CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT Project Update Peter Blake, GCP Transport Director

Upload: others

Post on 29-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

CAMBOURNE TO CAMBRIDGE

BETTER PUBLIC TRANSPORT PROJECT

Project Update

Peter Blake, GCP Transport Director

Page 2: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Project Update

• Extensive work to develop the Cambourne to Cambridge scheme - 3 public consultations

• Since the Local Liaison Forum in November 2018:

o Consultation on Phase 2 - Madingley Mulch roundabout to Cambourne, including over 30 public

events, speaking with over 800 residents

o Workshops with the LLF Technical Group, on the following subjects

• Modelling

• Wider Economic Impacts

• Environmental Scoring and Mitigation – two workshops held;

• Madingley Hill ‘Quick Wins’ – two workshops held;

• Northern Route – two workshops held

• Non Motorised Access and Landscape and Ecology Working Groups to inform the scheme design

• Publication of technical notes in response to stakeholder feedback to -

• Explore ‘quick-win’ options along Madingley Hill. Viable projects avoid land take and significant

environmental impact and minimise input from, or impact on, third parties, restricting options to a

short section of public transport lane, extension of cycling improvements and review of signal

timings.

• Provide further clarification on why a northern alignment via Girton was previously discounted.

Technical papers available on the LLF Cambourne to Cambridge section on the GCP website.

Page 3: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Project Update

• Work is ongoing; in particular around environmental and mitigation issues

• Continued dialogue with LLF and further Tech Group workshops

• Continuing stakeholder engagement - meetings and council and community

presentations

• A further LLF meeting in the Autumn in advance of an Outline Business

Case being presented to the GCP Executive Board for decision on a

preferred scheme

Page 4: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

CAMBOURNE TO CAMBRIDGE

BETTER PUBLIC TRANSPORT PROJECT

Phase 2 Consultation Findings

Mike Soper, Research Team Manager

Page 5: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

• 968 responses, drawn mainly from the A428 Corridor

• 32% from Cambourne and further west.

• 31% from Coton to Caldecote (see map below)

Response

Page 6: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Demographics

1%

3%

11%

19%

22%

17%

17%

7%

3%

0% 5% 10% 15% 20% 25%

Under 15

15-24

25-34

35-44

45-54

55-64

65-74

75 and above

Prefer not to say

4%

57%

9%

3%

1%

25%

3%

1%

0% 10% 20% 30% 40% 50% 60% 70%

In education

Employed

Self-employed

A home-based worker

A stay at home parent, carer or similar

Retired

Prefer not to say

Other

Economic Status

Age Range

Yes, 5%

No, 91%

Prefer not to say, 4%

Disability

Page 7: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Stakeholders

• 35 written submissions (in addition to on-going engagement).

Abbotsley Parish Council Barton Parish Council Bourn Parish Council British Horse Society Cambridge Connect Cambridge Local Access Forum Cambridge Past, Present & Future Caxton Parish Council CB3 Ltd CBAG Cllr Gavin Clayton Cllr Markus Gehring Comberton Parish Council Coton Parish Council Coton View Countryside Properties (UK) Ltd Dry Drayton Parish Council East Anglian Haulage Ltd / Madingley Mulch / Madmix

Great Gransden Parish Council Hardwick Parish Council Heidi Allen, MP Hill Residential Ltd and Chivers Farms (Hardington) LLP Historic England K4One Consulting National Trust Natural England Omobono Ltd Paragon Land and Estates Ltd Pigeon Investment Management Ltd Road Haulage Association Save Coton Corridor Save the West Fields Smarter Cambridge Transport Toft Parish Council Wildlife Trust

Stake holder response list (summarised in the report)

Page 8: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Preferred link between Madingley Mulch roundabout and Bourn

Airfield

Option 1: Off-road, 48%

Option 2: On-road with junction improvements, 19%

Option 3: On-road with public transport priority lanes, 21%

Don't know, 4%

None of the above, 9%

Page 9: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Park and Ride location preference

Option A - Scotland Farm, 63%

Option B - Waterworks, 17%

Neither site, 8%

No preference, 12%

Page 10: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Importance of walking, cycling and equestrian routes

59% 21% 10% 6% 4%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Very important Quite important Neutral Not very important Not at all important

Page 11: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

CAMBOURNE TO CAMBRIDGE

BETTER PUBLIC TRANSPORT PROJECT

Environment & Landscape

James Montgomery

Mott McDonald

Page 12: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Openness Screening/Integration

Left hand represents open area treatment Right hand represents treatment with screening

Discussion on mitigation

Indicative general route design optionsRoad surfacing is under discussion -determined by vehicle and guidance type

Page 13: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Illustrative sketch only

Not for scaling purposes

Discussion on mitigation

Broadway to Sterling Way

Page 14: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Illustrative sketch only

Not for scaling purposes

Discussion on mitigation

St Neots Road – Option 1

Page 15: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Illustrative sketch only

Not for scaling purposes

Discussion on mitigation

St Neots Road – Option 2

Page 16: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Illustrative sketch only

Not for scaling purposes

Discussion on mitigation

St Neots Road – Option 3

Page 17: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Madingley Rise Options

1. Screen route or leave open as shown here

2. Increase hedge planting down from Madingley Road towards Coton (red arrow)

Discussion on mitigation

Page 18: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Route Alignment Options - Coton Orchard and west of Cambridge Road:

Discussion on mitigation

Page 19: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

St Neots Road

This distance is open for discussion –

could be between 12m and 40m

Illustrative sketch onlyNot for scaling purposes

Discussion on mitigation

Cambridge Road @ Coton

Page 20: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Environment and landscape

Key environmental issues

• Internationally and Nationally significant – American Cemetery

• Nationally significant – Madingley Wood SSSI

• Listed buildings (St Peters Church, and 17 other lower grade structures in proximity to off-route

alignment)

• Landscape impacts of construction and during operation (views from Red Meadow Hill, for

example)

• Potential for buried archaeology in West Fields, Waterworks and Scotland Farm

• Local wildlife sites (West Cambridge/M11 area)

• Coton Orchard (habitat and commercial activity)

• Noise concerns around St Neots Road (Waterworks to Scotland Farm area), Coton and Rifle

Range Road

• TPO trees

• Flood risk around Bin Brook

• Some protected species – mobile and variable along the route

Page 21: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

Environment and landscape

Community drop-in sessions at Hardwick Primary School

We are holding two community drop-in sessions at Hardwick Primary School,

Thursday 11th July, 5pm-8pm

Saturday 13th July from 10.30am-1.30pm.

This will be an opportunity to see proposed features to protect and potentially enhance

biodiversity, ask questions of the project team and share views.

Page 22: Project Update - citydeal-live.storage.googleapis.com...PowerPoint Presentation Author: Bik, Alison C Created Date: 6/14/2019 8:59:52 AM

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT