Proposal to develop National OPRC Contingency Planning Workshops with the Use of RETOS™
Videopresentation at the 9th Ordinary Steering Committee Meeting of RAC/REMPEITC-Caribe 5 - 7 June 2018
Miguel Moyano – Upstream [email protected]
![Page 2: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/2.jpg)
Presentation Outline
• What is ARPEL?• A brief history of RETOS™• RETOS™ - What is it? • Use and features• Final remarks
![Page 3: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/3.jpg)
Background of the Manual & RETOS™
![Page 4: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/4.jpg)
The Issue
In the absence of standards or “best practice” guidelines, how to evaluate oil spill response readiness in terms of:
• the Oil Spill Response Plans (OSRPs), and• the actual response capability
![Page 5: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/5.jpg)
The Challenges
§ There are no international assessment standards for the:o content of information that should be included
in OSRPs, or theo format and presentation of the information
within an OSRP. § Readiness includes the experience, training, and
skills of those involved. These human elements are intangible and difficult to evaluate.
![Page 6: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/6.jpg)
National and International Standards
• MARPOL / OPRC / Cartagena Convention / Southeastern Pacific Convention
• IMO Guidelines• Industry guidelines (IPIECA, ARPEL,
API)• ISO 9000 y 14000 and other ISO
Standards• Laws and regulations
The guidelines and practices in the ARPEL Manual and RETOS™ are
suggested; NOT mandatory
![Page 7: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/7.jpg)
Special Workshop Sub-Committee for 2008 IOSC
• Prepare a comprehensive suite of OSR planning andreadiness assessment elements to encourageimproved response capacity
• Develop and provide an international guide on theassessment of oil spill response systems
• Provide an evergreen tool that can be revised andupdated to promote continued improvements in OSRreadiness
Objectives:
![Page 8: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/8.jpg)
IOSC 2008 Guide
Published both in English and Spanish by the American Petroleum Institute (API, 2008, Taylor et al, 2008) and presented in May 2008 during a special session at the IOSC held in Savannah, Georgia, United States
![Page 9: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/9.jpg)
ARPEL Manual and RETOS™
The Manual provides the background for OSR management assessment and explains the terms used, the approach to the assessment process, the concept for a Global Improvement Program and +150 references
The Tool (RETOS™) is the Excel™ application intended as a checklist-type approach for a specific program and level of evaluation.
Freely available at www.arpel.org
![Page 10: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/10.jpg)
What is RETOS™?Miguel cambia tapa nueva
• The ARPEL “Readiness Evaluation Tool for Oil Spills (RETOS™)” and its accompanying Manual were developed to assistgovernments and companies to assess the level of oil spill response planning and readiness management and bridge the gaps identified
• In relation to commonly agreed pre-established criteria
![Page 11: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/11.jpg)
Some highlights of RETOS™
• Scope: oil spills
• Does not include hazardous or noxious substances
• Directed at any number of possible spill scenarios:
• spill sources (e.g., tankers, tank vessels, pipelines, platforms, land facilities)
• receiving environments (e.g., land, inland waterways, offshore, etc.)
