ps3: protection & control of series compensated networks

14
1 Australia PS3: Protection & Control of Series Compensated Networks Q8 b) What are the requirements of utilities in terms of certification tests for relays and/or protection systems before applying these to series compensated lines?

Upload: lynde

Post on 12-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

PS3: Protection & Control of Series Compensated Networks. Q8 b) What are the requirements of utilities in terms of certification tests for relays and/or protection systems before applying these to series compensated lines?. Electricity Supply Network. 1998 330KV Double Circuit 225km. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PS3:  Protection & Control of Series Compensated Networks

1

Australia

PS3: Protection & Control of Series Compensated Networks

Q8 b) What are the requirements of utilities in terms of certification tests for relays and/or protection systems before applying these to

series compensated lines?

Page 2: PS3:  Protection & Control of Series Compensated Networks

2

Australia

Electricity Supply Network

Page 3: PS3:  Protection & Control of Series Compensated Networks

3

Australia

Loy Yang

Red Cliffs

Kerang

Horsham

Portland

Bendigo

Ballarat

Wodonga Shepparton

Glenrowan

Hazelwood/Morwell

Mount Beauty

MelbourneMetro

Terang

Dederang

Yallourn

DartmouthMcKay Creek/West Kiewa

Eildon

Anglesea

Moorabool

GeelongPt. Henry

500 kV

330 kV

220 kV

275 kV

SP AusNet Network

• 1998

• 330KV

• Double Circuit

• 225km

Page 4: PS3:  Protection & Control of Series Compensated Networks

4

Australia

Project ObjectivesSM

TS

DDTS

No 1

line

No 2

line

Compensation: 50 % Compensation: 50 %

Transfer Capability restored to 1500 MW, Transfer Capability restored to 1500 MW, 36% improvement 36% improvement

Total project cost $A13.5 M Total project cost $A13.5 M

Completion period 14 monthsCompletion period 14 months

Page 5: PS3:  Protection & Control of Series Compensated Networks

5

Australia

Capacitor Arrangement

DDTSSMTS

Bypass Circuit Breaker

Spark Gap

MOV

DischargeReactor

Page 6: PS3:  Protection & Control of Series Compensated Networks

6

Australia

Distance Relay Problems

• Distorted Distance Measurement• Incorrect Directionality (Voltage & Current inversions)

• Transient over- and under-reach ( Sub- sychronous Transient Oscillations)

• Nonlinear & solid by-passing of capacitors initiate transient changes of :– Voltage magnitude and polarity– Impedance measured

Page 7: PS3:  Protection & Control of Series Compensated Networks

7

Australia

Incorrect Reach

AB

E

D

E

C

Line # 2

Line # 1

Line # 3

Page 8: PS3:  Protection & Control of Series Compensated Networks

8

Australia

Fault Simulations

Page 9: PS3:  Protection & Control of Series Compensated Networks

9

Australia

Page 10: PS3:  Protection & Control of Series Compensated Networks

10

Australia

Internal Fault

static

First cycleSecond cycleThird cycle

R

jX

dynamic

Reverse (blocking)

Z

Forward (operating) reach

SMTS, No 1 (Faulty) Line Relay, Fault on No 1 line, MOV, no Gap

Page 11: PS3:  Protection & Control of Series Compensated Networks

11

Australia

External Fault

First cycleSecond cycleThird cycle

R

jX

dynamic

Reverse (blocking)

Z

static

Forward (operating) reach

SMTS, No 2 (Healthy) Line Relay, Fault on No 1 line, MOV, no gap

Page 12: PS3:  Protection & Control of Series Compensated Networks

12

Australia

Relay Selection

• 2 x Distance + existing Power Line Carrierreliable Under/over reach transmission time 30ms

• 1 x Current Diff + new μWave Radiomany faults faster than distance schemes signal fading

Page 13: PS3:  Protection & Control of Series Compensated Networks

13

Australia

Operating Times

0

10

20

30

40

50

60

SMTS Loc 1 Loc 2 Loc 3 Loc 5 DDTS

X SEL/S

X SEL/D

X LFCB/S

X LFCB/D

Y ALPS/S

Y ALPS/D

1 2 3 5

Page 14: PS3:  Protection & Control of Series Compensated Networks

14

Australia

Summary

• Transient fault studies essential for SC Lines

– Difficulty to gather data.

• Automatic Test Equipment extremely useful design

tool

• Derived from paper:“Fault simulation studies for protection of series compensated lines”

– Adam Klebanowski, GPU PowerNet, Victoria, Australia– Asia Pacific Regional ProTest (DOBLE) User Group Meeting, Melbourne,

Australia, 1999– [email protected]