1 | Page Proposed Action Plan For Rejuvenation of Sone River (Hon. NGT OA no. 673/2018 order date 08.04.2019) (Statue of sonebhadra) (Shivling) From Regional Office M.P. Pollution Control Board Regional Office Shahdol(M.P.)

Upload: others

Post on 02-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

1 | P a g e

Proposed Action Plan For

Rejuvenation of Sone River (Hon. NGT OA no. 673/2018 order date 08.04.2019)

(Statue of sonebhadra) (Shivling)

From

Regional Office

M.P. Pollution Control Board

Regional Office Shahdol(M.P.)

Page 2: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

2 | P a g e

TABLE OF CONTENTS

S.No. CONTENTS PAGE NO. 1. Background of Sone river 3

2. pollution Status 3

3. Various river/Nalla joining to river

Sone

4

4. Water quality goal 5

5. Field survey 5-6

6 Water Characteristics of river Sone 7-8

6.1 Status of water quality of ground

water in the study area

9

7. Bio monitoring of river Sone 9

8. Component of action plan 10

9. Measure of abate Pollution in River

Sone

11-13

10. Proposed action plan- short & Long

term action

14-18

11. Detail of local bodies river Sone 19-20

12. Details of OPM & it's up gradation

work

20-27

13 recommendation 28

14. Executive Summary on Proposed

action plan for Rejuvenation of river

28-34

Page 3: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

3 | P a g e

Proposed Action Plan For Rejuvenation of Sone River

1. Sone River & pollution status:

The Sone River originated from "Sone Muda" Amarkantak dist. Anuppur (Longitude: 23.49'23.6

Latitude: 80.24'29.3) than it flows underground and become surface river at village- Cholna of

Anuppur distic. A dam is constructed by M.B. Power Ltd. Jaithari at village koytar & dhurvasin.

Then river flows to forest area toward town Chachai of Anuppur. Then it flows to Village. Amlai.

where the intake well point of orient paper mill is exists, then it follows to Bhaturaghat road

bridge toward village Navalpur, Chaka, Jarwahi, lalpur, Diyapipar, ksheersagar (picnic spot),

Johila river joins to son river at dashrathgaht, maseera, Devlond (Bansagar dam). The total

length of sone river from village cholne Dist. Anuppur to Devlond Distt. Shahdol is about 209

Kms. from here sone river crosses the jurisdiction of regional office Shahdol, and enters into

jurisdiction of regional office Rewa.

2. Pollution ststus:- At entry point into Sidhi District. Sone river water quality is under "A" grade.

As river water is being used for Drinking and irrigation purpose from Bansagar Dam.

Page 4: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

4 | P a g e

3. Various river /Nalla joining to river Sone: 1.1 it is to be mention here that there are six rivers name kewai river, Tipan river, surfa

river, Mudna river, Juhilla Rivers, Chandas river join to Sone river in stretch from cholna

villege Dist. Anuppur to Devlondh(Bansager dam). Other 5 nalla. Ghattan, Nargadha, Gaibuda,

bagaiha & Taki nalla of shahdol city fall into river mudna which joins to river sone at

ksheersagar, distance approx. 22 Km.

The details of above river/nalla are as below:

(A) Details of other river which are joins to river Sone:

(i) kewai River: it flows from town Kotma dist. Anuppur.and it joins to river Sone at Village

Cholna.

(ii) Tipan River: it flows from town Venkatnagar dist. Anuppur and. it joins to river Sone at

Behind Collector office Dist. anuppur.

(iii) Surfa River: it flows from Dhanpuri dist. Shahdol and it joins to river Sone at near Surfe

Dam in District: Shahdol.

(iv) Juhilla River: it flows from Village Jaleshwar dist. Anuppur. It joins to river Sone at

dasrathgaht Dist. Shahdol.

(v) Mudna River: it flows from Villaga panchganw (Kelmaniya mountain) dist. Anuppur. it

joins to river Sone at Ksheersagar Dist. Shahdol.

(vi) Chandas River: it flows from Lakhanpur (Karra tola) area of district: Anuppur, and it is

non- perennial river. It joins to river Sone at BabaKuti in Anuppur.

Details of Nalla which joins to river sone:

i. Ghattan Nalla: it contains domestic sewage waste of village: Dhurvasin (Pop :1627)

Dist. Anuppur

ii. Nargadha Nalla: Main 2 sewer drains of city- Dhanpuri meets into nargadha nalla near

Nagarpalika office Dhanpuri, police chauki near road bridge dhanpuri. After it nargadha

nalla join to Sone River at Saboo village (except summer season)its approx length is about

18 km.

iii. Tanki Nalla: Main 3 sewer drains of city- Shahdol meets into Mudna river which finally

meet into river Sone at ksheersagar distance is about 22 Kms. water quality of these nalla

become normal due to self purification in river of long distance and uneven terrain.

iv. Gaibuda Nalla: it contains domestic sewage waste of Khad(Bansagar) (Pop :10657)

Dist. Shahdol

v. Baigha Nalla: it contains domestic sewage waste of Khad(Bansagar) (Pop :10657)

Page 5: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

5 | P a g e

.4. Water Quality Goal:

It is an important aspect for the study of river sone in context of its utility as it is

Perennial River. The ultimate goal for beneficial use of river will determine the level of water

quality. In the above application OA no. 673/2018, Hon'ble National Green Tribunal passed the

order that "All States and Union Territories are directed to prepare action plans within two

months for bringing all the polluted river stretches to be fit at least for bathing purposes

(i,e BOD < 3 mg/L and FC < 500 MPN /100 ml) within six months from the date of finalization of

the action plans." it is necessary to mention hear the water quality of Sone River at Bhaturaghat

before April 2017. During this period by the order of CPCB & Direction from MPPCB M/s Orient

paper mill Amali has done up gradation of ETP by Improvement in technology by adopting,

HRTS(High rate transpiration system)in 442 acre These measures adopted by the industry to

comply zero liquid discharge. Sone river quality after April 2017 till date are normally meets

the river water quality standard and as above direction. There is no need of special action plan

for the River Sone.

