Proposed Action Plan For
Rejuvenation of Sone River (Hon. NGT OA no. 673/2018 order date 08.04.2019)
(Statue of sonebhadra) (Shivling)
From
Regional Office
M.P. Pollution Control Board
Regional Office Shahdol(M.P.)
2 | P a g e
TABLE OF CONTENTS
S.No. CONTENTS PAGE NO. 1. Background of Sone river 3
2. pollution Status 3
3. Various river/Nalla joining to river
Sone
4
4. Water quality goal 5
5. Field survey 5-6
6 Water Characteristics of river Sone 7-8
6.1 Status of water quality of ground
water in the study area
9
7. Bio monitoring of river Sone 9
8. Component of action plan 10
9. Measure of abate Pollution in River
Sone
11-13
10. Proposed action plan- short & Long
term action
14-18
11. Detail of local bodies river Sone 19-20
12. Details of OPM & it's up gradation
work
20-27
13 recommendation 28
14. Executive Summary on Proposed
action plan for Rejuvenation of river
28-34
3 | P a g e
Proposed Action Plan For Rejuvenation of Sone River
1. Sone River & pollution status:
The Sone River originated from "Sone Muda" Amarkantak dist. Anuppur (Longitude: 23.49'23.6
Latitude: 80.24'29.3) than it flows underground and become surface river at village- Cholna of
Anuppur distic. A dam is constructed by M.B. Power Ltd. Jaithari at village koytar & dhurvasin.
Then river flows to forest area toward town Chachai of Anuppur. Then it flows to Village. Amlai.
where the intake well point of orient paper mill is exists, then it follows to Bhaturaghat road
bridge toward village Navalpur, Chaka, Jarwahi, lalpur, Diyapipar, ksheersagar (picnic spot),
Johila river joins to son river at dashrathgaht, maseera, Devlond (Bansagar dam). The total
length of sone river from village cholne Dist. Anuppur to Devlond Distt. Shahdol is about 209
Kms. from here sone river crosses the jurisdiction of regional office Shahdol, and enters into
jurisdiction of regional office Rewa.
2. Pollution ststus:- At entry point into Sidhi District. Sone river water quality is under "A" grade.
As river water is being used for Drinking and irrigation purpose from Bansagar Dam.
4 | P a g e
3. Various river /Nalla joining to river Sone: 1.1 it is to be mention here that there are six rivers name kewai river, Tipan river, surfa
river, Mudna river, Juhilla Rivers, Chandas river join to Sone river in stretch from cholna
villege Dist. Anuppur to Devlondh(Bansager dam). Other 5 nalla. Ghattan, Nargadha, Gaibuda,
bagaiha & Taki nalla of shahdol city fall into river mudna which joins to river sone at
ksheersagar, distance approx. 22 Km.
The details of above river/nalla are as below:
(A) Details of other river which are joins to river Sone:
(i) kewai River: it flows from town Kotma dist. Anuppur.and it joins to river Sone at Village
Cholna.
(ii) Tipan River: it flows from town Venkatnagar dist. Anuppur and. it joins to river Sone at
Behind Collector office Dist. anuppur.
(iii) Surfa River: it flows from Dhanpuri dist. Shahdol and it joins to river Sone at near Surfe
Dam in District: Shahdol.
(iv) Juhilla River: it flows from Village Jaleshwar dist. Anuppur. It joins to river Sone at
dasrathgaht Dist. Shahdol.
(v) Mudna River: it flows from Villaga panchganw (Kelmaniya mountain) dist. Anuppur. it
joins to river Sone at Ksheersagar Dist. Shahdol.
(vi) Chandas River: it flows from Lakhanpur (Karra tola) area of district: Anuppur, and it is
non- perennial river. It joins to river Sone at BabaKuti in Anuppur.
Details of Nalla which joins to river sone:
i. Ghattan Nalla: it contains domestic sewage waste of village: Dhurvasin (Pop :1627)
Dist. Anuppur
ii. Nargadha Nalla: Main 2 sewer drains of city- Dhanpuri meets into nargadha nalla near
Nagarpalika office Dhanpuri, police chauki near road bridge dhanpuri. After it nargadha
nalla join to Sone River at Saboo village (except summer season)its approx length is about
18 km.
iii. Tanki Nalla: Main 3 sewer drains of city- Shahdol meets into Mudna river which finally
meet into river Sone at ksheersagar distance is about 22 Kms. water quality of these nalla
become normal due to self purification in river of long distance and uneven terrain.
iv. Gaibuda Nalla: it contains domestic sewage waste of Khad(Bansagar) (Pop :10657)
Dist. Shahdol
v. Baigha Nalla: it contains domestic sewage waste of Khad(Bansagar) (Pop :10657)
5 | P a g e
.4. Water Quality Goal:
It is an important aspect for the study of river sone in context of its utility as it is
Perennial River. The ultimate goal for beneficial use of river will determine the level of water
quality. In the above application OA no. 673/2018, Hon'ble National Green Tribunal passed the
order that "All States and Union Territories are directed to prepare action plans within two
months for bringing all the polluted river stretches to be fit at least for bathing purposes
(i,e BOD < 3 mg/L and FC < 500 MPN /100 ml) within six months from the date of finalization of
the action plans." it is necessary to mention hear the water quality of Sone River at Bhaturaghat
before April 2017. During this period by the order of CPCB & Direction from MPPCB M/s Orient
paper mill Amali has done up gradation of ETP by Improvement in technology by adopting,
HRTS(High rate transpiration system)in 442 acre These measures adopted by the industry to
comply zero liquid discharge. Sone river quality after April 2017 till date are normally meets
the river water quality standard and as above direction. There is no need of special action plan
for the River Sone.
