public engagement opportunities - sanibel shared use path …€¦ · 23 the cut‐through path...

24

Upload: others

Post on 23-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important
Page 2: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Public Engagement Opportunities:

Open House Meetings• Tuesday, 2/19/19

• 10 am to 6 pm• Monday, 4/22/19

• 10 am to 6 pm

Community Events• Path Intercept Surveys

• Saturday, 2/16/19• Arts and Crafts Festivals

• Sunday, 2/17/19• Saturday, 3/16/19

• Farmers Market• Sunday, 2/24/19• Sunday, 3/3/19

Project Advisory Committee (PAC)

• Thursday, 1/31/19• 9 am to 11 am

• Friday, 3/22/19• 9 am to 11 am

• Tuesday, 4/30/19• 9 am to 11 am

Online Public Survey• Begins – Monday, 2/11/19• Ends – Tuesday, 4/30/19

Project Websitewww.sanibelbikeped.com

Page 3: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Online Survey Results

Based on 1,844 ResponsesAs of April 10,2019

Page 4: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Online Survey Results

Based on 1,844 ResponsesAs of April 10,2019

Page 5: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Online Survey Results

Based on 1,844 ResponsesAs of April 10,2019

Page 6: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Lind

gren

 Bou

levard

Purdy Drive

Online Map Comment Clusters

1 Comment

2 – 3 Comments

4 – 5 Comments

6 – 8 Comments

Comment Points

Interactive Online Map Comments

Based on 107 ResponsesAs of April 10,2019

12

34 5

6 8 9 111012

14

13

1516

17 18

19

7

20

2122

23

24

25 26

28

30 31

27

29

Page 7: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Map ID Comment

1 When people going to the historic village from the west they are directed to a roundabout way to get three. Just add a connection from the path to the crossing road.

2 The Sunday Farmer’s Market is the most bike‐friendly day of the week. The City’s many bike racks are encouraging even more and more people choose to come on bike or on foot. Great job!

3 Crosswalk at Periwinkle and St Michael’s Church is noncompliant (with MUTCD) (both sides). Either the “stop” markings on the path need to be removed or regulation mini‐stop signs should be installed.

4 Difficult for bikers crossing at crosswalk to see bikers coming from either direction on the path. Perhaps a traffic mirror would work.

5 In front of St Michaels church the sudden zig and zag to keep on bike path (going east west on north side of Periwinkle) should be straightened. Motorists are never certain what cyclists are doing here and causes possible bad reactions by motorists.

6 At crosswalk on Periwinkle at Sanibel Community House, the intersection (both sides) is noncompliant (with MUTCD). Either the “stop” markings on the path need to be removed or regulation mini‐stop signs should be installed.

7 I really like the crosswalk at community house! When I ride at night it has some light and traffic is coming from just two directions unlike at the intersection at Periwinkle and Tarpon Bay. Also, the marker in the middle of the road alerts drivers.

8 Island Cow should put stop sign and lines on their driveway to prevent cars from always just running out onto bike path. Very busy location and cars aren’t looking for bikes – Island Cow should take responsibility of hazard they are making here.

9 Too many people cross here rather than using the crosswalk by the Community House.

10 The quick “jog” that the path takes at the intersection of Periwinkle and Meridian is of concern. I’ve witnessed many near‐accidents here with folks cycling different directions on the path and not being ready for the quick change in course.

11 Agree with the problem of visibility., I live off Meridian and is very difficult for cars and bicycles to see each other, poor quality road apron also along with needing straightening.

12 Parking lot (Periwinkle Place western entrance) ingress‐egress point can be dangerous. Cars stop on bike path and don’t watch for bikes, Require Place to make this intersection safer with their own parking lot stop and look for cyclists sign and stop line.

13 Every business should provide the same bike racks that the city has for the farmers market.

14 SCA needs more bike racks…and ones that work for bikes. Would be helpful to provide businesses and organizations the types of bike racks that work best for most bikes.

15 Periwinkle Way has the most intense Shared Use Path traffic on the island. Looking to the future, it would ease path congestion if a parallel path could be placed on the north side of Periwinkle. I believe this is a long term objective of the City

16 Dangerous parking lot (Tahitian Gardens western entrance) ingress‐egress point. No visibility for bikes or cars – cars don’t stop, Bikes can’t see cars from parking lot. Must require Tahitian Gardens to make this intersection safer with their own parking lot.

