MICHIGAN DEPARTMENT OF TRANSPORTATION BID LETTING RESULTS LETTING OF DECEMBER 7, 2018 PROJECTS PENDING RELEASE The project call numbers listed below are pending release for contract award with a corresponding reason. A release date provided indicates the project is resolved. Update date: 01/02/2019; 2:50p.m. CALL NUMBER REASON RELEASE DATE 1812 001 UBR 01/02/2019 1812 002 UBR 01/02/2019 1811 004 UBR 12/13/2018 1812 005 UBR\10% 12/20/2018 1812 011 10% 12/13/2018-All Bids Rejected 1812 013 10% 12/20/2018 1812 015 10% 12/17/2018 1812 021 10% 12/17/2018 1812 022 UBR 12/14/2018 1812 023 10% 12/20/2018 1812 025 10% 12/20/2018 1812 026 10% 12/20/2018 1812 027 UBR 12/13/2018 1812 028 UBR 12/11/2018 1812 030 10% 12/20/2018 1812 031 10% 12/20/2018 1812 032 10% 12/20/2018 1812 033 10% 12/20/2018 1812 038 UBR 12/19/2018 1812 039 UBR\10% 12/20/2018 1812 046 10% 12/20/2018 1812 051 10% 12/20/2018 1812 052 10% 12/20/2018 UBR-Selected for Unbalanced Bid Review Scroll down to view projects released for award.

Upload: others

Post on 24-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

MICHIGAN DEPARTMENT OF TRANSPORTATION

BID LETTING RESULTS

LETTING OF DECEMBER 7, 2018

PROJECTS PENDING RELEASE

The project call numbers listed below are pending release for contract

award with a corresponding reason. A release date provided indicates

the project is resolved.

Update date: 01/02/2019; 2:50p.m.

CALL NUMBER REASON RELEASE DATE

1812 001 UBR 01/02/2019

1812 002 UBR 01/02/2019

1811 004 UBR 12/13/2018

1812 005 UBR\10% 12/20/2018

1812 011 10% 12/13/2018-All Bids Rejected

1812 013 10% 12/20/2018

1812 015 10% 12/17/2018

1812 021 10% 12/17/2018

1812 022 UBR 12/14/2018

1812 023 10% 12/20/2018

1812 025 10% 12/20/2018

1812 026 10% 12/20/2018

1812 027 UBR 12/13/2018

1812 028 UBR 12/11/2018

1812 030 10% 12/20/2018

1812 031 10% 12/20/2018

1812 032 10% 12/20/2018

1812 033 10% 12/20/2018

1812 038 UBR 12/19/2018

1812 039 UBR\10% 12/20/2018

1812 046 10% 12/20/2018

1812 051 10% 12/20/2018

1812 052 10% 12/20/2018

UBR-Selected for Unbalanced Bid Review

Scroll down to view projects released for award.

Page 2: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 001 Low Bid: $14,586,700.70

Project: ST 13082-125865 , ETC Engineer Estimate: $15,652,817.67

Local Agreement: Pct Over/Under Estimate: -6.81 %

Start Date: March 1, 2019 Completion Date: September 27, 2020

Description:

4.79 mi of hot mix asphalt overlay, reconstruct roadway to maintain underclearance, replace cable barrier and guardrail, clearing, resurface a carpool lot and pavement markings on I-94 from 6-1/2 Mile Road to M-311 (11 Mile Road), Calhoun County. This project includes a 5 year materials and workmanship pavement warranty.

5.00 % DBE participation required

Bidder As-Submitted As-Checked

Michigan Paving and Materials Company $14,586,700.70Rieth-Riley Construction Co., Inc. $16,180,002.31

Total Number of Bidders: 2

1/2/2019

SameSame

1 **2

Page 3: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 002 Low Bid: $5,697,443.59

Project: NH 11053-128059 Engineer Estimate: $6,714,488.74

Local Agreement: Pct Over/Under Estimate: -15.15 %

Start Date: September 5, 2019 Completion Date: March 22, 2020

Description:

Bridge rehabilitation including epoxy overlay, concrete curb, sidewalk and patching, mechanical, electrical, and structural steel repair on M-63 Blossomland Bascule Bridge and I-94BL Bicentennial Bascule Bridge over the St.Joseph River in the cities of Benton Harbor and St. Joseph, Berrien County. This project includes a 2 year bridgecoating warranty and a 5 year performance warranty on thin epoxy bridge deck overlay.

4.00 % DBE participation required

Bidder As-Submitted As-Checked

Milbocker and Sons, Inc. $5,697,443.59Anlaan Corporation $5,837,420.69

Total Number of Bidders: 2

01/02/2019

SameSame

1 **2

Page 4: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 003 Low Bid: $1,932,132.98

Project: ST 08052-123181 Engineer Estimate: $2,023,876.09

Local Agreement: Pct Over/Under Estimate: -4.53 %

Start Date: March 11, 2019 Completion Date: November 15, 2019

Description:

Bridge replacement with prefabricated superstructure, approach work, concrete curb, gutter, sidewalk, cofferdams, steel piles, sewer, culvert, drainage, guardrail and pavement markings on M-66 over Quaker Brook in the village of Nashville, Barry County.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Davis Construction, Inc. $1,932,132.98Nashville Construction Company $2,047,857.33Milbocker and Sons, Inc. $2,536,220.57C. A. Hull Co., Inc. $2,622,938.81Anlaan Corporation $2,713,072.32Toebe Construction LLC $2,866,595.19

Total Number of Bidders: 6

SameSameSameSameSameSame

1 **23456

Page 5: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 004 Low Bid: $11,186,834.42

Project: NH 24011-120219 Engineer Estimate: $11,484,984.80

Local Agreement: 18-5351 Pct Over/Under Estimate: -2.60 %

Start Date: February 19, 2019 Completion Date: October 1, 2021

Description:

1.27 mi of hot mix asphalt reconstruction and realignment, concrete retaining wall reconstruction, drainage, sanitary and water main reconstruction, traffic signal work, guardrail and pavement markings on US-31 from the Mitchell Street Bridge to Fairview Avenue in the city of Petoskey, Emmet County. This project includes two 5 year materials and workmanship pavement warranties.

