![Page 1: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/1.jpg)
Connecticut DOT & Industry
Design-Build Workshop
PROJECT QUALITY ASSURANCE
August 26, 2013
Newington, CT
Presented by:
Gregory Doyle – FHWA
David Brown – Delcan
Christopher Angelotti – Conn DOT
![Page 2: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/2.jpg)
Module Overview
1) QA Terminology and Responsibilities(States and Industry not aware of current terms & roles)
2) D-B Procurement: QA Requirements in RFP(Requirements often Not Clear in RFP and Contract)
3) Design QA: QC vs. Acceptance(Recommended practices / Items to consider)
4) Construction QA: FHWA TechBrief (April 2012)(23 of 60 RFPs examined, could not determine Acceptance
responsibility – TRR 2081)
2
![Page 3: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/3.jpg)
Part 1
Quality Assurance Terminology
and Responsibilities
3
![Page 4: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/4.jpg)
Quality Assurance Definition
AASHTO R10 & TRB Circular E-C173
Quality Assurance – “(1) All those planned and
systematic actions necessary to provide confidence
that a product or facility will perform satisfactorily in
service; or (2) making sure the quality of a product is
what it should be …
The use of the term QA/QC or QC/QA is discouraged
and the term QA should be used”.
4
![Page 5: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/5.jpg)
Correct Use of the Term “Quality Assurance”
Per AASHTO, ANSI, ASQ, FHWA, NCHRP, TRB:
Acceptance(Agency’s responsibility)
Quality Control(Contractor’s responsibility)
5
QC/QA
![Page 6: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/6.jpg)
• Provide Quality Control (QC):
� Design Quality Control System
� Construction Quality Control System
• Complete Preliminary Design
• Prepare Final Design
• Issue Construction Documents (Plans & Specifications)
• Construct Project
6
Design-Builder’s Responsibility
![Page 7: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/7.jpg)
• Develop Concept/Preliminary Design (Pre-RFP)
• Establish Design criteria & Construction standards
(in RFP and Contract)
• Provide Project Oversight & Acceptance:
� Design Acceptance System
� Construction Acceptance System
� May augment staff with “Designated Agent” staff
(Consultant under contract to Agency – NOT under D-B)
7
Agency’s Responsibility
![Page 8: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/8.jpg)
Discussion - Questions
- QA Terminology
- Design-Builder Responsibility
- Agency Responsibility
8
![Page 9: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/9.jpg)
Part 2
D-B Procurement:
QA Requirements in
Request for Proposal (RFP)
9
![Page 10: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/10.jpg)
RFPQA Programs for Design-Build
Design
QA Program
[Best Practice]
Construction
QA Program
[23 CFR 637.207(b)]
Design Builder
Design
QC System
Agency
Design
Acceptance
System
Design Builder
Construction
QC System
Agency
Construction
Acceptance
System
10
![Page 11: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/11.jpg)
11
RFPExample Lead QC Personnel
Design-Builder
Quality Control Administrator
• Registered PE
• Minimum 10 Years Experience
• QA Training Certificate
(NETTCP 1-Day Course)
Design-Builder
Design QC Manager
• B.S. in Civil Engineering
• Min. 10 Years Experience
• QA Training Certificate
(NETTCP 1-Day Course)
Design-Builder
Construction QC Manager
• B.S. in Civil Engineering
• Construction QA Technologist
Certification (NETTCP 3-Day)
![Page 12: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/12.jpg)
RFPD-B Quality Management Plan (QMP)
• Recommended practice to require single
comprehensive Design-Builder QMP:
– Documents all QC requirements and procedures
(both Design QC & Construction QC)
– Removes potential “stove-piping”
between Design and Construction
• Should be reviewed and accepted
by the Agency prior to starting work
12
![Page 13: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/13.jpg)
• Agency may require QC Plans for complex design
activities or features (examples):
� Cable-Stay Bridge Design Elements
� Storm Water Siphon System
