psc planning strategy 21122010.pdf
TRANSCRIPT
![Page 1: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/1.jpg)
Primary (PSC) Planning Strategy
PREPARED BY PREPARED BY PREPARED BY PREPARED BY ERICSSON RNO TEAM ERICSSON RNO TEAM ERICSSON RNO TEAM ERICSSON RNO TEAM DATE: 21DATE: 21DATE: 21DATE: 21stststst Dec 2010Dec 2010Dec 2010Dec 2010
![Page 2: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/2.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 2
Agenda
› Introduction
– PSC Planning Strategy
– PSC Group
– PSC Table
– Impact of poor planning
› Current PSC Planning
– Current PSC Planning – Issue Example
› Recommended PSC Planning
› Future PSC Fine Tuning
– Methodology / Optimize PSC Planning.
![Page 3: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/3.jpg)
Introduction
![Page 4: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/4.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 4
PSC Planning Strategy
› Primary Scrambling Codes (PSC) are consisting of 512 codes which are from 0 to 511,
each code is unique and this is needed to separate terminals or base stations from each other.
› There are many ways to plan PSC’s. However, the most important factors of PSC planning are consistency, follow pattern and allow for future growth.
› Below is the typical SC planning strategy:
• 8 Color Groups (CG – Clusters)
• 64 PSC per color group
• Maximum number of sites per cluster is 21, with each site having 3 sectors
• One color group is reserved to special events, new sites, IBS and high sites
• Cluster reuse pattern is 1/7
![Page 5: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/5.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 5
PSC Group
![Page 6: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/6.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 6
PSC table
![Page 7: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/7.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 7
Impact of poor planning
› Poor PSC planning will result in the followings
– Intercell PSC Clash
› Meaning the source cell and one of the NBs cell are having the same PSC
– One-Way PSC Clash
› Meaning 2 or more NBs in the same source cell are having the same PSC
– Two-Way PSC Clash
› Meaning call in 2-way SHO and NBs of each 2 active set are having the same PSC
› Any of the above will result in 50/50 chance of drop call
› This will have impact to both CS and PS service.
![Page 8: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/8.jpg)
Current PSC Planning
![Page 9: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/9.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 9
Current PSC Planning – Issue example
![Page 10: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/10.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 10
Current PSC Planning – Issue example (cont’d)
Example Co-PSC:1
1.9 km
2.4 km
![Page 11: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/11.jpg)
Recommended PSC Planning
![Page 12: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/12.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 12
Ericsson Site-PSC DesignMacro Site PSC IBS Site PSC
![Page 13: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/13.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 13
Ericsson CELL-PSC DesignMacro Cell PSC IBS Cell PSC
› With this method, we can see the followings
– Systematic and clear PSC Pattern
– Consistency
![Page 14: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/14.jpg)
Future PSC Fine Tuning
![Page 15: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/15.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 15
Methodology / Optimize PSC Planning
› As more site integrated to the network, it is necessary to fine-tune the PSC
planning.
– This can be done by either temporary solving the clash or re-create the new PSC.
› In order to sufficient solving PSC issue. The followings critical information is
required
– Site to Site Distance
– Site Status (On-Air / Off-Air)
– Handoff Attempt (need to be collected minimum 3 days, ideally 1 week)
› Network Counter
› WNCS Data
› GPEH Data
![Page 16: PSC Planning Strategy 21122010.pdf](https://reader033.vdocuments.site/reader033/viewer/2022042520/563dbb66550346aa9aacd71d/html5/thumbnails/16.jpg)
Ericsson RND | Primary (PSC) Planning Strategy | © Ericsson AB 2010 | 2010-12-21 | Page 16