proposed federal infrastructure …data.cincinnati.com/misc/stimulus/docs/01-15 odot...˘ ˇ ˆ ˙...

47
Count Project Code (Sponsor Agency/Entitiy + Project #) Funds able to be obligated by July 1, 2009? (check if yes) This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector Potential Public or Private Partners Development Region (To be completed by ODOD) County and/or City Total Project Costs Federal Request Comments Regarding Status of Project Estimated Construction Jobs Estimated Job Creation Estimated Job Retention Project Description 1 ODOT-1-23835 ALL IR 75 9.60 Allen $3,604,363 $3,604,363 Rehabilitate both ramp structures over the N & S Railroad 2 ODOT-1-23870 HAN TR 241 0.09 Hancock $925,000 $925,000 Replace Existing Structure Over The Blanchard River With A New Structure. Ohio Department of Transportation PROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS Blanchard River With A New Structure. 3 ODOT-1-24489 ALL Eastown Rd. 0.00 Allen $5,534,075 $5,534,075 Extend Eastown Rd. From The Elm St. Jct. To Sr117. 4 ODOT-1-25098 DEF SR 66 7.37 Defiance $14,006,154 $14,006,154 Replace Existing Structure Over Us24 With A New Widened 5 Lane Structure. Upgrade Interchange Ramps. Implement Access Managment Techniques Between Sessions St. And Elliott Rd. Resurface From Elliott Rd. To Jewell Rd. 5 ODOT-1-25156 HAR SR 31/53/67/68/309 11.14 Hardin $1,302,187 $1,302,187 2-Lane Resurfacing On Sr31, Sr53, Us68, Sr67 And Sr309. 6 ODOT-1-25163 PUT SR 694 0.00 Putnam $1,049,400 $1,049,400 2-lane resurfacing 7 ODOT-1-25167 HAR SR 53 11.80 Hardin $139,614 $139,614 Move Ditch Back From The Roadway And Pipe The Last 150' To The Intersection 8 ODOT-1-25203 HAN IR 75 22.42 Hancock $1,176,219 $1,176,219 Minor rehab of IR75 9 ODOT-1-25240 VAN-127/224-10.99/15.84 Van Wert $1,376,000 $1,376,000 Resurfacing - 2-lane 10 ODOT-1-25242 WYA SR 103 6.59 Wyandot $220,700 $220,700 2-Lane Resurfacing On Sr103. Resurfacing on SR37 and SR53. Includes 11 ODOT-1-25272 HAR SR 37/53 0.00/1.92 Hardin $291,000 $291,000 Resurfacing on SR37 and SR53. Includes resurfacing in the Village of Forrest. 12 ODOT-1-75528 WYA-23-0.00 Wyandot $3,640,000 $3,640,000 Minor Rehab - 4-lane resurfacing 13 ODOT-1-75593 ALL TR 26 0.99 Fruend Rd. Allen $531,250 $531,250 Replace The Existing Structure Over Jennings Creek With A New Structure. 14 ODOT-1-75604 PAU CR 115 5.16 Paulding $437,950 $437,950 Replace The Existing Structure Over Six Mile Creek With A New Structure. 15 ODOT-1-75659 VAN CR 77 0.17 Van Wert $136,360 $136,360 Rehabilitate The Existing Structure By Replacing The Bridge Deck With Prestressed Concrete Box Beams. 16 ODOT-1-75824 HAN/WYA US 30 11.24/8.18 Hancock $750,928 $750,928 Overlay The Existing Bridge Decks With Micro-Silica Concrete 17 ODOT-1-76699 DEF/PAU-111/637-0.00-15.63-23.38 Defiance $1,233,000 $1,233,000 Resurfacing - 2-lane 18 ODOT-1-76876 HAN SR 37 1.36/6.54 Hancock $1,040,886 $1,040,886 2 Lane Resurfacing On Sr37. 19 ODOT-1-78111 HAN East Melrose Avenue Hancock $1,900,000 $1,900,000 Rehabilitate Street And Railroad Grade Crossing. 20 ODOT-1-80301 D01 BM FY09 District 1 $563,000 $563,000 Perform Miscellaneous Bridge Maintenance Activities On Various Structures. Activities On Various Structures. 21 ODOT-1-80305 D01 PM FY09 District 1 $907,000 $907,000 Upgrade Existing Painted Pavement Markings On Rural State Highway System For Fy2009 22 ODOT-1-80412 HAN SR 568 3.15 Hancock $590,444 $590,444 Add Turn Lanes On The North And West Approaches Of The Intersection. 23 ODOT-1-80441 ALL Lima RR Grade Separation Allen $26,605,500 $26,605,500 Study potential Grade separation of Indiana & Ohio Railroad between Bellefontaine Avenue and North Street. Then construct a grade separation at the chosen location. 24 ODOT-1-80455 ALL IR 75-11.83 Allen $1,774,900 $1,774,900 Replace culvert No. CLI-124-0003 and culvert No. CLI-350-1421 25 ODOT-1-80459 DEF SR 15/66/111/281/424 14.350 Defiance $1,700,000 $1,700,000 Pavement and Bridge Rehabilitation 26 ODOT-1-80465 VAN/PAU SR 49 19.83/0.00 Van Wert $997,000 $997,000 2-lane resurfacing 27 ODOT-1-80493 ALL/HAR-196/385-0.00/0.00 Allen $324,500 $324,500 Resurfacing - 2-lane 28 ODOT-1-81299 HAN CR 26-17.59 Hancock $800,000 $800,000 Remove And Replace Existing Structurally Deficient Bridge. !" # $%&

Upload: phamdang

Post on 30-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

1 ODOT-1-23835 � ALL IR 75 9.60 ������������� Allen $3,604,363 $3,604,363 Rehabilitate both ramp structures over the N & S Railroad

2 ODOT-1-23870 � HAN TR 241 0.09 ������������� Hancock $925,000 $925,000 Replace Existing Structure Over The Blanchard River With A New Structure.

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

2 ODOT-1-23870 � HAN TR 241 0.09 ������������� Hancock $925,000 $925,000Blanchard River With A New Structure.

3 ODOT-1-24489 � ALL Eastown Rd. 0.00 ������������� Allen $5,534,075 $5,534,075 Extend Eastown Rd. From The Elm St. Jct. To Sr117.

4 ODOT-1-25098 � DEF SR 66 7.37 ������������� Defiance $14,006,154 $14,006,154

Replace Existing Structure Over Us24 With A New Widened 5 Lane Structure. Upgrade Interchange Ramps. Implement Access Managment Techniques Between Sessions St. And Elliott Rd. Resurface From Elliott Rd. To Jewell Rd.

5 ODOT-1-25156 � HAR SR 31/53/67/68/309 11.14 ������������� Hardin $1,302,187 $1,302,187 2-Lane Resurfacing On Sr31, Sr53, Us68, Sr67 And Sr309.

6 ODOT-1-25163 � PUT SR 694 0.00 ������������� Putnam $1,049,400 $1,049,400 2-lane resurfacing

7 ODOT-1-25167 � HAR SR 53 11.80 ������������� Hardin $139,614 $139,614 Move Ditch Back From The Roadway And Pipe The Last 150' To The Intersection

8 ODOT-1-25203 � HAN IR 75 22.42 ������������� Hancock $1,176,219 $1,176,219 Minor rehab of IR759 ODOT-1-25240 � VAN-127/224-10.99/15.84 ������������� Van Wert $1,376,000 $1,376,000 Resurfacing - 2-lane10 ODOT-1-25242 � WYA SR 103 6.59 ������������� Wyandot $220,700 $220,700 2-Lane Resurfacing On Sr103.

Resurfacing on SR37 and SR53. Includes 11 ODOT-1-25272 � HAR SR 37/53 0.00/1.92 ������������� Hardin $291,000 $291,000 Resurfacing on SR37 and SR53. Includes resurfacing in the Village of Forrest.

12 ODOT-1-75528 � WYA-23-0.00 ������������� Wyandot $3,640,000 $3,640,000 Minor Rehab - 4-lane resurfacing

13 ODOT-1-75593 � ALL TR 26 0.99 Fruend Rd. ������������� Allen $531,250 $531,250 Replace The Existing Structure Over Jennings Creek With A New Structure.

14 ODOT-1-75604 � PAU CR 115 5.16 ������������� Paulding $437,950 $437,950 Replace The Existing Structure Over Six Mile Creek With A New Structure.

15 ODOT-1-75659 � VAN CR 77 0.17 ������������� Van Wert $136,360 $136,360Rehabilitate The Existing Structure By Replacing The Bridge Deck With Prestressed Concrete Box Beams.

16 ODOT-1-75824 � HAN/WYA US 30 11.24/8.18 ������������� Hancock $750,928 $750,928 Overlay The Existing Bridge Decks With Micro-Silica Concrete

17 ODOT-1-76699 � DEF/PAU-111/637-0.00-15.63-23.38 ������������� Defiance $1,233,000 $1,233,000 Resurfacing - 2-lane18 ODOT-1-76876 � HAN SR 37 1.36/6.54 ������������� Hancock $1,040,886 $1,040,886 2 Lane Resurfacing On Sr37.

19 ODOT-1-78111 � HAN East Melrose Avenue ������������� Hancock $1,900,000 $1,900,000 Rehabilitate Street And Railroad Grade Crossing.

20 ODOT-1-80301 � D01 BM FY09 ������������� District 1 $563,000 $563,000 Perform Miscellaneous Bridge Maintenance Activities On Various Structures.Activities On Various Structures.

21 ODOT-1-80305 � D01 PM FY09 ������������� District 1 $907,000 $907,000Upgrade Existing Painted Pavement Markings On Rural State Highway System For Fy2009

22 ODOT-1-80412 � HAN SR 568 3.15 ������������� Hancock $590,444 $590,444 Add Turn Lanes On The North And West Approaches Of The Intersection.

23 ODOT-1-80441 � ALL Lima RR Grade Separation ������������� Allen $26,605,500 $26,605,500

Study potential Grade separation of Indiana & Ohio Railroad between Bellefontaine Avenue and North Street. Then construct a grade separation at the chosen location.

24 ODOT-1-80455 � ALL IR 75-11.83 ������������� Allen $1,774,900 $1,774,900 Replace culvert No. CLI-124-0003 and culvert No. CLI-350-1421

25 ODOT-1-80459 � DEF SR 15/66/111/281/424 14.350 ������������� Defiance $1,700,000 $1,700,000 Pavement and Bridge Rehabilitation26 ODOT-1-80465 � VAN/PAU SR 49 19.83/0.00 ������������� Van Wert $997,000 $997,000 2-lane resurfacing27 ODOT-1-80493 � ALL/HAR-196/385-0.00/0.00 ������������� Allen $324,500 $324,500 Resurfacing - 2-lane

28 ODOT-1-81299 � HAN CR 26-17.59 ������������� Hancock $800,000 $800,000 Remove And Replace Existing Structurally Deficient Bridge.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #��������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

29 ODOT-1-81313 � ALL Lima Jameson Avenue ������������� Allen $1,386,455 $1,386,455

Roadway Will Become 2 Way Traffic. Widen Pavement To Accomodate Three 12' Lanes. Two Lanes Southbound And One Lane Northbound. Replace Gutter And 29 ODOT-1-81313 � ALL Lima Jameson Avenue ������������� Allen $1,386,455 $1,386,455 Lane Northbound. Replace Gutter And Sidewalks. Appears Sidewalk Will Be Approximately The Same Location As It Exists Now.

30 ODOT-1-81435 � PAU-637-15.69 ������������� Paulding $291,180 $291,180 Bridge Rehab

31 ODOT-1-81832 � ALL Spencerville Streetscape ������������� Allen $1,125,431 $1,125,431

Aesthetically Enhance Broadway Street (Sr 66) (Located In The Village Of Spenceville) By Incorporating Brick Pavers, Replacing Sidewalks, And Planting Trees And Shrubs. Also Includes Trash Recepticles And Benches.

32 ODOT-1-81837 � ALL Bluffton Streetscape ������������� Allen $625,182 $625,182

Aesthetically Enhance Main Street (Sr103) In Downtown Bluffton By Replacing Portions Of Existing Sidewalk And Replacing With Decorative Pavers. Also Replace Existing Deteriorated Curb, Add New Decorative Lighting.

�������������

Connect Two Ends Of The Blanchard River Greenway Trails By Constructing A Bikepath 33 ODOT-1-81843 � HAN-Blanchard River Greenway Tr ������������� Hancock $2,500,000 $2,500,000 Greenway Trails By Constructing A Bikepath Along The Blanchard River Between Taylor Street And Central Parkway.

34 ODOT-1-82038 � VAN-81-0.73 ������������� Van Wert $1,123,200 $1,123,200 Resurfacing - 2-lane

35 ODOT-1-82150 � D01 GR FY09 ������������� District 1 $132,200 $132,200 Guardrail Repair And Replacement Contract

36 ODOT-1-82152 � WYA SR 67-11.03/11.51 ������������� Wyandot $243,604 $243,604Overlay Deck On Structure Over St James Run; Replace Approach Slabs On Structure Over St James River

37 ODOT-1-82172 � HAN SR 103 15.28 ������������� Hancock $168,105 $168,105 Replace Twin Cell Culvert And Provide Clear Zone Grading

38 ODOT-1-82197 � ALL-30/65-8.80/13.22 ������������� Allen $87,164 $87,164 Bridge Rehab - Vandal Protection Fence39 ODOT-1-82682 � D01-BP-FY13 ������������� District 1 $5,000,000 $5,000,000 Bridge Painting

40 ODOT-1-83190 � HAN ODNR DISTRICT 2 HQ ������������� Hancock $60,000 $60,000 Resurface Odnr District Headquarters Entrance Road And Parking Lot.

41 ODOT-1-83268 � DEF CR 153 ������������� Defiance $872,532 $872,532Replace Structure Over Tiffin River Usint Ibrd Funding.Ibrd Funding Use For (Grs) Abutments Geosynthetically Reinforced SoilAbutments Geosynthetically Reinforced Soil

42 ODOT-1-83553 � ALL/HAN-75-18.28/0.00 ������������� Allen $3,829,200 $3,829,200 Minor Rehab - 4-lane resurfacing

43 ODOT-1-83598 � ALL 309 CURB REPLACEMENTS ������������� Allen $247,000 $247,000Remove And Replace Raised Curb Median As Well As Drainage Structures From Cole Street To Leland Avenue.

44 ODOT-1-83773 � PUT US 224-2.64 ������������� Putnam $47,000 $47,000

The Village Of Kalida Is Letting Their Own Project To Reconstruct Us 224 And Sr 114 Intersection. Odot Will Reimburse The Village For The Top 3" Of Asphalt And Longitudinal Pavement Markings On Both Us 224 And Sr 11

45 ODOT-1-83894 � DEF SR 66 8.40 ������������� Defiance $759,181 $759,181 Resurface Using Microsurfacing.46 ODOT-1-84148 � HAN-568-0.52 ������������� Hancock $129,300 $129,300 Bridge Rehab

47 ODOT-1-84439 � ALL/HAN 75/68 MEDIAN BARRIER ������������� Allen $839,000 $839,000Repair/Replace Sections Of Deteriorated Median Wall Barrier On Both All 75 And Han 68

48 ODOT-1-84496 � WYA US 23 6.69 ������������� Wyandot $3,105,000 $3,105,000 Grind And Pave Us 23 On Both Mainline And Shoulders

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #��������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

49 ODOT-1-84764 � HAN CR 802-SUMMIT STREET ������������� Hancock $470,394 $470,394Replace Bridge On Summit Street Over East Branch Of The Portage River In FostoriaClearing Obstruction from Runway Safety 50 ODOT-1-85380 � Defiance ES09 Obstr Rem T/W ������������� Defiance $491,310 $491,310 Clearing Obstruction from Runway Safety Areas - relocate taxiway

51 ODOT-1-85381 � Findlay ES09 T/W, Apron, RSA ������������� Hancock $3,625,025 $3,625,025 Relocate taxiway, expand apron, improve runway safety area

52 ODOT-1-85386 � Hardin County ES09 Reconst T/W ������������� Hardin $278,906 $278,906 Reconstruct parallel taxiway

53 ODOT-1-85413 � Maumee & Western Rail Line Rehab �������������Henry, Defiance

$2,400,000 $2,400,000 Maumee & Western Railroad Line Rehabilitation

54 ODOT-1-85491 � ALL Riverwalk Connector ������������� Allen $2,000,000 $2,000,000 Build bikepath grade separation over Roush Road that conects existing path.

55 ODOT-1-85495 � ALL Kibby/Main ������������� Allen $309,760 $309,760Replace the Kibby Street Bridge over Lost Creek. Deck repair and overlay of the Main Street bridge over the Ottawa River.

56 ODOT-1-85500 � ALL WWTP ������������� Allen $275,000 $275,000 Rehab. piers, guardrail and wearing surface over Ottawa River.

57 ODOT-1-85650 � D01 Pavement Projects PCR <60 ������������� D01 $51,000 $51,000 General PID of District Pavement Below 60 PCR in Current Program

58 ODOT-2-8936 � LUC-20-11.57 ������������� Lucas $412,000 $412,000 Replace 14 feet culvert over a ditch59 ODOT-2-8941 � SEN-23-4.88 ������������� Seneca $260,000 $260,000 Replace 14 feet culvert over a ditch60 ODOT-2-11451 � OTT-19-6.67 ������������� Ottawa $320,000 $320,000 Bridge replacement60 ODOT-2-11451 � OTT-19-6.67 ������������� Ottawa $320,000 $320,000 Bridge replacement61 ODOT-2-11455 � WIL-191-5.31 ������������� Williams $700,000 $700,000 Bridge replacement62 ODOT-2-11459 � WIL-576-17.73 ������������� Williams $2,040,000 $2,040,000 Bridge replacement

63 ODOT-2-21052 � LUC SR 2 30.23 Yondota/Teachout ������������� Lucas $4,500,000 $4,500,000 Widen Sr-2 In Lucas County At Yondota And Teachout

64 ODOT-2-23111 � SEN JONES ROAD Grade Separation ������������� Seneca $9,000,000 $9,000,000 Railroad Grade Separation

65 ODOT-2-23114 � FUL/LUC Hallett Ave Grade Sep ������������� Fulton $8,700,000 $8,700,000 Railroad Grade Separation66 ODOT-2-23593 � LUC-25-8.29/8.37 ������������� Lucas $4,400,000 $4,400,000 Rehabilitate 2 bridges 67 ODOT-2-23595 � SEN SR 67 2.43 ������������� Seneca $2,010,000 $2,010,000 Replace Bridge

68 ODOT-2-25447 � SEN SR 101 5.69 Resuf ������������� Seneca $3,000,000 $3,000,000

2-Lane Mill And Fill (2.25") With About 16% Pavement Repairs, Perform Necessary Related Work. See Pid 80572 For Sen-101 From 1.67 To 5.69. Update: Added The Sen-101-5.37 Culvert.

69 ODOT-2-25490 � HEN SR 424 0.00 Resurf ������������� Henry $2,000,000 $2,000,000 Pavement and Bridge Rehabilitation70 ODOT-2-25492 � WOO-75-30.70 ������������� Wood $20,300,000 $20,300,000 Major reconstruction

2-Lane Resurfacing With Pavement Repairs As Needed; Perform Necessary Related

71 ODOT-2-25494 � WOO SR 199 6.22 ������������� Wood $2,270,000 $2,270,000

As Needed; Perform Necessary Related Work. Mill 1.5" And Fill With 3.75" With 1% Pavement Repairs.Update: From W. Millgrove S. Corp Line To N. Corp Line: Mill 2" & Replace With 1.25" Intermediate 442 9.5Mm Type A

72 ODOT-2-25521 � WOO-75-19.92 ������������� Wood $27,300,000 $27,300,000 Major reconstruction

73 ODOT-2-25522 � WIL SR 49 0.00 Resurf ������������� Williams $618,000 $618,0002-Lane Resurfacing With Pavement Repairs As Needed; Perform Necessary Related Work.

74 ODOT-2-25528 � LUC IR 75 6.11 Prev Maint ������������� Lucas $500,000 $500,000

Priority System Preventive Maintenance Project On Luc-75 From About Us-24/Collingwood, Near Phillips Ave, To Ceceilia, Perform Necessary Related Work.

75 ODOT-2-25555 � LUC IR 75 0.27 Ovrly Bridges ������������� Lucas $17,200,000 $17,200,000 Hydrodemo The Existing Wearing Course And Overlay With Micro-Silica.

76 ODOT-2-75322 � SEN TR 43 0.20 Grade Separation ������������� Seneca $6,800,000 $6,800,000 Railroad Grade Separation

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

77 ODOT-2-75578 � LUC Hill Ave ������������� Lucas $6,900,000 $6,900,000

Widen Hill Ave In The City Of Toledo To 3 Lanes: One In Each Direction And One 2 Way Left Turn Lane; Add Curb And Curb Ramps With Truncated Domes; Perform Ramps With Truncated Domes; Perform Necessary Related Work.

78 ODOT-2-75937 � LUC 475 2.54 Salisb Interchg ������������� Lucas $27,789,000 $27,789,000Construction Of New/Modified I-475/Salsibury Rd Interchange In Lucas County

79 ODOT-2-76049 � Lucas/Wood ITS ������������� Wood $16,000,000 $16,000,000 Intell. Trans. Systems80 ODOT-2-77255 � Lucas I-475 ������������� Lucas $95,000,000 $95,000,000 Interstate Reconstruction

81 ODOT-2-79026 � WOO SR 105 6.70 Curve Safety ������������� Wood $730,000 $730,000

Resurface And Perform A Minor Widening Of The Curve Between Tr-10 (Banks) And Tr-266 (Aufderstrasse). Project Was Downscaled Drastically From Its Original Scope. Perform Necessary Related Work.

82 ODOT-2-79991 � LUC-475-14.18 ������������� Lucas $1,200,000 $1,200,000 Paint steel bridges83 ODOT-2-80000 � LUC-184-8.32/8.40 ������������� Lucas $7,200,000 $7,200,000 Bridge redecking

84 ODOT-2-80030 � WOO IR 75 28.78 Bridge painting ������������� Wood $1,400,000 $1,400,000Paint the structural steel of the I-75 bridges over the Ohio Turnpike (I-80/90) in Wood County; Construct A Two-Way Left Turn Lane And

85 ODOT-2-80038 � LUC McCord Rd Widening Phase 2 ������������� Lucas $2,200,000 $2,200,000

Construct A Two-Way Left Turn Lane And Reconstruct Pavement. Curb And Gutter And Some Sidewalks Will Be Constructed/Upgraded And Shoulder Widened To 4 Feet Along The Length Of The Project. Proper Signage, Striping,

86 ODOT-2-80044 � LUC Nebraska/King roundabout ������������� Lucas $714,000 $714,000

Construct A One Lane Modern Roundabout At The Intersection Of Nebraska Ave And King Rd In Western Lucas County. Design Was Changed From Left Turn Lanes To A Roundabout. Mill And Fill Of The Existing Pavement With Some Minor Pavement Repairs;

87 ODOT-2-80045 � LUC Angola Rd Widening ������������� Lucas $1,765,000 $1,765,000Build A Two Way Left Turn Lane And Reconstruct Pavement; Perform Necessary Related Work.

88 ODOT-2-80372 � SEN CR 62/592 Resurfacing ������������� Seneca $1,900,000 $1,900,000 Resurface Cr-62 And Cr-592; Perform Necessary Related Work.

Construct A New 4 Lane Divided Facility On

89 ODOT-2-80444 � LUC US 24 6.19 Part 3 F2P ������������� Lucas $76,450,000 $76,450,000A New Alignment, With A New Interchange At Sr-64 And Overpasses At Neowash Rd, Neapolis-Waterville Rd, Dutch Rd, And Waterville-Monclova Rd In Lucas County;

90 ODOT-2-80446 � HEN/LUC US 24 15.85 Part 2 F2P ������������� District 2 $72,300,000 $72,300,000

Construct A New 4 Lane Divided Facility On A New Alignment, With A New Interchange At Sr-295 And Overpasses At Cr-109 And Jeffers Rd In Lucas County, And An Overpass At Cr-3 In Henry County.

91 ODOT-2-80510 � LUC Glendale Ave Resurfacing ������������� Lucas $538,700 $538,700Resurface Glendale Ave (CR-503) in the City of Toledo from Byrne Rd to Charmaine Dr.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

92 ODOT-2-80527 � SEN Miami St Enh in Tiffin Ermk ������������� Seneca $827,796 $827,796

To Enhance Miami Street, The Entryway To Tiffin University, By Installing A 10 Feet Wide Median To Create A Boulevard, 92 ODOT-2-80527 � SEN Miami St Enh in Tiffin Ermk ������������� Seneca $827,796 $827,796Wide Median To Create A Boulevard, Installing Four Handicap Accessible Crosswalks Using Brick Pavers, Installing Streetlights Landscaping

93 ODOT-2-80638 � SAN CR 213 0.00 Resurfacing ������������� Sandusky $466,000 $466,000Resurface Cr-213 In Sandusky From Cr-192 To Woodland Ave In The City Of Clyde; Perform Necessary Related Work.

94 ODOT-2-80672 � FUL US20/SR109 13.79/5.80 Resurf ������������� District 2 $3,610,000 $3,610,000

Mill 3.25" And Fill With 1.75" Intermediate And 1.5" Surface With An Estimated 8% Pavement Repair. The Thickness Of The Milling & Filling Is Reduced To 2.25" For Ful-109 From Us-20 (Slm 14.89) To Sr-120 (Slm 16.89). Perform Necessary Related Work.

95 ODOT-2-80694 �LUC-475-5.22/5.47 bridges over Angola & RR

������������� Lucas $7,420,000 $7,420,000 Bridge redecking and widening

96 ODOT-2-80695 � 475 over Turnpike ������������� Lucas $12,240,000 $12,240,000 Bridge redecking and widening

97 ODOT-2-80728 � SEN SR 18 12.11 Tiffin Urban Pav ������������� Seneca $560,000 $560,000

Resurface Sr-18 In The City Of Tiffin, Under The Urban Paving Program, From Us-224 97 ODOT-2-80728 � SEN SR 18 12.11 Tiffin Urban Pav ������������� Seneca $560,000 $560,000 The Urban Paving Program, From Us-224 To Elmer St., A Distance Of About 1.44 Mile. Perform Necessary Related Work.

98 ODOT-2-80849 � SAN SR 412 5.75 ������������� Sandusky $206,000 $206,000Replace San-412-5.75 Culvert Over Little Racoon Creek, Perform Necessary Related Work.

99 ODOT-2-80859 � SEN CR 7 4.00 Bridge Repl ������������� Seneca $830,000 $830,000

Replace Cr-7 Bridge Over A Branch Of The Wolf Creek; The Existing Structure Is A Concrete Beam Structure; Perform Necessary Rellated Work.

100 ODOT-2-81292 � LUC-24-15.23 ������������� Lucas $3,100,000 $3,100,000 Redeck existing bridge101 ODOT-2-81518 � WOO-75-11.74 Rest areas ������������� Wood $2,000,000 $2,000,000 Improve facilities & lots at rest areas

102 ODOT-2-81978 � FUL VAR PM Ph 2 ������������� Fulton $135,000 $135,000

A Project To Perform Pavement Marking On Various County Routes In Fulton County. Project Is Funded With Ceao Funds. Perform Necessary Related Work.