• Identify Design QC Plan format &
contents in RFP
• All QC Plans approved by D-B QC Administrator
and accepted by Agency
13
RFPDesign Quality Control Plans
![Page 14: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/14.jpg)
• Identify Major Work Items requiring QC Plans:
� Earthwork
� Bridge Substructure Elements
� Bridge Superstructure Elements
� Architectural Elements
� HMA/PCC Pavement
• Specify standard QC Plan format
• All QC Plans approved by D-B QC Administrator
and accepted by Agency14
RFPConstruction Quality Control Plans
![Page 15: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/15.jpg)
QC for D-B Pilot ProjectQC for D-B Pilot Project
The DB Entity develops a Comprehensive Quality Management Plan (QMP)
• The QMP contains the QC procedures for all design and construction activities and interactions
• The Department accepts the plan
• The DB Entity implements the plan as written
• The plan is expected to be revised if needed with the concurrence/acceptance of ConnDOT
The DB Entity develops a Comprehensive Quality Management Plan (QMP)
• The QMP contains the QC procedures for all design and construction activities and interactions
• The Department accepts the plan
• The DB Entity implements the plan as written
• The plan is expected to be revised if needed with the concurrence/acceptance of ConnDOT
15
![Page 16: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/16.jpg)
QC System ObjectivesQC System Objectives
• Ensure all elements of the project work meet or exceed the quality requirements set forth in the RFP and Contract
– Place the responsibility for achieving design and construction quality on the DB Entity
– Establish procedures for coordinating and ensuring consistency and quality of work
• Ensure all elements of the project work meet or exceed the quality requirements set forth in the RFP and Contract
– Place the responsibility for achieving design and construction quality on the DB Entity
– Establish procedures for coordinating and ensuring consistency and quality of work
16
![Page 17: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/17.jpg)
• Quality Control Administrator
– Responsible for overall management of the QC System
• Design Quality Control Manager
– Responsible for implementation of all Design QC procedures and activities
• Construction Quality Control Manager
– Responsible for implementation of all Construction QC
procedures and activities
• Quality Control Administrator
– Responsible for overall management of the QC System
• Design Quality Control Manager
– Responsible for implementation of all Design QC procedures and activities
• Construction Quality Control Manager
– Responsible for implementation of all Construction QC
procedures and activities
17
DB Entity QC PersonnelDB Entity QC Personnel
![Page 18: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/18.jpg)
ConnDOT ResponsibilitiesConnDOT Responsibilities
• Review and acceptance of the QMP
• Monitor and ensure compliance with the QMP
• Participate in revision of the QMP if necessary
• Perform Design and Construction Acceptance activities
• Review and acceptance of the QMP
• Monitor and ensure compliance with the QMP
• Participate in revision of the QMP if necessary
• Perform Design and Construction Acceptance activities
18
![Page 19: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/19.jpg)
Discussion - Questions
D-B Procurement - RFP:
- D-B Entity QC Requirements
- Agency Acceptance Criteria
19
![Page 20: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/20.jpg)
Part 3
Design Quality Assurance:
Design-Builder QC System &
Agency Acceptance System
20
![Page 21: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/21.jpg)
Informal QC (by Frontline Design Staff)
• QC “Self-Check” Activities
• Coordination Activities with Construction
Formal QC (by Design QC Staff)
• Inter-discipline Reviews
• Independent Structural Design Checks
• Design Package Review at Key Milestones
(e.g., 75%, 100%)
Design-Builder Design QC System
21
Design
QC Team
(Formal QC)
Design
Production
Team
(Frontline QC)