17 In order for vehicles to exit Purdy Drive, it is necessary to pull up onto or beyond the path. Periwinkle is not visible to the motorist if vehicle is behind the path. Perhaps vegetation can be removed to ensure visibility of both path users

18 There are many markers along the path that are part of the new Heritage Trail, which is a wonderful addition to the path experience. However, many path users don’t know what the mounted signs are and don’t stop to learn about Sanibel.

19 Perhaps the path could be moved back from Periwinkle just like they did at Donax.

20 While not part of the SUP. The Pond Apple Trail gets very wet and muddy. Please improve as you did on the rest of the trail.

21 The crosswalk at Bailey Rd & Periwinkle is noncompliant (with MUTCD) – either the “stop” markings on the path need to be removed or regulation mini stop signs should be installed (could paint stop bars & “caution” marking).

22 The crosswalk over Periwinkle just west of Bailey Rd should be removed. Too dangerous here with incoming cars merging and not yet alert for bikes in roadway. Motorists are too busy merging with traffic to be alert for bikes crossing here.

23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important for path users to know you can get back to Periwinkle path in a couple of ways.

24 Bailey Rd path regularly floods for extended periods of time. Much longer than the road floods.

25 Very dangerous! People ride bikes right out into the road into the Dunes! A girl was killed here!

26 The Chamber of Commerce needs bike racks in their front yard for the many folks that ride there on bicycles. Why don’t they encourage biking?

27 The crosswalk on Causeway Blvd to Chamber of Commerce has noncompliant (MUTCD) “stop” path markings on both sides. Either regulation mini‐stop signs should be installed or the “stop” markings should be removed (prefer latter).

28 Agree. Need better traffic control at this crosswalk.

29 You made it over the causeway and are cruising onto Sanibel! You can cross over to the sidewalk and path and then be taken away from the Periwinkle Way Causeway intersection and out of the way to Bailey Rd. There it is difficult to cross over to the “main” path…

30 I like that the path has been marked to remind bikers to “warn when passing” however the locations should be given more consideration. The four way at Periwinkle and Lindgren can be a busy area, some portions of the path are narrower than others and visibility is limited in some directions…

31 Need more bike racks at the Chamber of Commerce.

Interactive Online Map Comments – From Map Insets

Page 8: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Sanibel Shared Use Path Master Plan Vision

Sanibel’s Shared Use Path system is and will continue to be an invaluable resource, one of the “crown jewels” of the island. Sanibel’s Shared Use Path system will serve as a means for residents and visitors to move about the island safely and easily under human power, reducing the need for using motorized vehicles on City streets and roads. The Path system will be designed and maintained in a manner that provides maximum access to frequently visited island destinations and is 

attractive and consistent with Sanibel’s unique character as a barrier island sanctuary and small town community.

From the Sanibel Shared Use Path Master Plan, Adopted 2009

Page 9: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Goals and ObjectivesGoal: The safety of Sanibel’s Shared Use Path system and its users shall be of the highest priority.Objectives:• Design the Path system’s physical structure and signage to meet up‐to‐date standards so that Path users are safe and feel 

comfortable.

• Improve daytime and evening bicycle, pedestrian, and motorist visibility along the Path system, particularly at intersections and commercial and residential driveways.

• Enforce City ordinances and State statutes to maximize Path safety and minimize crashes.

• Conduct an on‐going safety awareness program for Path users and motorists, using the widest possible range of educational and outreach initiatives.

Goal: The Shared Use Path system will be managed and maintained in a quality manner, to support the full range of current and projected future user demands.

Objectives:• Maintain the Path system in accordance with appropriate engineering and design practices and with State standards wherever 

possible, consistent with the City’s unique right of way and land use conditions.

• Manage the Path system in a manner that protects the fragile nature of our island’s environment.

• Implement a Shared Use Path monitoring and maintenance program that will both proactively and systematically locate, scheduleand prioritize pavement, vegetation trimming and related improvements.

• Insure that Path rest areas, support facilities and signage are attractive and in keeping with the character of Sanibel.From the Sanibel Shared Use Path Master Plan, Adopted 2009

Page 10: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Goals and ObjectivesGoal: Improvements and extensions to the Shared Use Path system will be done for the purpose of connecting residents 

and visitors with frequently visited island destinations and activity centers and to correspondingly reduce vehicular trips and energy consumption.

