![Page 1: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/1.jpg)
PTT Analyst site visit
Date : 8 February 2014
![Page 2: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/2.jpg)
Type Run-of-river hydropower
Capacity 1,285 MW
Location Xayaburi, Lao PDR
Offtaker 1,220 MW : 29-yr PPA with EGAT
60 MW : 29-yr PPA with EdL
Project Cost ≈THB 115 billion
YOUR SENSE OF ENERGY
1
![Page 3: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/3.jpg)
Logistic to site 1) BKK - Vientiane (by plane),
Vientiane-Xayaburi (by plane)
2) BKK – Luangphabang (by plane),
Luangphabang – Xayaburi (by car~ 120 km, 3 hr)
3) BKK – Loei (by plane),
Loei – Xayaburi (by car, ~60 + 200 km, 1+3.5 hr)
XAYABURI HPP
Loei
Luang Prabang
Vientiane
Xayaburi
บ้านนาหลา บ้านตาลาน
โครงการ
เมืองไซยะบรีุ
2
![Page 4: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/4.jpg)
GPSC
EGCO NSC
XPCL
100%
25.0%
CK EdL P.T
30% 20% 5%
Laos Thai
12.5%
BECL
7.5%
• Ch. Karnchang Public Company Limited (CK) 30 % • Natee Synergy Company Limited (PTTI) 25 % • Electricity Generating Public Company Limited (EGCO) 12.5 % • Bangkok Expressway Public Company Limited (BECL) 7.5 % • P.T. Construction and Irrigation Company Limited (PT) 5 % • Electricite du Laos (EdL) 20 %
PTT
PTT
Global
Chemical
Thaioil Thaioil
Power
3
![Page 5: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/5.jpg)
XPCL EGAT
EdL
EPC
(CK-Lao)
P1 (Civil) P2 (Hydromechanical)
Whessoe
P3 (Electromechanical)
Andritz P4 (Transmission)
GoL
Lenders (KTB, BBL, SCB, KBANK,
Thailand EXIM, TISCO)
Project Developers
Lender’s Engineer
(POYRY)
Owner Engineer
(SEAN)
Lender’s legal advisor
EIA
(TEAM)
CA
PPA
PPA
SHA
CFA
GoL’s Engineer
(POYRY)
EMP & RAP
(PT & TEAM)
Designer
(Colenco & TEAM)
EMP - Environment Manage Plan
RAP - Resettlement Action Plan
4
![Page 6: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/6.jpg)
Main Contractor : Ch. Karnchang (Lao) Company Limited
Type of contract : EPC Turnkey Lump Sum Contract
Comprised of main 4 packages
1) Civil Works : Ch. Karnchang (Lao) Company Limited
2) Hydro-Mechanic : Whessoe (Malaysia) [Navigation lock gate, spillway gate, etc]
3) Electro-Mechanic : Andritz (Austria) [Turbines, Generators, 500kV & 115kV
substation, Control system, etc]
4) Transmission line : Cerieco (China)
5
![Page 7: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/7.jpg)
- Project Development Agreement signed : 25 November 2008
- Tariff MOU with EGAT signed : 5 July 2010
- EPC Contract signed : 14 Oct 2011
- Concession Agreement signed : 29 Oct 2011
- EGAT PPA signed : 29 Oct 2011
- Credit Facilities Agreement signed : 31 Oct 2011
- Notice to Proceed : 15 Mar 2012
- 1st drawdown : 12 Apr 2012
- COD : 29 Oct 2019
6
![Page 8: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/8.jpg)
7
![Page 9: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/9.jpg)
Vientiane
Luangphabang
0 100 200 KM
Khon Kaen 4
Loei 2 (A.Tha Li)
XAYABURI HPP
by project
by EGAT
8
![Page 10: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/10.jpg)
9
![Page 11: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/11.jpg)
Environment Management Program (EMP)
– Water quality monitoring program
– Public Health Management
– Fish Biomass and Fish Migration program
Resettlement Action Plan (RAP)
– Resettlement work
– Survey on Income generation
– Livelihood Restoration Program (LRP)
– Community Development Program (CDP)
10
![Page 12: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/12.jpg)
Social Issues
- Navigation Navigation Lock
Environmental Issues
- Sediment transfer Low level outlet spillway
- Fish migration Fish passing facilities Fishery program
11
![Page 13: PTT Analyst site visit Date : 8 February 2014ptt.listedcompany.com/.../20140208-PTT-analystSiteVisit.pdf2014/02/08 · PTT Analyst site visit Date : 8 February 2014 Type Run-of-river](https://reader030.vdocuments.site/reader030/viewer/2022041021/5ed0ab72a7d2a602ce4e6504/html5/thumbnails/13.jpg)
12