![Page 12: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/12.jpg)
Some definitions used in RETOS™• Program is the OSR program that is
being assessed or evaluated
• Seven different oil spill response Scopes (for industry and government)
• Categories (10 in total)
• Three Assessment Levels -Increasingly comprehensive criteria
• Criteria (i.e., management requirements – Critical Criteria for Level A)
• Indicators (0=missing, 1=partial, 2=complete, N/A)
A. Legislation, Regulations & Agreements
B. Oil Spill Contingency PlanningC. Response CoordinationD. Health, Safety & SecurityE. Operational ResponseF. Tracking, Assessment, and
Information ManagementG. LogisticsH. Financial and Administrative
ConsiderationsI. Training & ExercisesJ. Sustainability & Improvement
![Page 13: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/13.jpg)
The 7 Scopes of RETOS™• Government or Industry
1. Facility – Terminal, plant, refinery2. Facility/Asset Operation - Pipelines,
vessels, fleet• Government
3. Port/City/Local4. Area - Region, Province, State5. National (& Multi-National)
• Industry6. Country or Business Line (e.g.,
Production)7. Corporate
![Page 14: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/14.jpg)
Using ARPEL RETOS™ V 2.1
An exampleNational Program
Level A
![Page 15: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/15.jpg)
Running RETOSTM – Home Screen
![Page 16: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/16.jpg)
Using RETOS™ - Selecting the Level
![Page 17: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/17.jpg)
Using RETOS™ - The evaluation
![Page 18: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/18.jpg)
Using RETOS™ - The score
![Page 19: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/19.jpg)
Running RETOSTM – Home Screen
![Page 20: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/20.jpg)
Using RETOS™ - Global Performance Analysis
0%
20%
40%
60%
80%
100%
Legislation, Regulations, Agreements
Oil Spill Contingency
Planning
Response Coordination
Health, Safety & Security
Operational Response
Tracking, Assessment &
Information Management
Logistics
Financial & Administrative Considerations
Training & Exercises
Sustainability &
Improvements
Level A Results with No Weighting
![Page 21: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/21.jpg)
Using RETOS™ - Global Improvement Program
Global Improvement Program - Implementation PlanPriority
Task(Listed by Element and
Criteria)
Comment / Recommendations
Person ResponsibleResources
(Human, Physical, Info Sources)
Schedule(indicate Target
Completion Date)
IOSC 2008Guidelines Reference*
Critical Criteria Missing
1B9: General area at risk is identified based on spill sources.
There has not been a proper risk assessment. Suggest this is made and see the need to adapt the OSR program
IOSC Sub-element 4.3
Critical Criteria Partial
2
C6: Incident command is assigned to one or two specific individuals (by name or position) with backups identified.
Need to identify backup personnel.
IOSC Element 10, Sub-element 10.3
E3: Equipment is properly stored, in good working condition and being properly maintained and inspected.
Recommend boom be placed under shelter-will suffer UV damage if left as is.
A. LEGISLATION, REGULATIONS, AGREEMENTSSigned agreements for local (within reasonable distance) OSR assistance are in place.
Agreements are verbal only. Recommend more formalized approach.
IOSC Sub-element 23.4
I. TRAINING & EXERCISES
Regular training courses are provided on OSCP to response team personnel.
An initial class was provided to personnel at site at the time of plan rollout. New personnel have not received training on the Plan. Provide for newer personnel.
IOSC Element 9 and Element 27
Reviewed By:
Approved By: Date
![Page 22: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/22.jpg)
International use by Government and Industry
USCG
COCATRAMREMPEITC
ARPEL GI-WACAF
OSPRI
GI-SEA
![Page 23: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/23.jpg)
National OPRC Contingency Planning Workshops with the Use of RETOS™
• Participation: government and industry
• Objectives:1. Train national authorities and local industry in the use of RETOS™
2. Evaluate the gaps of OSR programs using RETOS™
a) Companies – RETOS Scope: depends of their main in-country operations
b) Governments - RETOS Scope: National OSR Program with all involved entities
3. Identify those Categories/Criteria of the National OSR Program with the lowest results
4. Have government and local industry, supported by specialists, to device a work plan to cooperatively bridge these largest gaps
![Page 24: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/24.jpg)
National OPRC Contingency Planning Workshops with the Use of RETOS™
• Rationale:1. NATIONAL LEVEL
a) Have a common understanding on government expectations of local industry management capabilities on oil spill planning and readiness
b) Have individual governments identify their weaknesses by developing annual assessment to check for improvements
c) Identify opportunities for government and industry to work togetherd) Aim for governments to achieve Level A and –thus- be ready for implementing
cooperation agreements
2. REGIONAL LEVELa) Evaluate the gaps of national OSR programs using RETOS™ b) Support REMPEITC-Caribe mission to cost/efficiently channel the assistance to
individual countries based on an annual benchmark with other countries
![Page 25: Proposal to develop National OPRC Contingency Planning ... 9-7-3... · ARPEL Manual and RETOS™ The Manual provides the background for OSR management assessment and explains the](https://reader033.vdocuments.site/reader033/viewer/2022051915/60076036411da01d6a79bb76/html5/thumbnails/25.jpg)
www.arpel.org – [email protected]
Javier de Viana 1018, Montevideo, Uruguay –
Tel.: (598) 2410 6993 – Fax: (598) 2410 9207