project references - fabrication
DESCRIPTION
Customer: FMC Technologies Project: Stjerne Fast Track Project Operator: Statoil, North Sea Delivery: 2011/2012 Weight: 350 t Description: Fabrication and delivery of integrated template structure and manifold Customer: FMC Technologies Project: Vigdis NE Fast Track Project Operator: Statoil, North Sea Delivery: 2011/2012 Weight: 350 t Description: Fabrication and delivery of integrated template structure and manifold Job References Project References - Fabrication Page: 1 of 21TRANSCRIPT
Project References - Fabrication Page: 1 of 21
Job References
Project References Fabrication Customer: FMC Technologies Project: Vigdis NE Fast Track Project Operator: Statoil, North Sea Delivery: 2011/2012 Weight: 350 t Description: Fabrication and delivery of integrated template
structure and manifold
Customer: FMC Technologies Project: Stjerne Fast Track Project Operator: Statoil, North Sea Delivery: 2011/2012 Weight: 350 t Description: Fabrication and delivery of integrated template
structure and manifold
Customer: FMC Technologies Project: Hyme Fast Track Project Operator: Statoil Delivery: 2011/2012 Weight: 350 t Description: Fabrication and delivery of integrated template
structure and manifold
Customer: FMC Technologies Project: Visund Sør Fast Track Project Operator: Statoil, North Sea Delivery: 2010/2011 Weight: 350 t Description: Fabrication and delivery of integrated template
structure and manifold
Project References - Fabrication Page: 2 of 21
Job References
Customer: FMC Technologies Project: Kirinskoye Operator: Gasprom, Russia Delivery: 2011 Weight: 410 t Description: Fabrication and delivery of foundation base
structure, manifold and two off protection structures
Customer: FMC Technologies Project: Girri Project Operator: Total, Angola Delivery: 2011 Weight: 100 t Description: Fabrication and delivery of one off manifold,
prefab items for Angolan fabricator and 5 off well jumpers
Customer: FMC Technologies Project: Gullfaks PS Operator: Statoil, North Sea Delivery: 2011 Weight: 100 t Description: EPC – 1 off protection structure
Customer: FMC Technologies Project: Marulk Operator: Statoil, North Sea Delivery: 2010 Weight: 340 t Description: Fabrication and delivery of integrated template
structure and manifold
Customer: FMC Technologies Project: OKONO Operator: Eni, Nigeria Delivery: 2010 Weight: 50 t Description: Fabrication and delivery of 4 off UTA
Project References - Fabrication Page: 3 of 21
Job References
Customer: FMC Technologies Project: GERM Operator: BP Angola Delivery: 2010 Weight: 15 t Description: Fabrication and delivery of pig launcher and pig
receiver.
Customer: FMC Technologies Project: Pazflor Separation Unit (SSU) Operator: Total Angola Delivery: 2010 Weight: 2400 t Description: Delivery of 3 off world’s first gas subsea
separation systems each consisting of : 1 off Intermediate Frame 1 off Separator Module 1 off Manifold Module 1 off Inlet Module 2 off Pump Modules
Customer: FMC Technologies Project: Pazflor Distribution Units Operator: Total Angola Delivery: 2010 Weight: 550 t Description: 1 off SIV Module
3 off UDM modules 2 off UCM Modules 6 off UTP Modules
Customer: FMC Technologies Project: Troll B Gas Injection Operator: Statoil Delivery: 2010 Weight: 450 t Description: 2 off Flow Modules
2 off Integrated Satellite Structures
Project References - Fabrication Page: 4 of 21
Job References
Customer: FMC Technologies Project: Norne M Operator: Statoil Delivery: 2009 Weight: 450 t Description: 2 off Host Systems
