of the
Commission building
ii) Purchase Printers
Laptops and Air
conditioners for the
Commission
iii) Purchase one
utility vehicle, Motor
bike and major body
works on the
Commission Bus
Accra
120,000 80,000 300,000
PSC PWD,AESL, Service Providers
2.Implemet the new
Conditions of service
for PSC staff
(Organize staff
meeting on the
Conditions of Service
Accra
180,000 PSC MOF
147
Table 105 ANNUAL ACTION PLANS 2015
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget
Implementing Agencies
1st 2nd 3rd 4th GoG IGF
Donor
Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i) Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organize VCT for
Staff of the
Commission
Accra
10,000
PSC Ghana Aids Commission
Distribute 4000
female and male
condoms to staff of
the Commission
12,000 PSC Ghana Aids Commission
148
Table 106- ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG
GH₡
IGF
Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
(I)Facilitate review and development of job description and scheme of service for Seventy (70) public service organizations
Accra 21,000.00
PSC(MSD) Selected Public Service Institutions
149
Table 107- ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd
3rd 4th GoG
GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
(ii) Development of
Proposal on Scope of
Monitoring/Evaluation
for review
Accra
8,000.00
PSC(MSD) Selected Public Service Institutions
150
Table 108- ANNUAL ACTION PLANS 2016
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
iii) Development of
draft Data Collection
Instruments for review
Accra 12,000.00
PSC(MSD) Selected Public Service Institutions
151
Table- ANNUAL ACTION PLANS 2016
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
iv) Submission of
Second Draft for
approval by the
Commission for
Stakeholder
Consultations
Accra 7,000
PSC(MSD) Selected Public Service Institutions
152
Table- ANNUAL ACTION PLANS 2016
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF
Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
v) Stakeholder
Consultations on the
adoption of the Data
Collection
Instruments
vi) Conduct ,submit
and disseminate
Survey Report
Accra 15,700.00
PSC(MSD) Selected Public Service Institutions
153
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
i) Sensitise
and build
capacity of
end users of
some selected
MDAs on the
establishment
of the HRMIS
(phase 3
Accra 37,500.00
PSC(MSD)
Selected Public Service Institutions
)Facilitate the
establishment
of the system
in some
selected
MDAs and
MMDAs
Accra
69,500.00
PSC(MSD)
Selected Public Service Institutions
PSCs PSCs PSCs Annual Locati Output Quarterly Time schedule Indicative Budget Implementing Agencies
154
Adopted Policy objectives
Adopted Strategies
Programmes and Sub-programmes
Activities on Indicators 1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
iii) Roll out the
system to 250
MDAs and
MMDAs
Country-wide
17,200.00
PSC Selected Public Service Institutions
155
Table 12 ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
v) Conduct
monitoring
and
evaluation
exercise
Accra
45,000.00
PSC(MSD)
Selected Public Service Institutions
vi) Generate
annual
report on
the state of
the HRMIS
21,000 PSC(MSD)
Selected Public Service Institutions
156
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
i) Print 2000
copies of the
Human
Resource
Policy
Framework
and Manual
Accra
27,000.00
PSC(HRPD) Selected Public Service Institutions
ii) Sensitize
Heads of
public
service
organization
and Human
Resource
Managers
Accra 45,000.00
PSC(HRPD) Selected Public Service Institutions
157
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
iii)Build
capacity of
Human
Resource
Managers.
Accra
44,000.00
PSC(HRPD)
Selected Public Service Institutions
iv)Monitor
and
Evaluate the
use of the
HR manual
in the
MDAs and
MMDAs
25,000.00
PSC(HRPD)
Selected Public Service Institutions
158
ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF
Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
v) Generate
report on the
state of
recruitment
and career
development
in the public
service
Accra
18,000.00
PSC(HRPD) PSC
vi) Purchase
office
equipment
for the
Counseling
Unit.
10,000.00
PSC(HRPD) PSC
159
ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
vii) Conduct
three
promotional
Exams for
the Public
Services
annually.
Country-wide
No of
Public
Service
Qualifying
Promotion
Examinati
ons
Conducted
.