Resurface Detroit Ave (Us-24) From Glendale Ave To Garden Lake Blvd In The

103 ODOT-2-81981 � LUC US 24 21.47 Urban Pav ������������� Lucas $580,000 $580,000Glendale Ave To Garden Lake Blvd In The City Of Toledo Under The Urban Paving Program. Perform Necessary Related Work.

104 ODOT-2-82185 � LUC 65 4.40 Summit Enh CBS Ermrk ������������� Lucas $475,892 $475,892

A Streetscape Improvements Of Summit St Between Locust St And Lagrange St In The City Of Toledo. Project Will Involve Streetscape Beautification Including Sidewalk And Pedestrian Friendly Improvements, As Well As Landscaping And Other Site Amenities.

105 ODOT-2-82332 � HEN-18-12.00 ������������� Henry $1,025,000 $1,025,000 2 lane resurfacing106 ODOT-2-82333 � SEN-53-4.64 ������������� Seneca $310,000 $310,000 Replace one culvert and reline another107 ODOT-2-82401 � LUC SR 2 32.21 Howard Inters ������������� Lucas $2,400,000 $2,400,000 Safety Upgrade of Howard intersection

108 ODOT-2-82416 � WIL SR 15 Culverts ������������� Williams $824,000 $824,000

Replace 3 Culverts In Williams County On Sr-15. These Culverts Are:Wil-15-8.64 Cmp Elleptical 87"X63"X82'Wil-15-10.25 Cmp Arch 87"X63"X66'Wil-15-14.25 Cmp Arch 87"X63"X94'Perform Necessary Related Work.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #��������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

109 ODOT-2-82711 � LUC Broadway St Enhancement ������������� Lucas $175,400 $175,400

A Tmacog Funded Enhancement Project Along Broadway St To Provide A Decorative Walk With Concrete Pavers, Improved Decorative Pedestrian Lighting,

109 ODOT-2-82711 � LUC Broadway St Enhancement ������������� Lucas $175,400 $175,400Decorative Pedestrian Lighting, Planting,....Perform Necessary Related Work.

110 ODOT-2-82769 � WOO Eckel Jct/Fort Meigs/SR-199 ������������� Wood $567,000 $567,000

In The City Of Perrysburg, Upgrade The Intersection Of Eckel Junction Rd And Fort Meigs Rd By Signalizing And Minor Widening To Construct Exclusive Left-Turn Lanes On All Approaches. Upgrade The Northern T Intersection Of Eckel Junction Rd And Sr-199

111 ODOT-2-83219 � OTT East Harbor State Park Pavng ������������� Ottawa $670,000 $670,000

An Odnr Sponsored Project To Microsurface The Parking Areas Of The Ott-East Harbor State Park, Design Is Handled By Central Office Production, Perform Necessary Related Work.

112 ODOT-2-83239 � WOO IR 75 28.66 Slide Repair ������������� Wood $4,500,000 $4,500,000

A GSM funded project to install curb along the NB edge of pavement with 2 catch basins to control water. The slopes should be flattened slightly and the dariange ditch should be moved away from the toe of the should be moved away from the toe of the slope. The voids under the approach slabs sh

113 ODOT-2-83241 � SAN US 6 17.94 Slide Repair ������������� Sandusky $4,500,000 $4,500,000

A GSM funded project to address the rotational slide resulting from the saturated soils in the fill. The existing material in the clear zone of US-6/US-20 in Fremont has been moving since December 2006. A source of water has been investigated but has not

114 ODOT-2-83242 � WOO IR 75 5.05 Slope Repair ������������� Wood $4,500,000 $4,500,000

A GSM partially funded project to address circular failures throughout the embankement slopes. Perform necessary related work.

115 ODOT-2-83267 � HEN SR 108 17.60 Resurf/Bridge ������������� Henry $1,760,000 $1,760,000

Mill 3.25" And Fill With 1.75" Intermediate And 1.5" Surface With An Estimated 8% Pavement Repairs. Perform Necessary Related Work. Smoothseal From Slm 17.64 To Slm 18.73. Added Bridge From Pid 84669.84669.

116 ODOT-2-83269 � OTT SR 163 20.89 Resurf ������������� Ottawa $1,200,000 $1,200,000

Mill 3.25" And Fill With 1.75" Intermediate And 1.5" Surface With An Estimated 8% Pavement Repairs. Perform Necessary Related Work.

117 ODOT-2-83270 � SAN US 6 0.00/18.81 Resurf ������������� Sandusky $3,870,000 $3,870,000

Mill 3.25" And Fill With 1.75" Intermediate And 1.5" Surface With 8% Estimated Pavement Repairs. Perform Necessary Related Work. Update: The End Point For The First Piece Has Been Changed To Stop At Helena West Corp Line Due To Their Sewer Project In 2010

118 ODOT-2-83271 � SEN US 224 19.83 Resurf ������������� Seneca $2,680,000 $2,680,000

Mill 2.25" And Fill With 0.75" Intermediate And 1.5" Surface With 8% Estimated Pavement Repairs. Perform Necessary Related Work.

119 ODOT-2-83411 � WOO IR 280 0.74 (Signs) ������������� Wood $1,000,000 $1,000,000 Systematic sign replacement project, perform necessary related work.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����(��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

120 ODOT-2-83590 � D02 TSG FY2010 ������������� District 02 $500,000 $500,000

District wide signal maintenance contract to maintain aging traffic signals. The contract will include upgrading LED's, signal heads 120 ODOT-2-83590 � D02 TSG FY2010 ������������� District 02 $500,000 $500,000will include upgrading LED's, signal heads and hangers that were installed begining in 2002. Additionally, the contract will perform upgrade to various signal wiri

121 ODOT-2-83603 � SEN-SR19/SR228-9.58/0.00 Chpseal ������������� District 2 $385,000 $385,000A 2-Lane Preventive Maintenance (Single Chipseal). Update: Extended Sr-19 From Slm 15.19 To Slm 19.71.

122 ODOT-2-84082 � LUC US20 Greenhouse Row ������������� Lucas $1,230,000 $1,230,000

Construct Pilot Enhancement Project That Includes Bioswales And Which Utilizes Local Plants; Other Enhancement Features To Be Included As Appropriate.

123 ODOT-2-84319 � OTT Ferry Terminal Buildings ������������� Ottawa $484,800 $484,800

Project To Utilize And Showcase Solar Technology At The Port Clinton And Put-In-Bay Terminal Buildings. The Terminal Buildings Will Receive New Roofing And Solar Technology

124 ODOT-2-84407 � LUC SR 2 9.83 EB lanes reconfig ������������� Lucas $400,000 $400,000

Project To Revise The Traffic Control Plan On Eastbound Sr-2 (Airport Hwy) From Spring Meadows East Dr To Sb I-475 124 ODOT-2-84407 � LUC SR 2 9.83 EB lanes reconfig ������������� Lucas $400,000 $400,000 Spring Meadows East Dr To Sb I-475 Signalized Intersection To Improve Lane Utilization.

125 ODOT-2-84430 � LUC SR 184 1.860 Signal Upgrade ������������� Lucas $765,000 $765,000

Project To Upgrade Existing Traffic Signals Along Alexis Rd Between Flanders Rd & Detroit Ave (21 Intersections) And At The Intersection Of Angola Rd & Holland-Sylvania.

126 ODOT-2-84672 � WOO-475-3.86 over Maumee River ������������� Wood $6,500,000 $6,500,000 Bridge overlay

127 ODOT-2-84932 � SAN CR Var Pav Marking Phase 3 ������������� Sandusky $136,000 $136,000Pavement Marking Of Various Count Routes In Sandusky County, Perform Necessary Related Work.

128 ODOT-2-85058 � D02 GR FY2010 ������������� District 02 $1,000,000 $1,000,000 Districtwide guardrail maintenance contract; perform necssary related work.

129 ODOT-2-85220 � LUC IR 475 1.00 Slope Repair ������������� Lucas $4,500,000 $4,500,000

A GSM funded project to repair slope failure of west enbankement of I-475 SB near US-24 in Lucas County, perform necessary related work.

130 ODOT-2-85241 � SAN-20-10.17 ������������� Sandusky $8,000,000 $8,000,000 major reconstruction130 ODOT-2-85241 � SAN-20-10.17 ������������� Sandusky $8,000,000 $8,000,000 major reconstruction

131 ODOT-2-85363 � HEN SR 110 3.51 Slide Repair ������������� Henry $4,500,000 $4,500,000 Repair a slide on SR-110 in Henry County, perform necessary related work.

132 ODOT-2-85399 � Carl Keller ES09 Recon T/W ������������� Ottawa $162,000 $162,000 Reconstruct taxiway133 ODOT-2-85402 � Put-In-Bay ES09 Obst Rem RSA ������������� Ottawa $480,000 $480,000 Relocate helipad134 ODOT-2-85405 � Sandusky Co ES09 Ext. T/W ������������� Sandusky $1,200,000 $1,200,000 Extend taxiway135 ODOT-2-85415 � Indiana Northeastern Line Rehab ������������� Williams $600,000 $600,000 Indiana Northeastern Line Rehabilitation

136 ODOT-2-85416 �ORDC - Construction (CSX North Baltimore)

������������� Wood $10,000,000 $10,000,000 ORDC - Construction (CSX North Baltimore)

137 ODOT-2-85519 � Toledo Express ES09 R/W T/W Reha ������������� Lucas $3,750,000 $3,750,000 Rehab R/W, Recosntruct T/W

138 ODOT-2-85545 � TARTA 62 - 35/40 Ft Buses ������������� District 02 $21,700,000 $21,700,000TARTA - 62- 35/40 foot replacement buses (Biodiesel)

139 ODOT-2-85546 � TARTA 10 - <30 Ft Buses ������������� District 02 $2,250,000 $2,250,000 TARTA - 10- <30 foot buses (5 replacement, 5 explansion

140 ODOT-2-85547 � TARTA 10 - <30 Ft Buses ADA Para ������������� District 02 $2,250,000 $2,250,000 TARTA - 10- <30 foot buses ADA Paratransit (Replacement)

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����&��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

141 ODOT-2-85548 � TARTA - Rehab/New Bus Stations ������������� District 02 $20,000,000 $20,000,000 TARTA - Rehab/New Bus Stations

142 ODOT-2-85551 � TARTA - 7 Repl. Serv Supp Vehcls ������������� District 02 $210,000 $210,000 TARTA - 7 Replacement Service Support VehiclesVehicles

143 ODOT-2-85633 � Toledo Shipyard Modernization ������������� Lucas $15,000,000 $15,000,000 City of Toledo Shipyard Modernization

144 ODOT-2-85651 � D02 Pavement Projects PCR <60 ������������� D02 $29,357,000 $29,357,000 General PID of District Pavement Below 60 PCR in Current Program

145 ODOT-2-85674 � Toledo Metcalf ES09 R/W rehab ������������� Wood $2,921,000 $2,921,000 R/W 14/32 Rehab

146 ODOT-3-13363 � MED SR 0252 09.951 ������������� Medina $1,148,225 $1,148,225 Replace 4 Deficient Structures Over Small Creeks 1994-A Bridge Program

147 ODOT-3-13364 � MED-421-3.073 ������������� Medina $1,400,000 $1,400,000 Structure Replacement148 ODOT-3-16592 � MED SR 0301 15.885 ������������� Medina $575,282 $575,282 Rplace deficient 68' Structure149 ODOT-3-18221 � ASD-42-3.57 ������������� Ashland $1,300,000 $1,300,000 Bridge Rehabilitation150 ODOT-3-18232 � LOR SR 0083 10.32 ������������� Lorain $474,296 $474,296 Replace deficient 38' Structure151 ODOT-3-18241 � WAY-301-3.86 ������������� Wayne $2,000,000 $2,000,000 Bridge Rehabilitation152 ODOT-3-18242 � WAY-539-10.81 ������������� Wayne $2,100,000 $2,100,000 Bridge Rehabilitation153 ODOT-3-19571 � ASD-302-0.89 ������������� Ashland $700,000 $700,000 Bridge Replacement154 ODOT-3-19601 � ASD-89-2.94 ������������� Ashland $500,000 $500,000 Bridge Replacement

155 ODOT-3-19656 � ERI SR 0060 08.92 ������������� Erie $516,622 $516,622 Replace Twin 10 Ft Cmp Arch Over Edson Creek

156 ODOT-3-19657 � ERI SR 0061 01.89 ������������� Erie $444,252 $444,252 Replace twin 10 ft arch 156 ODOT-3-19657 � ERI SR 0061 01.89 ������������� Erie $444,252 $444,252 Replace twin 10 ft arch 157 ODOT-3-20383 � HUR-61-21.86 ������������� Huron $500,000 $500,000 Arch Replacement

158 ODOT-3-22080 � LOR SR 0611 05.66 (Colorado Ave) ������������� Lorain $3,223,143 $3,223,143 Upgrade Sr611 To Three Lanes To Provide Adequate Capacity Incl 4' Paved Shoulder

159 ODOT-3-23574 � MED SR 0083 00.93 ������������� Medina $6,465,548 $6,465,548 2 Lane Resurfacing Includes Culvert Med-83-2.27

160 ODOT-3-23799 � LOR SR 0002 03.50 ������������� Lorain $4,624,100 $4,624,100Minor Rehabilitation Coordinate With Pid:81796 Lor Sr 0002 07.42 (Safety Project)

161 ODOT-3-24811 � ERI SR 0004 11.03 ������������� Erie $1,430,686 $1,430,686Conrail Underpass Paintingunderpass Rehabilitation Project Replace Concrete, Drainage And Handrails

162 ODOT-3-25667 � CRA SR 0004 10.88 ������������� Crawford $2,617,662 $2,617,662 2-lane resurfacing163 ODOT-3-25703 � WAY SR 0003 17.61 ������������� Wayne $1,346,000 $1,346,000 Urban Paving Program - City Of Wooster

164 ODOT-3-25732 � LOR-2-10.46 ������������� Lorain $650,000 $650,000 Preliminary Engineering for Replace and Widen Structure Deck

165 ODOT-3-77460 � LOR Ferndale Ave. Phase II ������������� Lorain $2,910,375 $2,910,375Reconstruct The Pavement On Existing Alignment And New Grade Including Curb 165 ODOT-3-77460 � LOR Ferndale Ave. Phase II ������������� Lorain $2,910,375 $2,910,375 Alignment And New Grade Including Curb And Gutter W/ Sidewalks

166 ODOT-3-77475 � MED IR 0076 00.61 ������������� Medina $19,000,000 $19,000,000Rehabilitation Replace existing shoulders-install underdrains-remove/replace 7" asphalt-mainline bridge deck overlays .

167 ODOT-3-77975 � CRA SR 0004 08.82 ������������� Crawford $2,683,425 $2,683,425

Full Reconstruction Of Sandusky Ave. In The City Of Bucyrus Between Charles Ave. And The Sandusky River Bridge. The Length Is Approximately 2,700 Feet Or 0.51 Miles.

168 ODOT-3-77984 � CRA Park Road Bridge ������������� Crawford $222,568 $222,568 Replace The Crestline-Park Road Bridge

169 ODOT-3-77986 � RIC Orange Street Bridge ������������� Richland $814,595 $814,595Replace The Existing Superstructure And Limited Rehabilitation Work On The Existing Abutments

170 ODOT-3-78848 � HUR CR 0139 01.50 (Angling Rd) ������������� Huron $604,994 $604,994

Bridge Replacement On Cr 139 (Greenwich Angling Road) Over The Southwest Branch Of The Vermilion River, North Of South Central High School.

171 ODOT-3-79279 � ERI CR 0007 00.90 (Strub Rd) ������������� Erie $589,000 $589,000 Intersection Project

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����)��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

172 ODOT-3-79425 � HUR US 0224 05.75 ������������� Huron $1,432,957 $1,432,957

Phase 3 Of The City Of Willard Us Route 224 Project And Is Located Within The Corporation Limits Of The City. The Total 172 ODOT-3-79425 � HUR US 0224 05.75 ������������� Huron $1,432,957 $1,432,957Corporation Limits Of The City. The Total Project Is Approximately 2,400 Feet. This Projects Consists Of The Construction Of A Complete 3 Lane, 36' Wide Pavement

173 ODOT-3-79449 � CRA SR 0019 01.18 ������������� Crawford $2,237,035 $2,237,035Urban Paving - Paving State Routes Within The City Of Galion. Coordinate With Small City Project Pid:83138 Cra Sr 0061 01.29

174 ODOT-3-79452 � LOR SR 0058 24.65 ������������� Lorain $1,537,686 $1,537,686 Urban Paving - On Sr58 Within The City Of Lorain

175 ODOT-3-79454 � ERI Mills Street ������������� Erie $1,523,710 $1,523,710

Reconstruction Of Mills Street In The City Of Sandusky From Perkins Ave. To Rr. The Project Will Reconstruct Mills Street By Replacing The Existing Typical Street Section With Concrete Curb And Gutter, New Full Depth Asphalt Pavement, Concrete Sidewalks,

176 ODOT-3-79489 � WAY SR 0057 02.19 ������������� Wayne $450,453 $450,453 Urban Paving - Resurface Sr57 In City Of OrrvilleResurface Sr 301 From Elyria North Corp 177 ODOT-3-80169 � LOR SR 0301 21.82 ������������� Lorain $945,700 $945,700 Resurface Sr 301 From Elyria North Corp (21.82) To Sr611 (25.11)

178 ODOT-3-80173 � ASD SR 0060 00.68 ������������� Ashland $2,979,278 $2,979,278Resurfacingasd-060-00.68 (Sr 3) To 11.77 (Just North Of Sr60/Us30 Ramps)Asd-003-06.08 (Sr 60) To 06.80 (Hol Co Line)

179 ODOT-3-80175 � HUR SR 0060 02.07 ������������� Huron $1,648,934 $1,648,934Overlay Sr60 From New London North Corp (2.07) To Us20 (13.44)Thin Overlay Over Existing (Pid:77297) Chip Seal Surface

180 ODOT-3-80506 � MED Guilford Boulevard ������������� Medina $536,580 $536,580 Reconstruct Guilford Ave.181 ODOT-3-80507 � MED N. Huntington Street ������������� Medina $1,543,781 $1,543,781 Reconstruct North Huntington Street

182 ODOT-3-81326 � ASD Bicycle Bridge ������������� Ashland $336,421 $336,421Construct A Bicycle And Pedestrian Bridge W/ 800' Of Trail To Complete A Missing Link On A Local Facility

183 ODOT-3-82635 � RIC-42-13.52 ������������� Richland $1,800,000 $1,800,000

Preliminary Engineering for Reconstruction of Roadway from Parry Avenue to McElroy Road including dual lane roundabouts north and south of US 30 Interchange

184 ODOT-3-82694 � MED CR GR FY2009 ������������� Medina $272,700 $272,700

Install New Guardrail And Repair Or Replace Existing Guardrail At Various Locations On Various County Roads In Medina County

185 ODOT-3-82986 � D03 LOOP FY2009 ������������� District 3 $50,000 $50,000 District Wide Loop Maintenancedistrict Will Program Traffic Signal Project

186 ODOT-3-82989 � D03 PM FY2009 ������������� District 3 $950,000 $950,000 District Wide Pavement Marking Fast Dry / Polyester / Auxiliary

187 ODOT-3-82991 � D03 RPM FY2009 ������������� District 3 $250,000 $250,000 Replace Prismatic Retro-Reflectors And Replace Any Broken Or Missing Castings

188 ODOT-3-83179 � ERI Castalia Fish Hatchery ������������� Erie $65,000 $65,000 Seal Coat And Aggregate Resurfacing

189 ODOT-3-83449 � LOR-90-13.20 ������������� Lorain $1,300,000 $1,300,000Preliminary Engineering/Detailed Design for Bridge Rehabilitation of 2 sets of I-90 structures

190 ODOT-3-84729 � D03 PR FY2009 (B) ������������� District 3 $122,951 $122,951 Tree Removal Needed For Future Construction Projects

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����*��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

191 ODOT-3-84949 � D03 TSG FY2009 ������������� District 3 $345,000 $345,000

District Wide Traffic Signal / Electrical Installations Reconstruction.New Signal - Med Sr 3 / Sr 162New Overhead Flasher Ric Sr 96 / Ric Sr 545 (R/W Needed) And 191 ODOT-3-84949 � D03 TSG FY2009 ������������� District 3 $345,000 $345,000 Ric Sr 96 / Ric Sr 545 (R/W Needed) And Ric Sr 314/ Millsbororeconstruction - Eri Sr 101/Eastbay Dr., Eri Sr 2 Wb Ramp/Us 250, Asd Sr

192 ODOT-3-85357 � RIC IR 0071 18.78 ������������� Richland $750,000 $750,000Detail Design for construction of new ramp from Eastbound US 30 to Southbound IR 71

193 ODOT-3-85406 � Ashland Co ES09 T/W Rehab ������������� Ashland $339,000 $339,000 Rehab taxiways

194 ODOT-3-85408 � Huron Co ES09 Obst Rem RSA ������������� Huron $157,900 $157,900 Clearing Obstruction from Runway Safety Areas, draingage improvements

195 ODOT-3-85417 � Ashland Rail W Salem Line Improv ������������� Ashland $400,000 $400,000 Ashland Railway W. Salem Line Improvements

196 ODOT-3-85418 � Ph II Lorain Cnty Trans Center ������������� Lorain $3,200,000 $3,200,000 Phase II Lorain County Transportation Center

197 ODOT-3-85438 � Loraine Co ES09 Recon T/W ������������� Lorain $307,000 $307,000 Reconstruct taxiways198 ODOT-3-85439 � Mansfield Lahm ES09 MITLs ������������� Richland $611,544 $611,544 Rehab taxiway lights199 ODOT-3-85441 � Medina Muni ES09 Recon T/W ������������� Medina $350,000 $350,000 Reconstruct taxiway

200 ODOT-3-85652 � D03 Pavement Projects PCR <60 ������������� D03 $27,689,000 $27,689,000 General PID of District Pavement Below 60 200 ODOT-3-85652 � D03 Pavement Projects PCR <60 ������������� D03 $27,689,000 $27,689,000 General PID of District Pavement Below 60 PCR in Current Program

201 ODOT-4-14543 � SUM CR 0638 00.00 ������������� Summit $6,294,060 $6,294,060Replace 159 Foot Bridge Over Conrail And Csx Railroad. Project To Include Necessary Approach Work.

202 ODOT-4-18466 � POR Crain Avenue ������������� Portage $13,600,000 $13,600,000

Replace Or Rehab Bridge Over Cuyahoga River And Csx. Improve Crain Ave. Intersection Improvement Of Three Intersections.

203 ODOT-4-22867 � STA Hills & Dales Road ������������� Stark $6,516,000 $6,516,000

Widen Existing Road To 4 Lanes With Curb & Gutters, 5 Lanes To Be Provided At All Major Intersections Includes Storm Sewer & Traffic Signals.

204 ODOT-4-23460 � TRU West Park Avenue ������������� Trumbull $1,300,000 $1,300,000 Replacement Of The West Park Avenue Bridge.

205 ODOT-4-23982 � TRU Fairport Street ������������� Trumbull $475,000 $475,000 Replacement Of The Fairport St. Bridge Over Mahoning River In Newton Township

206 ODOT-4-25235 � MAH-193/422 ������������� Mahoning $16,300,000 $16,300,000 Bridges

207 ODOT-4-25238 � STA SR 0241 07.67 ������������� Stark $2,600,000 $2,600,000Structure Replacement With Paint To Sta. 241-7.81.Miscellaneous Work To Sta-241-207 ODOT-4-25238 � STA SR 0241 07.67 ������������� Stark $2,600,000 $2,600,000 241-7.81.Miscellaneous Work To Sta-241-7.67

208 ODOT-4-25430 � STA SR 0172 11.91 / 15.55 ������������� Stark $1,700,000 $1,700,000 Minor Rehab Resurfacing Sr-172.

209 ODOT-4-25446 � SUM SR 0008 18.05 ������������� Summit $1,000,000 $1,000,000 Minor Rehab/Resurfacing. Culvert Work On Slm, Sum-8-19.01.

210 ODOT-4-25506 � MAH US 0224 16.17 ������������� Mahoning $975,000 $975,000 Bridge Re-Deck.

211 ODOT-4-25534 � POR SR 0014 03.68 ������������� Portage $925,000 $925,000Minor Rehab/Resurfacing.From 0.32 Miles East Of Sr-303 To Eastern Corp Limit Of Streetsboro.Minor Bridge Repair

212 ODOT-4-25544 � SUM SR 0082 08.03 ������������� Summit $930,000 $930,000Minor Rehab Resurfacing And Minor Bridge Work On 2 Structures From Sum-82-0803 To Portage County.

213 ODOT-4-25549 � STA US 62/250 0.00/1.28 ������������� Stark $2,000,000 $2,000,000

Resurfacing, With Additional Paving On Us-250.Major 2 Pavement Treatment.Quantity Splits Required Between Nhs And Stp Portions.

214 ODOT-4-25557 � SUM/POR IR 0480 03.72 ������������� Summit $6,305,000 $6,305,000 Minor Rehab/Resurfacing With Minor Bridge Work.Additional Paving On Sr-14.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

215 ODOT-4-25589 � TRU SR 7/7D/62A 5.71/0.00/0.00 ������������� Trumbull $1,650,000 $1,650,000

Minor Rehab - Resurfacing From Us-62 To Sr-305. Includes Paving Of Sr-7D And Us-62A Directional Alternates. Includes Installation Of An Overhead Flasher At Sr-7 Installation Of An Overhead Flasher At Sr-7 At Chestnut Ridge.

216 ODOT-4-25769 � ATB US 0020 10.53 ������������� Ashtabula $3,275,000 $3,275,000

Increase Lane Widths & Upgrade Drainage Thru Section. Reestablish Curb Height. Employ Access Management Principles.Resurface Atb-20 From 10.40 To 11.08

217 ODOT-4-76047 � TRU Niles Bike Path ������������� Trumbull $3,420,000 $3,420,000

Clearing And Grubbing, With The Removal Of Existing Railroad Bed, Placing New Base And Pavement Material; Also Repair And Restore Existing Structures And Place Two New Structures.

218 ODOT-4-76178 � MAH US 0224 08.60 ������������� Mahoning $1,100,000 $1,100,000Replace The Culvert At Eastern Gault Road And Rebuild The Eroded Soil On Both Sides Of Us224

219 ODOT-4-76297 � ATB SR 167/307 0.00/12.23 ������������� Ashtabula $1,550,000 $1,550,000

Minor Rehabilitation And Resurfacing Also Concrete Overlay On One Structure Over Sr11.Culvert Replacement On Sr-167 At Slm 5.67Culvert Invert Paving On Sr-307 At Slm 5.67Culvert Invert Paving On Sr-307 At Slm 16.58 And Slm 18.01

220 ODOT-4-76318 � MAH-7/62/170-11.26/17.73/15.53 ������������� Mahoning $900,000 $900,000 Minor rehabilitatio/resurfacing.

221 ODOT-4-76319 � MAH SR 0011 08.02 ������������� Mahoning $3,250,000 $3,250,000 Deck replacement, widening, and painting of two structures.

222 ODOT-4-76326 � MAH SR 0616 05.24 ������������� Mahoning $1,025,000 $1,025,000Minor Rehabilitaion/Resurfacing, And Overlay Bridge Over Tributary Of Mckelvey Lake.

