![Page 1: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/1.jpg)
Yes No YesGeneration
(kW)No
1 23/Aug/2016 24115359996113 224 B-2b(12)T 135Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 135
2 16/Dec/2016 24112530025005 663 A-2c(06)T 17Osman Muhammad Maud
Reon Energy Solution Pvt. Ltd.- - Yes Yes 17
3 05/Dec/201608112121095000 Old
08112721095000 New9 A1b (03)T 10
Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 10
4 18/Nov/201608112122115500 Old
08112722115500 New5 A1b(03)T 2.25
Amir Pervaiz Ch.
Read Solar- - Yes Yes 2.25
5 31/Aug/201609112121339200 Old
09112721339200 New8 A1b(03)T 2.5
Amir Pervaiz Ch.
Read Solar- - Yes Yes 2.5
6 27/Oct/2016 24115311000076 250 B2b(12)T 100 ADAPTIV Technologies Pvt. Ltd. - - Yes Yes 100
7 31/Aug/2016 14115241476201 6 A1b (03) 3Amir Pervaiz Ch.
Read Solar- - Yes Yes 3
8 21/Dec/2016 15115160057100 5 A1b (03)T 14.85Farhan
Power Highway- - Yes Yes 14.85
9 21/Dec/2016 15115160057200 5 A1b (03)T 14.85Tahira Arshad
Power Highway- - Yes Yes 14.85
10 21/Nov/2016 11115241179100 9 A1b(03) 6Khurram Jan
JKS Pvt. Ltd.- - Yes Yes 6
11 02/Dec/2016 44114161433600 5 A1b (03)T 5M. Zahid Mustafa
MHM Technologies- - Yes Yes 5
12 23/Aug/2016 14115251652718 5 A1B(03)T 10Yasir Haleem
Nizam Energy Pvt. Limited- - Yes Yes 10
13 02/Dec/201601112110487600 Old
01112710487600 New9 A1b (03)T 6.2
M. Zahid Mustafa
MHM Technologies- - Yes Yes 6.2
14 08/Nov/2016 24112131006000 84 B2b(12)T 30Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 30
15 20/Oct/2016 13115421260810 5 E-i (55) 6Farrukh Nayyar
Solar Tech Intl. Limited- - Yes Yes 6
16 21/Feb/201714112110259904 Old
14112710259904 New8 A1b(03)T 2.5
M. Ishaq Bhatti
Read Solar- - Yes Yes 2.5
17 21/Feb/201714112110259903 Old
14112710259903 New5 A1b(03)T 2.5
M. Ishaq Bhatti
Read Solar- - Yes Yes 2.5
18 23/Aug/2016 13115261692600 9 A1a (01) 5.6Yasir Haleem
Nizam Energy Pvt. Limited- - Yes Yes 5.6
19 08/Dec/201609112110968003 Old
09112710968003 New8 A1b (03)T 6
Gul Sher Khan
ALPHA Renewables (SMC) Pvt. Ltd.- - Yes Yes 6
20 03/Feb/2017 44115260204128 35 A1b (03)T 9.6Mushtaq Muhammad
Multiline Engineering Company- - Yes Yes 9.6
21 03/May/2017 15115162801000 5 A1b(03)T 5Khalid Mukhtar
Sabbo Traders- - Yes Yes 5
22 21/Apr/2017 15115231928500 4 A1a(01)T 3Khalid Mukhtar
Sabbo Traders- - Yes Yes 3
23 04/Apr/2017 13115441916900 5 A1b(03)T 6
Yahya Hassan Naqvi
Paragon International - - Yes Yes 6
24 31/Aug/2016 15115421487402 9 A1b(03)T 7.28Abdul Wassay
Spel Technology Support Pvt. Ltd.- - Yes Yes 7.28
25 08/Nov/201624112341240731 Old
24112621240731 New180 A1b (03)T 10
Anis Arif
TSMLE Solar- - Yes Yes 10
26 29/Nov/2016 15115421376643 9 A1b(03)T 7.54Farrukh Nayyar
Solar Tech Intl. Limited- - Yes Yes 7.54
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
Page 1 of 31
![Page 2: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/2.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
27 21/Feb/201714112110266902 Old
14112710266902 New5 A1b(03)T 2.5
M. Ishaq Bhatti
Read Solar- - Yes Yes 2.5
28 06/Mar/2017 13115441889900 5 A1b(03)T 6M. Saad Muzamil
Pantera Energy- - Yes Yes 6
29 11/Apr/2017 14115241551600 5 A1a(01)T 4.8Zamir Khan
GO Solar Pvt. Ltd- - Yes Yes 4.8
30 14/Jun/2017 12115251513397 8 A1b(03) T 7.5Ehsan Ali
Nizam Energy Pvt. Ltd.- - Yes Yes 7.5
31 12/May/2017 14115255532300 11 A1b(03)T 10.4M. Saad Muzamil
Pantera Energy- - Yes Yes 10.4
32 06/Jun/2017 12115421194600 10 A1b(03) T 11Ali Raza
Ravi Sundar Pvt. Ltd.- - Yes Yes 11
33 05/Jun/2017 8115161019200 4 A1a(01) 6.315M. Saad Muzamil
Pantera Energy- - Yes Yes 6.315
34 31/Aug/2016 8115130764300 5 A1b(03)T 6Tehseen Qureshi
Pantera Energy- - Yes Yes 6
35 23/May/2017 15115262007512 5 A1b(03)T 3M. Ishaq Bhatti
Read Solar- - Yes Yes 3
36 24/May/2017 15115257710840 11 A1b(03)T 7.8M. Saad Muzamil
Pantera Energy- - Yes Yes 7.8
37 26/Jul/2017 15115257257504 11 A1b(03)T 12.4Rana Abbas
AE Solar Alternative Energy- - Yes Yes 12.4
38 21/Jun/201712112370493804 Old
12112610493804 New7 A1b(03) T 7.5
Ali Raza
Multi Links Pvt. Ltd.- - Yes Yes 7.5
39 10/May/2017 12115262722000 17 A1b(03)T 10.6Ali Raza
Multilinks Solar Energy- - Yes Yes 10.6
40 13/Jun/2017 12115262104803 17 A1b(03) T 7.8Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 7.8
41 19/Sep/2016 27112530289400 9 A2c(06)T 3Mian Sultan Mehmood
Creative Electronics Pvt. Ltd.- - Yes Yes 3
42 20/Jun/2017 15115262008001 9 A1b(03)T 8 Mansha Energy Pvt. Ltd. - - Yes Yes 8
43 21/Jul/2017 15115421361200 10 A1b(03)T 9.36Zubair Aslam Khan
AGE Solar- - Yes Yes 9.36
44 25/May/2017 24115150901800 145 A2c(06)T 59.4Zaeem Aslam
EBR Energy Pvt. Ltd.- - Yes Yes 59.4
45 23/Aug/2016 24113312401301 47 A2C(06)T 3Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 3
46 04/May/2017 24115159000802 48 A2b(05) 9.18M. Ishaq Bhatti
Read Solar- - Yes Yes 9.18
47 29/Nov/2016 14115442002100 5 A1b(03)T 3Farrukh Nayyar
Solar Tech Intl. Limited- - Yes Yes 3
48 23/May/2017 15115257503100 11 A1b(03)T 13Sharafar Ali Khan
Indus Solar International - - Yes Yes 13
49 12/Jun/2017 10115230881208 13 A1b(03) T 12.8Waqar Amir
DWP Technologies Pvt. Ltd.- - Yes Yes 12.8
50 28/Mar/201746112111660925 Old
46112711660925 New38 A2c(06) T 10.08
Usman Muhammad
Plans Energy Solution- - Yes Yes 10.08
51 23/Feb/201724112399000628 old
24112639000628 New150 B2b(12)T 55.44
Syed Amir Ali
G-Hop Pvt. Ltd.- - Yes Yes 55.44
52 06/Mar/201712112351292645 old
12112641292645 New6 A1b(03)T 3
M. Saad Muzamil
Pantera Energy- - Yes Yes 3
Page 2 of 31
![Page 3: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/3.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
53 04/Jul/2017 2112210204110 18 A1b(03)T 22.8Asif Javed
Thermovision- - Yes Yes 22.8
54 13/Jun/2017 24115159250116 60 A1b(03) T 55.36Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 55.36
55 31/Aug/201710112121432900 Old
10112721432900 New5 A1b(03)T 3
M. Saad Muzamil
Pantera Energy- - Yes Yes 3
56 07/Jul/2017 13115411007300 8 A1b(03)T 8.96Kaheel Butt
Reon Energy- - Yes Yes 8.96
57 24/Jul/2017 9115230811007 14 A1b(03)T 10.2M. Saad Muzamil
Pantera Energy- - Yes Yes 10.2
58 28/Mar/2017 24117419113001 222 B2b (12) T 80.64Ali Zeshan
JKS Pvt. Ltd.- - Yes Yes 80.64
59 24/Oct/2017 45117391037003 69 D1b(50) 46.8Abdul Majeed Saqib
Haris & CO.- - Yes Yes 46.8
60 24/Jul/2017 12115262924100 17 A1b(03)T 12.96Farooq Saeed
Pantera Energy Pvt. Limited- - Yes Yes 12.96
61 14/Jun/2017 15115111433700 6 A1b(03) T 5.3Imran Hashmi
Pakistan Solar Association- - Yes Yes 5.3
62 07/Sep/2017 5115260553200 8 A1b(03)T 4.16Yasir Ali
Maxell Power Pvt. Ltd.- - Yes Yes 4.16
63 18/Oct/2017 14112182217000 5 A1b(03)T 3.78Waqas Khaleeque
Smart Solar- - Yes Yes 3.78
64 04/Jul/201715112122238200 Old
15112722238200 New5 A1b(03)T 6.24
Sajid Rafique
Hadron Solar Pvt. Ltd.- - Yes Yes 6.24
65 10/Aug/2017 12115241327501 7 A1a(01)T 6.24Hafiz Ali Riaz
Read Solar- - Yes Yes 6.24
66 21/Jul/201710112110191270 Old
10112710191270 New8 A1b(03)T 3.2
Sajid Rafique
Hadron Solar Pvt. Ltd.- - Yes Yes 3.2
67 05/Oct/2017 13115261641203 15 A1b(03)T 14.08M. Salman Shuaib
Solar System Pvt. Ltd.- - Yes Yes 14.08
68 31/Aug/2017 15115231963300 7 A1b (03) 3Amir Ch.
