  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    1/27

    ABB GroupJuly 26, 2012 | Slide 1

    Global sales programSummary of the day

    Luis-Fabiano Santos, Global Product Manager, Substation Automation Systems

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    2/27

    ABB GroupJuly 26, 2012 | Slide 2

    Global sales programSummary of the day

    Content

    Protection applications and system solutions

    Introduction to IEC 61850

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    3/27

    ABB GroupJuly 26, 2012 | Slide 3

    Substation automations systemsProtection applications and system solutions

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    4/27

    ABB GroupJuly 26, 2012 | Slide 4

    Substation Automation SystemsAllocation of Functions

    Station

    Level

    BayLeve

    l

    Process

    Level

    Functional allocation

    Station automation

    Monitoring

    Fault evaluation

    Event and alarm viewing

    and acknowledgement

    Remote communication for

    telecontrol and supervision

    Protection

    Control

    Monitoring

    Interlocking

    Data acquisition

    GIS or AIS switchgear

    Instrument transformers

    Power transformers

    Surge arresters

    Non-conventional transformers

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    5/27

    ABB GroupJuly 26, 2012 | Slide 5

    Modern bay protection solutionsRequirements

    New additional requirements Optimized, standard protection solutions for

    applications from Distribution to EHV

    Flexible realization of protection philosophy and

    schemes

    Scalable hardware and functionality

    Fully modeled schemes compliant with IEC61850 for efficient integration into IEC 61850-