223 ODOT-4-76328 � MAH-680-0.00 ������������� Mahoning $7,625,000 $7,625,000 Resurfacing - 4 lane224 ODOT-4-76329 � POR SR 0043 15.44 ������������� Portage $400,000 $400,000 Minor Rehabilitation/Resurfacing

225 ODOT-4-76339 � STA US 0062 30.13 ������������� Stark $4,900,000 $4,900,000Minor rehabilitation/resurfacing.Minor bridge work to five structures.

226 ODOT-4-76354 � TRU SR 5/88 - 20.11/14.05 ������������� Trumbull $1,710,000 $1,710,000 Minor Rehab / Resurfacing. Bridge Work On Four Structures.

227 ODOT-4-76437 � SUM SR 0093 06.92 ������������� Summit $5,275,000 $5,275,000

Widen To A 5 Lanes At The Intersction Of Robinson Avenue, Improve Intersection With Addition Of Dual Eastbound Left Turn Lanes And Additional Travel Lanes. Widen Lanes And Additional Travel Lanes. Widen Northbound To Cormany Avenue.

228 ODOT-4-76442 � MAH US 0224 16.33 ������������� Mahoning $3,600,000 $3,600,000

Widen For Addition Of Right Turn Lanes On Both Sides. Transition To Us224 Approches To South Avenue To Create Dual Eastbound Left Turn Lanes And Upgrade Closed Loop Signal System.

229 ODOT-4-76747 � ATB IR 0090 07.56 ������������� Ashtabula $66,185,449 $66,185,449 Total pavement replacement. With mainline and overhead bridge work.

230 ODOT-4-77522 � POR SR 0014 02.20 ������������� Portage $1,300,000 $1,300,000Removal And Replacement Of 2 Structures: #0220-Over Tinkers Creek And #0821-Over Branch Of Cuyahoga River.

231 ODOT-4-77557 � POR SR 0014 05.12 ������������� Portage $726,234 $726,234Widen Approaches To Create Left Turn Storage Lanes At The Intersection Of Diagonal Rd/Sr14

232 ODOT-4-77823 � ATB SR 0007 21.00 ������������� Ashtabula $1,600,000 $1,600,000 Resurfacing. Miscellaneous Bridge And Culvert Work.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

233 ODOT-4-77835 � POR/TRU 305/305D/282 0.00/0.00/0 ������������� Portage $3,100,000 $3,100,000

Resurfacing. Miscellaneous Bridge Work.Segment On Tru-305 From Portage County Line To Us-422Part 2, Culvert Replacement Is Pid# 83770, Por-305-233 ODOT-4-77835 � POR/TRU 305/305D/282 0.00/0.00/0 ������������� Portage $3,100,000 $3,100,000 Replacement Is Pid# 83770, Por-305-4.18Part 3, Culvert Replacements Under Pid# 84237, Por-282-0.63, Por-305-7.17, Tru-305-0.68

234 ODOT-4-77837 � POR SR 0044 14.91 ������������� Portage $800,000 $800,000 Resurfacing. Miscellaneous Culvert Work.

235 ODOT-4-77857 � MAH SR 0170 08.79 ������������� Mahoning $690,000 $690,000 Reactive Maintenance Resurfacing. Additional Paving On Sr-616.

236 ODOT-4-77858 � STA 62/212 - 3.96 ������������� Stark $2,650,000 $2,650,000 Resurfacing

237 ODOT-4-77863 � STA SR 0800 00.00 ������������� Stark $1,380,000 $1,380,000 Resurfacing.Culvert Repair To Sfn 7606729.

238 ODOT-4-78016 � POR Brady Lake Road ������������� Portage $1,440,000 $1,440,000Replacement Of Existing 2 Span Steel Truss And Steel Beam Structure, Also Includes Approach Reconstruction

239 ODOT-4-78243 � POR SR 0043 23.59 ������������� Portage $8,237,500 $8,237,500 Adding Lanes In Each Direction Plus Additional Turn Lanes Where Necessary.

240 ODOT-4-78270 � SUM Waterloo Rd Towpath ������������� Summit $816,750 $816,750 To Continue Existing Towpath Trail South From The Future Trail

241 ODOT-4-78399 � ATB West Avenue Brdg over RR ������������� Ashtabula $1,375,000 $1,375,000Overpass Rehabilitation, Which Includes Abutment Reconstruction, Expansion Joint 241 ODOT-4-78399 � ATB West Avenue Brdg over RR ������������� Ashtabula $1,375,000 $1,375,000 Abutment Reconstruction, Expansion Joint Replacement, Deck Overlay And Painting

242 ODOT-4-78871 � MAH US 0062 20.53 ������������� Mahoning $165,932 $165,932Landscaping The Ramps Of The Mcguffey Bridge And Planting Street Trees Along Andrews Avenue.

243 ODOT-4-79518 � ATB Old Plank Road (TR 528C) ������������� Ashtabula $925,500 $925,500 Replacement Of The Existing Structure.

244 ODOT-4-79630 � STA Deer Creek Park Ped Bridge ������������� Stark $1,423,000 $1,423,000 Construct Bicycle/Pedestrian Bridge At Deer Creek Dam Spill Way

245 ODOT-4-79827 � TRU Mahoning Ave/SR45 ������������� Trumbull $1,260,000 $1,260,000

Transportation Issue To Be Corrected: Mill And Resurface Roadway Including Repair Of Curbs, Sidewalks And Install Ada Curb Ramps.

246 ODOT-4-80549 � POR Spaulding Drive ������������� Portage $520,875 $520,875

Removal And Replacement Of Superstructure And Substructure And Improvements To Repair The Adjacent Roadway And Right-Of-Way

Minor Rehabilitation And Resurfacing, Concrete Overlay Of Six Structures.Change Nb Left Lane Ends To Right Lane Ends By

247 ODOT-4-80560 � STA/SUM IR 77 17.63/0.40 ������������� Stark $5,000,000 $5,000,000Nb Left Lane Ends To Right Lane Ends By Revising Striping.Median Cable Barrier At Assorted Locations.Sign Replacement North Through Central Interchange.

248 ODOT-4-80568 � SUM Atterbury Blvd. ������������� Summit $487,125 $487,125 Bridge Replacement On Atterbury Blvd. Over Brandywine Creek

249 ODOT-4-80630 � SUM IR-77 Landscaping ������������� Summit $630,000 $630,000

All Aspects Of Landscaping Such As Planting Of Vines, Shade Trees, Ornamental Trees, Evergreen Trees, Grasses, Shrubs, And Perennials.Major New Project Related.

250 ODOT-4-80663 � ATB Harbor Streetscape ������������� Ashtabula $491,692 $491,692Road Improvements, Streetscapes And Pedestrian Safety Additions To Ashtabula Harbor.

251 ODOT-4-80686 � STA SR 0172 08.83 ������������� Stark $2,600,000 $2,600,000Safety Reconstruction, Related Safety Improvements, Including Access Management And Drainage.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

252 ODOT-4-81149 � SUM IR 0271 7.56/09.30 Slope ������������� Summit $2,400,000 $2,400,000Subsurface Investigation Of Embankment Slope Failure Along Ir-271, Southwest Of Boston Heights In Summit County.

253 ODOT-4-81466 � SUM-77-24.20 ������������� Summit $3,350,000 $3,350,000 Resurfacing - 4 lane253 ODOT-4-81466 � SUM-77-24.20 ������������� Summit $3,350,000 $3,350,000 Resurfacing - 4 lane

254 ODOT-4-81696 � POR Portage Hike & Bike ������������� Portage $482,522 $482,522 Paving With Asphalt Along The Existing Rail Corridor.

255 ODOT-4-82009 � SUM SR 0091 00.62 ������������� Summit $65,000 $65,000 Construction Of New Traffic Signal.

256 ODOT-4-82011 � ATB SR 0011 14.40 ������������� Ashtabula $475,000 $475,000Replacement Of Ground-Mounted Signs Along Sr-11.Includes Ramps But Not Lead-Ins.

257 ODOT-4-82048 � ATB Union Cemetary Bridge ������������� Ashtabula $396,000 $396,000Rehab Superstructure And Substructure Including Patching Concrete Abutments And Armoring Them From Stream Erosion.

258 ODOT-4-82128 � MAH CR-109 (Raccoon Rd.) ������������� Mahoning $252,964 $252,964Construction Of 4 Foot Wide Concrete Walk, 500 Feet Of An Elevated Boardwalk, Eleven Curb Ramps And Signal Upgrade.

259 ODOT-4-82129 � MAH SR 0170 05.08 ������������� Mahoning $89,704 $89,704 Construct Concrete Walk And 10 Decorative Light Poles.

260 ODOT-4-82483 � STA SR 0044 04.26 ������������� Stark $360,000 $360,000 Remove And Replace Existing Structure.Replace Bridge Railing. Add Decorative

261 ODOT-4-82549 � MAH Glenbridge ������������� Mahoning $240,301 $240,301

Replace Bridge Railing. Add Decorative Bridge Lighting. Repair Sandstone Fascia Brick On Substructure. Upgrade Bridge Approach Drainage, Paint Structural Steel And Add Approach Sidwalk To Bridge And Around The City Block.

262 ODOT-4-82750 � STA-77-2.75 ������������� Stark $300,000 $300,000 Slide repair

263 ODOT-4-82753 � D04 Facilities WWTS project ������������� District 4 $275,000 $275,000 Construction Of Wwts Project At Rome, Brookfield, And Drakesburg Outposts.

264 ODOT-4-82922 � STA-30-21.55 ������������� Stark $3,000,000 $3,000,000 Resurfacing - 2 lane

265 ODOT-4-83027 � TRU SR 0193 02.15 ������������� Trumbull $600,000 $600,000 Bridge Replacement With Four Sided Box Culvert.

266 ODOT-4-83093 � POR US 0224 12.01 ������������� Portage $800,000 $800,000 Embankment Repair.

267 ODOT-4-83320 � STA SR 93 (9.94)(10.03)(11.71) ������������� Stark $2,025,000 $2,025,000Resurfacing. Miscellaneous Bridge Work. Culvert Replacement At Slm Sta-93-16.70Split From Pid# 25432, Sta-93-0.00

268 ODOT-4-83373 � STA IR 0077 Noise Walls ������������� Stark $700,000 $700,000 Installation Of Two Noise Walls (Wall K Extension And Wall M).

269 ODOT-4-83385 � MAH West Fifth Street ������������� Mahoning $300,000 $300,000 Mill And Fill.270 ODOT-4-84052 � POR SR 0082 05.07 ������������� Portage $1,650,000 $1,650,000 Resurfacing.271 ODOT-4-84136 � ATB/TRU Chip Seal Various Routes ������������� Ashtabula $675,000 $675,000 Preventive Maintenance Chip Seal

272 ODOT-4-84349 � MAH Four Mile Run (CH119) ������������� Mahoning $171,000 $171,000

Signal Upgrade And Installing Video Detection With New Poles , Curb Ramps, Pavement Markings And Some Pavement Replacement

273 ODOT-4-84373 � D04 TSG FY 2009 ������������� District 4 $450,000 $450,000

Upgrade And Installation Of Signal Appurtanences Including Signal Heads, L.E.D.'S, Battery Backups, And Power Services. Construction Of New Overhead Flashers. Signal At Mah-170-8.79 Added From Pid#77857.

274 ODOT-4-84394 � SUM Everett Road (CR47) ������������� Summit $941,079 $941,079

Improvement By Replacing Pavement And Resurfacing As Well As Excavating The Shoulder, Making Pavement Repairs And Resurfacing The Full Width Of The Roadway, Applying Pavement Markings And Installing Raised Pavement Markers.

275 ODOT-4-84417 � ATB-20-14.68 ������������� Ashtabula $3,000,000 $3,000,000 Resurfacing

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������'��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

276 ODOT-4-84561 � MAH Calvary Run Dr-Mill Creek Pk ������������� Mahoning $131,420 $131,420Resurfacing To Include Park Entrance At South Lakeview Avenue And The Adjacent Parking AreaRehabilitation Of 10 Mainline Structures To

277 ODOT-4-84735 � STA IR 0077 08.40 ������������� Stark $6,000,000 $6,000,000Rehabilitation Of 10 Mainline Structures To Pave The Roadway Between The Structures.

278 ODOT-4-84751 � STA/SUM US62T/IR76 37.88/4.96 ������������� Stark $200,000 $200,000 Heat Straightening Of Bridge Beams. Two Structures.

279 ODOT-4-84809 � SUM SR 0091 07.90 ������������� Summit $350,000 $350,000 Asphalt Deck Overlay. Repair Of Existing Sidewalk And Railing.

280 ODOT-4-84872 � POR SR 0261 01.19 ������������� Portage $600,000 $600,000 Rehabilitation And Repair Of Hinge System.

281 ODOT-4-84951 � POR Guardrail Phase 3 - Various ������������� Portage $270,000 $270,000 Upgrade Sub-Standard Guardrail.282 ODOT-4-84952 � POR Guardrail Phase 2 - Various ������������� Portage $270,000 $270,000 Upgrade Sub-Standard Guardrail.

283 ODOT-4-84957 � POR Hayes Road (CH138) ������������� Portage $126,000 $126,000 Full Depth Repairs, Resurface Pavement And Provide New Pavement Striping

284 ODOT-4-84959 � POR Infirmary Road (CH164) ������������� Portage $77,400 $77,400Plane Pavement , Make Full Depth Repairs, Resurface Pavement And Provide New Pavement Striping

285 ODOT-4-84960 � POR Cleveland Road (CH171) ������������� Portage $61,200 $61,200Plane Pavement, Make Full Depth Repairs, Resurface Pavement, And Provide New Pavement StripingPavement Striping

286 ODOT-4-84961 � POR Wall Street (CH159) ������������� Portage $90,000 $90,000Plane Pavement, Make Full Depth Repairs, Resurface Pavement And Provide New Pavement Striping

287 ODOT-4-84962 � POR Tallmadge Road (CH18) ������������� Portage $832,500 $832,500Plane Pavement, Make Full Depth Repairs, Resurface Pavement And Provide New Pavement Striping

288 ODOT-4-84978 � SUM Waterloo Road (CH450) ������������� Summit $1,237,500 $1,237,500

Improvement By Milling, Making Pavement Repairs And Resurfacing The Full Width Of The Roadway , Applying Pavement Markings And Installing Raised Pavement Markers

289 ODOT-4-84989 � SUM Front Street ������������� Summit $496,000 $496,000 Resurfacing.290 ODOT-4-84992 � SUM Portage Trail ������������� Summit $414,000 $414,000 Resurfacing.291 ODOT-4-84993 � SUM Wyoga Lake Road ������������� Summit $459,000 $459,000 Resurfacing.292 ODOT-4-85443 � Akron Fulton ES09 Rehab T/W ������������� Summit $792,000 $792,000 Rehab taxiway293 ODOT-4-85444 � Ashtabula Co ES09 Reh R/W, Apron ������������� Ashtabula $1,146,793 $1,146,793 Rehab runway and apron

294 ODOT-4-85445 � Portage Co ES09 Obs Rem RSA ������������� Portage $495,000 $495,000 Clearing Obstruction from Runway Safety Areas, site prep for terminal area

295 ODOT-4-85513 � Akron Canton ES09 R/W Ext + ������������� Summit $13,470,000 $13,470,000 Extend R/W, Modify Terminal Bldg.

296 ODOT-4-85520 � Youngstown ES09 Hgr, sewer Repai ������������� Trumbull $710,000 $710,000Hangar Development, Terminal Sewer Repairs

297 ODOT-4-85533 � Akron Metro 20 40-foot CNG buses ������������� Summit $7,000,000 $7,000,000 Akron Metro 20 40-foot CNG buses

298 ODOT-4-85538 � WRTA 10 Modified Minivans ������������� District 04 $500,000 $500,000 WRTA - 10 Modified Minivans, accesible, gasoline/electric hybrid

299 ODOT-4-85539 � WRTA 10 Transit Buses ������������� District 04 $5,000,000 $5,000,000 WRTA - 10 Transit Buses, 30 foot. deisel / electric hybrid

300 ODOT-4-85541 � WRTA YSU Integrated Trans Ctr ������������� District 04 $30,000,000 $30,000,000WRTA - City of Youngstown/Yongstown State University Central Area Integrated Transportation Center

301 ODOT-4-85542 � Akron Metro Expansion Ghent Rd ������������� Summit $1,000,000 $1,000,000 Akron Metro Expansion of Ghent Road Park and Ride

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������%��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

302 ODOT-4-85544 � Akron Metro Upgrade Radio ������������� Summit $3,500,000 $3,500,000 Akron Metro Upgrade Radio and safety communications systems

Akron Metro Upgrade scheduling and 303 ODOT-4-85550 � Akron Metro Upgrade scheduling ������������� Summit $2,000,000 $2,000,000

Akron Metro Upgrade scheduling and routing capability for paratransit and demand response service

304 ODOT-4-85552 � Akron Metro Rehab railroad track ������������� Summit $5,000,000 $5,000,000 Akron Metro Rehabilitation of railroad trackage and bridges

305 ODOT-4-85554 � SARTA - 15 - 30' Hybrid Buses ������������� District 04 $8,673,000 $8,673,000 SARTA - 15 - 30' Hybrid Diesel/Electric buses

306 ODOT-4-85555 � SARTA - 23 <30 Paratransit buses ������������� District 04 $6,670,000 $6,670,000SARTA - 23 <30 Paratransit Hybrid Diesel/Electric buses

307 ODOT-4-85556 � SARTA - Transit Center ������������� District 04 $3,530,000 $3,530,000 SARTA - Transit Center

308 ODOT-4-85557 � SARTA - Bus Wash ������������� District 04 $170,000 $170,000 SARTA - Bus Wash

309 ODOT-4-85558 � SARTA - Bus Lifts ������������� District 04 $191,296 $191,296 SARTA - Bus Lifts

310 ODOT-4-85559 � SARTA - Bus Lanes ������������� District 04 $805,000 $805,000 SARTA - Bus Lanes

311 ODOT-4-85560 � Akron Metro Rebuild maint facil ������������� Summit $5,000,000 $5,000,000 Akron Metro Rebuild maintenance facilities and buses garages to LEED standardsand buses garages to LEED standards

312 ODOT-4-85563 � Akron Metro security cameras ������������� Summit $2,100,000 $2,100,000 Akron Metro Security cameras on buses

313 ODOT-4-85565 � Akron Metro CNG compressors ������������� Summit $2,000,000 $2,000,000Akron Metro New and expanded CNG compressors

314 ODOT-4-85566 � Akron Metro Back up generator ������������� Summit $1,000,000 $1,000,000 Akron Metro New Back up Generator

315 ODOT-4-85567 � Akron Metro (20)<30 ft buses ������������� Summit $3,000,000 $3,000,000 Akron Metro 20 less than 30 foot buses CNG

316 ODOT-4-85570 � Akron Metro smart card system ������������� Summit $500,000 $500,000 Akron Metro New smart card fare system

317 ODOT-4-85571 � Akron Metro Next Bus Dest Signs ������������� Summit $1,000,000 $1,000,000 Akron Metro Next Bus Destination signs

318 ODOT-4-85572 � Akron Metro garage solar panels ������������� Summit $2,000,000 $2,000,000 Akron Metro Solar Panels for the main bus garge

319 ODOT-4-85573 � Akron Metro geothermal facility ������������� Summit $1,500,000 $1,500,000 Akron Metro Geothermal Heating & Cooling for main facilityfor main facility

320 ODOT-4-85575 � Akron Metro north park n ride ������������� Summit $1,500,000 $1,500,000 Akron Metro North Akron Park and Ride

321 ODOT-4-85576 � Akron Metro fareboxes ������������� Summit $2,500,000 $2,500,000 Akron Metro fareboxes

322 ODOT-4-85577 � Akron Metro rehab admin build ������������� Summit $2,000,000 $2,000,000Akron Metro Rehab admin building to LEED standards

323 ODOT-4-85596 � PARTA electronic fare boxes ������������� Portage $1,600,000 $1,600,000 PARTA electronic fare boxes

324 ODOT-4-85597 � PARTA hardware and software ������������� Portage $1,765,000 $1,765,000 PARTA Hardware and software for regional coordinated transportation

325 ODOT-4-85654 � D04 Pavement Projects PCR <60 ������������� D04 $9,283,000 $9,283,000 General PID of District Pavement Below 60 PCR in Current Program

326 ODOT-5-21477 � MUS SR 376 00.00 ������������� Muskingum $2,139,362 $2,139,362

Single Chip Seal with a 1-1/2" overlay on portions of SR 376 in Muskingum County and SR 313 in Muskingum and Guersey Counties

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

�������������

Resurface with related work on East Bound IR 70 from 0.54 mi E of IR 77 NB to CR 73 and the West Bound Passing Lane. (West

327 ODOT-5-21494 � GUE IR 70 10.54 ������������� Guernsey $1,762,546 $1,762,546 Bound Driving Lane was milled and thin overlayed under PID 83671 in early FY 2009) Mill 2" and fill 1-3/4" Inter and 1-1/2" surfac

328 ODOT-5-21631 � GUE IR 77 10.25 ������������� Guernsey $1,440,914 $1,440,914

Mill & fill wilth related work on IR 77. Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; include work on ramps where appropriate/joint repair as necessary, include mill/fill of shoulders

329 ODOT-5-23147 � PER CR 21 00.10 ������������� Perry $250,000 $250,000 Replacement Of The Bridge Carrying Cr 21 Over A Stream.

330 ODOT-5-23148 � PER CR88 ������������� Perry $600,000 $600,000 Replacing The Bridge Carrying Cr 88 Over A Stream At Sr 668.

331 ODOT-5-24404 � GUE IR 77 00.61 WWTS ������������� Guernsey $500,000 $500,000 Guernsey 77 Municipal Water And Sewer

332 ODOT-5-25045 � GUE SR 285 4.60 ������������� Guernsey $748,584 $748,584 Resurfacing with related work. General preventive maintenace.

Resurfacing with related work Mill 2" and fill 333 ODOT-5-25049 � MUS/COS SR 16 11.28/00.00 ������������� Coshocton $2,729,159 $2,729,159

Resurfacing with related work Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; joint repair as necessary

334 ODOT-5-25162 � GUE US 22 00.00 ������������� Guernsey $4,480,897 $4,480,897 Resurfacing With Related Work

335 ODOT-5-25685 � Lic-IR 70-09.55 ������������� Licking $4,176,016 $4,176,016 Resurfacing of Divided System

336 ODOT-5-25687 � KNO SR 13/95 16.02/0.00 ������������� Knox $2,823,688 $2,823,688 Resurfacing With Related Work Around Fredericktown

337 ODOT-5-25874 � GUE IR 70 17.39 ������������� Guernsey $2,858,670 $2,858,670

Resurfacing with related work of the East Bound IR 70 from 0.09 miles east of CR 73 to Gue/Bel County Line and the West Bound Passing Lane. (West Bound Driving Lane was milled and thin overlayed under PID 83671 in early FY 2009) Mill 2" and fill 1-3/4"

338 ODOT-5-75137 � MUS CR 500 0.00 ������������� Muskingum $861,159 $861,159 Resurfacing Of County Road 500 Between Sr60 And Sr146

339 ODOT-5-75141 � FAI CR 49 0.06 ������������� Fairfield $831,762 $831,762 Resurfacing Cr 49 -340 ODOT-5-75487 � Per-CR 2-00.00 ������������� Perry $936,245 $936,245 Resurfacing of County Route340 ODOT-5-75487 � Per-CR 2-00.00 ������������� Perry $936,245 $936,245 Resurfacing of County Route341 ODOT-5-75489 � Per-CR 22-00.00 ������������� Perry $381,800 $381,800 Resurfacing of County Route

342 ODOT-5-76384 � LIC SR 16 19.79 ������������� Licking $4,933,862 $4,933,862

Resurfacing with related work. Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; include work on ramps where appropriate/joint repair as necessary, include mill/fill of shoulders

343 ODOT-5-76425 � LIC SR 16 24.58 ������������� Licking $3,486,720 $3,486,720

Resurfacing with related work on SR 16. Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; include work on ramps where appropriate/joint repair as necessary, include mill/fill of shoulders

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������(��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

344 ODOT-5-78713 � KNO Big Run Bridge ������������� Knox $651,727 $651,727

The Project Is Limited To The Bridge And River Access On The Public Road Right-Of-Way, And Includes An Existing Parking Lot Adjacent To The Bridge Developed In 2002 344 ODOT-5-78713 � KNO Big Run Bridge ������������� Knox $651,727 $651,727 Adjacent To The Bridge Developed In 2002 With An Odnr Division Of Watercraft Grant Administered By The Knox County Park District

345 ODOT-5-78777 � LIC CR 42 1.75 ������������� Licking $1,081,725 $1,081,725

Reconstruction And Widening From 2-10' Lanes To 3-11' Lanes, From Us-40 To Refugee Road In Etna Twp. Project Will Include Removal Of Three Vertical Curves, Major Widening Of Existing Bridge, And Installation Of A Traffic Signal

346 ODOT-5-78791 � GUE IR 70 09.10 (Tower Lighting) ������������� Guernsey $1,036,150 $1,036,150Replacement of tower lighting in the IR 70 & IR 77 interchange area

347 ODOT-5-79145 � KNO US 62 10.23 ������������� Knox $701,340 $701,340 Replacement Of The Us 62 Bridge Sfn 4202074

348 ODOT-5-79602 � D05 RPM FY2009 ������������� District 5 $250,000 $250,000 Fy 2009 Rpm Replacement Project Part Of Three Year Cycle

349 ODOT-5-79603 � D05 PM FY2009(A) Fast Dry ������������� District 5 $125,000 $125,000District Wide Project To Renew Center Line And Auxillary Markings Using Fast Dry 349 ODOT-5-79603 � D05 PM FY2009(A) Fast Dry ������������� District 5 $125,000 $125,000 And Auxillary Markings Using Fast Dry Paints

350 ODOT-5-79604 � D05 PM FY2009(B) Poly ������������� District 5 $825,000 $825,000 District Wide Project To Upgrade The Poly Paint Striping

351 ODOT-5-79607 � D05 GR FY2009/2010 ������������� District 5 $600,539 $600,539 Guard Rail Repair Contract

352 ODOT-5-79620 � MUS IR 70 20.53 ������������� Muskingum $550,000 $550,000 Culvert liner project on Interstate Route 70 in Muskingum County

353 ODOT-5-80489 � GUE SR 662 00.10 ������������� Guernsey $285,724 $285,724

Geological Site Management Fy 2008 Slip Repair Candidatefy 2008 Geological Site Management Program; Moved To Fy 2009 Geological Site Management Program

354 ODOT-5-81088 � PER 22/13/93 5.51/26.88/11.58 ������������� Perry $1,774,486 $1,774,486 Resurfacing With Related Work355 ODOT-5-81105 � LIC SR 161/37 00.00/10.25 ������������� Licking $3,700,000 $3,700,000 Pavement and Bridge Rehabilitation

356 ODOT-5-81211 � KNO SR 546 1.09 ������������� Knox $1,024,283 $1,024,283 Replace The Bridges On Knox Sr 546 At The 1.17 & The 2.11 Lane Miles

357 ODOT-5-81221 � PER US 22 6.77 ������������� Perry $1,606,035 $1,606,035 Resurfacing with related work on a portion of US 22 in Perry County

�������������Repairs and leveling on SR 666 in

358 ODOT-5-81223 � MUS SR 666 0.66 ������������� Muskingum $975,200 $975,200Repairs and leveling on SR 666 in Muskingum County and SR 93 in Coshocton County

359 ODOT-5-81251 � LIC/MUS US 40 26.66/1.21 ������������� Licking $896,404 $896,404 Rehab bridges & superstucture, on US 40 in Lic & Muskingum Counties

360 ODOT-5-81812 � LIC Bike/Ped Bridge ������������� Licking $776,934 $776,934

Construction Of Pedestrian Bridge Over Raccoon Creek Constructed Next To The Existing Sr 661 Bridge Within The Village Of Granville At The 00.28 Mile Marker.