Read Solar Pvt. Ltd.- - Yes Yes 3
69 11/Sep/2017 14115231695400 10 A1b(03)T 9.945Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 9.945
70 27/Sep/2017 13115231601200 14 A1a(01) 11.73M. Aitiq
ECO Engieering Concept Pvt. Ltd.- - Yes Yes 11.73
71 19/Oct/2017 15115231957100 8 A1b(03)T 6.12Farooq Saeed
Pantera Energy Pvt. Limited- - Yes Yes 6.12
72 23/Dec/2016 24115271000065 995 B3(14)T 157.5Mirza Azhar Baig
Orient Energy System Pvt. Limited- - Yes Yes 157.5
73 20/Jul/2017 11115320273700 8 A1b(03)T 7.6Saim Mehmood
Salam Enterprises- - Yes Yes 7.6
74 20/Jul/2017 11115320272323 5 A1b(03)T 4.94Saim Mehmood
Salam Enterprises- - Yes Yes 4.94
75 16/Oct/2017 10115241123305 8 A1b(03)T 9.92Haziq Shoaib
RH Realty (SMC-Pvt) Ltd.- - Yes Yes 9.92
76 25/Sep/2017 15115257229700 17 A1b(03) T 15Sheraz Tahir Khan
WRL Technologies Pvt. Ltd.- - Yes Yes 15
77 23/Aug/2017 44115130018600 9 A2c(06)T 6.24Sajid Rafique
Hadron Solar Pvt. Ltd.- - Yes Yes 6.24
78 20/Jun/2017 15112431561603 2 A1a(01) 2Imran Hashmi
Pakistan Solar Association- - Yes Yes 2
Page 3 of 31
![Page 4: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/4.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
79 06/Mar/2017 43114111011102 8 A2c(06)T 6M. Saad Muzamil
Pantera Energy- - Yes Yes 6
80 29/Sep/2017 4117140329721 5 A1b(03)T 3Yasir Ali
Maxell Power Pvt. Ltd.- - Yes Yes 3
81 11/Sep/2017 10115252564900 5 A1b(03)T 5Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 5
82 11/Sep/2017 14112541251703 5 A1a(01) 4.96Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 4.96
83 15/Sep/2017 14115255104103 11 A1b(03)T 5Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 5
84 13/Nov/2017 15115257705000 11 A1b(03)T 6Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 6
85 04/Dec/2017 7112520662700 5 A1b(03)T 3 Farooq Saeed, Pantera Energy Lahore - - Yes Yes 3
86 25/Sep/2017 15115256731900 11 A1b(03)T 6.48Zeeshan Ali Bhatti
ERCON Energy- - Yes Yes 6.48
87 30/Nov/2016 13115261658800 9 A1a (01) 7.1Sajid Rafique
Hadron Solar Pvt. Ltd.- - Yes Yes 7.1
88 15/Dec/2017 14115261720607 18 A1b(03) T 10.45 Elemetec (Pvt.) Ltd. - - Yes Yes 10.45
89 22/May/2017 24115159001400 58 A1a(01) 18.5Muneeb Baig
Nizam Solar- - Yes Yes 18.5
90 23/Aug/2017 14115411039403 25 A1b(03)T 8.16Sajid Rafique
Hadron Solar Pvt. Ltd.- - Yes Yes 8.16
91 26/Dec/2017 15112141448200 5 A1b(03) T 3Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 3
92 20/Oct/2017 24112520095001 89 A1a(01) 63.49Mirza Azhar Baig
Orient Energy System Pvt. Limited- - Yes Yes 63.49
93 09/Jan/2018 12115410909600 6 A1b(03) T 8.1 Haseeb Saadat, Allied Solar - - Yes Yes 8.1
94 17/Jan/2018 15115421378203 8 A1b(03) T 1.6 Nizam Energy - - Yes Yes 1.6
95 21/Jun/2017 7115230584900 5 A1a(01)T 3.06Tehseen Qureshi
Pantera Energy- - Yes Yes 3.06
96 02/Nov/2017 24115132108805 69 A2c(06)T 62.6M. Ali Zaman
AZL Pvt. Ltd.- - Yes Yes 62.6
97 24/Oct/201724112349000710 old
24112629000710 new52 A1b(03)T 45
Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 45
98 09/Feb/201814112110253200 Old
14112710253200 New9 A-1b(03)T 3.5 Nizam Energy - - Yes Yes 3.5
99 09/Feb/201814112110253300 Old
14112710253300 New9 A-1b(03)T 3.5 Nizam Energy - - Yes Yes 3.5
100 31/Jan/2018 13112181990901 5 A1b(03) T 4.56Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 4.56
101 09/Feb/2018 8112540772600 7 A-1b(03)T 5Saif-ur-Rahman
Solar Tech (Pvt) Ltd- - Yes Yes 5
102 25/Jul/2017 7115130708601 5 A1b(03)T 4.8Ali Zeshan
JKS Pvt. Ltd.- - Yes Yes 4.8
103 13/Nov/2017 14115411033968 18 A1a(01) 13.64 Amir Pervaiz Ch. Read Solar - - Yes Yes 13.64
104 25/Jul/2017 13115421209000 9 A1b(03)T 9M. Ishaq Bhatti
Read Solar- - Yes Yes 9
Page 4 of 31
![Page 5: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/5.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
105 24/Oct/2017 24112520008602 67 A2b(05) 14Sami Ullah
Premier Energy- - Yes Yes 14
106 09/Feb/2018 13115241437400 14 A1b(03) T 14
Umair Arshad
Tesla Industries Private
Limited
- - Yes Yes 14
107 24/Oct/2017 13115261691700 9 A1b(03)T 9Zeeshan Ali
Premier Energy- - Yes Yes 9
108 24/Oct/2017 24115159250117 30 A2c(06)T 15Sami Ullah
Premier Energy- - Yes Yes 15
109 11/Sep/2017 24115159250273 68 A1b(03)T 18.8Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 18.8
110 04/Dec/2017 12115151468901 5 A1b(03)T 4.86 Farooq Saeed, Pantera Energy Lahore - - Yes Yes 4.86
111 09/Feb/201809112121249800 Old
09112721249800 New5 A-1b(03)T 4.84
Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 4.84
112 12/Mar/201824112119008629 Old
24112719008629 New320 A-1b(03)T 60.5 M/s Adaptive technologies Private Ltd. - - Yes Yes 60.5
113 07/Dec/2017 12115241363202 10 A1b(03)T 4Sami Ullah
Premier Energy- - Yes Yes 4
114 11/Dec/2017 13115241377400 14 A1b(03) T 8.32Farooq Saeed
Pantera Energy Pvt. Ltd.- - Yes Yes 8.32
115 09/Feb/2018 10115241162000 6 A-1a(01) 5.13Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 5.13
116 09/Feb/2018 9115230806100 8 A1b(03) T 7.8Hafiz Ullah M/s Siddiq Renewable
Eneragy- - Yes Yes 7.8
117 11/Dec/2017 10115230923000 5 A1b(03) T 3.1Muhammad Amir Shahzad
SUN Player & CO Pvt. Ltd.- - Yes Yes 3.1
118 26/Feb/2018 9115230810400 7 A-1b(03)T 6.12 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 6.12
119 25/Sep/2017 14115331501920 7 A1b(03)T 6.49Zeeshan Ali Bhatti
ERCON Energy- - Yes Yes 6.49
120 31/Jan/2018 3115260209500 7 A1b(03) T 6.75Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 6.75
121 26/Mar/2018 10115151196500 10 A-2A(04) 10.24 Creative electronics (Pvt). Ltd - - Yes Yes 10.24
122 30/Nov/2017 15115261970200 18 A1b(03)T 6.1Ali Hassan Habib
HIMA^Verte Lahore- - Yes Yes 6.1
123 16/Oct/2017 13115231558300 7 A1b(03)T 5.7Sajid Rafique
Hadron Solar Pvt. Ltd.- - Yes Yes 5.7
124 11/Dec/2017 13115231533905 7 A1b(03) T 6.6Muhammad Amir Shahzad
SUN Player & CO Pvt. Ltd.- - Yes Yes 6.6
125 11/Dec/2017 15115256534600 11 A1b(03) T 4.34Muhammad Amir Shahzad
SUN Player & CO Pvt. Ltd.- - Yes Yes 4.34
126 28/Mar/2018 15115256316600 11 A-1b(03)T 5.3 Creative electronics (Pvt). Ltd - - Yes Yes 5.3
127 12/Jun/2017 24112520130100 179 A2c(06)T 19.2Waqar Amir
DWP Technologies Pvt. Ltd.- - Yes Yes 19.2
128 09/Feb/2018 14112182163600 9 A-1b(03)T 7.8Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 7.8
129 04/Dec/2017 15115460640093 9 A1b(03)T 8 Farooq Saeed, Pantera Energy Lahore - - Yes Yes 8
130 26/Feb/2018 15115460640095 9 A-1b(03)T 3.12 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 3.12
Page 5 of 31
![Page 6: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/6.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
131 11/Sep/2017 11115230958200 14 A1b(03)T 7.5Zain-ul-Abideen
Premier Energy Pvt. Ltd.- - Yes Yes 7.5
132 09/Feb/2018 44115262516107 25 A-2c(06)T 5Naseer Ahmad
Catkin Engineering - - Yes Yes 5
133 01/Feb/201724111259921400 Old
24111629921400 New430 B2b(12)T 30
Farrukh Nayyar
Solar Tech Intl. Limited- - Yes Yes 30
134 24/Oct/2017 9115240943408 14 A1b(03)T 11.9Zeeshan Ali
Premier Energy- - Yes Yes 11.9
135 01/3/2018 08112520881904 5 A-1b(03)T 5.94 Solar Tech - - Yes Yes 5.94
136 01/3/2018 8112520881800 5 A-1b(03)T 5.94 Solar Tech - - Yes Yes 5.94
137 06/3/2018 14115411077800 9 A-1b(03)T 7.5 Premier Energy Pvt. Ltd - - Yes Yes 7.5
138 16/Apr/2018 4115150457800 7 A-1b(03)T 5.5 Creative electronics (Pvt). Ltd - - Yes Yes 5.5
139 31/Jan/2018 11115230998100 10 A1b(03) T 9.36Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 9.36
140 26/Feb/2018 10115241121806 14 A-1b(03)T 10.8 Pantera Energy Pvt. Ltd. - - Yes Yes 10.8
141 06/3/2018 10115241129709 7 A-1a(01)T 9 Premier Energy Pvt. Ltd - - Yes Yes 9
142 31/Jan/2018 13115231591600 5 A1b(03) T 3Khuzaima Aslam
Creative Electronics Pvt. Ltd.- - Yes Yes 3
143 13/Nov/2017 13115421207200 7 A1b(03)T 6 Amir Pervaiz Ch. Read Solar - - Yes Yes 6
144 06/Apr/2018 15115411158800 20 A-1b(03)T 11.7 Premier Energy Pvt. Ltd - - Yes Yes 11.7
145 28/Mar/2018 15115470822169 16 A-1b(03)T 10.6 Creative electronics (Pvt). Ltd - - Yes Yes 10.6
146 12/Mar/2018 24115240012000 76 A-1b(03)T 25.11Farrukh Nayyar
Solar Tech Intl. Limited- - Yes Yes 25.11
147 10/Jul/201724111249008800 old
24111659008800 new1550 B3(14)T 181.45
Hafiz Ullah M/s Siddiq Renewable
Eneragy- - Yes Yes 181.45
148 16/Aug/2017 24116410008101 1016 B3(14)T 1000Tayyab Rafique
Reon Energy Ltd.- - Yes Yes 1000
149 06/Mar/2017 15115257216600 17 A1b(03)T 7.65Farooq Saeed
Pantera Energy Pvt. Limited- - Yes Yes 7.65
150 16/Mar/2018 14115255596000 11 A-1b(03)T 10.24 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 10.24
151 18/Apr/2018 15115256512400 11 A-1b(03)T 5.88 HISEL Power Pakistan Pvt Ltd - - Yes Yes 5.88
152 02/May/2018 11115230979100 9 A-1b(03)T 7.8 Creative electronics (Pvt). Ltd - - Yes Yes 7.8
153 29/May/2018 13115231589302 7 A-1a(01) 7.15 Nizam Energy - - Yes Yes 7.15
154 21/Jun/2018 27112520746100 7 A2c(06)T 7 Pantera Energy Pvt. Ltd. - - Yes Yes 7
155 21/May/2018 24118312600675 178 B-2b(12)T 107.2 M/s Orient Energy Systems (Private) Ltd - - Yes Yes 107.2
156 13/Apr/201824112399000440 old
24112639000440 New60 B-2b(12)T 32.64 HISEL Power Pakistan Pvt Ltd - - Yes Yes 32.64
Page 6 of 31
![Page 7: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/7.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
157 07/Jun/2018 7112520719000 12 A1b(03) T 10.56 M/s Renewable Stars (PVT.) Limited - - Yes Yes 10.56
158 03/Apr/201805112170585900 Old
05112730585900 New8 A-1b(03)T 7.98 Creative electronics (Pvt). Ltd - - Yes Yes 7.98
159 06/May/201824112179026300 Old
24112739026300 New205 A1b(03) T 25.6 JAFFER BROTHERS PVT LIMITED - - Yes Yes 25.6
160 07/Dec/2017 24115159250374 85 A1b(03) T 19.12Sami Ullah
Premier Energy- - Yes Yes 19.12
161 03/Apr/2018 11115241187800 11 A-1b(03)T 6.24 Hadron Solar (Pvt) Ltd - - Yes Yes 6.24
162 29/Mar/2018 14115261767500 9 A-1b(03)T 9 Solar Tech - - Yes Yes 9
163 06/May/2018 15115256328000 11 A1b(03) T 9.88 M/s Renewable Stars (PVT.) Limited - - Yes Yes 9.88
164 11/May/2018 15115256964000 11 A1b(03) T 10.4 Premier Energy Pvt. Ltd - - Yes Yes 10.4
165 11/May/2018 12115262002700 18 A1b(03) T 11.22 Creative electronics (Pvt). Ltd - - Yes Yes 11.22
166 16/May/2018 24115159250045 295 A-2c(06)T 57.6 Premier Energy Pvt. Ltd - - Yes Yes 57.6
167 16/May/2018 14115162757700 6 A-1b(03)T 5.2 Premier Energy Pvt. Ltd - - Yes Yes 5.2
168 06/May/2018 12115410895300 7 A1b(03) T 5.2 M/s Renewable Stars (PVT.) Limited - - Yes Yes 5.2
169 21/May/201824111259029731 Old
24111629029731 New480 B-2b(12)T 60 Msquare R Engineering Services - - Yes Yes 60
170 11/Oct/201746112390217300 old
46112630217300 New37 B2b(12)T 32.46
Umair Idrees
Masco Energy Services- - Yes Yes 32.46
171 25/Jun/2018 13115261705699 5 A1b(03)T 5.12 Masco Energy Services - - Yes Yes 5.12
172 04/May/2018 9115130018100 10 A1b(03) T 9.36 Hardon Solar (PVT) LTD - - Yes Yes 9.36