2 off Integrated Satellite Structures
Customer: FMC Technologies Project: Pluto Project, Australia Operator: Woodside Delivery: 2009 Weight: 750 t Description: 1 off Production Manifold Module
1 off Pigging Module 2 off Manifold Support Structures 2 off Closed Caisson Foundations 7 off Utility Termination Assemblies 3 off MEG PLETS 2 off Field Termination Assemblies 6 off 8” Multibore spool kits 2 off 14” Single bore spool kits 2 off 20 “ Single Bore Spools
Customer: FMC Technologies Project: Enfield II Project, Australia Operator: Woodside Delivery: 2008-2009 Weight: 150 t Description: 1 off Production Manifold Module
1 off Manifold Support Structure
Project References - Fabrication Page: 5 of 21
Job References
Customer: Technip Norway Project: GJØA Riser Bases Operator: StatoilHydro Delivery: 2009 Weight: 650 t Description: 1 Gas Export Riser Base (incl pig receiver)
1 Gas Export Plem Flags (incl pig launcher) 1 Gas Export Future Tie-in Valve Structure 1 Oil Export Riser Base 1 Gas Infield Riser Base 1 Oil Infield Riser Base 1 Vega Riser Base
Customer: FMC Technologies Project: Ekofisk Project Operator: ConocoPhillips Delivery: 2009 (sail away date) Weight: 350 t Description: 2 off Manifold Modules
2 off HOST Systems 1 off Protection Structure Site Integration Testing and Load Out
Customer: FMC Technologies Project: Vega Project Operator: StatoilHydro Delivery: 2009 (sail away date) Weight: 1750 t Description: 3 off Manifold Modules
3 off Integrated Template Systems 4 off Flow Module Site Integration Testing and Load Out
Customer: FMC Technologies Project: Ormen Lange Subsea Phase II Operator: StatoilHydro Contr. Value: 130 MNOK Delivery: 2009 Weight: 1500 t Overall size: 44 x 32 x 14 m (L x W x H) Description: 1 off Manifold System
1 off Template Systems 4 off PLEM units 2 off MEG PLET units Site Integration Testing and Load Out
Project References - Fabrication Page: 6 of 21
Job References
Customer: FMC Technologies Project: Troll O2 Project Operator: StatoilHydro Delivery: 2009 Weight: 500 t Description: Customer: FMC Technologies
1 off Integrated Template System 1off Manifold Module 1 off Pig Loop Module Site Integration Testing and Load Out
Customer: FMC Technologies Project: GJØA Project Operator: StatoilHydro Contr. Value: 130 MNOK Delivery: 2008 Weight: 2000 t Description: 4 off Manifold Modules
4 off Integrated Template Systems 1 off Flowbase 1 off Integrated Satellite System Site Integration Testing and Load Out
Customer: M-I Epcon Project: EPCON skids
(4 off – various projects ) Contract: EPC contracts Delivery: 2006-2008 (sail away date) Weight: 100 t Description: Produced Water Treatment System
Customer: FMC Technologies Project: Tyrihans Project Operator: StatoilHydro Contr. Value: 130 MNOK Delivery: 2008 Weight: 2000 t Description: 5 off Integrated Template Systems
5 off Manifold Modules Site Integration Testing and Load Out
Customer: Aker Kvaerner Subsea Project: Tyrihans SRSWI Project Operator: StatoilHydro Delivery: 2008 Weight: 150 t Description: 1 off Pump, Trafo and Manifold Module
Site Integration Testing and Load Out
Project References - Fabrication Page: 7 of 21
Job References
Customer: FMC Technologies Project: Yttergryta Project Operator: StatoilHydro Delivery: 2008 Weight: 370 t Description: 1 off Flow Base
1 off PLEM 1 off Satellite Structure
Customer: FMC Technologies Project: Sigrid Project Operator: StatoilHydro Delivery: 2008 Weight: 40 t Description: 1 off Flow Base
Customer: FMC Technologies Project: Alve Project, Norway Operator: Statoil Delivery: 2007 Weight: 100 t Description: 1 off Fixed HOST