4. FIELD SURVEY
5.1 Field Survey
The field survey is carried out to maintain and observe the pollution level and current status of
Sone River. The physical survey is conducted from "Sone Muda" Amarkantak & Village Cholna
Dist. Anuppur to the Sone River at Devlond (Bansagar dam) Distt. Shahdol.
a) The length of Sone River from its origin "Sone Muda" Amarkantak, & Village Cholna Dist.
Anuppur to Sone River at Devlond (Bansagar Dam) Dist. Shahdol is about 209 km.
b) The following important Nallas / Rivers are meeting with the Sone River within The
region of regional office Shahdol.
6 | P a g e
Table- 1: Outfalls meeting Sone River within stretch from Sone muda Amarkantak to
Bansager Dam Khad
(area of local bodies-Amarkantak, Anuppur, Dhanpuri, Shahdol, Khad)
Sr.
No.
River / Nalla Wards
Covered
Remark
1 Kewai River -
Without any treatment Nalla/
Swear Drain Ultimately falls into
River Sone through various non –
Perennial Rivers of the region. STP
costing about 9.5 lakh for Khad
(Bansagar)nagar parishad is under
construction. 25% civil work has
already been completed. Proposal
for STP at Dhanpuri is prepared.
Financial approval is awaited. For
Shahdol city tendering process for
construction of two STP is under
process.
2 Tipan river -
3 Chandas river -
4 sarfa river -
5 Mudna river 39 (Shahdol
nagar palika)
6 Juhila river -
7 ghattan nalla village:
Dhurvasin
8 nargadha nalla 24(Dhanpuri
nagar palika)
9 Tanki nalla (Shahdol City in
Mudna River)
39 (Shahdol
nagar palika)
10. Gaibuda Nalla 15(Khad nagar
palika)
11. Baigha Nalla 15(Khad nagar
palika)
c) There is total Approx 05 various major sewer outfalls meeting into Sone Rivers directly
or through other channels in form of various non Perennial River or Nallas.
d) There are several reservoir/ Check Dams at various locations along the Sone rivers,
namely M.B. Power dam of M/s M.B. Power Ltd Jaithari, Sand bund at Amlai of M/s Orient
Paper Mill, Govt. stop Dam at Jarwahi , Devlond (Bansagar dam)Dist. Shahdol etc. to store the
water for drinking water of Rewa city Power generation, irrigation purpose and to facilitate the
downstream villages as drinking water sources.
7 | P a g e
5. Water Characteristics of river Sone
Table 2 : Before April 2017 Average Water Quality of River Sone
(Average result with their range of year 2016-2017)
S.N
o. Name of sampling station
pH
Range
(Min-
Max.)
BOD
Range
(Min-
Max.)
COD
Range
(Min-
Max.)
TDS
Range
(Min-
Max.)
Total coli
from
Range
(Min-
Max.)
1 River Sone at Chachai Near
ATPS
Pumping Station dist. Anuppur
7.80
(7.38-8.12)
1.48
(0.8-2.2)
14.4
(9.6-30)
292.7
(194-
473)
35.17
(0-70)
2 River Sone near OPM
Pumping
station at Amlai dist. Shahdol
7.78
(7.32-8.10)
1.48
(1.0-2.1)
13.7
(9.2-
20.0)
303.0
(188-
473)
41.0
(29-70)
3 River Sone at Bhaturaghat
500 meter d/S after mixing
to
Opm Grad II treated effluent
Dist. Shahdol
7.63
(6.59-8.2)
1.60
(1.6-12.4)
19.2
(18.4-80)
543.6
(286-
1462)
92.16
(40-350)
4
Rever Sone At Devlond 7.70
(7.0-8.10)
1.26
(0.7-1.9)
9.6
(5-19.2)
251.0
(178-
472)
37.17
(21-90)
5
Rivar Sone at Jarwahi Near
road bridge Dist. Shahdol
7.62
(7.3-8.0)
2.20
(1.9-2.4)
30.0
(10-40.5)
589.8
(275-
680)
-
6 River Sone at Diyapiper near
road bridge Dist. Shahdol
7.59
(7.16-8.10)
2.23
(1.8-2.9)
16.7
(6-25.6)
585.5
(314-
658)
-
8 | P a g e
Table 3 : After March 2017 Average Water Quality of River Sone
(Average result with their range of year 2017-2018)
S.N
o. Name of sampling station
pH
Range
(Min-
Max.)
BOD
Range
(Min-
Max.)
COD
Range
(Min-
Max.)
TDS
Range
(Min-
Max.)
Total coli
from
Range
(Min-Max.)