361 ODOT-5-81912 � COS/GUE GR2009 ������������� Coshocton $575,000 $575,000Guardrail At Various Locations On County Routes In Coshocton And Guernsey Counties

362 ODOT-5-81913 � Cos/Gue-GR2010 ������������� Coshocton $575,000.00 $575,000.00 Guardrail Installation

363 ODOT-5-81922 � Cos/Gue-GR2011 ������������� Coshocton $575,000.00 $575,000.00 Guardrail Installation364 ODOT-5-81925 � KNO CR78/VAR GR2012 ������������� Knox $293,265 $293,265 Installation Of Guardrail

365 ODOT-5-81969 � LIC SR 16 20.86 (Hudson) ������������� Licking $4,985,260 $4,985,260 Safety And Traffic Study Of The Sr 13 Interchange With Sr 16.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������&��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

Resurfacing with related work on Interstate 70 in Fairfield County and extending to SR 158 interchange in Licking County. Mill 2"

366 ODOT-5-82144 � FAI/LIC IR 70 00.00/00.00 ������������� Fairfield $4,243,834 $4,243,834158 interchange in Licking County. Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; include work on ramps where appropriate/joint repair as necessary, include mill/fi

367 ODOT-5-82425 � Gue-PM-FY2012 ������������� Guernsey $700,000 $700,000 Pavement Marking

368 ODOT-5-82752 � MUS SR 60 17.93 Safety Project ������������� Muskingum $2,014,455 $2,014,455

Conduct A Safety Study Of The Traffic Patterns On Sr 60 (Maple Ave) In The City Of Zanesville And Undertake A Series Of Quick Fixes To Relieve Congestion. Improve Access Management On Sr 60 From Adair Avenue To Military

369 ODOT-5-82969 � GUE IR 77 0.00 ������������� Guernsey $1,604,523 $1,604,523

3" mill & fill with 1-3/4" intermediate and 1-1/4" surface and associated additional work on a portion of Interstate Route 77 in Guernsey County

370 ODOT-5-83004 � PER SR 93 22.46 ������������� Perry $1,605,778 $1,605,778 Replace the deck and paint the structure on the SR 93 bridge

370 ODOT-5-83004 � PER SR 93 22.46 ������������� Perry $1,605,778 $1,605,778the SR 93 bridge

371 ODOT-5-83106 � MUS IR 70 13.19 ������������� Muskingum $2,748,029 $2,748,029

Resurfacing with related work on Interstate Route 70 east of Zanesville in Muskingum County. Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; include work on ramps where appropriate/joint repair as necessary, include mill/fill of shoulders

372 ODOT-5-83159 � FAI CR 56 0.000(Sheridan/Tiki) ������������� Fairfield $800,000 $800,000Simple Mill And Fill Project With Some Full Depth Repair And Curb Replacement And Bridge Repair.

373 ODOT-5-83535 � D05 TSG FY2009 ������������� District 5 $399,350 $399,350

Installation Of Traffic Signals At Two Locations In District 5. One On Us 40 In Licking County At The Intersection With Columbia Rd. This Will Be Interconnected With Other Area Signals. The Second Is In Fairfield County On Sr 37 At Arbor Valley Road.

374 ODOT-5-84294 � MUS SR 666 5.25/5.72 ������������� Muskingum $650,000 $650,000

Series Of Down Slope Slides Along Sr 666 Causing Cracking And Undulation Of The 374 ODOT-5-84294 � MUS SR 666 5.25/5.72 ������������� Muskingum $650,000 $650,000 Causing Cracking And Undulation Of The Road Surface. Selected As Fy 2012 Gsm Project.

375 ODOT-5-84766 � LIC IR 70 8.73 (Cable Barrier) ������������� Licking $479,019 $479,019Installation Of Cable Median Barrier On Interstate Route 70 Between 0.5 Miles West Of Sr 158 To The Concrete Median At Sr 79

376 ODOT-5-85016 � Mus-SR 146-25.65 ������������� Muskingum $456,456 $456,456 Single Chip Seal

377 ODOT-5-85034 � MUS SR 16 09.89 ������������� Muskingum $625,000 $625,000Leveling on approach slabs at various locations on State Route 16

378 ODOT-5-85119 � Fai-US 33-09.90 ������������� Fairfield $668,000 $668,000 Approach Slab Overlays

379 ODOT-5-85370 � FAI US 33 01.00 (Tower Lighting) ������������� Fairfield $1,700,000 $1,700,000Installation of tower lighting at the Hill/Diley Interchange on US 33

380 ODOT-5-85375 � LIC SR 37/16 14.65/14.24 ������������� Licking $2,228,270 $2,228,270 Mill and fill with 3.25 with associated work. Include work on ramps where appropriate

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������)��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

381 ODOT-5-85407 � D05 Rockfalls ������������� Muskingum $1,100,220 $1,100,220

To Install poured cement walls at seven rockfall locations to prevent falling rocks from blocking the drainage ditches or ending up on the roadway.up on the roadway.

382 ODOT-5-85410 � GUE IR 77 09.26 R ������������� Guernsey $75,000 $75,000 Project to replace the bearings on the IR 77 Bridge in Guernsey County

383 ODOT-5-85414 � LIC/MUS SR 16 32.77/00.00 ������������� Muskingum $728,250 $728,250 Install R/W fencing along the Limited Access portion of Lic/Mus SR 16

384 ODOT-5-85447 � Coshocton Co ES09 R/W Ext ������������� Coshocton $400,000 $400,000 Runway extension, taxiway extension

385 ODOT-5-85450 � D05 GR FY2010 (Interstate) ������������� District 05 $750,000 $750,000Upgrading of end assemblies and replacement of deficient guardrail along the interstate in District 5

386 ODOT-5-85451 � Perry Co ES09 Recon Perry ������������� Perry $454,000 $454,000 Reconstruct runway387 ODOT-5-85452 � Fairfield Co ES09 Obst Rem RSA ������������� Fairfield $1,200,000 $1,200,000 Relocate road388 ODOT-5-85453 � Zansesville Muni ES09 Recon T/Ws ������������� Muskingum $2,345,000 $2,345,000 Relocate two taxiways

389 ODOT-5-85460 � D05 GR FY2010 (Pri System) ������������� District 05 $750,000 $750,000 Guardrail repair project on priority routes in District 5

Repair of damaged or deficient guardaril on 390 ODOT-5-85474 � D05 GR FY 2010 (Gen System-A) ������������� District 05 $1,100,000 $1,100,000

Repair of damaged or deficient guardaril on the General System routes in Coshocton, Knox and Guernsey Counties

391 ODOT-5-85478 � D05 GR FY2010 (Gen System-B) ������������� District 05 $1,000,000 $1,000,000

Repair of damaged or deficient guardrails at various locations on the General System in Fairfield, Licking, Perry and Muskingum counties

392 ODOT-5-85510 � D05 Districtwide approach slab ������������� District 05 $1,100,000 $1,100,000 Districtwide approach slab leveling

393 ODOT-5-85522 � D05 FAI/PER/LIC Spot Paving ������������� District 05 $825,000 $825,000 STIMULUS project for spot paving in Fairfield, Perry, and Licking Counties

394 ODOT-5-85523 � D05 KNO/MUS Spot Paving ������������� District 05 $825,000 $825,000 STIMULUS project for spot paving in Knox and Muskingum Counties

395 ODOT-5-85527 � D05 COS/GUE Spot Paving ������������� District 05 $825,000 $825,000 STIMULUS project fir spot paving in Coshocton and Guernsey Counties

396 ODOT-5-85536 � MUS I70-22.00 ������������� Muskingum $4,510,000 $4,510,000Replace deck and Paint 3 bridges within Mus Cty

397 ODOT-5-85540 � LIC 70-13.67 L/R ������������� Licking $8,800,000 $8,800,000 New deck and addition of rd lane

398 ODOT-5-85543 � GUE IR 77 1.050 ������������� Guernsey $1,100,000 $1,100,000 backwall and overlay

399 ODOT-5-85549 � GUE IR 70 12.300 ������������� Hamilton $5,500,000 $5,500,000 Replace Deck and backwall at 12.32 I70 bridge

400 ODOT-5-85553 � MUS IR 70 6.500 ������������� Muskingum $1,320,000 $1,320,000 Overlay and deck patching of left and right structures

401 ODOT-5-85562 � MUS IR 70 6.500 ������������� Muskingum $8,250,000 $8,250,000Replace and widen bridges on MUS I70 at the 9.58

402 ODOT-5-85564 � FAI SR 664 10.000 ������������� Fairfield $341,000 $341,000 Bridge backwall repair and overlay

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������*��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

403 ODOT-5-85568 � KNO 13 16.22-21.00 ������������� Knox $165,000 $165,000Catch basin and drainage improvement on State Route 13 (16.00-21.00) in Knox CountyCounty

404 ODOT-5-85574 � MUS 22 South Zanesville ������������� Muskingum $220,000 $220,000 Drainage improvements on SR 22 (South Zanesville) in Muskingum County

405 ODOT-5-85599 � COS SR 83 7.950 Bridge repair ������������� Coshocton $1,430,000 $1,430,000 COS SR 83 7.950 Bridge repair

406 ODOT-5-85655 � D05 Pavement Projects PCR <60 ������������� D05 $9,791,000 $9,791,000 General PID of District Pavement Below 60 PCR in Current Program

407 ODOT-5-85665 � Newark/Heath ES09 R/W Ext, Obst ������������� Licking $2,517,500 $2,517,500 R/W Extension, Obstruction Removal

408 ODOT-6-20880 � FRA US 62 9.52 ������������� Franklin $6,087,075 $6,087,075

Provide Appropriate Turn Lanes At Intersections, Reduce Conflicting Driveways And Ingress/Egress Controls, Provide Curb And Gutter Drainage, And Realign Us 62/Briggs Rd Intersection And Shopping Center Drive.

409 ODOT-6-22937 � FAY SR 753 12.87 ������������� Fayette $6,388,144 $6,388,144

Extension Of Sr753 From The Existing Terminus At Us22 To A Point South Of Sr238 On Us62. Consultant Project Sr238 On Us62. Consultant Project Manager: Andy Shahan

410 ODOT-6-24696 � FRA SR 315 2.40 ������������� Franklin $23,900,000 $23,900,000 Four Lane Resurfacing Project411 ODOT-6-25718 � PIC-23-3.21 ������������� Pickaway $16,200,000 $16,200,000 Bridge rehabilitation

412 ODOT-6-25729 � MRW SR 19 5.72 ������������� Morrow $354,000 $354,000Structure Replacement Over Hirth Run. Fy09 District Bridge Program.Mrw-Sr19-1.16 (Sfn 5900026)

413 ODOT-6-25811 � MAD US 40 0.00 ������������� Madison $1,500,000 $1,500,000

Four Lane Resurfacing Project. Rural General System.1.5" Resurfacing With Single Chip Seal (Changed From 2" Mill And Fill).

414 ODOT-6-75499 � FRA CR 125 5.02 ������������� Franklin $6,990,966 $6,990,966

Widen Cr125 (Clime Road) From Two To Three Lanes With Curb And Gutter. Project Limits Extend From Cr25 (Demorest Road) To Us62 (Harrisburg Pike). Nepa Process Under Pid-14684. Project To Include Bike Lanes.

415 ODOT-6-75810 � FRA US 33 Blacklick Creek Greenway ������������� Franklin $3,051,000 $3,051,000 Bikeway/bridge

Construction of a grade separation with the

416 ODOT-6-75917 � DEL CR 124 4.38 (Home Road) ������������� Delaware $11,960,000 $11,960,000

Construction of a grade separation with the CSX railroad. Right of way and construction to be funded by the Ohio Railroad Grade Separation Program. Delaware County to provide Preliminary Engineering. Feasibility Study completed under PID 23133.DEL Count

417 ODOT-6-76536 � MAD SR 142 13.08 ������������� Madison $862,000 $862,000Reconstruct Sr-142 To Eliminate A Sharp Two-To-Four Lane Transition And Improve County Road 49 Intersection.

418 ODOT-6-76561 � MAD US 40 14.89 ������������� Madison $3,400,000 $3,400,000

Reconstruct Intersection Of Us 40 And Sr 142/Mad Cr 7 By Adding Left Turn Lanes On Us 40 And Realigning Cr 7. Right Turn Lane Will Be Added On Sr 142 Sb.

419 ODOT-6-77235 � PIC CR 4 2.64 ������������� Pickaway $4,545,500 $4,545,500

Replacement Of Existing Bridge On A Modified Alignment Including Relocation/Reconstruction Of 0.32 Miles Of Cr4 (Commercial Point Road).

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

420 ODOT-6-77562 � DEL SR 257 14.30 ������������� Delaware $770,000 $770,000Replace Superstructure. New Concrete Slab Deck, Approach Slabs, And Replace Abutments.Del-257-1430 Over Bokes CreekAbutments.Del-257-1430 Over Bokes Creek

421 ODOT-6-77564 � FAY US 22 16.560 ������������� Fayette $863,000 $863,000 Replace Superstructure (Deck And Beams).

422 ODOT-6-77566 � FRA IR 70 5.250 ������������� Franklin $1,700,000 $1,700,000

Fra-70-5.25 (Hilliard Rome Sb Over 70) Deck Replacement.Fra-70-5.26 (Hilliard Rome Nb Over 70) Deck Overlay, Substructure Patching.

423 ODOT-6-77567 � FRA IR 70 10.170 ������������� Franklin $600,000 $600,000

Harper Rd - weekend MSC overlay of EB structure, expansion joints, patch parapets.NS RR - weekend MSC overlay of EB side only.

424 ODOT-6-77568 � FRA IR 71 11.520 ������������� Franklin $947,000 $947,000

Structure Deck Replacement For Dyer Road Over I-71. Work Includes Structure Raising To Meet The Minimium Clearance Over I-71.

425 ODOT-6-77591 � FRA SCIOTO BIKEWAY CONNECTOR������������� Franklin $4,300,000 $4,300,000 Bikeway Connector

426 ODOT-6-79030 � FRA CR 29 7.34 ������������� Franklin $1,518,031 $1,518,031

Replace Deck Of Scioto Darby Creek Rd Bridge Over Csx Railroad.Wide Shoulders Will Be Provided To Accommodate Future Bicycle/Pedestrian Access.

427 ODOT-6-79031 � FRA Scioto Trail Hilltop Connector ������������� Franklin $2,017,000 $2,017,000 Bikeway/bridge

428 ODOT-6-79357 � FRA US 40 8.590 ������������� Franklin $605,000 $605,000

Fy09 Urban Paving Project - City Of Columbus.Fra-Us40-8.59-10.55: Columbus. W Broad Street From Hague Ave To Central Ave.Added Federal/State Paving Of West Broad St Ramps (Broad St To I-70 Wb And I-70 Eb To Broad Street)

429 ODOT-6-79445 �FAY WASHINGTON CH SIGNAL UPGRADE ������������� Fayette $1,016,000 $1,016,000

Update And Interconnect All Traffic Signals On Federal Aid Routes In City Of Washington Court House. Work Includes Upgrade Of Controllers, Signal Lamps, Revising Lane Usage/Parking To Allow For Center Turn Lanes, Revise Pavement Markings, Add Loop Detector

430 ODOT-6-79942 � FRA-71-17.56 ������������� Franklin $1,000,000 $1,000,000 Bridge repair

Upgrade Interchange Of Us 33/Sr 161/Post Rd To Include Interchange Reconfiguration, 431 ODOT-6-80748 � UNI US 33 24.870 ������������� Union $24,100,000 $24,100,000 Rd To Include Interchange Reconfiguration, Ramp Relocation, And Necessary Improvements To Adjacent Roadways.

432 ODOT-6-81201 � D06 GRAFTI FY09 ������������� District 6 $130,000 $130,000Removal Of Graffiti From Walls And Abutments Through District Six. Two Year Contract (Fy09 And Fy10)

433 ODOT-6-81548 � UNI CR 310 0.70 ������������� Union $605,625 $605,625

Structure Replacement With Approach Roadway Improvements.Local-Let Design/Build Project Sold/Administered By Uni County Engineer.

434 ODOT-6-81737 � FRA IR 270 24.430 ������������� Franklin $4,700,000 $4,700,000

Widening Of Ir-270 Structure Over Csx Rr Between Us-23 And I-71 Interchanges.Addition Of One Lane (6Th Lane) Each Direction Between Us-23 And Csx Rr Bridge.

435 ODOT-6-81746 � Franklin I-270/US23/SR 315 ������������� Franklin $160,000,000 $160,000,000 Interstate Reconstruction436 ODOT-6-82122 � FRA US 40 4.450 ������������� Franklin $433,000 $433,000 Fy09 Microsurfacing Project.

437 ODOT-6-82663 � PIC SR 56 33.580 ������������� Pickaway $470,000 $470,000 Pic-56-33.58 Structure Replacement Over Toad Run.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

438 ODOT-6-82739 � D06 ExtruSign FY09 ������������� District 6 $1,200,000 $1,200,000

Systematic Replacement Of Extrusheet Signs On I-71 In Fay, Mad, Pic, Fra South Of 665, Del North Of Powell Rd, And Mrw Counties.Counties.

439 ODOT-6-82813 � FRA US 23 5.68 ������������� Franklin $719,000 $719,000 Fy09 Urban Paving Project. Columbus Doing Plans Odot Let.Slm 5.68 - 7.96

440 ODOT-6-82862 �FRA LANDSCAPE MAINTENANCE FY09 ������������� Franklin $435,945 $435,945

Provide Maintenance And Upkeep Of Existing Landscaping At Various Interchanges Throughout Franklin County.1 Year Fy09 Contract.

441 ODOT-6-83638 � D06 PPM FY09B ������������� District 6 $2,016,000 $2,016,000

Mircrosurfacing On:Del-257-14.26-22.62 (Sr-37 To Mar County Line)Fra-674-1.43-4.68 (Cr-937/Cr-39 To Bridge Over Us-33)Mar257-0.00-0.66 (Del County Line To Sr-47)Pic-316-9.48-14.05 (Sr-104 To Sr-752)Uni-4-13.61-24.29

442 ODOT-6-83718 � FRA Prairie Oaks/Three Creeks ������������� Franklin $195,377 $195,377

Priaire Oaks - Darby Bennd Lakes Area: Pave Two Existing Gravel Parking Areas, Overlay Existing Entrance Road.Three Creeks Metro Park: Mill And Fill Entrance Road.

Demolition Of The Town Street Bridge In

443 ODOT-6-83763 � FRA US 62D 1.29 DEMO ������������� Franklin $1,475,495 $1,475,495

Demolition Of The Town Street Bridge In Advance Of Bridge Replacement Of Fra-62D-1.22, Pid 17831.Construction Contract Funded By City Of Columbusodot To Provide Construction Inspection.

444 ODOT-6-84976 � FRA IR 71 20.08 Sign ������������� Franklin $235,000 $235,000 Change Or Re-Face Existing Dynamic Message Sign.$70,000.

445 ODOT-6-85419 � Camp Chase Railroad Line Rehab ������������� Franklin $750,000 $750,000 Camp Chase Railroad Line Rehabilitation

446 ODOT-6-85454 � Bolton Field ES09 Obs Rem MIRLs ������������� Franklin $225,000 $225,000 Obstruction Removal in Apch, Lighting and Generator Replacement

447 ODOT-6-85455 � OSU ES09 Rehab R/W, Apron ������������� Franklin $4,984,000 $4,984,000 Rehab runway and apron448 ODOT-6-85457 � Delaware Muni ES09 Obstr Rem Rd ������������� Delaware $1,000,000 $1,000,000 Relocate road449 ODOT-6-85458 � Marion Muni ES09 Drainage ������������� Marion $400,000 $400,000 Rehab storm drainage system450 ODOT-6-85459 � Morrow Co ES09 Rehab R/W ������������� Morrow $375,000 $375,000 Rehab runway

451 ODOT-6-85517 � Port Columbus ES09 Relocate R/W+ ������������� Franklin $89,121,042 $89,121,042Relocate R/W, Noise Mitigation, Install Baggage Screening, Improve Airport Access

�������������452 ODOT-6-85518 � Rickenbacker ES09 Rehab R/W, Lts ������������� Franklin $5,487,000 $5,487,000 Rehab R/W plus HIRLs, Guidance Signs

453 ODOT-6-85528 � Franklin I-70/I-71 Phase 1,2,3&4 ������������� Franklin $717,000,000 $717,000,000 Interstate Reconstruction

454 ODOT-6-85537 � FRA IR 71 19.09 (Phase 2) ������������� Franklin $6,000,000 $6,000,000Provide noise barrier walls along I-71 at various locations as waranted. Design/build contract.

455 ODOT-6-85578 � COTA Fields Facility Renovation ������������� Franklin $24,000,000 $24,000,000 COTA Fields Avenue Facility Renovation Project

456 ODOT-6-85579 � COTA New Paratransit Facility ������������� Franklin $23,000,000 $23,000,000 COTA Construction of a New Paratransit Facility

457 ODOT-6-85656 � D06 Pavement Projects PCR <60 ������������� D06 $1,550,000 $1,550,000 General PID of District Pavement Below 60 PCR in Current Program

458 ODOT-6-85664 � Fayette Co ES09 Ramp Exp ������������� Fairfield $343,400 $343,400 Ramp Expansion, Ph 3

459 ODOT-6-85666 � Pickaway Co ES09 R/W Ext+ ������������� Pickaway $1,292,650 $1,292,650 R/W & T/W Extension, Perimeter Fencing, Obstruction Removal

460 ODOT-7-19596 � DAR SR 185 7.28 ������������� Darke $712,104 $712,104 Resurface The Existing Roadway And Other Roadway Related Items.

461 ODOT-7-19708 � CHP-559-1.65 ������������� Champaign $486,326 $486,326 Bridge Replacement

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

462 ODOT-7-19740 � LOG SR 274 3.19 ������������� Logan $848,127 $848,127

Log-274-3.19 --Replace Structure Over The Great Miami River. 3 Spans.Pe And Rw Under Pid #19740, Log-274-4.78; On 04/30/07, Co Split Into Two Projects For Bid

462 ODOT-7-19740 � LOG SR 274 3.19 ������������� Logan $848,127 $848,12704/30/07, Co Split Into Two Projects For Bid Letting--Pid #19740, Log-274-3.19 & Pid #82785, Log-274-4.78

463 ODOT-7-19988 � (R) LOG-235-2.22 ������������� Logan $1,682,271 $1,682,271 Bridge Replacement

464 ODOT-7-25120 � AUG SR 197 0.00 ������������� Auglaize $812,217 $812,217 Resurface The Existing Roadway And Other Roadway Related Items.

465 ODOT-7-25124 � CHP-161-0.00 ������������� Champaign $782,438 $782,438 Resurfacing466 ODOT-7-25323 � MER SR 118 24.74 ������������� Mercer $255,045 $255,045 Bridge Painting

467 ODOT-7-25331 � MOT SR 725 0.34 ������������� Montgomery $347,407 $347,407 Structure Replacement. Structure 0.34 Is 13' Culvert.

468 ODOT-7-75104 � MOT SR 48 0.45 ������������� Montgomery $1,549,171 $1,549,171

Improve Capacity And Safety At One Signalized Intersection. Left Turn Lanes Are Needed At Intersection Of Sr48/Social Row Road. Left Turn Lanes Are Needed For All Four Approaches At The Sr48/Social Row Intersection. Traffic Signals Will Be Upgraded.

469 ODOT-7-75705 � LOG CR 12/VAR ������������� Logan $1,594,592 $1,594,592Resurface Various County Roads Due To Poor Pavement Condition. Total Project 469 ODOT-7-75705 � LOG CR 12/VAR ������������� Logan $1,594,592 $1,594,592 Poor Pavement Condition. Total Project Length Is 31.7 Miles.

470 ODOT-7-75791 � CLA US 40 18.74 ������������� Clark $1,012,874 $1,012,874

Plane And Resurface The Existing Roadway With Asphalt Concrete And Other Roadway Related Items. Cla-Sr72-Shoulder Stabilization Also.

471 ODOT-7-75853 � CLA SR 334 1.07 ������������� Clark $2,766,854 $2,766,854 Construct An At Grade Intersection.

472 ODOT-7-75914 � MIA CR 149 6.58 ������������� Miami $506,940 $506,940

Replace The Existing 55' Long, 24' Wide, 1926 Concrete Beam Bridge With A New One, Approximately 70' Long, 36' Wide Prestressed Concrete Box Beam Or I Beam Structure. Project Will Include Sidewalks.

473 ODOT-7-76665 � LOG US 33 15.78 ������������� Logan $2,465,059 $2,465,059Pavement Planing And Resurfacing With Asphalt Concrete And Other Roadway Related Items.

474 ODOT-7-76698 � MIA IR 75 0.00 ������������� Miami $4,356,391 $4,356,391Plane And Resurface The Existing Roadway With Asphalt Concrete And Other Roadway Related Items.

475 ODOT-7-77245 � MOT IR 75 11.01 ������������� Montgomery $93,000,000 $93,000,000 Add Third Lane475 ODOT-7-77245 � MOT IR 75 11.01 ������������� Montgomery $93,000,000 $93,000,000 Add Third Lane

476 ODOT-7-77246 � MOT IR 75 0.75 ������������� Montgomery $29,666,269 $29,666,269 Construct A New Local Diamond Type Interchange

477 ODOT-7-77247 � Montgomery I-75 Phase 2 ������������� Montgomery $327,000,000 $327,000,000 Interstate Reconstruction478 ODOT-7-77249 � Montgomery ITS ������������� Montgomery $8,000,000 $8,000,000 Intell. Trans. Systems

479 ODOT-7-77394 � CHP US 36 14.99 ������������� Champaign $1,730,000 $1,730,000

Pavement Planing And Resurfacing Of The Existing Roadway With Asphalt Concrete. (4Ps7/Local). Construct Sidewalks And Curb Lawns, Replace C&G, Eliminate Some Drive Approaches, Add Street Lighting And Landscaping.

480 ODOT-7-77397 � CHP SR 55 15.32 ������������� Champaign $204,247 $204,247 Shoulder stabilization and resurfacing

481 ODOT-7-77398 � AUG SR 364 9.73 ������������� Auglaize $741,009 $741,009 Resurface The Existing Roadway With Asphalt Concrete.

482 ODOT-7-77417 � CLA SR 54 0.00 ������������� Clark $620,132 $620,132 Resurface The Existing Roadway With Asphalt Concrete.

483 ODOT-7-77427 � LOG SR 638 0.00 ������������� Logan $541,584 $541,584 Resurface The Existing Roadway With Asphalt Concrete.

