Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste Management Facility in Wellington. An evaluation has been conducted by CBCL which determined that the landfill could increase its height to 24 meters without impacting or creating any potential technical, operational, safety or visual concerns or issues. Increasing the height to 24 meters allows the Corporation to fully utilize the space occupied by the landfill, extend its useful life for many years, and offer a financially-responsible solution for all ratepayers. The following documents provide an overview of the existing site and demonstrate how an increase in height to 24 meters would appear visually. The artistic renderings reflect the proposed height at the worst time of year when foliage from trees is not present. During times when trees are in foliage it would be very difficult to see the landfill from any viewpoint. PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE WASTE MANAGEMENT FACILITY PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE WASTE MANAGEMENT FACILITY

Upload: others

Post on 18-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste Management Facility in Wellington.

An evaluation has been conducted by CBCL which determined that the landfill could increase its height to 24 meters without impacting or creating any potential technical, operational, safety or visual concerns or issues.

Increasing the height to 24 meters allows the Corporation to fully utilize the space occupied by the landfill, extend its useful life for many years, and offer a financially-responsible solution for all ratepayers.

The following documents provide an overview of the existing site and demonstrate how an increase in height to 24 meters would appear visually. The artistic renderings reflect the proposed height at the worst time of year when foliage from trees is not present. During times when trees are in foliage it would be very difficult to see the landfill from any viewpoint.

PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE WASTE MANAGEMENT FACILITY

PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE WASTE MANAGEMENT FACILITY

Page 2: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

La Société de gestion des déchets de Prince-Est propose d’augmenter la hauteur approuvée de son site d’enfouissement situé à l’Installation de gestion des déchets de Prince-Est à Wellington.

Selon une évaluation menée par la firme CBCL, la hauteur du site d’enfouissement pourrait être augmentée à 24 mètres sans créer de préoccupations ou de problèmes techniques, opérationnels, visuels ou de sécurité.

Cette augmentation de hauteur permettrait à la Société d’utiliser pleinement l’espace occupé par le site d’enfouissement, de prolonger sa vie utile d’un grand nombre années et d’offrir une solution viable aux contribuables.

Les documents suivants donneront un aperçu du site existant et montreront ce que ressemblera l’augmentation à 24 mètres. Les vues d’artiste reflètent la hauteur proposée au pire des temps lorsqu’il n’y a pas de feuilles sur les arbres. Lorsqu’il y aura des feuilles, il sera très difficile de voir le site d’enfouissement, peu importe le point de vue.

AUGMENTATION DE HAUTEUR PROPOSÉE POUR LE SITE D’ENFOUISSEMENT DE L’INSTALLATION DE GESTION DES DÉCHETS DE PRINCE-EST

AUGMENTATION DE HAUTEUR PROPOSÉE POUR LE SITE D’ENFOUISSEMENT DE L’INSTALLATION DE GESTION DES DÉCHETS DE PRINCE-EST

IWMCSOCIÉTÉ DE GESTION DES DÉCHETS DE L’ÎLE

Page 3: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

East Prince Waste Management FacilityInstallation de gestion des déchets de Prince-Est

East Prince Waste Management FacilityInstallation de gestion des déchets de Prince-Est

Page 4: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

Height DrawingDessin de la hauteur

HE

IGH

T A

BO

VE

EX

IST

ING

GR

AD

E

HA

UT

EU

R A

U-D

ES

SU

S

DE

LA

PE

NT

E E

XIS

TAN

TE

EXISTINGGRADE /

PENTEEXISTANTE

14

24

36

5H : 1V5H : 1V

CURRENT APPROVED TOP /PLAFOND ACTUEL APPROUVÉ

EXISTING GRADE /PENTE EXISTANTE

APPROMIXATE CURRENT LANDFILL TOP /NIVEAU APPROXIMATIF ACTUEL

DE LA DÉCHARGE

PROPOSED TOP /PLAFOND PROPOSÉ

Page 5: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

View #1 / Vue #1

Artist Rendering / Vue d’artiste

EXISTING / EXISTANTE

AERIAL / AÉRIENNE PHOTO

PROPOSED / PROPOSÉE

Page 6: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

View #2 / Vue #2

EXISTING / EXISTANTE

AERIAL / AÉRIENNE PHOTO

PROPOSED / PROPOSÉE

Artist Rendering / Vue d’artiste

Page 7: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

View #3 / Vue #3

Artist Rendering / Vue d’artiste

EXISTING / EXISTANTE

AERIAL / AÉRIENNE PHOTO

PROPOSED / PROPOSÉE

Page 8: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

East Prince Waste Management Facility LandfillConceptual Design Cross Section

East Prince Waste Management Facility LandfillConceptual Design Cross Section

Gas Ventilation Pipe

Top Soil & Grass

Protective Matting(Geotextile A)

Gravel Drainage Layer

Protective Matting(Geotextile B)40 mil Plastic HDPE Liner(Geomembrane)Sand Cushion Venting Layer

Waste

Waste

Gravel Drainage(Collection Layer)

Wastewater Collection Pipe(HDPE)

Protective Matting(Geotextile B)

80 mil Plastic HDPE Liner(Geomembrane)

Compacted Soil(Low Permeability Soil Liner)

Protective Matting(Geotextile A)

Soil Drainage Layer(Grading/Drainage Layer)

Soil Reinforcement(Geogrid)

Soil Base Layer(Grading Pad)

IWMCISLAND WASTE MANAGEMENT CORPORATION

Page 9: PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE … · Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste

DéchetsGravier de drainage

(couche collectrice)

Tuyau de collecte des eaux usées

(polyéthylène haute densité)

Tapis de protection(géotextile B)

Doublure de plastique en polyéthylène haute

densité de 80 mil(géomembrane)

Terre compactée(couche de sol à faible perméabilité)

Tapis de protection(géotextile A)

Drainage du sol(couche de terrassement/drainage)

Consolidation des sols(grille)

Couche de terre de base(terrassement)

Tuyau de ventilation des gaz

Terre arable et pelouse

Tapis de protection(géotextile A)

Couche de gravier de drainage

Tapis de protection(géotextile B)

Doublure de plastique en polyéthylène haute densité de 40 mil(géomembrane)

Coussin de sable (couche d’aération)

Déchets

Site d’enfouissement – Installation de gestion des déchets de Prince-EstSchéma théorique : coupe transversale