![Page 1: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/1.jpg)
Commercial Street Bridge
Feasibility StudySR 376, SEC A62
PUBLIC MEETING
November 13, 2019
Frick Environmental Center
![Page 2: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/2.jpg)
Project Team
PennDOT District 11-0 Design Division
• Doug Seeley, P.E. –
Assistant District Executive, Design
• Michael Szurley, P.E. – Project Manager
HDR
• Roger Eaton, P.E. –
Lead Bridge Designer/Deputy Project Manager
![Page 3: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/3.jpg)
Project Location
Source: United States Geological Survey
North American Datum of 1983 (NAD83)
World Geodetic System of 1984 (WGS84)
Pittsburgh East, PA 2016
Frick
Environmental
Center
![Page 4: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/4.jpg)
Proximity to Squirrel Hill Tunnel
IRISH CENTER
![Page 5: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/5.jpg)
Overview Points
Completed in 1951, the Commercial Street Bridge is nearly 70 years old.
The structure carries approximately 100,000 vehicles per day, but does not allow permit loads due to insufficient load-carrying capacity.
![Page 6: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/6.jpg)
Major Past Rehabilitation
Construction completed in 1951
1980 Rehabilitation • Deck widened by 2 feet in both directions
• Concrete wearing surface removed and replaced
• Latex overlay added
![Page 7: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/7.jpg)
Major Past Rehabilitation
2007 Rehabilitation • Joint replacements
• Hydro-demolition and latex wearing surface
• Concrete substructure repairs
• Floorbeam repair
![Page 8: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/8.jpg)
Major Past Rehabilitation
2012 Rehabilitation • Replace select expansion joints with
strip seal dams
• Strengthen fascia (outer) stringer
• Install column bracing at top of arch spans
• Miscellaneous concrete spall repairs
![Page 9: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/9.jpg)
Current Condition
Numerous concrete spalls
Cracks up to ¼” wide in some locations
Active corrosion is evident throughout the structure
The condition of the deck, floor system, and arch spandrel columns prevent the bridge from carrying large/oversize vehicles
Another rehabilitation will be needed soon to prevent load restrictions
![Page 10: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/10.jpg)
Study Phase Chronology
March, 2019: Project Purpose and Need Approved: “Address deficiencies of the Commercial Street Bridge in order to provide a safe and efficient bridge”.
April, 2019: Feasibility of rehabilitation options completed. Several rehabilitation options were evaluated and determined not to meet Purpose & Need or Secretary of the Interior criteria.
May, 2019: Historic Bridge Rehabilitation Analysis findings approved by FHWA.
Sept, 2019: Historic Bridge Rehabilitation Analysis findings approved by PA State Historic Preservation Office.
Today: Evaluation of structure replacement options in progress.
![Page 11: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/11.jpg)
Bridge Replacement Options
Two construction methods considered:
Staged Construction• Build new bridge in 3 partial-width steps;
• Maintains 2 lanes of traffic in each direction during peak hours.
Slide-In Construction • Build new bridge beside existing and slide into place;
• Short-term closure of I-376 required.
![Page 12: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/12.jpg)
Staged Construction Sequence
N
![Page 13: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/13.jpg)
Staged Construction Sequence
N
![Page 14: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/14.jpg)
Staged Construction Sequence
N
![Page 15: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/15.jpg)
Staged Construction Sequence
N
![Page 16: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/16.jpg)
Staged Construction Sequence
N
![Page 17: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/17.jpg)
Staged Construction Sequence
N
![Page 18: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/18.jpg)
Bridge Types- Staged Construction
Steel Arch
Concrete Arch
Haunched Steel Plate Girder
![Page 19: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/19.jpg)
Concrete Arch
![Page 20: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/20.jpg)
Haunched Steel Plate Girder
![Page 21: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/21.jpg)
Slide-In Construction Sequence
N
![Page 22: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/22.jpg)
Slide-In Construction Sequence
N
![Page 23: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/23.jpg)
Slide-In Construction Sequence
N
![Page 24: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/24.jpg)
Slide-In Construction Sequence
N
![Page 25: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/25.jpg)
Bridge Types- Slide-In Construction
Haunched Steel Plate Girder
Steel Tied Arch
![Page 26: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/26.jpg)
Steel Tied Arch
![Page 27: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/27.jpg)
Haunched Steel Plate Girder
![Page 28: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/28.jpg)
Next Steps
1. Initiate Section 106 - Completed
2. Identify & Document Historic Resources - Completed
3. Complete Section 106 Consultation • Assess Effects
• Resolve Adverse Effects
4. Select Preferred Alternative
5. Perform Preliminary & Final Design
6. Construction (Anticipated 2023-2025)
![Page 29: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/29.jpg)
PA Department of Transportation
Engineering District 11-0
45 Thoms Run Road
Bridgeville PA 15017
QUESTIONS ?
• PennDOT Design Division
• Direct questions to:
• Michael Szurley, P.E. – Project Manager at 412.429.5035 or [email protected]
• Todd Crouch – Environmental Supervisor - NEPA
• PennDOT Press Office
• Steve Cowan – District Press Officer
We kindly ask that all attendees complete a survey of this presentation… Thank you!
![Page 30: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/30.jpg)
Haunched Steel Plate Girder
Steel Tied Arch
Concrete Arch
![Page 31: PUBLIC MEETING - PennDOT Home · Bridge Replacement Options Two construction methods considered: Staged Construction •Build new bridge in 3 partial-width steps; •Maintains 2 lanes](https://reader035.vdocuments.site/reader035/viewer/2022081405/5f0cfb5f7e708231d438177a/html5/thumbnails/31.jpg)