SOLUTIONS FOR THE OIL & GAS INDUSTRY
PTSC PetroVietnam Technical Services Corporation: a member of the Vietnam Oil and Gas Group (PetroVietnam) providing diversified technical services for the oil and gas industry inside and outside Vietnam.
With more than 25 subsidiaries, PTSC as a multi-sector corporation has gained a reputation of a leader in providing oil & gas services in Vietnam.
PTSCs listed in public stock market and revenue reached ~$US 1 bil in 2010.
1 of
Marine Services
EPCIC & fabrication projects (PTSC M&C) HUC, O&M and other Offshore Services Production Services FPSO/ROV Supply Base Services Procurement & Logistics Services Other Services
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Established on May 15, 2001, changed to Joint Stock
Company since April 2011.
QHSE Management system: ISO 9001-2008, ISO
14001-2004 and OHSAS 18001-2007 accredited by
DNV
Located in Vung Tau City, Southern Vietnam
Amongst Top 500 largest companies (VNR-500)
2 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
0.98
39.45 39.94 15.74 24.44
51.54
106.39 98.64
177.26
349.22
535.80 556.94
-
100.00
200.00
300.00
400.00
500.00
600.00
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
Revenue
Annual Revenue
Revenue (US$ mil)
3 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 4 of
With a team of committed, professional and dynamic engineers with experiences from more than 40 successful projects
with average production capacity of 50,000 MT per year PTSC M&C continuously strives to deliver the highest HSE and
QAQC standards to our Clients expectations and beyond.
Executing full EPCIC services for offshore facilities
including fixed platforms, floating objects (ships,
barges), modules, skids, vessels and others.
Executing EPC services for various onshore plants
(power plant, GPP, gas terminal..) and jetty, port,
yard, workshop and associated facilities.
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 5 of
Director
Chairman
E & A
Workshop
Structure
Workshop 1
Structure
Workshop 2
Mec. & Piping
Workshop
Services
General
Workshop
Equipments
General
Workshop
Security
Team
Deputy Director Deputy Director Deputy Director Deputy Director Deputy Director
Co
m. D
ep
t
BD
De
pt.
Engr
. De
pt
F&A
De
pt.
Pla
n. D
ep
t.
QA
QC
De
pt.
HSE
De
pt
HR
De
pt.
Ad
min
De
pt.
Co
nst
r. D
ep
t.
T&O
De
pt.
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 6 of
People are our priority
As of Nov2012
Manpower Resources Indirect Resources Breakdown
23
0
200
400
600
800
1000
1200
Long term Casual
Indirect
Direct
3%
2%
7% 6%
13%
3%
14% 4%
15%
7%
5%
21%
HR Dept
F&A Dept
Planning Dept
Procurement Dept
T&O Dept
HSE Dept
QAQC Dept
Construction Dept
Engineering Dept
Admin Dept
BD Dept
Others
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 7 of
HSE mindset is a core value for our success
23
No Description YEAR TOTAL
2001-2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
1 Total Manhours
Worked 4,559,697 506,345 1,410,830 1,723,959 4,865,002 2,587,970 2,873,171 5,832,071 6,625,567
7,962,141
38,946,753
2 LTI rate 0 0 0 0 0 0 0 0.17 0 0.13 0.3
3 Lost Time Injuries 0 0 0 0 0 0 0 1 0 1 2
4 Lost Work day 0 0 0 0 0 0 0 30 0 11 41
5 Restricted Duty
Injuries 0 0 0 0 0 0 0 0 0 1 1
6 Medical Treatment
Injuries 0 0 1 1 1 0 1 1 1 0 6
7 First Aid 1 0 2 1 1 0 1 2 4 0 12
8 Near Miss 0 4 2 5 8 6 4 25 12 23 89
9 HAZOB Cards N/A 87 585 700 1,571 734 2,696 3,753 4,450
4,147
18,713
10 Fire/Explosion 0 0 1 0 3 0 0 0 0 1 5
11 Equipment Damage 0 1 0 2 2 0 0 0 1 2 08
12 Vehicle Incidents 0 0 0 0 0 0 0 0 0 0 0
13 No. of Fatality 0 0 0 0 0 0 0 0 0 0 0
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Engineering Team with more than 250 experienced in-
house engineers;
Recently performed the Detailed Engineering for Hai Su
Den platform and Thang Long Dong Do platforms in PTSC
M&C Vung Tau offices.
Engineering infrastructure with fully equipped engineering
software.
Management teams with experiences from approximately
40 EPCIC projects in DE Management & Execution,
Construction Engineering and follow-on engineering,
procurement support across all disciplines.
Extensive experience of in-house design process skids e.g.
Fuel Gas Skids, Chemical Injection Skids, Pressure Vessels
& Tanks.
