ps product hinged arc roof

2
Prolyte has developed a very clever variation to its existing Arc Roof – a hinged system. The hinged construction on the mast sections allows for construction at stage level, cutting build times and improving safety during build-up. When the complete roof is built and the canopies are in position, the entire structure can then be hoisted into position, using two manual chain hoists connected to the towers at the rear. Once the roof is lifted into place, 8 additional pins are used to secure the hinges in the masts thereby securing the complete system. Build it Quickly, Build it Safely The Hinged Arc Roof system reduces build time considerably. Total set-up time, including the Stage Frame B (EasyFrame B), for an 8x6m Arc Roof is approx. 3-4 hours with a crew of 4. Building the complete system at stage level diminishes the need to climb the towers, reducing work hazards for the technical crew. Convert to a Hinged System Existing Arc Roof systems can easily be converted to the hinged version. Investing in a small selection of additional parts means you can still use your existing Arc Stage but with the added benefits of a hinged system. To convert to a Hinged Arc Roof the following items are needed: Stage Frame B (EasyFrame B) support frame – to the size of your stage 2 rear towers 2 rear frame adapters 8 hinge frames The Hinged Arc Roof has the same features and technical specifications as the existing Arc Roof system. Specifications Article Code: available on request HINGED ARC ROOF WWW.PROLYTE.COM Product NEWS Hinged Arc Roof Prolyte Group HQ Leek, Netherlands [email protected] Prolyte Products UK Ltd Wakefield, England [email protected] Prolyte Products GmbH Emsdetten, Germany [email protected] Prolyte Products RO SRL Slatina, Romania [email protected] © 2013 Prolyte Group Prices are in Euro’s, CPT (Incoterms), excluding VAT, packaging and transport costs. We reserve the right to alter prices, products, codes and technical information without prior notice.

Upload: prolyte-group

Post on 10-Mar-2016

227 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: PS Product hinged arc roof

Prolyte has developed a very clever variation to its existing Arc Roof – a hinged system.

The hinged construction on the mast sections allows for construction at stage level,

cutting build times and improving safety during build-up.

When the complete roof is built and the canopies are in position, the entire structure

can then be hoisted into position, using two manual chain hoists connected to the

towers at the rear.

Once the roof is lifted into place, 8 additional pins are used to secure the hinges in the

masts thereby securing the complete system.

Build it Quickly, Build it Safely

The Hinged Arc Roof system reduces build time considerably. Total set-up time,

including the Stage Frame B (EasyFrame B), for an 8x6m Arc Roof is approx. 3-4 hours

with a crew of 4. Building the complete system at stage level diminishes the need to

climb the towers, reducing work hazards for the technical crew.

Convert to a Hinged System

Existing Arc Roof systems can easily be converted to the hinged version. Investing in a

small selection of additional parts means you can still use your existing Arc Stage but

with the added benefits of a hinged system.

To convert to a Hinged Arc Roof the following items are needed:

• Stage Frame B (EasyFrame B) support frame – to the size of your stage

• 2 rear towers

• 2 rear frame adapters

• 8 hinge frames

The Hinged Arc Roof has the same features and technical specifications as the existing

Arc Roof system.

Specifications

Article Code: available on request

HINGED ARC ROOF

WWW.PROLYTE.COM

Product NEWSHinged Arc Roof

Prolyte Group HQLeek, [email protected]

Prolyte Products UK LtdWakefield, [email protected]

Prolyte Products GmbHEmsdetten, [email protected]

Prolyte Products RO SRLSlatina, [email protected]

© 2013 Prolyte GroupPrices are in Euro’s, CPT (Incoterms), excluding VAT, packaging and transport costs. We reserve the right to alter prices, products, codes and technical information without prior notice.

Page 2: PS Product hinged arc roof

WWW.PROLYTE.COM

Product NEWSArc Roof

Prolyte Group HQLeek, [email protected]

Prolyte Products UK LtdWakefield, [email protected]

Prolyte Products GmbHEmsdetten, [email protected]

Prolyte Products RO SRLSlatina, [email protected]

© 2013 Prolyte GroupPrices are in Euro’s, CPT (Incoterms), excluding VAT, packaging and transport costs. We reserve the right to alter prices, products, codes and technical information without prior notice.

ROOF STRUCTURE

Towers Non. Portal structure, MPT base sections and H30V truss

Main grid H30V truss and 6 special corners

TECHNICAL SPECIFICATIONS - ARC ROOF

Dimensions

10 x 8 m , 8 x 6 m, 6 x 4 m,

(32’9” x 26’3”), (26’3” x 19’8”),

(19’8” x 13’1”)

Loading capacity (UDL)

10 x 8 m approx. 2600 kg / 5126 lbs

8 x 6 m approx. 2400 kg / 5286 lbs

6 x 4 m approx. 2000 kg / 4405 lbs

Total weight approx. 600 kg / 1324 lbs

Transportation volume approx. 6 m3 / 212 cu. ft.

Max. wind speed 28,4 m/second, 63,3 mph

The Arc Roof is a fixed construction, based on three inward-curving trusses that are

mounted to side masts. A hinged connection at the outer ends simplifies system setup.

Special corners connect the arches to the main grid. Different configurations are made

possible by simply changing the arches. The arched trusses have a keder profile on top

for fitting the optional canopy.

Basic trussing

Tower – MPT base sections

H30V truss

Grid – H30D arched truss - with keder profile

Including

• Tension gear and steel wires

• Comprehensive building manual

ARC ROOF

ARC ROOF SYSTEM Inside Overall

Stage measurements A B C D E F

10 x 8 m 32’9” x 26’3” 10,12 m 33’2” 8,42 m 27’7” 6,03 m 19’9” 11,14 m 36’6” 8,15 m 26’8” 6,31 m 20’8”

8 x 6 m 26’3” x 19’8” 8,12 m 26’7” 6,42 m 21’0” 4,76 m 15’7” 9,14 m 29’12” 6,15 m 20’2” 4,99 m 16’6”

6 x 4 m 19’8” x 13’1” 6,12 m 20’0” 4,71 m 15’5” 4,49 m 14’8” 7,14 m 23’5” 4,44 m 14’7” 4,77 m 15’8”

Side view - 8 x 6 m Arc

Top view - 8 x 6 m Arc

A

B

C F

D

E

Front view - 8 x 6 m Arc