![Page 2: Project Resources Building Capacity To Achieve Enduring Conservation Results](https://reader036.vdocuments.site/reader036/viewer/2022082711/56649f095503460f94c1dff6/html5/thumbnails/2.jpg)
• Hypothesis: to achieve our objectives and
maintain results over time...
Build capacity = abate threats & conserve targets
• This scale is a “work in progress” over the last 10
years
• Once again -- key resource factors
Key Points to Introduce This Step
![Page 3: Project Resources Building Capacity To Achieve Enduring Conservation Results](https://reader036.vdocuments.site/reader036/viewer/2022082711/56649f095503460f94c1dff6/html5/thumbnails/3.jpg)
• The factors should be considered relative to what is
needed to implement the conservation strategies
and achieve the objectives
• “Unified field theory” --these factors apply for projects at all scales worldwide
• The job is never “done”
Key Points to Introduce This Step
![Page 4: Project Resources Building Capacity To Achieve Enduring Conservation Results](https://reader036.vdocuments.site/reader036/viewer/2022082711/56649f095503460f94c1dff6/html5/thumbnails/4.jpg)
Common Issues & Recommendations
• Does “Legal Framework for Conservation” mean that the necessary policies are actually in place?– No… it means the basic framework exists for developing
or enhancing the necessary policies -- e.g. the local government has authority to enact zoning ordinances
• What if my ranking for a factor is somewhere in between “High” and “Medium,” for example?– Don’t worry about precision in these rankings; the
assessment & discussion are more important than the score
![Page 5: Project Resources Building Capacity To Achieve Enduring Conservation Results](https://reader036.vdocuments.site/reader036/viewer/2022082711/56649f095503460f94c1dff6/html5/thumbnails/5.jpg)
Common Issues & Recommendations
• The benchmarks for “High” sometimes seem too low -- shouldn’t we do better?– The benchmarks were designed for global
application, so they may seem “generous” for some U.S. projects
• Any successful multi-institution partnerships?– Yes, the Malpai Borderlands Group, Gulf
Coastal Plain Ecosystem Partnership, Gondwana Link, among others
![Page 6: Project Resources Building Capacity To Achieve Enduring Conservation Results](https://reader036.vdocuments.site/reader036/viewer/2022082711/56649f095503460f94c1dff6/html5/thumbnails/6.jpg)
Helpful Hints
Show multiple team capacity scores concurrently & have general discussion among project teams
Project 1 Project 2 Project 3 Project 4 Project 5
Staff Leadership Low High High Very High Low
Multidisciplinary Team Medium High High Very High Medium
Institutional Leadership Medium High Very High Very High Medium
Funding Low Medium Medium High Medium
Legal Framework for Conservation Medium Medium High High High
Community & Constituency Support Medium Medium High High Medium
![Page 7: Project Resources Building Capacity To Achieve Enduring Conservation Results](https://reader036.vdocuments.site/reader036/viewer/2022082711/56649f095503460f94c1dff6/html5/thumbnails/7.jpg)
• Provide time for teams to develop & discuss capacity-building strategies
– Use same approach to develop capacity strategies as conservation strategies
• Objectives, strategic actions, action steps
– Make sure objectives are measurable
– Suggest they work first on a challenging resource
factor