PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015 Florida Department of TRANSPORTATION Florida Department of Transportation

Upload: lesley-stephens

Post on 19-Jan-2016

221 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

PROJECT SCOPE OVERVIEW

SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley

StFPN 436491-1-32-01

PRESENTER:LIYANAGE INDIKE RATNAYAKE

SEPTEMBER 04, 2015

Florida Department ofTRANSPORTATION

Florida Department of Transportation

Page 2: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Preserve existing pavement and improve ride quality through Milling and Resurfacing• Enhance Safety and Mobility of the project corridor while

accommodating all modes of transportation• Minimize inconvenience to travelling public • Achieve efficient design through application of Practical

Design Guidelines

PROJECT INFORMATION

Florida Department of Transportation

Project Objectives

Page 3: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Milling and Resurfacing• Work Types

• 3.1- Minor Highway Design• 4.1.1 – Miscellaneous Structures• 6.3.1 – ITS Analysis & Design • 7.1 – Signing and Pavement Marking• 7.3 - Signalization

• Total project length: 0.580 Miles• From MP 0.010 (west radius return of Nebraska Ave) to 0.590

(east radius return of Ashley St)• Ties into project FPID 434841-1 (in-house, March 2017 Letting)

PROJECT INFORMATION

Florida Department of Transportation

Project Overview

Page 4: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Current Design Schedule: 18 Months• Letting Date: 12/26/2017• Funded for Design and Construction (Federal)• Some Improvements under Federal Safety Funds• Current PPR Estimate: $ 742,472.00• Designated as BDI (Business Development Initiative) for design

PROJECT INFORMATION

Florida Department of Transportation

Project Overview

Page 5: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

END PROJECT

BEGIN PROJECT

PROJECT INFORMATION

Florida Department of Transportation

Project Location

Page 6: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Urban multi-lane, One-way, variable width, curb and gutter with parking • Sidewalks on both sides• No designated Bike Lanes• Mid-block crosswalks• Several signalized intersections• Patterned pavements and sidewalks• Granite curbs• Access Management Classification: 7

PROJECT INFORMATION

Florida Department of Transportation

Existing Conditions

Page 7: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

Traffic Data

PROJECT INFORMATION

Florida Department of Transportation

Page 8: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

Pavement Data

• Base Materials: Limerock, shell, concrete, and brick.• Average asphalt thickness: 4.5 inches (2.9 inches minimum

and 4.5 inches maximum)• Pavement Condition Survey results:

PROJECT INFORMATION

Florida Department of Transportation

Page 9: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

PROJECT INFORMATION

Florida Department of Transportation

Typical Section

Page 10: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

Crash Data• Total 24 crashes

between 2011 and 2013• No Fatalities• 30% Injury Crashes • No Pedestrian and

Bicyclist crashes

PROJECT INFORMATION

Florida Department of Transportation

Page 11: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Milling and Resurfacing• Cross slope corrections• ADA improvements to sidewalks and curb ramps• Address Sight Distance issues at intersections

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Roadway

Page 12: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Bulb-outs at Signalized Intersections• Enhance pedestrian safety • Tampa St, Franklin St, Florida Ave, Marion St, Morgan St, Pierce

St• Drainage and utility impacts

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Roadway

Parking

SidewalkCurb Ramps

X-Walks

Page 13: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Improvements at Lee Roy Selmon Expressway Off Ramp• Existing flexible delineators damaged by vehicles crossing over• Alternative Analysis to make recommendations

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Roadway

Page 14: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• No major flooding complaints• Minor Drainage improvements as needed• Address ponding along walkways and curb returns• Potential impacts due to proposed bulb-outs

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Drainage

Page 15: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Deficiencies in Bicyclist Accommodations• Deficiencies in Cross Slope• Deficiencies in Gutter Grade

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Anticipated Variations & Exceptions

Page 16: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Project located in Downtown Tampa• Several stakeholders

• City of Tampa, Hillsborough County, HART, several UOA’s, Several Businesses

• Community Awareness Plan• Project Fact sheet, Project

Brochure, Elected Official Notifications

• Design Open House

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Public Involvement

Page 17: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• High pedestrian volumes• Major Transit Route• Consideration to Special Events

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Temporary Traffic Control Plan

Page 18: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Update S&M throughout the corridor including parking areas and bus stops• Update signal clearance

timings• Overhead sign panel

modifications

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Signing and Markings/Signalization

Page 19: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Upgrade signing for mid-block crossings • Advance warning signs including RRFB’s

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Signing and Markings/Signalization

Page 20: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Upgrade signing and markings on Lee Roy Selmon Expressway off Ramp• Wrong Way Traffic Control features• Speed Feedback Signs

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Signing and Markings/Signalization

Page 21: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Coordination with several UAO’s • Fiberlight LLC, Deltacom, FPL Fibernet LLC, Verizon,

Hillsborough County ITS, Hillsborough County Clerck of Circuit CO, Hillsborough County Traffic Service, Level 3 Communications LLC, MCI, TECO Peoples Gas, City of Tampa Water Department, City of Tampa Transportation, City of Tampa Water (Sewer), Tampa Electric Company, Bright House Networks, Sprint Nextel, XO Communications.

• FDOT and COT ITS (Fiber Optic Cables) in the vicinity• No ITS work anticipated (Optional Services if needed)

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Utilities

Page 22: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Minor structures involvement• Overhead sign structure evaluation

PROPOSED SCOPE OF WORK

Florida Department of Transportation

Structures

• Provided by the Department

Surveying & Mapping, SUE, Geotechnical

Page 23: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Project information available in Department’s Publicly-Accessible websites

• DRAFT Scope: ftp://ftp.dot.state.fl.us/LTS/D7/Procurement/PSU/Scopes/Drafts/

• Project Intelligence:ftp://ftp.dot.state.fl.us/LTS/D7/Development/ProjMgmt/ProjectIntelligence/

OTHER INFORMATION

Florida Department of Transportation

Page 24: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• FDOT Project Manager: Liyanage “Indike” Ratnayake• FDOT Technical Review Committee Members:• Rochelle Garrett• Daniel Lauricello• Lilliam Escalera

• Professional Services Contract Administrator• Nikitra King

OTHER INFORMATION

Florida Department of Transportation

Page 25: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

• Selection Procedure• Letter of Response and Interview

• Important Dates• Marketing Meeting Date: September 08th, 2015; 08:30 AM to 12:00PM• Advertisement Date: 14SEP2015• Longlist (TRC) Date: 19OCT2015• Shortlist Selection Date: 27OCT2015 • TRC Meeting Date: 19NOV2015• Final Selection Meeting Date: 08DEC2015 • 1st Negotiations Meeting Date: 21DEC2015

OTHER INFORMATION

Florida Department of Transportation

Page 26: PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN 436491-1-32-01 PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015

THANK YOU!

QUESTIONS???

Florida Department ofTRANSPORTATION