    compliant systems

    Convenient selection, simple ordering and fast

    delivery

    Modern bay protection solutions meet all traditional protection

    requirements and are ready for future requirements

    Traditional protection requirements Fast clearance of faults

    Reliable fault isolation

    Avoid heavy damage to primary and secondary

    equipment

    Prevent cascading trips and minimizes power

    losses Maintain maximum power availability

    Reliable protection schemes to achieve

    maximum security

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    6/27

    ABB GroupJuly 26, 2012 | Slide 6

    Bay protection solutionsStandards and functional descriptions

    IEC 61850 ANSI Function description

    T2WPDIF 87T Transformer differential protection, two windings

    T3WPDIF 87T Transformer differential protection, three windings

    REFPDIF 87N Restricted earth fault protection, low impedance

    PHPIOC 50 Instantaneous phase overcurrent protection

    OC4PTOC 51/67 Four step directional phase overcurrent protection

    EFPIOC 50N Instantaneous residual overcurrent protection

    EF4PTOC 51N/67N Four step directional residual overcurrent protection

    RBRF 50BF Breaker failure protection

    PTUV 27 Undervoltage protection

    PTOV 59 Overvoltage protection

    PTOV 59N Residual overvoltage protection

    PTUF 81 (U) Underfrequency

    PTOF 81 (O) Overfrequency

    IEC 61850 ANSI Function description

    PDIF 87L Line differential protection

    PDIF 87B Busbar differential protection

    PDIF 87G Generator differential protection

    PDIF 87M Motor (machine) differential protection

    PDIS 21 Distance protection

    RPSB 68 Power swing detection

    PPAM 78 Out-of-step protection

    PTUC 37 Undercurrent protection

    PTTR 49 Thermal overload protection

    PTOC 46 Negative sequence based overcurrent function

    RSYN 25 Synchrocheck, energizing check, and synchronizing

    RREC 79 Autoreclose

    PTRC 94 Tripping logic

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    7/27

    ABB GroupJuly 26, 2012 | Slide 7

    Bay protection solutionTransmission, medium Lines, differential/distance with AR

    Main 1RED67016 binary inputs,

    24 binary outputs,6 analog voltage inputs

    6 analog current inputs1 C37.94 : 3 km100 km

    Main 2REL670

    16 binary inputs,24 binary outputs,

    6 analog voltage inputs6 analog current inputs

    1 C37.94 : 3 km100 km

    Bay unitREB50016 binary inputs,

    24 binary outputs,6 analog voltage inputs6 analog current inputs

    IEC ANSI IEC ANSIPDIF 87L RSYN 25PDIS 21 RREC 79

    PTOC 51/67N

    PTOC 51/67PIOC 50/50NPTOV 59/59N

    RPSB 78PSOF SOTFPTRC 94RDRE 95DRGGIO DTT

    IEC ANSI IEC ANSIPDIS 21,85 RSYN 25PTOC 51/67N RREC 79

    PTOC 51/67PIOC 50/50NPTOV 59/59NRPSB 78PSOF SOTFPTTR 49PTRC 94RDRE 95DRGGIO DTT

    IEC ANSI IEC ANSIPDIF 87B 27 TCSRBRF 50/62BF 69 LatchPTOC 51EFPRDRE 95DRPTRC 94

    Main 1

    protection

    Optionpackage

    Option

    package

    Main 2

    protection

    Add on

    packagebusbar &breaker failureprotection

    Add onpackagegeneral

    BB I

    QA1

    BI1

    BB II

    BU1

    QB1 QB2

    BI2

    BI3

    BI4

    Line bay single / double bus

    Functionality /

    protection conceptRelay hardware

    Bay protection

    solutionFeeder

    voltage level

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    8/27

    ABB GroupJuly 26, 2012 | Slide 8

    Bay protection solutionTransmission,3w transformer

    Functionality /

    protection conceptRelay hardware

    Bay protection

    solutionFeeder

    voltage level

    Group 116 binary inputs,

    24 binary outputs,3 analog voltage inputs

    9 analog current inputs

    Group 2

    16 binary inputs,24 binary outputs,

    3 analog voltage inputs9 analog current inputs

    Bay unit16 binary inputs,

    24 binary outputs,6 analog voltage inputs6 analog current inputs

    BB I

    QA1

    BI1

    BB II

    BU1

    QB1 QB2

    BI2

    BI3

    BI4

    Trafo bay single / double bus

    BI5

    BI6

    BI7

    IEC ANSI IEC ANSI

    PDIF 87T GGIO Guard

    PTOC 51/67

    PIOC 50/50N

    PTTR 49

    PTRC 94

    RDRE 95DR

    GGIO DTT

    IEC ANSI IEC ANSI

    PTOC 51/67N PDIF HV 87N

    PTOC 51/67 PDIF MV 87N

    PIOC 50 GGIO Guard

    PVPH 24

    PTOV 59

    PTRC 94

    RDRE 95DR

    GGIO DTT

    IEC ANSI IEC ANSI

    PDIF 87B 27 TCS

    RBRF 50/62BF

    PTOC 51EFP

    RDRE 95DR

    PTRC 94

    Add-on package

    Busbar andbreaker failure

    protection

    Add-on package

    general

    Group 1

    protection Add-on package

    Group 2

    protection Add-on package

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    9/27

    ABB GroupJuly 26, 2012 | Slide 9

    Bay protection solutionTransmission,double busbar

    Functionality /

    protection conceptRelay hardware

    Bay protection

    solutionFeeder

    voltage Level

    Central unit19 casing

    12 BI9 BO

    Bay unit

    4I standard20 BI

    16 BO

    =QA1

    =QB1

    =QB9

    =QC9

    =Q2

    =QB1

    =QA1

    =QB1

    =QB1

    =Q3

    =QA1

    =QB1

    =QB1

    =QA1

    =QB1

    =QB9

    =QC9

    =Q1

    =QB1

    IEC ANSI

    PDIF 87B

    Central Unit

    IEC ANSI

    RBRF 50/62BF

    PTOC 51 EFP

    PIOC 51

    Bay Unit

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    10/27

    ABB GroupJuly 26, 2012 | Slide 10

    Main 1

    TRIP

    Arrangement 3Arrangement 2 Arrangement 4Arrangement 1

