Proposed Road PROPOSED ROAD IMPROVEMENTS TO GAUTENG FREEWAY NETWORK n general, freeways will be upgraded to 4 lanes per direct Some sections, up to 6 lanes per direction Interchanges are improved: 7 Systems Interchanges (additional lanes, directional ram 21Access Interchanges (Additional bridges, single points, Additions, lane additions) Auxiliary lanes at on- and off-ramps Cross road improvements Median lighting is provided

Upload: maggie-verster

Post on 08-May-2015

1.966 views

Category:

Business


1 download

TRANSCRIPT

Page 1: Proposed New Highways And Tollgates(1)

Proposed RoadPROPOSED ROAD IMPROVEMENTS TO GAUTENG FREEWAY NETWORK

• In general, freeways will be upgraded to 4 lanes per direction

• Some sections, up to 6 lanes per direction

• Interchanges are improved:►7 Systems Interchanges (additional lanes, directional ramps)►21Access Interchanges (Additional bridges, single points, ramp

Additions, lane additions)• Auxiliary lanes at on- and off-ramps

• Cross road improvements

• Median lighting is provided

Page 2: Proposed New Highways And Tollgates(1)

N1: WILLIAM NICOL INTERCHANGE

Page 3: Proposed New Highways And Tollgates(1)

N1: RIVONIA ROAD INTERCHANGE :

Page 4: Proposed New Highways And Tollgates(1)

N1: Allandale Interchange

Page 5: Proposed New Highways And Tollgates(1)

JOHN VORSTER INTERCHANGE N1: John Vorster Interchange

Page 6: Proposed New Highways And Tollgates(1)

N1: Lynnwood Interchange

Page 7: Proposed New Highways And Tollgates(1)

N3/N12 Elands InterchangeN3: Elands Interchange

Page 8: Proposed New Highways And Tollgates(1)

N3: Gilloolys Interchange

Page 9: Proposed New Highways And Tollgates(1)

Project financingPROJECT FINANCING & IMPLEMENTATION

• User pay principle will be used to finance project

• Open gantry tolling

• Provides a mechanism for accelerated financing of infrastructure

Page 10: Proposed New Highways And Tollgates(1)

Toll StrategyTOLL PRINCIPLES

• Road user charging implemented worldwide to manage congestion and promote other modes of transport (public transport)

►Travel demand management measure►Provides a mechanism for accelerated financing of infrastructure►Alternative funding mechanisms essential to provide infrastructure and to stimulate economic growth►Sanral mandated to implement tolling as mechanism to raise funds

Page 11: Proposed New Highways And Tollgates(1)

Position of Toll PointsPOSITION OF TOLL POINTS- Tolls declared

Page 12: Proposed New Highways And Tollgates(1)

Open Road Tolling OPEN ROAD TOLLING

Electronic Toll Collection = no physical plazas = no delay

Page 13: Proposed New Highways And Tollgates(1)

• Award of construction contracts: May 2008

• Construction for 2010 phase commences (2,5 year construction period): May 2008

• Construction substantially completed: May 2010

• Construction completion date: October 2010

• Commencement of toll operations: October 2010

PROJECT PROGRAMME

Page 14: Proposed New Highways And Tollgates(1)

N1: WILLIAM NICOLIMPLEMENTATION CHALLENGES

• Availability of skills• Availability of materials• Risks associated with traffic• Risks regarding labour actions• Impact of the above on construction

costs• Impact of high construction costs on

future implementation