Extensive experience of civil engineering for wharf, yard
strengthening, jetty upgrade, piling foundation
Partnership with leading international engineering houses
8 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Discipline Software Application
Process Hysys Process simulation, sizing
FlareSim Flare design
Piping CAESAR II Pipe stress analysis
Mechanical PVElite Pressure Vessel design
Structural
SACS 5.2, 5.3 Offshore Structural Engineering
Plaxis Slope stability and pavement/ foundation design
GRL WEAP Pile Driveability
BOCAD Structural detail design
Tekla Steel Structural Detail design and shop drawing generation
Electrical ETAP Electrical design
Instrument INTOOLS Instrument design
Drafting
PDMS 12.0 included MDS, PSI, PDMS Review modules 3D Modeling for Structural, Piping, Electrical.
CADWorx 3D Modeling for Process Skids
AutoCAD 2010 Drafting, Designing, Modeling
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Extensive in-house experience and capacity in purchasing materials, equipments regionally and globally
Provide the most efficiency & competitive price in the shortest time with high quality
Actively promote and follow international trading practices terms and conditions
More than 50 qualified procurement employees with experience from major international EPCIC projects
Possess a rich Vendors database and unit prices database
Efficient in-house expediting team familiar with custom authorities and closely connected to regional and global forwarders and custom authorities
9 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 10 of
Yard Facilities
Total yard area can be utilized up to 133 ha, in the above area plus other yard locations within Vungtau.
Total PTSC M&C Yard Area: 22 ha
Quay length: 500m (11 sections)
Quay width: 26m (04 sections) and
28m (07 sections)
Water depth: 9-14m
Distribution capacity on the jetty:
Min: 6 MT cargo/m2, Max: 10.5 MT
cargo/m2
Distribution capacity on the open
yard area: Min: 6 MT/m2, Max: 70
MT/m2
The quay was designed for 20,000
DWT Vessels
03 Skid ways including 6,000 MT;
10,000 MT and 25,000 MT capacity
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 11 of
Manpower Resouces, Subcontractors, Tools & Equipments
Deversified and modern in-
house fabrication facilities
ready for the work; chain
system to increase
productivity, minimize human
mistakes
Tools & Equipments
A skillful and hard-working
workforce with workers;
qualified & familiar with
international standards;
annual trained through
various courses; supervised by
over 100 experienced
supervisors at construction
yard.
Manpower Resources
Close partnership with various parties in cooperating,
supervising and managing production quality &
safety; verifying
3rd parties services
Co-operating with experienced and qualified
construction subcontractors inside and outside
Vietnam (maximizing local content, share
resources/workload and approach new potential
projects)
Subcontractors
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 12 of
Provide complete delivery solutions for offshore transportation, installation, hook-up & commissioning projects ranging from marginal field developments to large integrated gas processing facilities
Extensive experience of offshore services through out various EPCIC projects implemented.
Wide range of global T&I, HUC partners
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Onshore Projects
GPPIC Project
Client: PetroVietnam Gas Company
Project type: EPC
Duration: 08/2001 02/2002
Key Facilities: Four (04) big
compressors
NCS Condesate Storage Project
Client: Client: PetroVietnam Gas Company
Project type: EPC
Duration: 11/2001 11/2003
Key Facilities: Two condensate tanks, condensate
pumps, metering skid system, floating roofs
Capacity: 16,500 m3/each
22 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Dung Quat Refinery Harbor
Project
Client: DungQuat Refinery PMT
Project type: PC
Duration: 06/2006 12/2007
Key Facilities: construct from Berth
1 to 6 of Product Export harbor for
DungQuat Refinery Harbor Project.
Onshore Projects
22 of 23
Phu Quy wind-turbine Project
Client: PV EIC
Project type: I
Duration: 10/2010 11/2010
Key Facilities: transportation and
installation of 03 wind-turbines .