1 River Sone at Chachai
Near ATPS Pumping Station
dist. Anuppur
7.89
(7.6-8.1)
1.26
(7.6-8.1)
13.07
(9.6-20)
189.3
(149-
260)
48.75
(17.0-
170.0)
2 Rever Sone OPM Pumping station
at Amlai dist. Shahdol
7.91
(7.7-8.1)
1.58
(1.2-1.9)
11.05
(5-20)
200.0
(157-
306.0)
46.92
(21.0-
140.0)
3 River Sone at Bhaturaghat
Near road bridge Dist.Shahdol
7.93
(7.7-8.1)
1.80
(1.5-2.3)
17.58
(9.6-30)
250
(177-
333)
53.50
(121.0-
140.0)
4
Rever sone At Devlond 7.77
(7.4-7.9)
1.04
(0.6-2.1)
7.60
(4.8-20)
170.2
(141.0-
229.0)
29.67
(12.0-90.0)
5 Rivar Sone at Jarwahi Near road
bridge Dist.
Shahdol
7.85
(7.6-8.1)
1.56
(1.1-2.4)
14.32
(5.3-53)
223.6
(167-
427)
46.08
(21-140)
6 River Sone at Diyapiper near
road bridge Dist. Shahdol
7.76
(7.6-7.8)
1.23
(1.1-1.4)
9.87
(9.6-10)
224.0
(184-
287)
32.67
(21-50)
5.1 Status of water quality of ground water in the study area
Along the River Sone & its catchment, MPPCB Shahdol collected 4 nos. ground water samples
from 2 sampling locations during 2016-17 & 2017-18. 2 ground water sampling locations are
located in local bodies which are situated in nearby local bodies (Anuppur, Dhanpuri, Shahdol,
Khad Bansagar )along with the Sone River under the jurisdiction of regional office Shahdol. The
ground water samples collected from afore-said locations were analysed for parameters such
as Sulphates (SO4), Fluoride (F) and as well as heavy metals such as Cadmium (Cd), Copper
(Cu), Lead (Pb), Iron (Fe), Nickel (Ni), Zinc (Zn) and Manganese (Mn) in Regional Laboratory,
MPPCB, Jabalpur. Water Quality Monitoring Results of ground water samples collected by the
teams is given in the Table-4. Minimum and maximum concentration of SO4, Fluoride and
9 | P a g e
heavy metals and no. of GW sampling locations are well within the IS 10500-2012 drinking
water specifications (acceptable limits), as amended is given in Table 4.
Table 4. Minimum and maximum concentration of SO4, Fluoride and Heavy metals and
No. of GW sampling locations not complying with the IS 10500-2012 drinking water
specifications (acceptable limits)
Sl.
No
.
Details
Analysis results of Ground Water Samples for General
Parameters and Heavy Metals in mg/l
SO4 F Cd Cu Pb Fe Ni Zn Mn Total
Cr
1 Minimum
(in mg/l) ND ND ND ND ND ND ND ND ND ND
2 Maximum
(in mg/l)
ND ND ND ND ND ND ND ND ND ND
3
No. of locations
exceeding the
limit
ND ND ND ND ND ND ND ND ND ND
IS 10500-2012
Drinking Water
Specifications-
Acceptable Limit (in
mg/l)
200 1.0 0.003 0.05 0.01 0.3 0.02 5.0 0.1 0.05
6. Bio monitoring of river Sone:
Project for monitoring (biodiversity & indexing of the river sone)under the jurisdiction of
regional office shahdol from intake well station of village Amlai district Shahdol to river Sone
at Navalpur ghat has already been prepared and submitted to head office for financial approval
. Study stretch area is approx 18 Kms for monitoring of Faecal Streptococci is covered under
project,
7. Components of Action Plan
a. Main Sources of Pollution in river Sone:
• Domestic waste water of city Dhanpuri Nagarpalika directly meeting River Sone
through Nargadha Nalla.
• Coal mines domestic waste water joins to Nargadha Nalla in Sohagpur area for Dhanpuri
OCM, Sharda OCM, Amlai OCM, and Bangwar U/G have installed STP. Baghaiya also join
Nargadha nalla.
• Shahdol city waste through drains comes in Mudna River mix with small non-perennial
Adna River at Chhatwai Ghat & it joins to Sone River at KsheerSagar.
10 | P a g e
8. MEASURES TO ABATE POLLUTION IN RIVER SONE
As stated here in above, various measures is to be implemented by nagar palika Shahdol and
nagar palika Dhanpuri nagar, District Administration , MPPCB and other government agencies in
compliance of order passed time to time by Hon’ble National Green Tribunal, Central Zonal Bench
Bhopal in the cases filed before Hon'ble Green Tribunal.
8.1 Work taken up so far to maintain and regular watch of Sone river water quality:-
8.1.1 Solid Waste Management Practices - By adopting the best SWM practices in the local
body situated near the sone river and creating the awareness in the public - not to dump house
refuse, debris and demolished material in & along the river and not to dispose the sewage
directly in the river or water streams. The following are the details of works done under SWM. 8.1.1.1 Collection & Transportation –
a. 80% Door to Door collection of waste is being
Practiced in all 93 wards of local body Anuppur,
Dhanpuri, Shahdol, Khad (Devlond).
b. There are 52 covered Vehicles for Door to Door
Collection of Waste (One part for Dry Waste and
Other for Wet waste).
c. All Household and Commercial area is covered
by these 52 Door to Door Vehicles
.