173 07/Aug/2018 15115421361201 5 A1b(03) T 4.68 Read Solar Pvt. LTD - - Yes Yes 4.68
174 06/May/2018 15115241669300 10 A1b(03) T 10.32 M/s Renewable Stars (PVT.) Limited - - Yes Yes 10.32
175 27/Jul/2018 8115250258419 14 A1b(03) T 7.8 Premier Energy Pvt. Ltd - - Yes Yes 7.8
176 11/May/201814112122077500 Old
14112722077500 New6 A1b(03) T 4.62 Creative electronics (Pvt). Ltd - - Yes Yes 4.62
177 29/Jun/201814112171831100 Old
14112731831100 New9 A1b(03) T 5.2 Hadron Solar (Pvt) Ltd - - Yes Yes 5.2
178 05/Jul/201803112170382800 Old
03112730382800 New9 A1b(03) T 9 Hadron Solar (Pvt) Ltd - - Yes Yes 9
179 11/May/201807112370092101 Old
071112610092101 New6 A1b(03) T 5.72 Creative electronics (Pvt). Ltd - - Yes Yes 5.72
180 09/Aug/201807112370059602 Old
07112610059602 New9 A1b(03) T 10.71 Creative electronics (Pvt). Ltd - - Yes Yes 10.71
181 29/Jun/2018 15115411129300 12 A1b(03) T 12 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 12
182 16/Aug/2018 11115410834703 5 A1b(03) T 6.16 HISEL Power Pakistan Pvt Ltd - - Yes Yes 6.16
Page 7 of 31
![Page 8: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/8.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
183 02/May/2018 13112331299300 5 A-1b(03)T 5.1 Creative electronics (Pvt). Ltd - - Yes Yes 5.1
184 06/May/2018 24115256131007 205 A1b(03) T 35.1 ZEDSOLAR LIMITED - - Yes Yes 35.1
185 24/Oct/2017 24115141000307 69 A1b(03)T 36.85 Orient Energy System Pvt. Ltd. - - Yes Yes 36.85
186 05/Jul/201804112120514900 Old
04112720514900 New6 A1b(03) T 3.72 Creative electronics (Pvt). Ltd - - Yes Yes 3.72
187 04/May/2018 12115264131000 5 A1b(03) T 5.44 Hardon Solar (PVT) LTD - - Yes Yes 5.44
188 12/Jun/2018 27115130430400 5 A1C(06)T 4.86 Pantera Energy Pvt. Ltd. - - Yes Yes 4.86
189 01/Aug/2018 12115410846600 5 A1b(03) T 5.12 Premier Energy Pvt. Ltd - - Yes Yes 5.12
190 28/Aug/2018 11115410821700 6 A1b(03)T 5.1 M/s Renewable Stars (PVT.) Limited - - Yes Yes 5.1
191 27/Jul/2018 12115451355408 5 A1b(03) T 4.86 Pantera Energy Pvt. Ltd. - - Yes Yes 4.86
192 05/Jun/201824112122403700 Old
24112722403700 New2345 A1b(03) T 488 Premier Energy Pvt. Ltd - - Yes Yes 488
193 07/Aug/2018 12115251513303 8 A1b(03) T 7.2 Msaqure R Enginering Services - - Yes Yes 7.2
194 27/Aug/2018 8115250258420 14 A1b(03)T 10.4 M/s Sky Electric (Private) Limited - - Yes Yes 10.4
195 27/Aug/2018 15115256508300 17 A1b(03)T 15.08 M/s Sky Electric (Private) Limited - - Yes Yes 15.08
196 03/Aug/2018 14115331502080 7 A1b(03) T 3.54 Ercon Energy - - Yes Yes 3.54
197 08/Aug/2018 10112210639576 9 A1b(03) T 6.24 Creative electronics (Pvt). Ltd - - Yes Yes 6.24
198 03/Sep/2018 44112521653600 5 A2c(06)T 6 Pantera Energy Pvt. Ltd. - - Yes Yes 6
199 01/Aug/2018 13115151589101 23 A1b(03) T 5.12 Premier Energy Pvt. Ltd - - Yes Yes 5.12
200 21/Jun/2018 15115162828203 9 A1b(03)T 7.56 Creative electronics (Pvt). Ltd - - Yes Yes 7.56
201 29/Jun/2018 13115241431006 14 A1b(03) T 12.19 PITCO Pvt. Limited - - Yes Yes 12.19
202 29/Aug/2018 12115410928300 5 A1b(03)T 18 Hadron Solar (Pvt) Ltd - - Yes Yes 18
203 11/Jul/2018 12115441853700 9 A1b(03) T 7 Ercon Energy - - Yes Yes 7
204 01/Oct/2018 14115255703254 11 A1b(03)T 5.46 Premier Energy Pvt. Ltd - - Yes Yes 5.46
205 08/Aug/2018 15115258210400 17 A1b(03) T 8.06 Creative electronics (Pvt). Ltd - - Yes Yes 8.06
206 11/Jul/2018 13115131246101 5 A1b(03) T 5.18 M/s solar Tech (Pvt.) Limited - - Yes Yes 5.18
207 13/Aug/201812112121813100 Old
12112721813100 New8 A1b(03) T 5.58 Read Solar Pvt. LTD - - Yes Yes 5.58
208 14/Sep/2018 10115241095200 8 A1b(03)T 7.04 M/s Sky Electric (Private) Limited - - Yes Yes 7.04
Page 8 of 31
![Page 9: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/9.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
209 28/Aug/2018 14115261814500 9 A1a(01) 10.24 Premier Energy Pvt. Ltd - - Yes Yes 10.24
210 13/Aug/2018 15115258385203 11 A1b(03) T 10.725 Read Solar Pvt. LTD - - Yes Yes 10.725
211 15/Aug/201802112170228400 Old
02112730228400 New5 A1a(03)T 4.275 M/s Sky Electric (Private) Limited - - Yes Yes 4.275
212 12/Sep/2018 15112360921024 5 A1b(03)T 4.8 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.8
213 17/Aug/2018 11112331112330 4 A1a(01) 6.3 Ercon Energy - - Yes Yes 6.3
214 09/Oct/201814112391280230 old
14112631280230 New9 A1b(03)T 3.3 Read Solar Pvt. LTD - - Yes Yes 3.3
215 29/May/2018 1115230003919 5 A-1b(03)T 3.25 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 3.25
216 27/Aug/2018 14115241479700 10 A1a(01) 5.4 Pantera Energy Pvt. Ltd. - - Yes Yes 5.4
217 24/Sep/2018 11115261053601 5 A1a(01) 4.875 Premier Energy Pvt. Ltd - - Yes Yes 4.875
218 26/Sep/2018 13115421257701 10 A1b(03)T 9.92 M/s Sky Electric (Private) Limited - - Yes Yes 9.92
219 11/Oct/201802112170231700 Old
02112730231700 New5 A1b(03)T 10.24 Premier Energy Pvt. Ltd - - Yes Yes 10.24
220 24/Sep/2018 15115231928400 9 A1b(03)T 9 HISEL Power Pakistan Pvt Ltd - - Yes Yes 9
221 01/Oct/2018 10115151148200 5 A1b(03)T 4.72 Read Solar Pvt. LTD - - Yes Yes 4.72
222 01/Oct/2018 15115241645500 6 A1b(03)T 4.25 Read Solar Pvt. LTD - - Yes Yes 4.25
223 29/Jun/2018 24115240012800 130 A1b(03) T 28.35 ADAPTIV Technologies Pvt. Ltd. - - Yes Yes 28.35
224 24/Sep/2018 15112182302500 9 A1b(03)T 8.96 Premier Energy Pvt. Ltd - - Yes Yes 8.96
225 03/Sep/2018 14117112080004 19 A1b(03)T 18 Power Highway - - Yes Yes 18
226 02/Oct/2018 12115262807500 17 A1b(03)T 9.6 Sky Electric (PVT) Ltd - - Yes Yes 9.6
227 14/Sep/2018 46113552126813 18 B1b(09)T 16.2 Read Solar Pvt. LTD - - Yes Yes 16.2
228 12/Sep/201804112120600700 Old
04112720600700 New9 A1b(03)T 3.855 Read Solar Pvt. LTD - - Yes Yes 3.855
229 01/Oct/201801112120109300 Old
01112720109300 New6 A1b(03)T 5.2 Solar Sigma Ltd - - Yes Yes 5.2
230 03/Sep/201808112121200101 Old
08112721200101 New5 A1a(01)T 3.12 M/s Sky Electric (Private) Limited - - Yes Yes 3.12
231 11/Sep/2018 6112520620400 13 A1b(03)T 4.8 ADAPTIV Technologies Pvt. Ltd. - - Yes Yes 4.8
232 12/Sep/2018 15112521645300 4 A1a(01) 5.2 M/s Sky Electric (Private) Limited - - Yes Yes 5.2
233 24/Sep/201814112341429402 old
14112621429402 new15 A1b(03)T 3.18 Albario Engineering (PVT) Ldt. - - Yes Yes 3.18
234 15/Aug/201815112351373525 old
15112641373525 New9 A1a(03)T 5.2 M/s Sky Electric (Private) Limited - - Yes Yes 5.2
Page 9 of 31
![Page 10: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/10.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
235 03/Sep/2018 12115231086105 10 A1b(03)T 10.8 TESLA Industries Pvt. Limited - - Yes Yes 10.8
236 24/Sep/2018 15115256310700 11 A1b(03)T 9.18 TESLA Industries Pvt. Limited - - Yes Yes 9.18
237 29/Jun/2018 14115261731900 18 A1a(01) 6.24 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 6.24
238 11/Oct/2018 14115261726900 14 A1a(01) 12.28 Hadron Solar (Pvt) Ltd - - Yes Yes 12.28
239 11/Oct/2018 13115410999000 3 A1a(01) 9.75 Hadron Solar (Pvt) Ltd - - Yes Yes 9.75
240 03/Oct/2018 15115411160100 26 A1b(03)T 13.515 HISEL Power Pakistan Pvt Ltd - - Yes Yes 13.515
241 24/Sep/201813112171610800 Old
13112731610800 New10 A2a(04) 6.24 Hadron Solar (Pvt) Ltd - - Yes Yes 6.24
242 11/Oct/201811112111132102 Old
11112711132102 New5 A1b(03)T 3.2 HISEL Power Pakistan Pvt Ltd - - Yes Yes 3.2
243 11/Sep/2018 24115159009601 125 A2C(06)T 20 Premier Energy Pvt. Ltd - - Yes Yes 20
244 03/Oct/2018 13115261660600 9 A1a(01) 8.32 HISEL Power Pakistan Pvt Ltd - - Yes Yes 8.32
245 04/Sep/2018 24115359993100 62 B2b(12)T 48.96 Creative electronics (Pvt). Ltd - - Yes Yes 48.96
246 01/Oct/2018 5115130428107 8 A1b(03)T 7.68 Read Solar Pvt. LTD - - Yes Yes 7.68
247 01/Oct/2018 12115241340700 6 A1a(01) 3.9 Premier Energy Pvt. Ltd - - Yes Yes 3.9
248 03/Oct/2018 6115240624001 5 A1b(03)T 4.77 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.77
249 22/Oct/2018 15115460581207 5 A1b(03)T 9.92 Pantera Energy Pvt. Ltd. - - Yes Yes 9.92
250 12/Oct/201810112340863300 old
10112620863300 New22 A1b(03)T 10.26 HISEL Power Pakistan Pvt Ltd - - Yes Yes 10.26
251 03/Oct/2018 15115250653600 11 A1b(03)T 4.77 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.77
252 03/Oct/2018 15115256349600 11 A1b(03)T 10.6 HISEL Power Pakistan Pvt Ltd - - Yes Yes 10.6
253 22/Oct/2018 13115241440400 12 A1a(01) 9.9 Creative electronics (Pvt). Ltd - - Yes Yes 9.9
254 02/Oct/2018 24115411142102 50 A1b(03)T 13.44 Premier Energy Pvt. Ltd - - Yes Yes 13.44
255 12/Jul/2018 24112251007003 163 B2b(12)T 32.175 Premier Energy Pvt. Ltd - - Yes Yes 32.175
256 14/Sep/201814112391280150 old
14112631280150 New9 A1b(03)T 8.64 M/s Sky Electric (Private) Limited - - Yes Yes 8.64
257 15/Oct/201814112391280030 old
14112631280030 New20 A1b(03)T 8.26 HISEL Power Pakistan Pvt Ltd - - Yes Yes 8.26
258 15/Oct/201814112391281250 old
14112631281250 New14 A1b(03)T 4.16 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.16
259 11/Sep/2018 15115470822135 5 A1b(03)T 4.08 M/s Sky Electric (Private) Limited - - Yes Yes 4.08
260 22/Oct/2018 44114111262603 5 A1b(03)T 5 Pantera Energy Pvt. Ltd. - - Yes No
Page 10 of 31
![Page 11: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/11.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
261 15/Oct/2018 13115421237600 8 A1b(03)T 7.65 Premier Energy Pvt. Ltd - - Yes Yes 7.65
262 13/Dec/201809112121368700 Old
09112721368700 New9 A1b(03)T 5.12 Read Solar Pvt. LTD - - Yes Yes 5.12
263 16/Oct/2018 13112521386500 31 A1b(03)T 30.69 Premier Energy Pvt. Ltd - - Yes Yes 30.69
264 02/Oct/2018 14115261720556 18 A1b(03)T 18 Premier Energy Pvt. Ltd - - Yes Yes 18
265 02/Oct/2018 12115262918002 17 A1b(03)T 15.08 Sky Electric (PVT) Ltd - - Yes Yes 15.08
266 01/Nov/2018 5113470381505 8 A1b(03)T 11.84 Inverex power Solution - - Yes Yes 11.84
267 24/Oct/2018 14115231801500 10 A1a(01) 4.48 Premier Energy Pvt. Ltd - - Yes Yes 4.48
268 22/Oct/2018 14115231716001 12 A1b(03)T 10.71 Premier Energy Pvt. Ltd - - Yes Yes 10.71
269 12/Nov/2018 14115255334700 11 A1b(03)T 5.94 M/s Renewable Stars (PVT.) Limited - - Yes Yes 5.94
270 12/Oct/2018 14115255526100 11 A1b(03)T 5.035 Read Solar Pvt. LTD - - Yes Yes 5.035
271 12/Nov/2018 8115250258415 14 A1b(03)T 7.8 Premier Energy Pvt. Ltd - - Yes Yes 7.8
272 03/Dec/2018 15115256530300 17 A1b(03)T 3.36 Read Solar Pvt. LTD - - Yes Yes 3.36
273 03/Dec/2018 15115257766500 11 A1b(03)T 5.6 Read Solar Pvt. LTD - - Yes Yes 5.6
274 16/Oct/2018 24112520096000 77 A1a(01) 76.89 Premier Energy Pvt. Ltd - - Yes Yes 76.89
275 04/Jan/2019 15115111409700 8 A1b(03)T 11.88 Read Solar Pvt. LTD - - Yes Yes 11.88
276 04/Dec/2018 14115411039600 22 A1b(03)T 20.355 Premier Energy Pvt. Ltd - - Yes Yes 20.355
277 01/Nov/2018 13115441890000 5 A1b(03)T 5 Power Highway - - Yes No
278 04/Dec/2018 24115411136307 70 A1b(03)T 17.8 Hadron Solar (Pvt) Ltd - - Yes Yes 17.8
279 22/Oct/2018 14115261723900 17 A1b(03)T 10 Read Solar Pvt. LTD - - Yes No
280 23/Oct/2018 12115262627105 11 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes No