![Page 22: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/22.jpg)
Design QC Structure
22
Design-Builder
Quality Control Administrator
Design
QC Team
Structured QC
� Formal
Checks
(Milestones)
Construction
QC Team
Structured QC
� Inspection
& Testing
(Random)
Design
Production
Staff
Frontline QC
� Self-Checks
� Coordination
Design
Manager
Construction
Production
Staff
Frontline QC
� Self-
Inspection
Construction
Manager
![Page 23: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/23.jpg)
Quality Management Plan (QMP)
• Documents all QC requirements and procedures
(both Design QC & Construction QC)
• Recommended Sections:
1. Introduction
2. QC Organization & Roles
3. Document Management Procedures
4. Design QC Procedures
5. Construction QC Procedures
23
![Page 24: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/24.jpg)
In-Progress Acceptance Activity (by Agency & FHWA Staff)
• “Over-the-Shoulder” In-Progress Design Reviews / Audits
Formal Acceptance (by Agency & FHWA Staff)
• Structure Type/Size/Location
• Design Packages - Formal Milestone Review & Acceptance
(e.g., 75% Design, 100% Plans & Specs, Release for Const. Packages)
Agency Design Acceptance System
Agency
Design
Acceptance
Staff
FHWA
Review/Acceptance
24
Consultant
• Prelim. Design
• Tech. Assistance
![Page 25: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/25.jpg)
Agency
Project Manager
(District)
Design
Project
Engineer
(District)
Construction
Resident
Engineer
FHWA
Area Engineer
or
Major Project Engineer
25
Consultant
• Prelim. Design
• Tech. Assistance
Recommended Design Acceptance Staff
![Page 26: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/26.jpg)
Design Quality Process
�Quality Management Plan (QMP)
�Discipline Checklists
�Designer QC process – checker, back checker
�Inter-discipline review / Constructability review
�Independent structural design check
�Design QC Team (formal QC process)
�Independent design input verification
�Agency / 3rd party review
�Comment Resolution
26
![Page 27: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/27.jpg)
Design Quality Process
�Quality Management Plan (QMP)
�Interim review (40-60%)
�Final review (100%)
�Released For Construction (RFC)
�Notice of Design Change (NDC)
�Field Design Change (FDC)
�Request For Information (RFI)
�Request For Information – Owner (RFIO)
�As-built Record Plans
27
![Page 28: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/28.jpg)
ConnDOT Design Responsibilities
ConnDOT Design Responsibilities
• Monitor DB Entity QC activity
• Design Acceptance actions
• Monitor DB Entity QC activity
• Design Acceptance actions
28
![Page 29: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/29.jpg)
Discussion - Questions
Design Quality Assurance:
- Design-Builder QC System
- Agency Acceptance System
- Design Quality Issues
29
![Page 30: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/30.jpg)
Part 4
Construction Quality Assurance:
FHWA TechBrief (April 2012)
30
![Page 31: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/31.jpg)
� Quality Assurance (QA):
(NOT specific role of one entity)
� Design-Builder Quality Control (QC)
� Agency Acceptance
� Agency Independent Assurance (IA)
Construction QA TechBrief (April 2012)
31
![Page 32: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/32.jpg)
Personnel
Qualification/
Certification
Dispute
Resolution
Independent
Assurance
(IA)
Laboratory
Accreditation
and
Qualification
Contractor
Quality
Control
(QC)
Agency
Acceptance
Construction QA Program Core Elements
32
![Page 33: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/33.jpg)
Informal QC (by Frontline “Production” Staff)
• QC “Self-Inspection” Activities
Formal QC (by Construction QC Staff)
• QC of Project Produced Items
• QC of Fabricated Structural Items
• QC of Standard Manufactured Items
• Accredited/Qualified QC Laboratories
• Qualified/Certified QC Personnel
Design-Builder Construction QC System
33
Construction
QC Team
(Formal QC)
Construction
Production
Team
(Frontline QC)
![Page 34: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/34.jpg)