Objectives:• Maintain a five year capital improvement schedule for the Shared Use Path system, programmed and updated on an annual basis.

• Insure that an proposed new Path improvement or extension addresses existing and future user demands and is consistent with the Sanibel Plan, the City’s land use conditions, and the recommendations and priorities of the Shared Use Master Plan.

• Design Path improvements and extensions to meet up‐to‐date standards whenever possible.

• Insure that Path improvements and extensions are attractive and in keeping with the character of Sanibel.

From the Sanibel Shared Use Path Master Plan, Adopted 2009

Page 11: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Goals and ObjectivesGoal: The City will build a sense of stewardship for the Shared Use Path system within the greater Sanibel Community.Objectives:• City Council will establish policies and priorities that will both support implementation of the Shared Use Path Master Plan and

engage the entire Sanibel community throughout the implementation process.

• The City Manager will continue to lead and coordinate implementation of the Shared Use Path Master Plan and oversight of the Shared Use Path system within the City administration, insuring that the Path system receives focused attention on an on‐going basis.

• Initiate a communications program to inform the public on the importance of the Path system to Sanibel. This communication program will:

• Reinforce the Path system’s role as a convenient means of non‐motorized transportation that will help to: reduce automobile trips, road congestions and parking demands.

• Underscore the impact the Path system can have in protecting the natural environment.

• Encourage use of the Path system to promote health, wellness and increased mobility.

• Encourage public‐private partnerships to support the Path system.

• Consider opportunities for volunteers and City staff to work together on a wide range of programs and projects associated with Path system safety, education, conditions and public information.

• Explore the formation of innovative public, private, and not‐for‐profit partnerships that will have the capacity to pursue fund raising and financing strategies to support implementation of the Shared Use Path Master Plan.

From the Sanibel Shared Use Path Master Plan, Adopted 2009

Page 12: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Shared Use Path Opportunities

Categorized by Master Plan Goals

Safety Quality of Service Connectivity Stewardship

The safety of Sanibel’s Shared Use Path system and its users shall be of the highest priority.

The Shared Use Path system will be managed and maintained in a quality manner, to support the full range of current and projected future user demands.

Improvements and extensions to the Shared Use Path system will be done for the purpose of connecting residents and visitors with frequently visited island destinations and activity centers and to correspondingly reduce vehicular trips and energy consumption.

The City will foster a sense of stewardship for the Shared Use Path system within the greater Sanibel Community.

Page 13: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Pedestrian and Bicycle Crashes (2013 – 2017)

Crash Severity CrashesFatal 0Incapacitating Injury 4Non‐Incapacitating Injury 15Possible Injury 8Property Damage Only 12Total 39

Page 14: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Reported Shared Use Path Incidents (2017 – 2018)Total Shared Use Path Incidents 34 Fall‐Off Bike Incidents

19 Bike vs. Vehicle Incidents 7 Bike vs. Bike Incidents

Page 15: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Shared Use Path Safety: Engineering, Education, and Enforcement

Engineering• Consistent with the Sanibel Plan, continue to apply 

appropriate design standards based on context, volume, mix of users, available right‐of‐way, and drainage and environmental impacts.

• Path Surface and Width

• Clearance and Sight Lines

• Signage and Pavement Markings

• Lighting

• To the extent possible, ensure that all new and retrofitted Paths are accessible in accordance with the Americans with Disabilities Act (ADA). 

• Continue to evaluate Path conditions that contribute to unsafe conditions and behavior.

• Monitor and address safety issues at locations with higher concentrations of Shared Use Path incidents and pedestrian and bicycle crashes.

• Continue to incorporate design principles that accommodate all users of all ages and abilities into all roadway projects.

Education• Continue to support and work with local partners, on 

developing and distributing educational materials related to the Shared Use Paths.

• Encourage participation from all responsible parties,bike rental companies, advocacy groups, resorts, business community and employers to develop and distribute education materials to all Path users. 

• Continue to explore opportunities to develop broad reaching programs and materials that can effectively reach the number of daily and seasonal visitors to Sanibel.

• Continue to conduct annual public forums on Shared Use Path safety for island residents and visitors.

• The Sanibel Police Department in conjunction with the Lee County School District will continue to conduct bicycle safety courses to elementary and middle school students at The Sanibel School.