281 24/Oct/2018 12115262619801 11 A1b(03)T 5.12 Power Highway - - Yes Yes 5.12
282 06/Mar/2017 2711412 0615001 6 A2c(06)T 7.5M. Saad Muzamil
Pantera Energy- - Yes No
283 05/Nov/2018 24116130751605 160 B2b(12)T 75.26 Read Solar Pvt. LTD - - Yes Yes 75.26
284 11/Oct/2018 6112330574501 5 A1b(03)T 5.3 Power Highway - - Yes Yes 5.3
285 11/Oct/2018 5112330427200 5 A1b(03)T 4.875 Sky Electric (PVT) Ltd - - Yes Yes 4.875
286 03/Dec/2018 13112331334402 12 A1b(03)T 12.025 Premier Energy Pvt. Ltd - - Yes Yes 12.025
Page 11 of 31
![Page 12: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/12.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
287 03/Dec/2018 13112331334401 12 A1b(03)T 12.025 Premier Energy Pvt. Ltd - - Yes Yes 12.025
288 02/Nov/2018 13115441937000 5 A1b(03)T 4.76 Read Solar Pvt. LTD - - Yes No
289 01/Nov/2018 14115442019000 5 A1b(03)T 5 Power Highway - - Yes No
290 12/Nov/2018 14115421301300 6 A1b(03)T 9.6 Premier Energy Pvt. Ltd - - Yes Yes 9.6
291 03/Dec/2018 15115256731200 11 A1b(03)T 5.6 Read Solar Pvt. LTD - - Yes Yes 5.6
292 02/Nov/2018 12115262500180 11 A1b(03)T 5.6 Read Solar Pvt. LTD - - Yes Yes 5.6
293 12/Oct/2018 24111420850701 38 B2b(12)T 15 Read Solar Pvt. LTD - - Yes Yes 15
294 04/Oct/201812112351295010 old
12112641295010 new9 A1b(03)T 11.5 ATS Engineering Sales & Service - - Yes Yes 11.5
295 22/Oct/201815112351376216 Old
15112641376216 new8 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes No
296 22/Oct/201815112351376810 Old
15112641376810 New14 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes No
297 12/Nov/2018 10115230881710 7 A1b(03)T 10 Msquare R Engineering Services - - Yes Yes 10
298 12/Nov/2018 14112211400487 9 A1b(03)T 9.5 Msquare R Engineering Services - - Yes Yes 9.5
299 12/Nov/2018 14112211400299 9 A1b(03)T 9.5 Msquare R Engineering Services - - Yes Yes 9.5
300 23/Oct/2018 9115240915800 5 A1b(03)T 6.76 Sky Electric (PVT) Ltd - - Yes Yes 6.76
301 07/Jan/2019 15115241635800 14 A1b(03)T 15.275Catkin engineering Sales and Services Pvt.
Ltd. - - Yes Yes 15.275
302 22/Nov/201805112120748100 Old
05112720748100 New5 A1b(03)T 6.5 Msquare R Engineering Services - - Yes Yes 6.5
303 12/Nov/201802112170156505 Old
02112730156505 New5 A1b(03)T 5.005 Premier Energy Pvt. Ltd - - Yes Yes 5.005
304 22/Nov/2018 11115231058800 14 A1a(01) 10.24 HISEL Power Pakistan Pvt Ltd - - Yes Yes 10.24
305 14/Dec/2018 15115241674904 12 A1b(03)T 20.48 HISEL Power Pakistan Pvt Ltd - - Yes Yes 20.48
306 11/Dec/2018 15115257247800 5 A1b(03)T 7.25 Power Highway - - Yes Yes 7.25
307 14/Dec/2018 15115258216400 17 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes Yes 10.4
308 23/Oct/201810112370422808 Old
10112610422808 New11 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes No
309 24/Oct/201811112370441900 Old
11112610441900 New5 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes No
310 04/Dec/2018 12115231082500 9 A1b(03)T 7.98 Premier Energy Pvt. Ltd - - Yes Yes 7.98
311 22/Nov/2018 14115261758302 9 A1a(01) 9 HISEL Power Pakistan Pvt Ltd - - Yes Yes 9
312 16/Nov/201814112370562303 Old
14112610562303 New5 A1b(03)T 3.12 HISEL Power Pakistan Pvt Ltd - - Yes No
Page 12 of 31
![Page 13: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/13.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
313 03/Dec/2018 1115220085592 5 A2a(04) 4.8M/s JD Aviation Sourcing & Engineering
Service Pvt.Ltd- - Yes No
314 15/Jan/2019 15115257982700 11 A1b(03)T 8.96 Creative electronics (Pvt). Ltd - - Yes Yes 8.96
315 03/Dec/2018 15115256735000 17 A1b(03)T 15.36 HISEL Power Pakistan Pvt Ltd - - Yes Yes 15.36
316 04/Jan/2019 9115250532102 6 A1b(03)T 4.8 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.8
317 27/Dec/2018 14115231843605 7 A1b(03)T 7 HISEL Power Pakistan Pvt Ltd - - Yes Yes 7
318 13/Dec/2018 11115161478200 11 A1b(03)T 10.56 Premier Energy Pvt. Ltd - - Yes Yes 10.56
319 04/Feb/2019 13115151543300 12 A1a(01) 10.56 Premier Energy Pvt. Ltd - - Yes Yes 10.56
320 04/Dec/2018 10115241125400 10 A1b(03)T 15.12Catkin engineering Sales and Services Pvt.
Ltd. - - Yes Yes 15.12
321 27/Dec/2018 12115265010000 11 A1b(03)T 12.6 Zorays (SMC-PVT.) Ltd. - - Yes Yes 12.6
322 01/Aug/2018 27114120366703 5 A2c(06)T 4.5 Pantera Energy Pvt. Ltd. - - Yes No
323 05/Dec/2018 24117149002606 450 B2b(12)T 600.32 Reon Energy Limited - - Yes Yes 600.32
324 05/Dec/2018 24117149002600 990 B3(14)T 998.4 Reon Energy Limited - - Yes Yes 998.4
325 14/Jan/2019 44115241030300 6 A2c(06)T 3.5 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 3.5
326 21/Jan/2019 14115231705600 7 A1b(03)T 3.9 Nizam Energy - - Yes Yes 3.9
327 17/Dec/2018 12115265702900 9 A1b(03)T 9 Sky Electric (PVT) Ltd - - Yes Yes 9
328 17/Dec/2018 12115263016300 11 A1b(03)T 10.07 Sky Electric (PVT) Ltd - - Yes Yes 10.07
329 14/Jan/2019 12115262652407 18 A1b(03)T 10.24 Sky Electric (PVT) Ltd - - Yes Yes 10.24
330 26/Nov/2018 13113471941504 10 A1b(03)T 10 Read Solar Pvt. LTD - - Yes Yes 10
331 24/Oct/2018 13115261667300 9 A1a(01) 8.77 Sky Electric (PVT) Ltd - - Yes Yes 8.77
332 27/Dec/2018 4115260296908 5 A1b(03)T 4.86 HISEL Power Pakistan Pvt Ltd - - Yes Yes 4.86
333 21/Jan/2019 14115261748101 9 A1b(03)T 9 HISEL Power Pakistan Pvt Ltd - - Yes Yes 9
334 28/Jan/2019 24116410008102 950 B3(14)T 440.64 CSUN Energy Pakistan (Pvt.) Limited - - Yes Yes 440.64
335 04/Jan/2019 4115110585402 5 A1b(03)T 4.48 JAFFER BROTHERS PVT LIMITED - - Yes Yes 4.48
336 27/Dec/2018 14115255594400 5 A1b(03)T 14.4 Zorays (SMC-PVT.) Ltd. - - Yes Yes 14.4
337 21/Jan/2019 15115257715200 17 A1b(03)T 4.94 Creative electronics (Pvt). Ltd - - Yes Yes 4.94
338 02/Oct/201808112121117200 Old
08112721117200 New9 A1b(03)T 7.15 Sky Electric (PVT) Ltd - - Yes No
Page 13 of 31
![Page 14: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/14.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
339 12/Oct/201805112170537100 Old
05112730537100 New8 A1b(03)T 5.12 Sky Electric (PVT) Ltd - - Yes Yes 5.12
340 13/Dec/201807112170895300 Old
07112730895300 New5 A1b(03)T 6.4 TESLA Industries Pvt. Limited - - Yes Yes 6.4
341 01/Jan/201908112170966800 Old
08112730966800 New9 A1a(01) 8.775 HISEL Power Pakistan Pvt Ltd - - Yes Yes 8.775
342 18/Sep/2018 24114230259504 453 B3(14)T 307 Reon Energy Limited - - Yes Yes 307
343 21/Dec/2018 24112149004100 112 A2c(06)T 8.96 ATS Engineering Sales & Service - - Yes Yes 8.96
344 28/Jan/2019 7112330650803 12 A1b(03)T 17.875 Power Highway - - Yes No
345 24/Oct/2018 15115241670116 7 A1b(03)T 8.77 Sky Electric (PVT) Ltd - - Yes No
346 14/Jan/2019 10115241172700 6 A1b(03)T 10.07 Sky Electric (PVT) Ltd - - Yes No
347 14/Jan/2019 9115230804901 14 A1b(03)T 10.3 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 10.3
348 22/Jan/2019 11115230967400 6 A1b(03)T 7 HISEL Power Pakistan Pvt Ltd - - Yes Yes 7
349 21/Dec/2018 24115159250673 130 A1b(03)T 129.9JD Aviation Sourcing and Engineering
Services- - Yes Yes 129.9
350 11/Jan/2019 5113460592013 5 A1b(03)T 2.76 Hadron Solar (Pvt) Ltd - - Yes No
351 04/Jan/2019 14112141366500 5 A1b(03)T 4.5 Read Solar Pvt. LTD - - Yes No
352 24/Jan/2019 1112140000500 6 A1b(03)T 8.58 Creative electronics (Pvt). Ltd - - Yes Yes 8.58
353 01/Jan/2019 15115256307400 17 A1b(03)T 6.175 Sky Electric (PVT) Ltd - - Yes Yes 6.175
354 01/Feb/2019 15115241601024 7 A1b(03)T 3.6 Premier Energy Pvt. Ltd - - Yes No
355 12/Feb/2019 10115241128500 7 A1b(03)T 10.24 Read Solar Pvt. LTD - - Yes No
356 08/Jan/2019 9115240906200 7 A1b(03)T 10.24 Read Solar Pvt. LTD - - Yes No
357 27/Dec/2018 15115162791700 9 A1b(03)T 3.1 Premier Energy Pvt. Ltd - - Yes Yes 3.1
358 13/Feb/2019 14115261877300 18 A1a(01) 11.55 HISEL Power Pakistan Pvt Ltd - - Yes Yes 11.55
359 24/Sep/2018 24113539000114 69 A2c(06)T 9 Siddiq Renewable Energy Pvt. Ltd - - Yes Yes 9
360 28/Jan/2019 13115241384500 8 A1b(03)T 2.97 HISEL Power Pakistan Pvt Ltd - - Yes
361 13/Feb/2019 15115241641500 14 A1a(01) 4.8 HISEL Power Pakistan Pvt Ltd - - Yes
362 11/Feb/2019 12115410895700 10 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075
363 22/Jan/201924112399000131 old
24112639000131 New160 B-2b(12)T 32 HISEL Power Pakistan Pvt Ltd - - Yes Yes 32
364 13/Feb/2019 13115441889600 5 A1b(03)T 4.8 JAFFER BROTHERS PVT LIMITED - - Yes No
Page 14 of 31
![Page 15: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/15.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
365 04/Feb/2019 13115411004300 16 A1b(03)T 15.6 Premier Energy Pvt. Ltd - - Yes Yes 15.6
366 08/Jan/2019 14115255356400 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075
367 11/Feb/2019 15115257731200 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075
368 28/Jan/2019 6115261570600 5 A1a(01) 4.8 Premier Energy Pvt. Ltd - - Yes No
369 11/Feb/2019 27115240671110 13 A2c(06)T 17.16 Nizam Energy - - Yes No
370 03/Dec/2018 14115255318700 11 A1b(03)T 5.2 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes Yes 5.2
371 12/Feb/2019 15115256523800 11 A1b(03)T 10.88 Read Solar Pvt. LTD - - Yes Yes 10.88
372 22/Jan/2019 15115257210420 11 A1b(03)T 9.75 Sky Electric (PVT) Ltd - - Yes Yes 9.75
373 11/Jan/2019 44115311204218 5 A2c(06)T 5.12 Hadron Solar (Pvt) Ltd - - Yes Yes 5.12
374 21/Jan/2019 11115130215000 8 A1b(03)T 5 HISEL Power Pakistan Pvt Ltd - - Yes No
375 12/Feb/2019 7115130716600 8 A1b(03)T 11.84 Read Solar Pvt. LTD - - Yes No
376 15/Jan/2019 11115161553401 5 A1b(03)T 5.04 Read Solar Pvt. LTD - - Yes Yes 5.04
377 21/Jan/2019 11115320271015 30 A1b(03)T 24 Read Solar Pvt. LTD - - Yes Yes 24
378 24/Jan/2019 12115241343301 14 A1a(01) 10.075 Sky Electric (PVT) Ltd - - Yes No
379 21/Feb/2019 13115410947700 9 A1b(03)T 10.24 DWP Technologies (Pvt.) Limited - - Yes Yes 10.24
380 29/Mar/2019 9115230823802 7 A1b(03)T 9.6 Read Solar Pvt. LTD - - Yes No
381 03/Apr/2019 14115255701350 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075
382 22/Nov/2018 1112210127567 9 A1b(03)T 8.84 Sky Electric (PVT) Ltd - - Yes No
383 21/Feb/2019 9115250375302 30 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes Yes 10.075
384 29/Mar/2019 12115262811900 17 A1b(03)T 9.76 Sky Electric (PVT) Ltd - - Yes No
385 01/Feb/2019 11112711076001 8 A1b(03)T 11.8 Hadron Solar (Pvt) Ltd - - Yes No
386 01/Feb/2019 11112711077900 9 A1b(03)T 5.94 Hadron Solar (Pvt) Ltd - - Yes No
387 24/Jan/2019 12115264062000 11 A1b(03)T 5.2 Sky Electric (PVT) Ltd - - Yes No
388 04/Feb/2019 15115120146200 6 A1b(03)T 3.2 Premier Energy Pvt. Ltd - - Yes No
389 02/Apr/2019 13112210858510 15 A1b(03)T 4.55 Sky Electric (PVT) Ltd - - Yes Yes 4.55
390 02/Apr/2019 11115241211901 5 A1b(03)T 7.15 Sky Electric (PVT) Ltd - - Yes No
Page 15 of 31
![Page 16: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/16.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
391 25/Mar/2019 14115255734401 11 A1b(03)T 7.8Catkin engineering Sales and Services Pvt.