Construction QC Organization
34
Design-Builder
Quality Control Administrator
Design
QC Team
Structured QC
� Formal
Checks
(Milestones)
Construction
QC Team
Structured QC
� Inspection
& Testing
(Random)
Design
Production
Staff
Frontline QC
� Self-Checks
� Coordination
Design
Manager
Construction
Production
Staff
Frontline QC
� Self-
Inspection
Construction
Manager
![Page 35: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/35.jpg)
Quality Management Plan (QMP)
• Documents all QC requirements and procedures
(both Design QC & Construction QC)
• Recommended Sections:
1. Introduction
2. QC Organization & Roles
3. Document Management Procedures
4. Design QC Procedures
5. Construction QC Procedures
35
![Page 36: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/36.jpg)
• Project Produced Materials– QC Inspection Schedules (Attributes, Lot/Sublot Sizes)
– QC Testing Schedules (Quality Characteristics, Lot/Sublot Sizes)
– QC Documentation & Data Analysis
• Fabricated Structural Materials– Fabricator QSMs (Fabricator QC Inspection & Testing)
– Project Site QC (Inspection & Testing Schedules)
• Standard Manufactured Materials– Manufacturer QSMs - AASHTO R38 (QC Inspection & Testing)
– Project Site QC (Review of Manufacturer COCs)
– QC Inspection (at Delivery, during Storage & Installation)
36
QMP5.0 – Construction QC Procedures
![Page 37: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/37.jpg)
• Document project-specific Construction QC
requirements for Major Work Items:
� Earthwork
� HMA/PCC Pavement
� Drilled Shafts
� Bridge Superstructure
� Architectural Elements
37
Construction QC Plans
QMP5.0 – Construction QC Procedures
![Page 38: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/38.jpg)
Agency Construction Acceptance
• All acceptance activities must be carried out by the Agency or their “Designated Agent”
• Agency independently performs:� Acceptance Inspection
� Acceptance (Verification) Testing
• Agency personnel Monitor/Audit Design-Builder QC activities:� Verify compliance with Quality Mgmt. Plan and QC Plans
Agency
Construction
Acceptance
Staff
38
![Page 39: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/39.jpg)
Agency
Project Manager
(District)
Design
Project
Engineer
(District)
Construction
Resident
Engineer
FHWA
Area Engineer
or
Major Project Engineer
39
Consultant
• Prelim. Design
• Tech. Assistance
Example Agency Acceptance Staff
![Page 40: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/40.jpg)
• Attributes to be inspected which reflect quality
of finished product [637.207(a)(1)(i)(C)]
• Attributes for:
� D-B Quality Control
� Agency Acceptance
Inspection Attributes
40
![Page 41: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/41.jpg)
Inspection Attributes - Examples
Inspection ComponentQuality Control
Inspection Attributes
Acceptance
Inspection Attributes
Equipment
Mixer Drum Blade Condition N/A
Vibrator Frequency N/A
Finishing Machine Settings N/A
Environmental Conditions
Form Cleanliness N/A
Temperature of Air &
Contact SurfacesN/A
Materials
Aggregates & Cementitious Material
(Correct Type)
Aggregates & Cementitious Material
(Correct Type)
Admixtures (Correct Type & Dosage) Admixtures (Correct Type & Dosage)
Epoxy Reinforcement Bar
(Correct Type / Damage to Coating)
Epoxy Reinforcement Bar
(Correct Type / Damage to Coating)
Workmanship
Form Dimensions Form Dimensions
Reinforcement Bar Layout Reinforcement Bar Layout
Finished Dimensions Finished Dimensions
Surface Defects
(Honeycombing, Cracking)
Surface Defects
(Honeycombing, Cracking) 41
![Page 42: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/42.jpg)
• Two general approaches:
A. Use Agency Acceptance
(Verification) test data only for
the acceptance determination
B. Include Validated Contractor QC test data in the
acceptance determination
Testing Approaches for Acceptance
42
![Page 43: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/43.jpg)
• Design-Builder Quality Control
� Test each Sublot per Lot
• Agency Acceptance (Verification)
Approach A (Agency data only):
� Test each Sublot per Lot
Approach B (Agency data + Validated QC data):