4.00 % DBE participation required

Bidder As-Submitted As-Checked

D. J. McQuestion & Sons, Inc./J & N $11,186,834.42 Same 1 **Construction, LLCElmer's Crane and Dozer, Inc. $12,430,000.00 Same

Total Number of Bidders: 2

12/13/2018

2

Page 6: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 005 Low Bid: $10,926,062.62

Project: NH 52042-119937 , ETC Engineer Estimate: $9,683,593.92

Local Agreement: 18-5381 Pct Over/Under Estimate: 12.83 %18-5492

Start Date: 10 days after award Completion Date: June 19, 2020

Description:

0.79 mi of hot mix asphalt reconstruction includes widening, construction of roundabouts, and non-motorized shared use path, concrete pavement, curb, gutter, sidewalk and precast box culvert, earthwork, aggregate base, roadway lighting, water main, sanitary and storm sewer, signing and pavement markings on US-41 at various locations, Marquette County. This project includes a 5 year materials and workmanship pavement warranty.

2.00 % DBE participation required

Bidder As-Submitted As-Checked

Hebert Construction Co. $10,926,263.62 $10,926,062.62 1 **Bacco Construction Company $12,063,608.51 Same 2A. Lindberg & Sons, Inc. $14,509,184.03 $14,507,703.35 3

Total Number of Bidders: 3

12/20/2018

Page 7: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 006 Low Bid: $1,895,784.67

Project: IMG 41064-129569 Engineer Estimate: $1,842,617.21

Local Agreement: Pct Over/Under Estimate: 2.89 %

Start Date: April 29, 2019 Completion Date: October 25, 2019

Description:

19.70 mi of freeway sign upgrading and delineator installations along M-6 from I-196 to I-96, Ottawa and Kent Counties.

No DBE participation required

Bidder As-Submitted As-Checked

Action Traffic Maintenance, Inc. $1,895,784.67J. Ranck Electric, Inc. $2,231,268.14Highway Service Company, Inc. $2,368,617.60

Total Number of Bidders: 3

SameSameSame

1 **23

Page 8: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 007 Low Bid: $1,777,939.72

Project: HSIP 28091-132412 Engineer Estimate: $1,778,955.26

Local Agreement: 18-5085 Pct Over/Under Estimate: -0.06 %

Start Date: September 19, 2020 Completion Date: September 19, 2020

Description:

0.32 mi of roundabout construction, hot mix asphalt reconstruction, concrete curb, gutter and sidewalk, culvert, sewer, drainage, signing and pavement markings on US-131 at M-186 in the village of Fife Lake, Grand Traverse County. This project includes a 5 year materials and workmanship pavement warranty.

4.00 % DBE participation required

Bidder As-Submitted As-Checked

J & N Construction, LLC $1,777,939.72Elmer's Crane and Dozer, Inc. $1,949,999.99Rieth-Riley Construction Co., Inc. $2,109,609.71

Total Number of Bidders: 3

SameSameSame

1 **23

Page 9: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 008 Low Bid: $586,529.03

Project: MRR 78022-200399 Engineer Estimate: $566,708.71

Local Agreement: 18-5249 Pct Over/Under Estimate: 3.50 %

Start Date: April 22, 2019 Completion Date: November 1, 2021

Description:

0.10 mi of hot mix asphalt reconstruction, concrete driveway, curb, gutter and ADA ramps, lighting and pavement markings on US-12 at Michigan Southern Railroad crossing in the city of Sturgis, St. Joseph County. This project includes a 5 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Kalin Construction Co., Inc. $586,529.03 Same 1 **Peters Construction Co. $593,427.45 $593,318.60 2Hoffman Bros., Inc. $613,895.52Epic Excavating, Inc. $625,644.74Milbocker and Sons, Inc. $665,947.90Northern Construction Services, Corp. $671,580.45

Total Number of Bidders: 6

SameSameSameSame

3456

Page 10: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 009 Low Bid: $150,624.70

Project: GF19 78015-204223 Engineer Estimate: $194,828.49

Local Agreement: Pct Over/Under Estimate: -22.69 %

Start Date: July 8, 2019 Completion Date: August 28, 2019

Description:

Epoxy overlay and pavement markings on US-131 over the St. Joseph River, St. Joseph County.