8.1.1.2 MSW Processing & Disposal
There are four municipal local bodies established
along the river sone from Amarkantak to Devlond
(Khad).-
a. Amarkntak Nagar palika
b. Anuppur Nagar palika
c. Dhanpuri Nagar palika
d. Khad(Devlond) Nagar palika parishad
Above city establishment are small township population ranging 8000-30000 only. In
Amarkantak nagar palika parishad solid waste approx 3 TPD is collected and disposed to land
fill site away from Sone River and practically no pollution effect in Sone river. similarly
11 | P a g e
Anuppur, Dhanpuri & Devlond municipal area have solid waste dumping site away from River
Sone.
At present MSW from this municipal area is being dumped in landfill site. There is no
waste processing unit/composting plant. Centralized cluster approach is proposed to
establisher MSW processing plant in Shahdol by urban development department.
8.1.3 Sewerage Treatment Plants and Common Effluent Treatment Plant – The details
There is no sewage treatment plant for treatment of effluent from municipal area established
Near Sone River, though STP from Amarkantak of capacity two MLD is proposed. Work order
for the same is being finalized by MP urban development department. It is pertinent to mention
that domestic waste water of municipal area Amarkantak do not join Sone river. Proposal for
STP from other municipal area Dhanpuri is submitted to urban administration and
develpoement department and pollution control board. Though three major nallas named
Nargadha, Baghaiya & coal mine no. 1 nalla ultimatly join to Nargadha Nalla. The maximum
part of domestic sewage of dhanpuri town goes to nargadha nalla. In lean summer season
Nargadha nalla become dry, when it reach's to national highway no. 43 near road bridge. In
other season , it ultimately reaches to river Sone at village Saboo.
8.1.4 Regulatory measures
8.1.4.1 Banning of use of Polythene Carry bags:-
Govt. of M.P. has issued order vide dated 24.05.2017 for banning of use, sale,
manufacturing and storage of polythene bags. In compliance of this order local body Dhanpuri,
Anuppur, Shahdol, Khad (Bansagar) have they also banned the polythene carry bags with in the
area of respective local body.
Above Local bodies will with the help of MPPCB has conducted many raids on the polythene
stockist and traders. Local body have seized about 1070 Kg polythene and imposed fine of
49,450 in the period of financial year 2018-19 as anti polythene measure. This action has
resulted in pollution control with reference to plastic havoc in the catchment of River Sone.
Local body has observed more than 50% reduction of polythene waste generation in its MSW.
12 | P a g e
(Surprise Inspection for polythene seizure in Dhanpuri NP)
13 | P a g e
[Anti polythene campaign in KHAD(Devlond) NPP ]
(Anti polythene campaign in Bauhari NPP )
14 | P a g e
9. Proposed action plan- Short term & Long term action and the identified
authorities for initiating actions and the time limits for ensuring compliance.
The short term and long term action plans and the implementing agencies responsible for
execution of the action plans and the time limits are given in table as below :-
Proposed Short Term and Long Term Action Plan for Rejuvenation of River Sone
SI
No.
Action plan for rejuvenation of River
Sone
Organization/Age
ncy/ industry
Responsible for
Execution of the
Action Plan
Time Target
(For
Preparation
of Scheme)
Present
Status
a. Up gradation in STP treatment maintain
zero liquid discharge. Unit OPM it is
situated near the catchment area of
River Sone at Amlai
M/s Orient paper
mill
80% work
completed (up
to june 19)
80% work
completed
b. Inventorisation of the industries in the
catchment area of River Sone covering
validity Status of Consents under Water
& Air Acts and Authorisation, Effluent
Generation. ETP capacities and final
mode of effluent discharges
MPPCB and
MPSIDC
Within 08
Months
c. Actions against the Identified industries
in operation without Consents under
Water & Air Acts/Authorisation under
the H & OW (M & TM) Rules 2016 as
amended.
MPPCB Time to time
regularly
Consent/
authorization
are valid
d. Action against the industries not
installed ETP or STPs, exist but not
operating or ETP/STP outlet or treated
effluent is not complying to the effluent
discharge standards (norms).
MPPCB Within 04
month
e. Action against the red category
industries for installation of OCEMS and
not transferring data in CPCB and
MPPCB (If situation exists)
MPPCB Within 03
month
Presently
complied
f. Small scale/tiny and service providing
units located in urban or semi-urban
limits like Dairies. Auto Service Stations
to have a minimum provision of O & G
traps.
MPPCB Within 06
month
Instruction
are already
issued
15 | P a g e
g. Prohibition of Burning of any kind of
waste including agro-residues
State Govt./District
and Local
authorities
Regularly at
the end of crop
season
Govt. of M.P.
has already
issued
prohibitory
orders.
II Sewage Treatment & Disposal Plan
1. Local bodies nearby area of Sone river Amarkantak, Anuppur, Dhanpuri, Khad (Bansagar).
a. Construction of Sewage treatment plant
in area of Nagarpalika Parishad
Amarkantak .
Nagarpalika
Parishad
Amarkantak
06 month. The
construction
of sewage
treatment
plant is
financially
approved.
Approval for
site selection
is under
consideration
b. Construction of Sewage treatment plant
in area of Nagarpalika Parishad
Anuppur.
Nagarpalika
Anuppur & Urban
Development
Department
06 month proposal for
Sewage
treatment
plant is
approved by
Govt. of M.P.
the tendering
process is
under process
c. Construction of Sewage treatment plant
in area of Nagarpalika Parishad
Dhanpuri.