4. FIELD SURVEY

5.1 Field Survey

The field survey is carried out to maintain and observe the pollution level and current status of

Sone River. The physical survey is conducted from "Sone Muda" Amarkantak & Village Cholna

Dist. Anuppur to the Sone River at Devlond (Bansagar dam) Distt. Shahdol.

a) The length of Sone River from its origin "Sone Muda" Amarkantak, & Village Cholna Dist.

Anuppur to Sone River at Devlond (Bansagar Dam) Dist. Shahdol is about 209 km.

b) The following important Nallas / Rivers are meeting with the Sone River within The

region of regional office Shahdol.

Page 6: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

6 | P a g e

Table- 1: Outfalls meeting Sone River within stretch from Sone muda Amarkantak to

Bansager Dam Khad

(area of local bodies-Amarkantak, Anuppur, Dhanpuri, Shahdol, Khad)

Sr.

No.

River / Nalla Wards

Covered

Remark

1 Kewai River -

Without any treatment Nalla/

Swear Drain Ultimately falls into

River Sone through various non –

Perennial Rivers of the region. STP

costing about 9.5 lakh for Khad

(Bansagar)nagar parishad is under

construction. 25% civil work has

already been completed. Proposal

for STP at Dhanpuri is prepared.

Financial approval is awaited. For

Shahdol city tendering process for

construction of two STP is under

process.

2 Tipan river -

3 Chandas river -

4 sarfa river -

5 Mudna river 39 (Shahdol

nagar palika)

6 Juhila river -

7 ghattan nalla village:

Dhurvasin

8 nargadha nalla 24(Dhanpuri

nagar palika)

9 Tanki nalla (Shahdol City in

Mudna River)

39 (Shahdol

nagar palika)

10. Gaibuda Nalla 15(Khad nagar

palika)

11. Baigha Nalla 15(Khad nagar

palika)

c) There is total Approx 05 various major sewer outfalls meeting into Sone Rivers directly

or through other channels in form of various non Perennial River or Nallas.

d) There are several reservoir/ Check Dams at various locations along the Sone rivers,

namely M.B. Power dam of M/s M.B. Power Ltd Jaithari, Sand bund at Amlai of M/s Orient

Paper Mill, Govt. stop Dam at Jarwahi , Devlond (Bansagar dam)Dist. Shahdol etc. to store the

water for drinking water of Rewa city Power generation, irrigation purpose and to facilitate the

downstream villages as drinking water sources.

Page 7: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

7 | P a g e

5. Water Characteristics of river Sone

Table 2 : Before April 2017 Average Water Quality of River Sone

(Average result with their range of year 2016-2017)

S.N

o. Name of sampling station

pH

Range

(Min-

Max.)

BOD

Range

(Min-

Max.)

COD

Range

(Min-

Max.)

TDS

Range

(Min-

Max.)

Total coli

from

Range

(Min-

Max.)

1 River Sone at Chachai Near

ATPS

Pumping Station dist. Anuppur

7.80

(7.38-8.12)

1.48

(0.8-2.2)

14.4

(9.6-30)

292.7

(194-

473)

35.17

(0-70)

2 River Sone near OPM

Pumping

station at Amlai dist. Shahdol

7.78

(7.32-8.10)

1.48

(1.0-2.1)

13.7

(9.2-

20.0)

303.0

(188-

473)

41.0

(29-70)

3 River Sone at Bhaturaghat

500 meter d/S after mixing

to

Opm Grad II treated effluent

Dist. Shahdol

7.63

(6.59-8.2)

1.60

(1.6-12.4)

19.2

(18.4-80)

543.6

(286-

1462)

92.16

(40-350)

4

Rever Sone At Devlond 7.70

(7.0-8.10)

1.26

(0.7-1.9)

9.6

(5-19.2)

251.0

(178-

472)

37.17

(21-90)

5

Rivar Sone at Jarwahi Near

road bridge Dist. Shahdol

7.62

(7.3-8.0)

2.20

(1.9-2.4)

30.0

(10-40.5)

589.8

(275-

680)

-

6 River Sone at Diyapiper near

road bridge Dist. Shahdol

7.59

(7.16-8.10)

2.23

(1.8-2.9)

16.7

(6-25.6)

585.5

(314-

658)

-

Page 8: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

8 | P a g e

Table 3 : After March 2017 Average Water Quality of River Sone

(Average result with their range of year 2017-2018)

S.N

o. Name of sampling station

pH

Range

(Min-

Max.)

BOD

Range

(Min-

Max.)

COD

Range

(Min-

Max.)

TDS

Range

(Min-

Max.)

Total coli

from

Range

(Min-Max.)