No DBE participation required

Bidder As-Submitted As-Checked

RAM Construction Services of Michigan, Inc. $150,624.70Progress Company, Inc. $163,966.00Smith's Waterproofing LLC $171,252.00Fahrner Asphalt Sealers, L.L.C. $175,701.00

Total Number of Bidders: 4

SameSameSameSame

1 **234

Page 11: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 010 Low Bid: $2,161,611.47

Project: STL 44555-129918-2 , ETC Engineer Estimate: $2,169,362.40

Local Agreement: 18-5263 Pct Over/Under Estimate: -0.36 %

Start Date: 10 days after award Completion Date: September 19, 2021

Description:

0.59 mi of hot mix asphalt reconstruction, concrete curb, gutter and spillway, culvert, driveway, sidewalk and ramps, drainage, sewer, water main, streetscaping and pavement markings on Main Street from Union Street to Mulholland Drive, Lapeer County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Boddy Construction Company, Inc. $2,161,611.47DiPonio Contracting, Inc. $2,230,374.46Superior Contracting Group L.L.C. $2,242,314.80Kalin Construction Co., Inc. $2,300,225.69Angelo Iafrate Construction Company $2,371,117.97Zito Construction $2,483,957.19Crawford Contracting, Inc. $2,528,297.02Tri-City Groundbreakers, Inc. $2,702,341.00

SameSameSameSameSameSameSameSame

1 **2345678

L. A. Construction, Corp. $2,934,456.22 $2,934,385.52 9

Total Number of Bidders: 9

Page 12: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 012 Low Bid: $711,663.55

Project: TAU 23000-202535-2 Engineer Estimate: $713,526.00

Local Agreement: 18-5241 Pct Over/Under Estimate: -0.26 %

Start Date: April 15, 2019 Completion Date: July 15, 2019

Description:

2.50 mi of hot mix asphalt surfacing, aggregate base, concrete curb, gutter, culvert, drainage, bicycle lane pavement markings and guardrail for addition of bike lanes along Old Lansing Road from Lansing Road to Mt. Hope Highway, Eaton County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $711,663.55Woodhull Construction Company, Inc. $728,180.89C & D Hughes, Inc. $733,699.10C L Trucking & Excavating, LLC $750,774.29Hoffman Bros., Inc. $754,632.94Nashville Construction Company $755,695.37Malley Construction, Inc. $761,874.60Milbocker and Sons, Inc. $783,202.21Epic Excavating, Inc. $829,072.90Kamminga & Roodvoets, Inc. $926,677.65

Total Number of Bidders: 10

SameSameSameSameSameSameSameSameSameSame

1 **2345678910

Page 13: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 013 Low Bid: $531,354.15

Project: STL 48555-130384 Engineer Estimate: $477,750.00

Local Agreement: 18-5472 Pct Over/Under Estimate: 11.22 %

Start Date: 10 days after award Completion Date: September 27, 2019

Description:

1.80 mi of hot mix asphalt resurfacing with aggregate shoulders, guardrail and pavement markings on County Road 407 west of M-123, Luce County. This is a Local Agency project.

No DBE participation required

Bidder As-Submitted As-Checked

Payne & Dolan Inc. $531,354.15Bacco Construction Company $536,795.80

Total Number of Bidders: 2

12/20/2018

SameSame

1 **2

Page 14: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 014 Low Bid: $402,424.75

Project: STU 11000-130766 Engineer Estimate: $374,500.00

Local Agreement: 18-5462 Pct Over/Under Estimate: 7.46 %

Start Date: 10 days after award Completion Date: July 19, 2019

Description:

0.15 mi of hot mix asphalt cold milling and resurfacing, concrete sidewalk ramps, storm sewer, aggregate base, remove and install signal on Red Bud/River cutoff at the River Street intersection in the city of Buchanan, Berrien County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Severance Electric Co., Inc. $402,424.75Strain Electric Company $407,955.25J. Ranck Electric, Inc. $435,945.75

Total Number of Bidders: 3

SameSameSame

1 **23

Page 15: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 015 Low Bid: $333,482.21

Project: STL 74000-200505 Engineer Estimate: $267,294.83

Local Agreement: 17-5418 Pct Over/Under Estimate: 24.76 %

Start Date: May 14, 2019 Completion Date: June 30, 2019

Description:

0.53 mi of hot mix asphalt cold milling and resurfacing, drainage and pavement markings on Howard Street from Harrington Road north to the Croswell north village limits in the city of Croswell, Sanilac County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Ace-Saginaw Paving Company $333,482.21Astec Asphalt, Inc. $336,471.90Pyramid Paving and Contracting Co. $449,726.39

Total Number of Bidders: 3

12/17/2018

SameSameSame

1 **23

Page 16: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 016 Low Bid: $236,915.40

Project: STUL 80000-132351 Engineer Estimate: $249,245.00

Local Agreement: 18-5471 Pct Over/Under Estimate: -4.95 %

Start Date: 10 days after award Completion Date: May 31, 2019

Description:

0.60 mi of hot mix asphalt base crushing, shaping and resurfacing, concrete curb and gutter, trenching, aggregate shoulders, drainage and pavement markings on 72nd Avenue from M-40 to Nursery Street in the village of Lawton, Van Buren County. This is a Local Agency project.

No DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $236,915.40Michigan Paving and Materials Company $238,904.20Kamminga & Roodvoets, Inc. $273,606.00

Total Number of Bidders: 3

SameSameSame

1 **23

Page 17: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 017 Low Bid: $2,259,504.55

Project: EMRP 77000-203441 Engineer Estimate: $2,475,210.85

Local Agreement: 18-5485 Pct Over/Under Estimate: -8.71 %

Start Date: January 1, 2019 Completion Date: May 1, 2019

Description:

Bridge removal and replacement and approach work on Fisher Road over the Black River, St Clair County. This is a Local Agency project.