Customer: FMC Technologies Project: Moho Well Jumpers, Angola Operator: Total Delivery: 2007 Description: 10 off Multibore Well Jumper Kits
EPC of Lifting Arrangement
Customer: Aker Kvaerner Subsea Project: BP King Pump Project Operator: BP Delivery: 2007 Weight: 150 t Description: 2 off Manifolds
3 off Pump Structures
Project References - Fabrication Page: 8 of 21
Job References
Customer: FMC Technologies Project: Tordis Separation Project Operator: Statoil Delivery: 2007 Weight: 1700 t Description: World’s first Subsea Separation System
1 off Foundation Base Structure 1 off Manifold Module 1 off Separation Module 2 off Desanding Modules 1 off Waterflow Module 3 off Multiphase Flow Modules 1 off Pipeline / Inline Module
Customer: FMC Technologies Project: Vincent Project, Australia Operator: Woodside Delivery: 2007 Weight: 250 t Description: 2 off Manifold Modules
2 off Templates Site Integration Testing and Load Out
Customer: FMC Technologies Project: Vigdis Extension II Project Operator: Statoil Delivery: 2007 Weight: 400 t Description: 1 off Integrated Template Structure
1 off Manifold Site Integration Testing and Load Out
Project References - Fabrication Page: 9 of 21
Job References
Customer: FMC Technologies Project: Ormen Lange Spools Operator: Hydro / Saipem Delivery: 2007 Weight: 100 t Description: Spools
Customer: APL Project: Puffin Loading Buoy Delivery: 2007 Weight: 110 t Description: Refurbishment of 1 off Loading Buoy
Customer: FMC Technologies Project: Oseberg Delta Project Operator: Norsk Hydro Delivery: 2006 Weight: 400 t Description: 1 off Integrated Template Structure
1 off Manifold Module 1 off Pig Loop Module 1 off Drill Cut Injection Module
Customer: FMC Technologies Project: Norne K Project Operator: Statoil Delivery: 2006 Weight: 50 t Description: 1 off Manifold Module
Customer: FMC Technologies Project: Åsgard Project Operator: Statoil Delivery: 2006 Weight: 50 t Description: 1 off Manifold Module
Customer: FMC Technologies Project: Heidrun Project Operator: Statoil Delivery: 2006 Weight: 240 t Description: 1 off Satellite Structure and Flowbas
Project References - Fabrication Page: 10 of 21
Job References
Customer: APL Project: Alvheim Loading Buoy Delivery: 2006 Weight: 520 t Description: 1 off Loading Buoy
Customer: APL Project: KMZ Loading Buoy Delivery: 2006 Weight: 500 t Description: 1 off Loading Buoy
Customer: Aker Kvaerner Subsea Project: Dalia Project I + II, Angola Operator: TotalFinaElf E&P Angola Delivery: 2005-2007 Description: Machining and welding of 72 flow loops
Customer: Sevan Marine Project: Hummingbird Flare Boom Contr. Value: 8 MNOK Delivery: 2006 Weight: 90 t Description: Flare boom (60 m long)
Customer: FMC Technologies Project: Ormen Lange Project Operator: Hydro Delivery: 2005 Total weight: 2600 t Description: 2 off manifolds each 450 tonnes
2 template systems each 700 tonnes 1 PLET bottom structure 300 tonnes System testing
Project References - Fabrication Page: 11 of 21
Job References
Customer: FMC Technologies Project: Skinfaks-Rimfaks, Norway Operator: Statoil Delivery: 2005-2006 Total weight: 500 t Description: 1 off manifold/template system (EPC)
1 off tie-in manifold/template system (EPC) 1 off Satellite/Flowbase system 2 off Protection Structures (EPC)
Customer: FMC Technologies Project: Enfield, Australia Operator: Woodside Delivery: 2005 Weight: 120 t Description: 3 off manifolds, E-FAT
Customer: FMC Technologies Project: Chinguetti, Mauritania, West Africa Operator: Woodside Delivery: 2004-2005 Weight: 400 t Description: 3 off template/manifold systems