1 River Sone at Chachai

Near ATPS Pumping Station

dist. Anuppur

7.89

(7.6-8.1)

1.26

(7.6-8.1)

13.07

(9.6-20)

189.3

(149-

260)

48.75

(17.0-

170.0)

2 Rever Sone OPM Pumping station

at Amlai dist. Shahdol

7.91

(7.7-8.1)

1.58

(1.2-1.9)

11.05

(5-20)

200.0

(157-

306.0)

46.92

(21.0-

140.0)

3 River Sone at Bhaturaghat

Near road bridge Dist.Shahdol

7.93

(7.7-8.1)

1.80

(1.5-2.3)

17.58

(9.6-30)

250

(177-

333)

53.50

(121.0-

140.0)

4

Rever sone At Devlond 7.77

(7.4-7.9)

1.04

(0.6-2.1)

7.60

(4.8-20)

170.2

(141.0-

229.0)

29.67

(12.0-90.0)

5 Rivar Sone at Jarwahi Near road

bridge Dist.

Shahdol

7.85

(7.6-8.1)

1.56

(1.1-2.4)

14.32

(5.3-53)

223.6

(167-

427)

46.08

(21-140)

6 River Sone at Diyapiper near

road bridge Dist. Shahdol

7.76

(7.6-7.8)

1.23

(1.1-1.4)

9.87

(9.6-10)

224.0

(184-

287)

32.67

(21-50)

5.1 Status of water quality of ground water in the study area

Along the River Sone & its catchment, MPPCB Shahdol collected 4 nos. ground water samples

from 2 sampling locations during 2016-17 & 2017-18. 2 ground water sampling locations are

located in local bodies which are situated in nearby local bodies (Anuppur, Dhanpuri, Shahdol,

Khad Bansagar )along with the Sone River under the jurisdiction of regional office Shahdol. The

ground water samples collected from afore-said locations were analysed for parameters such

as Sulphates (SO4), Fluoride (F) and as well as heavy metals such as Cadmium (Cd), Copper

(Cu), Lead (Pb), Iron (Fe), Nickel (Ni), Zinc (Zn) and Manganese (Mn) in Regional Laboratory,

MPPCB, Jabalpur. Water Quality Monitoring Results of ground water samples collected by the

teams is given in the Table-4. Minimum and maximum concentration of SO4, Fluoride and

Page 9: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

9 | P a g e

heavy metals and no. of GW sampling locations are well within the IS 10500-2012 drinking

water specifications (acceptable limits), as amended is given in Table 4.

Table 4. Minimum and maximum concentration of SO4, Fluoride and Heavy metals and

No. of GW sampling locations not complying with the IS 10500-2012 drinking water

specifications (acceptable limits)

Sl.

No

.

Details

Analysis results of Ground Water Samples for General

Parameters and Heavy Metals in mg/l

SO4 F Cd Cu Pb Fe Ni Zn Mn Total

Cr

1 Minimum

(in mg/l) ND ND ND ND ND ND ND ND ND ND

2 Maximum

(in mg/l)

ND ND ND ND ND ND ND ND ND ND

3

No. of locations

exceeding the

limit

ND ND ND ND ND ND ND ND ND ND

IS 10500-2012

Drinking Water

Specifications-

Acceptable Limit (in

mg/l)

200 1.0 0.003 0.05 0.01 0.3 0.02 5.0 0.1 0.05

6. Bio monitoring of river Sone:

Project for monitoring (biodiversity & indexing of the river sone)under the jurisdiction of

regional office shahdol from intake well station of village Amlai district Shahdol to river Sone

at Navalpur ghat has already been prepared and submitted to head office for financial approval

. Study stretch area is approx 18 Kms for monitoring of Faecal Streptococci is covered under

project,

7. Components of Action Plan

a. Main Sources of Pollution in river Sone:

• Domestic waste water of city Dhanpuri Nagarpalika directly meeting River Sone

through Nargadha Nalla.

• Coal mines domestic waste water joins to Nargadha Nalla in Sohagpur area for Dhanpuri

OCM, Sharda OCM, Amlai OCM, and Bangwar U/G have installed STP. Baghaiya also join

Nargadha nalla.

• Shahdol city waste through drains comes in Mudna River mix with small non-perennial

Adna River at Chhatwai Ghat & it joins to Sone River at KsheerSagar.

Page 10: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

10 | P a g e

8. MEASURES TO ABATE POLLUTION IN RIVER SONE

As stated here in above, various measures is to be implemented by nagar palika Shahdol and

nagar palika Dhanpuri nagar, District Administration , MPPCB and other government agencies in

compliance of order passed time to time by Hon’ble National Green Tribunal, Central Zonal Bench

Bhopal in the cases filed before Hon'ble Green Tribunal.

8.1 Work taken up so far to maintain and regular watch of Sone river water quality:-

8.1.1 Solid Waste Management Practices - By adopting the best SWM practices in the local

body situated near the sone river and creating the awareness in the public - not to dump house

refuse, debris and demolished material in & along the river and not to dispose the sewage

directly in the river or water streams. The following are the details of works done under SWM. 8.1.1.1 Collection & Transportation –

a. 80% Door to Door collection of waste is being

Practiced in all 93 wards of local body Anuppur,

Dhanpuri, Shahdol, Khad (Devlond).

b. There are 52 covered Vehicles for Door to Door

Collection of Waste (One part for Dry Waste and

Other for Wet waste).

c. All Household and Commercial area is covered

by these 52 Door to Door Vehicles

.