Ltd. - - Yes Yes 7.8
392 13/Mar/2019 12112641292947 5 A1b(03)T 4.48 Maxell Power Pvt. Limited - - Yes No
393 25/Jan/2019 14112182175000 13 A1b(03)T 10.24 HISEL Power Pakistan Pvt Ltd - - Yes No
394 22/Jan/2019 27112210333107 8 A-2c(06)T 5.04 HISEL Power Pakistan Pvt Ltd - - Yes No
395 21/Dec/2018 24112429000902 420 A3(66) 76.85 Premier Energy Pvt. Ltd - - Yes Yes 76.85
396 04/Feb/2019 5112540426102 8 A1b(03)T 11.84 Premier Energy Pvt. Ltd - - Yes No
397 21/Dec/201813112370519800 Old
13112610519800 New8 A1b(03)T 5.32 Read Solar Pvt. LTD - - Yes No
398 14/Feb/2019 15115332014000 9 A1b(03)T 11.88 Premier Energy Pvt. Ltd - - Yes Yes 11.88
399 18/Feb/2019 15115411125100 6 A1b(03)T 8.64 Premier Energy Pvt. Ltd - - Yes No
400 08/Apr/2019 13115421216200 10 A1b(03)T 10.44 Renewable stars pvt. Ltd. - - Yes Yes 10.44
401 01/Apr/2019 15115262007771 5 A1b(03)T 5.12 Zorays (SMC-PVT.) Ltd. - - Yes No
402 28/Jan/2019 15115256535900 11 A1b(03)T 10.2 Sky Electric (PVT) Ltd - - Yes Yes 10.2
403 21/Feb/2019 15115257814700 11 A1b(03)T 7.68 DWP Technologies (Pvt.) Limited - - Yes Yes 7.68
404 15/Mar/2019 14115261819900 7 A1a(01) 5.2 Sky Electric (PVT) Ltd - - Yes No
405 04/Mar/2019 24115331000053 91 B2b(12)T 12.8 Hadron Solar (Pvt) Ltd - - Yes Yes 12.8
406 22/Jan/2019 11112210642730 9 A1b(03)T 8.68 Creative electronics (Pvt). Ltd - - Yes No
407 22/Feb/2019 24112211011804 65 A2c(06)T 22.08 Read Solar Pvt. LTD - - Yes No
408 04/Mar/2019 14112210916815 9 A1b(03)T 8.77 ADAPTIV Technologies Pvt. Ltd. - - Yes No
409 28/Feb/2019 3112330248700 5 A1b(03)T 3.96 Read Solar Pvt. LTD - - Yes No
410 28/Feb/2019 3112330248701 5 A1b(03)T 3.96 Read Solar Pvt. LTD - - Yes No
411 01/Feb/2019 10115230869201 6 A1a(01) 5.25 Sky Electric (PVT) Ltd - - Yes No
412 14/Feb/2019 12115231135900 5 A1b(03)T 6.4 Smart Sense - - Yes No
413 20/Feb/2019 12115231086107 12 A1b(03)T 5.04 JKS Pvt. Limited - - Yes No
414 15/Feb/2019 24115258029601 259 A1b(03)T 92.4 Solis Energy solutions Pvt. Limited - - Yes No
415 14/Feb/2019 14115261824202 9 A1a(01) 10.24 Smart Sense - - Yes No
416 01/Mar/2019 14115261830700 8 A1a(01) 10 Premier Energy Pvt. Ltd - - Yes No
Page 16 of 31
![Page 17: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/17.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
417 01/Mar/2019 15115442100101 5 A1b(03)T 7.28 Read Solar Pvt. LTD - - Yes No
418 19/Apr/2019 12115231142206 6 A1b(03)T 5.12 Siddiq Renewable Energy Pvt. Ltd - - Yes No
419 08/Apr/2019 12115241334400 5 A1a(01) 6 Read Solar Pvt. LTD - - Yes No
420 21/Mar/2019 44115160321909 20 A2c(06)T 9.92 Premier Energy Pvt. Ltd - - Yes No
421 11/Mar/2019 14115231695700 11 A1b(03)T 11.25 Premier Energy Pvt. Ltd - - Yes No
422 15/Mar/2019 10115230882212 8 A1b(03)T 4.55 Sky Electric (PVT) Ltd - - Yes No
423 15/Jan/2019 9115240964402 5 A1b(03)T 3.2 Read Solar Pvt. LTD - - Yes No
424 25/Feb/2019 11115241191607 7 A1b(03)T 8.48 HISEL Power Pakistan Pvt Ltd - - Yes No
425 25/Mar/2019 13115261640435 9 A1b(03)T 10.08 Zi solar Pvt. Limited - - Yes No
426 27/Mar/2019 12115262306700 17 A1b(03)T 10.88 Indus Solar International Pvt.Limited - - Yes No
427 11/Sep/2018 24115331000059 325 B2b(12)T 64.175 Premier Energy Pvt. Ltd - - Yes Yes 64.175
428 15/Mar/2019 15115411152600 5 A1b(03)T 5 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes No
429 25/Mar/2019 14115255712200 11 A1b(03)T 15.275Catkin engineering Sales and Services Pvt.
Ltd. - - Yes Yes 15.275
430 01/Apr/2019 10112710191430 9 A1b(03)T 13.43 Hadron Solar (Pvt) Ltd - - Yes No
431 12/Feb/2019 8112721156100 5 A1b(03)T 5 SPEL TECHNOLOGY SUPPORT PVT Ltd. - - Yes No
432 12/Feb/2019 14112742123201 5 A1b(03)T 4.68 Creative electronics (Pvt). Ltd - - Yes No
433 23/May/2019 15112731875400 8 A1b(03)T 10.01 Read Solar Pvt. LTD - - Yes No
434 14/May/2019 9115420978900 5 A1b(03)T 4.8 DWP Technologies (Pvt.) Limited - - Yes No
435 14/May/2019 14115421340917 10 A1b(03)T 12.8 DWP Technologies (Pvt.) Limited - - Yes No
436 22/Apr/2019 10115130093602 8 A1b(03)T 10.45 Power Highway - - Yes No
437 02/Apr/2019 5115130393200 8 A1a(01) 10.26 Hadron Solar (Pvt) Ltd - - Yes No
438 12/Mar/2019 14115261771201 9 A1b(03)T 8.84 Read Solar Pvt. LTD - - Yes No
439 02/May/2019 10115230885302 14 A1b(03)T 9.6 Sleek Solar International Pvt.Limited - - Yes No
440 15/Mar/2019 14115261741301 9 A1a(01) 9.1 Sky Electric (PVT) Ltd - - Yes No
441 12/Mar/2019 15115258615900 11 A1b(03)T 5.94 Premier Energy Pvt. Ltd - - Yes No
442 16/Apr/2019 8112721096800 8 A1b(03)T 11.9 Read Solar Pvt. LTD - - Yes No
Page 17 of 31
![Page 18: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/18.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
443 15/Feb/2019 24112739008657 426 A2c(06)T 91 Solis Energy solutions Pvt. Limited - - Yes No
444 15/Feb/2019 24115469000104 220 A1b(03)T 91 Solis Energy solutions Pvt. Limited - - Yes No
445 02/Apr/2019 14115255701406 17 A1b(03)T 10.4 Premier Energy Pvt. Ltd - - Yes No
446 04/Apr/2019 12115151456100 5 A1b(03)T 7.04 HISEL Power Pakistan Pvt Ltd - - Yes No
447 20/Feb/2019 15115162817300 6 A1b(03)T 3.36 Sky Electric (PVT) Ltd - - Yes No
448 03/Apr/2019 13115261652100 9 A1b(03)T 11.7 Premier Energy Pvt. Ltd - - Yes No
449 01/Apr/2019 13115261640293 9 A1b(03)T 7.84 HISEL Power Pakistan Pvt Ltd - - Yes No
450 08/May/2019 9115130056200 5 A1b(03)T 7 Creative electronics (Pvt). Ltd - - Yes No
451 01/Apr/2019 10112610405511 40 A1a(01) 10.88 TESLA Industries Pvt. Limited - - Yes No
452 22/May/2019 12112641294924 10 A1b(03)T 8.32 Read Solar Pvt. LTD - - Yes No
453 06/May/2019 14115255326000 11 A1b(03)T 10.56 Read Solar Pvt. LTD - - Yes No
454 02/May/2019 7112520738800 6 A1b(03)T 6.5 Premier Energy Pvt. Ltd - - Yes No
455 23/Apr/2019 10112710191460 9 A1b(03)T 13.43 Hadron Solar (Pvt) Ltd - - Yes No
456 29/Apr/2019 12112711201104 8 A1b(03)T 4.62 Hadron Solar (Pvt) Ltd - - Yes No
457 06/May/2019 13115261661000 9 A1b(03)T 13 Read Solar Pvt. LTD - - Yes No
458 26/Apr/2019 12115264101501 8 A1b(03)T 11.7 Premier Energy Pvt. Ltd - - Yes No
459 17/Apr/2019 15115331713900 9 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - - Yes No
460 21/Mar/2019 12115161611400 5 A1b(03)T 6.5 Msquare R Engineering Services - - Yes No
461 16/May/2019 14115231704600 8 A1b(03)T 11.7 ATS Engineering Sales & Service - - Yes No
462 02/May/2019 12115262314200 11 A1b(03)T 6.4 Power Highway - - Yes No
463 06/May/2019 3112720417200 5 A1b(03)T 4.9 Premier Energy Pvt. Ltd - - Yes No
464 23/Apr/2019 46112132972600 14 B1b(09)T 12.4 Mak Pumps Company (Pvt.) ltd. - - Yes No
465 26/Apr/2019 15115261862800 9 A1b(03)T 12.35 Premier Energy Pvt. Ltd - - Yes No
466 16/Apr/2019 12115262601401 17 A1b(03)T 14.96 Read Solar Pvt. LTD - - Yes No
467 01/Feb/2019 14115331502968 7 A1b(03)T 4.68 Creative electronics (Pvt). Ltd - - Yes No
468 02/May/2019 6115261570500 5 A-1a(01) 5.8 Premier Energy Pvt. Ltd - - Yes No
Page 18 of 31
![Page 19: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/19.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
469 24/Apr/2019 15115256966500 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - - Yes No
470 16/Apr/2019 15115231975400 10 A1a(01) 8.58 Read Solar Pvt. LTD - - Yes No
471 01/Mar/2019 14115255768700 5 A1b(03)T 7.15 Sky Electric (PVT) Ltd - - Yes No
472 22/Apr/2019 15115257729600 9 A1b(03)T 11.22 Hadron Solar (Pvt) Ltd - - Yes No
473 02/May/2019 15115256947200 11 A1b(03)T 10.4 Sky Electric (PVT) Ltd - - Yes No
474 11/Jun/2019 15115261959900 18 A1b(03)T 9.9 Hadron Solar (Pvt) Ltd - - Yes No
475 27/May/2019 13115241374001 12 A1b(03)T 17.55 Power Highway - - Yes No
476 29/May/2019 15115257213330 11 A1b(03)T 10.5 Premier Energy Pvt. Ltd - - Yes No
477 23/May/2019 9112521063401 7 A1b(03)T 10.24 Read Solar Pvt. LTD - - Yes No
478 11/Jun/2019 15115261976100 9 A1b(03)T 9.9 Hadron Solar (Pvt) Ltd - - Yes No
479 27/Mar/2019 15115258231000 11 A1b(03)T 4.55 Sky Electric (PVT) Ltd - - Yes No
480 22/Apr/2019 10112610405512 40 A-1a(01) 10.4 Power Highway - - Yes No
481 13/Mar/2019 12112641295029 5 A1b(03)T 5.13Catkin engineering Sales and Services Pvt.