2.00 % DBE participation required

Bidder As-Submitted As-Checked

Davis Construction, Inc. $2,259,504.55Z Contractors, Inc. $2,495,443.10Dan's Excavating, Inc. $2,741,731.05C. A. Hull Co., Inc. $2,794,777.79Anlaan Corporation $2,894,867.90Grand River Construction, Inc. $2,999,083.67Toebe Construction LLC $3,313,876.86

Total Number of Bidders: 7

SameSameSameSameSameSameSame

1 **234567

Page 18: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 018 Low Bid: $1,215,130.00

Project: STL 64000-200527 Engineer Estimate: $1,311,836.00

Local Agreement: 18-5468 Pct Over/Under Estimate: -7.37 %

Start Date: May 6, 2019 Completion Date: June 29, 2019

Description:

2.70 mi of hot mix asphalt base crushing, shaping and resurfacing and pavement markings on Oceana Drive from Lever Road to north of Monroe Road, Oceana County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $1,215,130.00Michigan Paving and Materials Company $1,367,357.00

Total Number of Bidders: 2

SameSame

1 **2

Page 19: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 019 Low Bid: $1,217,926.42

Project: BO 38000-133156 Engineer Estimate: $1,272,034.25

Local Agreement: 18-5486 Pct Over/Under Estimate: -4.25 %

Start Date: 10 days after award Completion Date: September 13, 2019

Description:

Bridge reconstruction with a concrete precast three sided culvert, hot mix asphalt approach, steel sheet piling, earthwork and pavement markings on Moon Lake Road over the Dollar Lake Channel, Jackson County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

E.T. MacKenzie Company $1,217,926.42Nashville Construction Company $1,235,816.58J. E. Kloote Contracting, Inc. $1,257,068.12Milbocker and Sons, Inc. $1,281,153.36Davis Construction, Inc. $1,344,252.32Anlaan Corporation $1,361,633.45C. A. Hull Co., Inc. $1,432,366.87

Total Number of Bidders: 7

SameSameSameSameSameSameSame

1 **234567

Page 20: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 020 Low Bid: $856,206.15

Project: STL 74555-119026-2 Engineer Estimate: $827,587.78

Local Agreement: 18-5342 Pct Over/Under Estimate: 3.46 %

Start Date: 10 days after award Completion Date: July 3, 2019

Description:

6.54 mi of hot mix asphalt overlay, aggregate shoulders and pavement markings on Ruth Road from M-46 north to the Deckerville south village limits, Sanilac County. This is a Local Agency project.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Pyramid Paving and Contracting Co. $856,206.15Ace-Saginaw Paving Company $876,823.42

Total Number of Bidders: 2

SameSame

1 **2

Page 21: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 021 Low Bid: $199,195.50

Project: STL 15555-130358 Engineer Estimate: $169,721.50

Local Agreement: 18-5444 Pct Over/Under Estimate: 17.37 %

Start Date: April 15, 2019 Completion Date: June 15, 2019

Description:

0.40 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter and ADA ramps and pavement markings on North Lake Street from State Street to south of Lakeview Road in the city of Boyne City, Charlevoix County. This is a Local Agency project.

No DBE participation required

Bidder As-Submitted As-Checked

Payne & Dolan Inc. $199,195.50Rieth-Riley Construction Co., Inc. $200,557.00

Total Number of Bidders: 2

12/17/2018

SameSame

1 **2

Page 22: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 022 Low Bid: $808,428.43

Project: TA 23000-201173 Engineer Estimate: $842,000.00

Local Agreement: 18-5494 Pct Over/Under Estimate: -3.99 %

Start Date: March 4, 2019 Completion Date: July 31, 2019

Description:

0.50 mi of hot mix asphalt shared use path, timber boardwalk and fabricated bridge along Old River Trail from Webster Road to Hunter's Orchard Park, Eaton County. This is a Local Agency project.

5.00 % DBE participation required

Bidder As-Submitted As-Checked

E.T. MacKenzie Company $808,428.43Nashville Construction Company $811,397.15L.J. Construction, Inc. $839,464.00Milbocker and Sons, Inc. $840,511.85Kamminga & Roodvoets, Inc. $842,343.44Davis Construction, Inc. $845,919.17Miller Development, Inc. $863,992.60Anlaan Corporation $892,644.80

Total Number of Bidders: 8

12/14/2018

SameSameSameSameSameSameSameSame

1 **2345678

Page 23: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 023 Low Bid: $3,103,828.95

Project: IM 11015-126888 Engineer Estimate: $2,606,039.00

Local Agreement: Pct Over/Under Estimate: 19.10 %

Start Date: February 4, 2019 Completion Date: August 23, 2019

Description:

Bridge rehabilitation including deck patching, epoxy overlay, deep overlay, painting bearings, concrete beam patching, substructure repair, steel beam end repair, pin and hanger replacement, thrie beam retrofit, concrete surface coating, full paint, approach work and maintaining traffic on I-94 at Glenlord Road and at Cleveland Avenue, Berrien County. This project includes a 2 year bridge painting warranty and a 2 year concrete surface coating warranty.

2.00 % DBE participation required

Bidder As-Submitted As-Checked

C. A. Hull Co., Inc. $3,103,828.95Davis Construction, Inc. $3,106,803.11Anlaan Corporation $3,154,270.59

SameSameSame

1 **23

Milbocker and Sons, Inc. $3,253,420.49 $3,165,420.49 4

Total Number of Bidders: 4

12/20/2018

Page 24: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 024 Low Bid: $1,737,848.29

Project: ST 71071-201114 Engineer Estimate: $1,793,147.51

Local Agreement: Pct Over/Under Estimate: -3.08 %

Start Date: May 1, 2019 Completion Date: July 12, 2019

Description:

26.07 mi of single chip seal with fog seal on US-23 and M-65 at various locations, Alcona County. This project includes a 2 year pavement performance warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Fahrner Asphalt Sealers, L.L.C. $1,737,848.29 Same 1 **Highway Maintenance and Construction $1,830,920.60 SameCompany

2

Pavement Maintenance Systems, LLC $1,861,197.30 Same

Total Number of Bidders: 3

3

Page 25: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 025 Low Bid: $1,330,827.13

Project: GF19 80013-200135 Engineer Estimate: $942,051.34

Local Agreement: Pct Over/Under Estimate: 41.27 %

Start Date: February 4, 2019 Completion Date: May 24, 2019

Description:

Bridge rehabilitation including concrete deck patching, scour protection, temporary path, substructure and beam end repairs on I-196 over abandoned railroad and Black River/Kal-Haven Trail, Van Buren County.