8.1.1.2 MSW Processing & Disposal

There are four municipal local bodies established

along the river sone from Amarkantak to Devlond

(Khad).-

a. Amarkntak Nagar palika

b. Anuppur Nagar palika

c. Dhanpuri Nagar palika

d. Khad(Devlond) Nagar palika parishad

Above city establishment are small township population ranging 8000-30000 only. In

Amarkantak nagar palika parishad solid waste approx 3 TPD is collected and disposed to land

fill site away from Sone River and practically no pollution effect in Sone river. similarly

Page 11: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

11 | P a g e

Anuppur, Dhanpuri & Devlond municipal area have solid waste dumping site away from River

Sone.

At present MSW from this municipal area is being dumped in landfill site. There is no

waste processing unit/composting plant. Centralized cluster approach is proposed to

establisher MSW processing plant in Shahdol by urban development department.

8.1.3 Sewerage Treatment Plants and Common Effluent Treatment Plant – The details

There is no sewage treatment plant for treatment of effluent from municipal area established

Near Sone River, though STP from Amarkantak of capacity two MLD is proposed. Work order

for the same is being finalized by MP urban development department. It is pertinent to mention

that domestic waste water of municipal area Amarkantak do not join Sone river. Proposal for

STP from other municipal area Dhanpuri is submitted to urban administration and

develpoement department and pollution control board. Though three major nallas named

Nargadha, Baghaiya & coal mine no. 1 nalla ultimatly join to Nargadha Nalla. The maximum

part of domestic sewage of dhanpuri town goes to nargadha nalla. In lean summer season

Nargadha nalla become dry, when it reach's to national highway no. 43 near road bridge. In

other season , it ultimately reaches to river Sone at village Saboo.

8.1.4 Regulatory measures

8.1.4.1 Banning of use of Polythene Carry bags:-

Govt. of M.P. has issued order vide dated 24.05.2017 for banning of use, sale,

manufacturing and storage of polythene bags. In compliance of this order local body Dhanpuri,

Anuppur, Shahdol, Khad (Bansagar) have they also banned the polythene carry bags with in the

area of respective local body.

Above Local bodies will with the help of MPPCB has conducted many raids on the polythene

stockist and traders. Local body have seized about 1070 Kg polythene and imposed fine of

49,450 in the period of financial year 2018-19 as anti polythene measure. This action has

resulted in pollution control with reference to plastic havoc in the catchment of River Sone.

Local body has observed more than 50% reduction of polythene waste generation in its MSW.

Page 12: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

12 | P a g e

(Surprise Inspection for polythene seizure in Dhanpuri NP)

Page 13: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

13 | P a g e

[Anti polythene campaign in KHAD(Devlond) NPP ]

(Anti polythene campaign in Bauhari NPP )

Page 14: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

14 | P a g e

9. Proposed action plan- Short term & Long term action and the identified

authorities for initiating actions and the time limits for ensuring compliance.

The short term and long term action plans and the implementing agencies responsible for

execution of the action plans and the time limits are given in table as below :-

Proposed Short Term and Long Term Action Plan for Rejuvenation of River Sone

SI

No.

Action plan for rejuvenation of River

Sone

Organization/Age

ncy/ industry

Responsible for

Execution of the

Action Plan

Time Target

(For

Preparation

of Scheme)

Present

Status

a. Up gradation in STP treatment maintain

zero liquid discharge. Unit OPM it is

situated near the catchment area of

River Sone at Amlai

M/s Orient paper

mill

80% work

completed (up

to june 19)

80% work

completed

b. Inventorisation of the industries in the

catchment area of River Sone covering

validity Status of Consents under Water

& Air Acts and Authorisation, Effluent

Generation. ETP capacities and final

mode of effluent discharges

MPPCB and

MPSIDC

Within 08

Months

c. Actions against the Identified industries

in operation without Consents under

Water & Air Acts/Authorisation under

the H & OW (M & TM) Rules 2016 as

amended.

MPPCB Time to time

regularly

Consent/

authorization

are valid

d. Action against the industries not

installed ETP or STPs, exist but not

operating or ETP/STP outlet or treated

effluent is not complying to the effluent

discharge standards (norms).

MPPCB Within 04

month

e. Action against the red category

industries for installation of OCEMS and

not transferring data in CPCB and

MPPCB (If situation exists)

MPPCB Within 03

month

Presently

complied

f. Small scale/tiny and service providing

units located in urban or semi-urban

limits like Dairies. Auto Service Stations

to have a minimum provision of O & G

traps.

MPPCB Within 06

month

Instruction

are already

issued

Page 15: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

15 | P a g e

g. Prohibition of Burning of any kind of

waste including agro-residues

State Govt./District

and Local

authorities

Regularly at

the end of crop

season

Govt. of M.P.

has already

issued

prohibitory

orders.

II Sewage Treatment & Disposal Plan

1. Local bodies nearby area of Sone river Amarkantak, Anuppur, Dhanpuri, Khad (Bansagar).

a. Construction of Sewage treatment plant

in area of Nagarpalika Parishad

Amarkantak .

Nagarpalika

Parishad

Amarkantak

06 month. The

construction

of sewage

treatment

plant is

financially

approved.

Approval for

site selection

is under

consideration

b. Construction of Sewage treatment plant

in area of Nagarpalika Parishad

Anuppur.

Nagarpalika

Anuppur & Urban

Development

Department

06 month proposal for

Sewage

treatment

plant is

approved by

Govt. of M.P.

the tendering

process is

under process

c. Construction of Sewage treatment plant

in area of Nagarpalika Parishad

Dhanpuri.