Nagarpalika
Dhanpuri & Urban
Development
Department
01 Year Instruction
for early
establishment
and
commissionin
g are issued
and reminded
time to time
d. Construction of Sewage treatment plant
in area of Nagarpalika Parishad Shahdol.
Nagarpalika
Shahdol.
01 year 2 sewage
treatment
plant is under
tendering
process
capacity
approx 17.5
MLD
e. Construction of Sewage treatment plant
in area of Nagarpalika Parishad Khad
(Bansagar).
Nagarpalika
parishad Khad
(Bansagar)
04 month approx 25%
civil work is
completed ,
Proposal
already
16 | P a g e
sanction from
Govt. of M.P.
f. Plantation in the area Forest Dept.
(Social Forestry)
Within six
months
Completed in
Amarkantak
area
2. Rejuvenation of water quality of Ponds: not applicable (because there is no pond in the area)
3. Protection of Pond & its water quality: not applicable (because there is no pond in the area)
4. Completion of Conveyance System for City Sewage
(a) For Primary Sewerage: The work
related to laying of sewer line in
Amarkantak is almost completed .
The construction of sewage
treatment plant is proposed, site
selection has been done and
approval is under consideration.
In Anuppur nagar parishad
proposal for Sewage treatment
plant is approved by Govt. of M.P.
the tendering process is under
process. Sewage treatment plant
For dhanpuri nagarpalika is
prepared. financial approval
from M.P. urban administration
& development department is
still awaited. In Shahdol nagar
palika, proposal for Sewage
treatment plant (two in no.) is
Approved from Govt. of M.P. &
tendering work is under process.
For Khad nagar parishad
,proposal for Sewage treatment
plant is already sanctioned from
urban administration and
development department from
Govt. of M.P. 25% construction
work of STP has been completed.
total project cost is about 9.5
lakhs.
Nagarpalika Parishad
Amarkantak,
Anuppur, Dhanpuri,
Shahdol,
Khad(Devlond)
Scheme is
already under
implementation
To be
completed in 06
Months.
5. Implementation of local bodies Sewerage project
Total project cost of about Rs. 45 cr. of Local bodies (Amarkantak, Anuppur, Shahdol, Khad(Devlond))
17 | P a g e
5.1 Interception & Diversion of Sewage with STP in river Sone : Not applicable
6. Phase-2:- DPR has been Prepared for following works submitted and almost of them section Project
of approx Rs. 20 cr.
6.1 Not applicable (though there is no pond or such type of water body in the catchment area of Sone
river)
6.2 Interception & Diversion of Sewage going into Nargadha Nalla joining river Sone at Saboo village
dist: Shahdol & construction of STP.
6.3 Interception & Diversion of Sewage going into river mudna of Shahdol city which joins to river Sone
at ksheersagar dist: Umaria & construction of STP.
7 River front development of Sone river in smart city area: Not applicable
8 Zero liquid discharge from Orient paper mill is from March 2017.
III. Ground Water Quality
a. Sampling of contaminated hand pumps
and found to be unfit for drinking
purpose by the public
Local bodies/
Collector/PHED
Within 06
months
--
b. Supply of potable water to the Concern
communities in the Local body area
Local bodies/PHED Within 06
months
---
c. Carrying assessment of ground water
survey for quality and to identify over
exploited and critical blocks.
CGWB/M.P. Ground
Water Department
Within 06
Months
--
d. To Conduct periodic surprise inspection
of the industry to rule out any forceful
injection of industrial effluents into
groundwater resources
MPPCB and M.P.
Ground Water
Department
Within 03
Months
--
e. All the industry should be directed to
obtain NOC from the CGWB and action
against the units in Operation without
obtaining of NOC from CGWA
CGWB/CGWA and
M.P. Ground Water
Department
Within 06
Months
Proposed to
incorporate in
model
consent draft
is already
placed
f. To ensure rain water harvesting by the
industrial commercial and other
institutions and groundwater recharging
with only clean water be encouraged by
CGWB/CGWA
CGWA/M.P. Ground
Water
Department/T&CP
/MCI/Local bodies
Within 06
Months
--
IV Flood Plain Zone (FPZ)
a. Survey & Demarcation of FPZ of River
Sone & Identification of encroachments.
District/Local
administration
Within 06
Months
--
b. Checking encroachments in the
FPZ of River Sone
District/Local
administration
Within 06
Months
---
c. Notification of Flood plain Zone FPZ
State Government Within 06
Months
--
18 | P a g e
d. Plantation in Flood plain Zone (FPZ) M.P. State Forest
Department
By Next
Mansoon
---
e. Prohibition of disposal of municipal
plastic and biomedical waste
particularly in drains
Local
administration
Regularly Disposal of
Solid Waste in
FPZ of rivers
& Nallas
already
banned. The
MCI is
following
good practices
in
management
of MSW &
received no.1
award for this
work.
V E-Flow and Irrigation Practices
1. Catchment improvement of River Sone
(a) Removal of obstruction in upstream
catchment of River Sone
WRD Shahdol Within six
months
(b) Strengthening of existing river bank viz.
stone pitching of bunds, plantation etc.
