PROJECT SCOPE OVERVIEW
SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley
StFPN 436491-1-32-01
PRESENTER:LIYANAGE INDIKE RATNAYAKE
SEPTEMBER 04, 2015
Florida Department ofTRANSPORTATION
Florida Department of Transportation
• Preserve existing pavement and improve ride quality through Milling and Resurfacing• Enhance Safety and Mobility of the project corridor while
accommodating all modes of transportation• Minimize inconvenience to travelling public • Achieve efficient design through application of Practical
Design Guidelines
PROJECT INFORMATION
Florida Department of Transportation
Project Objectives
• Milling and Resurfacing• Work Types
• 3.1- Minor Highway Design• 4.1.1 – Miscellaneous Structures• 6.3.1 – ITS Analysis & Design • 7.1 – Signing and Pavement Marking• 7.3 - Signalization
• Total project length: 0.580 Miles• From MP 0.010 (west radius return of Nebraska Ave) to 0.590
(east radius return of Ashley St)• Ties into project FPID 434841-1 (in-house, March 2017 Letting)
PROJECT INFORMATION
Florida Department of Transportation
Project Overview
• Current Design Schedule: 18 Months• Letting Date: 12/26/2017• Funded for Design and Construction (Federal)• Some Improvements under Federal Safety Funds• Current PPR Estimate: $ 742,472.00• Designated as BDI (Business Development Initiative) for design
PROJECT INFORMATION
Florida Department of Transportation
Project Overview
END PROJECT
BEGIN PROJECT
PROJECT INFORMATION
Florida Department of Transportation
Project Location
• Urban multi-lane, One-way, variable width, curb and gutter with parking • Sidewalks on both sides• No designated Bike Lanes• Mid-block crosswalks• Several signalized intersections• Patterned pavements and sidewalks• Granite curbs• Access Management Classification: 7
PROJECT INFORMATION
Florida Department of Transportation
Existing Conditions
Traffic Data
PROJECT INFORMATION
Florida Department of Transportation
Pavement Data
• Base Materials: Limerock, shell, concrete, and brick.• Average asphalt thickness: 4.5 inches (2.9 inches minimum
and 4.5 inches maximum)• Pavement Condition Survey results:
PROJECT INFORMATION
Florida Department of Transportation
PROJECT INFORMATION
Florida Department of Transportation
Typical Section
Crash Data• Total 24 crashes
between 2011 and 2013• No Fatalities• 30% Injury Crashes • No Pedestrian and
Bicyclist crashes
PROJECT INFORMATION
Florida Department of Transportation
• Milling and Resurfacing• Cross slope corrections• ADA improvements to sidewalks and curb ramps• Address Sight Distance issues at intersections
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Roadway
• Bulb-outs at Signalized Intersections• Enhance pedestrian safety • Tampa St, Franklin St, Florida Ave, Marion St, Morgan St, Pierce
St• Drainage and utility impacts
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Roadway
Parking
SidewalkCurb Ramps
X-Walks
• Improvements at Lee Roy Selmon Expressway Off Ramp• Existing flexible delineators damaged by vehicles crossing over• Alternative Analysis to make recommendations
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Roadway
• No major flooding complaints• Minor Drainage improvements as needed• Address ponding along walkways and curb returns• Potential impacts due to proposed bulb-outs
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Drainage
• Deficiencies in Bicyclist Accommodations• Deficiencies in Cross Slope• Deficiencies in Gutter Grade
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Anticipated Variations & Exceptions
• Project located in Downtown Tampa• Several stakeholders
• City of Tampa, Hillsborough County, HART, several UOA’s, Several Businesses
• Community Awareness Plan• Project Fact sheet, Project
Brochure, Elected Official Notifications
• Design Open House
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Public Involvement
• High pedestrian volumes• Major Transit Route• Consideration to Special Events
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Temporary Traffic Control Plan
• Update S&M throughout the corridor including parking areas and bus stops• Update signal clearance
timings• Overhead sign panel
modifications
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Signing and Markings/Signalization
• Upgrade signing for mid-block crossings • Advance warning signs including RRFB’s
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Signing and Markings/Signalization
• Upgrade signing and markings on Lee Roy Selmon Expressway off Ramp• Wrong Way Traffic Control features• Speed Feedback Signs
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Signing and Markings/Signalization
• Coordination with several UAO’s • Fiberlight LLC, Deltacom, FPL Fibernet LLC, Verizon,
Hillsborough County ITS, Hillsborough County Clerck of Circuit CO, Hillsborough County Traffic Service, Level 3 Communications LLC, MCI, TECO Peoples Gas, City of Tampa Water Department, City of Tampa Transportation, City of Tampa Water (Sewer), Tampa Electric Company, Bright House Networks, Sprint Nextel, XO Communications.
• FDOT and COT ITS (Fiber Optic Cables) in the vicinity• No ITS work anticipated (Optional Services if needed)
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Utilities
• Minor structures involvement• Overhead sign structure evaluation
PROPOSED SCOPE OF WORK
Florida Department of Transportation
Structures
• Provided by the Department
Surveying & Mapping, SUE, Geotechnical
• Project information available in Department’s Publicly-Accessible websites
• DRAFT Scope: ftp://ftp.dot.state.fl.us/LTS/D7/Procurement/PSU/Scopes/Drafts/
• Project Intelligence:ftp://ftp.dot.state.fl.us/LTS/D7/Development/ProjMgmt/ProjectIntelligence/
OTHER INFORMATION
Florida Department of Transportation
• FDOT Project Manager: Liyanage “Indike” Ratnayake• FDOT Technical Review Committee Members:• Rochelle Garrett• Daniel Lauricello• Lilliam Escalera
• Professional Services Contract Administrator• Nikitra King
OTHER INFORMATION
Florida Department of Transportation
• Selection Procedure• Letter of Response and Interview
• Important Dates• Marketing Meeting Date: September 08th, 2015; 08:30 AM to 12:00PM• Advertisement Date: 14SEP2015• Longlist (TRC) Date: 19OCT2015• Shortlist Selection Date: 27OCT2015 • TRC Meeting Date: 19NOV2015• Final Selection Meeting Date: 08DEC2015 • 1st Negotiations Meeting Date: 21DEC2015
OTHER INFORMATION
Florida Department of Transportation
THANK YOU!
QUESTIONS???