Ltd. - - Yes No
482 27/May/2019 12112641293089 7 A1b(03)T 10 Allied Solar (Pvt.) Limited - - Yes No
483 23/May/2019 8112710926600 7 A1b(03)T 10.4 Read Solar Pvt. LTD - - Yes No
484 26/Mar/2019 13112210838128 9 A1b(03)T 6.48 HISEL Power Pakistan Pvt Ltd - - Yes No
485 08/May/2019 13115231571500 5 A1b(03)T 4.86 JKS Pvt. Limited - - Yes No
486 19/Jun/2019 14115231858100 9 A1b(03)T 6.5 Sky Electric (PVT) Ltd - - Yes No
487 23/Apr/2019 44115241298910 10 A-2c(06)T 14.85 Hadron Solar (Pvt) Ltd - - Yes No
488 08/May/2019 13115241432500 5 A1b(03)T 6.5 JKS Pvt. Limited - - Yes No
489 28/May/2019 15115421378301 10 A1b(03)T 8.32 Premier Energy Pvt. Ltd - - Yes No
490 11/Jun/2019 11115261047400 9 A1b(03)T 4.6 Premier Energy Pvt. Ltd - - Yes No
491 15/May/2019 15115256336501 11 A1b(03)T 5.16Catkin engineering Sales and Services Pvt.
Ltd. - - Yes No
492 06/May/2019 15115257517600 11 A1b(03)T 10.2 Read Solar Pvt. LTD - - Yes No
493 29/May/2019 6115251253404 5 A1b(03)T 3.96 Read Solar Pvt. LTD - - Yes No
494 15/May/2019 15115411163700 15 A1b(03)T 10.24Catkin engineering Sales and Services Pvt.
Ltd. - - Yes No
Page 19 of 31
![Page 20: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/20.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
495 29/May/2019 14115411039900 9 A1b(03)T 5.04Catkin engineering Sales and Services Pvt.
Ltd. - - Yes No
496 11/Jun/2019 15115421377836 9 A1b(03)T 10.5 Premier Energy Pvt. Ltd - - Yes No
497 14/Jun/2019 15115421365501 7 A1b(03)T 10.5 Premier Energy Pvt. Ltd - - Yes No
498 18/Jun/2019 12115262500400 17 A1b(03)T 12.35 Read Solar Pvt. LTD - - Yes No
499 01/Oct/2018 24111212402702 1500 C2a(28) 139.425 Power Highway - Ripe - - Generation License issued.
500 04/Jan/2019 13113551146256 5 A1b(03)T 4.9 HISEL Power Pakistan Pvt Ltd - Ripe - - Sent to M&T for testing
501 25/Jan/2019 11115241207216 15 A1b(03)T 6.4 HISEL Power Pakistan Pvt Ltd - Ripe - - Sent to M&T for testing
502 15/Oct/201824112150252805 Old
24112740252805 New25 A2c(06)T 13.16 HISEL Power Pakistan Pvt Ltd - Ripe - - Generation License issued. Meter Allocated
503 04/Mar/2019 24115119005511 280 A1b(03)T 137.6 TESLA Industries Pvt. Limited - Ripe - - Bi-Directional MDI meter to be provided by Applicant
504 25/Feb/2019 24113330602901 41 A2c(06)T 23.68 Read Solar Pvt. LTD - Ripe - - Bi-Directional MDI meter to be provided by Applicant
505 04/Mar/2019 24115119005500 450 A1b(03)T 168.04 TESLA Industries Pvt. Limited - Ripe - - Bi-Directional MDI meter to be provided by Applicant
506 12/Mar/2019 12115262914401 11 A1b(03)T 13.5 Premier Energy Pvt. Ltd - Ripe - - Generation License issued. Meter Allocated
507 08/Mar/2019 24115239012301 66 A1b(03)T 32.175 Premier Energy Pvt. Ltd - Ripe - - Bi-Directional MDI meter to be provided by Applicant
508 28/Feb/2019 6112730737901 5 A1b(03)T 5.4Catkin engineering Sales and Services Pvt.
Ltd. - Ripe - - Generation License issued. Meter Allocated
509 18/Mar/2019 12113430396605 5 A1b(03)T 7.29 Power Highway - Ripe - - Generation License issued. Meter Allocated
510 18/Mar/2019 12113430396600 5 A1b(03)T 7.29 Power Highway - Ripe - - Generation License issued. Meter Allocated
511 22/Jan/2019 24111520085002 30 A1b(03)T 26 Albario Engineering (PVT) Ldt. - Ripe - - Bi-Directional MDI meter to be provided by Applicant
512 26/Mar/2019 7112610092600 5 A1a(01) 11.7 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated
513 12/Mar/2019 3112220140730 5 A1b(03)T 4.88 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated
514 15/Mar/2019 24115421244003 36 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Bi-Directional MDI meter to be provided by Applicant
515 24/Oct/2018 12115263007402 17 A1b(03)T 15 TESLA Industries Pvt. Limited - Ripe - - Generation License issued. Meter Allocated
516 03/Apr/2019 10112210639575 9 A1b(03)T 4.32 Maxell Power Pvt. Limited - Ripe - - Generation License issued. Meter Allocated
517 27/Mar/2019 4115150457600 7 A1b(03)T 3.84 Power Highway - Ripe - - Generation License issued. Meter Allocated
518 17/Apr/2019 12115241335300 10 A1a(01) 6.6 Hadron Solar (Pvt) Ltd - Ripe - - Meter Received in M&T
519 17/Apr/2019 10115241162900 6 A1b(03)T 5 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated
520 02/Apr/2019 15111653006560 5 A1b(03)T 4.62 HISEL Power Pakistan Pvt Ltd - Ripe - - Generation License issued. Meter Allocated
Page 20 of 31
![Page 21: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/21.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
521 27/Mar/2019 4112520351101 6 A1b(03)T 7.15 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated
522 08/May/2019 12112721806600 7 A1b(03)T 5 JKS Pvt. Limited - Ripe - - Generation License issued. Meter Allocated
523 16/Apr/2019 10112620834600 13 A1b(03)T 17.16 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated
524 02/May/2019 14115421332900 6 A1b(03)T 7.15 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated
525 03/May/2019 7112720926300 9 A1b(03)T 4.95 JKS Pvt. Limited - Ripe - - Generation License issued. Meter Allocated
526 24/Apr/2019 46115350753602 17 B1b(09)T 5.36 Zorays (SMC-PVT.) Ltd. - Ripe - - Generation License issued. Meter Allocated
527 08/May/2019 15115241657600 9 A1a(01) 4.55 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated
528 06/May/2019 15115262007510 5 A1b(03)T 3.84 Read Solar Pvt. LTD - Ripe - - Generation License issued. Meter Allocated
529 13/May/2019 13115231533100 9 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated
530 16/May/2019 15115421374845 12 A1b(03)T 15.6 Sky Electric (PVT) Ltd - Ripe - - Bi-Directional meter to be provided by Applicant
531 16/May/2019 12115151470902 5 A1b(03)T 6.5 Sky Electric (PVT) Ltd - Ripe - - Bi-Directional meter to be provided by Applicant
532 22/Apr/2019 12115251513354 8 A1b(03)T 10 Msquare R Engineering Services - Ripe - - Bi-Directional meter to be provided by Applicant
533 14/May/2019 15115258420900 11 A1b(03)T 9.88Catkin engineering Sales and Services Pvt.
Ltd. - Ripe - - Bi-Directional meter to be provided by Applicant
534 26/Mar/2019 15112450613703 5 A1b(03)T 2.65 Read Solar Pvt. LTD - Ripe - - Bi-Directional meter to be provided by Applicant
535 02/May/2019 15115257201026 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated
536 21/Mar/2019 14112141332300 8 A1b(03)T 10.5 Premier Energy Pvt. Ltd - Ripe - - Generation License issued. Meter Allocated
537 26/Apr/2019 15115258221000 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued. Meter Allocated
538 06/May/2019 15115257712211 11 A1b(03)T 5.2 Pantera Energy Pvt. Ltd. - Ripe - - Site attented on 29-7-19 and found site not completed
539 06/May/2019 13115261693000 9 A1a(01) 12.42 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
540 29/May/2019 12115262616801 11 A1b(03)T 3.575 Allied Solar (Pvt.) Limited - Ripe - - Meter not Provided by Applicant
541 23/May/2019 271151110553401 6 A2c(06)T 7.26 Read Solar Pvt. LTD - Ripe - - Meter Received in M&T
542 20/May/2019 13115241413000 6 A1b(03)T 6.5 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
543 28/May/2019 15115160057101 10 A1b(03)T 5.04 HISEL Power Pakistan Pvt Ltd - Ripe - - Meter not Provided by Applicant
544 28/May/2019 10115230883861 7 A1b(03)T 14.58 Maxell Power Pvt. Limited - Ripe - - Meter not Provided by Applicant
545 16/May/2019 24112520139040 105 A2c(06)T 26.6 Maxell Power Pvt. Limited - Ripe - - Meter not Provided by Applicant
546 23/May/2019 1112730116200 7 A1b(03)T 8 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
Page 21 of 31
![Page 22: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/22.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
547 29/May/2019 7112520730600 5 A1a(01) 4.57Catkin engineering Sales and Services Pvt.
Ltd. - Ripe - - Meter not Provided by Applicant
548 29/May/2019 12115262616802 11 A1b(03)T 3.575 Allied Solar (Pvt.) Limited - Ripe - - Meter not Provided by Applicant
549 23/May/2019 15115258234801 8 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Meter not Provided by Applicant
550 27/May/2019 15115262008921 9 A1b(03)T 13.5 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
551 13/May/2019 12115251516508 10 A1b(03)T 10.7 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
552 06/May/2019 8112721095500 9 A1b(03)T 4 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant
553 08/Jan/2019 14115241473000 10 A1a(01) 11.55 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
554 11/Jun/2019 9115230811600 10 A1b(03)T 10.04 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Site attented on 23-7-19 and found site not completed
555 21/May/2019 3112740354500 5 A1b(03)T 4.94 SPEL TECHNOLOGY SUPPORT PVT Ltd. - Ripe - - Meter not Provided by Applicant
556 29/May/2019 12115251513011 8 A1b(03)T 10 SPEL TECHNOLOGY SUPPORT PVT Ltd. - Ripe - - Meter not Provided by Applicant
557 28/May/2019 24112610405508 50 A1b(03)T 20.48 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
558 21/May/2019 3112140247302 5 A1b(03)T 4.68 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
559 16/May/2019 15112722238600 7 A1b(03)T 4.875 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
560 11/Jun/2019 15115241658703 5 A1b(03)T 4.87 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
561 27/May/2019 9112210550412 9 A1b(03)T 4.48 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
562 28/May/2019 10115111073000 8 A1b(03)T 10.8 AYK (Pvt.) Limited - Ripe - - Meter not Provided by Applicant
563 25/Mar/2019 44111450600800 8 A2c(06)T 11.52 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
564 13/Jun/2019 9115230805902 14 A1b(03)T 12.72 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
565 13/Jun/2019 5115130462200 6 A1b(03)T 5.12 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant
566 11/Jun/2019 5117250294104 22 A1b(03)T 33.5 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
567 21/May/2019 13115151585500 8 A1b(03)T 4.8 DWP Technologies (Pvt.) Limited - Ripe - - Meter not Provided by Applicant
568 02/May/2019 6113460606806 12 A1b(03)T 12 Power Highway - Ripe - - Meter not Provided by Applicant
569 29/May/2019 12115265622700 11 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Meter not Provided by Applicant
570 23/May/2019 15115241680800 8 A1a(01) 7.15 Sky Electric (PVT) Ltd - Ripe - - Meter not Provided by Applicant
571 23/May/2019 14113471961301 8 A1a(01) 7.68Catkin engineering Sales and Services Pvt.