% of
petitions
and
complaint
s resolved
15,500.00
PSC(HRPD) Selected Public Service Institutions
viii)Process
Petitions
and
Complaints
from public
servants,
MDAs and
MMDAs
Country-wide
5,000.00
PSC(HRPD) Selected Public Service Institutions
160
ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
i) Print 100
copies of the
Governance
Manual for
the public
service
Country-wide
18,000.00
PSC Presidency, Governing Board/Council, Council of State
ii) Sensitize
Boards and
Management
of public
service
organizations
on the manual
Country-wide
65,000.00
PSC Presidency, Governing Board/Council, Council of State
161
ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
iii)Monitor,
evaluate and
generate report
on the use of
the manual
Country-wide
No of Conference organized
20,000.00
PSC Presidency, Governing Board/Council, Council of State
Organize
Annual
Conference of
Chief
Directors,
Chief
Executives,
and Governing
Boards.
Country-wide
75,000.00
PSC Presidency, Governing Board/Council, Council of State
Chief Directors,
Chief Executives
162
ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Organize
Annual
conference
of Human
Resource
Managers of
public
service
organization
Country-wide
No of HR Managers conference organized AU/Africa Public Service Day organized
34,000 PSC Selected Public Service Institutions
Organize
Annual
Activities to
commemora
te the
UN/AU
Public
Service Day
Country-wide
70,000 PSC Selected Public Service Institutions
163
ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd
3rd 4th GoG IGF
Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration
Sub-Programme: General Administration and Finance
i) Rehabilitee some
selected offices of the
Commission building
ii) Purchase Heavy
Duty Photocopiers,
Computers ,Office
Chairs and Tables
iii) Purchase two 4X4
Cross country vehicle,
and 1 Saloon Vehicle
Accra
230,000 140,000 440,393
PSC PWD,AESL, Service Providers
2.Review and develop
a new Conditions of
service for PSC staff
Accra
140,000 PSC MoF
164
ANNUAL ACTION PLANS 2016
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd
3rd 4th GoG IGF
Donor
Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i) Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organize VCT for
Staff of the
Commission
Accra
15,000
PSC Ghana Aids Commission
Distribute 3000
female and male
condoms to staff
of the Commission
20,000 PSC Ghana Aids Commission
165
Table 12- ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG
GH₡
IGF
Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organisational Development and Management (PMS)
(I)Facilitate review and development of job description and scheme of service for fifty(50) public service organizations
Accra 13,000.00
PSC(MSD) Selected Public Service Institutions
166
Table- ANNUAL ACTION PLANS 2017
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organisational Development and Management (PMS)
iii) Professionalize HR Function in the public service
Accra 70,000
PSC(MSD) Selected Public Service Institutions
167
Table- ANNUAL ACTION PLANS 2017
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd
3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
iv) Facilitate training programmes in performance management
Accra 60,000
PSC(MSD) Public Service Institutions
168
Table- ANNUAL ACTION PLANS 2017
PSC Adopted Policy objectives
PSC Adopted Strategies
PSC Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
Enhance supervision and productivity in the public service
1.Institutionalise performance management policy in the public service 2.Strenghten capacity to implement performance management system at all functional levels in public service organisations
Performance Management System and Organizational Development and Management (PMS)
v) Monitor and evaluate the Performance Management System
Accra 9,700.00
PSC(MSD) All Public Service Institutions
169
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
i)Facilitate
the
establishme
nt of the
system in
all MDAs
and
MMDAs
Country-wide
45,500.00
PSC(MSD) All Public Service Institutions
170
Table 12 ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1.Design and implement Human Resource Management Information System(HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
v) Validate
the
operation
of the
HRMIS
Accra
27,000.00
PSC(MSD)
All Public Service Institutions
vi)Monitor
and
evaluate
the
performanc
e of
HRMIS
Accra
45,000.00
PSC(MSD)
All Public Service Institutions
171
Table 12 ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location Output Indicators
Quarterly Time schedule Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG GH₡
IGF Donor
Lead Collaborating
2.Establish a reliable public service-wide human resource management information system
1. Design and implement Human Resource Management Information System (HRMIS). 2.Co-ordinate capacity building of public service. organizations for effective implementation of the HRMIS 3.Analyse and disseminate data on HR in the public service
Public Service Human Resource Management Sub; Research ,information, monitoring and Evaluation
vii) Roll out
the system to
all MDAs
and MMDAs
Accra
150,000.00
PSC(MSD) All Public Service Institutions
viii)Generate
annual report
on the state
of the
HRMIS
Accra
20,000.00
PSC(MSD) All Public Service Institutions
172
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
i) Print 500
copies of the
Human
Resource
Policy
Framework
and Manual
Accra
17,000.00
PSC(HRPD) Selected Public Service Institutions
ii) Sensitize
Heads of
public
service
organization
and Human
Resource
Managers
Accra 35,000.00
PSC(HRPD) Selected Public Service Institutions
173
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st
2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
iii)Monitor
and
Evaluate
the use of
the HR
manual in
the MDAs
and
MMDAs
Accra
33,000.00
PSC(HRPD)
Selected Public Service Institutions
174
ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF
Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
v) Generate
report on the
state of
recruitment
and career
development
in the public
service
Accra
18,000.00
PSC(HRPD) PSC
175
ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
3.Promote excellence in people management
1.Develop a comprehensive policy framework and manual to guide human resource governance and management in the Public Service. 2. Sensitize staff of public service organizations on the Policy Framework and Manual. 3. Build capacity of the Public Service for effective implementation of the Policy Framework and Manual.