� Test only some Sublots per Lot (e.g. 25% - 50%)
� For very large Projects/Lots, some Agencies
have used 10% - 20% frequency
Testing Frequency
43
![Page 44: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/44.jpg)
Independent Assurance
• Performed by Agency or Designated Agent personnel
who are not directly responsible for project Acceptance
sampling and testing or inspection
• Provides periodic independent
evaluation of QC and Acceptance
personnel and their equipment
• Not used to make a determination
of work quality or acceptability
44
![Page 45: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/45.jpg)
Example DB Project QA Organization
(Design QC Mgr)
Design
QC Team
Design
Quality
Control
(Const QC Mgr)
Construction
QC Team
Construction
Quality
Control
Agency
(Project Manager)
(Project Engineer)
Design
Acceptance
(Resident Engineer)
Construction
Acceptance
Agency
Independent
Assurance
Owner’s
Responsibility
Design-
Builder’s
Responsibility
Design-Builder
(Quality Control Administrator)
Design-Builder
(Project Manager)
45
Design
Production Team
Frontline QC
Construction
Production Team
Frontline QC
![Page 46: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/46.jpg)
Construction Quality
�D-B Quality Management Plan
�Pre-activity Work Plan
�Quality Task Force Meetings
�Mimic Safety Program success factors
�Sub-contractor Quality management
�Build pride in workmanship
�NOT
�“It’s good enough.”
�“We don’t have time for inspection or testing.”
46
![Page 47: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/47.jpg)
Material Sampling & Testing
�Purpose of Design-Builder QC sampling/testing
�Ensure production/placement is “in control”
�Consistency of on-site material
�Statistical analysis of test data – risk of failure
�Concrete strength – 7 day vs. 28 day results
�Qualified Product List – or Approved Equal
�Reduced Agency sampling & testing rate?
�(Typical 25-50% - Very large quantities may see 10-20%)
47
![Page 48: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/48.jpg)
Inspection of Workmanship
�Who should be inspecting work?
�Foreman – completing standard checklist
�QC Team Inspector – Daily Inspection Report
�Agency managed CEI – or Agency staff
�Quality Check Point – Pass or Fail
�How much ‘Inspection’ is needed?
�Collect DATA to build confidence
48
![Page 49: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/49.jpg)
Construction Quality Wrap-Up
�Partnering between Agency and Design-Builder is the
biggest boost to Quality
�Everyone has a role to play – understand your role and
don’t duplicate
49
![Page 50: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/50.jpg)
ConnDOT Construction Responsibilities
ConnDOT Construction Responsibilities
• Construction Acceptance actions
– Monitor DB Entity QC activity
– Inspection
– Testing
• Independent Assurance (IA)
– By ConnDOT Division of Material Testing
• Dispute Resolution system
• Construction Acceptance actions
– Monitor DB Entity QC activity
– Inspection
– Testing
• Independent Assurance (IA)
– By ConnDOT Division of Material Testing
• Dispute Resolution system
50
![Page 51: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/51.jpg)
Discussion - Questions
Construction Quality Assurance:
- Design-Builder QC System
- Agency Acceptance System
- Agency Independent Assurance
- Construction Quality Issues
51
![Page 52: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/52.jpg)
SummaryConnDOT Pilot Approach
SummaryConnDOT Pilot Approach
• Promote DB Entity QC Procedures
• Provide sufficient data to ensure quality
• Review success and failures to improve future projects
• Promote DB Entity QC Procedures
• Provide sufficient data to ensure quality
• Review success and failures to improve future projects
52
![Page 53: PROJECT QUALITY ASSURANCE - portal.ct.gov · Quality Assurance Definition AASHTO R10 & TRB Circular E-C173 Quality Assurance –“(1) Allthoseplanned and systematic actionsnecessaryto](https://reader030.vdocuments.site/reader030/viewer/2022040108/5f084abd7e708231d421496b/html5/thumbnails/53.jpg)
Thank YouThank You