Nagarpalika

Dhanpuri & Urban

Development

Department

01 Year Instruction

for early

establishment

and

commissionin

g are issued

and reminded

time to time

d. Construction of Sewage treatment plant

in area of Nagarpalika Parishad Shahdol.

Nagarpalika

Shahdol.

01 year 2 sewage

treatment

plant is under

tendering

process

capacity

approx 17.5

MLD

e. Construction of Sewage treatment plant

in area of Nagarpalika Parishad Khad

(Bansagar).

Nagarpalika

parishad Khad

(Bansagar)

04 month approx 25%

civil work is

completed ,

Proposal

already

Page 16: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

16 | P a g e

sanction from

Govt. of M.P.

f. Plantation in the area Forest Dept.

(Social Forestry)

Within six

months

Completed in

Amarkantak

area

2. Rejuvenation of water quality of Ponds: not applicable (because there is no pond in the area)

3. Protection of Pond & its water quality: not applicable (because there is no pond in the area)

4. Completion of Conveyance System for City Sewage

(a) For Primary Sewerage: The work

related to laying of sewer line in

Amarkantak is almost completed .

The construction of sewage

treatment plant is proposed, site

selection has been done and

approval is under consideration.

In Anuppur nagar parishad

proposal for Sewage treatment

plant is approved by Govt. of M.P.

the tendering process is under

process. Sewage treatment plant

For dhanpuri nagarpalika is

prepared. financial approval

from M.P. urban administration

& development department is

still awaited. In Shahdol nagar

palika, proposal for Sewage

treatment plant (two in no.) is

Approved from Govt. of M.P. &

tendering work is under process.

For Khad nagar parishad

,proposal for Sewage treatment

plant is already sanctioned from

urban administration and

development department from

Govt. of M.P. 25% construction

work of STP has been completed.

total project cost is about 9.5

lakhs.

Nagarpalika Parishad

Amarkantak,

Anuppur, Dhanpuri,

Shahdol,

Khad(Devlond)

Scheme is

already under

implementation

To be

completed in 06

Months.

5. Implementation of local bodies Sewerage project

Total project cost of about Rs. 45 cr. of Local bodies (Amarkantak, Anuppur, Shahdol, Khad(Devlond))

Page 17: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

17 | P a g e

5.1 Interception & Diversion of Sewage with STP in river Sone : Not applicable

6. Phase-2:- DPR has been Prepared for following works submitted and almost of them section Project

of approx Rs. 20 cr.

6.1 Not applicable (though there is no pond or such type of water body in the catchment area of Sone

river)

6.2 Interception & Diversion of Sewage going into Nargadha Nalla joining river Sone at Saboo village

dist: Shahdol & construction of STP.

6.3 Interception & Diversion of Sewage going into river mudna of Shahdol city which joins to river Sone

at ksheersagar dist: Umaria & construction of STP.

7 River front development of Sone river in smart city area: Not applicable

8 Zero liquid discharge from Orient paper mill is from March 2017.

III. Ground Water Quality

a. Sampling of contaminated hand pumps

and found to be unfit for drinking

purpose by the public

Local bodies/

Collector/PHED

Within 06

months

--

b. Supply of potable water to the Concern

communities in the Local body area

Local bodies/PHED Within 06

months

---

c. Carrying assessment of ground water

survey for quality and to identify over

exploited and critical blocks.

CGWB/M.P. Ground

Water Department

Within 06

Months

--

d. To Conduct periodic surprise inspection

of the industry to rule out any forceful

injection of industrial effluents into

groundwater resources

MPPCB and M.P.

Ground Water

Department

Within 03

Months

--

e. All the industry should be directed to

obtain NOC from the CGWB and action

against the units in Operation without

obtaining of NOC from CGWA

CGWB/CGWA and

M.P. Ground Water

Department

Within 06

Months

Proposed to

incorporate in

model

consent draft

is already

placed

f. To ensure rain water harvesting by the

industrial commercial and other

institutions and groundwater recharging

with only clean water be encouraged by

CGWB/CGWA

CGWA/M.P. Ground

Water

Department/T&CP

/MCI/Local bodies

Within 06

Months

--

IV Flood Plain Zone (FPZ)

a. Survey & Demarcation of FPZ of River

Sone & Identification of encroachments.

District/Local

administration

Within 06

Months

--

b. Checking encroachments in the

FPZ of River Sone

District/Local

administration

Within 06

Months

---

c. Notification of Flood plain Zone FPZ

State Government Within 06

Months

--

Page 18: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

18 | P a g e

d. Plantation in Flood plain Zone (FPZ) M.P. State Forest

Department

By Next

Mansoon

---

e. Prohibition of disposal of municipal

plastic and biomedical waste

particularly in drains

Local

administration

Regularly Disposal of

Solid Waste in

FPZ of rivers

& Nallas

already

banned. The

MCI is

following

good practices

in

management

of MSW &

received no.1

award for this

work.

V E-Flow and Irrigation Practices

1. Catchment improvement of River Sone

(a) Removal of obstruction in upstream

catchment of River Sone

WRD Shahdol Within six

months

(b) Strengthening of existing river bank viz.

stone pitching of bunds, plantation etc.

WRD Shahdol Within six

months

(c) There is no encroachments in bank of

river Sone -- -- --

(d) Plantation in the area Forest Dept. Within six

months

(e) Repair of existing Stops dams Local Bodies/concert

collectors

Within six

months

Work in

progress

1. E-Flow & irrigation practices

a. Measurement of flow of River Sone and

maintaining records

M.P. Irrigation

Department / Local

bodies

Regularly

b. To conserve water and good irrigation

practices to be adopted by the farmers

by organizing mass awareness

programmes and through media in

vernacular language

M.P. State

Irrigation and

Agriculture

Departments.