484 ODOT-7-77430 � MIA SR 201 9.36 ������������� Miami $442,969 $442,969 Resurface The Existing Roadway With Asphalt Concrete.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������'��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

485 ODOT-7-77454 � MIA SR 41 12.64 ������������� Miami $2,236,943 $2,236,943

Relocate The Intersection Of Washington Road And Sr41 Approximately 1000' To The West To Correct An Existing 60-Degree Intersection Angle. Work Will Include 485 ODOT-7-77454 � MIA SR 41 12.64 ������������� Miami $2,236,943 $2,236,943 Intersection Angle. Work Will Include Widening On Sr41 To Add Left Turn Lanes And New Pavement, And Widening On Washington Road.

486 ODOT-7-77473 � AUG SR 67 2.94 ������������� Auglaize $865,571 $865,571 Resurface The Existing Roadway With Asphalt Concrete.

487 ODOT-7-77490 � AUG/SHE-362-0.00/1.52 ������������� Auglaize $476,250 $476,250 Resurfacing488 ODOT-7-77492 � CHP SR 55 11.70 ������������� Champaign $529,650 $529,650 Resurface the existing roadway

489 ODOT-7-77493 � CHP SR 29 21.75 ������������� Champaign $1,199,456 $1,199,456 Resurface The Existing Roadway With Asphalt Concrete.

490 ODOT-7-77495 � (R) CLA-42-0.00 ������������� Clark $976,121 $976,121 Resurfacing491 ODOT-7-77496 � DAR-571-20.67 ������������� Darke $508,103 $508,103 Resurfacing492 ODOT-7-77497 � (R) DAR-722-0.00 ������������� Darke $1,403,573 $1,403,573 Resurfacing

493 ODOT-7-77498 � DAR SR 319/SR 705 0.00/0.00 ������������� Darke $1,309,087 $1,309,087 Resurface The Existing Roadway With Asphalt Concrete.

494 ODOT-7-77504 � LOG-273-2.85 ������������� Logan $718,025 $718,025 Resurfacing495 ODOT-7-77544 � SHE-47-8.14 ������������� Shelby $759,867 $759,867 Resurfacing

496 ODOT-7-77633 � DAR SR 49 16.36 ������������� Darke $190,800 $190,800 Plane And Resurface The Existing Roadway 496 ODOT-7-77633 � DAR SR 49 16.36 ������������� Darke $190,800 $190,800With Asphalt Concrete.

497 ODOT-7-77845 �MOT SHILOH SPRINGS/SALEM AVE.

������������� Montgomery $3,042,583 $3,042,583 Intersection Relocation And Reconstruction.Also Demo Id Oh143.

498 ODOT-7-77861 � MOT SR 48 13.64 ������������� Montgomery $1,460,135 $1,460,135

Widen Main Street To Provide Left Turn Lanes At Helena Street And Fairview Avenue. Also To Include Renovations And Enhancements: Sidewalks, Trees And Shrubs, Benches And Decorative Masonry Piers.

499 ODOT-7-78104 �MOT EDWIN C MOSES BLVD BRIDGE

������������� Montgomery $4,988,884 $4,988,884 Replace The Existing Bridge.(Municipal Bridge Program)

500 ODOT-7-78666 � CLA NEW CARLISLE BIKEWAY ������������� Clark $719,626 $719,626 Construction Of A Multi-Use Trail.

501 ODOT-7-78823 � MOT CBD STREET CONVERSION ������������� Montgomery $2,200,000 $2,200,000

Develop Preliminary Plans To Convert One Way Streets To Two Way Streets In Dayton. Mvrpc Will Act As Lpa For Pe Phase. Construction Added To Project 07/05 - City Of Dayton Is The Lpa For Co Phase. Bikepath Striping Will Be Part Of The Project.Project.

502 ODOT-7-79448 � CLA SR 571 1.25 ������������� Clark $271,769 $271,769

Rehabilitate One Structure By Repairing Deck Edges And Overlaying Deck With Micro-Silica Concrete, With Minimal Approach Work.

503 ODOT-7-79450 � LOG SR 368 2.02 ������������� Logan $189,270 $189,270 Paint Superstructure.504 ODOT-7-79556 � DAR-709-9.77 ������������� Darke $443,593 $443,593 Bridge Replacement

505 ODOT-7-79581 � MER CR 170 8.14 ������������� Mercer $1,654,244 $1,654,244

Improve Deficient Pavement Width, Shoulder And Clear Zones, And Malfunctioning Drainage. Intersection Improvements, As Needed, Structure Replacement.

506 ODOT-7-80028 � MIA SR 571 13.43 ������������� Miami $1,077,835 $1,077,835Replace 7 Traffic Signals, Controllers, Loop Detectors, Wire, Mast Arm Poles, Fiber To Connect Signals, Master Computer.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������%��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

507 ODOT-7-80235 � MOT SR 741 6.46 ������������� Montgomery $140,806 $140,806

Enhancement To Include Addition Of Sidewalk, Brick Pavers, Light Poles, Landscaping, Banners, Driveway Delineation, Look Out At The End Of The 507 ODOT-7-80235 � MOT SR 741 6.46 ������������� Montgomery $140,806 $140,806 Delineation, Look Out At The End Of The Pedestrian Bridge On Sr741. Joint Project With Moraine (Lead Agency) And West Carrollton

508 ODOT-7-80265 � MOT TRAFFIC SIGNALS W. CARR. ������������� Montgomery $611,000 $611,000

Remove And Replace Traffic Signals Systems For 9 Intersections On S. Alex Road. Install Master Traffic Signal Computer System At The City Building.

509 ODOT-7-80354 � SHE RUSSELL RD, PH. 2 ������������� Shelby $3,307,573 $3,307,573

Reconstruct And Widen The Existing Roadway Including Curb, Storm Sewer, Sanitary And Water Modifications, Traffic Control Signs And Pavement Markings. Also Includes Bridge Replacement Over Ir75.

510 ODOT-7-80355 � SHE SR 29 15.73 ������������� Shelby $131,030 $131,030

Replace Existing Traffic Signal With A Fully Actuated Traffic Signal, To Include Ped Control And Ada Compliant Curb Ramps, New Signal Heads And Wire, Strain Poles W/Foundations, Loops, Pull Boxes And W/Foundations, Loops, Pull Boxes And Controller Cabinet And Equipment.

511 ODOT-7-80470 � MIA GR. MIA. BIKEWAY PH. 2 ������������� Miami $546,737 $546,737 Construct A Portion Of The Great Miami River Multi-Use Trail.Earmark Id Oh277

512 ODOT-7-80471 � MOT RIVERSCAPE Ph. 3 ������������� Montgomery $3,709,545 $3,709,545

Development Of Bicycle Hub And Recreation Trail Improvements In Downtown Dayton, To Include Pavement, Trees, Plantings, Turf, Furnishings And Fountains, And Associated Site Work And Utilities. Oh244 "Construct Road Projects And Transportation Enhancement

513 ODOT-7-80854 � MOT SR 48 6.49 ������������� Montgomery $492,900 $492,900 Pavement Planing And Resurfacing The Existing Roadway With Asphalt Concrete.

514 ODOT-7-80879 � DAR-503-0.00 ������������� Darke $1,185,195 $1,185,195 Resurfacing515 ODOT-7-80888 � MER-29/707-0.00/13.39 ������������� Mercer $2,892,516 $2,892,516 Resurfacing

516 ODOT-7-81018 � MOT SIGNALS PH. 7 ������������� Montgomery $1,575,000 $1,575,000Rebuild Fifteen Signalized Intersections Throughout The City With Poles, Vehicle 516 ODOT-7-81018 � MOT SIGNALS PH. 7 ������������� Montgomery $1,575,000 $1,575,000 Throughout The City With Poles, Vehicle Signals, Pedestrian Signals, And Cable.

517 ODOT-7-81022 �MOT WRIGHT-DUNBAR ENHANCEMENT ������������� Montgomery $1,700,000 $1,700,000

Resurfacing On West Third Street From Bank To P.L. Dunbar, Including Ada Ramps; Signal Replacement (Includeing Fiberoptic Interconnect Cable Installation) At Broadway/West Third And P.L. Dunbar/West Third;

518 ODOT-7-81026 � MOT KETTERING BIKEPATH ������������� Montgomery $402,178 $402,178 Construct A Multi-Use Path.

519 ODOT-7-81028 � MOT S. DIXIE PH. 3 KETTERING ������������� Montgomery $1,561,356 $1,561,356

Rehabilitate And Improve South Dixie Highway. Reconstruct The Two Sb And Two Nb Lanes And Curbs. Fill Missing Sections Of Sidewalk And Make Sidewalk And Drive Approach Repairs As Needed. Place All Street Light Wiring Underground.

520 ODOT-7-81039 � MOT CR 99 21.74 ������������� Montgomery $2,500,000 $2,500,000 Widen North Dixie Dr. from 2 to 5 lanes

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #���������$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

521 ODOT-7-81135 � AUG CR 152 13.51 ������������� Auglaize $2,161,367 $2,161,367

Reconstruct Harrison Street To Improve Sight Distances, Increase Roadway Width, Improve Storm Drainage (Local Funds). Replace Existing Bridge On Current Replace Existing Bridge On Current Alignment

522 ODOT-7-81557 � CLA PLEASANT STREET BRIDGE ������������� Clark $799,627 $799,627

Replace The Existing Bridge With A Con/Span Bridge System Or 3/4 Sided Box, Earth Work, Pavement Reconstruction And Utility Relocation. Install Lighting Under Bridge

523 ODOT-7-81764 � LOG COURT AVENUE ������������� Logan $193,347 $193,347 Reconstruct Historic Court Avenue In Bellefontaine.

524 ODOT-7-81765 � DAR BROADWAY/MAIN ������������� Darke $685,568 $685,568

Add Decorative Street Lighting, Replace Sidewalks As Needed, Add Pavers, Landscaping, Planters, Hanging Baskets, Benches, Trash Receptacles, C&G, Catch Basins, Upgrade To Ada Standards. Resurface Around The Traffic Circle.

525 ODOT-7-81767 � MER SOUTH MAIN STREET ������������� Mercer $761,920 $761,920

Extend Sidewalks, Add Street Lighting, Benches, Trees, And Trash Receptacles. Bury Existing Utility Lines.Reimbursement 525 ODOT-7-81767 � MER SOUTH MAIN STREET ������������� Mercer $761,920 $761,920 Bury Existing Utility Lines.Reimbursement For Resurfacing (3.0") Of Asphalt Concrete And Pavement Markings.

526 ODOT-7-81768 � MER SOUTH EASTERN AVENUE ������������� Mercer $302,400 $302,400

Construct New Sidewalks, Add Decorative Fencing, Cross Walk Signalization, Street Lighting, Landscaping, Trash Receptacles, Benches.

527 ODOT-7-82175 � MER VAR PM PH. 4 ������������� Mercer $136,400 $136,400 Provide Safety Upgrade To Mercer County Roads By Placing Pavement Markings.

528 ODOT-7-82177 � MER CR 99 1.18 ������������� Mercer $822,610 $822,610

Replace A Narrow, Structurally Deficient Bridge With A New Prestressed, Precast Concrete Multiple-Span Bridge On Capped Pile Abutments And Reinforced Concrete Drilled Shaft Piers. Associated Roadway Work As Necessary For Proper Roadway Geometrics.Project

529 ODOT-7-82322 � MOT US 40 19.26 ������������� Montgomery $932,910 $932,910Pavement Planing And Resurfacing With Asphalt Concrete.(Upp Program -- Mot Us40; Hsp Application For Mot Sr201.)Us40; Hsp Application For Mot Sr201.)

530 ODOT-7-82419 � MOT IR 70 6.49/VAR ������������� Montgomery $750,000 $750,000Spot Patching At Various Ramps And Approaches On Ir Routes In Montgomery County.

531 ODOT-7-82476 � D07 FDPM FY09 ������������� District 7 $840,000 $840,000 2009 Districtwide Fast Dry Pavement Marker Program.

532 ODOT-7-82481 � D07 RPM FY09 ������������� District 7 $220,000 $220,000 2009 Districtwide Raised Pavement Marker Program.

533 ODOT-7-82491 � D07 PPM FY09 ������������� District 7 $135,000 $135,000 2009 Districtwide Polyester Pavement Marker Program.

534 ODOT-7-82505 � MOT-725-13.82 ������������� Montgomery $2,514,094 $2,514,094 Minor Rehabilitation

535 ODOT-7-82706 � AUG SR 116 8.64 ������������� Auglaize $485,237 $485,237 Remove And Replace A Deficient Bridge With Minimal Roadway Work.

536 ODOT-7-82780 � CHP-559-6.91 ������������� Champaign $610,066 $610,066 Bridge Replacement

537 ODOT-7-82785 � LOG SR 274 4.78 ������������� Logan $1,042,355 $1,042,355 Replace Structure Over The Great Miami River.

538 ODOT-7-83117 � MOT SR 725 6.34 ������������� Montgomery $758,660 $758,660 Bridge Deck Replacement With Minimal Approach Work.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������(��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

539 ODOT-7-83168 � MIA SR 66 0.25 ������������� Miami $1,100,500 $1,100,500Resurface The Roadway With 3-1/4" Of Asphalt Concrete Under The Urban Paving Program--

540 ODOT-7-83189 � (R) CLA-54-5.61 ������������� Clark $190,602 $190,602 Bridge Deck Overlay540 ODOT-7-83189 � (R) CLA-54-5.61 ������������� Clark $190,602 $190,602 Bridge Deck Overlay

541 ODOT-7-83358 � D07-BH-FY2009 ������������� Montgomery $401,144 $401,144 Structural Steel Repair On Various Structures/Various Routes In District 7.

542 ODOT-7-83716 � MOT-Guide Sign Replacement ������������� Montgomery $400,000 $400,000 Signing543 ODOT-7-83717 � AUG-Guide Sign Replacement ������������� Auglaize $400,000 $400,000 Signing

544 ODOT-7-83842 �MIA GR. MIA. BW Connection SOUTH

������������� Miami $1,723,042 $1,723,042 Construct A Missing Link On The River Corridor Bikeway In Miami County.

545 ODOT-7-83895 � MER US 33/SR 219 5.54/8.80 ������������� Mercer $618,556 $618,556Work Consist Of Pavement Repair, Pavement Planing And Resurfacing The Existing Roadway With Asphalt Concrete.

546 ODOT-7-84056 � SHE-47-0.87 ������������� Shelby $160,789 $160,789 Culvert Construction

547 ODOT-7-84075 � MOT MAIN STREET DAYTON ������������� Montgomery $2,863,318 $2,863,318

Replace Asphalt And Concrete Base On The Center Lanes Of The Roadway. Replace Bricks In Crosswalks With Stamped Concrete. Remove Sidewalk Bricks, Add Base Material As Needed, Replace Bricks, Add New As Required. Is In An Historic District. In An Historic District.

548 ODOT-7-84118 � D07 SRTS MOT DELAINE AVENUE ������������� Montgomery $169,091 $169,091Construct Sidewalks, Enhance School Crosswalks, Add Application And Pedestrian Countdown Signals.

549 ODOT-7-84311 � D07 MICRO PM FY09 ������������� District 7 $1,502,152 $1,502,152 Microsurface The Existing Roadways. Preventive Maintenance.

550 ODOT-7-84353 � DAR US 36 16.58 ������������� Darke $150,319 $150,319

Perform A Hill Cut On Us 36 To Improve Intersection Sight Distance To Meet Sight Distance Requirements For A 55 Mph Roadway, Per L&D Manual.

551 ODOT-7-84357 � CLA US40/SR4 11.70/15.09 ������������� Clark $172,910 $172,910

Upgrade All Existing Incandescent Bulb Signal Heads To Led And Install Backplates On All East/West Facing Signal Heads To Provide Better Visibility Of Signal Indication. See Termini.Replace Incandescent Signal Lenses With Led Type Indications

552 ODOT-7-84391 � MOT SR 741 7.00 ������������� Montgomery $28,500 $28,500

Install Traffic Signal Head Blackplates And Battery Backups At Intersection To Improve Visibility Of The Signal Heads And Minimize 552 ODOT-7-84391 � MOT SR 741 7.00 ������������� Montgomery $28,500 $28,500 Visibility Of The Signal Heads And Minimize Visibility/Safety Concerns During Power Outage.

553 ODOT-7-84429 � MOT SR 235 0.22 L ������������� Montgomery $100,000 $100,000 Bridge Rehabilitation Of Structure Mot-235-0022 L, Along With Minimal Approach Work.

554 ODOT-7-84494 � CLA IR 675 0.00 ������������� Clark $426,473 $426,473

Removal And Replacement Of Guide Signs And Supports (As Required) On Mainline, Ramps, And Overpass Intersections, As Per Odot Design Standards.

555 ODOT-7-84935 � MIA SR 721 2.75 ������������� Miami $1,056,883 $1,056,883

Reconstruction Of The Existing Roadway And Other Roadway Related Items. Reimbursement Project In The Village Of Potsdam.

556 ODOT-7-85126 � SHE LOCKINGTON DAM RESERVE ������������� Shelby $27,000 $27,000

Resurfacing Existing Drives At Shelby County, Lockington Dam Reserve. Place 18" Conduit Under Existing Drive At Lockington Dam Reserve.Metroparks

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������&��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

557 ODOT-7-85367 �

MOT-35-18.57 (propose to pull out Bridges 19.64 L/R & 20.66 L/R due to system conditions)

������������� Montgomery $13,900,000 $13,900,000 Bridge Replacement

558 ODOT-7-85461 � Bellefontaine Muni ������������� Logan $195,000 $195,000 Construct taxiway558 ODOT-7-85461 � Bellefontaine Muni ������������� Logan $195,000 $195,000 Construct taxiway559 ODOT-7-85463 � Celina Lakefield ������������� Mercer $450,000 $450,000 Construct taxiway

560 ODOT-7-85464 � Neil Armstrong ������������� Auglaize $509,000 $509,000Replace Precision Approach Path Indicator and Runway End Indicator Lights; site work for administrative building

561 ODOT-7-85465 � Sidney Muni ������������� Shelby $235,000 $235,000 Extend runway, apron Improvements562 ODOT-7-85466 � Springfield Beckley ������������� Clark $1,235,000 $1,235,000 Rehab taxiway, install fencing

563 ODOT-7-85516 � Dayton Intl ES09 Reconst T/W Apr ������������� Montgomery $5,145,000 $5,145,000 Reconstruct T/Ws and Apron

564 ODOT-7-85657 � D07 Pavement Projects PCR <60 ������������� D07 $103,000 $103,000 General PID of District Pavement Below 60 PCR in Current Program

565 ODOT-8-5005 � GRE CR 142 0.36 ������������� Greene $4,295,660 $4,295,660

Reconstruction And Widening Of Roadway To Four Lanes With Left Turn Lanes. (Mpo'S-M) Dayton-Xenia Road From Wildonna Dr. To E. Lynn Dr.

566 ODOT-8-10754 � WAR IR 75 3.40 ������������� Warren $130,522,684 $130,522,684 Major Rehab Of Existing Pavment, Raise Bridges As Required

�������������Replace 122Ft Br Over W Fork Mill Creek.

567 ODOT-8-13539 � HAM IR 75 11.59L ������������� Hamilton $2,760,000 $2,760,000 Repair Retaining Wall By Patching And Sealing.

568 ODOT-8-22375 � CLE SR 276 1.00 ������������� Clermont $455,000 $455,000REPLACE BRIDGE NO. CLE-276-0104, SFN: 1304658. Bridge carries SR 276 over Kain Run.

569 ODOT-8-22950 � WAR IR 71 14.20 ������������� Warren $102,000,000 $102,000,000 Bridge Replacement

570 ODOT-8-23302 � HAM IR 275 7.02 ������������� Hamilton $1,005,560 $1,005,560

Construct Earthwork Bench And Counter Berm To Stabilize The Landslide Along Eb Ir275 Ramp To Eb Ir74.Pid 79999 Combined For Construction. Installation Of Drainage Tile To Dewater Landslide Area At 0.59 Miles South Of Ir74.

571 ODOT-8-24585 � D08 PM/RPM FY2009 ������������� District 8 $2,058,000 $2,058,000

District Wide Pavement Marking And Rpm Contract For Fy 09. Contract Inculdes Fast Dry Alkyd Paint For Aux. Markings On State And Interstate Routes, Polyester Paint For State And Interstate Routes, Fast Dry Water State And Interstate Routes, Fast Dry Water Based Paint For State And Interstate Rout

572 ODOT-8-24956 � GRE IR 675 14.88 ������������� Greene $5,400,000 $5,400,000 Rehab I-675 fromSR 235 to the Clark County Line

573 ODOT-8-24957 � GRE US 35 0.00 ������������� Greene $5,900,000 $5,900,000 Rehab US 35 at the US 35/I-675 interchange

574 ODOT-8-25200 � CLI US 68 8.80 ������������� Clinton $1,407,000 $1,407,000Replace Bridge No. Cli-68-0882, Sfn: 1401084. Bridge Carries Us 68 Over Sr 350.

575 ODOT-8-25259 � CLI SR 132 0.83 ������������� Clinton $1,218,000 $1,218,000Replace Bridge No. Cli-132-0083, Sfn: 1402587. Bridge Spans The East Fork Of Todd Creek.

576 ODOT-8-25372 � CLI SR 124/350 0.03/14.21 ������������� Clinton $2,303,306 $2,303,306Minor Rehabilitation of IR 75. Grind and pave, some joint repair.

577 ODOT-8-25374 � HAM BH VAR ������������� Hamilton $9,200,000 $9,200,000

Consultant Detailed Inspection Of Steel Box Pier Caps In District 8. Consultant Will Complete Rehab Plans For Items Discovered.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������)��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

Improve Itersection Of Sr 125 And Amelia-Olive Branch Road.Project Includes Constructing An Access Road To Eliminate

578 ODOT-8-75303 � CLE SR 125 5.00 ������������� Clermont $3,470,000 $3,470,000Constructing An Access Road To Eliminate Full Movement Access Locations Along Sr 125, Add Left-Hand Turn Lane From North Amelia-Olive Branch Onto Eastbound Sr 125, Curb And Gutter

579 ODOT-8-75567 � HAM IR 275 0.00 ������������� Hamilton $19,597,000 $19,597,000 Rehabilitate I-275 Including Resurfacing, Pavement Repair, And Bridge Repair.

580 ODOT-8-75631 � D08 BH FY2010 ������������� District 8 $1,370,000 $1,370,000 District Wide Bridge Repair project.

581 ODOT-8-75696 � CLI SR 380 0.00 ������������� Clinton $2,257,000 $2,257,000 Minor Rehabilitation - Pavement Gnrl Sys

582 ODOT-8-75839 � D08 Signals FY2009/2010 ������������� District 8 $2,100,000 $2,100,000Install By Contract A Maximum Of 18 Traffic Signals At Various Locations To Be Determined.

583 ODOT-8-75897 � PRE SR 732 0.00 ������������� Preble $2,645,000 $2,645,000

Plane And Pave Portions Of Sr 732 In Preble County. Also To Resurface Eaton Oxford Road, C-29, In From Of The Morning Sun Outpost.

584 ODOT-8-75906 � PRE CHIP FY2009 ������������� District 8 $560,000 $560,000

General System Preventive Maintenance Project For Fy 2009 - Goal 30 Lane Miles. This Project Will Apply A Single Layer Chip 584 ODOT-8-75906 � PRE CHIP FY2009 ������������� District 8 $560,000 $560,000 This Project Will Apply A Single Layer Chip Seal To Portions Of Sr 121, Sr 122, & Sr 725 In Preble County.

585 ODOT-8-76289 � Clermont I-275/SR 32 ������������� Clermont $88,000,000 $88,000,000 Interchange Modification

586 ODOT-8-77136 � CLE SR 132 11.10 ������������� Clermont $900,000 $900,000

Investigate And Recommend Monitoring And Remediation For Embankment Failure On The East Side Of Sr 132. Begin The Minor Pdp At Step 1 Utilizing The District Gsm Task Order, Pid 77134. Anticipating Applying For Fy10 Gsmp Funding For Repair.

587 ODOT-8-77137 � WAR SR 123 16.65 ������������� Warren $376,000 $376,000

Repair Stream Erosion And Embankment Failure Along The North Side Of Sr 123. Stream Realignment And/Or Other Stream Work Required.

588 ODOT-8-77164 � HAM Banks Intermodal Bid Pack. 5 ������������� Hamilton $60,300,000 $60,300,000 Construct Superstructure For Block 26-Bid Package 5 For Itermodal Facility.

Improve Capacity Of Us 27 (Colerain Avenue) Virgina/West Fork Intersection By 589 ODOT-8-77484 � HAM US 27 6.29 ������������� Hamilton $2,800,000 $2,800,000 Avenue) Virgina/West Fork Intersection By Providing Designated Left Turn And Right Turn Lanes To Reduce Traffic Congestion.

590 ODOT-8-77784 � D08 Bridge Maintenance FY2009 ������������� District 8 $770,685 $770,685 District Wide Bridge Maintenance And Preventive Maintenance Contract For Fy09.

591 ODOT-8-77791 � PRE SR 122 20.81 ������������� Preble $415,000 $415,000Replace Bridge No. Pre-122-2083, Sfn: 6802214. Bridge Carries Sr 122 Over A Tributary Of Twin Creek.

592 ODOT-8-77928 � BUT US 27 18.61 ������������� Butler $2,952,000 $2,952,000 Minor Rehabilitation On But Us 27, Us 127, And Sr 122.

593 ODOT-8-78085 � BUT SR 747 0.25 ������������� Butler $600,000 $600,000 Install Signal And Convert Access To Interstate Drive To Right In/Out Only

594 ODOT-8-78125 � CLI SR 72 0.00 ������������� Clinton $2,800,000 $2,800,000 Minor rehab. on SR 72 from the Highland Co. line to Greene Co. line.

595 ODOT-8-78495 � GRE Beavercreek Signals ������������� Greene $935,000 $935,000Interconnect 10 Existing Traffiic Signals With Fiber Optic Cable, Upgrade 5 Traffic Controllers.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #������*��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

596 ODOT-8-78571 � CLI SR 73 6.52-Phase 3 Relocate ������������� Clinton $23,400,000 $23,400,000 Phase 3 Relocation Of Sr73 From Mitchell Road To Us68

597 ODOT-8-78994 � CLE-CR181-0.32 ������������� Clermont $765,000 $765,000Replacement Of Existing Old Sr 28 Bridge (Cle-181-0.32) Over The O'Bannon Creek, 597 ODOT-8-78994 � CLE-CR181-0.32 ������������� Clermont $765,000 $765,000 (Cle-181-0.32) Over The O'Bannon Creek, Including Roadway Approaches.

598 ODOT-8-79005 � CLE CR 351-2.80 ������������� Clermont $1,487,500 $1,487,500

Replace Old Sr 32 Bridge Over Norfolk & Southern Railroad. Project Includes Change In Verticle And Horizontal Alignments, Drainage, Signing And Pavement Marking, And Track Side Drainage Improvements Under Bridge Adjacent To Railroad.

599 ODOT-8-79017 � WAR US 42 2.01 ������������� Warren $392,208 $392,208

Add Standard Right Turn Lanes Eastbound And Westbound On Tylersville Road At Us42, Includes Advanced Warning On Tylersville Road For Eastbound And Protect Only Left Turns For Tylersville

600 ODOT-8-79082 � CLI CR 25/27-0.64/0.16 ������������� Clinton $660,006 $660,006Resurfacing Of Cr 25 (Greenfield Pike) And Cr 27 (Fayetteville Road ) With Two Inches Of Asphalt.