Public Service Human Resource Management Sub; Recruitment and Career Development
vii) Conduct
three
promotional
Exams for
the Public
Services
annually.
Country-wide
No of
Public
Service
Qualifying
Promotion
Examinati
ons
Conducted
.
% of
petitions
and
complaint
s resolved
16,500.00
PSC(HRPD) Selected Public Service Institutions
viii)Process
Petitions
and
Complaints
from public
servants,
MDAs and
MMDAs
Country-wide
8,000.00
PSC(HRPD) Selected Public Service Institutions
176
ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
i) Print 500
copies of the
Governance
Manual for
the public
service
Country-wide
20,000.00
PSC Presidency, Governing Board/Council, Council of State
ii) Sensitize
Boards and
Management
of public
service
organizations
on the manual
Country-wide
45,000.00
PSC Presidency, Governing Board/Council, Council of State
177
ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
iii)Monitor,
evaluate and
generate
report on
the use of
the manual
Country-wide
No of Conference organized
20,000.00
PSC Presidency, Governing Board/Council, Council of State
Organize
Annual
Conference
of Chief
Directors,
Chief
Executives,
and
Governing
Boards.
Country-wide
80,000.00
PSC Presidency, Governing Board/Council, Council of State
Chief Directors,
Chief Executives
178
ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities
Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd 3rd 4th GoG IGF Donor
Lead Collaborating
4.Strengthen public sector management and oversight
1.Standardise rules, regulations and performance measures governing public sector management 2.Instutionalise training of public sector boards and Chief Executives
Public Service Human Resource Management Sub; Governance
Organize
Annual
conference
of Human
Resource
Managers of
public
service
organization
Country-wide
No of Managers conference organized AU/Africa Public Service Day organized
39,000 PSC Selected Public Service Institutions
Organize
Annual
Activities to
commemora
te the
UN/AU
Public
Service Day
Country-wide
80,000 PSC Selected Public Service Institutions
179
ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd
3rd 4th GoG IGF
Donor
Lead Collaborating
5.Improve the working environment and conditions
1.Upgrade the infrastructural base of the Commission 2.Review conditions of service in accordance with prevailing Government Policy
Management and Administration
Sub-Programme: General Administration and Finance
i) ) Rehabilitee some
selected offices of the
Commission building
ii) Purchase Heavy
Duty Photocopiers,
Computers ,Office
Chairs and Tables
iii) Purchase One 4X4
Cross country vehicle,
and 3 Saloon Vehicle
Accra
330,000 140,000 440,393
PSC PWD,AESL, Service Providers
2.Review and develop
a new Conditions of
service for PSC staff
Accra
179,000 PSC MoF
180
ANNUAL ACTION PLANS 2017
PSCs Adopted Policy objectives
PSCs Adopted Strategies
PSCs Programmes and Sub-programmes
Annual Activities Location
Output Indicators
Quarterly Time schedule
Indicative Budget Implementing Agencies
1st 2nd
3rd 4th GoG IGF
Donor
Lead Collaborating
6.Promote the reduction of HIV/AIDS/STI/TB transmission, its proper management and promote healthy lifestyle
i) Intensify education of staff to reduce infection and impact of HIV, AIDS and TB ii) Improve access to testing, counseling and use of condoms for PSC staff
Management and Administration
Sub-Programme: General Administration and Finance
Organize VCT for
Staff of the
Commission
Accra
10,000
PSC Ghana Aids Commission
Distribute 3000
female and male
condoms to staff of
the Commission
14,000 PSC Ghana Aids Commission
181