Regularly

Page 19: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

19 | P a g e

10. Details of local bodies near river Sone

(Hon. NGT OA no. 673/2018 order date 08.04.2019 )

S.

No.

Name of local

bodies

Population Name of

tributary

river

Total water

Consumptio

n

KLD/Day

Total

Waste

water

Generation

KLD/Day

Lastly Waste

water Comes

into Drain

KLD/Day

Remark

1.

Nagar palika

parishad

Amarkantak

8414

Floating

Population

--- 1810.896 1086.534 270.30

Sewage do

not reach

up to Sone

river

2.

Nagar palika

parishad

Anuppur

19970 Tipan

River 2695.950 1617.57 323.514

Sewage do

not reach

up to Sone

river

3.

Nagar palika

parishad

Dhanpuri

45156 Sarfa

River 6096.060 3657.636 731.527

Sewage

join to

Sone

river(expec

t summer

season)

4.

Nagar palika

parishad

Burhar

19289 --- 2604.015 1562.409 312.4818

Sewage do

not reach

up to Sone

river

5.

Nagar palika

parishad

Shahdol

95362 Mudna

River 12873.87 7724.322 1544.8644

Sewage

join to

Sone river

through

murna

river

6.

Nagar palika

parishad Khad

(Devlond)

10657 --- 1438.695 863.217 172.6434

Sewage

join to

Sone river

except

summer

season

NOTE:- River Kewai flows through Kotma Nagar Palika join Sone river near village- cholna Distt: Anuppur &

Juhilla River Join to Sone River at Dashrath Ghat Village – Masira under Distt: Shahdol.

Page 20: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

20 | P a g e

11. Details of Orient Paper Mill & Its Up gradation work

M/s Orient Paper Mill, Amlai, Distt.- Shahdol is a Paper and pulp industry it is

established in year 1968. With 300 TPD(Paper & Tissue Paper Production)

production capacity. This industry situated in Village-Amlai under shahdol

district and approx 2 km away from Sone River. Water Effluent volume is about

10000 M3/Day. Three types (grades) industrial waste water are being generated

by this industry. Grade-I waste water being generated by cooling and from

boiler in paper machine, this water is less polluted & is being used again in

generation process. Grade-II waste water generated from paper machine,

Cheaper house, & Hypo section. This water is treated by ETP and treated water

again being used in plantation (HRTS). Grade-III waste water generated from

pulp mill & soda recovery plant is highly polluted and found to contain lignin

material due to wood used as a raw material. treated water again being used in

plantation (HRTS).

Raw Material: Paper pulp, alum, caustic soda, liquid chlorine, poly- aluminium

chloride, sodium sulphate, & ASA (Alkenyl Succinic Anhydride)

12.1 Facilities of effluent treatment:

ETP Installation date: Before 1980

ETP Up gradation date: March 2017

1. Grade-I :- effluent is recycled.

2. Grade-II:- Its some part recycled & other part treated in ETP.

3. Grade-III:- its source is from pulp mill & soda recovery plant, effluent is

highly polluted not easily biodegradable and contain lignin material due to wood

used as a raw material. For its treatment, industry had established ETP but CPCB

issued guideline & instructions for up gradation of ETP because the existing ETP

was very old and not able to meet the pollution control norms, therefore to

achieve the norms and to reuse 100% in HRTS(High rate transpiration system),

Page 21: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

21 | P a g e

the industry has done up- gradation/augmentation of existing ETP by

construction of new equalisation tank and diffused aeration tank. The new

equalisation tank and diffused aeration tank was commissioned and all civil

mechanical & electrical work related to newly constructed equalisation tank and

diffused aeration tank are completed in march 2017.

4. Capacity: 20,000 KLD.

12.2 Details of HRTS System: The HRTS (High rated transpiration system)

work as living filtration device to renovate the waste water through

absorption, ion exchange, precipitation and stabilization of pollutants

through microbial degradation. HRTS is a land application system of

discharging effluents continuously at high rate designed by NEERI

Nagpur. It becomes functional in the year of 2000. OPM has developed

19 plantation sites in about 400 acres of land for utilization of treated

effluent. Many piezometric points have been installed to monitor

Ground water quality on regular basis.

12.2.1 Pictures of HRTS (High rated transpiration system):

Page 22: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

22 | P a g e

12.3 Pictures of ETP & STP :

Page 23: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

23 | P a g e

Page 24: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

24 | P a g e

Page 25: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

25 | P a g e

STP Picture

Sewage treatment plant for Domestic waste water from colony

Overview of Sewage Treatment Plant Construction Work: Cap. 1000 m3/day

1. Equalization Tank:

Page 26: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

26 | P a g e

2. Aeration Tank :

3. Clear Water collection Tank:

Page 27: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

27 | P a g e

4. Sludge Holding Tank:

5. MGF & ACF:

Page 28: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

28 | P a g e

12.4 Recommendations:

1. The industry should maintain ZLD in river Sone by expanding the HRTS

area. Present HRTS area may be increased to 100 acre, which is already

available with industry.

2. Make proper H.D.P.E. lining in oxidation ponds cum aeration tank to make

them compact to prevent seepage of waste water into river, underground

soil and subsequently to river Sone.