WRD Shahdol Within six
months
(c) There is no encroachments in bank of
river Sone -- -- --
(d) Plantation in the area Forest Dept. Within six
months
(e) Repair of existing Stops dams Local Bodies/concert
collectors
Within six
months
Work in
progress
1. E-Flow & irrigation practices
a. Measurement of flow of River Sone and
maintaining records
M.P. Irrigation
Department / Local
bodies
Regularly
b. To conserve water and good irrigation
practices to be adopted by the farmers
by organizing mass awareness
programmes and through media in
vernacular language
M.P. State
Irrigation and
Agriculture
Departments.
Regularly
19 | P a g e
10. Details of local bodies near river Sone
(Hon. NGT OA no. 673/2018 order date 08.04.2019 )
S.
No.
Name of local
bodies
Population Name of
tributary
river
Total water
Consumptio
n
KLD/Day
Total
Waste
water
Generation
KLD/Day
Lastly Waste
water Comes
into Drain
KLD/Day
Remark
1.
Nagar palika
parishad
Amarkantak
8414
Floating
Population
--- 1810.896 1086.534 270.30
Sewage do
not reach
up to Sone
river
2.
Nagar palika
parishad
Anuppur
19970 Tipan
River 2695.950 1617.57 323.514
Sewage do
not reach
up to Sone
river
3.
Nagar palika
parishad
Dhanpuri
45156 Sarfa
River 6096.060 3657.636 731.527
Sewage
join to
Sone
river(expec
t summer
season)
4.
Nagar palika
parishad
Burhar
19289 --- 2604.015 1562.409 312.4818
Sewage do
not reach
up to Sone
river
5.
Nagar palika
parishad
Shahdol
95362 Mudna
River 12873.87 7724.322 1544.8644
Sewage
join to
Sone river
through
murna
river
6.
Nagar palika
parishad Khad
(Devlond)
10657 --- 1438.695 863.217 172.6434
Sewage
join to
Sone river
except
summer
season
NOTE:- River Kewai flows through Kotma Nagar Palika join Sone river near village- cholna Distt: Anuppur &
Juhilla River Join to Sone River at Dashrath Ghat Village – Masira under Distt: Shahdol.
20 | P a g e
11. Details of Orient Paper Mill & Its Up gradation work
M/s Orient Paper Mill, Amlai, Distt.- Shahdol is a Paper and pulp industry it is
established in year 1968. With 300 TPD(Paper & Tissue Paper Production)
production capacity. This industry situated in Village-Amlai under shahdol
district and approx 2 km away from Sone River. Water Effluent volume is about
10000 M3/Day. Three types (grades) industrial waste water are being generated
by this industry. Grade-I waste water being generated by cooling and from
boiler in paper machine, this water is less polluted & is being used again in
generation process. Grade-II waste water generated from paper machine,
Cheaper house, & Hypo section. This water is treated by ETP and treated water
again being used in plantation (HRTS). Grade-III waste water generated from
pulp mill & soda recovery plant is highly polluted and found to contain lignin
material due to wood used as a raw material. treated water again being used in
plantation (HRTS).
Raw Material: Paper pulp, alum, caustic soda, liquid chlorine, poly- aluminium
chloride, sodium sulphate, & ASA (Alkenyl Succinic Anhydride)
12.1 Facilities of effluent treatment:
ETP Installation date: Before 1980
ETP Up gradation date: March 2017
1. Grade-I :- effluent is recycled.
2. Grade-II:- Its some part recycled & other part treated in ETP.
3. Grade-III:- its source is from pulp mill & soda recovery plant, effluent is
highly polluted not easily biodegradable and contain lignin material due to wood
used as a raw material. For its treatment, industry had established ETP but CPCB
issued guideline & instructions for up gradation of ETP because the existing ETP
was very old and not able to meet the pollution control norms, therefore to
achieve the norms and to reuse 100% in HRTS(High rate transpiration system),
21 | P a g e
the industry has done up- gradation/augmentation of existing ETP by
construction of new equalisation tank and diffused aeration tank. The new
equalisation tank and diffused aeration tank was commissioned and all civil
mechanical & electrical work related to newly constructed equalisation tank and
diffused aeration tank are completed in march 2017.
4. Capacity: 20,000 KLD.
12.2 Details of HRTS System: The HRTS (High rated transpiration system)
work as living filtration device to renovate the waste water through
absorption, ion exchange, precipitation and stabilization of pollutants
through microbial degradation. HRTS is a land application system of
discharging effluents continuously at high rate designed by NEERI
Nagpur. It becomes functional in the year of 2000. OPM has developed
19 plantation sites in about 400 acres of land for utilization of treated
effluent. Many piezometric points have been installed to monitor
Ground water quality on regular basis.
12.2.1 Pictures of HRTS (High rated transpiration system):
22 | P a g e
12.3 Pictures of ETP & STP :
23 | P a g e
24 | P a g e
25 | P a g e
STP Picture
Sewage treatment plant for Domestic waste water from colony
Overview of Sewage Treatment Plant Construction Work: Cap. 1000 m3/day
1. Equalization Tank:
26 | P a g e
2. Aeration Tank :
3. Clear Water collection Tank:
27 | P a g e
4. Sludge Holding Tank:
5. MGF & ACF:
28 | P a g e
12.4 Recommendations:
1. The industry should maintain ZLD in river Sone by expanding the HRTS
area. Present HRTS area may be increased to 100 acre, which is already
available with industry.