1 off protection structure (EPC) System testing
Customer: Aker Kvaerner Subsea Project: Dalia Project, Angola Operator: TotalFinaElf E&P Angola Delivery: 2004-2005 Description: Machining and welding of 42 Guide Base
Connectors
Customer: FMC Technologies Project: Heidrun Nordflanken Satellite Operator: Statoil Delivery: 2005-2006 Weight: 200 t Description: 1 off Satellite Structure/Flowbase system
Project References - Fabrication Page: 12 of 21
Job References
Customer: FMC Technologies Project: Rosa project, Angola, West Africa Operator: Total Delivery: 2005 Weight: 200 t Description: 4 off manifolds
2 off Pig Loop Module Shallow water test
Customer: FMC Technologies Project: Bouri project Operator: Agip Delivery: 2005 Weight: 25 t Description: 1 off protection structure (EPC)
Customer: FMC Technologies Project: Norne project, Norway Operator: Statoil Delivery: 2005 Weight: 150 t Description: 3 off manifolds, system testing
Customer: FMC Technologies Project: Norne project, Norway Operator: Statoil Delivery: 2004 Weight: 1000 t Description: 3 off integrated template systems
Customer: FMC Technologies Project: Baobab, Côte d’Ivoire, Africa Operator: Canadian National Resources (CNR) Delivery: 2004 Weight: 320 t Description: 4 off Manifold Modules, System testing
5 off SDU/UTA
Project References - Fabrication Page: 13 of 21
Job References
Customer: FMC Technologies Project: Oseberg Vestflanken Operator: Norsk Hydro Delivery: 2004 Weight: 200 t Description: 1 off Manifold/Template System
Customer: FMC Technologies Project: Oseberg J, Norway Operator: Norsk Hydro Delivery: 2004 Weight: 200 t Description: 1 off manifold/template system, system testing
Customer: FMC Technologies Project: SVAN (Sleipner Vest Alpha Nord), Norway Operator: Statoil Delivery: 2003 Weight: 300 t Description: Integrated Template manifold
Customer: FMC Technologies Project: Vigdis Field Development, Norway Operator: Statoil Delivery: 2003 Weight: 300 t Description: 2 off Satellite Structures
Customer: FMC Technologies Project: Vigdis Field Development, Norway Operator: Statoil Delivery: 2003 Weight: 230 t each Description: Testing, SIT, Template Manifold Systems
Project References - Fabrication Page: 14 of 21
Job References
Customer: Esso Norge AS Project: Ringhorne Jurassic Separation Module (EPC) Contr. Value: 200 MNOK Delivery: 2003 Weight: 350 t Description: Separation module (15 x 5 x 15 m)
Customer: FMC Technologies Project: Megi/Zafiro, Equatorial Guinea Operator: ExxonMobil Delivery: 2003 Weight: 270 t Description: Testing Manifolds and Pig Loop Modules
6 systems
Customer: FMC Technologies Project: Host System Operator: Terra Nova Alliance/ Statoil Delivery: 1996-2003 Weight: 1400 t (40 t each) Description: 35 off Host Template Manifold Systems
Customer: FMC Technologies Project: Girassol/ Jasmim, Angola Operator: TotalFinaElf Delivery: 1999-2003 Description: 14 off Manifolds, final assembly
Customer: FMC Technologies Project: Girassol/ Jasmim, Angola Operator: TotalFinaElf Delivery: 1999-2003 Description: PGBs ready for delivery
40 off
Project References - Fabrication Page: 15 of 21
Job References
Customer: APL, Arendal Project: Panyu Field, China Delivery: 2003 Weight: 320 t Description: Loading Buoy
Customer: Statoil Project: Kvitebjørn Drilling Facilities (EPC) Contr. Value: 1000 MNOK Delivery: March 2003 (sail away date) Weight: Drilling righ incl. derrick: 2700 t
Mud module: 1300 t Description: Drilling rig and mud module.