• Continue to identify opportunities to offer additional bicycle safety courses to City residents.

• Continue to actively and regularly promote the use of safety equipment including helmets, lights, and bells for all bicyclists.

Enforcement• Continue to provide regular training to law 

enforcement officers and traffic aides relating to bicyclist, pedestrian, and motorist traffic laws.

• Continue to focus enforcement efforts on education and compliance to help establish community awareness of the laws and unsafe behavior.

• Explore opportunities to expand law enforcement presence along the Shared Use Path system (e.g., expanded bicycle patrol).

• Continue to track and monitor warnings, tickets, collisions, crashes, and other incidents that occur along the Shared Use Paths.

• Encourage safe and courteous behavior through positive enforcement and recognition.

Page 16: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Shared Use Path Best Practice Design Considerations

Path widths are dependent on context, volume, mix of users, environmental impacts and available right‐of‐way. Generally the recommended width for bi‐directional shared‐use paths is 10–14 feet; a minimum width of 8 feet is appropriate in physical and environmentally constrained conditions. Because of right‐of‐way constraints and the Sanibel Plan’s focus on preservation of the barrier island as a sanctuary, the paths in Sanibel are generally narrower than typical shared use paths. This requires path users to be more vigilant and courteous to ensure that the path system remains safe and enjoyable, especially during peak times of year.

Path Width

Plant materials placed along the paths should be selected to take into consideration the need for excessive pruning, cleanup of fallen debris, and other maintenance. Trees and shrubs with aggressive root systems should either be avoided or root barriers should be provided. Consistent with the Sanibel Plan, new paths or widening to existing paths should avoid impacts to existing natural vegetation.

Vegetation and Landscaping

Consistent with Sate law, bicycles operated at night should be equipped with a headlight that is strong enough to allow for safe navigation and a taillight to make them visible to motorists and other Path users. Path lighting to enhance safety, may be considered at motor‐vehicle conflict points such as intersections or crosswalks, or where abrupt changes to the Path’s geometry may require additional visibility. Lighting along the Path and that crossings should be designed according to all applicable environmental, dark sky, energy conservation, or other local lighting standards, with consideration toward maximizing path user safety while minimizing glare and obtrusiveness to surrounding neighborhoods and wildlife.

Lighting

New pathways and reconstruction or widening of existing paths should be constructed, to the extent reasonable, in accord with the American Disabilities Act (ADA) and corresponding Public Rights‐of‐Way Accessibility Guidelines (PROWAG). In addition to path surface recommendations, this generally means maintaining no more than 5% slope along the path and no more than a 2% slope across the path.

Accessibility

Sign and pathway pavement marking designs should be consistent throughout the path system, be in accordance with local ordinances, and should comply with the Manual of Uniform Traffic Control Devices (MUTCD). The Sanibel Plan places an emphasis on maintaining the natural character of the island and avoiding sign clutter. Accordingly, signs should be limited to required traffic control signs and key wayfinding needs. Pavement markings may be used to convey secondary information including messaging related to courteous trail behavior and supplemental wayfinding.

Signage and Pathway Markings

Provide adequate horizontal and vertical clearances. When possible, maintain a minimum 2‐foot, preferred 4‐foot, clear area adjacent to both sides of the path and a minimum 8‐foot vertical clearance. When horizontal clearances cannot be maintained because of natural vegetation, consideration should be given to warning trail users with pavement markings and/or signs to slow and exercise extra caution.

Horizontal and Vertical Clearance

To the extent possible and consistent with the Americans with Disabilities Act, paths should be paved or constructed of hard‐surfaced materials and should provide a firm, stable, and slip‐resistant surface. Pervious materials that meet these criteria may be considered to reduce path impact on natural drainage.

Path Surface

8’

Page 17: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Shared Use Path Quality of Service

Maintenance Management• Continue to conduct a proactive maintenance program to ensure that 

the Shared Use Paths are safe and well maintained.

• Continue to conduct regular inspections of the Path system to evaluate surface conditions and to ensure that adequate clearances are maintained.

• Continue to inspect the condition of the Path signage and markings for visibility and retro‐reflectivity.

• Continue to identify and evaluate alternative forms of island appropriate Path surfaces and construction standards.

• Continue to employ best practice design standards associated with Shared Use Path markings, buffers, surfaces, and signage as part of the City’s ongoing maintenance program.