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Offshore EPCIC Projects
Bien Dong 1 Project
Client: Bien Dong POC
Project type: EPCIC
Duration: 02/2010 09/2012
Key Facilities: 01 CPP, 01 WHP, 01 CPP Jacket & Piles,
Pipeline & subsea cables
Total weight: ~ 35,000 MT
Tospides including the LQ and link bridge to the WHP, capacity
~266 mil MMSCSD
Overall size of Topsides: LxBxH = 60m x 46m x 46m
Water depth: 133m
PQP Topsides Loadout weight: 13,600 MT
PQP Jacket LO weight: 11,500 MT
13 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Offshore EPCIC Projects
Su Tu Den North East Project
Client: CuuLong JOC
Project type: EPCIC
Duration: 02/2008 07/2010
Key Facilities: 01 WHP, 01 jacket, infield pipelines &
submarine cable
Total weight: ~ 6,000 MT
Chim Sao Project
Client: Premier Oil Vietnam Offshore
Project type: EPCIC
Duration: 08/2008 10/2010
Key Facilities: 01 WHP, 01 jacket & piles, pipelines &
submarine cable
Total weight: ~ 7,500 MT
14 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Offshore EPCIC Projects
Rong Doi Booster Compressor Project
Client: Korea National Oil Company
Project type: EpC
Duration: 07/2011 07/2012
Key Facilities: 02 compressor modules
Total weight: ~ 500 MT
Hai Su Trang/ Den Project
Client: Thang Long JOC
Project type: EPCIC
Duration: 07/2011 05/2013 (tentatively)
Key Facilities: 02 WHPs, 02 Jackets, 02
Drilling Decks, Piles,, subsea templates, ,
infield pipeline
Total weight: ~ 7,000 MT
Thang Long Dong Do Project
Client: Lam Son JOC
Project type: EPCIC
Duration: 12/2011 12/2012 (tentatively)
Key Facilities: 02 WHPs, Plems, infield
pipeline
Total weight: ~ 2,500 MT
15 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Su Tu Trang Project
Client: CuuLong JOC
Project type: EPCIC
Duration: 03/2010 06/2012
Key Facilities: 01 WHP, 01 jacket, pipelines
Total weight: ~ 2,500 MT
Offshore EPCIC Projects
Bunga Orkid Project
Client: Talisman Malaysia Limited
Project type: EPC
Duration: 07/2006 03/2008
Key Facilities: 03 WHPs
Total weight: ~ 4,000 MT
Te Giac Trang Project
Client: Hoang Long JOC
Project type: EPCIC
Duration: 11/2009 08/2011
Key Facilities: 01 WHP, 02 jacket, 01 drilling
deck, infield pipeline
Total weight: ~ 4,000 MT
16 of 23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Su Tu Den South West Project
Client: CuuLong JOC
Project type: EPC
Duration: 05/2002 09/2003
Key Facilities: 01 WHP
Weight: 2,200 MT
Offshore E-P-C Projects
17 of
Pearl Project
Client: Petronas Carigali Vietnam
Project type: PCC
Duration: 01/2008 06/2009
Key Facilities: 01 WHP
Weight: 600 MT
Ruby-B Project
Client: Petronas Carigali Vietnam
Project type: EPC
Duration: 10/2004 09/2005
Key Facilities: 01 WHP
Weight: 1,300 MT
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Offshore E-P-C Projects
18 of
Topaz Project
Client: Petronas Carigali Vietnam
Project type: PCC
Duration: 10/2009 07/2010
Key Facilities: 01 WHP, 01 Jacket, Piles &
Conductors
Total weight: ~ 4,000 MT
Song Doc WHP-A Project
Client: Truong Son JOC
Project type: PC
Duration: 06/2007 02/2008
Key Facilities: 01 WHP
Weight: 600 MT
Bunga Tulip A Project
Client: Talisman Malaysia Limited
Project type: C
Duration: 12/2005 07/2006
Key Facilities: 01 WHP, 01 Mono-pod
Jacket
Total weight: 900 MT
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Offshore E-P-C Projects
19 of
WHP-C1/CLPP/NBR3 Project
Client: Japan Vietnam Petroleum Company
Project type: C
Duration: 10/2004 05/2005
Key Facilities: 02 WHPs, 01 bridge
Total weight: ~ 1,200 MT
WHP -S1 Project
Client: Japan Vietnam Petroleum Company
Project type: C
Duration: 02/2002 08/2002
Key Facilities: 01 WHP
Weight: 450 MT
Lan Tay Compression Module Project
Client: British Petroleum (BP) Vietnam
Project type: PC
Duration: 07/2006 10/2007
Key Facilities: 01 Compression Module
Weight: 2,000 MT
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Offshore E-P-C Projects
20 of
LQ-CPC/99 Project
Client: VietsovPetro JV
Project type: EPC
Duration: 12/1999 12/2000
Key Facilities: 02 LQs (70 men each)
Total weight: ~ 2,300 MT
Bunga Raya-A Project
Client: Talisman Malaysia Limited
Project type: EPC
Duration: 03/2002 07/2003
Key Facilities: 01 LQ (48 men), 01 Bridge
Total weight: 1,000 MT
NULQ Project
Client: Japan Vietnam Petroleum Company
Project type: EPC
Duration: 02/2002 08/2003
Key Facilities: 01 LQ (63 men), 02 bridges
Total weight: 1,400 MT
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY
Offshore E-P-C Projects
21 of
100 Men LQ Project
Client: Petrovietnam Marine Shipyard
Project type: C
Duration: 10/2010 03/2011
Key Facilities: 01 LQ (100 men) for 90m
water depth jack-up rig
Total weight: 300 MT
PTSC-01 Barge Project
Client: PTSC
Project type: EPC
Duration: 10/2008 11/2009
Key Facilities: 5,000DWT Ballast Barge for
transporting topsides, jackets,..
Total weight: 2,400 MT
3509 Tug Boat Project
Client: PTSC
Project type: PC
Duration: 12/2009 10/2010
Key Facilities: 02 tug boats with capacity
3,500 BHP and 4,750 BHP
Total weight: 1,000 MT
23
-
SOLUTIONS FOR THE OIL & GAS INDUSTRY 23 of 23
-