Ltd. - Ripe - - Meter not Provided by Applicant
572 22/Apr/2019 4113470302903 5 A1b(03)T 7.02 Power Highway - Ripe - - Meter not Provided by Applicant
Page 22 of 31
![Page 23: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/23.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
573 06/May/2019 44112140152101 7 A-2c(06)T 9.9 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant
574 28/May/2019 11115161472900 10 A1b(03)T 11.04 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
575 29/May/2019 14115255171000 9 A1b(03)T 11.88 Hadron Solar (Pvt) Ltd - Ripe - - Meter not Provided by Applicant
576 28/May/2019 11115161472800 6 A1b(03)T 8.9 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
577 13/May/2019 15112731865605 8 A1b(03)T 10.4 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
578 11/Jun/2019 13115261670325 9 A1b(03)T 4.48 Hadron Solar (Pvt) Ltd - Ripe - - Meter not Provided by Applicant
579 14/Jun/2019 27118322600667 37 A3(66) 34.02 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
580 13/Jun/2019 15115262007568 5 A1b(03)T 5.6Catkin engineering Sales and Services Pvt.
Ltd. - Ripe - - Meter not Provided by Applicant
581 14/Jun/2019 6115310503646 5 A1b(03)T 4.62 Creative electronics (Pvt). Ltd - Ripe - - Meter not Provided by Applicant
582 27/May/2019 15112742341100 9 A1b(03)T 12.8 Albario Engineering (PVT) Ldt. - Ripe - - Meter not Provided by Applicant
583 29/May/2019 45115410681600 7 A2c(06)T 3.06 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
584 12/Jun/2019 3112720354100 7 A1b(03)T 10.4 Dynamic Green Solutions Pvt. Limited - Ripe - - Meter not Provided by Applicant
585 21/May/2019 9111150858900 5.4 A1b(03)T 6.5 Solis Energy solutions Pvt. Limited - Ripe - - Meter not Provided by Applicant
586 24/May/2019 13115451510500 6 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
587 23/May/2019 14115255346200 11 A1b(03)T 10.4 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
588 14/Jun/2019 11115320157612 5 A1b(03)T 6.4 Siddiq Renewable Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
589 23/May/2019 4115131143501 5 A1b(03)T 7.1 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
590 23/May/2019 12112641293084 7 A1b(03)T 10.32 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
591 11/Jun/2019 12115262821600 11 A1b(03)T 12.8 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
592 11/Jun/2019 12115264322300 5 A1b(03)T 7.5 Premier Energy Pvt. Ltd - Ripe - - Meter not Provided by Applicant
593 11/Jun/2019 7115130708300 4 A1a(01) 4.48 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
594 08/May/2019 10117111692004 5 A1b(03)T 4.64 Power Highway - Ripe - - Meter not Provided by Applicant
595 29/May/2019 14115231721500 14 A1a(01) 20.8 AYK (Pvt.) Limited - Ripe - - Meter not Provided by Applicant
596 18/Jun/2019 15115261952800 9 A1a(01) 11.985 Read Solar Pvt. LTD - Ripe - - Meter not Provided by Applicant
597 24/Jun/2019 14115261747401 9 A1b(03)T 11.73 Nizam Energy - Ripe - - Generation License issued.
598 17/Jun/2019 8115130731300 5 A1b(03)T 4.68 JKS Pvt. Limited - Ripe - - Generation License issued.
Page 23 of 31
![Page 24: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/24.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
599 21/Jun/2019 12115262616803 17 A1b(03)T 4.55 Allied Solar (Pvt.) Limited - Ripe - - Generation License issued.
600 17/Jun/2019 12115265010301 11 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.
601 14/Jun/2019 2112710532701 5 A1b(03)T 3.96 Msquare R Engineering Services - Ripe - - Generation License issued.
602 17/Jun/2019 11112610438200 12 A1a(01) 13.2 JKS Pvt. Limited - Ripe - - Generation License issued.
603 18/Jun/2019 13115231603400 14 A1a(01) 5.2 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.
604 17/Jun/2019 13115241433206 8 A1b(03)T 10.725 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.
605 17/Jun/2019 13115241433205 14 A1a(01) 19.5 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.
606 13/Jun/2019 13115151613400 5 A1b(03)T 4.68 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.
607 17/Jun/2019 10115241115704 14 A1b(03)T 10.26 Allied Solar (Pvt.) Limited - Ripe - - Generation License issued.
608 17/Jun/2019 9115230831401 13 A1a(01) 10.56 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.
609 17/Jun/2019 8115130731200 7.5 A1b(03)T 11 JKS Pvt. Limited - Ripe - - Generation License issued.
610 13/Jun/2019 15115421378100 6 A1b(03)T 8.45 Power Highway - Ripe - - Generation License issued.
611 18/Jun/2019 13115231516000 14 A1b(03)T 4.875 Albario Engineering (PVT) Ldt. - Ripe - - Generation License issued.
612 21/Jun/2019 15115256932000 11 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.
613 26/Jun/2019 8115250278802 5 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.
614 25/Jun/2019 14115261856500 9 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.
615 13/Jun/2019 8112610109000 8 A1b(03)T 4.95 JKS Pvt. Limited - Ripe - - Generation License issued.
616 24/Jun/2019 13115410952403 8 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.
617 24/Jun/2019 14115255913500 11 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.
618 26/Jun/2019 14115255107000 11 A1b(03)T 7.92 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.
619 01/Jul/2019 14115411029703 10 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.
620 01/Jul/2019 44115269001503 24 A-2c(06)T 9 M/s EBR Energy Pakistan (Pvt).Limited - Ripe - - Generation License issued.
621 01/Jul/2019 15115256365300 11 A1b(03)T 12.4 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.
622 01/Jul/2019 7115250083503 15 A1b(03)T 22.5 M/s EBR Energy Pakistan (Pvt).Limited - Ripe - - Generation License issued.
623 13/Jun/2019 15115421378000 6 A1b(03)T 8.45 Power Highway - Ripe - - Generation License issued.
624 13/Jun/2019 15115256906501 17 A1b(03)T 10.56 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.
Page 24 of 31
![Page 25: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/25.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
625 26/Jun/2019 11112610245400 8 A1b(03)T 9.9 Maxell Power Pvt. Limited - Ripe - - Generation License issued.
626 25/Jun/2019 15115262009161 5 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.
627 26/Jun/2019 9115230814701 7 A1b(03)T 7.92 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.
628 17/Jun/2019 14115411033928 5 A1b(03)T 4.55 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.
629 13/Jun/2019 13115261611800 9 A1b(03)T 6.98 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.
630 27/May/2019 9112721293900 5 A1b(03)T 3.99 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.
631 14/Jun/2019 13115261618803 9 A1b(03)T 10.56 Creative electronics (Pvt). Ltd - Ripe - - Generation License issued.
632 21/Jun/2019 15115162837503 6 A1b(03)T 5.2 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.
633 13/Jun/2019 15115256985401 7 A1b(03)T 4.95 Hadron Solar (Pvt) Ltd - Ripe - - Generation License issued.
634 27/Jun/2019 15115241611700 9 A1b(03)T 11.7 Zi solar Pvt. Limited - Ripe - - Generation License issued.
635 01/Jul/2019 44115231760008 7 A-2c(06)T 7.9 Premier Energy Pvt. Ltd - Ripe - - Generation License issued.
636 13/Jun/2019 10115241123507 14 A1b(03)T 11.88Catkin engineering Sales and Services Pvt.
Ltd. - Ripe - - Generation License issued.
637 21/Jun/2019 15115256540500 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd - Ripe - - Generation License issued.
638 04/Dec/2018 14115231771903 5 A2a(04) 7.68 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
639 26/Mar/2019 15112450608618 5 A1b(03)T 3.588 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
640 29/May/2019 24116230011011 925 B3(14)T 983 Reon Energy Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
641 26/Jun/2019 12115262510700 17 A1b(03)T 14.95 Nizam Energy Unripe - - - - Sent to NEPRA for issuance of Generation License
642 13/Jun/2019 15115256901002 11 A1b(03)T 10.56 Creative electronics (Pvt). Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
643 20/May/2019 15115162808001 5 A1b(03)T 4.62 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
644 24/Jun/2019 9115230806300 11 A1b(03)T 10.6 Siddiq Renewable Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
645 24/Jun/2019 11115111122300 6 A1b(03)T 3.08 Renewable stars pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
646 01/Jul/2019 13115241429700 5 A1b(03)T 6 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
647 01/Jul/2019 1112210124919 13 A1b(03)T 4.69 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
648 25/Jun/2019 9112521047700 8 A1b(03)T 11.8 Allied Solar (Pvt.) Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
649 01/Jul/2019 15115256350200 11 A1b(03)T 15.1 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
650 25/Feb/2019 4113330422700 5 A1b(03)T 7.36 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
Page 25 of 31
![Page 26: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/26.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
651 29/May/2019 11115241267700 5 A1b(03)T 7.26 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
652 26/Jun/2019 14115241549804 12 A1b(03)T 10 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
653 05/Jul/2019 14115255779600 9 A1b(03)T 3.96 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
654 05/Jul/2019 15115258601621 11 A1b(03)T 4.68 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
655 01/Jul/2019 4115110503000 5 A1b(03)T 7.48 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
656 01/Jul/2019 13115410956502 5 A1b(03)T 7.15 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
657 28/May/2019 24112540120004 65 A2c(06)T 21 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
658 03/Jul/2019 14115255117100 9 A1b(03)T 8.45 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
659 21/Jun/2019 24112211007300 450 B2b(12)T 241.7 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
660 24/Jun/2019 24112211004401 490 B2b(12)T 89.9 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
661 17/Jun/2019 7112520663400 5 A1b(03)T 5.94 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
662 21/Jun/2019 10112620849000 9 A1b(03)T 4.8 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
663 08/Jul/2019 15115231973101 8 A1a(01) 13.7 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
664 21/Jun/2019 4113470278300 15 A1b(03)T 10.56 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
665 04/Jul/2019 12112311189630 5 A1b(03)T 5.2 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
666 05/Jul/2019 15115257875800 11 A1b(03)T 10.4 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
667 11/Jul/2019 13115251605900 12 A1b(03)T 16.5 Nizam Energy Unripe - - - - Sent to NEPRA for issuance of Generation License
668 02/Jul/2019 11115161475900 6 A1b(03)T 8.77 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
669 02/Jul/2019 7115160962000 6 A1b(03)T 4.87 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
670 08/Jul/2019 7115251343510 14 A1b(03)T 14.62 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
671 08/Jul/2019 14115231704313 7 A1b(03)T 9.75 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
672 08/Jul/2019 11115230991801 10 A1a(01) 6.5 Inverex power Solution Unripe - - - - Sent to NEPRA for issuance of Generation License
673 04/Jul/2019 14115441970500 5 A1b(03)T 3.08 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
674 10/Jul/2019 10115241098500 6 A1b(03)T 5.28 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
675 03/Jul/2019 44113341351000 15 A-2c(06)T 19.8 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
676 08/Jul/2019 12115241342901 14 A1a(01) 7.8 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
Page 26 of 31
![Page 27: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/27.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
677 04/Jul/2019 14115421287802 10 A1b(03)T 10.4 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
678 03/Jul/2019 14112212100500 5 A1b(03)T 5.12 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
679 11/Jul/2019 12115263305105 5 A1b(03)T 4.76 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
680 01/Jul/2019 24115122061310 160 B2b(12)T 29.9 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
681 01/Jul/2019 15112122236801 5 A1b(03)T 7.26 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
682 11/Jul/2019 15115421387420 25 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
683 10/Jul/2019 8112721158800 10 A1b(03)T 11.88 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
684 08/Jul/2019 11112610437414 8 A1b(03)T 8 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
685 05/Jul/2019 14115255521700 11 A1b(03)T 9.66 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
686 01/Jul/2019 5115130469200 5 A-1a(01) 3.2 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
687 11/Jul/2019 13115261599000 18 A1b(03)T 14.3 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
688 10/Jul/2019 15112541373506 5 A1b(03)T 7.47 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
689 10/Jul/2019 15115442300426 8 A1b(03)T 9.75 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
690 10/Jul/2019 24115169039300 69 B2b(12)T 18.2 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
691 01/Jul/2019 14115231695800 8 A1b(03)T 11.7 AYK (Pvt.) Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
692 11/Jul/2019 4115110508400 5 A1b(03)T 7.5 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
693 01/Jul/2019 9115130858900 6 A1b(03)T 4.55 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
694 11/Jul/2019 7115250083500 21 A1b(03)T 22.8 M/s EBR Energy Pakistan (Pvt).Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
695 03/Jul/2019 10112620865900 15 A1b(03)T 14.85 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
696 04/Jul/2019 12115161646800 12 A1b(03)T 14.85 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
697 25/Jun/2019 15112733206600 9 A1b(03)T 5.2 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
698 16/Jul/2019 15115160037300 5 A1b(03)T 7.47 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
699 08/Jul/2019 14112641341275 5 A1b(03)T 7.47 Power Highway Unripe - - - - Sent to NEPRA for issuance of Generation License
700 02/Jul/2019 15115258213500 17 A1b(03)T 5 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
701 19/Jul/2019 14112710253400 5 A1b(03)T 6.72 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
702 24/Jun/2019 44112734414100 9 A2c(06)T 11.22 Dynamic Green Solutions Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
Page 27 of 31
![Page 28: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/28.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
703 10/Jul/2019 11112731431000 8 A1b(03)T 5.28 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
704 17/Jul/2019 15115256514000 11 A1b(03)T 14.4 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
705 01/Jul/2019 15115256109900 11 A1b(03)T 15.84 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
706 16/Jul/2019 12115265003105 9 A1b(03)T 4.875 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
707 19/Jul/2019 14115261754600 9 A1a(01) 12.42 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
708 24/Jul/2019 6112520623100 7 A1a(01) 10.24Catkin engineering Sales and Services Pvt.
Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
709 17/Jul/2019 6112520504008 5 A1b(03)T 10.24 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
710 11/Jul/2019 11115241191900 9 A1b(03)T 10.56 HISEL Power Pakistan Pvt Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
711 04/Jul/2019 3112730369000 5 A1b(03)T 2.24 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
712 11/Jul/2019 12112721802001 9 A1b(03)T 5 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
713 11/Jul/2019 44112724432100 12 A2c(06)T 13.44 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
714 11/Jul/2019 15115241674905 20 A1b(03)T 20.46 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
715 11/Jul/2019 12115262718500 17 A1b(03)T 13.35 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
716 22/Jul/2019 12115262316500 17 A1b(03)T 7.26 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
717 22/Jul/2019 12115241283400 6 A1b(03)T 4.875 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
718 23/Jul/2019 13112182008600 5 A1b(03)T 4.68 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
719 21/Jun/2019 15115460630162 5 A1b(03)T 6.5 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
720 11/Jul/2019 7117260452313 4 A1a(01) 7.15 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
721 16/Jul/2019 11115230970400 5 A1b(03)T 7.475 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
722 22/Jul/2019 7115250087708 9 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
723 23/Jul/2019 15115255925000 11 A1b(03)T 10.08 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
724 23/Jul/2019 11115230980602 14 A1b(03)T 9.9 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
725 26/Jun/2019 12115264205800 9 A1b(03)T 9.9 Renewable stars pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
726 26/Jul/2019 3112740429600 6 A1b(03)T 9 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
727 29/Jul/2019 15115256969600 17 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
728 29/Jul/2019 15115256926500 9 A1b(03)T 4.55 Sky Electric (PVT) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
Page 28 of 31
![Page 29: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/29.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
729 25/Jul/2019 15115256990400 11 A1b(03)T 9.9 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
730 17/Jul/2019 15115241612900 9 A1b(03)T 9.88 JKS Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
731 23/Jul/2019 9112721304300 9 A1b(03)T 3.99 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
732 25/Jul/2019 24115132107500 50 A1b(03)T 27.5 Premier Energy Pvt. Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
733 23/Jul/2019 46115442372911 18 B1b(09)T 3.36 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
734 23/Jul/2019 15115442300528 8 A1b(03)T 9.9 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
735 29/Jul/2019 10115230881853 7 A1b(03)T 10.4 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
736 29/Jul/2019 9115240926100 9 A1b(03)T 5.2 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
737 29/Jul/2019 15115256750100 11 A1b(03)T 5.28 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
738 29/Jul/2019 13112210838294 9 A1b(03)T 7.2 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
739 01/Jul/2019 13115417319297 5 A1b(03)T 7.26 Pantera Energy Pvt. Ltd. Unripe - - - - Sent to NEPRA for issuance of Generation License
740 01/Aug/2019 9115130053801 9 A1b(03)T 13.2 Hadron Solar (Pvt) Ltd Unripe - - - - Sent to NEPRA for issuance of Generation License
741 06/Aug/2019 11115230992501 30 A1b(03)T 19.8 M/s EBR Energy Pakistan (Pvt).Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
742 25/Jun/2019 13115261590600 9 A1b(03)T 10.56 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
743 25/Jun/2019 13115261590500 9 A1b(03)T 10.4 Maxell Power Pvt. Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
744 01/Jul/2019 11112720355400 9 A1b(03)T 11.7 AYK (Pvt.) Limited Unripe - - - - Sent to NEPRA for issuance of Generation License
745 10/Jul/2019 12115262810200 17 A1b(03)T 20.48 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
746 17/Jul/2019 14115162768300 9 A1b(03)T 7.7 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
747 26/Jul/2019 15115162777600 9 A1b(03)T 7.7 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
748 26/Jul/2019 24112610405513 125 A1b(03)T 29.25 Read Solar Pvt. LTD Unripe - - - - Sent to NEPRA for issuance of Generation License
749 23/Aug/2016 24113340075008 50 (A2c(06)T 70 0 Unripe - - - -Cancelled Application As Requested by Applicant
Dated 06/04/2018
750 04/Jan/2017 24115320024411 488 B2b(12)T 1260HELMUT FUGEMANN
M/s German Green Power Solution Unripe - - - -
Cancelled due to documents not provided by Applicant
after repeated reminders
751 02/Aug/2017 13115241427602 14 A1b(03)T 9Amir Mehmood
SAN Network Pvt. Ltd.Unripe - - - -
Cancelled due to documents not provided by Applicant
after repeated reminders
752 13/Apr/2016 24112520090500 1600 A2c(06)T 3Khuzaima Aslam
Creative Electronics Pvt. Ltd.Unripe - - - -
Cancelled due to documents not provided by Applicant
after repeated reminders
Page 29 of 31
![Page 30: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/30.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
753 11/Jan/201809112171178800 Old
09112731178800 New12 A1b(03) T 10.5
Sami Ullah
Premier EnergyUnripe - - - -
Cancelled due to documents not provided by Applicant
after repeated reminders
754 11/Jan/2018 15115331502080 7 A1b(03) T 6.49 Ercon Energy Unripe - - - -Cancelled due to documents not provided by Applicant
after repeated reminders
755 25/Jun/2019 24112619003400 975 B3(14)T 431.43 Premier Energy Pvt. Ltd Unripe - - - - Under Process
756 01/Jul/2019 7112520817300 10 A1b(03)T 10.56 Maxell Power Pvt. Limited Unripe - - - - Under Process
757 01/Jul/2019 13112381305091 5 A1b(03)T 4.24 HISEL Power Pakistan Pvt Ltd Unripe - - - - Under Process
758 11/Jul/2019 15115262007714 5 A1b(03)T 7.475 Sky Electric (PVT) Ltd Unripe - - - - Under Process
759 11/Jul/2019 10112610419304 12 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process
760 16/Jul/2019 12115421196700 13 A1b(03)T 13.8 Creative electronics (Pvt). Ltd Unripe - - - - Under Process
761 16/Jul/2019 10112711028136 8 A1b(03)T 4 Creative electronics (Pvt). Ltd Unripe - - - - Under Process
762 16/Jul/2019 9112210547975 9 A1b(03)T 5.28 Premier Energy Pvt. Ltd Unripe - - - - Under Process
763 17/Jul/2019 14112641343824 12 A1b(03)T 3.5 JKS Pvt. Limited Unripe - - - - Under Process
764 23/Jul/2019 46117530829603 22 A2c(06)T 14.04 Read Solar Pvt. LTD Unripe - - - - Under Process
765 23/Jul/2019 15112722243601 7 A1b(03)T 10.22 Power Highway Unripe - - - - Under Process
766 23/Jul/2019 2112210213214 30 A1b(03)T 10.4 Premier Energy Pvt. Ltd Unripe - - - - Under Process
767 23/Jul/2019 4112220140932 9 A1b(03)T 6.6 Creative electronics (Pvt). Ltd Unripe - - - - Under Process
768 25/Jul/2019 24112449001703 276 A2c(06)T 19.5 Read Solar Pvt. LTD Unripe - - - - Under Process
769 26/Jul/2019 24113169003512 320 B-2b(12)T 236.54 JKS Pvt. Limited Unripe - - - - Under Process
770 26/Jul/2019 24113169003511 490 B-2b(12)T 104 JKS Pvt. Limited Unripe - - - - Under Process
771 26/Jul/2019 9112210548917 9 A1b(03)T 10.56 Albario Engineering (PVT) Ldt. Unripe - - - - Under Process
772 26/Jul/2019 7113120269070 5 A1b(03)T 4.825 AYK (Pvt.) Limited Unripe - - - - Under Process
773 29/Jul/2019 15115421383500 10 A1b(03)T 10.4 Sky Electric (PVT) Ltd Unripe - - - - Under Process
774 29/Jul/2019 10115241140200 8 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process
775 29/Jul/2019 12115241363906 14 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process
776 29/Jul/2019 24114142641801 350 A-3(66) 85.15 Premier Energy Pvt. Ltd Unripe - - - - Under Process
777 01/Aug/2019 10112610422300 8 A1b(03)T 7 JKS Pvt. Limited Unripe - - - - Under Process
Page 30 of 31
![Page 31: PROMOTION OF NET METERING IN LESCOlesco-bills.gov.pk.iis4001.shared-servers.com/lescoadmin... · 2019-08-09 · Yes No Yes Generation (kW) No Billing Started Reason for Unripe Case](https://reader033.vdocuments.site/reader033/viewer/2022042007/5e70791cbb206b09df42614b/html5/thumbnails/31.jpg)
Yes No YesGeneration
(kW)No
Billing Started
Reason for Unripe Case
PROMOTION OF NET METERING IN LESCO
Sr.
No.
Date of
ApplicationReference No.
Sanctioned
Load /
Connected
Load (kW)
Required Load
for Net Metering
(kW)
Name of VenderUnripe
Cases
Ripe
Cases
Connections
InstalledTariff
778 01/Aug/2019 15115160058300 5 A1b(03)T 7.26 JKS Pvt. Limited Unripe - - - - Under Process
779 01/Aug/2019 15115162782500 9 A1b(03)T 5.92 JKS Pvt. Limited Unripe - - - - Under Process
780 01/Aug/2019 14112641340661 7 A1b(03)T 4.8 JKS Pvt. Limited Unripe - - - - Under Process
781 02/Aug/2019 15115241621500 8 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process
782 02/Aug/2019 4115320135619 5 A1b(03)T 7.475 Sky Electric (PVT) Ltd Unripe - - - - Under Process
783 02/Aug/2019 12115241317400 10 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process
784 02/Aug/2019 12112231199001 5 A1b(03)T 4.55 Sky Electric (PVT) Ltd Unripe - - - - Under Process
785 05/Aug/2019 1112720105200 5 A1b(03)T 4.68 Read Solar Pvt. LTD Unripe - - - - Under Process
786 05/Aug/2019 8111520815403 5 A1b(03)T 6.5 Read Solar Pvt. LTD Unripe - - - - Under Process
787 05/Aug/2019 15112182393302 7 A1b(03)T 3.25 Read Solar Pvt. LTD Unripe - - - - Under Process
788 05/Aug/2019 12115262712300 17 A1b(03)T 14.3 Power Highway Unripe - - - - Under Process
789 05/Aug/2019 14115255590700 11 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process
790 05/Aug/2019 13115421226500 9 A1b(03)T 10.075 Sky Electric (PVT) Ltd Unripe - - - - Under Process
791 05/Aug/2019 14112731826300 9 A1b(03)T 12.54 Maxell Power Pvt. Limited Unripe - - - - Under Process
792 05/Aug/2019 46112211806103 24 B1b(09)T 15.18 Maxell Power Pvt. Limited Unripe - - - - Under Process
793 05/Aug/2019 7115440985710 5 A1b(03)T 5.28 Maxell Power Pvt. Limited Unripe - - - - Under Process
794 05/Aug/2019 13115261659000 9 A1a(01) 14.9 Premier Energy Pvt. Ltd Unripe - - - - Under Process
795 05/Aug/2019 24118340002100 69 B2b(12)T 16.25 Read Solar Pvt. LTD Unripe - - - - Under Process
796 06/Aug/2019 3115260296304 5 A1b(03)T 5.28 Pantera Energy Pvt. Ltd. Unripe - - - - Under Process
797 06/Aug/2019 12115231072600 5 A1a(01) 7.15 Sky Electric (PVT) Ltd Unripe - - - - Under Process
798 06/Aug/2019 12115410856703 10 A1b(03)T 12.025 Sky Electric (PVT) Ltd Unripe - - - - Under Process
799 06/Aug/2019 11112610236200 5 A1b(03)T 5.85 Read Solar Pvt. LTD Unripe - - - - Under Process
800 06/Aug/2019 10115230883415 7 A1b(03)T 10.24 Read Solar Pvt. LTD Unripe - - - - Under Process