• Continue to explore new opportunities for residents to report Shared Use Path maintenance issues.

• Continue to inform residents of improvements to the Shared Use Path system through an engagement process that addresses concerns and builds support.

• Continue to monitor and evaluate usage and volumes along the Shared Use Path system; consideration should be given to exploring the installation of automated Path counters that could provide the City with real‐time Path usage information.

• Continue to explore opportunities to provide adequate bicycle parking in public spaces including Shared Use Path rest areas and civic, cultural, and recreational facilities.

• Develop guidelines bicycle parking guidelines for commercial and institutional uses.

• Continue to regularly evaluate and update City law, regulations and policy documents addressing the Shared Use Path system.

• Continue to monitor State and Federal legislative initiative related to Shared Use Paths and related pedestrian and bicyclist activities.

• Regularly update the Shared Use Path Master Plan to document completed improvements, reflect current trends, and address changing community needs.

Page 18: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Shared Use Path Connectivity

Improvements• The City will continue to maintain an updated survey 

of the existing Shared Use Path system width and conditions.

• Continue to improve and widen all Shared Use Paths to an appropriate width, no less than 8 feet, based on the context, volume, mix of users, availability of right‐of‐way, and drainage and environmental impacts.

• For high‐volume segments (e.g., Periwinkle Way and Tarpon Bay Rd), continue to provide a minimum Shared Use Path width of 10 feet, subject to the availability of right‐of‐way and drainage and environmental impacts.

• Continue to monitor and evaluate opportunities to improve Shared Use Path crossings at both intersections and mid‐block locations, in accordance with the City’s Crosswalk Policy.

• Continue to explore and evaluate opportunities to improve Shared Use Path and driveway interactions.

• Continue to evaluate and identify improvements at locations with higher concentrations of pedestrian and bicycle crashes and Shared Use Path incidents.

Extensions• Consistent with the Sanibel Plan, continue to expand 

the Shared Use Path system whenever it can be accomplished in a fiscally sound manner compatible with surrounding land uses.

• Consider environmental and quality of life impacts when evaluating Shared Use Path extension.

• Consistent with the Sanibel Plan, continue to provide safe and convenient Shared Use Paths and routes as a means of encouraging pedestrian and bicyclist access to public recreation facilities and open space areas.

• Continue to identify and evaluate opportunities to connect Sanibel’s residents and visitors with frequently visited destinations and activity centers.

• Continue to coordinate with Lee County and other local agencies on opportunities to enhance pedestrian and bicycle connections to/from the City of Sanibel.

Support Facilities• Continue to enhance the Shared Use Path system 

through the addition of rest areas and related support facilities.

• Shared Use Path rest areas and support facilities will be located within existing and future rights‐of‐way and easements and subject to future funding availability and site, environmental and engineering analyses.

• All future Shared Use Path rest areas and related support facilities should match and fit harmoniously with their surrounding landscape and be made of materials that are accessible, durable, attractive, comfortable, and consistent with the character of Sanibel.

• Continue to foster public/private partnerships to aid in the funding and maintenance of future Shared Use Path rest areas and related support facilities.

Page 19: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Planned Shared Use Path Improvements

2

3

1

Palm Ridge RoadProject involves roadway, shared use path, access and landscaping improvements. The purpose of the project is to improve roadway aesthetics and shared use path safety.

Middle Gulf Drive Path and Roadway RelocationPurpose of this project is to improve shared use path safety and drainage, by shifting Middle Gulf Drive between Fulgur Street and Beach Road south to increase separation between the roadway and the shared use path and allow for widening of this section of heavily used path to 8’.

East Gulf DriveProject purpose is to widen and improve safety along the shared use path.

Page 20: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Existing Shared Use Path Widths

Shared Use Path Widening Opportunities

Continue to improve and widen all Shared Use Paths to an appropriate width, no less than 8 feet, based on the context, volume, mix of users, availability of right‐of‐way, and drainage and environmental impacts.

For high‐volume segments (e.g., Periwinkle Way and Tarpon Bay Rd), continue to provide a minimum Shared Use Path width of 10 feet, subject to the availability of right‐of‐way, and drainage and environmental impacts.