�������������Urban Paving In The City Of Bellbrook On

601 ODOT-8-79381 � GRE SR 725 0.52 ������������� Greene $354,000 $354,000 Sr 725. Includes Pavement Planing And Resurfacing. (Fy2009)

602 ODOT-8-79383 � PRE US 35 12.52 ������������� Preble $142,000 $142,000Urban Paving In The City Of Eaton. Includes Pavement Planing And Resurfacing. (Fy2009)

603 ODOT-8-79384 � BUT US 127 0.00 ������������� Butler $887,000 $887,000Urban Paving In The City Of Fairfield. Includes Pavement Planing And Resurfacing. (Fy2009)

604 ODOT-8-79386 � BUT SR 129 13.71 ������������� Butler $370,000 $370,000Urban Paving In The City Of Hamilton. Includes Pavement Planing And Resurfacing. (Fy2009)

605 ODOT-8-79388 � WAR US 42 2.07 ������������� Warren $340,000 $340,000Urban Paving Project In The City Of Mason. Includes Pavement Planing And Resurfacing. (Fy2009)

606 ODOT-8-79393 � HAM/CLE US 50 35.73/0.00 ������������� Clermont $488,800 $488,800Urban Paving Project In The City Of Milford. Includes Pavement Planing And Resurfacing. (Fy2009)

607 ODOT-8-79396 � BUT US 27 15.08 ������������� Butler $206,950 $206,950Urban Paving Project For The City Of Oxford. Includes Pavement Planing And 607 ODOT-8-79396 � BUT US 27 15.08 ������������� Butler $206,950 $206,950 Oxford. Includes Pavement Planing And Resurfacing. (Fy2009)

608 ODOT-8-79400 � HAM SR 4 8.33 ������������� Hamilton $223,000 $223,000Urban Paving Project For The City Of Springdale. Includes Pavement Planing And Resurfacing. (Fy2009)

609 ODOT-8-79403 � GRE US 68 8.75 ������������� Greene $63,000 $63,000Urban Paving Project For The City Of Xenia. Includes Pavement Planing And Resurfacing. (Fy2009)

610 ODOT-8-80226 � WAR-Cin-Day Rd Bridge Rep ������������� Warren $785,974 $785,974Replace Existing Three-Lane Bridge With A Structure To Accomodate Five Lanes With Increased Shoulder And Pedestrian Areas.

611 ODOT-8-80629 � HAM Street Grid Phase 1 ������������� Hamilton $5,237,500 $5,237,500 Construct Two Bridges To Sit On Top Of Superstructures For Parking Garage.

612 ODOT-8-80813 � HAM SR 4 9.67 ������������� Hamilton $747,000 $747,000

Add A Lane Northbound On Sr4 From Glensprings Drive To Ir275 Eastbound On Ramp. Add A Third Turn Lane On The Eastbound Exit Ramp From Ir275.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

613 ODOT-8-81570 � CLE Buckwheat Road Sidewalks ������������� Clermont $160,000 $160,000 Buckwheat Road-Extend Existing Sidewalk And Close Gaps In Existing Sidewalk.

614 ODOT-8-81603 � CLE SR 232 0.00 ������������� Clermont $1,993,100 $1,993,100 Resurface614 ODOT-8-81603 � CLE SR 232 0.00 ������������� Clermont $1,993,100 $1,993,100 Resurface

615 ODOT-8-81784 � HAM Sharonville Signals ������������� Hamilton $772,638 $772,638

Project Consists Of Improvements To Six Traffic Signals; Rebuild 2 Signals With Mast Arm Supports And Interconnect All Signals With Fiber Optic Cable. Signal Fixtures Will Be Retrofitted With Led Lamps.Siren Activated Emergency Vehicle Preemption

616 ODOT-8-81798 � HAM Cheviot Signals ������������� Hamilton $632,725 $632,725

On Harrison Avenue Install Mast Arm Signals At Four Intersections To Replace Outdated Strain Poles And Signal Equipment. Work Will Include The Replacement Of Controllers, Cabinets, And Wiring. Signal Interconnection Will Be Established With Rf Technology

617 ODOT-8-81900 � BUT Fairfield Signals ������������� Butler $2,236,000 $2,236,000

54 Traffic Signals In Fairfield Will Be Upgraded With New Controllers, Some Led Signal Heads And Miscellaneous Signal Equipments. Fiber-Optic Interconnect Will Be Installed To All Intersections. Ptz,Pan,Tilt And Zoom, Cameras And Central Software

618 ODOT-8-82282 � HAM IR 75 (3.68)(3.85)(4.15) ������������� Hamilton $6,600,000 $6,600,000 Pedestrian Bridge

619 ODOT-8-82612 � PRE Pavement Marking ������������� Preble $150,000 $150,000Pavement Marking Of Various Preble County Roads-Centerline Striping 135 Miles; Edgeline Striping 270 Miles.

620 ODOT-8-82930 � CLI SR 73 6.52-CLEAR & GRUBBING ������������� Clinton $75,000 $75,000 Clearing And Grubbing For Phase 3 Of The Sr 73 Wilmington Bypass

621 ODOT-8-83146 � WAR Lebanon Streetscape ������������� Warren $2,148,000 $2,148,000

Streetscape Project Consisting Of Brick Paver Sidewalks, Refurbishing Ornamental Street Lighting, Landscaping And Decorative Street Furniture.

622 ODOT-8-83658 � CLI Raised Pavement Marking ������������� Clinton $70,000 $70,000 Install Raised Pavement Markers

623 ODOT-8-83659 � CLI Pavement Marking ������������� Clinton $139,805 $139,805Apply Edgeline And Centerline Pavement Markings

624 ODOT-8-83809 � CLE SR 276 0.51 ������������� Clermont $1,240,000 $1,240,000Resurface Sr 276 From Sr 133 To Sr 132; Repair And Pave Odot Clermont County 624 ODOT-8-83809 � CLE SR 276 0.51 ������������� Clermont $1,240,000 $1,240,000 Repair And Pave Odot Clermont County Garage Parking Lot.

625 ODOT-8-83810 � PRE US 35 2.75 ������������� Preble $2,000,000 $2,000,000Resurface Us 35 From I-70 To The Northern Eaton Corp. This Does Not Include The 4-Lane Section Or Ramps To I-70.

626 ODOT-8-84126 � HAM Waldvogel RR Relocation ������������� Hamilton $4,500,000 $4,500,000 Removal And Reconstruction Of The Existing Csx And Two Cind Railroad Lines.

627 ODOT-8-84140 � BUT Liberty Twp Sidewalks ������������� Butler $40,000 $40,000Construct A Sidewalk To Connect Existing Crosswalk At School And Existing Neighborhood.

628 ODOT-8-84231 � HAM IR 275 22.99 ������������� Hamilton $1,000,000 $1,000,000Construct Noise Wall #4 That Was Originally Part Of Ham-275-21.52, Pid# 22386

629 ODOT-8-84256 � PRE US 40 7.38 ������������� Preble $149,000 $149,000Replace Small Culvert Pre-40-0740. The Existing Culvert Is An 84"X40" Cast-In-Place Concrete Culvert.

630 ODOT-8-84352 � CLI SR 730 0.00 ������������� Clinton $2,219,500 $2,219,500 Minor Rehabilitation - Pavement Gnrl Sys

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

631 ODOT-8-84427 � CLE US 50 7.75 ������������� Clermont $434,000 $434,000 Grind Pavement To Increase Friction Course And Install Linear Delineation

632 ODOT-8-84444 � HAM SR 562 0004L** ������������� Hamilton $1,500,000 $1,500,000 Bridge Deck Replacement633 ODOT-8-84467 � CLI SR 134 15.33 ������������� Clinton $1,587,600 $1,587,600 Minor Rehabilitation - Pavement Gnrl Sys633 ODOT-8-84467 � CLI SR 134 15.33 ������������� Clinton $1,587,600 $1,587,600 Minor Rehabilitation - Pavement Gnrl Sys634 ODOT-8-84470 � CLE SR 727 0.00 ������������� Clermont $1,328,000 $1,328,000 Minor Rehabilitation - Pavement Gnrl Sys

635 ODOT-8-84497 � HAM IR 75 10.72** ������������� Hamilton $6,091,500 $6,091,500 Minor Rehabilitation - Pavement Prmy Sys

636 ODOT-8-84786 � Ham Banks Int Blks 16&20 ������������� Hamilton $9,000,000 $9,000,000

Construction Of Block 16 And 20 Superstructures Along With Some Mechanical Work For The Banks Intermodal Facility.

637 ODOT-8-84973 � HAM Artimis Equip Rep. ������������� Hamilton $1,600,000 $1,600,000 Systematic Replacement Of All Artimis Field Devices.

638 ODOT-8-85044 � WAR IR 75 3.40 Tree Removal ������������� Warren $140,000 $140,000 Tree And Brush Removal Prior To War-Ir 75-3.40

639 ODOT-8-85364 � MOT GRE IR 675 2.00 2.70 �������������Greene,Montgomery

$6,072,000 $6,072,000

Replace existing noise wall panels on existing noise wall, investigate salvaging existing steel posts, replace steel posts where warranted.(Design Build Project)

640 ODOT-8-85420 � Indiana & Ohio Rail Blue Ash Reh ������������� Hamilton $500,000 $500,000 Indiana & Ohio Railway Blue Ash Line Rehab.

641 ODOT-8-85467 � Butler Co ES09 Recon Apron Runup ������������� Butler $888,000 $888,000 Reconstruct apron and run up area

642 ODOT-8-85468 � Cinci West ES09 AWOS, Term Imp ������������� Hamilton $300,000 $300,000Install Automated Weather Observing System, site improvements

643 ODOT-8-85469 � Clinton Co ES09 T/W Drainage ������������� Clinton $375,000 $375,000 Improve taxiway grading/drainage644 ODOT-8-85470 � Greene Co ES09 Reconst T/W ������������� Greene $1,023,120 $1,023,120 Relocate taxiway

645 ODOT-8-85471 � Miami U ES09 AWOS ������������� Butler $158,700 $158,700 Install Automated Weather Observing System

646 ODOT-8-85586 � GDRTA 10 hybrid options ������������� Montgomery $2,000,000 $2,000,000 GDRTA 10 Hybrid Options on 40’ Diesel Buses

647 ODOT-8-85587 � GDRTA trolley wire extension ������������� Montgomery $1,500,000 $1,500,000 GDRTA Overhead Trolley Wire Extension to Routes #3 and #4

648 ODOT-8-85588 � GDRTA injection systems ������������� Montgomery $225,000 $225,000 GDRTA Injection Systems for our Maintenance Department

649 ODOT-8-85589 � GDRTA AV screens for hub network ������������� Montgomery $120,000 $120,000GDRTA Audio/Visual Screens to be installed throughout our “Hub” network

650 ODOT-8-85590 � GDRTA security system upgrade ������������� Montgomery $0 $0GDRTA A Security System Upgrade allowing real-time monitoring at all RTA hub locations

651 ODOT-8-85591 � SORTA 57 Energy Efficient Buses ������������� Hamilton $37,500,000 $37,500,000 SORTA 57 Energy Efficient Buses

652 ODOT-8-85592 � SORTA CAD/AVL System ������������� Hamilton $8,671,000 $8,671,000 SORTA CAD/AVL System

653 ODOT-8-85593 � SORTA 12 30 ft low-floor buses ������������� Hamilton $4,092,000 $4,092,000 SORTA 12 30 ft low-floor buses

654 ODOT-8-85594 � SORTA fluid management system ������������� Hamilton $300,000 $300,000 SORTA Fleetwatch JX-55 Fluid Management System

655 ODOT-8-85595 � SORTA thermal management kit ������������� Hamilton $525,000 $525,000 SORTA "Mini-Hybrid" Thermal Managemen Bus Kit

656 ODOT-8-85637 � Hamilton I-75 ������������� Hamilton $512,000,000 $512,000,000 Interstate Reconstruction

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

657 ODOT-8-85658 � D08 Pavement Projects PCR <60 ������������� D08 $15,338,000 $15,338,000 General PID of District Pavement Below 60 PCR in Current Program

658 ODOT-9-13225 � SCI-52-1.25 ������������� Scioto $600,000 $600,000 Culvert

659 ODOT-9-13628 � LAW SR 217 9.300M ������������� Lawrence $389,000 $389,000Replace Existing Deficient Bridge On Sr 217 Over Dick Creek And All Necessary Approach Work.

660 ODOT-9-19250 � JAC SR 93 23.07 & SR 788 0.49 ������������� Jackson $1,062,111 $1,062,111

To Maintain And Preserve The Pavement By Making The Necessary Repairs And By Over Laying The Existing Pavement With Asphalt Concrete And Paving Shoulders.

661 ODOT-9-19255 � LAW SR 775 16.55 & SR 790 0.00 ������������� Lawrence $935,102 $935,102

To Maintain And Preserve The Pavement By Making The Necessary Repairs And By Over Laying The Existing Pavement W/Asphalt Concrete And Paving Shoulders.

662 ODOT-9-19267 � PIK SR 335 20.90 ������������� Pike $400,000 $400,000

To Maintain And Preserve The Pavement By Making The Necessary Repairs And By Over Laying The Existing Pavement With Asphalt Concrete And Paving Shoulders.

To Maintain And Preserve The Pavement

663 ODOT-9-19270 � PIK SR 335 7.90 ������������� Pike $768,443 $768,443

To Maintain And Preserve The Pavement By Making The Necessary Reapirs And By Over Laying The Existing Pavement With Asphal T Concrete And Paving Shoulders.

664 ODOT-9-19277 � ROS SR 327 (2.08)(4.66)(5.65) ������������� Ross $790,000 $790,000

To Maintain And Preserve The Pavement By Making The Necessary Repairs And By Over Laying The Existing Pavement With Asphal T Concrete And Paving Shoulders.

665 ODOT-9-20874 � ADA-348-4.81 ������������� Adams $1,000,000 $1,000,000 Bridge Replacement

666 ODOT-9-21250 � ROS SR 104 14.40 ������������� Ross $10,311,696 $10,311,696

It Is Proposed To Widen Sr104 From Us35 To The New Relocated Sr207 By Adding Additional Thru Traffic Lanes And A Center Turn Lane.

667 ODOT-9-22044 � JAC SR 327, SR 349, & SR 776 ������������� Jackson $486,178 $486,178It Is Proposed To Resurface Both Sr327 & Sr349 Within The City Limits Of Wellston. Both Routes Are Urban Paving.It Is Proposed To Resurface The Existing Pavement With Asphalt Concrete To 668 ODOT-9-22051 � HIG SR73/124/247-7.64/8.54/11.69 ������������� Highland $250,000 $250,000 Pavement With Asphalt Concrete To Maintain Structural Integrity And Provide A Smoother Ride.

669 ODOT-9-23022 � JAC SR 93 2.95 ������������� Jackson $470,000 $470,000

It Is Proposed To Replace Existing Deficient Structure No.4000870 Over Hunting Camp Creek With A New Structure And Necessary Approach Work.

670 ODOT-9-25434 � ADA SR 348 0.00 ������������� Adams $1,545,588 $1,545,588

Minor Rehabilitation. Ovrlay The Existing Pavement With 1/2" Asphalt Scratch Course, 1-1/2" Asphalt Overlay, Aggregate Shoulders, Thremoplastic Pavement Markers. Remove And Install Rpm'S.

671 ODOT-9-25481 � PIK SR 104 0.00 ������������� Pike $954,341 $954,341

Minor Rehabilitation. Apply 1/2" Asphalt Scratch Course, 1 1/2" Asphalt Surface Course, 2' Aggregate Shoulders. Thermplastic Pavement Markings, Remove & Replace Rpm'S.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����''��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

672 ODOT-9-25539 � HIG SR 134 5.25 ������������� Highland $865,264 $865,264

Minor Rehabilitation. To Maintain And Preserve The Pavement By Making The Necessary Repairs And Overlaying The Necessary Repairs And Overlaying The Existing Pavement With Asphalt Concrete.

673 ODOT-9-25579 � ADA SR 770 0.00 ������������� Adams $1,402,001 $1,402,001

Minor Rehabilitation. To Maintain And Preserve The Pavement By Making The Necessary Repairs And By Overlaying The Existing Pavement W/Asphalt Concrete.

674 ODOT-9-25601 � ROS US 35 34.16 & JAC US 35 0.00 ������������� Ross $2,980,699 $2,980,699

Minor Rehabilitation. To Maintain And Preserve The Pavement By Making The Necessary Repairs And Overlaying The Ex- Isting Pavement With Asphalt Concrete.

675 ODOT-9-25603 � BRO SR 505 6.75 & SR 756 0.00 ������������� Brown $686,545 $686,545

Minor Rehabilitation. To Maintain And Preserve The Pavement By Making The Necessary Repairs And By Overlaying The Existing Pavement W/Asphalt Concrete.

676 ODOT-9-25611 � LAW US 52 0.00 ������������� Lawrence $1,388,610 $1,388,610

Minor Rehabilitation. To Maintain And Preserve The Pavement By Making The Necessary Repairs And Overlaying The

676 ODOT-9-25611 � LAW US 52 0.00 ������������� Lawrence $1,388,610 $1,388,610Necessary Repairs And Overlaying The Existing Pavement W/Asphalt Concrete.

677 ODOT-9-25612 � JAC SR 93 6.31 ������������� Jackson $1,125,000 $1,125,000

Minor Rehabilitation. To Maintain And Preserve The Pavement By Making The Necessary Repairs And By Overlaying The Existing Pavement W/Asphalt Concrete.

678 ODOT-9-25863 � PIK SR 32 0.00 ������������� Pike $2,329,760 $2,329,760

Minor Rehabiliation. To Maintain And Preserve The Pavement By Making The Necessary Repairs By Overlaying The Existing Pavement W/Asphalt Concrete.

679 ODOT-9-75721 � BRO CR 24 5.26 ������������� Brown $725,000 $725,000To Replace The Existing Deficient Structure On Cr24 At Slm 5.26 In The Village Of Mt. Orab Corp. Limit.

680 ODOT-9-76029 � JAC SR 93 14.32 ������������� Jackson $1,448,000 $1,448,000To Widen This Section Of Highway By Adding A Two-Way Left Turn Lane For The Safety Of The Traveling Public.

681 ODOT-9-76468 � JAC SR 279 0.00 ������������� Jackson $1,303,600 $1,303,600

To maintain and preserve the existing pavement by making necessary repairs and by overlaying the existing pavement with

681 ODOT-9-76468 � JAC SR 279 0.00 ������������� Jackson $1,303,600 $1,303,600by overlaying the existing pavement with asphalt concrete.

682 ODOT-9-76472 � SCI US 52 23.47 & SR 335 0.00 ������������� Scioto $5,359,650 $5,359,650To Maintain And Preserve The Existing Pavement By Repairing & Overlaying The Existing Pavement With Asphalt Concrete.

683 ODOT-9-76474 � ROS SR 772 6.36 ������������� Ross $1,107,431 $1,107,431To Maintain And Preserve The Existing Highway By Repairing And Overlaying The Existing Pavement With Asphalt Concrete.

684 ODOT-9-77625 � HIG TR259 4.15 ������������� Highland $226,800 $226,800

Bridge On Tr259B (Cave Road) Over A Gorge To Be Replaced With Minimum Approach Work. This Bridge Is On A Private Reserve And Requires Permits To Work On Surrounding Property.

685 ODOT-9-78134 � D09 GR FY2009 ������������� District 9 $350,000 $350,000 To Replace/Repair Guardrail District Wide In D09.

686 ODOT-9-78136 � D09 RPM FY2009 ������������� District 9 $250,000 $250,000 To Replace Raised Pavement Markers On D09 Highways.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'%��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

687 ODOT-9-78164 � JAC SR 139 0.00/LAW SR 141 8.43 ������������� District 9 $592,149 $592,149 In Fy2009, District Wide Project To Perform Pavement Preventive Maintenance.

Overlay the existing asphalt surface 688 ODOT-9-78174 � BRO SR 221 0.00 & US 68 13.72 ������������� Brown $1,294,953 $1,294,953

Overlay the existing asphalt surface w/asphalt concrete in order to preserve and maintain the existing roadway.

689 ODOT-9-78175 � HIG US 62 10.37 SR 321 0.00 ������������� Highland $1,675,479 $1,675,479Overlay the existing roadway w/concrete asphalt in order to preserve and maintain the highway.

690 ODOT-9-78185 � SCI-52-8.66 ������������� Scioto $1,500,000 $1,500,000 Resurfacing

691 ODOT-9-78593 � LAW CR 1 9.32 & 9.48 Bridges ������������� Lawrence $935,100 $935,100 It Is Proposed To Replace Two Of The County Bridges In Cr1 (Old Us52).

692 ODOT-9-78991 � PIK CR 36, 0.45 Brdg PleasantHil ������������� Pike $492,606 $492,606 Bridge Replacement On Cr36, Slm 0.45.

693 ODOT-9-79847 � LAW SR 775 17.27 Brdg Replace ������������� Lawrence $317,000 $317,000 It Is Proposed To Replace The Defieicent Bridge On Sr775.

694 ODOT-9-79964 � ROS US 23 12.82 ������������� District 9 $2,947,112 $2,947,112 It Is Proposed To Resurface A Portion Of Us23 And Repair Various Bridges.

695 ODOT-9-79995 � ROS-138-11.00 ������������� Ross $1,100,000 $1,100,000 Resurfacing

696 ODOT-9-79996 � BRO SR 763 4.37 ������������� Brown $877,533 $877,533 It Is Proposed To Resurface 8 Miles Of Sr763.

697 ODOT-9-80001 � JAC-279-11.90 ������������� Jackson $1,400,000 $1,400,000 ResurfacingIt Is Proposed To Repair A Slip Area On

698 ODOT-9-80609 � LAW SR 7 4.50 Slide Repair ������������� Lawrence $197,950 $197,950

It Is Proposed To Repair A Slip Area On The Right Side Of The Roadway In A Fill Section. This Slip Area Is Between Sr7 And The Ohio River.

699 ODOT-9-80744 � HIG CR 79 0.00 Brdg Replacement ������������� Highland $896,400 $896,400 It Is Proposed To Replace Stucture 3631826.

700 ODOT-9-81910 � ROS Bainbridge Side Walk ������������� Ross $138,063 $138,063

The Proposed Side Walk Project Is Within The Corporation Limits Of The Village Of Bainbridge. It Will Be On Both Side Of Main Street (Us50).

701 ODOT-9-81915 � BRO US 52 12.23 2nd Street Scape ������������� Brown $536,937 $536,937

It Is Proposed To Construct A Street Scape On Second Street (Us52) Between Main & Market Streets By Removing The Side Walks, Installing Utilities Under The Side Walks And Replacing The Side Walks With Brick Paver Side Walks, Add Decorative Poles

702 ODOT-9-82808 � LAW Ironton 3rd St Project ������������� Lawrence $735,646 $735,646

On Third Street, In The City Of Ironton, It Is Proposed To Mill 6" Of Asphalt And Replace It With 2" Of Asphalt And Repair The Curb &

�������������It With 2" Of Asphalt And Repair The Curb & Gutters.

703 ODOT-9-83013 � BRO-131-3.28 ������������� Brown $1,500,000 $1,500,000 Deck Replacement

704 ODOT-9-83178 � BRO Grant Lake Wildlife Area ������������� Brown $253,468 $253,468 It Is Proposed To Resurface The Roadway.

705 ODOT-9-83184 � ROS SR 159 3.08 Signal ������������� Ross $226,000 $226,000It Is Proposed To Build A Stop-Go Signal At This Location And Coordinate It With The Existing Signal Coordination System.

706 ODOT-9-83303 � ROS SR 159 1.22 Intersection ������������� Ross $91,252 $91,252It Is Proposed To Perform Lane Configuration, Minor Signal Changes, And Thermo-Plastic Pavement Markings.

707 ODOT-9-83771 � PIK US 23 4.52 (Seif Rd Int) ������������� Pike $251,000 $251,000Install Turn Lane And Radius Improvements For The Intersection Of Seif Road And Us-23.

708 ODOT-9-83786 � JAC SR 327 1.02 Safety ������������� Jackson $350,000 $350,000

It Is Proposed To Resurface And Make Curve Corrections (Super-Elevation) To Better Ensure The Saftey Of The Traveling Public.

709 ODOT-9-84193 � LAW 7 Detention Basin ������������� Lawrence $250,000 $250,000 Detention Basin

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

710 ODOT-9-84820 � D09 PM FY2009 (B) ������������� District 9 $1,400,000 $1,400,000 District Wide Pavement Markings. Long Line Markings.

In Order To Address Rear End Accidents

711 ODOT-9-84828 � LAW US 52 10.58 Signs ������������� Lawrence $150,000 $150,000

In Order To Address Rear End Accidents On Us52 And In Advance Of The Ashlnad Bridge Intersection, It Is Proposed To Install Actuated Warning Signs W/Flashers.

712 ODOT-9-84925 � ADA US 52 8.25 Manchester SRTS ������������� Adams $75,000 $75,000

It Is Proposed To Construct A New Sidewalk Along Us52 From The Village Corporation Limits Up To The Manchester Local School Distrcit School Campus And Add Traffic Control On Island Creek Road.

713 ODOT-9-85047 � D09 GR FY2010 Replacement ������������� District 9 $1,300,000 $1,300,000 Guardrail714 ODOT-9-85379 � D09 GR Upgrade Stimulus Proj ������������� District 09 $2,000,000 $2,000,000 Guardrail715 ODOT-9-85382 � D09 Culvert Replace Stimulus Pro ������������� District 09 $1,000,000 $1,000,000 Culvert716 ODOT-9-85383 � D09 2Lane Widening Stimulus Proj ������������� District 09 $3,000,000 $3,000,000 Minor Widening717 ODOT-9-85389 � D09 Brdg Painting Stimulus Proj ������������� District 09 $2,000,000 $2,000,000 Bridge Painting718 ODOT-9-85390 � D09 Brdg Repair Stimulus Proj ������������� District 09 $1,000,000 $1,000,000 Heat Straightening719 ODOT-9-85391 � D09 Signal Upgrade Stimulus Proj ������������� District 09 $1,000,000 $1,000,000 Traffic Signal Upgrade

720 ODOT-9-85472 � Alexander Salamon ES09 AWOS ������������� Adams $249,000 $249,000 Install Automated Weather Observing 720 ODOT-9-85472 � Alexander Salamon ES09 AWOS ������������� Adams $249,000 $249,000System

721 ODOT-9-85473 � Brown Co ES09 Expand Apron ������������� Brown $192,000 $192,000 Expand apron

722 ODOT-9-85475 � Highland Co ES09 Obst Rem Apch ������������� Highland $85,000 $85,000 Lighting and Clearing Obstruction from Runway Safety Areas

723 ODOT-9-85476 � Pike Co ES09 Site Prep Hgr ������������� Pike $297,406 $297,406 Site prep for hangar construction724 ODOT-9-85477 � Ross Co ES09 Extend T/W ������������� Ross $533,604 $533,604 Extend taxiway

725 ODOT-9-85635 � LAW Southpoint Dock Project. ������������� Lawrence $3,600,000 $3,600,000 Lawrence County - Southpoint Dock Project.