Overall size drilling rig excl. derrick: 22.5 x 18 x 16.5 m (L x W x H). Overall size mud module: 39.5 x 11.5 x 19 m.
Customer: Minox Technology, Notodden Project: Heidrun Field, Norway Delivery: 2003 Weight: 45 t Description: Deoxygenation Package
Customer: APL, Arendal Project: Bohai SEA, China
CFD 11/BE 25 Delivery: 2003 Description: 2 SYS Yoke Systems
Project References - Fabrication Page: 16 of 21
Job References
Customer: BP Amoco Norge Project: Valhall Flank Development (EPCI) Contr. Value: 555 MNOK Delivery: July 2003 (sail away date) Weight: Topside: 2100 t
Jacket + piles: 4100 t Description: Wellhead platform to the north flank. Overall size
topside: 32 x 32 x 21.5 m (L x W x H).
Customer: BP Amoco Norge Project: Valhall Flank Development (EPCI) Contr. Value: 655 MNOK Delivery: Sept. 2002 (sail away date) Weight: Topside: 2100 t
Jacket + piles: 4100 t Description: Wellhead platform to the south flank. Overall size
topside: 32 x 32 x 21.5 m (L x W x H).
Customer: FMC Technologies Project: Fram Vest, Norway Operator: Norsk Hydro Delivery: 2002 Weight: 230 t each Description: 2 off Fixed Templates
Customer: Hydralift, Kristiansand Project: Santa Fe, Singapore Delivery: 2002-2003 Weight: 40 t each Description: BOP - Trolleys
Customer: Hydralift, Kristiansand Project: Santa Fe, Singapore Delivery: 2002-2003 Weight: 120 t each Description: BOP - Elevators
Project References - Fabrication Page: 17 of 21
Job References
Customer: Hydralift, Kristiansand Project: Santa Fe, Singapore Delivery: 2002-2003 Weight: 120 t each Description: BOP - Cranes
Customer: Esso Norge Project: Ringhorne Wellhead Platform (EPCI) Contr. Value: 3300 MNOK Load out date:
November 2001 (topside)
Delivery: August 2002 (sail away date) Weight: Topside incl. module: 12 500 t
Jacket + piles: 7000 t + 2500 t Drilling facilities: 5000 t
Description: Overall size: topside incl. module: 100 x 50 x 40 m (L x W xH)
Customer: APL, Arendal Project: Bayu-Undan Field, East Timor Delivery: 2002 Weight: 300 t Description: Turret and buoy assembly
Customer: FMC Technologies Project: Girassol/ Jasmim, Angola Operator: TotalFinaElf Delivery: 1999-2002 Description: 14 off CCF
Customer: FMC Technologies Project: Girassol/ Jasmim, Angola Operator: TotalFinaElf Delivery: 1999-2002 Weight: 350 t Description: 14 off Manifold Support Structures
Project References - Fabrication Page: 18 of 21
Job References
Customer: Minox Technology, Notodden Project: Valhall Field, Norway Delivery: 2001 Weight: 25 t Description: Deoxygenation Package
Customer: FMC Technologies Project: Otter Field, Ireland Operator: ExxonMobil Delivery: 2000 Description: Testing, template manifold system
Customer: Norsk Hydro Project: Heimdal 2000 Riser Platform (EPC) Contr. Value: 960 MNOK Date of order: September 1998 Delivery: April 2000 (sail away date) Weight: Topsides: 3000 t
Jacket: 5360 t Bridge: 500 t
Description: Overall size: Topsides: 30 x 30 x 18 m (L x W x H) Jacket: 40 x 40 x 144 m Bridge: 80 m
Customer: Statoil Project: Åsgard Operator: Statoil Delivery: 2000 Weight: 330 t Description: 11 off Riser Bases
Project References - Fabrication Page: 19 of 21
Job References
Customer: ABB Miljø AS Project: Åsgard Field, Norway Delivery: 1999 Weight: 45 t Description: Acid Gas Incinerator and Seawater Absorbers