    Main 2

    TRIP

    Control

    TRIP

    Main 1

    TRIP

    Main 2

    Control

    TRIP

    Main 1

    Main 2

    TRIP

    Control

    TRIP

    Main 1

    Main 2

    TRIP

    Control

    Bay protection solutionsPhysical arrangements for P&C panels

    Arrangement 5 Arrangement 6

    Main2 /

    Control

    TRIP

    Main 1

    TRIP

    Main 1

    Main 2 /

    Control

    TRIP

    Integration of protection and control in the same IED

    Arrangement 7 Arrangement 8

    Main 1

    Control 1

    TRIP

    Main 2

    Control 2

    TRIP

    Main 2 /Control 2

    TRIP

    Main 1 /

    Control 1

    TRIP

    Redundant control Redundant control integrated with protection

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    11/27

    ABB GroupJuly 26, 2012 | Slide 11

    Bay protection solutionsIEC 61850 station bus with GOOSE messages

    IEC 61850 station bus

    GOOSE messages GOOSE messages

    Station bus

    hardwired

    =QA1

    =QB1

    =QB9

    =QB2

    =QA1

    =QB1 =QB2

    =QA1

    =QB1 =QB2

    =QB9

    Protection Protection Protection

    Marshalling Marshalling Marshalling

    Control Control Control

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    12/27

    ABB GroupJuly 26, 2012 | Slide 12

    Bay protection solutionsThe free allocation of functions

    Control relay

    CSWI

    XCBR

    Protection relay

    PTOC

    XCBR TCTR

    HMI

    Conventional

    wiring

    Conventional

    wiring

    Conventional

    wiring

    Comand

    Reports

    position

    Reports

    trip

    Protection Relay

    PTOC

    XCBR TCTR

    Conventional

    wiring

    Conventional

    wiring

    CSWI

    HMI

    Comand

    Reports

    position

    Reports

    trip

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    13/27

    ABB GroupJuly 26, 2012 | Slide 13

    Bay protection solutionsIED Intelligent Electronic Devices

    IEC 61850 compliant

    Designed to communicate

    Extensive function library and powerful hardware

    platform

    Fast and reliable Ethernet communication

    Efficient engineering and handling

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    14/27

    ABB GroupJuly 26, 2012 | Slide 14

    Substation automations systemsIEC 61850

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    15/27

    ABB GroupJuly 26, 2012 | Slide 15

    IEC61850The standard in substation automation

    IEC 61850 COMMUNICATION NETWORKS

    AND SYSTEMS IN SUBSTATIONS

    EPRI

    IEC 61850 provides Process-oriented data model,

    independent from communication

    technology

    Standardized description of

    primary and secondary

    apparatuses, and their

    functionality

    Compatible data exchange

    between engineering tools

    Real-time communication

    capabilities for vertical and

    horizontal (bay-bay)

    communication

    IEC 61850

    Is the first truly global standard in

    the electric utility field

    Has been elaborated by some

    60 experts from Europe and North

    America and includes UCA 2.0 as

    a subset

    Influences other areas like

    wind and hydro power plants,

    distributed energy resources,

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    16/27

    ABB GroupJuly 26, 2012 | Slide 16

    Free con figurat ion The standard shall support different

    philosophiesand allow a free allocation offunctions e.g. it must work equally well for

    centralized (RTU like) or decentralized (SCS

    like) systems.

    Interoperabil i ty The ability for IEDs from one or severalmanufacturer to exchangeinformation and use

    the information for the their own functions.

    Long term s tabi l ity The standard shall be future proof, i.e.

    it must be able to follow the progress in

    communication technologyas well as

    evolving system requirements.

    Requirements for Standard in SA

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    17/27

    ABB GroupJuly 26, 2012 | Slide 17

    Real devices in

    substation

    Mapping

    Network

    TCP/IPMMS

    SCSM, i.e.

    61850-8-1

    61850-7-2

    Services

    61850-6

    Configuration File

    Encapsulatedrealworld

    ...

    (Virtual)

    LNLNLNLN

    Position

    Mode

    XCBR1

    Logical device (Bay)

    Virtualization

    61850-7-4 data

    (Position)

    61850-7-4 logical

    node (circuit-breaker)

    From real model to abstract model

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    18/27

    ABB GroupJuly 26, 2012 | Slide 18

    GatewayHMI

    IEC 61850

    Examples:

    Samples

    Trips

    Positions

    Vertical communication

    StationComputer

    Control Protection Protection& Control Control Protection

    Process Interface Process Interface Process Interface

    Station Level

    Bay Level

    Process Level (Equipments, processes)

    Control StationExamples:

    Comands

    Events

    Vertical Serial

    Communication

    NCC

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    19/27

    ABB GroupJuly 26, 2012 | Slide 19

    GatewayHMI

    IEC 61850 Horizontal communicationExamples:

    BlockingsUnblockings

    States

    Horizontal communication

    Gateway

    Vertical Serial

    Communcation

    StationComputer

    Control Protection Protection& Control Control Protection

    Process Interface Process Interface Process Interface

    Station Level

    Bay Level

    Process Level (Equipments, processes)