726 ODOT-9-85659 � D09 Pavement Projects PCR <60 ������������� D09 $5,883,000 $5,883,000 General PID of District Pavement Below 60 PCR in Current Program

727 ODOT-10-20256 � WAS SR0007 21.520 ������������� Washington $7,300,500 $7,300,500 Rehab Of The Washington Street Bridge

728 ODOT-10-21904 � ATH US 33 15.050 ������������� Athens $10,984,000 $10,984,000Four-Lane Minor Rehabilitaion Using Break And Seat Treatment On Concrete With An Asphalt Overlay.

729 ODOT-10-22510 � GAL US 35 3.790 ������������� Gallia $2,279,000 $2,279,000

Four-Lane Resurfacing Project Using An Asphalt Mill And Fill Treatment. Gal 35 3.79-8.34. Includes Resurfacing Rest Areas Ra-10-35 And Ra-10-36.10-35 And Ra-10-36.

730 ODOT-10-22549 � NOB SR 147 10.76 ������������� Noble $1,406,000 $1,406,000 Bridge Replacement Project. Includes Nob 147 1233

731 ODOT-10-23846 � HOC/ATH - US 33 ������������� Hocking $53,800,000 $53,800,000 Nelsonville Bypass Part 2

732 ODOT-10-24848 � ATH SR 356 0.000 ������������� Athens $1,749,000 $1,749,000Two-Lane Resurfacing Project. Ath 356 0.00-4.77. Includes Ath 682 5.96-7.75 And Vin 356 0.00-5.97.

733 ODOT-10-24897 � Vin 50-0.00 ������������� Vinton $2,400,000 $2,400,000 2 Lane Resurfacing

734 ODOT-10-25084 � GAL SR 218 5.010 ������������� Gallia $1,290,000 $1,290,000Bridge Deck Replacement Project For Gal 218 5.01. Bridge Replacement Project For Gal 218 6.90 And 11.26.

735 ODOT-10-75620 � NOB SR 513 5.45 ������������� Noble $467,000 $467,000Bridge replacement project for NOB 513 0545.

736 ODOT-10-75653 � NOB IR 77 4.080 ������������� Noble $2,369,000 $2,369,000Bridge Painting Project. Includes Nob 77 0408 Lt And Rt, Nob 77 16.80 Lt And Rt, Nob 78 0735 And Was 77 0280.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'(��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

737 ODOT-10-77724 � MOE SR 7 23.100 ������������� Monroe $1,008,000 $1,008,000

Concrete (Micro-Silica) Deck Overlay Project For Bridges Moe 7 2313, Was 339 1958 And 1995. In Addition Bridge Moe 7 2313 Will Require A New Edge Beam, 737 ODOT-10-77724 � MOE SR 7 23.100 ������������� Monroe $1,008,000 $1,008,000 2313 Will Require A New Edge Beam, Guardrail, New Backwalls On The Abutments (Both Sides) And New Approach Slabs (Both Sides).

738 ODOT-10-77971 � MOE SR 7 2.210 ������������� Monroe $1,748,000 $1,748,000

Two-Lane Resurfacing Project Using A Chipseal Interlayer And An Asphalt Overlay. Moe 7 2.21-8.45, Moe 7 21.13-22.73, Was 7 37.31-39.12, 49.53-51.43 And Was 26 20.99-21.99.

739 ODOT-10-77973 � GAL SR 160 0.000 ������������� Gallia $2,000,000 $2,000,000

Two-Lane Resurfacing project using a chipseal interlayer and an asphalt overlay. GAL 160 0.00-2.37, 2.37-3.07 SB only (includes Conc. joint repair), 3.07-4.10, GAL 279 0.00-0.67 and GAL 588 0.00-10.87.

740 ODOT-10-77976 � MRG SR 376 0.000 ������������� Morgan $1,387,000 $1,387,000Two-Lane resurfacing project using an asphalt overlay. MRG 376 0.00-9.76.

741 ODOT-10-78191 � ATH SR 682 4.000 ������������� Athens $3,726,000 $3,726,000

Proposed Project Will Widen Existing Two-Lane Sr 682 To Include A Third Two-Way Left Turn Lane. The Project Will Also Left Turn Lane. The Project Will Also Improve Intersection Geometrics.

742 ODOT-10-79577 � HOC/ATH - US 33 ������������� Hocking $100,500,000 $100,500,000 Nelsonville Bypass Part 3

743 ODOT-10-79882 � GAL SR 325 13.870 ������������� Gallia $400,000 $400,000Culvert Liner Project. Line Existing Culverts With Plastic And Grout. Gal 325 13.87, Gal 553 0.15 (No R/W) And Gal 850 1.80.

744 ODOT-10-79888 � D10 Pavement Marking FY2009 ������������� District 10 $1,674,000 $1,674,000 Pavement Marking Project For Fy 2009.

745 ODOT-10-79899 � D10 RPM FY2009 ������������� District 10 $250,000 $250,000Raised Pavement Marker (Rpm) Contract For Fy 2009. Various Routes And Sections In D-10.

746 ODOT-10-80150 � ATH SR 143 0.000 ������������� Athens $1,606,000 $1,606,000Two-Lane Resurfacing Project Using An Asphalt Overlay. Ath 143 0.00-0.79, Includes Meg 143 8.25-19.36.

747 ODOT-10-80323 � NOB IR 77 5.740 ������������� Noble $700,000 $700,000Pavement Replacement Project Under Bridges In Nob Co. Nob Ir 77 5.74-5.85 Nb And Nob Ir 77 15.81-15.86 Sb.

748 ODOT-10-80394 � MEG SR 124 63.050 ������������� Meigs $1,196,000 $1,196,000 Landslide Repair For Site Meg 124 63.05-63.17.

749 ODOT-10-80395 � NOB IR 77 7.910 ������������� Noble $454,000 $454,000 Landslide Repair For Site Nob 77 7.91.749 ODOT-10-80395 � NOB IR 77 7.910 ������������� Noble $454,000 $454,000 Landslide Repair For Site Nob 77 7.91.

750 ODOT-10-81395 � WAS SR 676 19.020 ������������� Washington $601,000 $601,000 Landslide Project Using Gsm Funds. Was 676 19.02-19.18.

751 ODOT-10-81451 � MOE SR 78 0.000 ������������� Monroe $349,000 $349,000Two-Lane Resurfacing Project Using A Microsurfacing Treatment. Moe 78 0.00-8.13 And Nob 513 0.00-0.42.

752 ODOT-10-81478 � MOE SR 260 0.000 ������������� Monroe $1,564,000 $1,564,000

Two-Lane resurfacing project using an asphalt overlay treatment. MOE 260 0.00-5.44, MOE 537 0.00-4.98 and WAS 260 9.97-11.00.

753 ODOT-10-81668 � MRG 83 10.330 ������������� Morgan $2,253,000 $2,253,000

Two-Lane Resurfacing Project Using An Asphalt Overlay Treatment. Mrg 83 10.33-15.62, Nob 83 0.00-6.77 And Nob 566 0.00-4.80.

754 ODOT-10-82837 � MEG SR 7 11.240 ������������� Meigs $815,000 $815,000Two-Lane Resurfacing Project Using A Double-Microsurfacing Treatment. Meg 7 11.24-18.64.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'&��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

755 ODOT-10-83289 � MEG US 33 8.660 LT and RT ������������� Meigs $394,000 $394,000Bridge Deck Overlay Project Using A Micro Silica Treatment. Meg 33 0866 Lt And Rt, Meg 33 0900 Lt And Rt.Pavement Marking Project On Various 756 ODOT-10-83534 � MEG Pavement Marking FY 2009 ������������� Meigs $137,400 $137,400 Pavement Marking Project On Various Routes And Sections In Meigs County.

757 ODOT-10-83704 � GAL SR 588 11.200 ������������� Gallia $172,000 $172,000Intersection Improvement. Signal Upgrade With Geometrics And Pavement Marking Within The City Of Gallipolis.

758 ODOT-10-83819 � WAS SR 26 0.420 ������������� Washington $1,921,000 $1,921,000Two-Lane resurfacing project using an asphalt overlay. WAS 26 0.42-2.46 and WAS 821 4.43-11.78.

759 ODOT-10-84190 � ATH US 50 4.990 ������������� Athens $671,000 $671,000

Four-Lane Preventive Maintenance Project Using A Microsurfacing Treatment. Ath 50 4.99-5.33 Eb, 5.53-9.18 Eb, 4.99-5.37 Wb And 5.55-9.18 Wb. Vin 50 16.57-17.75. Treatment Includes Double Micro On The Berms. Includes Resurfacing Rest Area Ra-10-34 With S

Two-Lane Preventive Maintenance Resurfacing Project Using A Single Chip

760 ODOT-10-84192 � GAL SR 218 0.000 ������������� Gallia $785,000 $785,000

Resurfacing Project Using A Single Chip Seal Treatment. Gal 218 0.00-3.89, Gal 553 0.31-2.37, Gal 554 15.99-19.00, Vin 160 9.03-11.89, 13.62-18.12 And Vin 327 6.89-13.56.

761 ODOT-10-84447 � WAS SR 60 5.060 ������������� Washington $1,000,000 $1,000,000 Two-Lane Resurfacing Project Using An Asphalt Overlay Treatment.

762 ODOT-10-84511 � MOE SR 379 0.000 ������������� Monroe $1,167,000 $1,167,000Two-Lane resurfacing project using an asphalt overlay treatment. MOE 379 0.00-8.18.

763 ODOT-10-85082 � WAS IR 77 0.300 ������������� Washington $195,000 $195,000Bridge Repair Project. Heat Straightening Of Steel From Bridge Being Struck By Vehicle. Was Ir 77 0.30 And 10.34.

764 ODOT-10-85352 � WAS River Trail Ph.4 (Harmar BR) ������������� Washington 200,000$ 200,000$

River Trail Phase 4 in the City of Marietta. Rehabilitation of the Harmar Railroad Bridge for shared use path over the Muskingum River to tie east and west side downtown economic areas together.Clearing Obstruction from Runway Safety

765 ODOT-10-85437 � Ohio U. ES09 RSA, apron, ALS ������������� Athens $3,193,575 $3,193,575Clearing Obstruction from Runway Safety Areas, apron improvement, approach lighting sys.

766 ODOT-10-85440 � Gallia-Meigs RSA improvement ������������� Gallia $260,750 $260,750 Clearing Obstruction from Runway Safety Areas - improve runway safety area

767 ODOT-10-85442 � Vinton Co. RSA improvement ������������� Vinton $1,200,000 $1,200,000 Clearing Obstruction from Runway Safety Areas - improve runway safety area

768 ODOT-10-85480 � Monroe Co ES09 Rehab T/W Apron ������������� Monroe $156,529 $156,529 Rehab taxiway and apron

769 ODOT-10-85660 � D10 Pavement Projects PCR <60 ������������� D10 $11,233,000 $11,233,000 General PID of District Pavement Below 60 PCR in Current Program

770 ODOT-11-19734 � TUS IR0077 24.50 ������������� Tuscarawas $19,089,339 $19,089,339 Construct New Full Interchange With Cr 80

771 ODOT-11-19817 �COL CR 403 1.96 (KNOX SCHOOL RD) ������������� Columbiana $2,840,900 $2,840,900

Relocate 4,200 Feet Of Existing Roadway, Remove Curves, Improve Profile. Includes Guardrail, Signing, Striping, And Installation Of Three Culverts.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����')��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

772 ODOT-11-22776 � HOL US0062 27.420 ������������� Holmes $3,581,661 $3,581,661Reconstruct Intersection Us62 &Cr77 To Improve Isd And Ssd. Includes Turn Lanes, Traffic Signal And Intersection Lighting.Traffic Signal And Intersection Lighting.

773 ODOT-11-24453 � COL CR 428 5.62 ������������� Columbiana $418,182 $418,182

Replace Bridge With Single Span Conc Beam Bridge, Incls 1100 Ft Roadway Realignment And Profile Adjustment, Intersection Relocation With Tr 1004, Guardrail, Striping, Signing

774 ODOT-11-24870 � HAS US0022 17.380 ������������� Harrison $1,750,000 $1,750,000Remove 3 Bridges Over Railroad R/W That Was Ceded To The State, Build Embankment And Pavement.

775 ODOT-11-24944 � HOL SR0179 00.670 ������������� Holmes $488,592 $488,592 Replace 3 Existing Concrete Structures W/ 3 Single Cell Concrete Structures.

776 ODOT-11-25545 � COL US 62 4.860 ������������� Columbiana $2,177,961 $2,177,961Minor Rehabilitation On Us 62, Sr 9, Sr 14, And Sr 173. Also Includes Urban Paving- Salem On Sr 14 And Sr 173 -

777 ODOT-11-25575 � TUS IR 77 12.30 ������������� Tuscarawas $10,065,190 $10,065,190 Minor Rehabilitaion

778 ODOT-11-75114 � HAS CR041 41.63 ������������� Harrison $940,086 $940,086 Replace existing bridge with minor approach workReplace Existing Bridge Constructed In 1906 With A New Multi-Span Multi-Beam Bridge, With Sidewalks And Pedestrian 779 ODOT-11-77275 � TUS-Tuscarawas Ave. ������������� Tuscarawas $3,825,000 $3,825,000 Bridge, With Sidewalks And Pedestrian Railing On Both Structure Facias, On The Existing Hroizontal Alignment And An Improved Vertical Alignment.

780 ODOT-11-77348 � HAS US 22 21.68 ������������� Harrison $4,233,375 $4,233,375Minor Rehab. Mill 1 3/4 In. Replace W/ 3 1/4In.; Replace Guardrail; Minimal Bridge Work; Minimal Joint Repair

781 ODOT-11-77350 � BEL SR 7 8.700 ������������� Belmont $1,088,985 $1,088,985 Pavement Preventative Treatment

782 ODOT-11-78670 � CAR SR0164 10.470 ������������� Carroll $465,480 $465,480Repair Existing Bridge By Replacing The Reinforced Concrete Deck Slab And Repairing The Substructure.

783 ODOT-11-78784 � COL-Train Station ������������� Columbiana $723,701 $723,701

Rehabilitate The Historic Pittsburgh, Marion & Chicago Train Station. Build A Community Room, Visitor Center, And Rest Rooms.

784 ODOT-11-80103 � BEL SR 148 12.000 ������������� Belmont $2,610,520 $2,610,520

General System- Resurfacing - B8- Low Vol. Ol (1 3/4") W/ Chip Seal And 2% Full Depth Repairs: Includes Work At Odnr Brush Creek Wildlife Area (Tr 289) Which Creek Wildlife Area (Tr 289) Which

785 ODOT-11-80131 � BEL 00148 25.12 ������������� Belmont $1,400,000 $1,400,000 Bridge Deck replacement786 ODOT-11-80419 � BEL SR 147 14.380 ������������� Belmont $1,881,380 $1,881,380 General System Resurfacing

787 ODOT-11-81263 � BEL US 250 5.92 ������������� Belmont $1,337,750 $1,337,750 Construct H Pile Wall To Repair Landslide In Two Locations On Bel Us 250,

788 ODOT-11-81265 � BEL US 250 7.790 ������������� Belmont $362,250 $362,250 Construct H Pile Wall To Repair Landslide,

789 ODOT-11-81266 � BEL SR 9 11.300 ������������� Belmont $611,000 $611,000 Repair H Pile Wall

790 ODOT-11-81587 � HAS US 250 11.720 ������������� Harrison $379,654 $379,654 General System - Poor Performing Pavement

791 ODOT-11-81591 � TUS US 250 0.000 ������������� Tuscarawas $1,120,362 $1,120,362 General System - Minor Rehab.

792 ODOT-11-81671 � HOL US 62 9.910 ������������� Holmes $1,908,638 $1,908,638 General System Minor Rehab - Poor Performing Pavement

793 ODOT-11-81673 � COL US 30 17.700 ������������� Columbiana $248,192 $248,192

General System Minor Rehab.- Remove And Replace 1 3/4 In.; Minimal Repair, Curb Ramps As Required By Ada - Will Require Funding Splits And Legislation

794 ODOT-11-81676 � JEF SR 152 5.260 ������������� Jefferson $1,189,992 $1,189,992 General System Minor Rehab.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����'*��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

795 ODOT-11-81677 � CAR SR 644 0.000 ������������� Carroll $348,315 $348,315 General System Preventive Maintenance - Fine Grained Poly, Mod Asphalt

796 ODOT-11-81687 � TUS US 250 23.460 ������������� Tuscarawas $745,646 $745,646 General System - Poor Performing Pavements

796 ODOT-11-81687 � TUS US 250 23.460 ������������� Tuscarawas $745,646 $745,646Pavements

797 ODOT-11-81695 � BEL SR 149 31.390 ������������� Belmont $1,016,508 $1,016,508 2 General System - Poor Performing Pavements1 General System - Minor Rehab

798 ODOT-11-81790 � COL Salem Signal Upgrade ������������� Columbiana $728,700 $728,700

Traffic Signal And Upgrade Project. Project To Include Upgrading The 14 Signalized Intersections On The Closed Loop System Installed In 1996; And Updating One Additional Controller. Work To Include: Controller And Cabinet Replacement, Signal Head Replacement

799 ODOT-11-81826 � COL-Bradshaw Ave ������������� Columbiana $900,000 $900,000Full Depth Pavement Replacement, Curb And Ramps, Catch Basins, Storm Sewer, Waterline, Sanitary Sewer.

800 ODOT-11-81875 � HOL-62-11.02 ������������� District 11 $367,150 $367,150 Replace Or Repair Deteriorated Culverts

801 ODOT-11-82001 � HAS SR 342 3.96 ������������� Harrison $1,200,000 $1,200,000 Replace Reinforced Concrete Deck On The Steel Beam BridgeUpgrade Pavement Marking, Install Overhead Lane Use, Route And Guide Signs In Advance Of Intersection, Improve 802 ODOT-11-82135 � JEF SR 43 3.45 ������������� Jefferson $326,955 $326,955 Signs In Advance Of Intersection, Improve Traffic Signal Visibility Using Back Plates And Supplemental Signal Indications And Revise Traffic Signal Timing.

803 ODOT-11-82206 � HOL VAR GR Phase 3 ������������� Holmes $300,000 $300,000 Guardrail Replacement/Repair804 ODOT-11-82207 � HOL VAR GR Phase 4 ������������� Holmes $300,000 $300,000 Guardrail Replacement/Repair805 ODOT-11-83121 � HOL SR 179 4.09 ������������� Holmes $270,000 $270,000 Replace Existing Slab Bridge806 ODOT-11-83175 � COL Zepernick Lake ������������� Columbiana $50,000 $50,000 Asphalt Resurfacing

807 ODOT-11-83231 � D11-RPM-FY2009 ������������� District 11 $270,000 $270,000 This Is The District'S Systematic Rpm Replacement Project.

808 ODOT-11-83275 � D11 GR FY 2009 ������������� District 11 $750,000 $750,000 Guardrail Reconstruction And Repair

809 ODOT-11-83606 � COL SR 14 9.380 and Various ������������� Columbiana $874,000 $874,000Repair Substructure (Piers (Piles)) By Encasing Them With Reinforced Concrete, For Seven Bridges In Col And Tus Counties.

810 ODOT-11-83615 � HOL SR 754 0.200 ������������� Holmes $953,480 $953,480 Chip Seal With A Functional (Asphalt) Overlay

811 ODOT-11-83616 � TUS SR 516 0.000 ������������� Tuscarawas $1,157,330 $1,157,330 Chip Seal With Functional (Asphalt) Overlay811 ODOT-11-83616 � TUS SR 516 0.000 ������������� Tuscarawas $1,157,330 $1,157,330 Chip Seal With Functional (Asphalt) Overlay

812 ODOT-11-83619 � JEF Veteran's Bridge Lighting ������������� Jefferson $550,000 $550,000

Design And Construct Decorative Lighting That Will Enhance The Uniques Structural Characteristics Of The Veteran'S Memorial Bridge.

813 ODOT-11-84162 � COL SR 45 22.040 ������������� Columbiana $2,154,300 $2,154,300 General System Resurfacing814 ODOT-11-84163 � CAR SR 39 23.410 ������������� Carroll $1,486,660 $1,486,660 General System Resurfacing815 ODOT-11-84165 � CAR SR 183 0.000 ������������� Carroll $605,230 $605,230 General System Resurfacing

816 ODOT-11-84267 � COL SR 154 10.92 ������������� Columbiana $650,000 $650,000 Replace Box Beam Bridge With Steel Beam Superstructure.

817 ODOT-11-84342 � HAS SR 9 9.380 ������������� Harrison $2,706,796 $2,706,796Has-9- B-3/4 Str. O.L. (3 ") With Repairs - Has-799- B8- Low Vol. Ol (1 3/4") W/ Chip Seal And Up To 5% Repair

818 ODOT-11-84788 � HAS SR 800 10.280 ������������� Harrison $80,000 $80,000 Replace Existing 84-In Cmp With New Concrete Pipe

819 ODOT-11-84912 � BEL SR 379 0.000 ������������� Belmont $379,600 $379,600 General System Preventive Maintenance - B11 Single Chip Seal

820 ODOT-11-84914 � CAR SR 9 15.820 ������������� Carroll $717,600 $717,600 General System Preventive Maintenace - B7 Pm Chip Seal

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

821 ODOT-11-84954 � HOL County Trail Phase 1 Repair ������������� Holmes $127,137 $127,137

Improve The Holmes County Trail By Eliminating The Drop Off Between The Buggy Side Of The Trail And The 821 ODOT-11-84954 � HOL County Trail Phase 1 Repair ������������� Holmes $127,137 $127,137Buggy Side Of The Trail And The Bicyle/Pedestrian Side Of The Trail. Work On The Buggy Side Will Include Placement Of Tack Coat, Ashphalt, Then Chip Seal.

822 ODOT-11-85079 � COL-30-33.78 ������������� Columbiana $83,637 $83,637

Repair A Roadway Failure That Was Caused By The Collapse Of An Underground Conduit Under The Roadway. Work To Include Pavement Replacement.

823 ODOT-11-85365 � HOL County Trail, Phases 3 and 5 ������������� Holmes 6,000,000$ 6,000,000$ Construct combination bicycle/buggy/pedestrian path on abandoned railroad bed. 16' paved typical

824 ODOT-11-85366 � COL Wellsville Docks, Phase 3 ������������� Columbiana $2,000,000 $2,000,000 Extension of the overhead bridge crane

825 ODOT-11-85421 � RJ Corman Cleveland Line Rehab ������������� Tuscarawas $900,000 $900,000 RJ Corman Cleveland Line Rehab.

826 ODOT-11-85422 � Ohio-Rail Piney Fork Ln/Minerva �������������Carroll,Jefferson

$500,000 $500,000 Ohi-Rail Piney Fork Line & Minerva Yard Rehabilitation

827 ODOT-11-85446 � Barnesville-Bradfield RW repair ������������� Belmont $109,380 $109,380 Runway repair828 ODOT-11-85448 � Carrol Co. RSA improvement ������������� Carroll $350,000 $350,000 Improve runway safety area829 ODOT-11-85449 � Columbiana Co. resurf apron ������������� Columbiana $450,000 $450,000 Reconstruct aprons830 ODOT-11-85479 � Harrison Co ES09 R/W Repair ������������� Harrison $173,414 $173,414 Rehab R/W831 ODOT-11-85481 � Harry Clever ES09 Rehab Aprons ������������� Tuscarawas $70,323 $70,323 Rehab aprons

832 ODOT-11-85661 � D11 Pavement Projects PCR <60 ������������� D11 $21,104,000 $21,104,000 General PID of District Pavement Below 60 PCR in Current Program

833 ODOT-11-85679 � COL Wellsville Docks, Phase 4 ������������� Columbiana $3,700,000 $3,700,000 Phase 4 involved the conveyor and captive bardge.

834 ODOT-12-10787 � CUY SR 087 04.24 ������������� Cuyahoga $10,200,000 $10,200,000 Bridge Replacement

835 ODOT-12-13185 � CUY SR 174 02.37 ������������� Cuyahoga $1,500,000 $1,500,000

Rehabilitate The River Road Bridge (Cuy-174-0237) Over The Chagrin River Located Just South Of Wilson Mills Road In Gates Mills.

836 ODOT-12-13486 � LAK SR 002 03.33 TRAC ������������� Lake $98,685,000 $98,685,000 Major Rehabilitation From Sr-91 To Newell Creek In Eastlake, Willoughby, And Mentor.

837 ODOT-12-19541 � CUY SR 043 03.69 ������������� Cuyahoga $920,000 $920,000Resurfacing Of Aurora Road (Sr 43) From Solon Road To Richmond Road (Sr 175) In The City Of Solon.Resurface Sr-306 From The Portage County

838 ODOT-12-21755 � GEA SR 306 00.00 Verglimit ������������� Geauga $1,770,000 $1,770,000

Resurface Sr-306 From The Portage County Line To Washington Street. Includes 24" Culvert Replacement At Slm 0.02Combined With Pid 83510 To Do Verglimit On The Hill North Of Us-422.

839 ODOT-12-21776 � CUY US 422 01.68 ������������� Cuyahoga $6,288,000 $6,288,000Resurface Us-422 (Woodland & Kinsman Avenues) From East 34Th To East 93Rd Street.

840 ODOT-12-21784 � CUY-17-17.85 ������������� Cuyahoga $9,000,000 $9,000,000 Bridge Deck841 ODOT-12-21788 � CUY IR 077 11.11 ������������� Cuyahoga $34,000,000 $34,000,000 Bridge Replacement842 ODOT-12-22211 � CUY/LAK IR 271X 06.40/00.00 ������������� Cuyahoga $8,000,000 $8,000,000 Mill and Fill

843 ODOT-12-22212 � CUY SR 017 08.42 ������������� Cuyahoga $1,500,000 $1,500,000 Replace The Brookpark Road Bridge Over Big Creek, Located East Of Tiedeman Road

844 ODOT-12-23960 � CUY IR 271 09.73 ������������� Cuyahoga $11,090,000 $11,090,000Minor Rehab With Structural Overlay Of Mainline Ir-271 From Fairmount Blvd. To South Of Wilson Mills Rd.

845 ODOT-12-24361 � CUY SR 087 04.25 ������������� Cuyahoga $900,000 $900,000 Bridge Repair

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

846 ODOT-12-24856 � GEA SR 087 07.72/VAR ������������� Geauga $750,000 $750,000

Preventative Maintenance On Sr-87 And Various Other Routes To Be Determined. May Include Paving Us-422 Ramps At Harper Rd And Sr-91Harper Rd And Sr-91

847 ODOT-12-25482 � CUY SR 252 00.05 ������������� Cuyahoga $8,353,680 $8,353,680

Construct A Grade Separation At Columbia Road (Sr-252) And The Csx Railroadcompany Tracks In The City Of Olmsted Falls.

848 ODOT-12-25621 � CUY IR 480 18.42 L&R ������������� Cuyahoga $4,000,000 $4,000,000Retrofit The Parapets Of The Twin Ir-480 Bridges Over The Cuyahoga Valley In Valley View And Independence.

849 ODOT-12-75051 � LAK EASTLAKE SIGNAL UPGRADE ������������� Lake $513,550 $513,550

A Project Involving Traffic Signal Improvements Along Sr-91 (Som Ctr Rd), Sr-640 (Vine St) And Sr-283 (Lakeshore Blvd) In The City Of Eastlake.