2. Make proper H.D.P.E. lining in oxidation ponds cum aeration tank to make
them compact to prevent seepage of waste water into river, underground
soil and subsequently to river Sone.
3. Industry should upgrade existing ETP By adding activated carban filter
(A.C.F.) and ozonator unit to comply consent condition.
4. Industry should install RO system for reusing grade II effluent.
5. Industry should install continuously online effluent quality monitoring
station at Bhaturaghat.
6. Industry should do plantation all along the banks of Sone river from
Bhatura village to jarwahi village.
Jr. Scientist Scientist Regional officer
(District I/C) MPPCB MPPCB
Shahdol Shahdol Shahdol
29 | P a g e
13. EXECUTIVE SUMMARY ON PROPOSED ACTION PLANS FOR REJUVENATION OF RIVER
FOR IDENTIFIED POLLUTED RIVER STRETCH SONE
S.
No.
DESCRIPTION OF ITEM DETAILS
1. Name of the identified polluted river and its
tributaries
: River Sone (also spelt as son) & tributary river
1. Mudna river
2. Is river is perennial and total length of the
polluted river
: Perennial river & stretch under Polluted river
Shahdol approx 18 Km. identified in year 2016 (but
after april 2017 quality of river water is be improved
and it is not polluted category quality of river water
is found in category "A" & "B" of ISO:2296)
3. No of drain contributing to pollution and
names of major drains.
: 1. Nargadha Nalla
2. Tanki Nalla
3. Gaibuda Nalla
4. Baigha Nalla
5. Ghattan Nalla
4. Whether River Rejuvenation committee
(RRC) constituted by the State Govt./ UT
Administration and if so, Date of
constitution of 'RRC' .
: Yes
5. Major town on the bank of the river with
population
: Nagar palika parishad Amarkantak
(Pop. 8414+5000 Floating)
Nagar palika parishad Anuppur
(Pop 19970)
Nagar palika parishad Dhanpuri
(Pop 45156)
Nagar palika parishad Burhar
(Pop 19289)
Nagar palika parishad Shahdol
(Pop 95362)
Nagar palika prishad Khad (Devlond)
(Pop 10657)
a. Total water consumption and
sewage generation in MLD
: 26.080 MLD (water consumption)
16.511 MLD(sewage generation)
b. Total no. of existing STPs and the
total capacities in MLD
: No existing and operational STPs in local bodies.
c. Gaps in sewage treatment in MLD
and no. of towns not having STPs
: 16.511 MLD(sewage generation)
1. Nagar palika parishad Amarkantak
2. Nagar palika parishad Anuppur
3. Nagar palika Dhanpuri
4. Nagar prishad Burhar
5. Nagar palika parishad Shahdol
6. Nagar palika prishad Khad (Devlond)
d. Total MSW generation in TPA : 15395.7 TPA
30 | P a g e
e. Existing treatment and disposal
facilities and total capacity.
:
Dump into Land fill site
6. Major industrial estates located with total
no. of industries.
: There is no industrial estate near the catchment of
river sone.
a. Total water consumption and total
industrial effluent generation in
MLD.
: No industrial effluent discharge to river Sone.
b. No. of industries having captive
ETPs and their treatment capacity
in MLD.
:
------
c. No. of CETP's and their treatment
capacity.
: -----
d. Gaps in treatment of industrial
effluent.
: ------
e. Total HW generation in TPA in the
catchment area.
: ------
f. Existing HW Treatment and
Disposal facilities and total capacity
with life span.
:
-------
7. Action plan include mainly covering aspect
such as(Proposal for utilization of sewage,
ground water recharging or rain water
harvesting , measure for regulating ground
water use, protection and management of
flood plain zone, maintaining minimum E-
flow and water shed management,
plantation on both sides of the river, setting
up of bio-diversity park etc. as per Hon'ble
NGT order dated 20.09.2018 and
19.12.2018
: Annexure I
8. Min. and Max. Required time period for
implementation of action plan.
: 2 year
9. Total estimated budget in crores towards
implementation of proposed action plans
with break-up (e.g. No. of STPs capacity,
total cost; No of CETPs, total capacity, Cost
towards interception and diversion of
sewage/effluent to STPs/CETPs etc.)
: 45 Cr. of STPs in local bodies (Amarkantak,
Anuppur, Dhanpuri, Burhar, Shahdol, Khad
(Devlond))
Cost towards interception and diversion of sewage:
20 Cr.
31 | P a g e
10. Responsible organization (s) for
implementation of proposed action plan
: Nagar palika parishad Amarkantak
Nagar palika parishad Anuppur
Nagar palika parishad Dhanpuri
Nagar palika parishad Burhar
Nagar palika parishad Shahdol
Nagar palika prishad Khad (Devlond)
11. Proposed Mechanism for execution of
action plans
: 1. Concerning local bodies shall submit estimate and
detail design of STP.
2. The required financial requirement may be
Sanctioned to concerning MLB/ULB.
3. M.P. Urban Department may supervise progress of
project and action plan for the same.
12. Expected deliverables with respect to
achieving Goals.
: ------
Annexure-I
I Sewage Treatment & Disposal Plan
1. Local bodies nearby area of Sone river are Amarkantak, Anuppur, Dhanpuri, Khad (Bansagar).
sa. Construction of Sewage treatment plant in
area of Nagarpalika Parishad Amarkantak .