    Control Station

    Vertical Serial

    Communication

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    20/27

    ABB GroupJuly 26, 2012 | Slide 20

    Substation Automation and Architecture Aspects

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    21/27

    ABB GroupJuly 26, 2012 | Slide 21

    Substation automations systemsOur solutions

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    22/27

    ABB GroupJuly 26, 2012 | Slide 22

    Substation automation systemsBay protection solutions

    Products

    Bay control IEDs

    Protection IEDs

    Gateways

    MicroSCADA Pro RTUs

    Disturbance Recorders

    Complexity

    Value

    Creation

    Products Systems

    ModulesConfigured IEDs for

    Generator protection Busbar protection

    Line protection

    Transformer protection

    Breaker protection Shunt reactor protection

    Capacitor protection

    Motor protection

    Bay control

    Engineered Packages

    Substation automation

    systems

    Station HMIs

    Gateways for telecontrol Bay level solutions for Control

    Protection

    Monitoring

    Turnkey Systems

    Complete Substation

    Automation Systems

    for Control, Monitoring,

    Protection Communication Solutions

    Design to commissioning

    Interface engineering

    Services

    Retrofit

    Upgrading & Migration

    Replacement of primary &

    secondary S/S equipment Spare Parts

    Power System Consulting

    (e.g. Analyses, setting &

    CT/VT calculations) Installation

    Commissioning

    Diagnosis Training

    Services

    S b i i

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    23/27

    ABB GroupJuly 26, 2012 | Slide 23

    Substation automation systemsBay protection solutions

    ABB maximizes the benefits from IEC 61850

    Fully IEC 61850 compliant portfolio

    Comprehensive SA functionality

    Powerful tool environment

    Proven excellence and experience in integrating 3rdparty devices & systems

    Maximum level of product integration for enhanced

    performance and advanced functionality

    Proficient project execution

    Deep understanding of customer requirements andknow-how in the substation domain

    Unique quality assurance by in-house SystemVerification Center

    S b t ti t ti t

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    24/27

    ABB GroupJuly 26, 2012 | Slide 24

    Substation automation systemsBay protection solutions

    Systems and products for substation automation in utilities

    and industries

    Bay protection and control solutions

    Measurement, monitoring and supervision of devices

    Development of local and remote solutions for parametersetting exchange and disturbance recorder evaluations

    Communication network among devices and systems

    Interoperable solutions for the protection and control of

    electrical substations

    Generator protection systems

    Drop-in P&C houses

    Services and support

    Rehabilitation and upgrade

    Commissioning and maintenance

    Power system studies & consulting Settings, CT/VT calculations and disturbance analysis

    Training

    S b t ti t ti t

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    25/27

    ABB GroupJuly 26, 2012 | Slide 25

    Substation automation systemsBay protection solutions

    The scope includes several applications

    Power system protection solutions

    Monitoring of electrical devices

    Integrated bay protection and control solutions

    Hardware and software based on Relionproduct

    family

    S b t ti t ti t

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00

    26/27

    ABB GroupJuly 26, 2012 | Slide 26

    Substation automation systemsBay protection solutions

    QA1

    BI1

    BI2

    BI3

    BI4

    QB1 QB2

    Bus coupler

    QA1

    BI1

    BI2

    BI3

    BI4

    BU1

    QB1 QB2

    Line

    long

    QA1

    BI1

    BI2

    BI3

    BI4

    BU1

    QB1 QB2

    Line

    m

    edium

    QA1

    BI1

    BI2

    BI3

    BI4

    BU1

    QB1 QB2

    Line

    short

    BI5

    BI1

    BI2

    BI3

    BI4

    BI6

    BI7

    QA1

    QB1 QB2

    Transformer

    BI1

    BI2

    BI3

    BI4

    BI6

    BI7

    QA1

    QB1 QB2

    Transformer

    Solution 5 Solution 6Solution 2 Solution 3 Solution 4Solution 1

    Interconnection

    IEC 61850-8-1

    Main applications

    Transmission lines

    Feeders and cables

    Power transformers

    Reactors

    Capacitors

    Generators

    Busbars

    Motors

    ABB know-how

    Focus on customer needs

    Efficiency in project execution

    Engineering and assemblying by ABB

    High quality manufacturing

    Expertise in solution and system design

    Comprehensive documentation

    Testing of solutions and complete system

  • 8/13/2019 Prot Appl Program - Summary of the Day - Rev00