850 ODOT-12-75181 � LAK SR 306 SIGNAL UPGRADE ������������� Lake $589,050 $589,050

A Project Involving The Replacement Of Traffic Signals Along Sr-306 At The Intersections Of Kirtland Road, Clocktower Drive, The Ir-90 Eb Ramp, And The Ir-90 Wb Ramp.

851 ODOT-12-75482 � CUY/LAK IR 271 14.09/0.00 ������������� Cuyahoga $9,000,000 $9,000,000 Minor rehab of IR-271

852 ODOT-12-77331 � D12 ITS TRAC ������������� District 12 $26,340,000 $26,340,000 District 12 Its - Freeway Management System (Mot).

852 ODOT-12-77331 � D12 ITS TRAC ������������� District 12 $26,340,000 $26,340,000System (Mot).

853 ODOT-12-78716 � CUY ROCKSIDE ROAD ������������� Cuyahoga $1,995,000 $1,995,000

Replace The Existing Single-Span Steel Girder Bridge On Stub Abutments Over The Ohio Canal And Cleveland Metro Parks Towpath Trail Due To Structural Deterioration And Abutment Foundation Failure.

854 ODOT-12-78718 � CUY CANNON ROAD ������������� Cuyahoga $805,500 $805,500 Replace A Structurally Deficient Bridge. ----- 2009 Ceao Lbr Program

855 ODOT-12-78840 � CUY GCRTA P&R (Wtlk) ������������� Cuyahoga $1,000,000 $1,000,000 Park-N-Ride Expansion

856 ODOT-12-78918 � CUY US 422 14.68/VAR Paint ������������� Cuyahoga $3,600,000 $3,600,000 2008 Bridge Program: Bridge Painting Bridge Painting Warranty; Ss 885 8 Bridges

857 ODOT-12-79159 � LAK US 020 14.34 ������������� Lake $520,000 $520,000

Resurfacing Of Mentor Ave. (Us 20) In The City Of Painesville From State Route 44 To Watson Road; Approximately 1.5 Mile Length.

858 ODOT-12-79545 � LAK SR 002 07.60 TRAC ������������� Lake $76,500,000 $76,500,000 Add Lane and Intersection UpgradeStreetscape Improvements &

859 ODOT-12-80862 � CUY US 006A 05.61/STREETSCAPE ������������� Cuyahoga $3,049,283 $3,049,283

Streetscape Improvements & Enhancementsincludes Paving Portion From W.74Th To W.65Th Not Pavedunder Pid 22570.

860 ODOT-12-80934 � CUY RIDGEBURY BLVD ������������� Cuyahoga $3,147,345 $3,147,345

Repair And Resurface Ridgebury Boulevard From Richmond Rd (Sr-175) To Som Ctr Rd (Sr-91) In The Cities Of Lyndhurst, Highland Hts, Mayfield Hts, And Mayfield Village.

861 ODOT-12-80975 � CUY LIBERTY ROAD ������������� Cuyahoga $509,995 $509,995Liberty Road (Cr- 148) Minor Widening And Resurfacing Improvement In The Village Of Bentleyville.

862 ODOT-12-80978 � CUY PETTIBONE ROAD ������������� Cuyahoga $12,610,000 $12,610,000

Reconstruction, Widening, And Bicycle Improvements To Pettibone Road In The City Of Solon From The West Corp. Limit To The East Corp. Limit.

863 ODOT-12-80981 � GEA SR 044 17.52 ������������� Geauga $653,428 $653,428 Intersection Improvement And Related Road Improvement In The City Of Chardon.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

864 ODOT-12-81071 � CUY SR 237 02.42 ������������� Cuyahoga $800,000 $800,000 Resurface Sr-237 (Prospect Avenue) From The South Corp. Limit To Bagley Road.

865 ODOT-12-81268 � GEA SR 700 02.71 ������������� Geauga $1,600,000 $1,600,000 Resurfacing865 ODOT-12-81268 � GEA SR 700 02.71 ������������� Geauga $1,600,000 $1,600,000 Resurfacing

866 ODOT-12-81405 � CUY SR 087 12.06 ������������� Cuyahoga $512,000 $512,000 Resurfacing Of Chagrin Blvd. (Sr-87) From East Of Ir-271 To West Of Lander Circle.

867 ODOT-12-81773 �CUY/SUM/STA/TUS CanalWay Signage ������������� Cuyahoga $500,000 $500,000

Installation Of Replacement Signs Along The 110-Mile Ohio & Erie Canal Way Scenic Byway In Cuyahoga, Summit, Stark, And Tuscarawas Counties.

868 ODOT-12-82167 � CUY IR 090 18.20 ������������� Cuyahoga $1,725,000 $1,725,000 Bridge Deck Replacement869 ODOT-12-82571 � GEA HEMLOCK ROAD (Y&Z) ������������� Geauga $270,000 $270,000 Hemlock Road (Y&Z) Resurfacing Project

870 ODOT-12-82654 �GEA PAVEMENT MARKINGS #4 FY2009 ������������� Geauga $150,000 $150,000

The Application Of Polyester Pavement Markings To Various County Maintained Routes.

871 ODOT-12-82793 �CUY LAKEWOOD SIGNALS (PHASE 1) ������������� Cuyahoga $2,063,500 $2,063,500

2009 Noaca Cmaq Project: Lakewood City Wide Signal Project - Phase 1* Us6 (Clifton Blvd) - Lake Rd To Cove Ave* Sr 237 (West Clifton Blvd) - Sloane Ave/Northwood Ave To Arlington Rd2009 Srts Project* Signal Installation @ Clifton Blvd And Jackson StreetStreet

872 ODOT-12-83142 � D12 BH FY2009 SEALING ������������� District 12 $1,000,000 $1,000,000 Concrete Sealing

873 ODOT-12-83293 � CUY WEST CREEK RESERVATION ������������� Cuyahoga $250,000 $250,000

Construction Of An All Purpose Trail Along West Ridgewood Dr. From The Cleveland Metroparks West Creek Reservation Entrance To Broadview Road.

874 ODOT-12-83401 � LAK SR 091 04.00 Slide ������������� Lake $244,125 $244,125

Remove And Replace Approximately 250 Linear Feet Of Highway Embankment Along The West Side Of The Southern Approach Of The Southbound Bridge Carrying Sr-91 Over The Norfolk & Southern And Csx Railroads In The City Of Willoughby.

875 ODOT-12-83498 � CUY IR 071 10.48 ������������� Cuyahoga $3,000,000 $3,000,000Preventative Maintenance (Mill And Fill) On Ir-71 From Ir-480 To The Brooklyn Corp. Line.

876 ODOT-12-83505 � D12 SIGN FY2009 Replace ������������� District 12 $1,200,000 $1,200,000 Fy2009 Systematic Sign And Sign Structure Replacement Contract

877 ODOT-12-83506 � D12 SIGN FY2009 Structure Repair ������������� District 12 $115,000 $115,000 Fy2009/4Cp7 Sign Structure Repair Contract

�������������Contract

878 ODOT-12-83507 � D12 TSG FY2009 ������������� District 12 $150,000 $150,000 Signal Contract. Signal Upgrade At The Broadway/Forbes/I-271 Interchange.

879 ODOT-12-83508 � D12 FEN FY2009 ������������� District 12 $500,000 $500,000 Fence Repair At Various Locations Across The District.

880 ODOT-12-83511 � GEA SR 168 03.06/VAR ������������� Geauga $250,000 $250,000Replacement Of Five Culverts In Geauga County.Gea-168-03.06Gea-608-00.42Gea-608-01.19Gea-608-04.02Gea-608-08.13

881 ODOT-12-83512 � D12 SLOPE FY2009 Repair ������������� District 12 $150,000 $150,000 Minor Slope Repair At Various Locations.882 ODOT-12-83513 � D12 DR FY2009 Cleaning ������������� Cuyahoga $150,000 $150,000 Drainage Cleaning At Various Locations.

883 ODOT-12-83561 � D12 BH FY2009 Fence ������������� District 12 $370,000 $370,000Replace The Bridge Fence On 13 Structures Removed From Pid 82171. 2009 Bridge Maintenance

884 ODOT-12-83562 � D12 BH FY2009 Misc ������������� District 12 $500,000 $500,000 Miscellaneous Bridge Work

885 ODOT-12-83621 � GEA US 322 10.40 ������������� Geauga $1,200,000 $1,200,000

Resurfacing Of Mayfield Road (Us 322) From Ravenna Road (Sr 44) To Old State Road (Sr 608) In Munson & Claridon Townships.

886 ODOT-12-84483 � CUY IR 480 10.36 ������������� Cuyahoga $300,000 $300,000 Replace Concrete Ramps At Ir-480 And W. 130Th.

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%'��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

887 ODOT-12-84768 � CUY West 3rd Street Painting ������������� Cuyahoga $3,000,000 $3,000,000Municipal Bridge Project: Paint The Vertical Lift Bridge Over The Cuyhoga River In The City Of Cleveland.Widen Existing Bridge To Standard

888 ODOT-12-85049 � CUY IR 490 01.87WN TRAC ������������� Cuyahoga $1,000,000 $1,000,000Widen Existing Bridge To Standard Shoulder Widths. Ramp To Be Used As A Detour For The Innerbelt Bridge.

889 ODOT-12-85377 � D12 Bridge Painting ������������� District 12 $20,000,000 $20,000,000 Bridge Painting890 ODOT-12-85378 � CUY Noise Wall Replacement ������������� Cuyahoga $20,000,000 $20,000,000 Noise Wall Maintenance/Repair

891 ODOT-12-85424 � Cleveland Commercial RR Rehab ������������� Cuyahoga $800,000 $800,000 Cleveland Commercial RR Line Rehabilitation

892 ODOT-12-85482 � Burke Lakefront ES09 Res R/W Apr ������������� Cuyahoga $3,700,000 $3,700,000 Resurface runway and apron893 ODOT-12-85483 � Cuyahoga Co ES09 Rehab R/W Apron ������������� Cuyahoga $1,800,000 $1,800,000 Rehab runway and apron894 ODOT-12-85484 � Geauga Co ES09 Const T/W ������������� Geauga $800,000 $800,000 Construct parallel taxiway

895 ODOT-12-85514 � Cle. Hopkins ES09 R/W Relocation ������������� Cuyahoga $74,916,000 $74,916,000Relocate R/W and Control Tower, Rehab T/Ws & Ramp, Noise Mitigation

896 ODOT-12-85531 � CUY IR 090 15.24 Phase 1,2&3 ������������� Cuyahoga $715,000,000 $715,000,000 CUY IR 090 15.24 Phase 1,2&3

897 ODOT-12-85580 � GCRTA Puritas rail station ADA ������������� Cuyahoga $8,500,000 $8,500,000 GCRTA Puritas Rail Station ADA Rehabilitation

898 ODOT-12-85581 � GCRTA Woodhill Rail Station ADA ������������� Cuyahoga $3,000,000 $3,000,000 GCRTA Woodhill Rail Station ADA RehabilitationRehabilitation

899 ODOT-12-85583 � GCRTA light rail trunk line turn ������������� Cuyahoga $2,000,000 $2,000,000 GCRTA Light Rail Trunk Line Turn Outs

900 ODOT-12-85584 � GCRTA Red Line Track Replacement ������������� Cuyahoga $600,000 $600,000 GCRTA Red Line S-Curve Track Replacement

901 ODOT-12-85585 � GCRTA paratransit vehicles ������������� Cuyahoga $4,640,000 $4,640,000 GCRTA Replacement of Paratransit Vehicles

902 ODOT-12-85604 � GCRTA Stephanie Tubbs Jones East Side Transit Center������������� Cuyahoga $10,400,000 $10,400,000 GCRTA Stephanie Tubbs Jones East Side Transit Center

903 ODOT-12-85606 � GCRTA E 55th St Rail Station ADA ������������� Cuyahoga $12,000,000 $12,000,000 GCRTA E 55th St Rail Station ADA904 ODOT-12-85607 � GCRTA Clifton Avenue BRT Project ������������� Cuyahoga $15,000,000 $15,000,000 GCRTA Clifton Avenue BRT Project905 ODOT-12-85609 � GCRTA Brookpark Station ADA Upgrade������������� Cuyahoga $15,000,000 $15,000,000 GCRTA Brookpark Station ADA Upgrade906 ODOT-12-85612 � GCRTA Airport Rail Station Tunnel ������������� Cuyahoga $8,000,000 $8,000,000 GCRTA Airport Rail Station Tunnel907 ODOT-12-85613 � GCRTA Fairhill Substation Rehab ������������� Cuyahoga $3,000,000 $3,000,000 GCRTA Fairhill Substation Rehab908 ODOT-12-85614 � GCRTA Waterfron Line Track Rep ������������� Cuyahoga $600,000 $600,000 GCRTA Waterfron Line Track Rep909 ODOT-12-85615 � GCRTA Light Rail Trunk Signals ������������� Cuyahoga $8,500,000 $8,500,000 GCRTA Light Rail Trunk Signals910 ODOT-12-85616 � GCRTA Rockefeller Br Demolition ������������� Cuyahoga $1,800,000 $1,800,000 GCRTA Rockefeller Br Demolition910 ODOT-12-85616 � GCRTA Rockefeller Br Demolition ������������� Cuyahoga $1,800,000 $1,800,000 GCRTA Rockefeller Br Demolition911 ODOT-12-85617 � GCRTA Lee/Van Aken Rail Rehab ������������� Cuyahoga $4,000,000 $4,000,000 GCRTA Lee/Van Aken Rail Rehab912 ODOT-12-85618 � GCRTA Rail Grade Crossing Upgrad ������������� Cuyahoga $2,800,000 $2,800,000 GCRTA Rail Grade Crossing Upgrad913 ODOT-12-85619 � GCRTA Warrensville/Van Aken Ext ������������� Cuyahoga $500,000 $500,000 GCRTA Warrensville/Van Aken Ext

914 ODOT-12-85662 � D12 Pavement Projects PCR <60 ������������� D12 $14,086,000 $14,086,000 General PID of District Pavement Below 60 PCR in Current Program

915 ODOT-13-85425 �RJ Corman Western Ohio Lines Rehabilitation (Allen, Van Wert, Auglaize, & Mercer Counties)

�������������Allen, Van Wert,Auglaize,

$1,304,560 $1,304,560 RJ Corman Western Ohio Lines Rehabilitation

916 ODOT-13-85426 �Wheeling & Lake Erie Railway Akron Subdivision Rehab. (Medina to Akron) �������������

Medina,Summit

$1,200,000 $1,200,000 Wheeling & Lake Erie Railway Akron Subdivision Rehab.

917 ODOT-13-85427 �Youngstown & Southeastern Railroad Line Rehabilitation (Mahoning and Columbiana)

�������������Mahoning,Columbiana

$936,000 $936,000 Youngstown & Southeastern Railroad Line Rehabilitation

918 ODOT-13-85428 �West Central Ohio Port Authority Line Rehab & Bridge Replacment (Clark, Fayette, Champaign, Green, & Logan

�������������Clark, Fayette,Champaign,

$2,500,000 $2,500,000West Central Ohio Port Authority Line Rehab & Bridge Replacment

919 ODOT-13-85429 �US Rail/City of Jackson Line Rehabilitation (Ross, Jackson, & Vinton Counties)

�������������Ross, Jackson,Vinton

$2,492,000 $2,492,000 US Rail/City of Jackson Line Rehabilitation

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%%��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

920 ODOT-13-85430 � State-owned Panhandle Line ������������� Statewide $9,200,000 $9,200,000 State-owned Panhandle Line921 ODOT-13-85431 � NS Double Stack Clearance ������������� Statewide $9,619,000 $9,619,000 NS Double Stack Clearance

922 ODOT-13-85432 �Future Phase AMTRAK Plan and

������������� Statewide $2,500,000 $2,500,000 Future Phase AMTRAK Plan and Design922 ODOT-13-85432 �Design

������������� Statewide $2,500,000 $2,500,000 Future Phase AMTRAK Plan and Design

923 ODOT-13-85433 �High Speed Rail Ohio Hub and Regional Planning

������������� Statewide $15,000,000 $15,000,000 High Speed Rail Ohio Hub and Regional Planning

924 ODOT-13-85434 � First Phase of Amtrak 3-C Service ������������� Statewide $250,000,000 $250,000,000 First Phase of Amtrak 3-C Service925 ODOT-13-85486 � Statewide Multimodal Plan ������������� Statewide $5,000,000 $5,000,000 Statewide Multimodal Plan

926 ODOT-13-85492 �Innovative Energy and Environmental Planning

������������� Statewide $5,000,000 $5,000,000 Innovative Energy and Environmental Planning

927 ODOT-13-85493 �Innovative Local Transit Grant Planning

������������� Statewide $10,000,000 $10,000,000 Innovative Local Transit Grant Planning

928 ODOT-13-85494 � CEAO Bridge Load Rating Grants ������������� Statewide $25,000,000 $25,000,000 CEAO Bridge Load Rating Grants

929 ODOT-13-85496 � MPO/CEAO Priority Projects ������������� Statewide $500,000,000 $500,000,000 Innovative Regional and Local Projects - MPO/CEAO Priority Projects

930 ODOT-13-85499 � River Projects ������������� Statewide $14,400,000 $14,400,000 River Projects931 ODOT-13-85501 � Lake Projects ������������� Statewide $20,000,000 $20,000,000 Lake Projects932 ODOT-13-85502 � Commercial Aviation ������������� Statewide $82,400,958 $82,400,958 Commercial Aviation

933 ODOT-13-85503 �ODOT Facilities - Environmental Improvements

������������� Statewide $10,000,000 $10,000,000 ODOT Facilities - Environmental Improvements

934 ODOT-13-85504 �ODOT Facilities - New Construction

������������� Statewide $10,000,000 $10,000,000 ODOT Facilities - New Construction and 934 ODOT-13-85504 �ODOT Facilities - New Construction and Major Repairs

������������� Statewide $10,000,000 $10,000,000 ODOT Facilities - New Construction and Major Repairs

935 ODOT-13-85505 �ODOT Facilities - Innovative Energy Generation or Conservation Projects

������������� Statewide $5,000,000 $5,000,000 ODOT Facilities - Innovative Energy Generation or Conservation Projects

936 ODOT-13-85506 �State Infrastructure Bank-local, multi-modal loans

������������� Statewide $170,000,000 $170,000,000 State Infrastructure Bank-local, multi-modal loans

937 ODOT-13-85507 �Major New Project Plans/Design - See December 20, 2006 Approved Tier II ������������� Statewide $150,000,000 $150,000,000 Major New Project Plans/Design

938 ODOT-13-85569 � Rural Transit 210 Buses ������������� Statewide $7,350,000 $7,350,00059 Rural Transit Systems - 210 <30 foot buses (vehicles to replace those beyond useful life)

939 ODOT-13-85620 � Rural Facility Engineering Desig ������������� STW $2,000,000 $2,000,000 Rural Facility Engineering Desig940 ODOT-13-85621 � Rural Major Equipment Purchase ������������� STW $500,000 $500,000 Rural Major Equipment Purchase941 ODOT-13-85623 � Rural Facility Rehab/Purchase ������������� STW $1,000,000 $1,000,000 Rural Facility Rehab/Purchase942 ODOT-13-85624 � Urban 248 30 ft buses ������������� STW $86,800,000 $86,800,000 Urban 248 30 ft buses

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%���$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

� ����#�������+ �� � #,�-�. ������/��� ���������

��������������� ������������������������

� ����#�������+ �� � #,�-�. ������/��� ���������

����0�����,�&� &((*� 1�*�!� ,�&��������������0����2��/�!�3������45�)�

����3�����,�%&�6 4��' �'(%&7�&�*** 1���!� ����������� ����,�%&�6 4��'

����3�����,�&� &&��% 1�%�!� �������,�&�6�,�%&��4����� ��,�����8�����#8�����

����3�����,�&� &&�%� 1�)!� 0��������$��� �45�������� ��8������4�!

����3�����,�&� &(�'� 1��!� 0��������$��� �#8�����09�!������8��������,��)�!

'���:��� 4���� &(�'� 1�%!) ,������������ ���9�� ����7�� ��$���8�� 4����645��������8����

'���3�����45��& &(�%� 1��!* ��$��,�*�������8������������ �9��%*�8��������;�����45��&��9������

'��� ������� 4�%� &�**� 1��!% 4�%��< �����������������������

'���5�8�����,�&�6 4�'� &&�'% 1�!� 5������������8���"�����,�&�6 4�'�������8����

%���0�8��;����,�*� &&��( 1��!� ��������8��45���$���< ��������8�����< �8�,�*�

%��� �8����6���� ;����,�)� &&�(�7�&&�(� 1��(!% 0����8��������$��� �,�()�645�������45��*'�= �� ���9�������8�����

%��� �8����6���� ;���� 4�(� *�(( 1&�!� >�;;����0���������< ������ ����$��� � 4�(�?����,�)�

%���4��6 �86/��� 4�(�?645�% %�)* 1�%�!� 5�������� 4�(��$��� �45��������45����-0�������������.

%���4���@� 4�'� ��'%% 1)�!� 5��������� 4�'��$��� ����� ��09�����45�%%

%���4�� � ��,�&(6&& &&�&�7�&&�(* 1')'!� 5��������������$��8������������$��� �45��*��8�!�/�������,�����8��������!���!�� ��

%���4�� � ��,�&(6�&&�A��� ��� &&�((7&&�(�7&&�(% 1'%)!� 5���������������������$��� �4�����4�!����45��*��������������8������ ��!%���4�� � ��,�&(6�&&�A��� ��� &&�((7&&�(�7&&�(% 1'%)!� 5���������������������$��� �4�����4�!����45��*��������������8������ ��!

%���4�� � ��,�&(�-+�����. &&�()7&&�(�7&&�(' 1��'!� 0����8�������������������������8������$��� ����;������4�����5�

%���4�� � ��45�) ��((� 1�(!� +�< �,�����8�����45�)����4�������5�!

����/��8�����6 ��@���� �45��( &&�'* 1��&!� �������45��(�$��� �45�(�����/��8�����

����?��$���63�@���,�&� &(**&-��.7�)��&(-�(. 1'(!� &�6&*�,�����8������������������

����?���@��6?��$���� 4�'' �'���7�&(*')7�&&��� 1��'!% /��9���� !4!�''������������������������/������������8�����

���� ��@���� � 4���645�*' ��%�) 1�&!& +�< �/���������$��� � 4���645�*'���� 4�%��5�8��5�

(���?���@��6?��$�����&�� &&�') 1���!� �������,�&��$��� ��&�������(

(���?���@���,�&� &*'�* 1()!) 0�����������,��&��$��� �#�@�< ���6?���@���/������3������,��&�

(���?���@���,�&��-B ��9��/��. &*''� 1%'!% B��9��/���,�����8����

(���?���@���,��&� ��&'' 1�'!� 0��������,��&��-4���8����� ����;���.�;��< �����'�����&�

(���?���@����'��6&�6&� )�)�) 1%*�!� �������45'��6,�&�6,�&��,�����8����

&��� ������ ����,�&� &&�%) 1'&!) /�� ������$����� ������ �9�� �������,�&����� ����/��������

&���/���@�,�&� �%**&7�)�')� 1&�!) 0��������$��� ��!()�� !�:�����$�45!%���� 4!%�

)����������45�%������� &(�*� 1''!� ������45�%

)���/���� ���6>�� �����45�'� ��*&��7�)��(� 1%��!� :�������/������)���/���� ���6>�� �����45�'� ��*&��7�)��(� 1%��!� :�������/������

)���/���� ����,��&�645�'� )�'�*7�)��'% 1%�!� �������,��&�645�'��,�����8�����#8������= �'

)���/���� ����,��&�645�'� � � ,�����������B����:���� �8�� �9����5�!�����C�������������������������

)���>�� �����,�&� &���* 1�7���!� 5����$���������$�� 8���������8������������4�����������

)���>�� �����,�&� &&))* 1��'!� 5�������������,�&��6�����8��������< ��������(�

)���>�� �����,�&� &(��( 1��%!� 5�������������,�&��$��� �45�%����,��&�

)���>�� �����,�&� &&)*� 1(�!* ,�&��4�����,��&��4��?���9������ �D�,��&��:�����,�&��+��?���9���5�� �

)���>�� �����&�6�&� &&�&)7&&)*� 1(*!% ,� ���9�� ��������,�&��6��&�������8����

*���3�< ��������45�&� &�*�' 1�'&!� #8�������$��8��/8������@��������

��������� ����,�&� &&&)� 1%�!( 5����$������"�����&�6 ����5��,�����8����

�����E�$$������+�< �59�������� &*'�' 1)�!* +�< �� 8��59��������

�����/���8����,�&�6*� &*�)� � ,����;����� 9��8����5���< ��D�B �����%D�5������������9��8��������< ���;�����

�����/���8����,�&�6*� )�%�) � ,����;����� 9��8����5������D�B ������D�5������������9��8������������;�����

�����/���8����,�&�6*� ��&*� � ,����;���������8D�B �����(

�����/���8������,����;����/��9� &&%�' 1��%!� ,����;���� �������,�&�6,�*�����/��9�D�B �����&

�����/���8����45��'& �'��� 1�(!* ,� ���9��45��'&���� ������9����>��@���0�����

�����/���8����45�)& )�*)) 1�*!) ����45�)&�$��� �,��&�����3������/����

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%(��$�%&

��������������� ������������������� ������������������

� ������������ ����� ��������

���� ������ ���� � ���� �� ������������ ����� ��������

Count

Project Code (Sponsor Agency/Entitiy + Project #)

Funds able to be obligated by July 1, 2009? (check if yes)

This project is more aspirational and funds may not meet a July 1st deadline (check if yes) Project Name Industry Sector

Potential Public or Private Partners

Development Region (To be completed by ODOD)

County and/or City

Total Project Costs Federal Request

Comments Regarding Status of Project

Estimated Construction Jobs

Estimated Job Creation

Estimated Job Retention Project Description

Ohio Department of TransportationPROPOSED FEDERAL INFRASTRUCTURE STIMULUS PROJECTS

�����/���8���64�� � ���,�&& &*(&� 1'�!* 0�����������,�&&�$��� �� 8�������@�����45�)�

�����/���8�������&� )�%�) 1'�!� ������$��� ��&�6%)��:��������&�6%)��+���8�,�����8�����

�����/���8����,����� ����� &&''% 1��!� /���8����59���C������,����� �����/�������������/���8����,����� ����� &&''% 1��!� /���8����59���C������,����� �����/��������

�����/���8����� ����������/��! &&''' 1���!� �9������/�����0�����

�����3�@��45�� )��%� 1(�!( ����45�%%����4�!�/���

���������������� ������������ ������������������������������������������ � ���������������

����3�@����45��( )�&�% 1(�!' �������45��(659���5�6/8�����C������5�

(�������< ����4���8����������� )�)�% 1%)!& +�< �$����������9����8�8< �������8�����F���������$�����< ���

&���/8�� ������� 4�() **�& 1((!� �;����������

)���B ����� 4�'� )�%() 1)�!' ������������������������������������8������;��< ����+!�?��$��������G����������

&��� ������ ������ 4�'� &�)(' 1���!� 0��������$��� �4��9�� 8��������,�(&�������8����

�����/���8������ 4�%� )�*)' 1�(!� ����#�����5����

���4�;����������,,HH 1&7�'&!%

��� ������ ���� �� �! ���� �� �!

�� ������� ������������ ������������������������ �� ����� ������������������ �����!"�� #�����%&��$�%&