Page 21: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Suggested Shared Use Path Connections (Under Evaluation)ID Suggested Extensions 

(Under Evaluation)

1 West Gulf Drive, from Rabbit Road to Dingman Drive

2 Rabbit Road, from West Gulf Drive to Sanibel Captiva Road

3 Tarpon Bay Road, from Sanibel Captiva Road to Tarpon Bay Explorers

4 Periwinkle Way, from Tarpon Bay Road to Palm Ridge Road

5 Palm Ridge Road, from Periwinkle Way to Tarpon Bay Road

6 New Shared Use Path Connection, from Dunlop Road to Dixie Beach Boulevard

7 Dixie Beach Boulevard, Royal Poinciana Drive to San Carlos Bay Drive

8 New Shared Use Path Connection, from Casa Ybel Road to Main Street

9 Periwinkle Way, from Dunlop Road to Lindgren Boulevard

10 New Shared Use Path Connection, from Dixie Beach Boulevard to Bailey Road

11 Bailey Rd, from south of Bay Drive to Bay Shore Drive

12 Periwinkle Way from Lighthouse Beach Park entrance to Lighthouse Park Fishing Pier

Page 22: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Shared Use Path Improvement Evaluation Considerations

Yes No

Are the suggested improvements consistent with the Sanibel Plan?

Are the suggested improvements consistent with the Shared Use Path Master Plan Goals and Objectives?

Opportunities Analysis

Public Outreach Evaluation of Impact on the Environment, Right‐of‐Way, Drainage, and Utilities

Recommendation

Recommended for Implementation

Recommended for Further Study

Not Recommended at this Time

Not Feasible/Inconsistent with Sanibel Plan

Yes No

Page 23: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Suggested Intersection Enhancements (Under Evaluation)

2

3

4

7 9

11

15

5 610

8

112

13 14

IDSuggested Intersection 

Enhancements(Under Evaluation)

1 Sanibel Captiva Rd at Ding Darling Entrance (improve visibility)

2 Sanibel Captiva Rd at Rabbit Rd (improve crosswalk alignment)

3 West Gulf Dr at Rabbit Rd (improve wayfinding)

4 Sanibel Captiva Rd at Tarpon Bay Rd/Palm Ridge Rd (general crossing improvements)

5 Periwinkle Way at St Michael Church (visibility and crossing improvements)

6 Periwinkle Way at Meridian Dr (visibility and crossing improvements)

7 Casa Ybel Rd at Algiers Ln(crosswalk alignment)

8 Middle Gulf Dr at Casa Ybel Rd(crosswalk alignment)

9 Middle Gulf Dr at Cowry Ct(improve visibility and crosswalk alignment)

10 Middle Gulf Dr at Par View Dr(enhance SUP connections)

11 East Gulf Dr at Nerita St(general crossing improvements)

12 Periwinkle Way at Bailey Rd (visibility and crossing enhancements)

13 Bailey Rd at Sand Castle Ct (potential new crossing)

14 Causeway Blvd at Chamber of Commerce(crossing enhancements)

15 Periwinkle Way at Yachtsman Dr(potential new crossing)

Page 24: Public Engagement Opportunities - Sanibel Shared Use Path …€¦ · 23 The cut‐through path from Beach Rd to Periwinkle path should be noted on the map (as gravel connection)…important

Opportunities – Shared Use Path Stewardship

Stewardship Communication• Continue to support programs that build awareness and stewardship for 

the island’s natural resources and the importance of alternative forms of transportation.

• Promote public and privately sponsored events and programs that encourage the use of alternative forms of transportation.

• Continue to engage and seek input from the community on matters related to the Shared Use Path system.

• Continue to work with community partners in planning and executing events focused around the Shared Use Path system.

• Consider participating in events (e.g., Florida and National Bike Month) as a way to celebrate and promote the Shared Use Path system.

• Produce and distribute informational guides on the Shared Use Path and will continue to pursue alternative sources of funding for the production and distribution of this information.

• Partner with local resorts, bicycle‐related businesses, restaurants, and destinations to distribute materials that inform and educate Path users on rules, regulations, and appropriate Path behavior. 

• Expand the Shared Use Path system’s presence on the City of Sanibel’s website (mysanibel.com). Consider providing a page dedicated to the Shared Use Path system that could serve as a platform for information about the Path system, laws, and appropriate user behavior.

• Continue to utilize the City’s existing Sanibel Bound mobile application as a platform for providing information on the Shared Use Path system.