Module
Customer: APL, Arendal Project: Åsgard Field Delivery: 1999 Weight: 300 t Description: Loading Buoy
Customer: Kværner Oil & Gas, Egersund
Project: Åsgard B Pipe Spools (C) Contr. Value: 12 MNOK Operator: Statoil Delivery: February 1999 (last shipment) Weight: 800 t Description: Pipe spools
Materials: 230, 6Mo, Duplex, Carbon Dimensions: 0.5” – 30”
Customer: Esso Norge
Project: Jotun Wellhead Platform (EPCIC) Contr. Value: 1800 MNOK Date of order: March 1997 Load out date:
August 1998 (Topside)
Delivery: October 1998 (sail away date) Weight: Topsides incl. modules: 8500 t
Jacket + piles: 6500 t + 3500 t Description: Overall size (L x W x H):
Topsides incl. modules: 58 x 42 x 30 m Jacket (subcontracted): 43 x 43 x 120 m
Customer: Amoco Norway Oil Company Project: Valhall WP Equipment Module (EPCI) Contr. Value: 70 MNOK Date of order: February 1997 Load out date:
May 1998
Weight: 600 t Description: Overall size: 20 x 14 x 9 m (L x W x H)
Project References - Fabrication Page: 20 of 21
Job References
Customer: Amoco Norway Oil Company Project: Valhall WP Equipment Module (EPCI) Contr. Value: 70 MNOK Date of order: February 1997 Load out date:
May 1998
Weight: 600 t Description: Overall size: 20 x 14 x 9 m (L x W x H)
Customer: BP Norge Project: Ula Wag Module (CI) Contr. Value: 48 MNOK Date of order: August 1996 Load out date:
April 1997
Weight: 380 t Description: Overall size: 16 x 6 x 14 m (L x W x H)
Customer: Amoco Norway Oil Company Project: Valhall WP Project (EPCIC) Contr. Value: 350 MNOK Date of order: June 1995 Load out date:
April 1996 (Topside + bridge)
Weight: Topside: 1200 t Bridge: 150 t Jacket: 2400 t (subcontracted to HHB)
Description: Topside, bridge and jacket Overall size (L x W x H): Topside: 31 x 34 x 12 m Bridge: 51 x 3.5 x 5 m Jacket: 23 x 23 x 95 m
Customer: Kongsberg Offshore AS
Project: Norne Templates and Manifold Systems (EPC) Operator: Statoil Contr. Value: 170 MNOK Date of order: July 1994 Load out date:
April 1996
Weight: 2050 t (5 units) Description: Overall size: 20 x 14 x 11 m (L x W x H)
Customer: Kongsberg Offshore (KOS) Project: Yme Beta Manifold Operator: Statoil Contr. Value: 660 000 NOK Date of order: October 1995 Load out date:
February 1996
Weight: 35 t Description: Overall size: 9.7 x 5.4 x 2.25 m (L x W x H)
Project References - Fabrication Page: 21 of 21
Job References
Customer: Aker Stord AS Project: Njord Floating Production Unit, Deck Sections
(C) Operator: Norsk Hydro Contr. Value: 38 MNOK Date of order: May 1995 Load out date:
December 1995 (last section)
Weight: 1300 t (7 units) Description: Overall size: max. 23 x 32 x 9 m (L x W x H)
Customer: Grootint B. V. (Aker/Kellogg J. V.) Project: Troll Land Kollsnes (C) Operator: Norske Shell Contr. Value: 56 MNOK Date of order: October 1993 Load out date:
February 1995 (last shipment)
Weight: Approx. 1500 t Description: Spool fabrication – Field area piping/3200
spools, various materials (2”-36”) Corrosion Protection – Aluminium spray metalizing 14 000 m2
Customer: Elf Petroleum Norge AS Project: Frøy Wellhead Platform Topside (EPC) Date of order: October 1992 Load out date:
July 1994
Weight: 2200 t Description: Overall size: 52.6 x 30 x 16.8 m (L x W x H)