3. Industry should upgrade existing ETP By adding activated carban filter

(A.C.F.) and ozonator unit to comply consent condition.

4. Industry should install RO system for reusing grade II effluent.

5. Industry should install continuously online effluent quality monitoring

station at Bhaturaghat.

6. Industry should do plantation all along the banks of Sone river from

Bhatura village to jarwahi village.

Jr. Scientist Scientist Regional officer

(District I/C) MPPCB MPPCB

Shahdol Shahdol Shahdol

Page 29: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

29 | P a g e

13. EXECUTIVE SUMMARY ON PROPOSED ACTION PLANS FOR REJUVENATION OF RIVER

FOR IDENTIFIED POLLUTED RIVER STRETCH SONE

S.

No.

DESCRIPTION OF ITEM DETAILS

1. Name of the identified polluted river and its

tributaries

: River Sone (also spelt as son) & tributary river

1. Mudna river

2. Is river is perennial and total length of the

polluted river

: Perennial river & stretch under Polluted river

Shahdol approx 18 Km. identified in year 2016 (but

after april 2017 quality of river water is be improved

and it is not polluted category quality of river water

is found in category "A" & "B" of ISO:2296)

3. No of drain contributing to pollution and

names of major drains.

: 1. Nargadha Nalla

2. Tanki Nalla

3. Gaibuda Nalla

4. Baigha Nalla

5. Ghattan Nalla

4. Whether River Rejuvenation committee

(RRC) constituted by the State Govt./ UT

Administration and if so, Date of

constitution of 'RRC' .

: Yes

5. Major town on the bank of the river with

population

: Nagar palika parishad Amarkantak

(Pop. 8414+5000 Floating)

Nagar palika parishad Anuppur

(Pop 19970)

Nagar palika parishad Dhanpuri

(Pop 45156)

Nagar palika parishad Burhar

(Pop 19289)

Nagar palika parishad Shahdol

(Pop 95362)

Nagar palika prishad Khad (Devlond)

(Pop 10657)

a. Total water consumption and

sewage generation in MLD

: 26.080 MLD (water consumption)

16.511 MLD(sewage generation)

b. Total no. of existing STPs and the

total capacities in MLD

: No existing and operational STPs in local bodies.

c. Gaps in sewage treatment in MLD

and no. of towns not having STPs

: 16.511 MLD(sewage generation)

1. Nagar palika parishad Amarkantak

2. Nagar palika parishad Anuppur

3. Nagar palika Dhanpuri

4. Nagar prishad Burhar

5. Nagar palika parishad Shahdol

6. Nagar palika prishad Khad (Devlond)

d. Total MSW generation in TPA : 15395.7 TPA

Page 30: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

30 | P a g e

e. Existing treatment and disposal

facilities and total capacity.

:

Dump into Land fill site

6. Major industrial estates located with total

no. of industries.

: There is no industrial estate near the catchment of

river sone.

a. Total water consumption and total

industrial effluent generation in

MLD.

: No industrial effluent discharge to river Sone.

b. No. of industries having captive

ETPs and their treatment capacity

in MLD.

:

------

c. No. of CETP's and their treatment

capacity.

: -----

d. Gaps in treatment of industrial

effluent.

: ------

e. Total HW generation in TPA in the

catchment area.

: ------

f. Existing HW Treatment and

Disposal facilities and total capacity

with life span.

:

-------

7. Action plan include mainly covering aspect

such as(Proposal for utilization of sewage,

ground water recharging or rain water

harvesting , measure for regulating ground

water use, protection and management of

flood plain zone, maintaining minimum E-

flow and water shed management,

plantation on both sides of the river, setting

up of bio-diversity park etc. as per Hon'ble

NGT order dated 20.09.2018 and

19.12.2018

: Annexure I

8. Min. and Max. Required time period for

implementation of action plan.

: 2 year

9. Total estimated budget in crores towards

implementation of proposed action plans

with break-up (e.g. No. of STPs capacity,

total cost; No of CETPs, total capacity, Cost

towards interception and diversion of

sewage/effluent to STPs/CETPs etc.)

: 45 Cr. of STPs in local bodies (Amarkantak,

Anuppur, Dhanpuri, Burhar, Shahdol, Khad

(Devlond))

Cost towards interception and diversion of sewage:

20 Cr.

Page 31: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

31 | P a g e

10. Responsible organization (s) for

implementation of proposed action plan

: Nagar palika parishad Amarkantak

Nagar palika parishad Anuppur

Nagar palika parishad Dhanpuri

Nagar palika parishad Burhar

Nagar palika parishad Shahdol

Nagar palika prishad Khad (Devlond)

11. Proposed Mechanism for execution of

action plans

: 1. Concerning local bodies shall submit estimate and

detail design of STP.

2. The required financial requirement may be

Sanctioned to concerning MLB/ULB.

3. M.P. Urban Department may supervise progress of

project and action plan for the same.

12. Expected deliverables with respect to

achieving Goals.

: ------

Annexure-I

I Sewage Treatment & Disposal Plan

1. Local bodies nearby area of Sone river are Amarkantak, Anuppur, Dhanpuri, Khad (Bansagar).

sa. Construction of Sewage treatment plant in

area of Nagarpalika Parishad Amarkantak .

Nagarpalika Parishad

Amarkantak

06 month. The construction

of sewage

treatment plant

is financially

approved.

Approval for site

selection is

under

consideration

b. Construction of Sewage treatment plant in

area of Nagarpalika Parishad Anuppur.