No DBE participation required

Bidder As-Submitted As-Checked

Milbocker and Sons, Inc. $1,330,827.13Anlaan Corporation $1,508,783.40C. A. Hull Co., Inc. $1,579,714.02

Total Number of Bidders: 3

12/20/2018

SameSameSame

1 **23

Page 26: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 026 Low Bid: $684,858.74

Project: BOI 13083-201345 Engineer Estimate: $347,560.09

Local Agreement: Pct Over/Under Estimate: 97.05 %

Start Date: July 8, 2019 Completion Date: August 30, 2019

Description:

Bridge rehabilitation including shallow polyester polymer concrete overlay, full depth deck patching, resealing joints, thrie beam retrofit and approach work on 24 Mile Road over I-94, Calhoun County.

No DBE participation required

Bidder As-Submitted As-Checked

Anlaan Corporation $684,858.74C. A. Hull Co., Inc. $719,002.37Grand River Construction, Inc. $852,438.00

Total Number of Bidders: 3

12/20/2018

SameSameSame

1 **23

Page 27: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 027 Low Bid: $4,815,844.79

Project: IM 70024-200662 Engineer Estimate: $5,216,724.47

Local Agreement: Pct Over/Under Estimate: -7.68 %

Start Date: April 15, 2019 Completion Date: June 8, 2020

Description:

3.96 mi of two course hot mix asphalt cold milling and resurfacing, concrete curb, gutter, bridge approach, culverts,drainage, guardrail, shoulder corrugations and pavement markings on I-196 from the Ottawa/Allegan county line toByron Road, Ottawa County. This project includes a 5 year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $4,815,844.79Michigan Paving and Materials Company $5,669,424.99

Total Number of Bidders: 2

12/13/2018

SameSame

1 **2

Page 28: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 028 Low Bid: $3,859,325.80

Project: ST 34044-110038 , ETC Engineer Estimate: $4,467,343.81

Local Agreement: Pct Over/Under Estimate: -13.61 %

Start Date: March 11, 2019 Completion Date: June 15, 2020

Description:

Hot mix asphalt resurfacing of existing carpool parking lot with minor widening on I-96 at Grand River Avenue in the northwest quadrant and bridge replacement on Cutler Road over I-96, Ionia County. This project includes a 2 year concrete surface coating warranty.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Davis Construction, Inc. $3,859,325.80Milbocker and Sons, Inc. $3,984,333.52Anlaan Corporation $4,097,246.53C. A. Hull Co., Inc. $4,166,021.90Toebe Construction LLC $4,247,467.64Z Contractors, Inc. $4,449,118.70Grand River Construction, Inc. $4,917,919.12

Total Number of Bidders: 7

12/11/2018

SameSameSameSameSameSameSame

1 **234567

Page 29: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 029 Low Bid: $2,312,097.82

Project: NH 67000-128719 , ETC Engineer Estimate: $2,655,266.61

Local Agreement: Pct Over/Under Estimate: -12.92 %

Start Date: July 8, 2019 Completion Date: May 2, 2020

Description:

12.28 mi of hot mix asphalt cold milling, resurfacing and pavement markings and carpool lot reconstruction on US- 131 from south of 14 Mile Road north to the White Pine Trail and at 20 Mile Road, Osceola and Wexford Counties. This project includes a 3 year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $2,312,097.82Elmer's Crane and Dozer, Inc. $2,724,084.27

Total Number of Bidders: 2

SameSame

1 **2

Page 30: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 030 Low Bid: $2,282,494.00

Project: NH 49023-119052 Engineer Estimate: $2,012,376.46

Local Agreement: Pct Over/Under Estimate: 13.42 %

Start Date: 10 days after award Completion Date: July 15, 2020

Description:

Bridge removal and replacement with 35-inch plate girder, concrete curb, gutter, approach, guardrail, drainage,

cofferdam, steel sheet piling, signage and pavement markings on US-2 over Brevort River, Mackinaw County.

No DBE participation required

Bidder As-Submitted As-Checked

Davis Construction, Inc. $2,282,494.00Hardman Construction, Inc. $2,499,056.94Anlaan Corporation $2,839,715.35

Total Number of Bidders: 3

12/20/2018

SameSameSame

1 **23

Page 31: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 031 Low Bid: $2,320,169.70

Project: GF19 25074-204083 Engineer Estimate: $1,952,913.96

Local Agreement: Pct Over/Under Estimate: 18.81 %

Start Date: June 26, 2019 Completion Date: August 24, 2019

Description:

3.68 mi of hot mix asphalt cold milling and resurfacing and joint repairs on M-54 from I-75 to Hill Road and on ramps at the M-54/I-75 interchange, Genesee County. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Ace-Saginaw Paving Company $2,320,169.70Ajax Paving Industries, Inc. $2,686,149.70Cadillac Asphalt, L.L.C. $2,869,468.25

Total Number of Bidders: 3

12/20/2018

SameSameSame

1 **23

Page 32: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 032 Low Bid: $1,229,626.56

Project: ST 72052-123189 Engineer Estimate: $916,388.08

Local Agreement: Pct Over/Under Estimate: 34.18 %

Start Date: September 3, 2019 Completion Date: October 25, 2019

Description:

0.10 mi of hot mix asphalt paving, concrete precast box culvert, tremie, railing, curb and gutter, earthwork, guardrail, cofferdams and pavement markings on M-18 over Backus Creek, Roscommon County.