Nagarpalika Parishad
Amarkantak
06 month. The construction
of sewage
treatment plant
is financially
approved.
Approval for site
selection is
under
consideration
b. Construction of Sewage treatment plant in
area of Nagarpalika Parishad Anuppur.
Nagarpalika Anuppur
& Urban Development
Department
06 month proposal for
Sewage
treatment plant
is approved by
Govt. of M.P. the
tendering
process is under
process
c. Construction of Sewage treatment plant in
area of Nagarpalika Parishad Dhanpuri.
Nagarpalika Dhanpuri
& Urban Development
Department
01 Year Instruction for
early
establishment
and
commissioning
are issued and
reminded time to
time
32 | P a g e
d. Construction of Sewage treatment plant in
area of Nagarpalika Parishad Shahdol.
Nagarpalika Shahdol. 01 year 2 sewage
treatment plant
is under
tendering
process capacity
approx 17.5 MLD
e. Construction of Sewage treatment plant in
area of Nagarpalika Parishad Khad (Bansagar).
Nagarpalika parishad
Khad (Bansagar)
04 month approx 25% civil
work is
completed ,
Proposal already
sanction from
Govt. of M.P.
f. Plantation in the area Forest Dept.
(Social Forestry)
Within six
months
Completed in
Amarkantak area
2. Rejuvenation of water quality of Ponds: not applicable (because there is no pond in the area)
3. Protection of Pond & its water quality: not applicable (because there is no pond in the area)
4. Completion of Conveyance System for City Sewage
(a) For Primary Sewerage: The work related
to laying of sewer line in Amarkantak is
almost completed . The construction of
sewage treatment plant is proposed,
site selection has been done and
approval is under consideration. In
Anuppur nagar parishad proposal for
Sewage treatment plant is approved
by Govt. of M.P. the tendering process
is under process. Sewage treatment
plant For dhanpuri nagarpalika is
prepared. financial approval from M.P.
urban administration & development
department is still awaited. In
Shahdol nagar palika, proposal for
Sewage treatment plant (two in no.) is
Approved from Govt. of M.P. &
tendering work is under process. For
Khad nagar parishad ,proposal for
Sewage treatment plant is already
sanctioned from urban administration
and development department from
Govt. of M.P. 25% construction work
of STP has been completed. total
project cost is about 9.5 lakhs.
Nagarpalika Parishad
Amarkantak, Anuppur,
Dhanpuri, Shahdol,
Khad(Devlond)
Scheme is already
under
implementation
To be completed
in 06 Months.
II Ground Water Quality
a. Sampling of contaminated hand pumps and
found to be unfit for drinking purpose by the
public
Local bodies/
Collector/PHED
Within 06
months
--
b. Supply of potable water to the Concern
communities in the Local body area
Local bodies/PHED Within 06
months
---
c. Carrying assessment of ground water survey CGWB/M.P. Ground Within 06 --
33 | P a g e
for quality and to identify over exploited and
critical blocks.
Water Department Months
d. To Conduct periodic surprise inspection of the
industry to rule out any forceful injection of
industrial effluents into groundwater
resources
MPPCB and M.P.
Ground Water
Department
Within 03
Months
--
e. All the industry should be directed to obtain
NOC from the CGWB and action against the
units in Operation without obtaining of NOC
from CGWA
CGWB/CGWA and
M.P. Ground Water
Department
Within 06
Months
Proposed to
incorporate in
model consent
draft is already
placed
f. To ensure rain water harvesting by the
industrial commercial and other institutions
and groundwater recharging with only clean
water be encouraged by CGWB/CGWA
CGWA/M.P. Ground
Water
Department/T&CP/M
CI/Local bodies
Within 06
Months
--
III Flood Plain Zone (FPZ)
a. Survey & Demarcation of FPZ of River Sone &
Identification of encroachments.
District/Local
administration
Within 06
Months
--
b. Checking encroachments in the
FPZ of River Sone
District/Local
administration
Within 06
Months
---
c. Notification of Flood plain Zone FPZ
State Government Within 06
Months
--
d. Plantation in Flood plain Zone (FPZ) M.P. State Forest
Department
By Next
Mansoon
---
e. Prohibition of disposal of municipal plastic
and biomedical waste particularly in drains
Local administration Regularly Disposal of Solid
Waste in FPZ of
rivers & Nallas
already banned.
The MCI is
following good
practices in
management of
MSW & received
no.1 award for
this work.
IV E-Flow and Irrigation Practices
1. Catchment improvement of River Sone
(a) Removal of obstruction in upstream
catchment of River Sone
WRD Shahdol Within six
months
(b) Strengthening of existing river bank viz.
stone pitching of bunds, plantation etc.
WRD Shahdol Within six
months
(c) There is no encroachments in bank of river
Sone -- -- --
(d) Plantation in the area Forest Dept. Within six
months
34 | P a g e
(e) Repair of existing Stops dams Local Bodies/concert
collectors
Within six
months
Work in progress
1. E-Flow & irrigation practices
a. Measurement of flow of River Sone and
maintaining records
M.P. Irrigation
Department / Local
bodies
Regularly
b. To conserve water and good irrigation
practices to be adopted by the farmers by
organizing mass awareness programmes and
through media in vernacular language
M.P. State Irrigation
and Agriculture
Departments.
Regularly
Scientist Executive engineer
Regional office Regional office