Nagarpalika Anuppur

& Urban Development

Department

06 month proposal for

Sewage

treatment plant

is approved by

Govt. of M.P. the

tendering

process is under

process

c. Construction of Sewage treatment plant in

area of Nagarpalika Parishad Dhanpuri.

Nagarpalika Dhanpuri

& Urban Development

Department

01 Year Instruction for

early

establishment

and

commissioning

are issued and

reminded time to

time

Page 32: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

32 | P a g e

d. Construction of Sewage treatment plant in

area of Nagarpalika Parishad Shahdol.

Nagarpalika Shahdol. 01 year 2 sewage

treatment plant

is under

tendering

process capacity

approx 17.5 MLD

e. Construction of Sewage treatment plant in

area of Nagarpalika Parishad Khad (Bansagar).

Nagarpalika parishad

Khad (Bansagar)

04 month approx 25% civil

work is

completed ,

Proposal already

sanction from

Govt. of M.P.

f. Plantation in the area Forest Dept.

(Social Forestry)

Within six

months

Completed in

Amarkantak area

2. Rejuvenation of water quality of Ponds: not applicable (because there is no pond in the area)

3. Protection of Pond & its water quality: not applicable (because there is no pond in the area)

4. Completion of Conveyance System for City Sewage

(a) For Primary Sewerage: The work related

to laying of sewer line in Amarkantak is

almost completed . The construction of

sewage treatment plant is proposed,

site selection has been done and

approval is under consideration. In

Anuppur nagar parishad proposal for

Sewage treatment plant is approved

by Govt. of M.P. the tendering process

is under process. Sewage treatment

plant For dhanpuri nagarpalika is

prepared. financial approval from M.P.

urban administration & development

department is still awaited. In

Shahdol nagar palika, proposal for

Sewage treatment plant (two in no.) is

Approved from Govt. of M.P. &

tendering work is under process. For

Khad nagar parishad ,proposal for

Sewage treatment plant is already

sanctioned from urban administration

and development department from

Govt. of M.P. 25% construction work

of STP has been completed. total

project cost is about 9.5 lakhs.

Nagarpalika Parishad

Amarkantak, Anuppur,

Dhanpuri, Shahdol,

Khad(Devlond)

Scheme is already

under

implementation

To be completed

in 06 Months.

II Ground Water Quality

a. Sampling of contaminated hand pumps and

found to be unfit for drinking purpose by the

public

Local bodies/

Collector/PHED

Within 06

months

--

b. Supply of potable water to the Concern

communities in the Local body area

Local bodies/PHED Within 06

months

---

c. Carrying assessment of ground water survey CGWB/M.P. Ground Within 06 --

Page 33: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

33 | P a g e

for quality and to identify over exploited and

critical blocks.

Water Department Months

d. To Conduct periodic surprise inspection of the

industry to rule out any forceful injection of

industrial effluents into groundwater

resources

MPPCB and M.P.

Ground Water

Department

Within 03

Months

--

e. All the industry should be directed to obtain

NOC from the CGWB and action against the

units in Operation without obtaining of NOC

from CGWA

CGWB/CGWA and

M.P. Ground Water

Department

Within 06

Months

Proposed to

incorporate in

model consent

draft is already

placed

f. To ensure rain water harvesting by the

industrial commercial and other institutions

and groundwater recharging with only clean

water be encouraged by CGWB/CGWA

CGWA/M.P. Ground

Water

Department/T&CP/M

CI/Local bodies

Within 06

Months

--

III Flood Plain Zone (FPZ)

a. Survey & Demarcation of FPZ of River Sone &

Identification of encroachments.

District/Local

administration

Within 06

Months

--

b. Checking encroachments in the

FPZ of River Sone

District/Local

administration

Within 06

Months

---

c. Notification of Flood plain Zone FPZ

State Government Within 06

Months

--

d. Plantation in Flood plain Zone (FPZ) M.P. State Forest

Department

By Next

Mansoon

---

e. Prohibition of disposal of municipal plastic

and biomedical waste particularly in drains

Local administration Regularly Disposal of Solid

Waste in FPZ of

rivers & Nallas

already banned.

The MCI is

following good

practices in

management of

MSW & received

no.1 award for

this work.

IV E-Flow and Irrigation Practices

1. Catchment improvement of River Sone

(a) Removal of obstruction in upstream

catchment of River Sone

WRD Shahdol Within six

months

(b) Strengthening of existing river bank viz.

stone pitching of bunds, plantation etc.

WRD Shahdol Within six

months

(c) There is no encroachments in bank of river

Sone -- -- --

(d) Plantation in the area Forest Dept. Within six

months

Page 34: Proposed Action Plan For Rejuvenation of Sone River Plan For rejuvenation22.pdf · Proposed Action Plan For Rejuvenation of Sone River 1. Sone River & pollution status: The Sone River

34 | P a g e

(e) Repair of existing Stops dams Local Bodies/concert

collectors

Within six

months

Work in progress

1. E-Flow & irrigation practices

a. Measurement of flow of River Sone and

maintaining records

M.P. Irrigation

Department / Local

bodies

Regularly

b. To conserve water and good irrigation

practices to be adopted by the farmers by

organizing mass awareness programmes and

through media in vernacular language

M.P. State Irrigation

and Agriculture

Departments.

Regularly

Scientist Executive engineer

Regional office Regional office

MPPCB Shahdol (M.P.) MPPCB Shahdol (M.P.)