2.00 % DBE participation required

Bidder As-Submitted As-Checked

Milbocker and Sons, Inc. $1,229,626.56Anlaan Corporation $1,356,686.76Elmer's Crane and Dozer, Inc. $1,396,621.21C. A. Hull Co., Inc. $1,719,829.26

Total Number of Bidders: 4

12/20/2018

SameSameSameSame

1 **234

Page 33: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 033 Low Bid: $1,154,289.36

Project: ST 54011-201126 Engineer Estimate: $916,264.30

Local Agreement: Pct Over/Under Estimate: 25.98 %

Start Date: July 8, 2019 Completion Date: 25 Working Days

Description:

14.65 mi of overband crack filling, chip sealing, single, warranty, and fog sealing on Old 131 from north of the south Mecosta county line northerly to south of 14 Mile Road, Mecosta County. This project includes a 2 year pavement performance warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Fahrner Asphalt Sealers, L.L.C. $1,154,289.36Pavement Maintenance Systems, LLC $1,221,885.91

SameSame

1 **2

Highway Maintenance and Construction $1,316,624.94 SameCompany

Total Number of Bidders: 3

12/20/2018

3

Page 34: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 034 Low Bid: $857,562.48

Project: MXE 11000-202249 Engineer Estimate: $896,161.21

Local Agreement: 18-5483 Pct Over/Under Estimate: -4.31 %

Start Date: April 15, 2019 Completion Date: May 17, 2019

Description:

2.33 mi of hot mix asphalt overlay, concrete repairs, parking lot rehabilitation, full depth widening at camp

entrance, fog seal and pavement markings in Warren Dunes State Park on State Park Road, Berrien County.

No DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $857,562.48Michigan Paving and Materials Company $916,492.11Milbocker and Sons, Inc. $929,477.42C & D Hughes, Inc. $959,228.74Kamminga & Roodvoets, Inc. $1,124,086.02

Total Number of Bidders: 5

SameSameSameSameSame

1 **2345

Page 35: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 035 Low Bid: $723,509.58

Project: GF19 25101-204029 Engineer Estimate: $821,234.82

Local Agreement: Pct Over/Under Estimate: -11.90 %

Start Date: July 15, 2019 Completion Date: August 24, 2019

Description:

0.49 mi of concrete pavement repairs on M-57 east of M-13, Genesee County.

No DBE participation required

Bidder As-Submitted As-Checked

Rigid Pavement Construction LLC $723,509.58Major Cement Co. $758,958.25Causie Contracting, Inc. $800,890.70C & D Hughes, Inc. $809,025.83Cipparrone Contracting, Inc. $825,928.25Florence Cement Company $1,049,171.75

Total Number of Bidders: 6

SameSameSameSameSameSame

1 **23456

Page 36: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 036 Low Bid: $821,474.46

Project: GF19 39042-204197 Engineer Estimate: $794,329.91

Local Agreement: Pct Over/Under Estimate: 3.42 %

Start Date: June 3, 2019 Completion Date: July 12, 2019

Description:

1.27 mi of hot mix asphalt cold milling and resurfacing, joint repairs, curb ramp opening upgrades and pavement markings on I-94BL from M-96 northwesterly to Michigan Avenue (I-94BL) in the city of Kalamazoo, Kalamazoo County.

No DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $821,474.46Michigan Paving and Materials Company $872,869.57

Total Number of Bidders: 2

SameSame

1 **2

Page 37: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 037 Low Bid: $239,205.05

Project: HSIP 09042-123963 Engineer Estimate: $249,377.69

Local Agreement: Pct Over/Under Estimate: -4.08 %

Start Date: August 12, 2019 Completion Date: September 27, 2019

Description:

0.26 mi of concrete pavement repairs and placement M-25 from North Water Street to South Catherine Street in the city of Bay City, Bay County.

No DBE participation required

Bidder As-Submitted As-Checked

Causie Contracting, Inc. $239,205.05 Same 1 **Cipparrone Contracting, Inc. $282,348.80 $280,048.80 2C & D Hughes, Inc. $289,550.80Florence Cement Company $299,415.80Major Cement Co. $308,527.42Great Lakes Contracting Solutions, LLC $368,153.05

Total Number of Bidders: 6

SameSameSameSame

3456

Page 38: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 038 Low Bid: $5,832,578.38

Project: NH 39014-200633 , ETC Engineer Estimate: $5,914,882.63

Local Agreement: Pct Over/Under Estimate: -1.39 %

Start Date: April 23, 2019 Completion Date: June 21, 2019

Description:

11.10 mi of hot mix asphalt cold milling and resurfacing, full depth joint repairs and concrete removal, aggregate shoulders, pavement markings and carpool lot resurfacing on US-131 from Milham Road north to north of M-43 and at Exit 44 in the cities of Kalamazoo and Portage, Kalamazoo County. This project includes a 3 year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $5,832,578.38Michigan Paving and Materials Company $7,025,095.65

Total Number of Bidders: 2

12/19/2018

SameSame

1 **2

Page 39: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 039 Low Bid: $5,477,801.66

Project: IM 34044-200581 Engineer Estimate: $4,866,027.81

Local Agreement: Pct Over/Under Estimate: 12.57 %

Start Date: April 28, 2019 Completion Date: October 15, 2019

Description:

9.48 mi of full depth concrete pavement repairs, spall repairs, hot mix asphalt shoulder and ramp resurfacing, bridge deck patching and joint replacement on I-96 from Sunfield Highway east to the east Ionia county line, Ionia County. This project includes a 3 year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

C & D Hughes, Inc. $5,477,801.66Cipparrone Contracting, Inc. $6,260,554.00Michigan Paving and Materials Company $6,295,404.98Florence Cement Company $6,965,270.54Major Cement Co. $7,241,206.25

Total Number of Bidders: 5

12/20/2018

SameSameSameSameSame

1 **2345

Page 40: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 040 Low Bid: $2,760,379.50

Project: M 16023-200965 Engineer Estimate: $3,240,438.18

Local Agreement: Pct Over/Under Estimate: -14.81 %

Start Date: June 17, 2019 Completion Date: September 6, 2019

Description:

18.77 mi of hot mix asphalt cold milling, resurfacing, corrugations, delineators and pavement markings on M-68 from I-75 to east of County Line Road, Cheboygan and Presque Isle Counties. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $2,760,379.50Bolen Asphalt Paving, Inc. $3,220,014.00Payne & Dolan Inc. $3,562,258.50

Total Number of Bidders: 3

SameSameSame

1 **23

Page 41: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 07, 2018

Letting Call: 1812 041 Low Bid:

Project: FM 78239-125433 Engineer Estimate:

Local Agreement: Pct Over/Under Estimate:

Start Date: April 1, 2019 Completion Date: 46 Calendar Days

Description:

Runway 9-27 Rehabilitation and Airfield Signage upgrades at the Three Rivers Municipal, Dr. Haines Airport, city of Three Rivers, St. Joseph County.

5.00 % DBE participation required

This proposal has been withdrawn.

Page 42: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 042 Low Bid: $572,043.13

Project: BO 61000-129302 , ETC Engineer Estimate: $662,491.85

Local Agreement: 18-5484 Pct Over/Under Estimate: -13.65 %

Start Date: April 1, 2019 Completion Date: July 26, 2019

Description:

Bridge rehabilitation including concrete patching, overlays, waterproofing membrane, bridge railing work, guardrail, hot mix asphalt paving and approach work on 6 structures at various locations, Muskegon County. This is a Local Agency project.

No DBE participation required

Bidder As-Submitted As-Checked

Anlaan Corporation $572,043.13C. A. Hull Co., Inc. $640,474.76Milbocker and Sons, Inc. $693,840.17Grand River Construction, Inc. $756,424.05

Total Number of Bidders: 4

SameSameSameSame

1 **234

Page 43: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 043 Low Bid: $597,860.83

Project: STL 65000-130281 Engineer Estimate: $640,806.50

Local Agreement: 18-5464 Pct Over/Under Estimate: -6.70 %

Start Date: April 15, 2019 Completion Date: July 26, 2019

Description:

0.75 mi of hot mix asphalt cold milling, base crushing, shaping, and resurfacing, concrete sidewalk ramps, water main and pavement on Fairview Road from Houghton Avenue north to State Street and on North Valley Street from Houghton Street north to State Street, Ogemaw County. This is a Local Agency project.

No DBE participation required

Bidder As-Submitted As-Checked

J & N Construction, LLC $597,860.83Bolen Asphalt Paving, Inc. $609,925.56Elmer's Crane and Dozer, Inc. $610,755.96Champagne and Marx Excavating, Inc. $732,611.79

Total Number of Bidders: 4

SameSameSameSame

1 **234

Page 44: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 044 Low Bid: $205,991.41

Project: STL 74141-129588-2 Engineer Estimate: $199,682.95

Local Agreement: 18-5358 Pct Over/Under Estimate: 3.16 %

Start Date: April 29, 2019 Completion Date: September 21, 2019

Description:

0.25 mi of hot mix asphalt base crushing, shaping and resurfacing, signing and pavement markings on Maple Valley Road from the south city limits of Brown City to the Huron & Eastern Railroad in the city of Brown City, Sanilac County. This is a Local Agency project.

No DBE participation required

Bidder As-Submitted As-Checked

Ace-Saginaw Paving Company $205,991.41T. G. Priehs, LLC $219,874.96Pyramid Paving and Contracting Co. $248,316.65

Total Number of Bidders: 3

SameSameSame

1 **23

Page 45: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 045 Low Bid: $1,051,734.04

Project: M 14051-131562 Engineer Estimate: $1,115,985.07

Local Agreement: Pct Over/Under Estimate: -5.76 %

Start Date: May 13, 2019 Completion Date: May 30, 2019

Description:

6.99 mi of hot mix asphalt cold milling and resurfacing on M-40 from Marcellus Highway north to the Cass/Van Buren county line and on M-51 from Swartwood Drive to the south village limits of Decatur in the village of Decatur, Van Buren County. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Michigan Paving and Materials Company $1,051,734.04Rieth-Riley Construction Co., Inc. $1,187,380.01

Total Number of Bidders: 2

SameSame

1 **2

Page 46: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 046 Low Bid: $2,384,726.86

Project: ST 22051-119042 Engineer Estimate: $1,600,283.16

Local Agreement: 18-5479 Pct Over/Under Estimate: 49.02 %

Start Date: 10 days after award Completion Date: September 13, 2019

Description:

Deck replacement, partial return walls replacement, substructure repair, concrete curb, gutter, riprap, structural steel repairs and painting, guardrail, approach work and pavement markings on US-8 over Menominee River, Dickinson County. This project includes a 2 year warranty on bridge coating.

No DBE participation required

Bidder As-Submitted As-Checked

Hebert Construction Co. $2,384,726.86C. A. Hull Co., Inc. $2,851,640.58

Total Number of Bidders: 2

12/20/2018

SameSame

1 **2

Page 47: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 047 Low Bid: $1,659,661.78

Project: M 37021-201355 Engineer Estimate: $1,830,515.42

Local Agreement: Pct Over/Under Estimate: -9.33 %

Start Date: July 8, 2019 Completion Date: September 13, 2019

Description:

7.89 mi of hot mix asphalt cold milling and resurfacing with guardrail upgrades on M-20 from the west Isabella County line to Gilmore Road, Isabella County. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Central Asphalt, Inc. $1,659,661.78Rieth-Riley Construction Co., Inc. $1,931,455.10

Total Number of Bidders: 2

SameSame

1 **2

Page 48: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 048 Low Bid: $268,062.61

Project: ST 39082-202704 Engineer Estimate: $278,394.65

Local Agreement: Pct Over/Under Estimate: -3.71 %

Start Date: August 5, 2019 Completion Date: October 18, 2019

Description:

Bridge rehabilitation including deck patching, crack sealing, resealing joints, waterproofing sidewalks, railing and deck, concrete, curb, gutter, sidewalk, approach work and pavement markings on M-43 (East Michigan Avenue) over the Kalamazoo River in the city of Kalamazoo, Kalamazoo County.

No DBE participation required

Bidder As-Submitted As-Checked

Anlaan Corporation $268,062.61Grand River Construction, Inc. $293,125.85Davis Construction, Inc. $321,858.20C. A. Hull Co., Inc. $334,945.91Milbocker and Sons, Inc. $358,185.22

Total Number of Bidders: 5

SameSameSameSameSame

1 **2345

Page 49: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 049 Low Bid: $1,661,043.05

Project: M 18021-201357 Engineer Estimate: $1,879,718.04

Local Agreement: Pct Over/Under Estimate: -11.63 %

Start Date: July 8, 2019 Completion Date: October 4, 2019

Description:

8.40 mi of hot mix asphalt cold milling and resurfacing, drainage and guardrail upgrades on US-10 from just west of the Clare/Osceola county line easterly to just west of Ludington Drive, Clare and Osceola Counties. This project includes a 3 year materials and workmanship pavement warranty.

No DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $1,661,043.05Central Asphalt, Inc. $1,856,899.76

Total Number of Bidders: 2

SameSame

1 **2

Page 50: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 050 Low Bid: $1,437,691.10

Project: IM 03035-128075 Engineer Estimate: $1,415,463.36

Local Agreement: Pct Over/Under Estimate: 1.57 %

Start Date: April 15, 2019 Completion Date: October 4, 2019

Description:

2.11 mi of hot mix asphalt cold milling and resurfacing, guardrail and approach reconstruction on westbound I-196 from the CXS Railroad to the Allegan/Ottawa county line in the city of Holland, Allegan County. This project includes a 5 year materials and workmanship pavement warranty.

3.00 % DBE participation required

Bidder As-Submitted As-Checked

Rieth-Riley Construction Co., Inc. $1,437,691.10Michigan Paving and Materials Company $1,557,431.37

Total Number of Bidders: 2

SameSame

1 **2

Page 51: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 051 Low Bid: $1,526,303.84

Project: NH 47082-132608 Engineer Estimate: $1,334,300.47

Local Agreement: Pct Over/Under Estimate: 14.39 %

Start Date: July 8, 2019 Completion Date: October 15, 2019

Description:

4.28 mi of single chip and fog seal, micro-surfacing, concrete curb, gutter, sidewalk and ramp upgrades and pavement markings on M-59 from I-96 to the east city limits of Howell in the city of Howell, Livingston County. This project includes a 2 year pavement performance warranty.

No DBE participation required

Bidder As-Submitted As-Checked

American Pavements, Inc. $1,526,303.84Pavement Maintenance Systems, LLC $1,798,707.00Fahrner Asphalt Sealers, L.L.C. $2,107,480.56Strawser Construction Inc. $2,523,560.00

Total Number of Bidders: 4

12/20/2018

SameSameSameSame

1 **234

Page 52: PROJECTS PENDING RELEASE - mdotjboss.state.mi.us · 12/7/2018  · 0 .1 0 m i o f h o t m ix a sp h a lt re co n stru ctio n , co n cre te d rive w a y, cu rb , gutter and ADA ramps,

Letting of December 7, 2018

Letting Call: 1812 052 Low Bid: $1,066,194.68

Project: M 83033-203001 Engineer Estimate: $958,763.36

Local Agreement: Pct Over/Under Estimate: 11.21 %

Start Date: August 12, 2019 Completion Date: November 2, 2019

Description:

Rehabilitation of 2 structures including backwall replacement, concrete curb, gutter, culvert downspout, approach work, drainage, guardrail, expansion joint, temporary steel sheet piling and pavement markings on US-131 at Boon Road and Old US-131, Wexford County.

No DBE participation required

Bidder As-Submitted As-Checked

Milbocker and Sons, Inc. $1,066,194.68Davis Construction, Inc. $1,148,782.70Anlaan Corporation $1,154,728.88Grand River Construction, Inc. $1,197,610.76Hardman Construction, Inc. $1,253,321.28C. A. Hull Co., Inc. $1,377,133.17

Total Number of Bidders: 6

12/20/2018

SameSameSameSameSameSame